![Page 1: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/1.jpg)
Horsley Witten Group, Inc.
Planning and Developing Achievable Stormwater Water Quality Goals in
New Hampshire
NEWEA Annual MeetingJanuary 23, 2017
Renee L. Bourdeau, PEHorsley Witten Group, Inc.
![Page 2: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/2.jpg)
Horsley Witten Group, Inc.
Presentation Outline
• Regulatory Background
• Community Case Studies
• Conclusions
2
![Page 3: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/3.jpg)
Horsley Witten Group, Inc.
Great Bay
Background: Great Bay Watershed
• Home to 25% of NH’s population
• Intersects 39 NH and 9 ME communities (48 total)
• Previous studies have found:– Dissolved inorganic nitrogen up
42% over the last 5 years (PREP).– Eelgrass biomass in the estuary
declined by 64% between 1990 and 2008
– Adult oyster populations have decreased from 125,000 (1997) to 10,044 (2009).3
![Page 4: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/4.jpg)
Horsley Witten Group, Inc.
Background: Great Bay Watershed
• 2009 – NHDES established numericnutrient criterion for nitrogen in tidalwaters of Great Bay to protecteelgrass and dissolved oxygen
• 2009 - NHDES lists Great Bay and 11 ofthe 18 sub-estuaries as impaired fornitrogen
• 2010 - NHDES established existingloads and load reductions to meetwater quality criterion
• 2014 - NHDES estimates non-pointsource load from all watersheds andtowns within the Great Bay Watershed.
• 2014 – As result of a court approvedsettlement and peer review findings,NHDES will cease to use numericnutrient thresholds4
![Page 5: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/5.jpg)
Horsley Witten Group, Inc.
Background: 2017 Final NH MS4 Permit • Discharges to Waters
Impaired by Nitrogen– Public Education & Outreach
– Amend/adopt regulations to include BMPs optimized for nitrogen removal
– Management of municipal land
– Nitrogen Source Identification Report
– Potential Structural BMPs
5
![Page 6: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/6.jpg)
Horsley Witten Group, Inc.
Background: WWTF Permits & AOC• Require tracking of all sources
which contribute nitrogen to the Great Bay
• Development of a Nitrogen Control Plan– 5-year schedule– Identify specific measures to be
installed to reduce non-point and point source stormwater
6
![Page 7: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/7.jpg)
Horsley Witten Group, Inc.
Background: NH State Water Quality Standard
“Class B waters shall contain no nitrogen in such concentrations that would impair any existing or designated uses, unless
naturally occurring.”
7
![Page 8: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/8.jpg)
Horsley Witten Group, Inc.
Case Studies
8
![Page 9: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/9.jpg)
Horsley Witten Group, Inc.
Case Study 1: Exeter- Squamscott River
9
![Page 10: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/10.jpg)
Horsley Witten Group, Inc.
• Freshwater & Tidal Tributary
• Portions of 19 Towns– 11 Regulated MS4s– 8 with MS4 waivers
Case Study 1: Exeter-Squamscott River
10
![Page 11: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/11.jpg)
Horsley Witten Group, Inc.
• Town of Exeter – WWTF AOC– MS4 Community– Contributes
greatest stormwater load in watershed (21%)
Case Study 1: Exeter- Squamscott River
11
![Page 12: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/12.jpg)
Horsley Witten Group, Inc.
Case Study 1: Exeter- Squamscott River
12
![Page 13: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/13.jpg)
Horsley Witten Group, Inc.
Case Study 1: Exeter- Squamscott River
13
![Page 14: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/14.jpg)
Horsley Witten Group, Inc.
Case Study 1: Exeter- Squamscott River
14
![Page 15: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/15.jpg)
Horsley Witten Group, Inc.
Case Study 1: Exeter- Squamscott River
15
![Page 16: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/16.jpg)
Horsley Witten Group, Inc.
• Challenges to Exeter– Investing significant $ to reduce nitrogen
loads at wastewater plant– NPS contributions in watershed will affect
their future investments in wastewater– Future development load reductions are
critical– Financial resources– Political buy-in– Septic System Regulations
Case Study 1: Exeter- Squamscott River
16
![Page 17: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/17.jpg)
Horsley Witten Group, Inc.
*Developed load includes stormwater, groundwater and septic systems
Case Study 2: Current Loads
Numeric Nutrient Criteria
17
![Page 18: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/18.jpg)
Horsley Witten Group, Inc.
*Developed load includes stormwater, groundwater and septic systems
Numeric Nutrient Criteria
Case Study 2: Future Loads
18
![Page 19: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/19.jpg)
Horsley Witten Group, Inc.
Case Study 2: Example: Potential impacts of Zoning Changes
Future (2040) Stormwater Annual Nitrogen Load by Min. Lot Size19
![Page 20: Planning and Developing Achievable Stormwater Water ...€¦ · Planning and Developing Achievable Stormwater Water Quality Goals in ... January 23, 2017. Renee L. Bourdeau, PE. Horsley](https://reader031.vdocuments.net/reader031/viewer/2022011900/5f0426527e708231d40c8e8b/html5/thumbnails/20.jpg)
Horsley Witten Group, Inc.
Conclusions
• Need to understand the complete picture
• Put local regulations in place to reduce future impacts
• Incorporate reduction strategies on EVERY project
• EDUCATE
20