planning & production

6

Upload: others

Post on 14-Jan-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PLANNING & PRODUCTION
Page 2: PLANNING & PRODUCTION

LEADERS IN CONFERENCE PLANNING & PRODUCTION

www.wplgroup.com/aci

ACI’s Nuclear Power Plant Life Management & Extension 2015 will address the key issues faced by the industry as-sociated with NPP’s life management and extension: age management programs and techniques, implementation of environmental standards, I & C systems and avoidance strategies for force shutdown.

Join us on 4 - 5 November 2015 in Paris, France to hear about R & D in component behaviour and integrity, best practices of applying safety principles and concepts in preparation for licence extension and discuss the challeng-es industry is facing keeping maintenance and operational cost down.

Topics for Discussion:

Contribution of nuclear energy to EU energy mix

Evaluation of nuclear power plant management and life extension

Environmental & safety standards

Public concerns for ageing nuclear power plants

Risk assessment for aging nuclear power plants

Ongoing challenges of NPPs maintenance

Financial & economic framework

Workforce development in nuclear industry

Challenges of licence extension

Nuclear power plant Long-Term Operations

Public Concerns for aging nuclear power plants

Commercial & Sponsorship Opportunities

With leading companies and organisations from the Nuclear

Energy Industry attending and speaking at our event, we

have the perfect vehicle to provide outstanding exposure to

a senior level audience.

There are various sponsorship packages available, including

sponsorship of a cocktail reception on the first evening of the

event and sponsorship of a networking lunch. For further

details, please contact:

Ray Mangon: +44 203 141 0610

[email protected]

Call For Papers

If you would like to be considered as a speaker at the event for a 30-45 minute presentation, please submit an abstract for consideration to:

Stergios Zacharakis: +44 203 141 0609

[email protected]

NUCLEAR POWER PLANT LIFE MANAGEMENT & EXTENSION 2015

Paris, France

4-5 November

2015

Who Will Attend?

Head of Operations

Technical Directors

Aging Management/Aging Specialists

Plant Life Extension Managers/Specialists

Plant Life Management Managers/Specialists

Technical Engineers

Asset Managers

Associations Representatives

Regulatory and Policy Officers

Solution Providers

Consultants

The Conference:

Registration is Simple:

If you would like to be to register for this event or wish to find out more information, please contact

Mado Lampropoulou +44 203 141 0607

[email protected]

Page 3: PLANNING & PRODUCTION

NUCLEAR POWER PLANT LIFE MANAGEMENT & EXTENSION 2015

Paris, France

4-5 November

2015

LEADERS IN CONFERENCE PLANNING & PRODUCTION

www.wplgroup.com/aci

Wednesday 4th November 2015

08:00

09:00

09:15

▪ Recognis ing the importance of nuclear to

the European energy mix

▪ Overview of programs in place to promote

role of nuclear energy across EU

▪ Highl ights of the European Energy Agenda

09:45 Q&A

10:00

10:30 Q&A

10:45

11:15

▪ UK electrici ty generation companies are

faced with low power prices and need to

maximise generation to mainta in

profi tabi l i ty

▪ Outage Optimisation and improvements in

Equipment Rel iabi l i ty are key bus iness

drivers

▪ Through the use of some case studies ,

efficiencies and benefi ts made to the

operator’s plant management wi l l be

shown

▪ The technologies described can be appl ied

to any plant and wi l l provide operationa l

benefi t

DAY 1

MORNING REFRESHMENTS

CONFERENCE PRESENTATION

The Impact of Technology Innovations on

Outage Optimisation in UK Nuclear Plant

REGISTRATION & COFFEE

CHAIRMAN'S OPENING REMARKS

CONFERENCE PRESENTATION

Contribution of Nuclear Energy to EU Energy

Mix

NEA activities on safety and regulation

KEYNOTE ADDRESS

Tomasz JackowskiActing Division Head

National Center For Nuclear Research (NCBJ)

Keith Parker

Chief Executive of Nuclear Industry

Association & Pres ident FORATOM

Kazuo Shimomura Acting Deputy Director-General and

Chief Nuclear OfficerOECD Nuclear Energy Agency (NEA)

11:45 Q&A

12:00

▪ Chal langes due to new regulatory

requirements

▪ Eva luation of the pros and cons di fferent

battery technologies

▪ Review of traditiona l and modern energy

s torage options

▪ Case s tudy, how to meet new increased

power demands

12:30 Q&A

12:45

14:00

▪ Overa l l cost of NPP and cost of NPP

accidents

▪ Need of "independence" in safet

eva luation

▪ Introducing "extended" safety margins

▪ Restoring the trust towards nuclear energy

14:30 Q&A

▪ Overview of age management programs and

techniques appl icable to aged nuclear

▪ I&C: Cable aging management and

condition monitoring

▪ Competi tiveness of di fferent technology

reactors▪ Exploring key cha l lenges associated with

degradation of aged reactors

CONFERENCE SESSION

NETWORKING LUNCH

A "new" vision for nuclear reactor safety

Risk Assessment for Aging Nuclear Power

Plants

CONFERENCE PRESENTATION

CONFERENCE PRESENTATION

Battery solutions for nuclear power plants,

present and future solutions

Francesco D'AuriaProfessorUniversity Of Pisa, DESTEC-GRNSPG

Mark CoughlinReserve Power Applications Specialist EMEAEnerSys

Bert HoltDirector: Nuclear Li fetime ProgrammesDoosan Babcock

Page 4: PLANNING & PRODUCTION

NUCLEAR POWER PLANT LIFE MANAGEMENT & EXTENSION 2015

Paris, France

4-5 November

2015

LEADERS IN CONFERENCE PLANNING & PRODUCTION

www.wplgroup.com/aci

14:45

15:15

15:45 Panel Q&A

16:00

▪ Benefi ts of operator and suppl ier

col laboration to mainta in safe NPP

▪ Extended l i fe and solutions for LTO

▪ IT-Systems for support of operationa l

management and process optimisation

▪ I&C sys tems innovations for NPP Long-Term

Operations16:30 Presentation title TBA

17:00Evaluation of Nuclear Power Plant

Management and Life Extension▪ Overview of the i s sues surrounding power

plant l i fe management (PLIM) & extens ion

▪ Summary of PLIM approaches and key

drivers for PLEX

▪ Current s tatus of power plant PLIM & PLEX

activi ties in Europe

▪ Examples of some UK speci fic activi ties to

support PLIM and PLEX in the UK nuclear

17:30 Panel Q&A

17:45

DAY 2Thursday 5th November 2015

08:30

09:00

AFTERNOON REFRESHMENTS

Nuclear Power Plant Long Term Operations

Emergency Power system: Stations

refurbishment in NPP PLEX Program

CONFERENCE SESSION

Overview of age management programs and

techniques applicable to aged nuclear

CLOSE OF DAY ONE

CHAIRMAN'S OPENING REMARKS

REGISTRATION & COFFEE

Abderrahim Al MazouziProject manager EDF R&DMember of the NUGENIA Executive Committee

David HughesOperations DirectorAMEC Foster Wheeler

Randall K. LewisGeneral Manager – Nuclear Services Rolls-Royce Nuclear

Fabrizio Bianco Electrical & Automation Engineering Unit HeadAnsaldo Nucleare

Pál KovacsAdvisor to CEO, State Secretary for Energy Affa irs of the 2nd Orban GovernmentMVM Paks Nuclear Power Plant Ltd.

▪ Strategies to keeping maintenance and

operationa l cost down

▪ Financia l benefi ts of plant’s l i fe extens ion

vs new bui ld

▪ Maximis ing the return on investment

through pro-active planning

09:15 Overcoming legal and financing obstacles in

life extension▪ The di fferent approaches to l icens ing l i fe

extens ions▪ Creating a financeable package

▪ Impl ications for decommiss ioning funding

arrangements

09:45 French Nuclear Reactors Reaching 40 Years:

Safety and Economic Challenges▪ Safety requirements and decis ion process

▪ Cost uncerta inties and economic cha l lenge

10:15 Panel Q&A

10:30

11:00

▪ Discuss key prerequis i tes in l i cence

extens ion appl ication

▪ Time sca le for l i cence extens ion

▪ Applying safety principles and concepts in

preparation for l i cence extens ion

▪ Best practises for l i fe extens ion l icence

appl ications

11:45 Q&A and Panel Discussion

MORNING REFRESHMENTS

PANEL DISCUSSION

Challenges of Licence Extension

CONFERENCE SESSION

Financial & Economic Framework

Francesco D'Auria

ProfessorUniversity Of Pisa, DESTEC-GRNSPG

Mark Newbery

PartnerHerbert Smith Freehills (HSF)

Yves MarignacDirector

WISE-Paris

Aurel ian Vasile BucurSNN/CNE Operating Engineer –

Investment Program Dpt

Societatea Nationala Nuclearelectrica (SNN)

Adrian Rizea

Director

CITON

Page 5: PLANNING & PRODUCTION

NUCLEAR POWER PLANT LIFE MANAGEMENT & EXTENSION 2015

Paris, France

4-5 November

2015

LEADERS IN CONFERENCE PLANNING & PRODUCTION

www.wplgroup.com/aci

In-Depth & Informative Formal Presentations

Knowledge Sharing During Informal Panel Discussions

Sponsorship and Exhibition: For commercial opportunities please

contact:

Ray Mangon +44 (0) 20 3141 0610

[email protected]

12:30

▪ Are current maintenance practices efficient

enough?

▪ Maintenance and modernisation

chal lenges of I&C systems

▪ R & D in component behaviour and integri ty

▪ Preventative maintenance case s tudies

13:45 Ongoing Challenges of NPPs Maintenance

14:15

14:45 Panel Q&A

15:00

15:10

CHAIRMAN'S CLOSING REMARKS

Ongoing Challenges of NPPs Maintenance

Are Current Maintenance Practices Efficient

Enough?

END OF THE CONFERENCE & AFTERNOON

REFRESHMENTS

NETWORKING LUNCH

CONFERENCE SESSION

Abdul AkbarSenior Advisor/Chief EngineerChina Zhongyuan Engineering Corporation/CNNC

Cel ine Wolf

General Manager –Nuclear Services France

Rolls-Royce

Page 6: PLANNING & PRODUCTION

NUCLEAR POWER PLANT LIFE MANAGEMENT & EXTENSION 2015

Paris, France

4-5 November

2015

LEADERS IN CONFERENCE PLANNING & PRODUCTION

www.wplgroup.com/aci

If you would like to register for this event or wish to find out more information,

please contact Mado Lampropoulou using any of the following methods:

+44 (0)20 3141 0607

[email protected]

http://www.acieu.net

Postal Address: ACI Europe, 5/13 Great Suffolk Street, London, SE1 0NS

Registration Is Simple

Registration Is Simple

£1,495.00

(ex. VAT)

Documentation Packet Only £420.00

Conference (Includes Documentation Packet) 4 -5 Nov ember 2015

Please Note. Members and customers of all supporting organizations are entitled to a dis-count off their conference package. For more information please call Mado on +44 (0) 203 141 0607

Documentation Packet Available

We are selling the Nuclear Power Plant Life Management & Extension 2015 papers at just £395 (+£25 P&P). Simply tick the box on the booking form, send it with payment and your copy will be on its way to you after the meeting. This important manual will be a source of invaluable reference for the future.

Terms & Conditions

Payment Payment must be received within five business days of returning the signed contract. After receiving payment a VAT receipt will be issued. If you do not receive a letter outlining details two weeks prior to the event, please contact the Conference Coordinator at ACI Europe Ltd.

Discounts are available for multiple/group bookings. Please call +44 (0)20 3141 0607 for more information.

Cancellations Substitutions are welcome up to 24 hours prior to the event. Cancellations must be received in writing no less than 3 weeks prior to the start of the conference; a full credit voucher towards a future ACI conference will be issued. Any cancellation received less than 3 weeks prior to the start of the event shall be deemed to be a breach of this contract by client, and accordingly, no credits will be given. Cancellations must be received in writing by mail or fax three weeks before the conference. Thereafter the full conference fee is payable. If for any reason ACI Europe Ltd decides to amend, cancel or postpone this conference, the conference fee will not be refunded. Furthermore, ACI Europe Ltd will not be responsible for covering airfare, hotel or other costs incurred by registrants. In the event that ACI Europe Ltd cancel or postpone the event, ACI Europe Ltd reserves the right to transfer this booking to another conference to be held in the following twelve months, or to provide a credit of an equivalent amount to another conference within the following twelve months. The construction, validity and performance of this agreement shall be governed in all respects by the laws of England to the exclusive jurisdiction of whose courts the Parties hereby agree to submit. Accommodation The cost of accommodation is not included in the event fee. Preferential rates will be arranged with or near the event venue, and all confirmed delegates will be given details of how to book accommodation at this rate in due course.

About ACI

ACI, a UK owned company, have been running successful conferences for the last 15 years in the USA. Headquartered in Chicago with offices all around the States,

they run forums in varied fields and are market leaders in healthcare business conferences. Opening their European head offic e at the end of 2005, they have ex-

panded rapidly and are launching a series of events covering the maritime, energy, oil and gas industries.

Supporting Partners Nugenia, NiA and Foratom members are entitled to a special

discount on registration, simply quote ENL1D10 to claim.

For further information or to register your attendance please

contact Mado Lampropoulou.