Planning and Preparing for the 2017 Solar Eclipse
![Page 2: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/2.jpg)
Contents
• Launch Location
• Common Core Hardware
• Common Core Modifications
• Additional Payloads
• Testing
• Post-launch Operations
![Page 3: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/3.jpg)
Launch Location
• Clarksville, TN
• Austin Peay University
• Expecting W/NW upper atmosphere flow
– August 2016 Jetstream was north of Kentucky
– Fort Campbell is a possible obstacle
• Peak Totality @ 1:25 PM CT
![Page 6: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/6.jpg)
Common Core Hardware
• Cut-down
• Live Video
• Iridium/Photo-On-Demand Tandem
![Page 7: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/7.jpg)
Tracker • Iridium Satellite
Module
• OCCAMS Board
– Zigbee
![Page 8: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/8.jpg)
Cutdown
• 30 rpm high torque motor
• OCCAMS board
– Zigbee
![Page 9: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/9.jpg)
Live Video • HD Video Stream
to GS and to online server
• Raspberry pi 2
![Page 10: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/10.jpg)
Photo on Demand • Still Images Every
Minute
• Can be retrieved by GS on command
• Dimensions can be edited from GS
• RDF900
![Page 11: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/11.jpg)
Ground Station • 3 Antenna
– Patch
– Yagi
– Dish
• Tracking is via Internet
• Automatic servo actuation
![Page 12: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/12.jpg)
Modifications
• Use new regulator but continue using current fill rig
• Replace Yagi with a more directional version
• Modify Ground station to track via APRS packets
• Redesign Payload packages – Thermal insulation
– Waterproofing
![Page 13: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/13.jpg)
Current Payload Package
![Page 14: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/14.jpg)
Additional Payloads
• Camera Pointing Payload
• Spot Trace
• APRS Beacon: 144.390 K4UAH-12
• Geiger Counter Payload
![Page 15: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/15.jpg)
Pointing Payload
• Stabilized GoPro Mount
– Azimuth Control
• Designed for video at altitude
![Page 16: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/16.jpg)
Geiger Counter Payload • Small form factor kit
• Powered by 9V
• Can share a Payload Package
http://www.imagesco.com
![Page 17: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/17.jpg)
Testing
• Individual system to GS ground test
• Short-Rage full-system ground test
• Long-Range full-system ground test
• Full system flight test in Huntsville
• 2nd full system test w/ an outreach event
![Page 18: Planning and Preparing for the 2017 Solar Eclipse · 2017 Solar Eclipse . Contents •Launch Location •Common Core Hardware •Common Core Modifications •Additional Payloads •Testing](https://reader033.vdocuments.net/reader033/viewer/2022050122/5f526809a03c59330e23708f/html5/thumbnails/18.jpg)
Post-Launch operations
• Team will begin packing equipment for recovery
– GS team will monitor the balloon
• Depart on recovery after Eclipse Passes
• Recover payload chain
• Return to Austin Peay
• Return to Huntsville