Planning and Management Tools
C h r i s t o p h e r S a l d a n a , P h . D.W o o d r u f f S c h o o l o f M e c h a n i c a l E n g i n e e r i n gG e o r g i a I n s t i t u t e o f T e c h n o l o g yA t l a n t a , G e o r g i a U S A
2
Understand the role of management and planning tools to:• Plan more formally• Organize information• Deal with qualitative information• Show relations between items and issues
Utilize techniques and tools for project managementIdentify critical project tasksCreating project timelinesAssigning responsibilities to work as a team
Learning Objectives
3
Techniques and tools for project management• Planning tree diagram (determine tasks)
• Responsibility matrix (assign tasks)
• Gantt chart (schedule tasks, determine critical path, monitor resource load)
• Prioritization matrix (prioritize tasks)
• Interrelationship diagram (determine causal relationship between inter-related items)
• Affinity diagram (determine needs – customer)
• Matrix diagram (quantitative relationship between items)
• PDPC chart (failure modes and contingency)
Project management tools
4
• Management goal = CQI
• The 8 MP tools are part of the “plan” segment of CQI.
• Tools encourage the participation and input from more people.
• Tools organize the non-quantitative information from “a chaotic situation [into] an implementable action plan” (p. 7, MJP).
Continuous Quality Improvement (CQI)
Deming Cycle
Charles Deming
Walter Shewhart
5
Continuous Quality Improvement (CQI)PDCA cycle
Johannes Vietze, 2013.
Christoph Roser, 2016.
Continuous improvement
Iterative problem solving
6
8 Management & Planning Tools
Affinity Diagram (2) Interrelationship Digraph (3) Tree Diagram (4)
Prioritization Matrices (5)
a b c d
Matrix Diagram (6)
123456
a b c d e f g h
Process Decision Program Chart (7)
x x o
Activity Network Diagram (8)
Gantt Chart (1)
7
Relationship of 8 MP Tools to QFD
(1)Affinity
Diagram
(3)Tree
DiagramRequirements
Flow
(4)Prioritization
Matrices
(2)Interrelationships
Digraph
(5)PDPC
(Unknown)
(7)Activity
NetworkDiagram(Known)
QFDDevelopment
Matrices
(How)Product
Characteristics
(5)Matrix
DiagramRelationships
How Much
ImportanceTarget Values
Importance Ratings
Interrelationships
Characteristics
Requirements
(What)Customer
Requirements
Com
petit
ive
Asse
ssm
ent
Prio
ritiza
tion
8
Purpose: communicate project scheduling and track project progressFirst: schedule critical tasks and deliverables/milestonesThen: work backward to schedule sequential, parallel, and coupled tasksUpdate: to evaluate progress and feasibility of deadlines/goals
Gantt Charts
Timeline of Required Tasks: Design an Aerial Lift
10
Purpose:• Creative process (generate
ideas)• Gathers language data
Start with:• What is issue under discussion?
Then:• Brainstorm ideas, gather ideas
under affinity headings
Affinity Diagram
Improved Training
Error Prevention
Problem Solving
Improved Hardware
Optical Scanning System
On-Line System at Customer
Site
Voice Activated System
Automated Entry
Clear Paperwork
Standardize completion Format
Increase Size to Increase Legibility
Train Clerical Sales and Customer Service
Personnel
Shorten 11-Digit Product Code
Color Code Forms by Product Group
Forms Contain Only Non-Standard Customer
information
Friendly Software
Inlet
Menu Driven
Outlet
Display Only Non-Standard Info. On Screen
Improve Prompts
Reducing data entry complexity
11
Purpose:• To show causality between items• To identify drivers and bottlenecks• Can be used to fill in roof of HOQ
First:• Place items to be discussed
Then:• Draw arrows between items• From to indicates causality
Arrows• Most out arrows primary: driver• Most in arrows secondary: bottleneck
Interrelationship Digraph
Lack of Knowledge of Job by Subcontractor
Interviewer
Wrong Person Sent
Lack of Good People
Lack of Formal Record of What
Final Job isRepeat Service
Calls Lack of Clear Job Expectations by Subcontractor
Unreasonable Customer
Poor Matching of People
Lack of Trades Experience in Management
Wrong Tools
Lack of Info. on Job
Lack of Knowledge of Matching People to Job
Requirements
Unclear Customer Expectations
Advertising Promises
Issues involved in repeated service calls
12
Purpose: Paths and tasks to accomplish primary goal and its related sub-goalsFirst: List main “what” (goal)Then: List “hows” (means), these become goals (“whats”) for next level, continue until you get to assignable tasks
Planning Tree Diagram
Reducing data entry complexity
13
Purpose: to prioritize items by:
• Prioritization against themselves
• Prioritization against criteria
Allows you to focus resources on important tasks
Prioritization Matrix A B C D E %A ΣR1/ΣCB ΣR2/ΣCC ΣR3/ΣCD ΣR4/ΣCE ΣR5/ΣC
ΣC1 ΣC2 ΣC3 ΣC4 ΣC5 ΣC
Total(+) = 5; (-) = 0.2
Taste Smell Safe Color Temp %Taste X - + + + ΣR1/ΣC 0.2923 29.23Smell + X + + + ΣR2/ΣC 0.3846 38.46Safe - - X + - ΣR3/ΣC 0.1077 10.77Color - - - X - ΣR4/ΣC 0.0154 1.54Temp - - + + X ΣR5/ΣC 0.2000 20.00
ΣC1 ΣC2 ΣC3 ΣC4 ΣC5 ΣC
5.6 0.8 15.2 20 10.4 52Total 100.0
Coffee example
14
Purpose: List tasks and action items, clarifies roles and shows points of contact
First: List tasks and team members
Then: Assign primary, secondary, and need to know to provide manageable load distribution, Update and re-assign as necessary
Job Responsibility Matrix
● = Primary ResponsibilityO = Secondary Responsibility∆ = Needs To Know
Task Team Member 1
Team Member 2
Team Member 3
1
2
3
4
5
6
15
Pre-meeting communication• Timely response (email, phone)• Documentation
Have an agenda for meetingDon’t spend too much time on one item
• Table and return• Do more research
Don’t spend too little time on an item• Ask how else can this be done?
Action items: be honest, accountable
Tips for Team Meetings
16
1. Teamwork.com
• Paid subscription through Georgia Tech, see ME2110 website for details
• Ability to create tasks, edit a project Gantt chart, assign tasks, etc.
• Accessible by iOS/Android/browser
2. Trello – web-based project management
3. Slack – web-based chat and project collaboration
4. Github – code repository w/version control (paid subscription through GT)
5. e-Collaboration: Dropbox (paid subscription through GT)
6. Other: OneDrive, Google Drive, etc.
Useful tools
17