PLANNINGAND REPORTINGGUIDELINES
Planning and Reporting Guidelines Palang Merah Indonesia
i
Planning is a responsibility or an obligation, not an option. Therefore, a planning process needs to be well prepared. One of the strategies is by providing the needed guidelines and tools. PMI at various levels throughout Indonesia has diverse capacity, both organizational and human resources capacity. Therefore, a reference that can facilitate PMI personnel in carrying out the planning process properly is needed.
Reporting is the evidence that we are accountable and trustworthy in relation to what we had planned and worked on. A quality report, which contains the information required in a complete and timely fashion, and presented in a form that is easy or interesting to read, is an indicator of the level of professionalism had by PMI personnel. A systematic, interesting, and informative report will be useful to inform various decisions to be taken when managing a program or an organization.
The Planning and Reporting Guideline was developed by PMI NHQ in order to build the capacity, skill, and practice in performing standard planning and reporting in PMI at all levels. Therefore, the board members of PMI NHQ encourage PMI at all levels to adopt the planning and reporting process and mechanisms in accordance with the technical instruction set forth in this guideline.
The Planning and Reporting Guideline was developed based on inputs from various PMI personnel, ranging from PMI NHQ, Chapters, and Branches. Therefore, we would like to express our highest appreciation for all inputs provided in improving this guideline.
The use of this guideline at various levels will ensure that all of the efforts undertaken by PMI nationwide will contribute to the manifestation of PMI’s vision, i.e. PMI demonstrates strong character, is professional, self-sustaining, and respected by the communities.
Jakarta, April 2015Secretary General
Ritola Tasmaya
Introduction
Planning and Reporting Guidelines Palang Merah Indonesia
ii
The Guideline consists of five important parts, i.e.:
1. Introduction, which describes the development process of Strategic Plan (SP) and Operational Plan (OP), the purpose and benefits, as well as the scope of planning in PMI at all levels.
2. PMI Planning Documents 2014-2019, consisting of Flowcharts of the Strategic Plan and Operational Plan along with the background and rationale, Strategic Plan and Operational Plan Matrices, Indicator Registry, and List of Activities to achieve outputs.
3. Planning Mechanism, the principles of planning, planning process, planning or annual meeting schedule.
4. Work Plan Development Process, consisting of planning formats for all levels along with the filling instructions.
5. Reporting, consisting of the purposes and benefits, reporting content and schedule, as well as formats of monthly, quarterly, semester, and annual report.
The guideline has been structured in a way that PMI at various levels can easily practice its contents in the annual work plan development process. Therefore, you need to understand the five parts above well.
Particularly for the second part, i.e. PMI planning documents 2014-2019, you need to examine each statement of strategic objective, outcome, output, as well as indicator and target. By doing so, you will understand the objectives PMI would like to pursue in the next five years and thus reflect them into local PMI’s annual work plan .
Whenever possible, follow the developed process and principles and use the formats provided carefully.
If you have any input to enhance this guideline in the future, you may contact the Planning Bureau and the Organizational Development Division of PMI National Headquarters.
We hope you enjoy learning and using this guideline.
Jakarta, March 2015
Guideline Development Tim
Instruction on How to Use The Guideline
Planning and Reporting Guidelines Palang Merah Indonesia
iii
Introduction iInstruction on How to Use The Guideline ii Table of Content iii
I. Introduction
1.1. Background 11.2. Strategic Plan 11.3. Operational Plan 21.4. Legal Foundation 41.5. General Definition 41.6. Purpose and Benefit 51.7. Scope of Planning 6
II. PMI Planning Documents 2014-2019
2.1. Flowchart of PMI Strategic Plan and Operational Plan 2014-2019 82.2. Summary on number of Indicator 282.3. Matrix of PMI Strategic Plan 2014-2019 302.4. Matrix of PMI Operational Plan 2015-2019 312.5. Indicator Registry for PMI Strategic Plan and Operational Plan 502.6. List of References for PMI Operational and Service Activities 79
III. Planning Implementation
3.1. Principles of Planning Implementation 1013.2. Inter-Level Planning (read from the bottom up) 1023.3. Planning Implementation Process 1023.4. Planning and Annual Meeting Implementation Schedule 1043.5. Adjustment of Provincial Strategic Plan 106
Table of ContentInstruction on How to Use The Guideline
Planning and Reporting Guidelines Palang Merah Indonesia
iv
IV. Planning Process
4.1. Planning Process in PMI Sub-district 1074.2. Work Plan or Activity Plan Format for PMI Sub-district 1084.3. Planning Process in PMI Branch 1094.4. Annual Work Plan Format for PMI Branch 1104.5. Description on Filling Planning Matrices for PMI Branch 1124.6. Planning Process in PMI Chapter 1164.7. Annual Work Plan Format for PMI Chapter 1184.8. Description on Filling Planning Matrices for PMI Chapter 1204.9. Planning Process in PMI NHQ 1244.10. Annual Work Plan Format for PMI NHQ 1264.11. Description on Filling Planning Matrices for PMI NHQ 128
V. Reporting
5.1. Background 1315.2. Benefits of Report 1315.3. Characteristics of Quality Report 1335.4. Tips for Developing a Useful Report 1335.5. Purpose of Reporting Guideline 1345.6. Types of Report 1355.7. Indicator Tracking Table (ITT) 1365.8. PMI Reporting Formats for all levels 138
A. Activity Report 138 B. Monthly Report 139 C. Quarterly Report 141 D. Semester Report 144 E. Annual Report 149
VI. Annexes
Annex 1. Sample of PMI Branch Planning Document 155Annex 2. Sample of Reports 162
Planning and Reporting Guidelines Palang Merah Indonesia
v
AABB American Association Blood Bank
AD/ART Anggaran Dasar dan Anggaran Rumah Tangga/Statute and Bylaws
APBD Anggaran Pendapatan dan Belanja Daerah/Local Budget
BNPB Badan Nasional Penanggulangan Bencana/National Disaster Management Agency
BNSP Badan Nasional Sertifikasi Profesi/National Profession Standardization Agency
BOR Bed Occupancy Rate
CA Cooperation Agreement
CBHFA Community-Based Health and First Aid
CEONC Comprehensive Emergency Obstetric Neonatal Care
CTP Cash Transfer Program
CSR Corporate Social Responsibility
DBM Dead Bodies Management
DDS Donor Darah Sukarela/Voluntary Blood Donor
DM Disaster Management
DP2 Data Penilaian Pegawai/Performance Appraisal Data
DPR/DPRD Dewan Perwakilan Rakyat/Daerah/(Local) Parliament
DRR Disaster Risk Reduction
DU Dapur Umum/Field Kitchen
DVI Disaster Victim Identification
EHL Exploring Humanitarian Law
EQA External Quality Assessment
FGD Focused Group Discussion
Forel Forum Sukarelawan/Volunteer Forum
Forpis Forum Remaja Palang Merah Indonesia/Youth Red Cross Forum
Gadar Gawat Darurat/Emergency
GMP Good Management Practice
HRD Human Resources Development
HSS Health and Social Services
ICBRR Integrated Community-Based Risk Reduction
ICRC International Committee of Red Cross
ICT Information, Communication, and Technology
Daftar Singkatan dan Akronim
Planning and Reporting Guidelines Palang Merah Indonesia
vi
IEC Information, Education, and Communication
IEMS Integrated Emergency Management System
IFRC International Federation of Red Cross
IPC Infection Prevention and Control
ITT Indicator Tracking Table
JCI Joint Commission International
Juklak Petunjuk Pelaksanaan/Implementation Guidelines
Juknis Petunjuk Teknis/Technical Guidelines
Jumbara Jumpa Bakti Gembira/Youth Gathering
K3RS Keselamatan dan Kesehatan Kerja Rumah Sakit/Hospital Occupational Health and Safety
KARS Komisi Akreditasi Rumah Sakit/Hospital Accreditation Committee
KGC Korean Green Cross
KSR Korps Sukarela/Volunteer Corps
M&E Monitoring and Evaluation
MoU Memorandum of Understanding
MRI Magnetic Resonance Imaging
Musrenbang Musyawarah Perencanaan Pembangunan/Development Planning Meeting
OEM Original Equipment Manufacturer
OP Operational Plan
PHAST Participatory Hygiene and Sanitation Transformation
PMER Planning, Monitoring, Evaluation, and Reporting
PMI Palang Merah Indonesia/Indonesian Red Cross
PNS Participating National Society
PO Peraturan Organisasi/Organizational Procedures
RCRC Red Cross and Red Crescent
RDMC Regional Disaster Management Committee
RFL Restoring Family Link
RM Resource Mobilization
RPJM Rencana Pembangunan Jangka Menengah/Medium-Term Development Plan
RPP Rencana Program Pokok/Key Program Plan
SAR Search and Rescue
SATGANA Satuan Penanggulangan Bencana/Disaster Response Unit
Planning and Reporting Guidelines Palang Merah Indonesia
vii
SIMUDDA Sistem Informasi Manajemen Unit Donor Darah/Blood Donor Unit Management Information System
SKP Satuan Kredit Profesional/Professional Credit Unit
SOP Standard of Procedure
SP Strategic Plan
SWOT Strength, Weakness, Opportunity, and Threat
TB Tuberculosis
ToT Training of Trainer
TSR Tenaga Sukarela/Professional Volunteer
TTD Teknik Transfusi Darah/Blood Transfusion Technique
UMP/K Upah Minimum Provinsi/Kabupaten/Kota/Local Minimum Wage
UTD Unit Transfusi Darah/Blood Transfusion Unit
WHO World Health Organization
YRC Youth Red Cross
I. INTRODUCTION Intr
oduc
tion
Planning and Reporting Guidelines Palang Merah Indonesia
1
A strategic and synergistic planning is the first step towards becoming a well-functioning National Society of Indonesian Red Cross (PMI). As the saying goes, ‘failing to plan is planning to fail’. Therefore, planning is a critical process to optimize quality services.
In addition to planning, reporting is also an important part to improve the organization’s accountability to the public and relevant stakeholders.
Planning and reporting is essentially doing what we say and saying what we do. Therefore, planning and reporting are essential areas to be improved in order to manifest realize PMI that demonstrates strong character, is professional, self-sustaining, and respected by the communities.
This guideline manual is a technical instruction that describes the concepts and basic principles, mechanisms, processes, and tools in performing planning and reporting.
Strategic Plan is a high-level planning document produced through a planning process to decide where the organization wants to be and why, then choose a variety of strategies to ensure that these objectives can be achieved with the best strategy.
Strategic Plan helps the organization to determine strategies to respond to opportunities and challenges that might arise in the future, while maintaining its coherence and long-term sustainability. A Strategic Plan is usually developed for a period of 5-10 years.
PMI has developed a Strategic Plan for 2014-2019 which consists of vision, mission, and strategic objectives (goal) to be achieved by PMI nationwide. The Strategic Plan has been developed as key policies and programs to be implemented over the next five years by PMI NHQ/Chapter/Branch.
1.1. Background
1.2. Strategic Plan (SP)
Planning and Reporting Guidelines Palang Merah Indonesia
2
The Strategic Plan drafting process has been initiated since December 2013 by conducting a SWOT analysis (Strength, Weaknesses, Opportunity, Threat).
Then in May-August 2014, the drafting team collected inputs through six regional meetings involving representatives of board members from PMI Chapters/Branches. Finally, the draft of key strategic plan policies was agreed on at PMI XX National Assembly Meeting Congress in December 2014.
PMI Strategic Plan helps all organizational entities to have a good understanding on PMI’s capacity and current situation, and then identify ways to address the opportunities and challenges inside and outside the organization. Furthermore, the Strategic Plan guides the organizational direction articulated in the vision and mission statements, and determines how to achieve them through strategic objectives.
Finally, the Strategic Plan is the main reference for developing the operational plan (annual work plans, programs, or projects), implementing, and evaluating PMI’s program performance by the end of 2019.
Based on the endorsed Strategic Plan, PMI Operational Plan 2015-2019 has also been developed through a participatory and consultative process, by involving PMI NHQ/Chapters /Branches, including movement partners (IFRC, PNSs, and ICRC) in January-February 2015. The Operational Plan aims to operationalize the Strategic Plan, through outcomes (intermediate results) and outputs (immediate results) to be achieved through various programs, projects, or activities.
The indicators and achievement targets for 2019 at different levels of objectives (outcomes and outputs) have also been set. The Operational Plan document will then be a reference to develop the annual work plan to ensure all programs implemented are coherent, synergistic, and sustainable.
1.3. Operational Plan (OP)
Planning and Reporting Guidelines Palang Merah Indonesia
3
The following chart illustrates the relationship between Strategic Plan, Operational Plan and Annual Work Plan.
The existence of these two planning documents is an indication that PMI has currently moved one step forward in the planning process. By having clear objectives for various levels, i.e. strategic objectives, outcomes, and outputs, the planning process is expected to be done based on needs and with clear objectives, not solely activity-based.
In addition, the developed indicators are the measurement of the work plan achievements, both annual and long-term (five years) ones. The followings are several important benefits of a quality Strategic Plan and Operational Plan.
a. Demonstrating clear leadership in providing direction or vision of the organization.
b. Stating a vision that unites and motivates all organizational entities to manifest it.
c. Improving the organization effectiveness through a decision making made based on a coherent framework, existing capacities and competences, priorities and consensus to maintain ‘ what we want to do’ and ‘what should be done’.
StrategicPlan (5-10 years)
OperationalPlan (1-5 years)
WorkPlan
(Annual)
ACTIVITY
HRMaterialBudget
Input
MISSION
VISION
STRATEGICOBJECTIVE
STRATEGICOBJECTIVE
STRATEGICOBJECTIVE
OUTCOME OUTCOME
OUTPUT
ACTIVITY
Planning and Reporting Guidelines Palang Merah Indonesia
4
d. Enhancing credibility and confidence in front of the government, donors, and other stakeholders.
e. Strengthening PMI’s position in negotiating a partnership, including with Movement Partners so that the supports could be aligned with the strategic plan, not vice versa.
f. Clarifying the role of PMI at all levels in achieving the strategic objectives to manifest the vision of the organization.
Finally, the Planning and Reporting Guideline will help PMI at all levels to develop a logic, realistic, objective-based, measurable, and synergistic planning in between levels. All organizations which have multi levels, basically adopt a two-way planning, i.e. top down and bottom up.
On one hand, ‘top down’ wise, the Strategic Plan and Operational Plan developed by PMI NHQ become a reference for planning by PMI Sub-districts, Branches, and Chapters.
On the other hand , ‘bottom up’ wise, by submitting work plan from PMI Sub-district to PMI Branch, from PMI Branch to PMI Chapter and so on from PMI Chapter to PMI NHQ, the work plan between different levels can be more synergistic, coherent, and accommodative.
a. PMI Statute resulted from the 2014 XX National Assembly Article 32 paragraph 6 section C, Article 33 paragraph 7 section C.
b. Strategic Plan and Operational Plan 2014-2019.
Planning is a planning mechanism starting from PMI Sub-district, PMI Branch, PMI Chapter to PMI NHQ. Planning in this guideline refers to the plan prepared by PMI Sub-districts, PMI Branches, PMI Chapters and PMI NHQ in reference to PMI Strategic Plan and Operational Plan 2014-2019.
1.4. Legal Foundation
1.5. General Definition
Planning and Reporting Guidelines Palang Merah Indonesia
5
If we refer to PMI Statute and Bylaw Article 33, paragraph 7, section C that states “ endorsing the Key Program Plan (RPP) in relevant Branch’s working area for 5 (five) years period based on PMI Chapters’ Program Plan also the Key Policies and Strategic Plan endorsed by PMI National and Provincial Assembly Meetings”, the form of RPP referred to is the strategic objectives in the Strategic Plan which are detailed out in PMI Operational Plan.
The planning focuses on eight PMI Key Program Plans (RPP) based on the strategic objectives set in the strategic plan, either for local, regional, or national levels, i.e.:
1. Penguatan dan pengembangan organisasi.
2. Peningkatan kapasitas SDM dan sarana prasarana.
3. Peningkatan kualitas dan efektivitas pelayanan darurat.
4. Peningkatan ketahanan masyarakat dan pelayanan kesehatan rujukan.
5. Peningkatan pelayanan donor darah.
6. Pengembangan sumber daya melalui kemitraan strategis.
7. Peningkatan akuntabilitas dan reputasi organisasi.
8. Penyebarluasan nilai-nilai kemanusiaan.
a. PMI at all levels, have a time/schedule reference and mechanisms to implement planning in order to better align with the organizational capacity, community needs and local government priorities; and synergy between different levels of PMI, starting from the Sub-district, Branch, Chapter, to NHQ.
b. PMI at all levels, have uniform planning formats, both in terms of form and term or nomenclature used so that they are easier to understand and compiled by PMI one level above and nationwide.
c. PMI at all levels, can use the planning document as a reference when conducting monitoring and evaluation activities in order to improve the organizational performance and accountability.
1.6. Purpose and Benefit
Planning and Reporting Guidelines Palang Merah Indonesia
6
1.7. Scope of Planning
PMI Level Scope of Work Plan
National Level
To formulate and endorse policies related to vision, mission, strategic objectives, implementation guideline, national and international partnerships, also tiered coaching functions.
Chapter Level
To describe the policies endorsed at the national level into a form of implementation guideline based on the needs, capacities, and priorities of PMI Chapter, Branch, and Sub-district; in the area, organizational development, also tiered coaching functions.
Branch Level
To plan and implement PMI work plan at the community or beneficiaries level based on the needs, capacities and priorities of PMI Branch and Sub-district in reference to the policies and program guidelines provided by PMI Chapter/NHQ.
Sub-district Level
To plan and implement PMI work plan at the community or beneficiaries level based on the needs, capacities and priorities of PMI Sub-district in reference to the policies and program guidelines provided by the PMI Chapter/NHQ
A Strategic Plan provides directions to the overall organization by defining vision and mission as well as relevant strategic objectives to achieve them.
An Operational plan determines how the objectives outlined in the Strategic Plan will be achieved at the field implementation.
Table 1. Scope of Planning
II. PMI PLANNING DOCUMENTS 2014-2019
PMI P
lann
ing
Doc
umen
ts
2014
-201
9
Planning and Reporting Guidelines Palang Merah Indonesia
7
PMI Planning Documents 2014-2019
The content of the Strategic Plan and the Operational Plan will be visualized in two forms, i.e. flowcharts and matrices (tabls).
The Strategic Plan and Operational Plan are presented in flowcharts to help the audience understand the logical relations between outputs, outcomes, strategic objectives, missions, and vision of PMI. In addition, the audience will understand the level of sufficiency in each objective at a lower level in order to manifest the objective at a higher level.
Meanwhile the Strategic Plan and Operational Plan presented in matrices are documents that include a detailed description of outcome and output indicators as well as each of its targets. These matrices will be used in preparing PMI’s annual work plan at all levels in accordance with the guidelines provided in the next section.
Definition of Key Terms in the Planning Document Matrices
Strategic Objective is a simple and clear statement that describes the long-term results to be achieved by a work plan.
Outcome is the intermediate result that has to be achieved in order to meet the Strategic Objective.
Output is a tangible product (goods and services) or immediate result of the activities carried out.
Indicator is a measurement unit to determine whether there is any progress or achievement of the intended objectives or results.
Indicator is just one of the measurement tools to assess performance. There are many ways to measure achievement of an objective, but not all of them need to be included into the work plan. Each indicator has a consequence of data collection responsibilities.
Therefore, not all of the things listed in the output/outcome statements need to be measured. The selected indicators are the ones that measure the most important parts in indicating a successful achievement of objectives and can easily be measured.
Target is the quantity or percentage to be achieved for each indicator, determined in accordance with the needs and capacities.
Planning and Reporting Guidelines Palang Merah Indonesia
8
2.1.
Flo
wch
art
of P
MI S
trat
egic
Pla
n an
d O
pera
tion
al P
lan
2014
-201
9
VISI
ON
Mis
sion
1w
ith
8 in
dica
tors
4 O
utco
mes
wit
h8
indi
cato
rs
9 O
utpu
tsw
ith
19 in
dica
tors
4 O
utco
mes
wit
h15
indi
cato
rs
10 O
utpu
tsw
ith
23 in
dica
tors
3 O
utco
mes
wit
h6
indi
cato
rs
9 O
utpu
tsw
ith
14 in
dica
tors
3 O
utco
mes
wit
h10
indi
cato
rs
10 O
utpu
tsw
ith
14 in
dica
tors
3 O
utco
mes
wit
h6
indi
cato
rs
12 O
utpu
tsw
ith
27 in
dica
tors
2 O
utco
mes
wit
h4
indi
cato
rs
5 O
utpu
tsw
ith
9 in
dica
tors
2 O
utco
mes
wit
h4
indi
cato
rs
6 O
utpu
tsw
ith
6 in
dica
tors
1 O
utco
mes
wit
h1
indi
cato
rs
3 O
utpu
tsw
ith
4 in
dica
tors
Mis
sion
2w
ith
2 in
dica
tors
Mis
sion
3w
ith
2 in
dica
tors
Stra
tegi
c O
bjec
tive
1St
rate
gic
Obj
ecti
ve 2
Stra
tegi
c O
bjec
tive
3St
rate
gic
Obj
ecti
ve 4
Stra
tegi
c O
bjec
tive
5 S
trat
egic
O
bjec
tive
6 S
trat
egic
O
bjec
tive
7 S
trat
egic
O
bjec
tive
8
Planning and Reporting Guidelines Palang Merah Indonesia
9
VISI
ON
: PM
I dem
onst
rate
s st
rong
cha
ract
ers
and
is p
rofe
ssio
nal,
se
lf-s
usta
inin
g, a
nd r
espe
cted
by
com
mun
itie
s.
Mis
sion
1
To b
ecom
e th
e fo
refr
ont
hum
anit
aria
n or
gani
zati
on
that
pro
vide
s qu
alit
y se
rvic
es t
o co
mm
unit
ies
in
line
wit
h th
e fu
ndam
enta
l pri
ncip
les
of t
he R
ed
Cros
s an
d Re
d Cr
esce
nt M
ovem
ent.
Mis
sion
2
To s
tren
gthe
n PM
I’s s
elf-
suffi
cien
cy t
hrou
gh
sust
aina
ble
stra
tegi
c pa
rtne
rshi
ps w
ith
the
gove
rnm
ent,
pri
vate
sec
tor,
mov
emen
t pa
rtne
rs,
com
mun
itie
s, a
nd o
ther
sta
keho
lder
s at
all
leve
ls.
Mis
sion
3
To im
prov
e PM
I’s
orga
niza
tion
al r
eput
atio
n at
the
nat
iona
l and
in
tern
atio
nal l
evel
s.
Stra
tegi
c O
bjec
tive
s
1.
To b
uild
a w
ell-
func
tion
ing
PMI a
t al
l lev
els,
wit
h th
e ca
paci
ty t
o cr
eate
syn
ergy
bet
wee
n pr
ogra
m a
ctiv
itie
s an
d th
e or
gani
zati
onal
po
licie
s, p
roce
dure
s, a
nd s
yste
m.
2.
To s
tren
gthe
n th
e ca
paci
ty o
f PM
I’s o
rgan
izat
iona
l res
ourc
es
at a
ll le
vels
, bo
th it
s hu
man
res
ourc
es a
nd t
he f
acili
ties
and
in
fras
truc
ture
s ne
eded
to
serv
e th
e co
mm
unit
ies.
3.
To im
prov
e th
e qu
alit
y of
dis
aste
r an
d he
alth
em
erge
ncy
resp
onse
s ac
ross
Indo
nesi
a, e
ithe
r in
ter
ms
of r
apid
ness
, co
vera
ge,
and
effe
ctiv
enes
s of
the
ser
vice
s.
4.
To s
tren
gthe
n co
mm
unit
y re
silie
nce
in o
rder
to
redu
ce t
he r
isks
and
im
pact
of
disa
ster
s an
d di
seas
es t
hrou
gh d
isas
ter
prep
ared
ness
, he
alth
, an
d so
cial
pro
gram
s, a
lso
refe
rral
hea
lth
serv
ices
.
5.
To in
crea
se t
he a
vaila
bilit
y of
saf
e, a
cces
sibl
e, a
nd q
ualit
y bl
ood
thro
ugho
ut In
done
sia.
Stra
tegi
c O
bjec
tive
s
6.
To s
tren
gthe
n th
e pa
rtne
rshi
p w
ith
nati
onal
and
loca
l gov
ernm
ents
, pu
blic
and
pri
vate
sec
tors
, m
ovem
ent
part
ners
, do
nor
agen
cies
, an
d ot
her
stak
ehol
ders
in
ord
er t
o as
sum
e PM
I’s m
anda
te
and
func
tion
s.
Stra
tegi
c O
bjec
tive
s
7.
To im
prov
e PM
I’s a
ccou
ntab
ility
as
a hu
man
itar
ian
orga
niza
tion
at
the
nati
onal
and
inte
rnat
iona
l lev
els.
8.
To im
prov
e th
e un
ders
tand
ing
of
all e
lem
ents
of
com
mun
itie
s on
hu
man
itar
ian
valu
es,
fund
amen
tal
prin
cipl
es o
f th
e in
tern
atio
nal
RCRC
mov
emen
t, a
s w
ell a
s In
tern
atio
nal H
uman
itar
ian
Law
s (I
HL)
thr
ough
com
mun
icat
ion,
ed
ucat
ion,
and
dis
sem
inat
ion
stra
tegi
es.
Stra
tegi
c Pl
an a
nd O
pera
tion
al P
lan
in fl
owch
arts
alo
ng w
ith
desc
ript
ion
on s
tate
men
t ba
ckgr
ound
Planning and Reporting Guidelines Palang Merah Indonesia
10
Strategic Plan Description Vision:
9 Strong Character, works in line with the International RCRC Fundamental Principles, Code of Conduct, both in managing its organization and its services.9 Professional, works based on universally accepted standards and norms and focuses on the most vulnerable groups.9 Self-sustaining, relies on existing organizational resources.9 Respected by communities, recognized and supported by public at large.
Mission 1:Recently, there have been many more organizations working on humanitarian issues, either at local, national, or international levels. Since 2008, the Government has even established a National and Local Disaster Management Agencies (BNPB and BPBD). PMI, which has been established since 1945 and the only Red Cross movement mandated by the Government of Indonesia, should strengthen its capacities to become the foremost humanitarian organization in Indonesia amidst growing humanitarian players in the country and globally.
This first mission could only be manifested if the organizational function could be optimized, supported with adequate human resources, infrastructures and equipment, high quality services in emergency response, in community development, health referral service, as well as specific Red Cross services, i.e. Blood Donor.
This first mission is an attempt to manifest the term ‘Strong Character and Professional’ within PMI’s vision statement above.
Mission 2:Independence is one of the seven Fundamental Principles of RCRC, including PMI. PMI realizes that strategic partnership is essential to carry out its mandate. At the same time, however, PMI has to be independent in a way that it should not be following or intervened by the interest of certain groups or political affiliations. In partnering with different stakeholders, PMI should position itself as a competent and equal partner, not an inferior neither superior one.
Mission 3:The organizational reputation should be established and maintained seriously because with good reputation, PMI will grow fast. If measured based on the geographical coverage and number of population served, PMI is the fifth biggest National Society in the world. Therefore, an international reputation should also be strengthened.
Planning and Reporting Guidelines Palang Merah Indonesia
11
Out
com
e 1.
1
PMI’s
Leg
al E
ntit
y is
str
engt
hene
d.
Out
com
e 1.
2
PMI’s
Sta
tute
s, O
rgan
izat
iona
l Pr
oced
ures
(PO
), a
nd Im
plem
enta
tion
G
uide
lines
(Ju
klak
), a
s w
ell a
s th
e le
gal
prod
ucts
issu
ed a
re in
stit
utio
naliz
ed a
t al
l le
vels
.
Out
com
e 1.
3
PMI’s
Pla
nnin
g, M
onit
orin
g,
Eval
uati
on,
and
Repo
rtin
g (P
MER
) sy
stem
is w
ell-
func
tion
ing
at a
ll le
vels
.
Out
com
e 1.
4
Coor
dina
tion
, co
mm
unic
atio
n, a
nd
coac
hing
mec
hani
sm is
ope
rati
onal
at
all
leve
ls.
Out
put
1.1.
1 RC
Bill
is
incl
uded
in
the
Nat
iona
l Le
gisl
atio
n Pr
ogra
m
agen
da.
Out
put
1.2.
1 P
MI S
tatu
tes,
O
rgan
izat
iona
l Pr
oced
ures
(PO
),
and
Impl
emen
tati
on
Gui
delin
es (
Jukl
ak),
as
wel
l as
lega
l pro
duct
s ar
e in
pla
ce a
nd
impl
emen
ted
at a
ll le
vels
.
Out
put
1.3.
1 PM
I boa
rd m
embe
rs a
nd s
taff
at
all l
evel
s ar
e re
gula
rly
coac
hed
on t
he im
plem
enta
tion
of
Plan
ning
, M
onit
orin
g, E
valu
atio
n, a
nd R
epor
ting
(P
MER
) sy
stem
by
com
pete
nt f
acili
tato
rs.
1.3.
2 Pl
anni
ng a
nd r
epor
ting
doc
umen
ts t
hat
are
in li
ne
wit
h th
e Pl
anni
ng a
nd R
epor
ting
Gui
delin
es a
re
avai
labl
e at
all
leve
ls.
1.3.
3 As
sess
men
t to
ols
(que
stio
nnai
res/
anal
ysis
too
ls)
for
PMI o
rgan
izat
iona
l cap
acit
y m
appi
ng a
re a
vaila
ble
and
adop
ted
at a
ll le
vels
.
1.3.
4 PM
I wor
k pl
ans
at a
ll le
vels
are
eva
luat
ed b
ased
on
the
Plan
ning
, M
onit
orin
g, E
valu
atio
n, a
nd R
epor
ting
(P
MER
) Re
fere
nce
Book
.
1.3.
5 PM
I Boa
rd M
embe
rs a
nd S
taffi
ng D
atab
ase
I upd
ated
on
reg
ular
bas
is.
Out
put
1.4.
1 In
tern
al a
nd c
ross
- ch
apte
rs/b
ranc
hes
com
mun
icat
ion
and
coor
dina
tion
are
im
plem
ente
d in
line
w
ith
the
proc
edur
es.
1.4.
2 Ti
ered
coa
chin
g on
or
gani
zati
onal
and
pr
ogra
m d
evel
opm
ent
is c
arri
ed o
ut o
n re
gula
r as
wel
l as
need
ba
sis.
STRA
TEG
IC O
BJEC
TIVE
-1To
bui
ld a
wel
l-fu
ncti
onin
g PM
I at
all l
evel
s, w
ith
the
capa
city
to
crea
te s
yner
gy b
etw
een
prog
ram
act
ivit
ies
and
the
orga
niza
tion
al p
olic
ies,
pro
cedu
res,
and
sys
tem
.
Planning and Reporting Guidelines Palang Merah Indonesia
12
Description
Strategic Objective 1PMI is considered well-functioning if it is capable to provide relevant services for vulnerable communities all over the country through its voluntary network, and this is only possible if the work plan along with the organizational policies, procedures, and system are effectively implemented.
Outcome 1.1.The existing legal entity of PMI, i.e. the Presidential Decree No 25/1950 and the Presidential Decree No 246/1963, is considered necessary to be strengthened with a Red Cross Law in order to strengthen PMI’s function and capacities all over Indonesia in performing the mandate assigned by the Government. The process of proposing the Red Cross Bill to be enacted as a Law has been started since 10 years ago, and it is expected to be concluded during the board tenure of 2014 – 2019. To do so, the Red Cross Bill should be put into the parliament’s legislative agenda beforehand.
Outcome 1.2.Policies in the form of organizational regulation and guidance such as statute and bylaws, Organizational Procedures, and Technical Guidelines are required not only as a document but to be institutionalized and applied on daily basis in PMI’s operation at all levels. For example, an institutionalized statute and bylaws means that their contents have been understood by all entities within the organization, not only understanding the sentences, but also the implication of each passage for PMI at all levels and applying them responsibly.
Organizational Procedures (PO) are derived from the statute and bylaws that regulate key and specific areas, such as Organizational Procedures on Board Members, Office Management, Services, Human Resources, Financial Management, Asset and Logistic Management, Staffing, Planning and Reporting, Partnership and Branding.
Implementation Guidelines (Juklak) are documents that detail out techniques of managing or implementing programs or specific activities as well as general provisions to serve as guidance for implementers. For example, Technical Guidelines on Financial Management, including techniques and formats for budgeting, cash request and utilization, as well as reporting. Or, Technical Guidelines on Planning and Reporting, which regulates work plan development process and reporting mechanisms from Branches, Chapters, and NHQ; by using specified formats within specified timeline.
Planning and Reporting Guidelines Palang Merah Indonesia
13
Legal Products are legally-binding documents, both internally and externally. Internally, PMI needs to standardize the legal products derived from statute and bylaws, both in format and substance, which are applied between or at all levels of PMI. Externally, it includes legal products between organizations, such as Memorandum of Understanding (MoU) and Cooperation Agreement.
PMI has had several MoUs either with the government or private sectors at national levels. Unfortunately however, these documents have little impact to PMI at the Chapters and Branches. As a result, the MoUs were merely documents and have no implication to PMI at all levels. Therefore, it requires a pro-active approach from PMI Board Members at all levels to establish communication and coordination so that the existing MoUs can be followed up and have positive benefits for PMI and its partners.
All of those documents should be filed and updated, and then disseminated for implementation and monitoring and evaluation.
Outcome 1.3.Planning, Monitoring, Evaluation, and Reporting (PMER) system is a system that regulates PMI’s organizational governance, management, and work plan. The PMER system is well-functioning if the four elements are implemented in line with the PMI Planning and Reporting Guidelines. For example, the annual work plan is developed in reference to PMI Strategic Plan and Operational Plan 2014 – 2019, conducted through the right process, i.e. through SWOT, needs, and objective analysis in participatory manner, and endorsed through an Annual Meeting on the specified timeline.
The PMER System could be implemented if the human resources capacity, both PMER knowledge and skills, is strengthened through training and coaching. The availability of planning and reporting documents is part of PMER system implementation. The result of Organizational Capacity Assessment is beneficial to understand the organization’s capacity (SWOT) and can be used as a basis for planning. Board member database is important information, which is useful for organizational management as well as communication/coordination.
Outcome 1.4.PMI comprises of NHQ, 33 Chapters dan approximately 450 Branches. All of them have to work together in a coordinated and synergistic approach. Therefore, it is important to set up a coordination and communication mechanism. A well-planned, systematic, and regular coaching is also highly needed to facilitate PMI development and to strengthen the unity of the organization nationwide. Such coaching has to be performed by the board members to other board members at a lower level; or by staff to other staff at a lower level. A well-planned and guided coaching needs to be developed based on the existing needs and condition of the targeted PMI.
Planning and Reporting Guidelines Palang Merah Indonesia
14
Out
com
e 2.
1.
PMI’s
HR
Man
agem
ent
that
incl
udes
re
crui
tmen
t, t
rain
ing,
ass
ignm
ent,
su
perv
isio
n, r
ewar
d an
d re
cogn
itio
n, a
s w
ell
as p
erfo
rman
ce e
valu
atio
n is
impr
oved
.
Out
com
e 2.
2.
PMI’s
edu
cati
on a
nd
trai
ning
sys
tem
is w
ell-
func
tion
ing.
Out
com
e 2.
3.
Avai
labi
lity
of b
asic
su
ppor
ting
fac
iliti
es a
nd
infr
astr
uctu
res
for
PMI
oper
atio
n is
incr
ease
d.
Out
com
e 2.
4.
Perf
orm
ance
and
uti
lizat
ion
of
Info
rmat
ion
and
Com
mun
icat
ion
Tech
nolo
gy in
sup
port
ing
PMI’s
op
erat
ion
is im
prov
ed.
Out
put
2.1.
1 H
uman
res
ourc
es w
ith
tech
nica
l and
man
ager
ial s
kills
ar
e av
aila
ble
and
trai
ned
to
carr
y ou
t th
eir
mai
n ta
sks
and
func
tion
s fo
r PM
I at
all l
evel
s.
2.1.
2 PM
I per
sonn
el r
ecei
ve
adeq
uate
hea
lth
serv
ices
, ei
ther
in t
erm
s of
pro
mot
ion,
pr
even
tion
, or
tre
atm
ent.
2.1.
3 Vo
lunt
eer
(KSR
, TS
R, in
clud
ing
corp
orat
e/ o
rgan
izat
ion/
inst
itut
ion
volu
ntee
rs)
and
YRC
man
agem
ent
guid
elin
es is
im
plem
ente
d at
all
leve
ls.
Out
put
2.2.
1 Tr
aine
rs a
nd f
acili
tato
rs a
re
trai
ned,
cer
tifie
d by
PM
I or
the
auth
oriz
ed in
stit
utio
n, a
nd a
re
avai
labl
e to
be
mob
ilize
d fo
r di
ffer
ent
trai
ning
s.
2.2.
2 Th
e na
tion
al t
rain
ing
curr
icul
um
need
ed f
or in
tern
al/e
xter
nal
purp
oses
is u
pdat
ed b
y PM
I an
d ac
cred
ited
by
nati
onal
in
stit
utio
ns (
Min
istr
y of
Hea
lth,
M
inis
try
of W
orkf
orce
and
Tr
ansm
igra
tion
Aff
airs
, BN
PB).
2.2.
3 PM
I tra
inin
gs a
re m
anag
ed in
line
w
ith
the
tech
nica
l gui
delin
es f
or
trai
ning
man
agem
ent.
Out
put
2.3.
1 PM
I bas
ic
oper
atio
nal
faci
litie
s (o
ffice
, di
sast
er o
pera
tion
ce
nter
/pos
ko,
war
ehou
se,
trai
ning
ce
nter
) ar
e w
ell-
func
tion
ing.
2.3.
2 PM
I ass
ets
and
basi
c fa
cilit
ies/
in
fras
truc
ture
s ar
e m
anag
ed in
line
w
ith
the
guid
ance
pr
ovid
ed.
Out
put
2.4.
1 PM
I’s In
form
atio
n an
d Co
mm
unic
atio
n Te
chno
logy
eq
uipm
ent
and
faci
litie
s ar
e av
aila
ble
and
wel
l-m
aint
aine
d.
2.4.
2 Co
mm
unic
atio
n ne
twor
k an
d so
ftw
are,
e.g
. co
mm
unic
atio
n ra
dio,
inte
rnet
, em
ail s
yste
m,
form
al m
essa
ging
, an
d ap
plic
atio
n, a
re a
vaila
ble
and
func
tion
ing
to s
uppo
rt
PMI’s
ope
rati
on a
nd s
ervi
ces,
in
clud
ing
bloo
d se
rvic
es.
STRA
TEG
IC O
BJEC
TIVE
-2To
str
engt
hen
the
capa
city
of
PMI’s
org
aniz
atio
nal r
esou
rces
at
all l
evel
s, b
oth
its
hum
an
reso
urce
s an
d th
e fa
cilit
ies
and
infr
astr
uctu
re n
eede
d to
ser
ve t
he c
omm
unit
ies.
Planning and Reporting Guidelines Palang Merah Indonesia
15
Description
Strategic Objective 2The resources discussed here are limited to human, facilities and infrastructures as an integral part of the organization. Meanwhile for funding, in general it comes from the outside and is acquired through different partnership strategies, and therefore is included under Strategic Objective 6. The availability of competent human resources as well as adequate basic infrastructures and equipment is essential to manifest PMI’s Vision and Missions.
Outcome 2.1Human Resource is the most valuable asset of an organization. A big organization is developed by highly committed and professional human resources. Therefore, human resources management should be conducted effectively and comprehensively, starting from recruitment until the end of mission. Human resources capacity development in technical and management skills should be conducted on a regular and sustainable manner through trainings and coaching. PMI is also responsible for the welfare of its human resources by providing different forms of compensation, i.e. health services or insurance, to improve the performance of the board members, staff, and volunteers.
Outcome 2.2PMI normally conducts training and coaching for its human resources independently, even the training center is directed for its human resource development while at the same time serving its partners and communities. With that, PMI must have a well-functioned training and education system in which it has accredited curriculums, certified trainers/facilitators, standard training management procedures, and need-based training implementation.
Outcome 2.3Basic facilities and infrastructure such as office, disaster operation center (posko), training center, and other assets should be managed in line with the approved guideline, starting from inventory, maintenance, and documentation or reporting.
Outcome 2.4Nowadays, Information and Communication Technology (ICT) can help an organization to grow fast through quick and accurate decision making and action. PMI services are mostly needed in critical or emergency times, and quite often related to human’s life safety. Besides, PMI’s services include a wide range of needs, community contexts (urban/rural) all over Indonesia.
As such, a well-functioning ICT is needed to anticipate the gap in time, distance, and access. In implementing its work plan, PMI needs an effective, modern, and massive approach so as to enable significant changes. Therefore, technology application (hardware or software) in educating, empowering, and engaging community members becomes very strategic.
Planning and Reporting Guidelines Palang Merah Indonesia
16
Out
com
e 3.
1.
PMI p
erso
nnel
’s c
apac
ity
spec
ializ
ing
in
emer
genc
y re
spon
se is
str
engt
hene
d.
Out
com
e 3.
2.
Avai
labi
lity
of e
mer
genc
y re
spon
se
equi
pmen
t in
line
wit
h ac
coun
tabi
lity
stan
dard
is in
crea
sed.
Out
com
e 3.
3.
Emer
genc
y re
spon
se m
anag
emen
t sy
stem
is
impl
emen
ted
by P
MI a
t al
l lev
els.
Out
put
3.1.
1 D
isas
ter
Resp
onse
(Sa
tgan
a) t
eam
and
em
erge
ncy
resp
onse
spe
cial
ists
are
av
aila
ble
and
read
y fo
r m
obili
zati
on a
t al
l lev
els,
incl
udin
g at
the
reg
iona
l and
na
tion
al le
vels
, in
line
wit
h th
e So
P.
3.1.
2 D
isas
ter
resp
onse
sim
ulat
ion
is o
rgan
ized
by
PM
I at
all l
evel
s in
line
wit
h th
e ne
eds
and
the
deve
lope
d co
ntin
genc
y pl
an.
Out
put
3.2.
1 St
anda
rd e
quip
men
t fo
r em
erge
ncy
resp
onse
, in
clud
ing
com
mun
icat
ion
equi
pmen
t fo
r co
ordi
nati
on a
s w
ell a
s do
cum
enta
tion
and
rep
orti
ng f
orm
ats
are
in p
lace
and
ope
rati
onal
at
all l
evel
s.
3.2.
2 Su
ffici
ent
stoc
k of
em
erge
ncy/
relie
f it
ems
is a
vaila
ble
in r
egio
nal w
areh
ouse
and
PM
I Cha
pter
’s lo
gist
ic s
tora
ge t
o su
ppor
t em
erge
ncy
resp
onse
.
Out
put
3.3.
1 Fr
amew
ork,
gui
delin
es,
and
SoP
for
emer
genc
y re
spon
se o
pera
tion
and
co
ordi
nati
on m
echa
nism
are
in p
lace
and
ad
opte
d by
PM
I at
all l
evel
s.
3.3.
2 PM
I am
bula
nce
serv
ice
beco
mes
a p
art
of
loca
l Int
egra
ted
Emer
genc
y M
anag
emen
t Sy
stem
(IE
MS)
.
3.3.
3 Co
ntin
genc
y pl
an is
upd
ated
by
PMI a
t al
l le
vels
on
annu
al b
asis
.
3.3.
4 Ea
rly
war
ning
info
rmat
ion
is f
orw
arde
d to
th
e co
mm
unit
ies
in t
imel
y m
anne
r.
3.3.
5 Th
e ne
ed f
or R
FL s
ervi
ce in
bot
h no
rmal
an
d em
erge
ncy
peri
ods
is f
ollo
wed
up
by
PMI a
t al
l lev
els.
STRA
TEG
IC O
BJEC
TIVE
-3To
impr
ove
the
qual
ity
of d
isas
ter
and
heal
th e
mer
genc
y re
spon
ses
acro
ss In
done
sia,
eit
her
in t
erm
s of
rap
idne
ss,
cove
rage
, an
d ef
fect
iven
ess
of t
he s
ervi
ces.
Planning and Reporting Guidelines Palang Merah Indonesia
17
Description
Strategic Objective 3Indonesia is a disaster prone country. Therefore, PMI’s capacity to respond to disasters and health crisis in an effective, efficient manner with massive coverage, as well as with high quality needs to be further strengthened, especially on personnel, supporting facilities, and response management system.
Outcome 3.1PMI’s emergency response personnel, both the ones organized in the Disaster Response Unit (Satgana) and personnel with specialized skills in disaster response/health crisis, have to be adequately available and ready to be mobilized when needed. Emergency simulation should be scheduled on regular basis to maintain the preparedness capacity of those response personnel, in line with the contingency plan and SoP.
Outcome 3.2Disaster response is a high risk service. Therefore, PMI personnel should be equipped with supporting gears for disaster response/health crisis, such as individual protection gears, base camp tools, and tactical equipment (operational vehicles, transport means, watsan equipment, field hospital equipment, evacuation tools), including communication and documentation (recording) equipment. All of them are needed to improve the quality of emergency response operation and organizational accountability. Finally, logistic should certainly be made available in adequate types or quantity, in regional or provincial warehouses, to be distributed based on needs.
Outcome 3.3Emergency response management entails personnel and equipment mobilization system, activation of contingency plan to become operational or action plan, information system from operation sites to decision making authority, which is conducted in line with the applicable PMI’s SoP. A good response management should meet accountability standards (e.g. SPHERE, Code of Conduct, and Disaster Relief Principles and Procedures).
An effective emergency response management starts from well-functioning early warning systems. PMI, which operates between the institution providing the early warning information and the communities in disaster affected areas, needs to establish strong and systematic network with both parties in order to receive and disseminate the early warning information.
PMI Branches’ ambulance services should become part of local hospital referral system coordinated in the local Integrated Emergency Management System so that they can provide timely and standard services to optimally benefit the communities and the organization.
Planning and Reporting Guidelines Palang Merah Indonesia
18
Out
com
e 4.
1.
PMI’s
cap
acit
y to
man
age
com
mun
ity-
base
d di
sast
er p
repa
redn
ess
and
heal
th p
rogr
ams
is
stre
ngth
ened
.
Out
com
e 4.
2.
PMI’s
cap
acit
y to
pro
vide
soc
ial
serv
ices
to
the
com
mun
itie
s is
in
crea
sed.
Out
com
e 4.
3.
PMI H
ospi
tals
’ se
rvic
es a
nd c
apac
ity
are
impr
oved
.
Out
put
4.1.
1 G
uide
lines
/SoP
doc
umen
ts
on c
omm
unit
y-ba
sed
disa
ster
pr
epar
edne
ss a
nd h
ealt
h pr
ogra
ms
are
avai
labl
e, u
pdat
ed,
and
appl
ied
by
PMI.
4.1.
2 Ad
equa
te s
uppo
rtin
g m
ater
ials
/to
ols
for
com
mun
ity-
base
d di
sast
er
prep
ared
ness
and
hea
lth
prog
ram
s (e
.g.
IEC
mat
eria
ls,
mod
elin
g eq
uipm
ent,
M&
E to
ols)
are
ava
ilabl
e.
4.1.
3 Co
mm
unit
y-ba
sed
disa
ster
pr
epar
edne
ss a
nd h
ealt
h pr
ogra
m
acti
viti
es a
re im
plem
ente
d by
co
mpe
tent
PM
I sta
ff/v
olun
teer
s/
faci
litat
ors
at a
ll le
vels
.
Out
put
4.2.
1 G
uide
lines
/SoP
do
cum
ents
and
su
ppor
ting
mat
eria
ls/
tool
s fo
r so
cial
ser
vice
s (e
.g.
IEC
mat
eria
ls,
mod
elin
g eq
uipm
ent,
M
&E
tool
s) a
re a
vaila
ble,
up
date
d, a
nd a
pplie
d in
PM
I.
4.2.
2 So
cial
ser
vice
act
ivit
ies
are
impl
emen
ted
by
com
pete
nt P
MI s
taff
/vo
lunt
eers
at
all l
evel
s.
Out
put
4.3.
1 In
form
atio
n on
hos
pita
l sta
ndar
d se
rvic
es (
pati
ent
serv
ices
, pa
tien
t sa
fety
, se
rvic
es t
o pe
ople
con
trac
ted
wit
h TB
, H
IV/A
IDS
and
CEO
NC)
ba
sed
on K
ARS
(Hos
pita
l Acc
redi
tati
on C
omm
issi
on)
or J
CI (
Join
t Co
mm
issi
on In
tern
atio
nal)
sta
ndar
ds is
dis
sem
inat
ed t
o al
l hos
pita
ls’
empl
oyee
s in
ord
er t
o gu
ide
them
in p
erfo
rmin
g th
eir
role
s an
d re
spon
sibi
litie
s.
4.3.
2 M
edic
al a
nd n
on-m
edic
al p
erso
nnel
at
the
hosp
ital
are
wor
king
in
line
wit
h th
e ho
spit
al s
tand
ard
for
pers
onne
l com
pete
nce
(edu
cati
on
qual
ifica
tion
, cr
eden
tial
com
pete
nce,
clin
ical
aut
hori
ty,
audi
t co
mpe
tenc
e).
4.3.
3 H
ospi
tal q
ualit
y an
d pa
tien
t sa
fety
impr
ovem
ent
prog
ram
s ar
e im
plem
ente
d th
roug
h In
fect
ion
Prev
enti
on a
nd C
ontr
ol (
IPCI
) pr
ogra
m,
Hos
pita
l Occ
upat
iona
l Hea
lth
and
Safe
ty a
nd (
K3RS
) pr
ogra
m,
as w
ell a
H
ospi
tal P
atie
nt S
afet
y pr
ogra
m.
4.3.
4 Ad
equa
te g
ener
al a
nd s
peci
aliz
ed/s
ub-s
peci
aliz
ed m
edic
al s
ervi
ces,
in
clud
ing
flags
hip
serv
ice
for
lifes
tyle
nee
ds,
are
avai
labl
e.
4.3.
5 Ed
ucat
ion,
tra
inin
g an
d de
velo
pmen
t, a
s w
ell a
s pe
rfor
man
ce e
valu
atio
n fo
r ho
spit
al’s
sup
port
ing
staf
f ar
e w
ell-
cond
ucte
d.
STRA
TEG
IC O
BJEC
TIVE
-4To
str
engt
hen
com
mun
ity
resi
lienc
e in
ord
er t
o re
duce
the
ris
ks a
nd im
pact
of
disa
ster
s an
d di
seas
es t
hrou
gh d
isas
ter
prep
ared
ness
, he
alth
, an
d so
cial
pro
gram
s, a
lso
refe
rral
hea
lth
serv
ices
.
Planning and Reporting Guidelines Palang Merah Indonesia
19
Description
Strategic Objective 4During the last decade, the Red Cross and Red Crescent Movement all over the world have shifted from response-driven organizations to preventive-oriented ones. This was done through different development and empowerment programs in reducing disaster risks and impact in the future.
Outcome 4.1The transition from a response organization to one with more development focus should be supported with capacity building in community-based program management, both in disaster preparedness and health sector. Through this approach, PMI needs to strengthen the communities’ capacity to utilize their own resources (human resources, equipment, natural/environment resources, social system and norms) to develop community members (individual or communal) who are resilient to the impacts of disaster/health crisis. Therefore, guidelines/SoP and adequate supporting facilities are needed to help PMI staff/volunteers/facilitators who are working for and with the communities.
Outcome 4.2PMI social services focus not only on meeting the common needs of vulnerable communities but also on facilitating those vulnerable communities to access public services, and empowering those groups through psychological support. PMI thus needs to have guidelines/SoP and adequate facilities to help PMI staff/volunteers/facilitators who are working for and with the vulnerable groups.
Outcome 4.3PMI Hospitals’ service and capacity should be strengthened, including its grade, standard service, medical and non-medical personnel’s competence, quality of health services (general, specialized, and flagship services), as well as standard of safety and comfort for the patients. PMI Bogor Hospital, which is one of the most well-equipped PMI hospital, will be a reference for improving other PMI hospitals in other provinces.
Planning and Reporting Guidelines Palang Merah Indonesia
20
Out
com
e 5.
1.
Bloo
d Tr
ansf
usio
n U
nit’
s (U
TD)
capa
city
in
line
wit
h th
e na
tion
al s
tand
ard
is
incr
ease
d.
Out
com
e 5.
2.
Hum
an r
esou
rces
cap
acit
y, a
lso
faci
litie
s an
d in
fras
truc
ture
at
UTD
Nat
iona
l/Pr
ovin
ces/
Dis
tric
ts a
re in
crea
sed.
Out
com
e 5.
3.
Avai
labi
lity
of s
afe,
acc
essi
ble,
an
d qu
alit
y bl
ood
in a
ll U
TD is
in
crea
sed.
Out
put
5.1.
1 Po
licie
s, p
roce
dure
s, a
nd g
uide
lines
re
late
d to
Goo
d M
anuf
actu
ring
Pra
ctic
e (G
MP)
for
blo
od s
ervi
ce a
re a
vaila
ble
and
impl
emen
ted
by U
TD a
t al
l lev
els.
5.1.
2 U
TD m
anag
emen
t sy
stem
, in
clud
ing
its
orga
niza
tion
al s
truc
ture
, st
affin
g, fi
nanc
e,
plan
ning
and
rep
orti
ng,
is o
pera
tion
al a
t al
l le
vels
.
5.1.
3 Co
mm
unic
atio
n, c
oord
inat
ion,
and
coa
chin
g m
echa
nism
is c
onsi
sten
tly
appl
ied
wit
hin
inte
rnal
UTD
, ac
ross
UTD
leve
ls,
and
wit
h ex
tern
al s
take
hold
ers
(loc
al g
over
nmen
t,
DH
O,
hosp
ital
s, P
OM
, ve
ndor
, et
c.).
Out
put
5.2.
1 U
TD e
mpl
oyee
s ar
e tr
aine
d in
impl
emen
ting
G
MP
and
nati
onal
sta
ndar
ds,
in li
ne w
ith
thei
r ro
les
and
resp
onsi
bilit
ies,
als
o co
mpe
tenc
es r
equi
red.
5.2.
2 Co
mpe
tent
and
pro
fess
iona
l tec
hnic
al
pers
onne
l on
Bloo
d Tr
ansf
usio
n Te
chni
que
are
adeq
uate
ly p
rodu
ced
from
the
Blo
od
Tran
sfus
ion
Tech
nolo
gy D
iplo
ma
Prog
ram
.
5.2.
3 Ad
equa
te a
nd s
tand
ard
faci
litie
s an
d in
fras
truc
ture
, al
so f
urni
ture
, fix
ture
s an
d eq
uipm
ent
(FF&
E) a
re a
vaila
ble
at a
ll U
TDs.
5.2.
4 Bl
ood
Don
or U
nit
Man
agem
ent
Info
rmat
ion
Syst
em (
SIM
UD
DA)
is w
ell-
func
tion
ing
at a
ll le
vels
to
supp
ort
bloo
d se
rvic
e do
cum
enta
tion
, re
port
ing,
and
tra
ckin
g.
Out
put
5.3.
1 In
itia
tive
s to
pro
mot
e Vo
lunt
ary
Bloo
d D
onor
s (D
DS)
are
con
duct
ed a
t a
mas
sive
sca
le o
n re
gula
r ba
sis.
5.3.
2 Ce
ntra
lizat
ion
of b
lood
pro
cess
ing,
bl
ood
scre
enin
g, a
nd c
ross
-mat
ched
tes
t is
con
duct
ed f
or b
lood
ser
vice
effi
cien
cy
and
effe
ctiv
enes
s.
5.3.
3 Bl
ood
is d
istr
ibut
ed in
line
wit
h th
e ho
spit
als’
nee
ds t
hrou
gh b
lood
pro
visi
on
serv
ice
netw
ork.
5.3.
4 Pr
oduc
tion
of
bloo
d re
agen
t, b
lood
bag
, an
d pl
asm
a fr
acti
onat
ion
is c
ondu
cted
by
UTD
and
PM
I NH
Q in
depe
nden
tly.
5.3.
5 Re
sear
ch a
nd d
evel
opm
ent
for
bloo
d se
rvic
e is
con
duct
ed b
y U
TD N
atio
nal
and
Prov
ince
s.
STRA
TEG
IC O
BJEC
TIVE
-5To
incr
ease
the
ava
ilabi
lity
of s
afe,
acc
essi
ble,
and
qua
lity
bloo
d th
roug
hout
Indo
nesi
a.
Planning and Reporting Guidelines Palang Merah Indonesia
21
Description
Strategic Objective 5Blood sometimes becomes an urgent need to save people’s life. PMI is the only humanitarian organization that has the mandate from the Government of Indonesia to support blood availability in the country. In fact, PMI is known as an organization working on blood donation, and blood is indeed still one of PMI strategic program priorities throughout Indonesia. Therefore, the capacity of all PMI Blood Transfusion Units (UTD), including its personnel, at all levels need to be strengthened in order to ensure the provision of safe, quality and accessible blood.
Outcome 5.1UTD’s capacity varies across provinces/districts; with some have had very good capacity while some others are still below the standard. PMI UTD should be operated in line with the policies, procedures, and guidelines related to the Good Manufacturing Practice (GMP) to ensure that its product is meeting the standard set. In the last 5-10 years, there were several issues arisen related to UTD management in several provinces, including the lack of harmony with local PMI offices. As such, the management system of UTD should be implemented based on the standard and supported with coordination, communication and coaching mechanisms at different levels of UTD, as well as with other stakeholders.
Outcome 5.2To apply GMP, trained personnel and standard infrastructures, facilities, and equipment have to be adequately available either in quantity, timeliness, and quality. A well-functioning Information System is vital to support UTD services. With a well-functioning Blood Donor Unit Management Information System (SIMUDDA), UTD will be able to deliver its work plan in a professional manner starting from planning, implementation, and reporting.
Outcome 5.3The availability of safe, quality, and accessible blood highly depends on the voluntary blood donor. The attempt to promote Blood Donor Volunteer should be conducted on a regular basis with a massive and proactive approach by visiting potential blood donor sources. This effort should be done intensively in order to attract new blood donors, while retaining blood donor volunteers who have donated their blood on regular basis.
On the other hand, the availability of safe, quality, and accessible blood should be further increased through centralization of blood processing, blood screening, and cross-matching test. In order to reduce dependency on supplies from overseas as well as to improve the effectiveness and efficiency of blood products production, PMI NHQ will continue its attempt to construct a factory to produce blood bag, reagent, and plasma fractionation in order to meet the needs of PMI UTD all over Indonesia. Researches in blood service development should also be conducted by UTD National and Provinces in order to improve innovation and quality of its services.
Planning and Reporting Guidelines Palang Merah Indonesia
22
Out
com
e 6.
1.
PMI’s
par
tner
ship
wit
h th
e go
vern
men
t, p
ublic
and
pri
vate
sec
tors
, m
ovem
ent
part
ners
, or
gani
zati
ons,
nat
iona
l and
inte
rnat
iona
l don
or a
genc
ies,
and
oth
er s
take
hold
ers
is
stre
ngth
ened
at
all l
evel
s.
Out
com
e 6.
2.
Reso
urce
Mob
iliza
tion
cap
acit
y to
en
hanc
e pa
rtic
ipat
ion
from
par
tner
s an
d co
mm
unit
ies
is s
tren
gthe
ned.
Out
put
6.1.
1 M
oU a
nd P
roje
ct A
gree
men
t do
cum
ents
bet
wee
n PM
I wit
h th
e go
vern
men
t, p
ublic
and
pri
vate
sec
tors
, m
ovem
ent
part
ners
, or
gani
zati
ons,
nat
iona
l and
inte
rnat
iona
l don
or a
genc
ies,
and
oth
er
stak
ehol
ders
are
ava
ilabl
e an
d im
plem
ente
d by
PM
I at
all l
evel
s.
6.1.
2 Pa
rtne
rshi
p bu
ildin
g in
itia
tive
s, in
clud
ing
the
impl
emen
tati
on o
f Co
oper
atio
n Ag
reem
ent
Stra
tegy
(CA
S),
are
purs
ued
cons
iste
ntly
by
PMI a
t al
l lev
els.
Out
put
6.2.
1 Re
sour
ce m
obili
zati
on c
apac
ity
stre
ngth
enin
g st
rate
gy is
dev
elop
ed
and
impl
emen
ted
by c
ompe
tent
per
sonn
el in
PM
I at
all l
evel
s.
6.2.
2 Po
tent
ial d
onor
map
ping
for
res
ourc
e m
obili
zati
on n
atio
n-w
ide
is
deve
lope
d an
d di
ssem
inat
ed t
o PM
I Cha
pter
s/Br
anch
es.
6.2.
3 G
uide
lines
reg
ulat
ing
the
utili
zati
on o
f fu
nd g
ener
ated
fro
m p
ublic
do
nati
on is
dis
sem
inat
ed a
nd im
plem
ente
d by
PM
I.
SRAT
EGIC
OBJ
ECTI
VE-6
To s
tren
gthe
n th
e pa
rtne
rshi
p w
ith
nati
onal
and
loca
l gov
ernm
ents
, pu
blic
and
pri
vate
se
ctor
s, m
ovem
ent
part
ners
, do
nor
agen
cies
, an
d ot
her
stak
ehol
ders
in o
rder
to
assu
me
PMI’s
m
anda
te a
nd f
unct
ions
.
Planning and Reporting Guidelines Palang Merah Indonesia
23
Description
Strategic Objective 6PMI has been able to remain active and productive for 70 years. This was possible with supports from different stakeholders. Without their supports, PMI will have limitations in performing its roles. Partnership is the term that needs to be further developed and maintained, both at national and international levels.
Outcome 6.1The partnership between PMI and the Government, public sector, corporate sector, movement partners, organizations, national and international donors, as well as other stakeholders is formally endorsed with an MoU or Cooperation Agreement. This is to ensure consistent legal protection for the partnership implementation at the target Chapters and Branches. There have actually been several MoUs initiated by PMI NHQ, however they were not implemented and did not have any significance as they were not followed up with communication and coordination at Chapter/Branch levels. PMI board members at all levels need to proactively present PMI as a potential partner for stakeholders through effective communication and coordination.
Outcome 6.2A healthy organization is an organization with a diverse source of funding or no dependency to one or several sources only. PMI needs fund to maintain its operation and provide services. Therefore, PMI at all levels have to proactively seek income for the organization. There are many activities that could bring income to PMI such as public fundraising, business unit development, service provision, and proposal submission. Nearly 80% of PMI Branches however received most of their funding from the government.
Lately, public fundraising such as Bulan Dana (Donation Month) has been facing different challenges as the communities were facing economic challenges. PMI fundraising strategies need to evolve as the world is changing. It requires specific Resource Mobilization strategies that are strategic, relevant, in line with the organization’s fundamental principles, and effective. These could only be achieved if the personnel managing the unit have specific competences in Resource Mobilization. This seems to be an area often neglected or not receiving serious attention. Therefore, it is not surprising that PMI’s performance is very limited, and few of them even only have their signboards.
After receiving the fund, the mechanism to utilize the fund raised, especially for funding raised nationwide (e.g. fund collected from a partnership with private sector or donor), should be discussed and agreed collectively in order to optimize PMI’s development and services throughout Indonesia.
Planning and Reporting Guidelines Palang Merah Indonesia
24
Out
com
e 7.
1.
Prin
cipl
es o
f ac
coun
tabi
lity
and
tran
spar
ency
are
wel
l-im
plem
ente
d by
PM
I acc
ordi
ngly
.
Out
com
e 7.
2.
Out
reac
h, q
ualit
y, a
nd in
tens
ity
of d
ocum
enta
tion
, pu
blic
atio
n,
prom
otio
n, a
nd a
dvoc
acy
of P
MI a
ctiv
itie
s/se
rvic
es a
re
incr
ease
d.
Out
put
7.1.
1 Re
port
s on
fina
ncia
l inc
ome
and
expe
ndit
ures
, in
clud
ing
finan
cial
an
d na
rrat
ive
repo
rts,
are
dev
elop
ed o
n pe
riod
ical
bas
is f
or in
tern
al
and
exte
rnal
con
sum
ptio
n.
7.1.
2 Au
dit
on P
MI’s
fina
ncia
l exp
endi
ture
s is
con
duct
ed a
nnua
lly b
oth
by
inte
rnal
and
ext
erna
l acc
ount
ant
and
follo
wed
up
acco
rdin
gly.
7.1.
3 G
uide
lines
on
bene
ficia
ry f
eedb
ack
and
com
plai
nt m
echa
nism
are
de
velo
ped
and
impl
emen
ted
by P
MI a
t al
l lev
els.
Out
put
7.2.
1 Ba
sic
PR a
nd c
omm
unic
atio
n eq
uipm
ent
and
tool
s (c
amer
a,
vide
o ca
mer
a, r
ecor
der)
, as
wel
l as
info
rmat
ion,
edu
cati
on,
and
com
mun
icat
ion
(IEC
) m
ater
ials
are
ade
quat
ely
avai
labl
e at
all
leve
ls
of P
MI.
7.2.
2 An
alys
is r
epor
t on
PM
I pub
licat
ion
in m
ass
med
ia (
prin
t, o
nlin
e,
TV,
radi
o) a
nd s
ocia
l med
ia (
Twit
ter
and
Face
book
) is
dev
elop
ed o
n re
gula
r ba
sis
at P
MI N
HQ
/Cha
pter
s.
7.2.
3 PR
and
com
mun
icat
ion
prod
ucts
to
prom
ote
PMI p
rogr
ams
and
serv
ices
are
dis
sem
inat
ed t
o th
e co
mm
unit
ies/
publ
ic o
n re
gula
r ba
sis.
STRA
TEG
IC O
BJEC
TIVE
-7To
impr
ove
PMI’s
acc
ount
abili
ty a
s a
hum
anit
aria
n or
gani
zati
on a
t th
e na
tion
al a
nd in
tern
a-ti
onal
leve
ls.
Planning and Reporting Guidelines Palang Merah Indonesia
25
Description
Strategic Objective 7Accountability is an ethical concept too broad to be defined. However, in short, accountability is the responsibility to them who has a partnership with an organization which will determine the continuity of that partnership. Accountability is closely related with reputation. To become a forefront humanitarian organization, PMI should put forward transparency and accountability principles, either in the organization, resources, or service/program management.
Outcome 7.1The demand for accountability and transparency has been increasing nowadays, especially for humanitarian organization like PMI, which depends on public fund. The effort to strengthen PMI accountability could be pursued through different methods. For example: publishing financial report that provides information on income and expenditures of funding from public/community, both for internal and external party; conducting regular annual audit, either by internal or external auditors; seeking opinion, feedback, and criticisms from the people served. Through those strategies, PMI can demonstrate its compliance and pursuance of conditions set by donors, and at the same time, PMI remains transparent to the people providing resources and those being served.
Outcome 7.2.Accountability and transparency will be ‘seen and heard’ by community at large through intensive, consistent, proportionate, and transparent publication and advocacy. All of those efforts should certainly be done with sufficient media-related equipment. Each organization has to understand its public ‘positioning’, thus it requires effective public relation strategies to strategically position itself among other players. For example, by conducting analysis on the impact of media publication on PMI, therefore the publication or the development of publication products can be done in a well-planned, targeted, and measurable manner.
Planning and Reporting Guidelines Palang Merah Indonesia
26
Out
com
e 8.
1.
Und
erst
andi
ng o
n RC
RC a
nd h
uman
itar
ian
valu
es a
mon
g PM
I pe
rson
nel a
nd e
xter
nal s
take
hold
ers
is im
prov
ed.
Out
put
8.1.
1 U
pdat
ed In
form
atio
n, E
duca
tion
, an
d Co
mm
unic
atio
n (I
EC)
mat
eria
ls o
n RC
RC D
isse
min
atio
n ar
e av
aila
ble
adeq
uate
ly a
t al
l le
vels
.
8.1.
2 Ch
arac
ter
build
ing
on h
uman
itar
ian
and
RCRC
val
ues
is f
acili
tate
d by
co
mpe
tent
dis
sem
inat
ors
at a
ll le
vels
.
8.1.
3 Pa
rtne
rshi
p w
ith
rele
vant
inst
itut
ions
(M
ilita
ry,
Polic
e, u
nive
rsit
ies,
sc
hool
s, N
GO
s) a
nd c
omm
unit
ies
is e
stab
lishe
d to
dis
sem
inat
e hu
man
itar
ian
and
RCRC
val
ues.
SRAT
EGIC
OBJ
ECTI
VE-8
To im
prov
e th
e un
ders
tand
ing
of a
ll el
emen
ts o
f co
mm
unit
ies
on h
uman
itar
ian
valu
es,
Fund
amen
tal P
rinc
iple
s of
the
Inte
rnat
iona
l RCR
C M
ovem
ent,
as
wel
l as
Inte
rnat
iona
l H
uman
itar
ian
Law
s th
roug
h co
mm
unic
atio
n, e
duca
tion
, an
d di
ssem
inat
ion
stra
tegi
es.
Planning and Reporting Guidelines Palang Merah Indonesia
27
Description
Strategic Objective 8Humanitarian values and the Fundamental Principles of the International RCRC Movement is a world heritage, especially in International Humanitarian Law. It is therefore important to inherit the awareness on the humanitarian values and the Fundamental Principles of the International RCRC Movement to all elements of community, from generation to generation, in order to preserve their existence.
Outcome 8.1The understanding on humanitarian values and the basic principles of the International RCRC movement is mandatory for PMI personnel at all levels, starting from the leaders, staff as well as volunteers. This corresponds to PMI’s Vision in Strategic Plan 2014 – 2019, “ PMI demonstrates strong character…”, therefore these values should be reflected in all aspects of the organization, i.e. leadership, program implementer, and nature/principles of PMI service.
The dissemination of humanitarian values and the Fundamental Principles of the International RCRC Movement internally will be integrated into all PMI training packages/module, and RCRC orientation to the board members. As for external party, the dissemination will be conducted through various events at PMI, both at the local and national levels, by utilizing media networks as well as partnership with Military, Police, universities, and schools networks.
Planning and Reporting Guidelines Palang Merah Indonesia
28
There are indicators applicable specifically for a certain level, for example, they are only relevant for PMI NHQ or Chapter or Branch. However, there are also indicators applicable to all levels, whether for two or three levels at the same time. Overall, there are 12 Strategic Plan indicators and 172 Operational Plan indicators. The following details of indicator are disaggregated between levels of objective and PMI levels therefore irrelevant for accumulation.
Strategic Plan
In total, there are 12 indicators to be measured nationwide by midterm and by the end of the effective period of the strategic plan, for example, in 2015 (as a baseline); 2017 (as midterm evaluation); and 2019 (as end line or final evaluation).
Operational Plan
The achievement of Operational Plan indicators will be measured on a regular basis in accordance with the reporting period in effect. The indicator measurement period is highly dependent on the indicator statement, but at least all of the indicators adopted in PMI annual work plan at all levels must be reported at the end of the year.
There are 22 Outcome statements with 56 indicators
9 PMI NHQ : 26 indicators9 PMI Chapter : 16 indicators9 PMI B : 31 indicators
9 National Blood Transfusion Unit (UTD) : 2 indicators9 Provincial Blood Transfusion Unit (UTD) : 5 indicators9 District Blood Transfusion Unit (UTD) : 5 indicators9 PMI Hospital : 3 indicators
2.2. Summary on Number of Indicator
Planning and Reporting Guidelines Palang Merah Indonesia
29
STRATEGIC OBJECTIVE 1:To build a well-functioning PMI at all levels, with the capacity to create synergy between program activities and the organizational policies, procedures, and system.
OUTCOME OUTCOME INDICATOR
TARGET 2019 FOR OUTCOME INDICATOR
OUTPUT OUTPUT INDICATOR
TARGET 2019 FOR OUTPUT
INDICATOR
1.1 PMI’s Legal Entity is strengthened.
1. RC law is passed. Year 2017 1.1.1 RC Bill is included in the National Legislation Program agenda.
2. Number of activities to disseminate information of RC Bill.
10
1.2 PMI’s Statutes, Organizational Procedures (PO), and Implementation Guidelines (Juklak), as well as the legal products issued are institutionalized at all levels.
3. PMI NHQ/Chapters/ Branches conducted the Five-Yearly Assembly Meeting in timely manner.
1/33/420 1.2.1 PMI Statutes, Organizational Procedures (PO), and Implementation Guidelines (Juklak), as well as legal products are in place and implemented at all levels.
6. PMI Chapters/Branches receive dissemination of information on statutes.
33/420
4. PMI NHQ/Chapters/ Branches conducted Annual Meeting in accordance with the assigned schedule.
1/33/320 7. PMI Branches use PMI bank account for its transactions.
420
5. Number of Organizational Procedures (PO) adjusted to the Statute.
5 8. Number of PMI employees who have written employment contracts.
Determined by Branches
9. PMI NHQ/Chapters/ Branches develop asset inventory in line with the technical guidelines.
1/33/420
10. PMI Chapters/Branches have HR regulation in place.
33/420
11. PMI Chapters/Branches has employee database that is updated on annual basis.
33/420
12. Number of PMI employee at the Chapters/Branches.
Determined by Chapters/ Branches
1.3 PMI’s Planning, Monitoring, Evaluation, and Reporting (PMER) system is well-functioning at all levels.
13. PMI NHQ/Chapters/ Branches develop annual work plan in line with the Planning and Reporting Guidelines.
1/33/375 1.3.1 PMI board members and staff at all levels are regularly coached on the implementation of Planning, Monitoring, Evaluation, and Reporting (PMER) system by competent facilitators.
16. PMI Chapters/Branches receive technical assistance visit on PMER.
20/235
17. PMI Chapters/Branches receive information regarding the Planning and Reporting Guidelines.
33/320
14. PMI NHQ/Chapters/ Branches develop annual report in line with the Planning and Reporting Guidelines.
1/33/375 1.3.2 Planning and reporting documents that are in line with the Planning and Reporting Guidelines are available at all levels.
18. PMI Chapter/Branches submit quarterly report to one level above, in line with the Planning and Reporting Guidelines.
33/375
There are 64 Output statements with 116 indicators9 PMI NHQ : 38 indicators9 PMI Chapter : 48 indicators9 PMI Branch : 63 indicators
9 National Blood Transfusion Unit (UTD) : 16 indicators9 Provincial Blood Transfusion Unit (UTD) : 13 indicators9 District/City Blood Transfusion Unit (UTD) : 14 indicators9 PMI Hospital : 6 indicators
In the Operational Plan Matrix, the indicator numbering is made sequentially per outcome and output. Thus, the arrangement is as described in the following table.
Indicator is a measurement or benchmark or evidence of the achievement of the intended
objectives, either at strategic objective, outcome, or output level.
Planning and Reporting Guidelines Palang Merah Indonesia
30
2.3.
Mat
rix
of P
MI S
trat
egic
Pla
n 20
14-2
019
VISI
ON
: PM
I dem
onst
rate
s st
rong
cha
ract
ers
and
is p
rofe
ssio
nal,
sel
f-su
stai
ning
, an
d re
spec
ted
by c
omm
unit
ies
MIS
SIO
NG
OA
L/ST
RATE
GIC
OBJ
ECTI
VEKE
Y PE
RFO
RMA
NCE
IND
ICAT
OR
TARG
ET 2
019
1.
To b
ecom
e th
e fo
refr
ont h
uman
-ita
rian
orga
niza
tion
that
pro
vide
s qu
ality
serv
ices
to c
omm
uniti
es
in li
ne w
ith th
e fu
ndam
enta
l pr
inci
ples
of t
he R
ed C
ross
and
Re
d Cr
esce
nt M
ovem
ent.
1. T
o bu
ild a
wel
l-fu
ncti
onin
g PM
I at
all l
evel
s, w
ith
the
capa
city
to
crea
te s
yner
gy b
etw
een
prog
ram
act
ivit
ies
and
the
orga
niza
tion
al p
olic
ies,
pro
cedu
res,
and
sys
tem
.
1.
RC L
aw is
lega
lized
.
2.
PMI N
HQ
/Cha
pter
s/Br
anch
es a
re
wel
l-fu
ncti
oned
.
- Ye
ar 2
017
- 1/
33/2
35
2. T
o st
reng
then
the
cap
acit
y of
PM
I’s o
rgan
izat
iona
l re
sour
ces
at a
ll le
vels
, bo
th it
s hu
man
res
ourc
es a
nd
the
faci
litie
s an
d in
fras
truc
ture
s ne
eded
to
serv
e th
e co
mm
unit
ies.
3.
Num
ber
of d
isas
ter
resp
onse
spe
cial
-is
ts a
t th
e na
tion
al le
vel.
4.
Regi
onal
war
ehou
ses
are
wel
l-fu
nc-
tion
ing.
- 50
peo
ple
- 6
war
ehou
ses
3. T
o im
prov
e th
e qu
alit
y of
dis
aste
r an
d he
alth
em
erge
ncy
resp
onse
s ac
ross
Indo
nesi
a, e
ithe
r in
ter
ms
of s
peed
, co
vera
ge,
and
effe
ctiv
enes
s of
the
ser
vice
s.
5.
PMI B
ranc
hes
are
prep
ared
for
di
sast
er.
6.
Num
ber
of d
irec
t be
nefic
iari
es o
f PM
I ser
vice
s.
- 12
0 PM
I Bra
nche
s
- Ac
tual
4. T
o st
reng
then
com
mun
ity
resi
lienc
e in
ord
er t
o re
duce
th
e ri
sks
and
impa
ct o
f di
sast
ers
and
dise
ases
thr
ough
di
sast
er p
repa
redn
ess,
hea
lth,
and
soc
ial p
rogr
ams,
als
o re
ferr
al h
ealt
h se
rvic
es.
7.
PMI B
ranc
hes
have
≥5
villa
ges
rece
ivin
g in
terv
enti
on,
whi
ch a
re
disa
ster
res
ilien
t.
- 23
5 PM
I Bra
nche
s
5. T
o in
crea
se t
he a
vaila
bilit
y of
saf
e, a
cces
sibl
e, a
nd
qual
ity
bloo
d th
roug
hout
Indo
nesi
a.8.
Bl
ood
Tran
sfus
ion
Uni
t (U
TD)
Dis
tric
ts/C
itie
s m
eet
the
serv
ice
min
imum
sta
ndar
d.
- 20
0 U
TDs
2.
To st
reng
then
PM
I’s se
lf-su
ffici
en-
cy th
roug
h su
stai
nabl
e st
rate
gic
part
ners
hips
with
the
gove
rn-
men
t, pr
ivat
e se
ctor
, mov
emen
t pa
rtne
rs, c
omm
uniti
es, a
nd o
ther
st
akeh
olde
rs a
t all
leve
ls.
6. T
o st
reng
then
the
par
tner
ship
wit
h na
tion
al a
nd lo
cal
gove
rnm
ents
, pu
blic
and
pri
vate
sec
tors
, m
ovem
ent
part
ners
, do
nor
agen
cies
, an
d ot
her
stak
ehol
ders
in
orde
r to
ass
ume
PMI’s
man
date
and
fun
ctio
ns.
9.
Perc
enta
ge o
f in
crea
se in
loca
l gov
-er
nmen
t fu
ndin
g al
loca
tion
to
PMI
Chap
ters
/Bra
nche
s.
10.
Perc
enta
ge o
f to
tal i
ncre
ase
in
inco
me
at P
MI N
HQ
/Cha
pter
s/Br
anch
es.
- 30
%
- 30
%
3.
To im
prov
e PM
I’s o
rgan
izat
ion-
al r
eput
atio
n at
the
nat
iona
l an
d in
tern
atio
nal l
evel
s.
7. T
o im
prov
e PM
I’s a
ccou
ntab
ility
as
a hu
man
itar
ian
orga
niza
tion
at
the
nati
onal
and
inte
rnat
iona
l lev
els.
11.
Num
ber
of n
ew p
rogr
am/
proj
ect
fund
ed b
y do
nors
.-
15
8. T
o im
prov
e th
e un
ders
tand
ing
of a
ll el
emen
ts o
f co
mm
unit
ies
on h
uman
itar
ian
valu
es,
fund
amen
tal
prin
cipl
es o
f th
e in
tern
atio
nal R
CRC
mov
emen
t,
as w
ell a
s In
tern
atio
nal H
uman
itar
ian
Law
s (I
HL)
th
roug
h co
mm
unic
atio
n, e
duca
tion
, an
d di
ssem
inat
ion
stra
tegi
es.
12.
Perc
enta
ge o
f su
rvey
ed r
espo
nden
ts
who
are
abl
e to
men
tion
PM
I man
-da
te c
orre
ctly
.
- 70
%
Planning and Reporting Guidelines Palang Merah Indonesia
31
2.4.
Mat
rix
of P
MI O
pera
tion
al P
lan
2015
-201
9
STRA
TEG
IC O
BJEC
TIVE
1:
To b
uild
a w
ell-
func
tion
ing
PMI a
t al
l lev
els,
wit
h th
e ca
paci
ty t
o cr
eate
syn
ergy
bet
wee
n pr
ogra
m a
ctiv
itie
s an
d th
e or
gani
zati
onal
pol
icie
s,
proc
edur
es,
and
syst
em.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
1.1
PMI’s
Leg
al
Enti
ty is
st
reng
then
ed.
1.
RC la
w is
pas
sed.
Year
201
71.
1.1
RC B
ill is
incl
uded
in t
he
Nat
iona
l Leg
isla
tion
Pro
gram
ag
enda
.
2.
Num
ber
of a
ctiv
itie
s to
dis
sem
inat
e in
form
atio
n of
RC
Bill.
10
1.2
PMI’s
Sta
tute
s,
Org
aniz
atio
nal
Proc
edur
es
(PO
), a
nd
Impl
emen
tati
on
Gui
delin
es
(Juk
lak)
, as
w
ell a
s th
e le
gal p
rodu
cts
issu
ed a
re
inst
itut
iona
lized
at
all
leve
ls.
3.
PMI N
HQ
/Cha
pter
s/ B
ranc
hes
cond
ucte
d th
e Fi
ve-Y
earl
y As
sem
bly
Mee
ting
in
tim
ely
man
ner.
1/33
/420
1.2.
1 PM
I Sta
tute
s, O
rgan
izat
iona
l Pr
oced
ures
(PO
), a
nd
Impl
emen
tati
on G
uide
lines
(J
ukla
k),
as w
ell a
s le
gal
prod
ucts
are
in p
lace
and
im
plem
ente
d at
all
leve
ls.
6.
PM
I Cha
pter
s/Br
anch
es r
ecei
ve
diss
emin
atio
n of
info
rmat
ion
on
stat
utes
.
33/4
20
4.
PMI N
HQ
/Cha
pter
s/ B
ranc
hes
cond
ucte
d An
nual
Mee
ting
in a
ccor
danc
e w
ith
the
assi
gned
sch
edul
e.
1/33
/320
7.
PMI B
ranc
hes
use
PMI b
ank
acco
unt
for
its
tran
sact
ions
.42
0
5.
Num
ber
of O
rgan
izat
iona
l Pro
cedu
res
(PO
) ad
just
ed t
o th
e St
atut
e.5
8.
Num
ber
of P
MI e
mpl
oyee
s w
ho h
ave
wri
tten
em
ploy
men
t co
ntra
cts.
Det
erm
ined
by
Bra
nche
s
9.
PMI N
HQ
/Cha
pter
s/ B
ranc
hes
deve
lop
asse
t in
vent
ory
in li
ne w
ith
the
tech
nica
l gui
delin
es.
1/33
/420
10.
PM
I Cha
pter
s/Br
anch
es h
ave
HR
regu
lati
on in
pla
ce.
33/4
20
11.
PM
I Cha
pter
s/Br
anch
es h
as
empl
oyee
dat
abas
e th
at is
upd
ated
on
ann
ual b
asis
.
33/4
20
12.
N
umbe
r of
PM
I em
ploy
ee a
t th
e Ch
apte
rs/B
ranc
hes.
Det
erm
ined
by
Cha
pter
s/
Bran
ches
1.3
PMI’s
Pla
nnin
g,
Mon
itor
ing,
Ev
alua
tion
, an
d Re
port
ing
(PM
ER)
syst
em
is w
ell-
func
tion
ing
at
all l
evel
s.
13.
PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p an
nual
wor
k pl
an in
line
wit
h th
e Pl
anni
ng a
nd R
epor
ting
Gui
delin
es.
1/33
/375
1.3.
1 PM
I boa
rd m
embe
rs a
nd
staf
f at
all
leve
ls a
re
regu
larl
y co
ache
d on
the
im
plem
enta
tion
of
Plan
ning
, M
onit
orin
g, E
valu
atio
n, a
nd
Repo
rtin
g (P
MER
) sy
stem
by
com
pete
nt f
acili
tato
rs.
16.
PM
I Cha
pter
s/Br
anch
es r
ecei
ve
tech
nica
l ass
ista
nce
visi
t on
PM
ER.
20/2
35
17.
PM
I Cha
pter
s/Br
anch
es r
ecei
ve
info
rmat
ion
rega
rdin
g th
e Pl
anni
ng
and
Repo
rtin
g G
uide
lines
.
33/3
20
14.
PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p an
nual
rep
ort
in li
ne w
ith
the
Plan
ning
an
d Re
port
ing
Gui
delin
es.
1/33
/375
1.3.
2 Pl
anni
ng a
nd r
epor
ting
do
cum
ents
tha
t ar
e in
lin
e w
ith
the
Plan
ning
and
Re
port
ing
Gui
delin
es a
re
avai
labl
e at
all
leve
ls.
18.
PM
I Cha
pter
/Bra
nche
s su
bmit
qu
arte
rly
repo
rt t
o on
e le
vel a
bove
, in
line
wit
h th
e Pl
anni
ng a
nd
Repo
rtin
g G
uide
lines
.
33/3
75
Planning and Reporting Guidelines Palang Merah Indonesia
32
STRA
TEG
IC O
BJEC
TIVE
1:
To b
uild
a w
ell-
func
tion
ing
PMI a
t al
l lev
els,
wit
h th
e ca
paci
ty t
o cr
eate
syn
ergy
bet
wee
n pr
ogra
m a
ctiv
itie
s an
d th
e or
gani
zati
onal
pol
icie
s,
proc
edur
es,
and
syst
em.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
15.
PM
I NH
Q’s
div
isio
ns/
bure
aus/
unit
s de
velo
p an
nual
rep
ort
in li
ne w
ith
the
Plan
ning
and
Rep
orti
ng G
uide
lines
.
1419
.
PMI N
HQ
’s D
ivis
ions
/ Bu
reau
s/U
nits
sub
mit
qua
rter
ly r
epor
t to
th
e O
ffice
Man
ager
, in
line
wit
h th
e Pl
anni
ng a
nd R
epor
ting
Gui
delin
es.
14
1.3.
3 As
sess
men
t to
ols
(que
stio
nnai
res/
anal
ysis
too
ls)
for
PMI
orga
niza
tion
al c
apac
ity
map
ping
are
ava
ilabl
e an
d ad
opte
d at
all
leve
ls.
20.
PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p O
rgan
izat
iona
l Cap
acit
y M
appi
ng e
very
tw
o ye
ars.
1/33
/420
1.3.
4 PM
I wor
k pl
ans
at a
ll le
vels
ar
e ev
alua
ted
base
d on
th
e Pl
anni
ng,
Mon
itor
ing,
Ev
alua
tion
, an
d Re
port
ing
(PM
ER)
Refe
renc
e Bo
ok.
21.
N
umbe
r of
pro
gram
fun
ded
by
exte
rnal
don
ors
that
is e
valu
ated
by
PMI N
HQ
at
the
end
of t
he p
rogr
am.
80%
out
of
the
exis
ting
pr
ojec
ts/
prog
ram
s
1.3.
5 PM
I Boa
rd M
embe
rs a
nd
Staf
fing
Dat
abas
e I u
pdat
ed
on r
egul
ar b
asis
.
22.
PM
I Cha
pter
s/Br
anch
es d
evel
op
Boar
d M
embe
rs a
nd S
taffi
ng
Dat
abas
e th
at is
reg
iste
red
at P
MI
NH
Q.
33/4
20
1.4
Coor
dina
tion
, co
mm
unic
atio
n,
and
coac
hing
m
echa
nism
is
oper
atio
nal a
t al
l lev
els.
23.
PM
I NH
Q/C
hapt
ers/
Bra
nche
s co
nduc
t pl
enar
y m
eeti
ng o
n m
onth
ly b
asis
.1/
33/4
601.
4.1
Inte
rnal
and
cro
ss-
chap
ters
/br
anch
es c
omm
unic
atio
n an
d co
ordi
nati
on a
re
impl
emen
ted
in li
ne w
ith
the
proc
edur
es.
24.
PM
I Cha
pter
s/Br
anch
es h
as a
for
mal
Bo
ard
Dec
ree
on B
oard
Mem
bers
an
d St
affin
g st
ruct
ures
.
33/4
20
1.4.
2 Ti
ered
coa
chin
g on
or
gani
zati
onal
and
pro
gram
de
velo
pmen
t is
car
ried
out
on
reg
ular
as
wel
l as
need
ba
sis.
25.
PM
I Cha
pter
s re
ceiv
e co
achi
ng v
isit
fr
om P
MI N
HQ
’s B
oard
Mem
bers
at
leas
t on
ce a
yea
r.
33
26.
PM
I Bra
nche
s re
ceiv
e co
achi
ng v
isit
fr
om P
MI C
hapt
er’s
Boa
rd M
embe
rs
at le
ast
once
a y
ear.
320
27.
PM
I Cha
pter
s/Br
anch
es r
ecei
ve
tech
nica
l ass
ista
nce
visi
t fr
om P
MI
staf
f fr
om o
ne le
vel a
bove
at
leas
t on
ce a
yea
r.
33/3
20
Planning and Reporting Guidelines Palang Merah Indonesia
33
STRA
TEG
IC O
BJEC
TIVE
2:
To s
tren
gthe
n th
e ca
paci
ty o
f PM
I’s o
rgan
izat
iona
l res
ourc
es a
t al
l lev
els,
bot
h it
s hu
man
res
ourc
es a
nd t
he f
acili
ties
and
infr
astr
uctu
re n
eede
d to
ser
ve t
he c
omm
unit
ies.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R O
UT
PUT
IN
DIC
ATO
R
2.1
PMI’s
HR
Man
agem
ent
that
incl
udes
re
crui
tmen
t,
trai
ning
, as
sign
men
t,
supe
rvis
ion,
re
war
d an
d re
cogn
itio
n,
as w
ell a
s pe
rfor
man
ce
eval
uati
on is
im
prov
ed.
28.
N
umbe
r of
PM
I em
ploy
ee
at N
HQ
/Cha
pter
s/Br
anch
es p
aid
in li
ne w
ith
the
Prov
inci
al/D
istr
ict
min
imum
wag
e st
anda
rd.
Det
erm
ined
by
Cha
pter
s/
Bran
ches
2.1.
1 H
uman
res
ourc
es w
ith
tech
nica
l and
man
ager
ial
skill
s ar
e av
aila
ble
and
trai
ned
to c
arry
out
the
ir
mai
n ta
sks
and
func
tion
s fo
r PM
I at
all l
evel
s.
36.
N
umbe
r of
bra
nch
volu
ntee
r tr
aine
d in
sp
ecia
lized
ski
ll se
ts o
f pr
iori
ty I/
II/III
ser
vice
s.
Det
erm
ined
by
Bran
ches
29.
Pe
rcen
tage
of
bran
ch
volu
ntee
r (K
SR/T
SR)
inac
tive
for
a y
ear.
<20%
37.
N
umbe
r of
em
ploy
ee
of P
MI N
HQ
/Cha
pter
s/
Bran
ches
who
att
end
tech
nica
l tra
inin
g.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
30.
Perc
enta
ge o
f br
anch
vo
lunt
eer
(YRC
/KSR
/TS
R) w
ho h
as t
aken
par
t in
bra
nche
s’ a
ctiv
itie
s on
qu
arte
rly
basi
s.
>50%
2.1.
2 P
MI p
erso
nnel
rec
eive
ad
equa
te h
ealt
h se
rvic
es,
eith
er in
ter
ms
of p
rom
otio
n,
prev
enti
on,
or t
reat
men
t.
38.
N
umbe
r of
ser
vice
s pr
ovid
ed b
y po
lycl
inic
to
PM
I per
sonn
el
ever
y qu
arte
r at
NH
Q/
Chap
ters
/Bra
nche
s.
Det
erm
ined
by
PM
I NH
Q/
Chap
ter/
Br
anch
es w
ith
poly
clin
ic
31.
N
umbe
r of
sch
ool i
n D
istr
icts
tha
t ha
s ac
tive
Yo
uth
Red
Cros
s (Y
RC)
unit
.
Det
erm
ined
by
Bra
nche
s2.
1.3
Volu
ntee
r (K
SR,
TSR,
incl
udin
g co
rpor
ate/
org
aniz
atio
n/in
stit
utio
n vo
lunt
eers
) an
d YR
C m
anag
emen
t gu
idel
ines
is
impl
emen
ted
at a
ll le
vels
.
39.
PM
I Bra
nche
s ha
ve a
ctiv
e Yo
uth/
Volu
ntee
r Fo
rum
.32
0
32.
N
umbe
r of
cor
pora
te
volu
ntee
rs (
corp
orat
e/
orga
niza
tion
s/ in
stit
utio
ns)
mob
ilize
d by
PM
I NH
Q/
Chap
ters
/ Br
anch
es.
Det
erm
ined
by
Cha
pter
s/
Bran
ches
40.
PM
I Cha
pter
s/Br
anch
es
orga
nize
You
th g
athe
ring
(J
umba
ra).
33/3
20
33.
N
umbe
r of
vol
unte
er
insu
red
by P
MI B
ranc
hes.
Det
erm
ined
by
Bra
nche
s41
.
PMI N
HQ
/Cha
pter
s or
gani
ze v
olun
teer
ga
ther
ing
(Tem
u Ka
rya)
.
1/33
34.
N
umbe
r of
PM
I NH
Q/
Chap
ters
/Bra
nche
s bo
ard
mem
ber
and
staf
f w
ho
rece
ive
PMER
tra
inin
g.
915
42.
PM
I Bra
nche
s up
date
vo
lunt
eer
data
base
on
quar
terl
y ba
sis.
420
35.
N
umbe
r of
tra
iner
cer
tifie
d by
PM
I NH
Q.
250
Planning and Reporting Guidelines Palang Merah Indonesia
34
STRA
TEG
IC O
BJEC
TIVE
2:
To s
tren
gthe
n th
e ca
paci
ty o
f PM
I’s o
rgan
izat
iona
l res
ourc
es a
t al
l lev
els,
bot
h it
s hu
man
res
ourc
es a
nd t
he f
acili
ties
and
infr
astr
uctu
re n
eede
d to
ser
ve t
he c
omm
unit
ies.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R O
UT
PUT
IN
DIC
ATO
R
2.2
PMI’s
edu
cati
on
and
trai
ning
sy
stem
is w
ell-
func
tion
ing.
43.
N
umbe
r of
PM
I tra
inin
g ce
rtifi
ed b
y na
tion
al
inst
itut
ions
.
5 tr
aini
ngs
2.2.
1 Tr
aine
rs a
nd f
acili
tato
rs a
re
trai
ned,
cer
tifie
d by
PM
I or
the
auth
oriz
ed in
stit
utio
n,
and
are
avai
labl
e to
be
mob
ilize
d fo
r di
ffer
ent
trai
ning
s.
46.
N
umbe
r of
tra
iner
ce
rtifi
ed b
y PM
I NH
Q
who
is m
obili
zed
per
year
.
100
trai
ners
per
ye
ar
44.
N
umbe
r of
tra
inin
g cu
rric
ulum
upd
ated
by
PMI
NH
Q a
t le
ast
once
in e
very
fo
ur y
ear.
547
. N
umbe
r of
YRC
fa
cilit
ator
ava
ilabl
e in
pr
imar
y/ s
econ
dary
/hig
h sc
hool
in P
MI B
ranc
hes’
w
orki
ng a
rea.
Det
erm
ined
by
Bran
ches
45.
N
atio
nal e
duca
tion
and
tr
aini
ng n
eed
anal
ysis
is
avai
labl
e ev
ery
year
.
548
.
Num
ber
of k
ey t
rain
er
auth
oriz
ed b
y PM
I NH
Q
thro
ugh
a D
ecre
e.
100
49.
N
umbe
r of
tra
iner
ce
rtifi
ed b
y BN
SP.
60
2.2.
2 Th
e na
tion
al t
rain
ing
curr
icul
um n
eede
d fo
r in
tern
al/e
xter
nal p
urpo
ses
is u
pdat
ed b
y PM
I and
ac
cred
ited
by
nati
onal
in
stit
utio
ns (
Min
istr
y of
H
ealt
h, M
inis
try
of W
orkf
orce
an
d Tr
ansm
igra
tion
Aff
airs
, BN
PB).
50.
N
umbe
r of
tra
inin
g cu
rric
ulum
for
par
tner
s re
ady
for
use/
adop
tion
.
5
51.
N
umbe
r of
tra
inin
g re
gist
ered
by
PMI N
HQ
to
be a
ccre
dite
d.
2
2.2.
3 PM
I tra
inin
gs a
re m
anag
ed
in li
ne w
ith
the
tech
nica
l gu
idel
ines
for
tra
inin
g m
anag
emen
t.
52.
N
umbe
r of
tra
inin
g re
port
fro
m P
MI
Chap
ters
/ Br
anch
es in
lin
e w
ith
the
tech
nica
l gu
idel
ines
for
tra
inin
g m
anag
emen
t.
80%
out
of t
he
repo
rts
rece
ived
53.
PM
I Cha
pter
s/Br
anch
es
deve
lop
annu
al t
rain
ing
cale
ndar
.
33/4
20
Planning and Reporting Guidelines Palang Merah Indonesia
35
STRA
TEG
IC O
BJEC
TIVE
2:
To s
tren
gthe
n th
e ca
paci
ty o
f PM
I’s o
rgan
izat
iona
l res
ourc
es a
t al
l lev
els,
bot
h it
s hu
man
res
ourc
es a
nd t
he f
acili
ties
and
infr
astr
uctu
re n
eede
d to
ser
ve t
he c
omm
unit
ies.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R O
UT
PUT
IN
DIC
ATO
R
2.3
Avai
labi
lity
of
basi
c su
ppor
ting
fa
cilit
ies
and
infr
astr
uctu
res
for
PMI o
pera
tion
is
incr
ease
d.
54.
N
umbe
r of
reg
iona
l w
areh
ouse
fun
ctio
ning
in
line
wit
h PM
I sta
ndar
ds.
62.
3.1
PMI b
asic
ope
rati
onal
fac
iliti
es
(offi
ce,
disa
ster
ope
rati
on
cent
er/p
osko
, w
areh
ouse
, tr
aini
ng c
ente
r) a
re w
ell-
func
tion
ing.
58.
PM
I Bra
nche
s ha
ve a
t le
ast
five
basi
c fa
cilit
ies
and
infr
astr
uctu
re f
or
offic
e op
erat
ion.
375
55.
PM
I Cha
pter
s/Br
anch
es
have
act
ive/
func
tion
ing
POSK
O.
33/3
2059
.
PMI C
hapt
ers
have
st
orag
e fo
r em
erge
ncy
&
relie
f lo
gist
ics.
15
56.
PM
I Tra
inin
g Ce
nter
mee
ts
cert
ifica
tion
sta
ndar
ds.
360
.
Num
ber
of e
duca
tion
or
tra
inin
g ac
tivi
ty
cond
ucte
d at
PM
I Tr
aini
ng C
ente
r.
Det
erm
ined
by
each
tra
inin
g ce
nter
57.
N
umbe
r of
reg
iona
l w
areh
ouse
tha
t m
aint
ains
m
inim
um s
tock
of
the
four
pri
orit
y it
ems
for
emer
genc
y/re
lief.
62.
3.2
PMI a
sset
s an
d ba
sic
faci
litie
s/
infr
astr
uctu
res
are
man
aged
in
line
wit
h th
e gu
idan
ce
prov
ided
.
61.
PM
I Cha
pter
s/Br
anch
es
subm
it a
sset
inve
ntor
y to
PM
I NH
Q o
n an
nual
ba
sis.
33/3
20
2.4
Perf
orm
ance
and
ut
iliza
tion
of
Info
rmat
ion
and
Com
mun
icat
ion
Tech
nolo
gy in
su
ppor
ting
PM
I’s
oper
atio
n is
im
prov
ed.
62.
Pe
rcen
tage
of
user
who
re
port
s sa
tisf
acti
on o
ver
PMI c
orpo
rate
em
ail
serv
ices
.
90%
2.4.
1 PM
I’s In
form
atio
n an
d Co
mm
unic
atio
n Te
chno
logy
eq
uipm
ent
and
faci
litie
s ar
e av
aila
ble
and
wel
l-m
aint
aine
d.
64.
PM
I NH
Q/C
hapt
ers/
Br
anch
es h
ave
fund
al
loca
ted
for
ICT
mai
nten
ance
.
1/33
/280
63.
N
umbe
r of
dow
nloa
d fo
r ‘P
MI F
irst
Aid
’/’D
isas
ter
Prep
ared
ness
’ ap
plic
atio
ns.
100,
000
2.4.
2 Co
mm
unic
atio
n ne
twor
k an
d so
ftw
are,
e.g
. co
mm
unic
atio
n ra
dio,
inte
rnet
, em
ail s
yste
m,
form
al m
essa
ging
, an
d ap
plic
atio
n, a
re a
vaila
ble
and
func
tion
ing
to s
uppo
rt
PMI’s
ope
rati
on a
nd s
ervi
ces,
in
clud
ing
bloo
d se
rvic
es.
65.
PM
I Bra
nche
s ha
ve
inte
rnet
acc
ess.
375
66.
Pe
rcen
tage
of
PMI
empl
oyee
at
NH
Q/
Chap
ters
/Bra
nche
s w
ho
uses
PM
I cor
pora
te e
mai
l ad
dres
s.
70%
67.
PM
I Bra
nche
s ha
ve f
unct
ioni
ng
com
mun
icat
ion
radi
o ne
twor
k.
235
Planning and Reporting Guidelines Palang Merah Indonesia
36
SRAT
EGIC
OBJ
ECTI
VE 3
:To
impr
ove
the
qual
ity
of d
isas
ter
and
heal
th e
mer
genc
y re
spon
ses
acro
ss In
done
sia,
eit
her
in t
erm
s of
rap
idne
ss,
cove
rage
, an
d ef
fect
iven
ess
of t
he s
ervi
ces.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
3.1
PMI p
erso
nnel
’s
capa
city
sp
ecia
lizin
g in
em
erge
ncy
resp
onse
is
stre
ngth
ened
.
68.
N
umbe
r of
em
erge
ncy
resp
onse
sp
ecia
list
at t
he
nati
onal
leve
l.
180
DR
spec
ialis
ts
33 D
BM
spec
ialis
ts
3.1.
1 D
isas
ter
Resp
onse
(Sa
tgan
a)
70.
N
umbe
r of
SAT
GAN
A te
am
mem
bers
at
PMI B
ranc
hes.
25-3
0 pe
r Br
anch
71.
N
umbe
r of
em
erge
ncy
resp
onse
spe
cial
ist
at P
MI
Chap
ters
.
33 R
FL s
peci
alis
ts
33 R
FL fi
eld
coor
dina
tors
33 C
TP t
rain
ers.
69.
N
umbe
r of
di
sast
er
resp
onse
si
mul
atio
n by
PM
I Bra
nche
s’
in li
ne w
ith
the
SoP.
Det
erm
ined
by
Bra
nche
s3.
1.2
Dis
aste
r re
spon
se s
imul
atio
n is
or
gani
zed
by P
MI a
t al
l lev
els
in li
ne
wit
h th
e ne
eds
and
the
deve
lope
d co
ntin
genc
y pl
an.
72.
N
umbe
r of
dis
aste
r re
spon
se
sim
ulat
ion
acti
viti
es
cond
ucte
d by
PM
I at
NH
Q/
Chap
ters
/ Br
anch
es a
nnua
lly.
1/15
/235
3.2
Avai
labi
lity
of e
mer
genc
y re
spon
se
equi
pmen
t in
line
wit
h ac
coun
tabi
lity
stan
dard
is
incr
ease
d.
73.
N
umbe
r of
be
nefic
iari
es
reac
hed
by
PMI B
ranc
hes’
em
erge
ncy
resp
onse
se
rvic
es.
Det
erm
ined
by
Bra
nche
s3.
2.1
Stan
dard
equ
ipm
ent
for
emer
genc
y re
spon
se,
incl
udin
g co
mm
unic
atio
n eq
uipm
ent
for
coor
dina
tion
as
wel
l as
doc
umen
tati
on a
nd r
epor
ting
fo
rmat
s ar
e in
pla
ce a
nd o
pera
tion
al
at a
ll le
vels
.
74.
PM
I Cha
pter
s ha
ve a
t le
ast
five
supp
orti
ng e
quip
men
t fo
r em
erge
ncy
resp
onse
op
erat
ion.
33
75.
PM
I Bra
nche
s ha
ve a
t le
ast
four
equ
ipm
ent
for
emer
genc
y re
spon
se t
eam
.
235
76.
PM
I Bra
nche
s ha
ve a
t le
ast
two
com
mun
icat
ion
equi
pmen
t fo
r em
erge
ncy
situ
atio
n.
235
77.
PM
I Bra
nche
s pr
ovid
e 24
x 7
am
bula
nce
serv
ice.
Det
erm
ined
by
Bran
ches
3.2.
2 Su
ffici
ent
stoc
k of
em
erge
ncy/
relie
f it
ems
is a
vaila
ble
in r
egio
nal
war
ehou
se a
nd P
MI C
hapt
er’s
logi
stic
st
orag
e to
sup
port
em
erge
ncy
resp
onse
.
78.
N
umbe
r em
erge
ncy/
relie
f it
ems
in P
MI C
hapt
ers’
w
areh
ouse
or
logi
stic
st
orag
e.
33 P
MI C
hapt
ers
Planning and Reporting Guidelines Palang Merah Indonesia
37
SRAT
EGIC
OBJ
ECTI
VE 3
:To
impr
ove
the
qual
ity
of d
isas
ter
and
heal
th e
mer
genc
y re
spon
ses
acro
ss In
done
sia,
eit
her
in t
erm
s of
rap
idne
ss,
cove
rage
, an
d ef
fect
iven
ess
of t
he s
ervi
ces.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
3.3
Emer
genc
y re
spon
se
man
agem
ent
syst
em is
im
plem
ente
d by
PM
I at
all l
evel
.
79.
N
umbe
r of
em
erge
ncy
inci
dent
re
spon
ded
by
PMI B
ranc
hes
wit
hin
the
first
si
x ho
urs.
Det
erm
ined
by
Bra
nche
s3.
3.1
Fram
ewor
k, g
uide
lines
, an
d So
P fo
r em
erge
ncy
resp
onse
ope
rati
on a
nd
coor
dina
tion
mec
hani
sm a
re in
pla
ce
and
adop
ted
by P
MI a
t al
l lev
els.
82.
N
umbe
r of
gui
delin
es/
SoP/
curr
icul
um o
n em
erge
ncy
resp
onse
issu
ed b
y PM
I NH
Q.
Resp
ondi
ng t
o ne
eds
80.
Am
ount
of
cont
inge
ncy
fund
ow
ned
by P
MI N
HQ
/ Ch
apte
rs/
Bran
ches
.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
83.
N
umbe
r of
inci
dent
rep
ort
subm
itte
d by
PM
I Bra
nche
s to
PM
I NH
Q/C
hapt
ers.
80%
out
of t
he
tota
l num
ber
of
inci
dent
81.
PM
I NH
Q/
Chap
ters
/ Br
anch
es
deve
lop
resp
onse
op
erat
ion
plan
w
ithi
n 3x
24
hour
s af
ter
the
emer
genc
y in
cide
nt.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
3.3.
2 PM
I am
bula
nce
serv
ice
beco
mes
a
part
of
loca
l Int
egra
ted
Emer
genc
y M
anag
emen
t Sy
stem
(IE
MS)
.
84.
N
umbe
r of
PM
I am
bula
nce
serv
ice
resp
onde
d th
roug
h IE
MS.
Det
erm
ined
by
Bran
ches
3.3.
3 Co
ntin
genc
y pl
an is
upd
ated
by
PMI
at a
ll le
vels
on
annu
al b
asis
.85
.
PMI N
HQ
/Cha
pter
s/ B
ranc
hes
deve
lop
annu
al C
onti
ngen
cy
Plan
.
1/33
/420
3.3.
4 Ea
rly
war
ning
info
rmat
ion
is
forw
arde
d to
the
com
mun
itie
s in
ti
mel
y m
anne
r.
86.
N
umbe
r of
ear
ly w
arni
ng
info
rmat
ion
forw
arde
d by
PM
I Bra
nche
s to
loca
l co
mm
unit
ies.
Det
erm
ined
by
Bran
ches
3.3.
5 Th
e ne
ed f
or R
FL s
ervi
ce in
bot
h no
rmal
and
em
erge
ncy
peri
ods
is
follo
wed
up
by P
MI a
t al
l lev
els.
87.
N
umbe
r of
RFL
cas
e fo
llow
ed
up b
y PM
I Bra
nche
s un
til t
he
proc
edur
e is
com
plet
ed.
80%
out
of R
FL
case
s at
Bra
nche
s
Planning and Reporting Guidelines Palang Merah Indonesia
38
SRAT
EGIC
OBJ
ECTI
VE 4
:To
str
engt
hen
com
mun
ity
resi
lienc
e in
ord
er t
o re
duce
the
ris
ks a
nd im
pact
of
disa
ster
s an
d di
seas
es t
hrou
gh d
isas
ter
prep
ared
ness
, he
alth
, an
d so
cial
pro
gram
s, a
lso
refe
rral
hea
lth
serv
ices
.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
201
9 FO
R O
UT
PUT
IN
DIC
ATO
R
4.1
PMI’s
cap
acit
y to
man
age
com
mun
ity-
base
d di
sast
er
prep
ared
ness
and
he
alth
pro
gram
s is
str
engt
hene
d.
88.
PM
I Bra
nche
s ha
s at
leas
t fiv
e vi
llage
s re
ceiv
ing
inte
rven
tion
sup
port
eve
ry
year
.
89.
PM
I Bra
nche
s ha
ve a
t le
ast
five
scho
ols
rece
ivin
g in
terv
enti
on s
uppo
rt e
very
ye
ar.
90.
N
umbe
r of
hea
lthy
sch
ools
at
PM
I Bra
nche
s’ w
orki
ng
area
.
91.
N
umbe
r of
dis
aste
r-pr
epar
ed s
choo
l at
PMI
Bran
ches
’ w
orki
ng a
rea.
280
280
Det
erm
ined
by
Bran
ches
Det
erm
ined
by
Bran
ches
4.1.
1 G
uide
lines
/SoP
doc
umen
ts
on c
omm
unit
y-ba
sed
disa
ster
pr
epar
edne
ss a
nd h
ealt
h pr
ogra
ms
are
avai
labl
e,
upda
ted,
and
app
lied
by P
MI.
94.
Num
ber
of g
uide
lines
/So
P on
com
mun
ity-
base
d pr
ogra
ms
avai
labl
e at
PM
I N
HQ
.
DM
(14
Ch
apte
rs/2
0 Br
anch
es w
here
pi
lot
prog
ram
s ar
e lo
cate
d).
Hea
lth
(100
% re
spon
ding
to
need
s).
4.1.
2 Ad
equa
te s
uppo
rtin
g m
ater
ials
/too
ls f
or
com
mun
ity-
base
d di
sast
er
prep
ared
ness
and
hea
lth
prog
ram
s (e
.g.
IEC
mat
eria
ls,
mod
elin
g eq
uipm
ent,
M&
E to
ols)
are
ava
ilabl
e.
95.
Num
ber
of IE
C M
ater
ial d
istr
ibut
ed t
o co
mm
unit
ies
by P
MI
Bran
ches
.
Det
erm
ined
by
Bran
ches
92.
N
umbe
r of
dir
ect
bene
ficia
ry f
rom
PM
I Br
anch
’s d
isas
ter
prep
ared
ness
pro
gram
.
93.
N
umbe
r of
dir
ect
bene
ficia
ry f
rom
PM
I Br
anch
es’
com
mun
ity-
base
d he
alth
pro
gram
.
Det
erm
ined
by
Bran
ches
Det
erm
ined
by
Bran
ches
4.1.
3 Co
mm
unit
y-ba
sed
disa
ster
pr
epar
edne
ss a
nd h
ealt
h pr
ogra
m a
ctiv
itie
s ar
e im
plem
ente
d by
com
pete
nt
PMI s
taff
/vol
unte
ers/
fa
cilit
ator
s at
all
leve
ls.
96.
Num
ber
of c
omm
unit
y-ba
sed
prog
ram
s im
plem
ente
d by
PM
I Br
anch
es.
97.
Num
ber
of s
peci
alis
t on
com
mun
ity-
base
d pr
ogra
m a
t PM
I Cha
pter
s.
98.
Num
ber
of s
taff
/ vo
lunt
eers
at
PMI N
HQ
/Ch
apte
rs/
Bran
ches
tr
aine
d on
com
mun
ity-
base
d pr
ogra
m.
DM
(14
Ch
apte
rs/2
0 Br
anch
es).
Hea
lth
(res
pond
ing
to
need
s).
33 P
MI C
hapt
ers
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
Planning and Reporting Guidelines Palang Merah Indonesia
39
SRAT
EGIC
OBJ
ECTI
VE 4
:To
str
engt
hen
com
mun
ity
resi
lienc
e in
ord
er t
o re
duce
the
ris
ks a
nd im
pact
of
disa
ster
s an
d di
seas
es t
hrou
gh d
isas
ter
prep
ared
ness
, he
alth
, an
d so
cial
pro
gram
s, a
lso
refe
rral
hea
lth
serv
ices
.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
201
9 FO
R O
UT
PUT
IN
DIC
ATO
R
4.2
PMI’s
cap
acit
y to
pro
vide
soc
ial
serv
ices
to
the
com
mun
itie
s is
in
crea
sed.
99.
N
umbe
r of
dir
ect
bene
ficia
ries
fro
m P
MI
Bran
ches
’ so
cial
ser
vice
s.
Det
erm
ined
by
Bran
ches
4.2.
1 G
uide
lines
/SoP
doc
umen
ts
and
supp
orti
ng m
ater
ials
/to
ols
for
soci
al s
ervi
ces
(e.g
. IE
C m
ater
ials
, m
odel
ing
equi
pmen
t, M
&E
tool
s) a
re
avai
labl
e, u
pdat
ed,
and
appl
ied
in P
MI.
100.
Num
ber
of g
uide
lines
/ So
P an
d su
ppor
ting
to
ols
for
soci
al s
ervi
ces
avai
labl
e at
PM
I NH
Q.
Resp
ondi
ng t
o ne
eds
4.2.
2. S
ocia
l ser
vice
act
ivit
ies
are
impl
emen
ted
by c
ompe
tent
PM
I sta
ff/v
olun
teer
s at
all
leve
ls.
101.
Num
ber
of s
ocia
l ser
vice
s ca
rrie
d ou
t at
PM
I NH
Q/
Chap
ters
/Bra
nche
s.
Det
erm
ined
by
Bran
ches
102.
Num
ber
of s
taff
/ vo
lunt
eers
at
PMI N
HQ
/Ch
apte
rs/
Bran
ches
tr
aine
d in
soc
ial s
ervi
ces.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
4.3
PMI H
ospi
tals
’ se
rvic
es a
nd
capa
city
are
im
prov
ed.
103.
PM
I hos
pita
l rec
eive
s ad
vanc
ed a
ccre
dita
tion
ce
rtifi
cate
fro
m t
he
Hos
pita
l Acc
redi
tati
on
Com
mis
sion
(Ko
mis
i A
kred
itas
i Ru
mah
Sak
it-
KARS
) or
Joi
nt C
omm
issi
on
Inte
rnat
iona
l (JC
I) f
rom
In
done
sian
Hea
lth
Min
istr
y.
14.
3.1
Info
rmat
ion
on h
ospi
tal
stan
dard
ser
vice
s (p
atie
nt
serv
ices
, pa
tien
t sa
fety
, se
rvic
es t
o pe
ople
con
trac
ted
wit
h TB
, H
IV/A
IDS
and
CEO
NC)
bas
ed o
n KA
RS
(Hos
pita
l Acc
redi
tati
on
Com
mis
sion
) or
JCI
(Joi
nt
Com
mis
sion
Inte
rnat
iona
l)
stan
dard
s is
dis
sem
inat
ed
to a
ll ho
spit
als’
em
ploy
ees
in o
rder
to
guid
e th
em in
pe
rfor
min
g th
eir
role
s an
d re
spon
sibi
litie
s.
106.
Num
ber
of P
MI h
ospi
tal
empl
oyee
who
rec
eive
s di
ssem
inat
ion
of
info
rmat
ion
on K
ARS/
JCI
st
anda
rd s
ervi
ces.
869
Planning and Reporting Guidelines Palang Merah Indonesia
40
SRAT
EGIC
OBJ
ECTI
VE 4
:To
str
engt
hen
com
mun
ity
resi
lienc
e in
ord
er t
o re
duce
the
ris
ks a
nd im
pact
of
disa
ster
s an
d di
seas
es t
hrou
gh d
isas
ter
prep
ared
ness
, he
alth
, an
d so
cial
pro
gram
s, a
lso
refe
rral
hea
lth
serv
ices
.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
20
19 F
OR
O
UT
COM
E IN
DIC
ATO
R
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
201
9 FO
R O
UT
PUT
IN
DIC
ATO
R
104.
An
nual
Bed
Occ
upan
cy
Rate
(BO
R) r
atio
.
105.
Pe
rcen
tage
of
incr
ease
in
PMI H
ospi
tals
’ in
com
e pe
r ye
ar.
Det
erm
ined
by
PMI H
ospi
tals
4.3.
2 M
edic
al a
nd n
on-m
edic
al
pers
onne
l at
the
hosp
ital
ar
e w
orki
ng in
line
wit
h th
e ho
spit
al s
tand
ard
for
pers
onne
l com
pete
nce
(edu
cati
on q
ualifi
cati
on,
cred
enti
al c
ompe
tenc
e,
clin
ical
aut
hori
ty,
audi
t co
mpe
tenc
e).
107.
Num
ber
of P
MI h
ospi
tal
empl
oyee
who
mee
ts t
he
stan
dard
for
com
pete
nce
for
perf
orm
ance
as
sess
men
t.
869
Det
erm
ined
by
PMI H
ospi
tals
4.3.
3 H
ospi
tal q
ualit
y an
d pa
tien
t sa
fety
impr
ovem
ent
prog
ram
s ar
e im
plem
ente
d th
roug
h In
fect
ion
Prev
enti
on a
nd
Cont
rol (
IPC)
pro
gram
, H
ospi
tal O
ccup
atio
nal H
ealt
h an
d Sa
fety
(K3
RS)
prog
ram
, as
wel
l a H
ospi
tal P
atie
nt
Safe
ty p
rogr
am.
108.
Num
ber
of P
MI h
ospi
tal
staf
f w
ho m
eets
the
em
ploy
ee t
rain
ed in
IPC/
K3RS
.
869
4.3.
4 Ad
equa
te g
ener
al a
nd
spec
ializ
ed/s
ub-s
peci
aliz
ed
med
ical
ser
vice
s, in
clud
ing
flags
hip
serv
ice
for
lifes
tyle
ne
eds,
are
ava
ilabl
e.
109.
Num
ber
of o
ut-p
atie
nts
visi
t in
a y
ear
at P
MI
hosp
ital
.
282,
819
110.
Num
ber
of s
peci
aliz
ed/
sub-
spe
cial
ized
ser
vice
pr
ovid
ed a
t PM
I hos
pita
l.
14
4.3.
5 Ed
ucat
ion,
tra
inin
g an
d de
velo
pmen
t, a
s w
ell a
s pe
rfor
man
ce e
valu
atio
n fo
r ho
spit
al’s
sup
port
ing
staf
f ar
e w
ell-
cond
ucte
d.
111.
Num
ber
of p
erso
nnel
w
ho r
ecei
ves
educ
atio
n/tr
aini
ng a
t PM
I Hos
pita
l.
PMI B
ogor
H
ospi
tal:
869
Planning and Reporting Guidelines Palang Merah Indonesia
41
STRA
TEG
IC O
BJEC
TIVE
5:
To in
crea
se t
he a
vaila
bilit
y of
saf
e, a
cces
sibl
e, a
nd q
ualit
y bl
ood
thro
ugho
ut In
done
sia.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
5.1
Bloo
d Tr
ansf
usio
n U
nit’
s (U
TD)
capa
city
in
line
wit
h th
e na
tion
al
stan
dard
is
incr
ease
d.
112.
UTD
Pro
vinc
es/
Dis
tric
ts m
eet
Goo
d M
anuf
actu
ring
Pr
acti
ce (
GM
P)
stan
dard
s.
42/3
55.
1.1
Polic
ies,
pro
cedu
res,
and
gu
idel
ines
rel
ated
to
Goo
d M
anuf
actu
ring
Pra
ctic
e (G
MP)
fo
r bl
ood
serv
ice
are
avai
labl
e an
d im
plem
ente
d by
UTD
at
all
leve
ls.
114.
N
umbe
r of
UTD
Pro
vinc
e/D
istr
ict
wit
h st
anda
rd o
rgan
izat
iona
l st
ruct
ure.
42/3
5
113.
UTD
Pro
vinc
es/
Dis
tric
ts m
eet
nati
onal
sta
ndar
ds.
42/3
511
5.
Perc
enta
ge o
f U
TD P
rovi
nce/
Dis
tric
t th
at p
asse
s th
e Ex
tern
al
Qua
lity
Assu
ranc
e as
sess
men
t.
100%
5.1.
2 U
TD m
anag
emen
t sy
stem
, in
clud
ing
its
orga
niza
tion
al
stru
ctur
e, s
taffi
ng,
finan
ce,
plan
ning
and
rep
orti
ng,
is
oper
atio
nal a
t al
l lev
els.
116.
U
TD N
atio
nal/
Pro
vinc
es/D
istr
icts
co
nduc
t em
ploy
ee p
erfo
rman
ce
asse
ssm
ent
ever
y ye
ar.
1/42
/35
117.
N
umbe
r of
UTD
em
ploy
ee a
t N
atio
nal/
Prov
ince
/Dis
tric
t le
vels
w
ith
basi
c sa
lary
in a
ccor
danc
e w
ith
the
civi
l ser
vant
sal
ary
scal
e in
eff
ect.
Det
erm
ined
by
UTD
s
118.
U
TD N
atio
nal/
Pro
vinc
es/D
istr
icts
co
nduc
t an
nual
ext
erna
l fina
ncia
l au
dit.
100%
119.
U
TD N
atio
nal/
Pro
vinc
es/
Dis
tric
t de
velo
p an
nual
wor
k pl
an.
90%
120.
U
TD N
atio
nal/
Pro
vinc
es/D
istr
icts
de
velo
p an
nual
act
ivit
y re
port
.80
%
Planning and Reporting Guidelines Palang Merah Indonesia
42
STRA
TEG
IC O
BJEC
TIVE
5:
To in
crea
se t
he a
vaila
bilit
y of
saf
e, a
cces
sibl
e, a
nd q
ualit
y bl
ood
thro
ugho
ut In
done
sia.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
5.1.
3 Co
mm
unic
atio
n, c
oord
inat
ion,
an
d co
achi
ng m
echa
nism
is
cons
iste
ntly
app
lied
wit
hin
inte
rnal
UTD
, ac
ross
UTD
leve
ls,
and
wit
h ex
tern
al s
take
hold
ers
(loc
al g
over
nmen
t, D
HO
, ho
spit
als,
PO
M,
vend
or,
etc.
).
121.
U
TD D
istr
icts
rec
eive
coa
chin
g vi
sit
from
Pro
vinc
e/N
atio
nal a
t le
ast
once
a y
ear.
80%
5.2
Hum
an r
esou
rces
ca
paci
ty,
also
fa
cilit
ies
and
infr
astr
uctu
re a
t U
TD N
atio
nal/
Prov
ince
s/D
istr
icts
are
in
crea
sed.
122.
Num
ber
of U
TD
trai
ning
cen
ter
accr
edit
ed b
y th
e M
inis
try
of H
ealt
h.
2 (N
atio
nal &
Ce
ntra
l Jav
a)5.
2.1
UTD
em
ploy
ees
are
trai
ned
in
impl
emen
ting
GM
P an
d na
tion
al
stan
dard
s, in
line
wit
h th
eir
role
s an
d re
spon
sibi
litie
s, a
lso
com
pete
nces
req
uire
d.
124.
N
umbe
r of
UTD
em
ploy
ee a
t N
atio
nal/
Prov
ince
/Dis
tric
t w
ho
atte
nds
GM
P tr
aini
ng.
Det
erm
ined
by
UTD
s
123.
Num
ber
of U
TD
empl
oyee
at
Nat
iona
l/ P
rovi
nce/
Dis
tric
t w
ho m
eets
25
Prof
essi
onal
Cre
dit
Uni
ts (
Satu
an K
redi
t Pr
ofes
iona
l-SK
P)
wit
hin
5 ye
ars.
Det
erm
ined
by
UTD
s12
5.
Num
ber
of U
TD e
mpl
oyee
at
Nat
iona
l/Pr
ovin
ce/D
istr
ict
who
re
ceiv
es t
rain
ing
at le
ast
once
a
year
.
Det
erm
ined
by
UTD
s
5.2.
2 Co
mpe
tent
and
pro
fess
iona
l te
chni
cal p
erso
nnel
on
Bloo
d Tr
ansf
usio
n Te
chni
que
are
adeq
uate
ly p
rodu
ced
from
the
Bl
ood
Tran
sfus
ion
Tech
nolo
gy
Dip
lom
a Pr
ogra
m.
126.
Pe
rcen
tage
of
Dip
lom
a Pr
ogra
m
grad
uate
s em
ploy
ed b
y he
alth
se
rvic
e pr
ovid
ers.
100%
5.2.
3 Ad
equa
te a
nd s
tand
ard
faci
litie
s an
d in
fras
truc
ture
, al
so f
urni
ture
, fix
ture
s an
d eq
uipm
ent
(FF&
E) a
re a
vaila
ble
at a
ll U
TDs.
127.
U
TD N
atio
nal/
Pro
vinc
es/D
istr
icts
ha
ve s
tand
ard
equi
pmen
t in
ac
cord
ance
wit
h th
eir
serv
ice
grad
e.
100%
128.
U
TD N
atio
nal/
Pro
vinc
es/D
istr
icts
us
e bl
ood
bags
and
rea
gent
tha
t co
mpl
y w
ith
nati
onal
sta
ndar
ds.
95%
Planning and Reporting Guidelines Palang Merah Indonesia
43
STRA
TEG
IC O
BJEC
TIVE
5:
To in
crea
se t
he a
vaila
bilit
y of
saf
e, a
cces
sibl
e, a
nd q
ualit
y bl
ood
thro
ugho
ut In
done
sia.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
5.1.
3 Bl
ood
Don
or U
nit
Man
agem
ent
Info
rmat
ion
Syst
em (
SIM
UD
DA)
is
wel
l-fu
ncti
onin
g at
all
leve
ls t
o su
ppor
t bl
ood
serv
ice
docu
men
tati
on,
repo
rtin
g, a
nd
trac
king
.
129.
U
TD N
atio
nal/
Pro
vinc
es/
Dis
tric
ts u
se B
lood
Don
or U
nit
Man
agem
ent
Info
rmat
ion
Syst
em
(SIM
UD
DA)
.
90%
130.
U
TD P
rovi
nces
/ D
istr
icts
sub
mit
bl
ood
serv
ice
repo
rt t
o U
TD.
90%
5.3
Avai
labi
lity
of
safe
, ac
cess
ible
, an
d qu
alit
y bl
ood
in a
ll U
TD is
in
crea
sed.
131.
Per
cent
age
of b
lood
do
nor
volu
ntee
r at
U
TD P
rovi
nce/
Dis
tric
t w
ho d
onat
es b
lood
3-
4 ti
mes
a y
ear.
85%
5.2.
1 In
itia
tive
s to
pro
mot
e Vo
lunt
ary
Bloo
d D
onor
s (D
DS)
are
co
nduc
ted
at a
mas
sive
sca
le o
n re
gula
r ba
sis.
133.
N
umbe
r of
peo
ple
reac
hed
thro
ugh
Volu
ntar
y Bl
ood
Don
or
prom
otio
nal a
ctiv
ity
ever
y qu
arte
r by
UTD
Nat
iona
l/Pr
ovin
ces/
Dis
tric
ts.
Det
erm
ined
by
UTD
s
132.
Am
ount
of
bloo
d (b
ag)
that
can
be
used
for
med
icat
ion
ever
y ye
ar a
t U
TD
Prov
ince
/Dis
tric
t.
3 m
illio
n 5.
3.2
Cen
tral
izat
ion
of b
lood
pr
oces
sing
, bl
ood
scre
enin
g,
and
cros
s-m
atch
ed t
est
is
cond
ucte
d fo
r bl
ood
serv
ice
effic
ienc
y an
d ef
fect
iven
ess.
134.
N
umbe
r of
UTD
Dis
tric
ts t
hat
adop
t th
e ce
ntra
lized
sys
tem
.80
% of
UTD
ac
ross
Jav
a,
Band
ar
Lam
pung
, an
d Ba
li
135.
N
umbe
r of
cen
tral
izat
ion
unit
es
tabl
ishe
d.80
% of
ce
ntra
lizat
ion
wor
k pl
an
5.2.
3 Bl
ood
is d
istr
ibut
ed in
line
w
ith
the
hosp
ital
s’ n
eeds
th
roug
h bl
ood
prov
isio
n se
rvic
e ne
twor
k.
136.
Pe
rcen
tage
of
bloo
d re
ques
t th
at
is r
atio
nal a
nd in
line
wit
h th
e m
edic
al in
dica
tion
in t
he h
ospi
tal
fulfi
lled
at U
TD D
istr
icts
.
85%
Planning and Reporting Guidelines Palang Merah Indonesia
44
STRA
TEG
IC O
BJEC
TIVE
5:
To in
crea
se t
he a
vaila
bilit
y of
saf
e, a
cces
sibl
e, a
nd q
ualit
y bl
ood
thro
ugho
ut In
done
sia.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
5.3.
4 Pr
oduc
tion
of
bloo
d re
agen
t,
bloo
d ba
g, a
nd p
lasm
a fr
acti
onat
ion
is c
ondu
cted
by
UTD
and
PM
I NH
Q
inde
pend
entl
y.
137.
N
umbe
r of
rea
gent
typ
e pr
oduc
ed.
2
138.
N
umbe
r of
blo
od r
eage
nt
prod
uced
.20
.000
set
@
10m
l ant
iser
a an
d 1
mill
ion
reag
ent
rapi
d
139.
N
umbe
r of
min
ipoo
l cr
yopr
ecip
itat
e pr
oduc
ed.
500
bags
140.
Pe
rcen
tage
of
prog
ress
in b
lood
ba
g fa
ctor
y co
nstr
ucti
on.
Det
erm
ined
by
PM
I NH
Q
141.
Pe
rcen
tage
of
bag
utili
zati
on
from
Kor
ean
Gre
en C
ross
(KG
C)
Ori
gina
l Equ
ipm
ent
Man
ufac
ture
r (O
EM)
in a
ll U
TDs.
35%
142.
Pe
rcen
tage
of
prog
ress
in p
lasm
a fr
acti
onat
or c
onst
ruct
ion.
Det
erm
ined
by
PM
I NH
Q
143.
N
umbe
r of
pla
sma
bag
sent
to
frac
tion
ator
in a
yea
r.D
eter
min
ed
by P
MI N
HQ
5.3.
5 Re
sear
ch a
nd d
evel
opm
ent
for
bloo
d se
rvic
e is
con
duct
ed b
y U
TD N
atio
nal a
nd P
rovi
nces
.
144.
N
umbe
r of
res
earc
h co
nduc
ted
by
UTD
Nat
iona
l/Pr
ovin
ces.
At le
ast
3 in
eac
h U
TD
Nat
iona
l/
Prov
ince
.
Planning and Reporting Guidelines Palang Merah Indonesia
45
STRA
TEG
IC O
BJEC
TIVE
6:
To s
tren
gthe
n th
e pa
rtne
rshi
p w
ith
nati
onal
and
loca
l gov
ernm
ents
, pu
blic
and
pri
vate
sec
tors
, m
ovem
ent
part
ners
, do
nor
agen
cies
, an
d ot
her
stak
ehol
ders
in o
rder
to
assu
me
PMI’s
man
date
and
fun
ctio
ns.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
6.1
PMI’s
pa
rtne
rshi
p w
ith
the
gove
rnm
ent,
pu
blic
and
pr
ivat
e se
ctor
s,
mov
emen
t pa
rtne
rs,
orga
niza
tion
s,
nati
onal
and
in
tern
atio
nal
dono
r ag
enci
es,
and
othe
r st
akeh
olde
rs is
st
reng
then
ed a
t al
l lev
els.
145.
Num
ber
of p
artn
er
that
has
for
mal
pa
rtne
rshi
p w
ith
PMI N
HQ
/Cha
pter
s/
Bran
ches
.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
6.1.
1 M
oU a
nd P
roje
ct A
gree
men
t do
cum
ents
bet
wee
n PM
I wit
h th
e go
vern
men
t, p
ublic
and
pr
ivat
e se
ctor
s, m
ovem
ent
part
ners
, or
gani
zati
ons,
na
tion
al a
nd in
tern
atio
nal
dono
r ag
enci
es,
and
othe
r st
akeh
olde
rs a
re a
vaila
ble
and
impl
emen
ted
by P
MI a
t al
l le
vels
.
146.
N
umbe
r of
MoU
sig
ned
at P
MI
NH
Q/C
hapt
ers/
Bra
nche
s.D
eter
min
ed
by N
HQ
/Ch
apte
rs/
Bran
ches
6.1.
2 Pa
rtne
rshi
p bu
ildin
g in
itia
tive
s,
incl
udin
g th
e im
plem
enta
tion
of
Coo
pera
tion
Agr
eem
ent
Stra
tegy
(CA
S),
are
purs
ued
cons
iste
ntly
by
PMI a
t al
l lev
els.
147.
N
umbe
r of
pro
mot
iona
l med
ia
dist
ribu
ted
to p
oten
tial
par
tner
s by
PM
I NH
Q/
Chap
ters
/Bra
nche
s.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
148.
N
umbe
r of
MoU
fol
low
ed u
p w
ith
Coop
erat
ion
Agre
emen
t by
PM
I N
HQ
/Cha
pter
s/ B
ranc
hes.
25
Coop
erat
ion
Agre
emen
ts
149.
N
umbe
r of
act
ivit
y co
nduc
ted
by
PMI N
HQ
/Cha
pter
s/ B
ranc
hes
in
colla
bora
tion
wit
h pa
rtne
rs.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
6.2
Reso
urce
M
obili
zati
on
capa
city
to
enh
ance
pa
rtic
ipat
ion
from
par
tner
s an
d co
mm
unit
ies
is s
tren
gthe
ned.
150.
Am
ount
of
annu
al
inco
me
from
PM
I N
HQ
/Cha
pter
s/
Bran
ches
’ bu
sine
ss
unit
s.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
6.2.
1 Re
sour
ce m
obili
zati
on c
apac
ity
stre
ngth
enin
g st
rate
gy is
de
velo
ped
and
impl
emen
ted
by
com
pete
nt p
erso
nnel
in P
MI a
t al
l lev
els.
153.
PM
I Cha
pter
s su
bmit
res
ourc
e m
obili
zati
on s
tren
gthe
ning
st
rate
gy d
ocum
ent
to P
MI N
HQ
.
33
Planning and Reporting Guidelines Palang Merah Indonesia
46
STRA
TEG
IC O
BJEC
TIVE
6:
To s
tren
gthe
n th
e pa
rtne
rshi
p w
ith
nati
onal
and
loca
l gov
ernm
ents
, pu
blic
and
pri
vate
sec
tors
, m
ovem
ent
part
ners
, do
nor
agen
cies
, an
d ot
her
stak
ehol
ders
in o
rder
to
assu
me
PMI’s
man
date
and
fun
ctio
ns.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
151.
Num
ber
of p
ropo
sal
subm
itte
d by
PM
I N
HQ
and
app
rove
d by
don
ors.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
154.
N
umbe
r of
act
ive
and
oper
atio
nal P
MI b
usin
ess
unit
at
NH
Q/C
hapt
ers/
Bra
nche
s.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
152.
Am
ount
of
PMI C
hapt
ers/
Br
anch
es’
inco
me
deri
ved
from
ex
tern
al t
rain
ings
.
Det
erm
ined
by
Cha
pter
s/
Bran
ches
155.
N
umbe
r of
tra
inin
g fa
cilit
ated
by
PM
I Cha
pter
s/Br
anch
es t
o ex
tern
al p
arty
.
Det
erm
ined
by
Cha
pter
s/
Bran
ches
6.2.
2 Po
tent
ial d
onor
map
ping
fo
r re
sour
ce m
obili
zati
on
nati
on-w
ide
is d
evel
oped
an
d di
ssem
inat
ed t
o PM
I Ch
apte
rs/B
ranc
hes.
156.
PM
I Cha
pter
s/ B
ranc
hes
rece
ive
repo
rt o
n po
tent
ial
dono
rs m
appi
ng f
or r
esou
rce
mob
iliza
tion
.
33/4
70
6.2.
3 G
uide
lines
reg
ulat
ing
the
utili
zati
on o
f fu
nd
gene
rate
d fr
om p
ublic
do
nati
on is
dis
sem
inat
ed
and
impl
emen
ted
by P
MI.
157.
PM
I Cha
pter
s/ B
ranc
hes
rece
ive
publ
ic d
onat
ion
in li
ne
wit
h th
e gu
idel
ines
.
Det
erm
ined
by
NH
Q
Planning and Reporting Guidelines Palang Merah Indonesia
47
STRA
TEG
IC O
BJEC
TIVE
7:
To im
prov
e PM
I’s a
ccou
ntab
ility
as
a hu
man
itar
ian
orga
niza
tion
at
the
nati
onal
and
inte
rnat
iona
l lev
els.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
7.1
Prin
cipl
es o
f ac
coun
tabi
lity
and
tran
spar
ency
ar
e w
ell-
impl
emen
ted
by
PMI a
ccor
ding
ly.
158.
PM
I Cha
pter
s/Br
anch
es
publ
ish
fund
rais
ing
repo
rt a
nnua
lly.
33/3
757.
1.1
Repo
rts
on fi
nanc
ial
inco
me
and
expe
ndit
ures
, in
clud
ing
finan
cial
and
nar
rati
ve
repo
rts,
are
dev
elop
ed
on p
erio
dica
l bas
is f
or
inte
rnal
and
ext
erna
l co
nsum
ptio
n.
161.
N
umbe
r of
fina
ncia
l rep
ort
subm
itte
d to
par
tner
s ev
ery
quar
ter
by P
MI
NH
Q/C
hapt
ers/
Bra
nche
s.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
159.
Per
cent
age
of f
und
allo
cate
d by
PM
I Br
anch
es f
or it
s se
rvic
es.
80%
7.1.
2 Au
dit
on P
MI’s
fina
ncia
l ex
pend
itur
es is
co
nduc
ted
annu
ally
bo
th b
y in
tern
al a
nd
exte
rnal
acc
ount
ant
and
follo
wed
up
acco
rdin
gly.
162.
PM
I Bra
nche
s co
nduc
t fin
anci
al a
udit
.28
0
160.
PM
I NH
Q/C
hapt
ers
cond
uct
exte
rnal
aud
it
on P
MI f
und
utili
zati
on
ever
y ye
ar.
1/33
7.1.
3 G
uide
lines
on
bene
ficia
ry f
eedb
ack
and
com
plai
nt
mec
hani
sm a
re
deve
lope
d an
d im
plem
ente
d by
PM
I at
all l
evel
s.
163.
PM
I Bra
nche
s co
nduc
t su
rvey
to
colle
ct
bene
ficia
ries
’ fe
edba
ck a
t le
ast
once
a y
ear.
280
7.2
Out
reac
h, q
ualit
y,
and
inte
nsit
y of
do
cum
enta
tion
, pu
blic
atio
n,
prom
otio
n, a
nd
advo
cacy
of
PMI
acti
viti
es/s
ervi
ces
are
incr
ease
d.
164.
Num
ber
of p
eopl
e re
ache
d by
mas
s m
edia
pu
blic
atio
n on
PM
I Br
anch
es’
prog
ram
/ se
rvic
es.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
7.2.
1 Ba
sic
PR a
nd
com
mun
icat
ion
equi
pmen
t an
d to
ols
(cam
era,
vid
eo c
amer
a,
reco
rder
), a
s w
ell a
s in
form
atio
n, e
duca
tion
, an
d co
mm
unic
atio
n (I
EC)
mat
eria
ls a
re
adeq
uate
ly a
vaila
ble
at
all l
evel
s of
PM
I.
165.
PM
I Cha
pter
s/ B
ranc
hes
have
at
leas
t tw
o ba
sic
PR &
com
mun
icat
ion
equi
pmen
t.
33/3
75
Planning and Reporting Guidelines Palang Merah Indonesia
48
STRA
TEG
IC O
BJEC
TIVE
7:
To im
prov
e PM
I’s a
ccou
ntab
ility
as
a hu
man
itar
ian
orga
niza
tion
at
the
nati
onal
and
inte
rnat
iona
l lev
els.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
7.2.
2 An
alys
is r
epor
t on
PM
I pu
blic
atio
n in
mas
s m
edia
(pr
int,
onl
ine,
TV
, ra
dio)
and
soc
ial
med
ia (
Twit
ter
and
Face
book
) is
dev
elop
ed
on r
egul
ar b
asis
at
PMI
NH
Q/C
hapt
ers.
166.
To
tal n
umbe
r of
new
s re
gard
ing
PMI p
ublis
hed
in lo
cal/
nati
onal
med
ia
at P
MI B
ranc
hes’
wor
king
ar
ea.
Det
erm
ined
by
NH
Q/
Chap
ters
/Br
anch
es
7.2.
3 PR
and
com
mun
icat
ion
prod
ucts
to
prom
ote
PMI p
rogr
ams
and
serv
ices
are
di
ssem
inat
ed t
o th
e co
mm
unit
ies/
publ
ic o
n re
gula
r ba
sis.
167.
N
umbe
r of
pro
mot
iona
l m
ater
ials
/pub
licat
ions
di
stri
bute
d by
PM
I NH
Q/
Chap
ters
/ Br
anch
es.
Det
erm
ined
by
NH
Q/
Chap
ters
/ Br
anch
es
Planning and Reporting Guidelines Palang Merah Indonesia
49
STRA
TEG
IC O
BJEC
TIVE
8:
To im
prov
e th
e un
ders
tand
ing
of a
ll el
emen
ts o
f co
mm
unit
ies
on h
uman
itar
ian
valu
es,
Fund
amen
tal P
rinc
iple
s of
the
Inte
rnat
iona
l RCR
C M
ovem
ent,
as
wel
l as
Inte
rnat
iona
l Hum
anit
aria
n La
ws
thro
ugh
com
mun
icat
ion,
edu
cati
on,
and
diss
emin
atio
n st
rate
gies
.
OU
TCO
ME
OU
TCO
ME
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TCO
ME
IND
ICAT
OR
OU
TPU
TO
UT
PUT
IND
ICAT
OR
TAR
GET
2019
FO
R
OU
TPU
T
IND
ICAT
OR
8.1
Und
erst
andi
ng
on R
CRC
and
hum
anit
aria
n va
lues
am
ong
PMI p
erso
nnel
an
d ex
tern
al
stak
ehol
ders
is
impr
oved
.
168.
Per
cent
age
of
resp
onde
nt
surv
eyed
by
PMI N
HQ
who
ca
n m
enti
on
PMI m
anda
te
corr
ectl
y.
80%
8.1.
1 U
pdat
ed In
form
atio
n,
Educ
atio
n, a
nd
Com
mun
icat
ion
(IEC
) m
ater
ials
on
RCRC
D
isse
min
atio
n ar
e av
aila
ble
adeq
uate
ly a
t al
l lev
els.
169.
N
umbe
r of
cer
tifie
d di
ssem
inat
ors
at P
MI N
HQ
/Ch
apte
rs/
Bran
ches
.
Det
erm
ined
by
NH
Q/C
hapt
ers/
Br
anch
es
170.
N
umbe
r of
peo
ple
who
att
end
RCRC
dis
sem
inat
ion
acti
viti
es a
t PM
I Bra
nch.
Det
erm
ined
by
NH
Q/C
hapt
ers/
Br
anch
es
8.1.
2 Ch
arac
ter
build
ing
on
hum
anit
aria
n an
d RC
RC
valu
es is
fac
ilita
ted
by
com
pete
nt d
isse
min
ator
s at
all
leve
ls.
171.
N
umbe
r of
IEC
mat
eria
l on
RCRC
D
isse
min
atio
n di
stri
bute
d by
PM
I N
HQ
/Cha
pter
s/ B
ranc
hes.
Det
erm
ined
by
NH
Q/C
hapt
ers/
Br
anch
es
8.1.
3 Pa
rtne
rshi
p w
ith
rele
vant
in
stit
utio
ns (
Mili
tary
, Po
lice,
uni
vers
itie
s,
scho
ols,
NG
Os)
and
co
mm
unit
ies
is
esta
blis
hed
to d
isse
min
ate
hum
anit
aria
n an
d RC
RC
valu
es.
172.
N
umbe
r of
dis
sem
inat
ion
acti
viti
es c
ondu
cted
by
PMI
NH
Q/
Chap
ters
/Bra
nche
s in
co
llabo
rati
on w
ith
part
ners
.
Det
erm
ined
by
NH
Q/C
hapt
ers/
Br
anch
es.
Planning and Reporting Guidelines Palang Merah Indonesia
50
Indicator is a measurement unit that helps to determine whether the progress or achievement of the intended objectives or results occurs. An indicator determines what information should be collected to answer the key questions about the progress or achievement of the project/program.
Indicators may either be quantitative (e.g. in form of numbers, percentage) or qualitative (e.g., level of knowledge and quality of implementation). If possible, project/ program indicators should be a combination of both.
The indicators assigned must be able to answer the key questions about project/program progress, i.e.:
9 How many activities have we done? How many resources have we used? (efficiency)9 Are we achieving the intended outputs/outcomes ? (effectiveness)9 How do the beneficiaries feel about our works or services? (relevance and appropriateness)9 Has the project/program corresponded to the actual needs? (effectiveness, relevance, and appropriateness)9 Do the works we do achieve the intended objectives? (impact)9 Will the benefits received by the beneficiaries be long-lasting, even after the project/program ends? (sustainability)
Information regarding these indicators will be collected during Monitoring and Evaluation. It will then be used to assess the progress and inform decision making throughout project/program implementation. The information can also be a lesson learned for the project/program in order to avoid repeating the same mistakes and to achieve success.
Indicators need to be defined so that PMI at various levels will have a good understanding on what to measure and how to measure them. Thus, the way to measure each indicator would be standardized across areas. Example on how to define indicators:
Indicator: Number of targeted villages in District A that meets the criteria of Disaster Prepared Village by the end of 2014.
2.5. Indicator Registry for PMI Strategic Plan and Operational Plan
Planning and Reporting Guidelines Palang Merah Indonesia
51
The definition of “criteria of disaster prepared village” is having a DRR committee/volunteers, having a vulnerability and risk map, having a village contingency plan, having an early warning system, having an emergency fund, etc.The indicator registry for PMI Operational Plan 2015-2019 was developed to assist the staff to understand :
9 the measurement of program achievement , 9 the characteristic of subjects to be measured (specific), 9 the limits of what can be measured (measurable),9 the ability to achieve it (attainable),9 its correspondence with program/project needs (relevance),9 the time span required (time-bound), when the measurement should be performed.
For the board members and staff, the indicators are also important for:
9 Planning phase, to help PMI understand and set a target for results achievement 9 Implementation phase, to help PMI to understand and oversee the achievement of each level of results, output (short-term result) or outcome (long-term result) through monitoring activities.9 Transition and End of Project/Program phase, as a basis for evaluation.
The indicator registry comprises of:
9 Description of indicator statement,9 Definition of indicator, specifically outlining the subject to be measured,9 Means of verification, i.e. the tool to verify achievement.9 Reporting time, i.e. when and how often the intended indicator achievement will be reported.
Planning and Reporting Guidelines Palang Merah Indonesia
52
Mat
riks
Daf
tar
Defi
nisi
Indi
kato
rST
RATE
GIC
OBJ
ECTI
VE-1
To b
uild
a w
ell-
func
tion
ing
PMI a
t al
l lev
els,
wit
h th
e ca
paci
ty t
o cr
eate
syn
ergy
bet
wee
n pr
ogra
m a
ctiv
itie
s an
d th
e or
gani
zati
onal
pol
icie
s,
proc
edur
es,
and
syst
em.
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
1Re
d Cr
oss
Law
is p
asse
d.Re
d Cr
oss
Law
is t
he la
w t
hat
regu
late
s m
atte
rs o
n:
9
nam
e, s
tatu
s, a
nd lo
cati
on9
man
date
and
key
res
pons
ibili
ties
9
proc
edur
es o
n th
e us
e of
Red
Cro
ss e
mbl
em
9
and
othe
r it
ems
on t
he o
rgan
izat
ion
The
Law
do
cum
ent
Whe
n th
e La
w
is p
asse
d
2N
umbe
r of
act
ivit
ies
to d
isse
min
ate
info
rmat
ion
of R
C Bi
ll.D
isse
min
atio
n ac
tivi
ties
are
var
ious
act
ivit
ies
cond
ucte
d by
PM
I in
form
s of
se
min
ars,
wor
ksho
ps,
and
othe
r ac
tivi
ties
tha
t ai
m t
o ga
rner
sup
port
s fr
om d
iffe
rent
st
akeh
olde
rs t
owar
d th
e La
w e
ndor
sem
ent.
Acti
vity
re
port
s M
onth
ly d
urin
g di
ssem
inat
ion
peri
od
3PM
I NH
Q/C
hapt
ers/
Bra
nche
s co
nduc
ted
the
Five
-Yea
rly
Asse
mbl
y M
eeti
ng in
tim
ely
man
ner.
PMI N
HQ
/Cha
pter
/Bra
nch
Asse
mbl
y M
eeti
ng is
con
duct
ed e
very
five
yea
r to
:
9
eval
uate
the
boa
rd m
embe
rs a
ccou
ntab
ility
dur
ing
thei
r te
nure
. 9
elec
t bo
ard
mem
bers
for
5 y
ear
peri
od.
9
stip
ulat
e ke
y po
licie
s an
d st
rate
gic
plan
for
the
nex
t fiv
e ye
ars
(bas
ed o
n th
e or
gani
zati
onal
leve
l).
Repo
rt o
f As
sem
bly
Mee
ting
Five
-yea
rly
4PM
I NH
Q/C
hapt
ers/
Bra
nche
s co
nduc
ted
Annu
al M
eeti
ng in
ac
cord
ance
wit
h th
e as
sign
ed
sche
dule
.
Annu
al M
eeti
ng is
con
duct
ed b
y PM
I NH
Q/C
hapt
ers/
Bran
ches
eve
ry y
ear
to:
9
eval
uate
the
im
plem
enta
tion
of
the
prev
ious
yea
r w
ork
plan
, in
clud
ing
the
budg
et.
9
deve
lop
annu
al w
ork
plan
for
the
fol
low
ing
year
inc
ludi
ng b
udge
t, i
ncom
e, a
nd
expe
ndit
ure
plan
ning
.9
It i
s at
tend
ed b
y PM
I bo
ard
mem
bers
and
the
ir c
ount
erpa
rts
at t
he p
rovi
nce/
dist
rict
.
Repo
rt o
f An
nual
M
eeti
ng
Year
ly
5N
umbe
r of
Org
aniz
atio
nal P
roce
dure
s (P
O)
adju
sted
to
the
Stat
ute.
The
Org
aniz
atio
nal P
roce
dure
s ar
e re
gula
tion
s on
e st
ep b
elow
the
Sta
tute
and
Byl
aws
that
ela
bora
te t
he m
ain
proc
edur
es o
f PM
I gov
erna
nce,
suc
h as
:9
Boar
d M
embe
rs9
Offi
ce M
anag
emen
t9
Serv
ices
9
Hum
an R
esou
rce
9
Fina
ncia
l Man
agem
ent
9
Asse
t an
d Lo
gist
ic M
anag
emen
t9
Pers
onne
l9
Plan
ning
and
Rep
orti
ng9
Part
ners
hip
9
Bran
ding
Org
aniz
atio
n Pr
oced
ures
D
ocum
ent
Qua
rter
ly
duri
ng P
O
adju
stm
ent
Planning and Reporting Guidelines Palang Merah Indonesia
53
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
6PM
I Cha
pter
s/Br
anch
es r
ecei
ve
diss
emin
atio
n of
info
rmat
ion
on
stat
utes
.
The
diss
emin
atio
n of
sta
tute
and
byl
aws
is a
n ac
tivi
ty t
o pr
ovid
e aw
aren
ess
on t
he
defin
itio
n an
d co
nseq
uenc
es o
f ea
ch a
rtic
le in
the
sta
tute
and
byl
aws,
inst
ead
of o
nly
dist
ribu
ting
the
boo
k. D
isse
min
atio
ns c
an b
e do
ne in
dif
fere
nt w
ays,
eit
her
thro
ugh
mee
ting
s, w
orks
hops
, sp
ecifi
c ev
ents
or
incl
uded
into
oth
er lo
cal o
r na
tion
al e
vent
s/m
eeti
ngs.
Acti
vity
re
port
M
onth
ly (
if t
he
diss
emin
atio
n is
co
nduc
ted)
7PM
I Bra
nche
s us
e PM
I ban
k ac
coun
t fo
r it
s tr
ansa
ctio
ns.
The
fund
ow
ned/
rece
ived
by
PMI i
s de
posi
ted
in P
MI a
ccou
nt,
not
pers
onal
acc
ount
. Ba
nk a
ccou
nt
book
Annu
ally
8N
umbe
r of
PM
I em
ploy
ees
who
hav
e w
ritt
en e
mpl
oym
ent
cont
ract
s.Em
ploy
ees
are
staf
f fo
rmal
ly w
orki
ng a
t PM
I. E
mpl
oym
ent
cont
ract
is a
lega
l do
cum
ent
desc
ribi
ng e
mpl
oym
ent
rela
tion
ship
bet
wee
n an
em
ploy
ee a
nd P
MI,
de
scri
bing
the
rol
es a
nd r
espo
nsib
iliti
es o
f th
e em
ploy
ee o
r th
e or
gani
zati
on a
nd
sign
ed b
y re
leva
nt b
oard
mem
ber
and
staf
f.
Empl
oym
ent
cont
ract
Annu
ally
9PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p as
set
inve
ntor
y in
line
wit
h th
e te
chni
cal g
uide
lines
.
The
asse
t in
vent
ory
in li
ne w
ith
tech
nica
l and
impl
emen
tati
on g
uide
s is
a d
ocum
ent
reco
rdin
g in
form
atio
n on
ass
et’s
exi
sten
ce,
incl
udin
g ph
ysic
al a
nd le
gal a
spec
t, s
uch
as:9
nam
e of
ass
et9
date
of
purc
hase
9
quan
tity
9
buyi
ng p
rice
9
asse
t st
atus
9
etc.
Asse
t in
vent
ory
list
Annu
ally
10PM
I Cha
pter
s/Br
anch
es h
ave
HR
regu
lati
on in
pla
ce.
HR
regu
lati
on in
clud
es:
9
recr
uitm
ent
9
grad
ing,
em
ploy
men
t, p
ay s
cale
9
Perf
orm
ance
eva
luat
ion
9
empl
oyee
s’ r
ight
s an
d re
spon
sibi
litie
s9
empl
oyee
s w
elfa
re9
sanc
tion
and
con
trac
t te
rmin
atio
n9
mon
itor
ing
and
supe
rvis
ion
9
pens
ion
HR
regu
lati
on
docu
men
tAn
nual
ly
Planning and Reporting Guidelines Palang Merah Indonesia
54
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
11PM
I Cha
pter
s/Br
anch
es h
as e
mpl
oyee
da
taba
se t
hat
is u
pdat
ed o
n an
nual
ba
sis.
Empl
oyee
Dat
abas
e in
clud
es in
form
atio
n on
:9
nam
e, p
lace
and
dat
e of
bir
th,
addr
ess,
em
ail,
hom
e/m
obile
pho
ne n
umbe
r,
cont
act
in e
mer
genc
y (s
pous
e or
par
ents
).9
posi
tion
, le
ngth
of
empl
oym
ent,
gra
de,
sala
ry.
9
trai
ning
his
tory
.
Empl
oyee
da
taba
se
Annu
ally
12N
umbe
r of
PM
I em
ploy
ee a
t th
e Ch
apte
rs/B
ranc
hes.
Empl
oyee
is a
per
man
ent
or fi
xed
term
sta
ff w
orki
ng a
t PM
I Offi
ce a
nd t
hus
calle
d Em
ploy
ee (
base
d on
Org
aniz
atio
nal P
roce
dure
on
HR)
.Em
ploy
ee
data
base
An
nual
ly
13PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p an
nual
wor
k pl
an in
line
w
ith
the
Plan
ning
and
Rep
orti
ng
Gui
delin
es.
Annu
al w
ork
plan
in li
ne w
ith
the
Plan
ning
and
Rep
orti
ng G
uide
lines
is a
wor
k pl
an
usin
g th
e fo
rmat
s pr
ovid
ed a
nd in
clud
ing
info
rmat
ion
on:
9
Stra
tegi
c O
bjec
tive
s9
Out
com
es,
indi
cato
rs,
and
targ
ets
9
Out
puts
, in
dica
tors
, an
d ta
rget
s9
Acti
viti
es9
Amou
nt o
f bu
dget
per
act
ivit
y an
d it
s ca
tego
ry
Wor
k pl
an
docu
men
tAn
nual
ly
14PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p an
nual
rep
ort
in li
ne
wit
h th
e Pl
anni
ng a
nd R
epor
ting
G
uide
lines
.
The
annu
al r
epor
t of
PM
I NH
Q/C
hapt
ers/
Bra
nche
s in
line
wit
h th
e Pl
anni
ng a
nd
Repo
rtin
g G
uide
lines
com
pris
es o
f :
9
Exec
utiv
e Su
mm
ary
9
Indi
cato
r Tr
acki
ng T
able
(IT
T)9
Fina
ncia
l Inf
orm
atio
n9
Anal
ysis
Annu
al R
epor
t D
ocum
ent
Annu
ally
15PM
I NH
Q’s
div
isio
ns/
bure
aus/
unit
s de
velo
p an
nual
rep
ort
in li
ne
wit
h th
e Pl
anni
ng a
nd R
epor
ting
G
uide
lines
.
The
annu
al r
epor
t of
PM
I NH
Q’s
div
isio
n/bu
reau
/uni
t in
line
wit
h th
e Pl
anni
ng a
nd
Repo
rtin
g G
uide
lines
com
pris
es o
f:9
Exec
utiv
e Su
mm
ary
9
Indi
cato
r Tr
acki
ng T
able
(IT
T)9
Fina
ncia
l Inf
orm
atio
n9
Anal
ysis
Annu
al R
epor
t D
ocum
ent
Annu
ally
16PM
I Cha
pter
s/Br
anch
es r
ecei
ve
tech
nica
l ass
ista
nce
visi
t on
PM
ER.
PMER
tec
hnic
al a
ssis
tanc
e is
pro
vide
d by
com
pete
nt p
erso
nnel
in P
MER
(ce
rtifi
ed
faci
litat
ors
by P
MI N
HQ
). T
he t
echn
ical
ass
ista
nce
is p
rovi
ded
in a
sys
tem
atic
ap
proa
ch b
y us
ing
the
mon
itor
ing
and
supe
rvis
ion
tool
s d
evel
oped
to
asse
ss a
nd t
o re
fine:
9
annu
al p
lann
ing
docu
men
t, in
clud
ing
deta
iled
impl
emen
tati
on p
lan.
9
mon
itor
ing
and
eval
uati
on s
yste
m a
nd m
echa
nism
.9
regu
lar
repo
rtin
g do
cum
ents
(m
onth
ly,
quar
terl
y, b
iann
ually
, an
d an
nual
ly).
9
othe
r is
sues
rel
ated
to
prog
ram
im
plem
enta
tion
suc
h as
tim
elin
e, r
esou
rces
, st
aff,
sta
keho
lder
s, r
isks
and
issu
es.
Tech
nica
l as
sist
ance
re
port
Mon
thly
(w
hen
Tech
nica
l As
sist
ance
is
cond
ucte
d)
Planning and Reporting Guidelines Palang Merah Indonesia
55
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
17PM
I Cha
pter
s/Br
anch
es r
ecei
ve
info
rmat
ion
rega
rdin
g th
e Pl
anni
ng
and
Repo
rtin
g G
uide
lines
.
Dis
sem
inat
ion
of P
lann
ing
and
Repo
rtin
g G
uide
lines
is a
n ac
tivi
ty t
o pr
ovid
e aw
aren
ess
on t
he p
lann
ing
and
repo
rtin
g pr
inci
ples
/pro
cess
/ m
echa
nism
/too
ls/f
orm
ats.
Thi
s ac
tivi
ty c
an b
e do
ne t
hrou
gh P
MER
tra
inin
gs,
mee
ting
s at
nat
iona
l, c
hapt
er,
or b
ranc
h le
vel,
as
wel
l as
thro
ugh
PMER
tec
hnic
al a
ssis
tanc
e.
Acti
vity
rep
ort
Mon
thly
(w
hen
diss
emin
atio
n is
co
nduc
ted)
18PM
I Cha
pter
/Bra
nche
s su
bmit
qu
arte
rly
repo
rt t
o on
e le
vel a
bove
, in
line
wit
h th
e Pl
anni
ng a
nd
Repo
rtin
g G
uide
lines
.
The
quar
terl
y re
port
of
PMI C
hapt
er/B
ranc
h in
line
wit
h th
e Pl
anni
ng a
nd R
epor
ting
G
uide
lines
com
pris
es o
f :
1. In
dica
tor
Trac
king
Tab
le (
ITT)
2. F
inan
cial
Info
rmat
ion
3. A
naly
sis
4. T
he f
ollo
win
g qu
arte
rly
impl
emen
tati
on p
lan
The
quar
terl
y re
port
has
to
be s
ubm
itte
d by
the
10t
h of
the
fol
low
ing
mon
th a
t th
e la
test
. Fo
r ex
ampl
e, t
he r
epor
t fo
r th
e m
onth
of
Janu
ary
to M
arch
201
5 w
ill b
e su
bmit
ted
by A
pril
10th
, 20
15.
Qua
rter
ly
Repo
rtQ
uart
erly
19PM
I NH
Q’s
Div
isio
ns/
Bure
aus/
Uni
ts
subm
it q
uart
erly
rep
ort
to t
he O
ffice
M
anag
er,
in li
ne w
ith
the
Plan
ning
an
d Re
port
ing
Gui
delin
es.
The
quar
terl
y re
port
of
PMI N
HQ
’s d
ivis
ion/
bure
au/
unit
in li
ne w
ith
the
Plan
ning
and
Re
port
ing
Gui
delin
es c
ompr
ises
of
:1.
Indi
cato
r Tr
acki
ng T
able
(IT
T)2.
Fin
anci
al In
form
atio
n 3.
Ana
lysi
s4.
The
fol
low
ing
quar
terl
y im
plem
enta
tion
pla
nTh
e qu
arte
rly
repo
rt h
as t
o be
sub
mit
ted
by t
he 1
0th
of t
he f
ollo
win
g m
onth
at
the
late
st.
Qua
rter
ly
Repo
rtQ
uart
erly
20PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p O
rgan
izat
iona
l Cap
acit
y M
appi
ng e
very
tw
o ye
ars.
The
Org
aniz
atio
nal C
apac
ity
Map
is r
esul
ted
from
an
asse
ssm
ent
tow
ard
indi
cato
rs
set
for
the
wel
l-fu
ncti
onin
g PM
I, e
.g.
on p
erso
nnel
, in
fras
truc
ture
s an
d eq
uipm
ent,
po
licie
s an
d pr
oced
ures
, pr
ogra
m s
ervi
ces,
rep
ort
avai
labi
lity,
and
oth
er in
form
atio
n co
llect
ed t
hrou
gh o
rgan
izat
iona
l cap
acit
y as
sess
men
t qu
esti
onna
ires
.
Org
aniz
atio
nal
capa
city
as
sess
men
t qu
esti
onna
ires
Ever
y tw
o ye
ars
21N
umbe
r of
pro
gram
fun
ded
by
exte
rnal
don
ors
that
is e
valu
ated
by
PMI N
HQ
at
the
end
of t
he p
rogr
am.
Prog
ram
s su
ppor
ted
by e
xter
nal p
arti
es a
re p
rogr
ams
fund
ed b
y do
nors
, ei
ther
the
go
vern
men
t, c
orpo
rate
s, o
r m
ovem
ent
part
ners
.
Eval
uate
d m
eans
con
duct
ing
a sy
stem
atic
and
obj
ecti
ve a
sses
smen
t on
the
impa
ct,
resu
lt,
effe
ctiv
enes
s, e
ffici
ency
, re
leva
nce,
and
sus
tain
abili
ty.
The
eval
uati
on s
houl
d ta
ke in
to a
ccou
nt t
he e
valu
atio
n st
anda
rd a
nd e
thic
s as
sti
pula
ted
in P
MER
Ref
eren
ce
book
.
Eval
uati
on
repo
rtEn
d of
pro
gram
Planning and Reporting Guidelines Palang Merah Indonesia
56
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
22PM
I Cha
pter
s/Br
anch
es d
evel
op
Boar
d M
embe
rs a
nd S
taffi
ng D
atab
ase
that
is r
egis
tere
d at
PM
I NH
Q.
Boar
d m
embe
rs d
atab
ase
cons
ists
of
info
rmat
ion
on:
9
Nam
e, s
ex,
educ
atio
n, p
rofe
ssio
n, h
ome
addr
ess,
em
ail
addr
ess,
pho
ne/m
obile
nu
mbe
r.
Offi
ce d
atab
ase:
9
Offi
ce a
ddre
ss,
emai
l, p
hone
num
ber,
wid
th o
f la
nd a
nd b
uild
ing,
ow
ners
hip
stat
us.
Dat
abas
e fo
rmat
fro
m
PMI N
HQ
Annu
ally
23PM
I NH
Q/C
hapt
ers/
Bra
nche
s co
nduc
t pl
enar
y m
eeti
ng o
n m
onth
ly
basi
s.
Plen
ary
mee
ting
is a
mee
ting
att
ende
d by
all
boar
d m
embe
rs a
nd o
ffice
man
ager
and
or
hea
ds o
f di
visi
on/b
urea
u/un
it/d
epar
tmen
t.
Min
utes
of
mee
ting
Mon
thly
24PM
I Cha
pter
s/Br
anch
es h
as a
for
mal
Bo
ard
Dec
ree
on B
oard
Mem
bers
and
St
affin
g st
ruct
ures
.
The
Dec
ree
on B
oard
Mem
bers
and
Sta
ffing
Str
uctu
re a
re d
ocum
ents
des
crib
ing
the
stru
ctur
es,
posi
tion
, an
d ro
les
and
resp
onsi
bilit
ies
of e
ach
posi
tion
. Th
e do
cum
ents
ar
e en
dors
ed t
hrou
gh a
dec
ree
sign
ed b
y th
e re
spec
tive
cha
irm
an.
Dec
ree
docu
men
t An
nual
ly (
if
ther
e is
any
ch
ange
)
25PM
I Cha
pter
s re
ceiv
e co
achi
ng v
isit
fr
om P
MI N
HQ
’s B
oard
Mem
bers
at
leas
t on
ce a
yea
r.
The
coac
hing
vis
it f
rom
PM
I NH
Q’s
Boa
rd M
embe
rs is
a v
isit
to
the
chap
ters
dur
ing
the
prov
inci
al a
ssem
bly
mee
ting
/ann
ual m
eeti
ng o
r ot
her
occa
sion
s us
ing
the
appr
oved
co
achi
ng g
uide
lines
.
Visi
t re
port
Mon
thly
(if
th
ere
is a
ny
visi
t m
ade)
26PM
I Bra
nche
s re
ceiv
e co
achi
ng v
isit
fr
om P
MI C
hapt
er’s
Boa
rd M
embe
rs
at le
ast
once
a y
ear.
The
coac
hing
vis
it f
rom
PM
I Cha
pter
’s B
oard
Mem
bers
is a
vis
it t
o th
e br
anch
es d
urin
g th
e lo
cal a
ssem
bly
mee
ting
/ann
ual m
eeti
ng o
r ot
her
occa
sion
s us
ing
the
appr
oved
co
achi
ng g
uide
lines
.
Visi
t re
port
Mon
thly
(if
th
ere
is a
ny
visi
t m
ade)
27PM
I Cha
pter
s/Br
anch
es r
ecei
ve
tech
nica
l ass
ista
nce
visi
t fr
om P
MI
staf
f fr
om o
ne le
vel a
bove
at
leas
t on
ce a
yea
r.
The
tech
nica
l ass
ista
nce
from
PM
I sta
ff o
ne le
vel a
bove
can
be
done
at
any
tim
e us
ing
the
appr
oved
coa
chin
g gu
idel
ines
. Vi
sit
repo
rtM
onth
ly (
if
ther
e is
any
vi
sit
mad
e)
Planning and Reporting Guidelines Palang Merah Indonesia
57
STRA
TEG
IC O
BJEC
TIVE
-2
To s
tren
gthe
n th
e ca
paci
ty o
f PM
I’s o
rgan
izat
iona
l res
ourc
es a
t al
l lev
els,
bot
h it
s hu
man
res
ourc
es a
nd t
he f
acili
ties
and
infr
astr
uctu
re n
eede
d to
se
rve
the
com
mun
itie
s.
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
28N
umbe
r of
PM
I em
ploy
ee a
t N
HQ
/Ch
apte
rs/B
ranc
hes
paid
in li
ne w
ith
the
loca
l min
imum
wag
e st
anda
rd.
PMI s
taff
is a
n in
divi
dual
wor
king
and
has
wri
tten
con
trac
t si
gned
by
the
boar
d m
embe
rs.
The
Loca
l Min
imum
Wag
e (U
MP/
K) is
the
min
imum
wag
e ap
plie
d fo
r al
l ch
apte
rs/b
ranc
hes.
Lapo
ran
keua
ngan
ata
u sl
ip g
aji
Tahu
nan
29Pe
rcen
tage
of
bran
ch v
olun
teer
(K
SR/T
SR)
inac
tive
for
a y
ear.
PMI V
olun
teer
Cor
ps (
KSR)
uni
t is
a m
echa
nism
for
indi
vidu
al m
embe
rs w
ho b
ecom
e KS
R m
embe
r w
ith
thei
r ow
n m
otiv
atio
n.
Prof
essi
onal
Vol
unte
er (
TSR)
is a
PM
I mem
ber
recr
uite
d in
divi
dual
ly f
rom
pro
fess
iona
l co
mm
unit
y w
ith
spec
ific
back
grou
nd,
e.g.
med
ical
doc
tor,
nut
riti
onis
t, s
anit
atio
n ex
pert
, ac
coun
tant
, lo
gist
icia
n, t
echn
icia
n, a
gric
ultu
ralis
t, a
rtis
t, IT
exp
ert,
tea
cher
, et
c. a
nd w
illin
g to
be
PMI v
olun
teer
s.
Non
-act
ive
mea
ns n
ever
par
tici
pate
in c
oach
ing
or s
ervi
ce a
ctiv
itie
s fo
r a
year
Dat
abas
e su
kare
law
anTa
huna
n
30Pe
rcen
tage
of
bran
ch v
olun
teer
(Y
RC/K
SR/T
SR)
who
has
tak
en p
art
in b
ranc
hes’
act
ivit
ies
on q
uart
erly
ba
sis.
YRC
volu
ntee
r is
a Y
outh
Red
Cro
ss m
embe
r at
sch
ools
loca
ted
in r
espe
ctiv
e Br
anch
es.
KSR
and
TSR
are
the
sam
e as
abo
ve.
Dat
abas
e su
kare
law
anTr
iwul
anan
31N
umbe
r of
sch
ool i
n D
istr
icts
tha
t ha
s ac
tive
You
th R
ed C
ross
(YR
C)
unit
.
YRC
unit
is c
onsi
dere
d ac
tive
if t
hey
have
YRC
reg
ular
act
ivit
ies
and
mai
ntai
n co
nsis
tent
coo
rdin
atio
n w
ith
PMI B
ranc
hes.
Dat
abas
e su
kare
law
anTa
huna
n
32N
umbe
r of
cor
pora
te v
olun
teer
s (c
orpo
rate
/ or
gani
zati
ons/
in
stit
utio
ns)
mob
ilize
d by
PM
I NH
Q/
Chap
ters
/ Br
anch
es.
Corp
orat
e vo
lunt
eer
is a
n em
ploy
ee o
f a
corp
orat
ion/
orga
niza
tion
/ins
titu
tion
re
gist
ered
to
supp
ort
PMI a
ctiv
itie
s ba
sed
on t
heir
spe
cific
spe
cial
izat
ion/
skill
s.D
atab
ase
suka
rela
wan
Bula
n (b
ila
ada
mob
ilisa
si
suka
rela
wan
m
itra
)
33N
umbe
r of
vol
unte
er in
sure
d by
PM
I Br
anch
es.
Insu
red
mea
ns e
ach
pers
onne
l is
prov
ided
wit
h he
alth
/lif
e in
sura
nce
in c
ondu
ctin
g th
e as
sign
men
t.
Kart
u as
uran
si
atau
daf
tar
pese
rta
asur
ansi
Tahu
nan
34N
umbe
r of
PM
I NH
Q/
Chap
ters
/Br
anch
es b
oard
mem
ber
and
staf
f w
ho r
ecei
ve P
MER
tra
inin
g.
Plan
ning
, M
onit
orin
g, E
valu
atio
n, a
nd R
epor
ting
(PM
ER)
trai
ning
is a
4-d
ay t
rain
ing
faci
litat
ed b
y PM
ER t
rain
ers
usin
g st
anda
rd P
MER
tra
inin
g cu
rric
ulum
and
mat
eria
ls.
Lapo
ran
pela
tiha
n PM
ERBu
lana
n (b
ila
ada
pela
tiha
n PM
ER)
Planning and Reporting Guidelines Palang Merah Indonesia
58
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
35N
umbe
r of
tra
iner
cer
tifie
d by
PM
I N
HQ
.PM
I NH
Q’s
cer
tific
ate
is p
rovi
ded
to t
rain
ers
who
hav
e at
tend
ed a
Tra
inin
g of
Tra
iner
(T
oT)
and
have
had
tra
inin
g ex
peri
ence
bas
ed o
n th
e pr
oced
ures
. Ea
ch P
MI C
hapt
er
orga
nizi
ng a
ToT
has
to
prop
ose
for
a ce
rtifi
cati
on p
roce
ss f
rom
PM
I NH
Q in
ref
eren
ce
to t
he S
oP f
or N
atio
nal C
erti
ficat
e N
umbe
ring
.
Trai
ning
&
Educ
atio
n U
nit
Repo
rt
Annu
ally
36N
umbe
r of
bra
nch
volu
ntee
r tr
aine
d in
spe
cial
ized
ski
ll se
ts o
f pr
iori
ty I/
II/III
ser
vice
s.
9
Spec
ializ
ed p
rior
ity
serv
ice
I in
clud
es a
sses
smen
t, fi
rst
aids
and
eva
cuat
ion,
re
stor
ing
fam
ily li
nk,
com
mun
icat
ion
and
publ
ic r
elat
ions
.9
Spec
ializ
ed p
rior
ity
serv
ice
II in
clud
es p
ublic
kit
chen
, he
alth
ser
vice
, am
bula
nce
serv
ice,
and
psy
chos
ocia
l sup
port
pro
gram
.9
Spec
ializ
ed p
rior
ity
serv
ice
III i
nclu
des
shel
ter
and
IDPs
, w
ater
and
san
itat
ion,
di
stri
buti
on a
nd r
elie
f.
Spec
ialis
t tr
aini
ng
repo
rt
Mon
thly
(if
th
ere
is a
ny
trai
ning
)
37N
umbe
r of
em
ploy
ee o
f PM
I NH
Q/
Chap
ters
/Bra
nche
s w
ho a
tten
d te
chni
cal t
rain
ing.
Tech
nica
l tra
inin
g is
all
type
s of
tra
inin
g ow
ned
by P
MI.
Tr
aini
ng
repo
rtM
onth
ly (
if
ther
e is
any
tr
aini
ng)
38N
umbe
r of
ser
vice
s pr
ovid
ed b
y po
lycl
inic
to
PMI p
erso
nnel
eve
ry
quar
ter
at N
HQ
/Cha
pter
s/Br
anch
es.
Hea
lth
serv
ices
pro
vide
d in
clud
e pr
omot
iona
l, p
reve
ntiv
e, a
nd t
reat
men
t se
rvic
es.
Poly
clin
ic
serv
ice
repo
rtQ
uart
erly
39PM
I Bra
nche
s ha
ve a
ctiv
e Yo
uth/
Volu
ntee
r Fo
rum
.9
Volu
ntee
r Fo
rum
(FO
REL)
is
a fo
rum
fun
ctio
ning
as
a m
echa
nism
to
deve
lop
volu
ntee
rs’
crea
tivi
ty a
nd s
ense
of
resp
onsi
bilit
y to
PM
I in
an e
ffec
tive
man
ner.
9
Yout
h Fo
rum
(FO
RPIS
) is a
foru
m o
f YRC
repr
esen
tati
ves t
o ch
anne
l and
coo
rdin
ate
the
aspi
rati
on o
f Be
ginn
er,
Seco
ndar
y, a
nd S
enio
r (M
ula,
Mad
ya,
Wir
a) Y
RC.
9
Fore
l/Fo
rpis
is c
onsi
dere
d ac
tive
if t
hey
orga
nize
reg
ular
coa
chin
g to
vol
unte
ers
and
mai
ntai
n co
nsis
tent
coo
rdin
atio
n w
ith
PMI B
ranc
hes.
Foru
m
esta
blis
hmen
t do
cum
ent
Annu
ally
40PM
I Cha
pter
s/Br
anch
es o
rgan
ize
Yout
h ga
ther
ing
(Jum
bara
).Yo
uth
Gat
heri
ng (
Jum
bara
-Jum
pa B
akti
Gem
bira
) is
an
annu
al e
vent
att
ende
d by
YRC
m
embe
rs a
nd c
oach
es a
s w
ell a
s PM
I per
sonn
el in
the
res
pect
ive
prov
ince
/dis
tric
t/ci
ty t
o ga
ther
and
sha
re k
now
ledg
e an
d ex
peri
ence
.
Jum
bara
ac
tivi
ty
repo
rt
Annu
ally
(If
Ju
mba
ra is
or
gani
zed
)
Planning and Reporting Guidelines Palang Merah Indonesia
59
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
41PM
I NH
Q/C
hapt
ers
orga
nize
vo
lunt
eer
gath
erin
g (T
emu
Kary
a).
Volu
ntee
r G
athe
ring
(Te
mu
Kary
a) is
an
annu
al e
vent
gat
heri
ng P
MI v
olun
teer
s fr
om
diff
eren
t ar
eas
to le
arn,
sha
re e
xper
ienc
e, m
onit
or a
nd e
valu
ate
the
volu
ntee
rs’
coac
hing
and
lead
ersh
ip d
evel
opm
ent
proc
ess
cond
ucte
d by
PM
I as
wel
l as
to d
evel
op
sust
aina
ble
role
s an
d ac
tivi
ties
for
vol
unte
ers.
Tem
u Ka
rya
acti
vity
re
port
Annu
ally
(If
vo
lunt
eer
gath
erin
g is
or
gani
zed
)
42PM
I Bra
nche
s up
date
vol
unte
er
data
base
on
quar
terl
y ba
sis.
Volu
ntee
r da
taba
se c
onsi
sts
of in
form
atio
n on
:9
nam
e, p
lace
& d
ate
of b
irth
, ad
dres
s, e
mai
l, h
ome/
mob
ile p
hone
num
ber.
9
sex,
vol
unte
er c
ateg
ory
(beg
inne
r, s
econ
dary
, se
nior
).9
date
of
regi
stra
tion
as
a vo
lunt
eer.
9
trai
ning
his
tory
.
Volu
ntee
r da
taba
se
Qua
rter
ly
43N
umbe
r of
PM
I tra
inin
g ce
rtifi
ed b
y na
tion
al in
stit
utio
ns.
Cert
ifica
tion
is c
ondu
cted
by
inst
itut
ions
aut
hori
zed
to p
rovi
de t
rain
ing
cert
ifica
tion
at
the
nat
iona
l lev
el,
such
as
the
Nat
iona
l Pro
fess
ion
Stan
dard
izat
ion
Agen
cy (
BNSP
- Ba
dan
Nas
iona
l Ser
tifik
asi P
rofe
si),
HRD
of
the
Min
istr
y of
Hea
lth,
BSN
I, a
nd t
he
Min
istr
y of
Wor
kfor
ce a
nd T
rans
mig
rati
on.
Trai
ning
ce
rtifi
cati
on
docu
men
t
Annu
ally
44N
umbe
r of
tra
inin
g cu
rric
ulum
up
date
d by
PM
I NH
Q a
t le
ast
once
in
ever
y fo
ur y
ear.
A cu
rric
ulum
is c
onsi
dere
d up
date
d if
it h
as b
een
furt
her
deve
lope
d in
line
wit
h ne
w
deve
lopm
ent
of t
rain
ing
mat
eria
l.Tr
aini
ng
curr
icul
umAn
nual
ly
45N
atio
nal e
duca
tion
and
tra
inin
g ne
ed
anal
ysis
is a
vaila
ble
ever
y ye
ar.
Trai
ning
nee
d an
alys
is m
ap is
a m
ap o
f ga
ps b
etw
een
the
num
ber
and
type
of
skill
s ow
ned
by t
rain
ed P
MI p
erso
nnel
ava
ilabl
e an
d th
e nu
mbe
r an
d ty
pe o
f sk
ills
owne
d by
tra
ined
per
sonn
el n
eede
d, w
hich
com
pris
es o
f in
form
atio
n ab
out
trai
ners
, ty
pes
of
trai
ning
, an
d tr
aini
ng a
lum
ni.
Trai
ning
nee
d an
alys
is m
ap
Annu
ally
46N
umbe
r of
tra
iner
cer
tifie
d by
PM
I N
HQ
who
is m
obili
zed
per
year
.Ce
rtifi
ed m
eans
rec
eivi
ng c
erti
ficat
e as
a t
rain
er f
rom
PM
I NH
Q.
Mob
ilize
d m
eans
tra
inin
g or
fac
ilita
ting
in d
iffe
rent
tra
inin
gs.
Trai
ning
as
sign
men
t le
tter
Annu
ally
47N
umbe
r of
YRC
fac
ilita
tor
avai
labl
e in
pri
mar
y/ s
econ
dary
/hig
h sc
hool
in
PMI B
ranc
hes’
wor
king
are
a.
YRC
trai
ner
is a
tra
iner
who
has
att
ende
d a
YRC
ToT.
YRC
trai
ner
list
Annu
ally
48N
umbe
r of
key
tra
iner
aut
hori
zed
by
PMI N
HQ
thr
ough
a D
ecre
e.M
ain
Trai
ner
is t
he h
ighe
st t
rain
er r
ank
from
thr
ee t
rain
er r
anks
– B
egin
ner,
Mid
-Lev
el,
and
Mai
n Tr
aine
r.D
ecre
e of
M
ain
Trai
ner
Annu
ally
49N
umbe
r of
tra
iner
cer
tifie
d by
BN
SP.
BNSP
is t
he N
atio
nal P
rofe
ssio
n St
anda
rdiz
atio
n Ag
ency
.Ce
rtifi
cate
fr
om B
NSP
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
60
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
50N
umbe
r of
tra
inin
g cu
rric
ulum
for
pa
rtne
rs r
eady
for
use
/ado
ptio
n.
Part
ners
tra
inin
g cu
rric
ulum
is a
spe
cific
tra
inin
g cu
rric
ulum
tha
t ca
n m
eet
the
part
ners
’ tr
aini
ng n
eed,
e.g
. Fi
rst
Aids
for
Wor
k Se
curi
ty a
nd S
afet
y, F
irst
Aid
s fo
r Am
bula
nce
Serv
ice,
Fam
ily C
are
for
Nur
sing
Sch
ool.
Part
ners
tr
aini
ng
curr
icul
um
Annu
ally
51N
umbe
r of
tra
inin
g re
gist
ered
by
PMI
NH
Q t
o be
acc
redi
ted.
Accr
edit
atio
n sh
ould
be
done
by
nati
onal
inst
itut
ions
suc
h as
MoH
, M
inis
try
of
Wor
kfor
ce a
nd T
rans
mig
rati
on,
Nat
iona
l Dis
aste
r M
anag
emen
t Ag
ency
(BN
PB).
Accr
edit
atio
n re
gist
rati
on
repo
rt
Annu
ally
52N
umbe
r of
tra
inin
g re
port
fro
m P
MI
Chap
ters
/ Br
anch
es in
line
wit
h th
e te
chni
cal g
uide
lines
for
tra
inin
g m
anag
emen
t.
The
cont
ent
of a
tra
inin
g re
port
in li
ne w
ith
the
trai
ning
man
agem
ent
guid
elin
es
incl
udes
:9
Back
grou
nd9
Obj
ecti
ve9
Expe
cted
res
ults
9
Nam
e, t
ime,
and
ven
ue9
Org
aniz
atio
n of
act
ivit
y 9
Part
icip
ants
, co
mm
itte
es,
and
faci
litat
ors
9
Budg
et a
nd fi
nanc
ial r
epor
t 9
Sum
mar
y of
act
ivit
y im
plem
enta
tion
pro
cess
9
Clos
ing
Trai
ning
re
port
An
nual
ly
53PM
I Cha
pter
s/Br
anch
es d
evel
op
annu
al t
rain
ing
cale
ndar
.An
nual
tra
inin
g ca
lend
ar in
clud
es in
form
atio
n on
:9
type
s of
tra
inin
g ne
eded
9
list
of s
taff
or
volu
ntee
rs in
nee
d of
tra
inin
g9
trai
ning
sch
edul
e
Trai
ning
ca
lend
ar
Annu
ally
54N
umbe
r of
reg
iona
l war
ehou
se
func
tion
ing
in li
ne w
ith
PMI
stan
dard
s.
A re
gion
al w
areh
ouse
is c
onsi
dere
d w
ell-
func
tion
ing
if m
eeti
ng t
he f
ollo
win
g cr
iter
ia:
9
havi
ng a
t le
ast
4 st
aff
man
agin
g th
e w
areh
ouse
9
havi
ng c
ompr
ehen
sive
and
upd
ated
logi
stic
inve
ntor
y 9
havi
ng d
ocum
ent
regi
stra
tion
sys
tem
9
havi
ng w
areh
ouse
and
logi
stic
mai
nten
ance
pla
n 9
havi
ng m
onth
ly w
areh
ouse
act
ivit
y re
port
N
ote:
the
se c
rite
ria
will
be
furt
her
enha
nced
and
for
mal
ly e
ndor
sed,
and
the
n di
ssem
inat
ed t
o re
gion
al w
areh
ouse
s.
Regi
onal
w
areh
ouse
as
sess
men
t re
sult
s
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
61
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
55PM
I Cha
pter
s/Br
anch
es h
ave
acti
ve/
func
tion
ing
POSK
O.
A PO
SKO
is c
onsi
dere
d ac
tive
/fun
ctio
ning
if it
has
sta
ndar
d ra
dio
com
mun
icat
ion
and
at le
ast
4 vo
lunt
eers
sta
ndby
for
24-
hour
ope
rati
on.
Acti
ve P
OSK
O
asse
ssm
ent
resu
lt
Annu
ally
56PM
I Tra
inin
g Ce
nter
mee
ts
cert
ifica
tion
sta
ndar
ds.
A PM
I tra
inin
g ce
nter
is c
onsi
dere
d m
eeti
ng c
erti
ficat
ion
stan
dard
if:
9
it h
as s
tand
ard
faci
litie
s in
line
wit
h PM
I tec
hnic
al im
plem
enta
tion
gui
delin
es o
n tr
aini
ng o
rgan
izat
ion.
9
it m
eets
the
sta
ndar
d qu
alit
y of
tra
inin
g m
anag
emen
t in
ref
eren
ce t
o au
thor
ized
bo
dies
suc
h as
HRD
, M
oH,
or M
inis
try
of W
orkf
orce
and
Tra
nsm
igra
tion
.N
ote:
Sta
ndar
d cr
iter
ia f
or c
erti
ficat
ion
will
be
furt
her
enha
nced
, en
dors
ed,
and
diss
emin
ated
to
PMI t
rain
ing
cent
ers.
Cert
ifica
teAn
nual
ly (
if
cond
ucti
ng
cert
ifica
tion
)
57N
umbe
r of
reg
iona
l war
ehou
se t
hat
mai
ntai
ns m
inim
um s
tock
of
the
four
pr
iori
ty it
ems
for
emer
genc
y/re
lief.
The
four
pri
orit
y re
lief
item
s in
clud
e:9
Fam
ily K
it (
2,00
0 un
its)
9
Hyg
iene
Kit
(2,
000
unit
s)9
Tarp
aulin
s (2
,000
uni
ts)
9
10,0
00 p
iece
s of
bla
nket
s
War
ehou
se
stoc
k re
port
Qua
rter
ly
58PM
I Bra
nche
s ha
ve a
t le
ast
five
basi
c fa
cilit
ies
and
infr
astr
uctu
re f
or o
ffice
op
erat
ion.
Basi
c in
fras
truc
ture
s an
d eq
uipm
ent
for
offic
e op
erat
ion
incl
ude:
9
desk
s9
com
pute
rs9
tele
phon
es9
facs
imile
s9
com
mun
icat
ion
radi
o (l
andl
ine/
mob
ile)
9
inte
rnet
9
four
-whe
el o
pera
tion
al v
ehic
les
9
two-
whe
el o
pera
tion
al v
ehic
les
9
logi
stic
sto
rage
/war
ehou
se
Offi
ce a
sset
in
vent
ory
Annu
ally
59PM
I Cha
pter
s ha
ve s
tora
ge f
or
emer
genc
y &
rel
ief
logi
stic
s.Re
lief
item
s st
orag
e is
PM
I Cha
pter
’s f
acili
ty t
o st
ore
logi
stic
, bo
th p
erm
anen
t an
d se
mi-
perm
anen
t, o
wne
d by
the
cha
pter
, re
nted
or
borr
owed
.
Build
ing/
stor
age
repo
rtAn
nual
ly
Planning and Reporting Guidelines Palang Merah Indonesia
62
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
60N
umbe
r of
edu
cati
on o
r tr
aini
ng
acti
vity
con
duct
ed a
t PM
I Tra
inin
g Ce
nter
.
Trai
ning
cen
ter
is a
n ed
ucat
ion
or t
rain
ing
faci
lity
owne
d by
PM
I, b
oth
perm
anen
t an
d se
mi-
perm
anen
t, o
wne
d by
PM
I, r
ente
d or
bor
row
ed,
whi
ch is
use
d fo
r in
tern
al
PMI o
r fo
r ex
tern
al p
arti
es.
PMI t
rain
ing
cent
er u
sage
re
port
Mon
thly
61PM
I Cha
pter
s/Br
anch
es s
ubm
it a
sset
in
vent
ory
to P
MI N
HQ
on
annu
al
basi
s.
Asse
t is
all
of P
MI’s
pos
sess
ions
, bo
th m
ovin
g an
d no
t m
ovin
g, a
nd h
ave
cert
ain
selli
ng v
alue
s, r
epor
ted
base
d on
PM
I Ass
et M
anag
emen
t Te
chni
cal G
uide
lines
.As
set
inve
ntor
y lis
tAn
nual
ly
62Pe
rcen
tage
of
user
who
rep
orts
sa
tisf
acti
on o
ver
PMI c
orpo
rate
em
ail
serv
ices
.
Use
r’s
sati
sfac
tion
ove
r PM
I cor
pora
te e
mai
l is
the
sati
sfac
tion
bas
ed o
n th
e ag
reed
su
rvey
cri
teri
a.Su
rvey
ana
lysi
s re
port
An
nual
ly
63N
umbe
r of
dow
nloa
d fo
r ‘P
MI
Firs
t Ai
d’/’
Dis
aste
r Pr
epar
edne
ss’
appl
icat
ions
.
‘PM
I Fir
st A
ids’
app
licat
ion
is a
n ap
plic
atio
n ai
min
g to
hel
p co
mm
unit
ies
in
cond
ucti
ng fi
rst
aids
thr
ough
info
rmat
ion
shar
ing
prov
ided
in s
tage
s fo
r ea
sier
un
ders
tand
ing.
D
isas
ter
Read
y ap
plic
atio
n is
an
appl
icat
ion
cont
aini
ng in
form
atio
n an
d le
sson
s le
arne
d to
rec
ogni
ze r
isks
and
to
deve
lop
cont
inge
ncy
plan
, as
wel
l as
fea
ture
s of
di
sast
er s
igns
.
Goo
gle
App
Stor
eM
onth
ly
64PM
I NH
Q/C
hapt
ers/
Bra
nche
s ha
ve
fund
allo
cate
d fo
r IC
T m
aint
enan
ce.
IT m
aint
enan
ce in
clud
es m
aint
enan
ce o
f al
l har
dwar
e an
d so
ftw
are,
as
wel
l as
Info
rmat
ion
and
Com
mun
icat
ion
Tech
nolo
gy s
yste
m.
Wor
k pl
an a
nd
budg
et
Annu
ally
65PM
I Bra
nche
s ha
ve in
tern
et a
cces
s.In
tern
et n
etw
ork
enta
ils in
tern
et c
onne
ctio
n an
d su
ppor
ting
har
dwar
e co
nsis
ting
of
com
pute
rs a
nd n
etw
orks
.In
tern
et
netw
ork
Annu
ally
66Pe
rcen
tage
of
PMI e
mpl
oyee
at
NH
Q/
Chap
ters
/Bra
nche
s w
ho u
ses
PMI
corp
orat
e em
ail a
ddre
ss.
The
perc
enta
ge is
cal
cula
ted
by u
sing
the
rat
io o
f PM
I per
sonn
el w
ho h
as b
een
regi
ster
ed in
PM
I NH
Q IT
uni
t w
ith
the
tota
l num
ber
of P
MI p
erso
nnel
.D
ata
on e
mai
l us
ers
Annu
ally
67PM
I Bra
nche
s ha
ve f
unct
ioni
ng
com
mun
icat
ion
radi
o ne
twor
k.A
radi
o co
mm
unic
atio
n ne
twor
k is
con
side
red
func
tion
ing
if c
onne
cted
wit
h th
e lo
cal r
adio
com
mun
icat
ion
netw
ork
(Dis
tric
t/Ci
ty a
nd P
rovi
nce)
.Ra
dio
com
mun
icat
ion
netw
orks
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
63
STRA
TEG
IC O
BJEC
TIVE
-3To
impr
ove
the
qual
ity
of d
isas
ter
and
heal
th e
mer
genc
y re
spon
ses
acro
ss In
done
sia,
eit
her
in t
erm
s of
rap
idne
ss,
cove
rage
, an
d ef
fect
iven
ess
of t
he s
ervi
ces
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
68N
umbe
r of
em
erge
ncy
resp
onse
sp
ecia
list
at t
he n
atio
nal l
evel
. A
nati
onal
em
erge
ncy
resp
onse
spe
cial
ist
is a
PM
I per
sonn
el w
ho h
as r
ecei
ved
trai
ning
s in
:1.
Man
agem
ent
and
Lead
ersh
ip2.
Rel
ief
Man
agem
ent
3.
Log
isti
c M
anag
emen
t
4. E
mer
genc
y H
ealt
h Se
rvic
es
5. W
ater
and
San
itat
ion
Serv
ices
6.
Psy
chos
ocia
l Sup
port
Ser
vice
s7.
She
lter
Ser
vice
s 8.
IT
Tele
com
Ser
vice
s9.
Gen
eral
Adm
inis
trat
ion
and
Fina
nce.
List
of
Nat
iona
l Em
erge
ncy
Resp
onse
sp
ecia
lists
Annu
ally
69N
umbe
r of
dis
aste
r re
spon
se
sim
ulat
ion
by P
MI B
ranc
hes’
in li
ne
wit
h th
e So
P.
Dis
aste
r Re
spon
se S
imul
atio
n is
:An
exe
rcis
e co
nduc
ted
base
d on
the
em
erge
ncy
scen
ario
agr
eed,
sta
rtin
g fr
om e
arly
w
arni
ng in
form
atio
n, p
erso
nnel
mob
iliza
tion
and
tas
k as
sign
men
ts,
coor
dina
ted
wit
h re
leva
nt p
arti
es in
the
fiel
d. D
isas
ter
Sim
ulat
ion
is in
line
wit
h th
e So
P if
:
✔ E
arly
war
ning
for
PM
I per
sonn
el u
ntil
mob
iliza
tion
run
in li
ne w
ith
the
SoP.
✔
Exe
cuti
on o
f ta
sks
is in
line
wit
h PM
Is s
tand
ard
of s
ervi
ce.
✔ C
oord
inat
ed m
eans
eng
agin
g ot
her
key
play
ers
incl
udin
g lo
cal c
omm
unit
ies.
Sim
ulat
ion
asse
ssm
ent
chec
klis
t
Mon
thly
(if
th
ere
is a
si
mul
atio
n)
70N
umbe
r of
SAT
GAN
A te
am m
embe
rs
at P
MI B
ranc
hes.
SATG
ANA
Team
is a
PM
I tea
m t
hat
has
com
plet
ed s
peci
fic D
isas
ter
Resp
onse
(S
ATG
ANA)
tra
inin
g.Vo
lunt
eer
data
base
An
nual
ly
71N
umbe
r of
em
erge
ncy
resp
onse
sp
ecia
list
at P
MI C
hapt
ers.
PM
I Cha
pter
’s e
mer
genc
y re
spon
se s
peci
alis
t is
a P
MI p
erso
nnel
who
has
rec
eive
d tr
aini
ng in
:1.
Man
agem
ent
and
Lead
ersh
ip2.
Rel
ief
Man
agem
ent
3.
Log
isti
c M
anag
emen
t
4. E
mer
genc
y H
ealt
h Se
rvic
es
5. W
ater
& s
anit
atio
n Se
rvic
es
6. P
sych
osoc
ial S
uppo
rt S
ervi
ces
7. S
helt
er S
ervi
ces
8. I
T Te
leco
m S
ervi
ces
9. G
ener
al A
dmin
istr
atio
n an
d Fi
nanc
e.
List
of
Chap
ter’
s Em
erge
ncy
Resp
onse
sp
ecia
lists
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
64
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
72N
umbe
r of
dis
aste
r re
spon
se
sim
ulat
ion
acti
viti
es c
ondu
cted
by
PMI a
t N
HQ
/Cha
pter
s/ B
ranc
hes
annu
ally
.
Dis
aste
r re
spon
se s
imul
atio
n is
an
exer
cise
con
duct
ed b
ased
on
the
emer
genc
y sc
enar
io a
gree
d, s
tart
ing
from
ear
ly w
arni
ng in
form
atio
n, p
erso
nnel
mob
iliza
tion
and
ta
sk a
ssig
nmen
ts,
coor
dina
ted
wit
h re
leva
nt p
arti
es in
the
fiel
d.
Sim
ulat
ion
acti
vity
re
port
Mon
thly
(If
th
ere
is a
ny
sim
ulat
ion)
73N
umbe
r of
ben
efici
arie
s re
ache
d by
PM
I Bra
nche
s’ e
mer
genc
y re
spon
se
serv
ices
.
Bene
ficia
ries
are
peo
ple
who
rec
eive
em
erge
ncy
serv
ices
(e.
g. c
ash,
rel
ief
item
s,
heal
th s
ervi
ces,
eva
cuat
ion)
fro
m P
MI d
irec
tly.
List
of
bene
ficia
ries
Mon
thly
(if
th
ere
is a
ny
emer
genc
y re
spon
se)
74PM
I Cha
pter
s ha
ve a
t le
ast
five
supp
orti
ng e
quip
men
t fo
r em
erge
ncy
resp
onse
ope
rati
on.
PMI C
hapt
ers
that
ow
n th
e st
anda
rd D
isas
ter
Man
agem
ent
serv
ice
equi
pmen
t to
sup
port
the
op
erat
iona
l nee
ds o
f Di
sast
er R
espo
nse
Team
, i.e
.:9
com
plet
e Pu
blic
Kit
chen
equ
ipm
ent
for
500
peop
le
9
Firs
t Aid
s eq
uipm
ent
(for
Indi
vidu
al o
r Te
am)
9
evac
uati
on e
quip
men
t (a
mbu
lanc
e ,
stre
tche
rs)
9
indi
vidu
al s
afet
y ge
ars
(life
jac
kets
, fa
ce m
asks
, (d
ust)
gla
sses
, he
lmet
s, g
love
s, a
nd
rain
coat
s)9
tem
pora
ry t
ents
+ s
uppo
rtin
g eq
uipm
ent
9
field
equ
ipm
ent
(hoe
s, s
hove
ls,
ham
mer
s, r
opes
)9
truc
ks (i
f not
yet
ow
ned,
thi
s co
uld
be a
ntic
ipat
ed b
y ha
ving
an
agre
emen
t fo
r re
ntal
)9
oper
atio
nal v
ehic
les
for
pers
onne
l9
ambu
lanc
e/em
erge
ncy
tran
spor
tati
on u
nits
in
line
wit
h PM
I st
anda
rd o
f am
bula
nce
serv
ice.
Offi
ce
inve
ntor
y lis
tAn
nual
ly
75PM
I Bra
nche
s ha
ve a
t le
ast
four
eq
uipm
ent
for
emer
genc
y re
spon
se
team
.
PMI B
ranc
hes
that
ow
n th
e st
anda
rd D
isas
ter
Man
agem
ent
serv
ice
equi
pmen
t to
sup
port
the
op
erat
iona
l nee
ds o
f Di
sast
er R
espo
nse
Team
, i.e
.:9
com
plet
e Pu
blic
Kit
chen
equ
ipm
ent
for
500
peop
le
9
Firs
t Aid
s eq
uipm
ent
(for
Indi
vidu
al o
r Te
am)
9
evac
uati
on e
quip
men
t (a
mbu
lanc
e ,
stre
tche
rs)
9
indi
vidu
al s
afet
y ge
ars
(life
jac
kets
, fa
ce m
asks
, (d
ust)
gla
sses
, he
lmet
s, g
love
s, a
nd
rain
coat
s)9
tem
pora
ry t
ents
+ s
uppo
rtin
g eq
uipm
ent
9
field
equ
ipm
ent
(hoe
s, s
hove
ls,
ham
mer
s, r
opes
)9
truc
ks (i
f not
yet
ow
ned,
thi
s co
uld
be a
ntic
ipat
ed b
y ha
ving
an
agre
emen
t fo
r re
ntal
)9
oper
atio
nal v
ehic
les
for
pers
onne
l9
ambu
lanc
e/em
erge
ncy
tran
spor
tati
on u
nits
in
line
wit
h PM
I st
anda
rd o
f am
bula
nce
serv
ice.
Offi
ce
inve
ntor
y lis
tAn
nual
ly
Planning and Reporting Guidelines Palang Merah Indonesia
65
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
76PM
I Bra
nche
s ha
ve a
t le
ast
two
com
mun
icat
ion
equi
pmen
t fo
r em
erge
ncy
situ
atio
n.
Com
mun
icat
ion
equi
pmen
t fo
r em
erge
ncy
use:
9
Com
mun
icat
ion
radi
o9
Phon
e9
Facs
imile
9
Com
pute
r w
ith
inte
rnet
con
nect
ion
Offi
ce
inve
ntor
y lis
t An
nual
ly
77PM
I Bra
nche
s pr
ovid
e 24
x 7
am
bula
nce
serv
ice.
PMI B
ranc
hes
that
ope
rate
24-
hour
am
bula
nce
serv
ice
on r
egul
ar b
asis
, w
ith
the
follo
win
g cr
iter
ia b
ut n
ot li
mit
ed t
o :
9
havi
ng a
t le
ast
1 am
bula
nce
wit
h st
anda
rd e
quip
men
t in
line
wit
h PM
I am
bula
nce
serv
ice
guid
elin
es9
havi
ng a
t le
ast
9 am
bula
nce
crew
s tr
aine
d in
Fir
st A
ids.
9
havi
ng c
all c
ente
r fa
cilit
ies
wit
h at
leas
t 3
oper
ator
s9
havi
ng
a re
ferr
al
syst
em
wit
h lo
cal
hosp
ital
/Int
egra
ted
Hea
lth
Emer
genc
y M
anag
emen
t Sy
stem
(IE
MS)
9
havi
ng o
pera
tion
al b
udge
t al
loca
tion
for
am
bula
nce.
Ambu
lanc
e se
rvic
e re
port
Mon
thly
78N
umbe
r em
erge
ncy/
relie
f it
ems
in
PMI C
hapt
ers’
war
ehou
se o
r lo
gist
ic
stor
age.
Relie
f it
em is
one
of
thes
e fo
ur r
elie
f it
ems
i.e.
:9
jerr
y ca
ns9
pails
/buc
kets
9
blan
kets
9
saro
ngs
War
ehou
se
repo
rtM
onth
ly
79N
umbe
r of
em
erge
ncy
inci
dent
re
spon
ded
by P
MI B
ranc
hes
wit
hin
the
first
six
hou
rs.
PMI B
ranc
hes
that
con
duct
init
ial a
ctio
n fo
r em
erge
ncy/
outb
reak
res
pons
e w
ithi
n th
e fir
st s
ix h
ours
aft
er t
he in
cide
nt,
such
as:
9
send
ing
sitr
ep o
n th
e m
ost
upda
ted
situ
atio
n9
send
ing
PMI B
ranc
h’s
disa
ster
ope
rati
on r
epor
t:-
mob
iliza
tion
of
SATG
ANA
team
- pr
ovid
ing
emer
genc
y as
sist
ance
s (S
AR,
evac
uati
on,
first
aid
s, e
mer
genc
y sh
elte
r, r
elie
f it
ems
dist
ribu
tion
)-
cond
ucti
ng h
oriz
onta
l/ve
rtic
al c
oord
inat
ion,
ope
rati
ng d
isas
ter
oper
atio
n ce
nter
(PO
SKO
) -
deve
lopi
ng e
mer
genc
y re
spon
se a
ctio
n pl
an.
Emer
genc
y re
spon
se
repo
rt
For
each
em
erge
ncy
even
t
Planning and Reporting Guidelines Palang Merah Indonesia
66
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
80Am
ount
of
cont
inge
ncy
fund
ow
ned
by P
MI N
HQ
/ Ch
apte
rs/B
ranc
hes.
Cont
inge
ncy
fund
is a
n ‘o
n ca
ll’ f
und
allo
cate
d in
the
bud
get
to s
uppo
rt e
mer
genc
y re
spon
se o
pera
tion
.Bu
dget
do
cum
ent
Annu
ally
81PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p re
spon
se o
pera
tion
pl
an w
ithi
n 3x
24 h
ours
aft
er t
he
emer
genc
y in
cide
nt.
Dis
aste
r/H
ealt
h Cr
isis
Res
pons
e O
pera
tion
Pla
n is
an
acti
on p
lan
base
d on
the
nee
d as
sess
men
t an
alys
is r
epor
ted/
subm
itte
d to
PM
I one
leve
l abo
ve w
ithi
n 3
x 24
hou
rs a
t th
e la
test
.
Ope
rati
on
plan
An
nual
ly
82N
umbe
r of
gui
delin
es/
SoP/
curr
icul
um o
n em
erge
ncy
resp
onse
is
sued
by
PMI N
HQ
.
Upd
ated
gui
delin
es/S
oPs
rela
ted
to e
mer
genc
y re
spon
se,
rele
vant
wit
h th
e ne
eds
in
the
field
. G
uide
lines
/So
P do
cum
ents
Annu
ally
83N
umbe
r of
inci
dent
rep
ort
subm
itte
d by
PM
I Bra
nche
s to
PM
I NH
Q/
Chap
ters
.
Dis
aste
r/he
alth
cri
sis
inci
dent
rep
ort
shou
ld c
onta
in in
form
atio
n on
:9
sum
mar
y of
dis
aste
r/he
alth
cri
sis
inci
dent
(na
me
of e
vent
, ti
me
of i
ncid
ent,
le
vel
of s
ever
ity)
, re
port
ed a
fter
the
inc
iden
t ha
ppen
ed,
wit
h on
ly b
rief
fol
low
up
upd
ate
repo
rt.
9
num
ber
of c
asua
ltie
s (i
njur
ed,
deat
h),
upda
ted
ever
y 3
days
.9
impa
ct o
f di
sast
er i
ncid
ent
(num
ber
of p
eopl
e lo
sing
hou
ses,
des
troy
ed p
ublic
fa
cilit
ies,
num
ber
of I
DPs
, ID
P lo
cati
on,
and
IDP
site
con
diti
on),
upd
ated
eve
ry
3 da
ys.
9
type
s an
d qu
anti
ty o
f im
med
iate
nee
ds,
upda
ted
ever
y 3
days
.
Emer
genc
y in
cide
nt
repo
rt
Annu
ally
84N
umbe
r of
PM
I am
bula
nce
serv
ice
resp
onde
d th
roug
h IE
MS.
IEM
S is
an
emer
genc
y m
anag
emen
t sy
stem
at
the
loca
l pub
lic h
ospi
tal t
hat
beco
mes
th
e re
fere
nce
of P
MI a
mbu
lanc
e se
rvic
e.Am
bula
nce
serv
ice
repo
rt
Mon
thly
85PM
I NH
Q/C
hapt
ers/
Bra
nche
s de
velo
p an
nual
Con
ting
ency
Pla
n.Co
ntin
genc
y Pl
an is
a p
lann
ing
proc
ess
that
incl
udes
cer
tain
pre
dict
ion,
bas
ed o
n th
e ag
reed
sce
nari
o an
d pu
rpos
e, s
peci
fied
tech
nica
l and
man
ager
ial r
espo
nse
acti
ons,
an
d re
sour
ce m
obili
zati
on t
o m
itig
ate
or a
ddre
ss a
n em
erge
ncy/
cris
is b
ette
r in
the
fu
ture
.
Cont
inge
ncy
Plan
D
ocum
ent
Annu
ally
86N
umbe
r of
ear
ly w
arni
ng in
form
atio
n fo
rwar
ded
by P
MI B
ranc
hes
to lo
cal
com
mun
itie
s.
Earl
y w
arni
ng in
form
atio
n di
ssem
inat
ed t
o th
e co
mm
unit
ies
is in
form
atio
n th
at is
not
lim
ited
to:9
disa
ster
war
ning
9
earl
y em
erge
ncy
resp
onse
act
ion
9
emer
genc
y co
mm
unic
atio
n fe
edba
ck m
echa
nism
.
Info
rmat
ion
diss
emin
atio
n re
port
Mon
thly
(if
th
ere
is a
ny
earl
y w
arni
ng
info
rmat
ion
diss
emin
ated
)
87N
umbe
r of
RFL
cas
e fo
llow
ed u
p by
PM
I Bra
nche
s un
til t
he p
roce
dure
is
com
plet
ed.
Perm
ohon
an p
elay
anan
Res
tori
ng F
amil
y Li
nk (
tida
k te
rbat
as p
ada
benc
ana/
konfl
ik)
yang
dia
juka
n (s
esua
i kri
teri
a) k
epad
a PM
I dan
dit
inda
klan
juti
dal
am m
enca
ri
peny
eles
aian
hin
gga
kasu
s di
nyat
akan
dit
utup
ole
h PM
I.
RFL
repo
rtM
onth
ly )
if
ther
e is
any
RF
L se
rvic
e pr
ovid
ed)
Planning and Reporting Guidelines Palang Merah Indonesia
67
STRA
TEG
IC O
BJEC
TIVE
-4To
str
engt
hen
com
mun
ity
resi
lienc
e in
ord
er t
o re
duce
the
ris
ks a
nd im
pact
of
disa
ster
s an
d di
seas
es t
hrou
gh d
isas
ter
prep
ared
ness
, he
alth
, an
d so
cial
pro
gram
s, a
lso
refe
rral
hea
lth
serv
ices
.
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
88PM
I Bra
nche
s ha
s at
leas
t fiv
e vi
llage
s re
ceiv
ing
inte
rven
tion
su
ppor
t ev
ery
year
.
Spec
ific
villa
ge o
r co
mm
unit
y (h
igh-
risk
com
mun
itie
s, m
arke
ts,
popu
lati
on w
ith
HIV
/ AI
DS,
etc
.),
init
iate
d by
PM
I or
join
tly
wit
h th
e go
vern
men
t, w
ith
the
crit
eria
in
clud
ing
but
not
limit
ed t
o :
9
targ
et v
illag
e in
PM
I Br
anch
’s D
RR p
rogr
am (
stip
ulat
ed w
ith
Dec
ree
or o
ther
do
cum
ents
wit
h th
e sa
me
lega
l pow
er).
9
cond
ucti
ng n
on-s
truc
tura
l mit
igat
ion
acti
viti
es.
9
cond
ucti
ng a
ctiv
itie
s to
red
uce
com
mun
ity
vuln
erab
ility
(ph
ysic
al/m
ater
ial,
so
cial
/org
aniz
atio
n, b
ehav
ior)
, su
ch a
s Ba
sic
Firs
t Ai
ds,
Mat
erna
l an
d Ch
ild
Hea
lth
Prom
otio
n, H
ygie
ne P
rom
otio
n to
Pre
vent
Com
mun
icab
le D
isea
se, H
ealt
hy
Life
styl
e Pr
omot
ion
to P
reve
nt N
on-C
omm
unic
able
Dis
ease
, Ro
ad S
afet
y, e
tc.
9
cond
ucti
ng a
ctiv
itie
s to
str
engt
hen
com
mun
itie
s’ c
apac
ity
(phy
sica
l/m
ater
ial,
so
cial
/org
aniz
atio
n, b
ehav
ior)
.9
resp
ondi
ng t
o in
cide
nts
requ
irin
g re
ferr
al.
9
resp
ondi
ng t
o po
tent
ial s
itua
tion
s fo
r ex
trao
rdin
ary
even
ts.
Lapo
ran
kegi
atan
pe
mbi
naan
de
sa
Bula
nan
89PM
I Bra
nche
s ha
ve a
t le
ast
five
scho
ols
rece
ivin
g in
terv
enti
on
supp
ort
ever
y ye
ar.
PMI B
ranc
hes
that
dev
elop
pro
gram
s/ac
tivi
ties
rel
ated
to
RCRC
and
its
serv
ices
wit
h ac
tivi
ties
as
follo
ws:
9
mob
iliza
tion
of
YRC/
KSR
to c
ondu
ct e
duca
tion
cam
paig
n in
uni
vers
itie
s/sc
hool
s (f
or D
M/F
A tr
aini
ng,
DRR
/hea
lth
prom
otio
n, e
nvir
onm
enta
l pro
tect
ion
init
iati
ve,
disa
ster
aw
aren
ess
prom
otio
n).
9
cond
ucti
ng d
isas
ter
resp
onse
sim
ulat
ion
in s
choo
ls/u
nive
rsit
ies
(eva
cuat
ion,
pr
epar
ing
scho
ol/u
nive
rsit
y as
tem
pora
ry ID
P sh
elte
r).
Lapo
ran
kegi
atan
pe
mbi
naan
se
kola
h
Bula
nan
90N
umbe
r of
hea
lthy
sch
ools
at
PMI
Bran
ches
’ w
orki
ng a
rea.
Hea
lthy
Sch
ool i
s a
YRC
acti
vity
in s
choo
ls,
such
as:
9
Peer
Edu
cati
on o
n H
ealt
hy B
ehav
iors
(he
alth
y en
viro
nmen
t pr
omot
ion,
han
d w
ashi
ng w
ith
soap
, br
ushi
ng t
eeth
, th
row
ing
tras
h in
gar
bage
bin
).9
Supp
orti
ng P
MI’s
Sch
ool H
ealt
h U
nit
acti
viti
es.
Chec
klis
t pe
nila
ian
krit
eria
se
kola
h se
hat
Tahu
nan
91N
umbe
r of
dis
aste
r-pr
epar
ed s
choo
l at
PM
I Bra
nche
s’ w
orki
ng a
rea.
PMI B
ranc
hes
that
fac
ilita
te/d
evel
op d
isas
ter
read
y sc
hool
s or
uni
vers
itie
s ,
wit
h cr
iter
ia in
clud
ing
but
not
limit
ed t
o :
9
mob
iliza
tion
of
YRC/
KSR
to c
ondu
ct e
duca
tion
cam
paig
n in
uni
vers
itie
s/sc
hool
s (f
or D
M/F
A tr
aini
ng,
DRR
/hea
lth
prom
otio
n, e
nvir
onm
enta
l pro
tect
ion
init
iati
ve,
disa
ster
aw
aren
ess
prom
otio
n).
9
cond
ucte
d di
sast
er
resp
onse
si
mul
atio
n in
sc
hool
s/un
iver
siti
es
(eva
cuat
ion,
pr
epar
ing
scho
ol/u
nive
rsit
y as
tem
pora
ry ID
P sh
elte
r).
Dis
aste
r re
ady
asse
ssm
ent
chec
klis
t
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
68
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
92N
umbe
r of
dir
ect
bene
ficia
ry f
rom
PM
I Bra
nch’
s di
sast
er p
repa
redn
ess
prog
ram
.
Dir
ect
bene
ficia
ries
are
peo
ple
who
are
act
ivel
y in
volv
ed in
, co
ntri
bute
to
and
rece
ive
bene
fit d
irec
tly
from
PM
I dis
aste
r pr
epar
edne
ss a
ctiv
itie
s.Ac
tivi
ty
repo
rtM
onth
ly
93N
umbe
r of
dir
ect
bene
ficia
ry f
rom
PM
I Bra
nche
s’ c
omm
unit
y-ba
sed
heal
th p
rogr
am.
Bene
ficia
ries
fro
m c
omm
unit
y-ba
sed
heal
th p
rogr
am a
re p
eopl
e w
ho a
ctiv
ely
cont
ribu
te t
o, r
ecei
ve b
enefi
t fr
om a
nd r
egis
tere
d in
com
mun
ity-
base
d he
alth
ac
tivi
ties
.
Acti
vity
re
port
Mon
thly
94N
umbe
r of
gui
delin
es/S
oP o
n co
mm
unit
y-ba
sed
prog
ram
s av
aila
ble
at P
MI N
HQ
.
Gui
delin
es/S
oP o
n co
mm
unit
y-ba
sed
prog
ram
are
the
exi
stin
g gu
idel
ines
for
co
mm
unit
y-ba
sed
prog
ram
s, u
pdat
ed w
ith
good
sta
ndar
ds.
Gui
delin
es/
SoP
Doc
umen
t An
nual
ly
95N
umbe
r of
IEC
mat
eria
l dis
trib
uted
to
com
mun
itie
s by
PM
I Bra
nche
s.
IEC
mat
eria
l is
a to
ol t
o di
ssem
inat
e in
form
atio
n in
ord
er t
o ed
ucat
e co
mm
unit
ies,
w
hich
cou
ld b
e in
for
m o
f le
aflet
s, b
roch
ures
, bo
okle
ts,
bann
ers,
etc
.IE
C m
ater
ial
dist
ribu
tion
lis
t
Annu
ally
96N
umbe
r of
com
mun
ity-
base
d pr
ogra
ms
impl
emen
ted
by P
MI
Bran
ches
.
A co
mm
unit
y-ba
sed
prog
ram
bot
h di
sast
er-
and
heal
th-r
elat
ed,
impl
emen
ted
by P
MI
Bran
ches
, in
clud
ing
in s
choo
ls/u
nive
rsit
ies.
Pr
ogra
m
docu
men
t An
nual
ly
97N
umbe
r of
spe
cial
ist
on c
omm
unit
y-ba
sed
prog
ram
at
PMI C
hapt
ers.
Com
mun
ity-
base
d pr
ogra
m s
peci
alis
t is
a P
MI s
taff
/vol
unte
er w
ho h
as a
tten
ded
com
mun
ity-
base
d pr
ogra
m t
rain
ings
and
has
bee
n m
obili
zed
to m
anag
e co
mm
unit
y-ba
sed
prog
ram
s.
Staf
f/vo
lunt
eer
data
base
Annu
ally
98N
umbe
r of
sta
ff/
volu
ntee
rs a
t PM
I N
HQ
/Cha
pter
s/ B
ranc
hes
trai
ned
on
com
mun
ity-
base
d pr
ogra
m.
Staf
f/KS
R/TS
R w
ho h
as a
tten
ded
at le
ast
one
com
mun
ity-
base
d pr
ogra
m t
rain
ing,
su
ch a
s:
P
HAS
T
CBH
FA
ICB
RR
Staf
f/vo
lunt
eer
data
base
Annu
ally
99N
umbe
r of
dir
ect
bene
ficia
ries
fro
m
PMI B
ranc
hes’
soc
ial s
ervi
ces.
Dir
ect
bene
ficia
ries
fro
m s
ocia
l ser
vice
are
tho
se r
ecei
ving
dif
fere
nt a
ssis
tanc
e su
ch
as :
m
ater
ial s
uppo
rts
m
ass
circ
umci
sion
f
ree
heal
th s
ervi
ces
(gla
sses
, ca
tara
ct s
urge
ry)
s
ocia
l wor
ks
Acti
vity
re
port
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
69
NO
.PE
RNYA
TAA
N IN
DIK
ATO
RD
EFIN
ISI
ALA
T VE
RIFI
KASI
WA
KTU
PE
LAPO
RAN
100
Num
ber
of g
uide
lines
/ SO
P an
d su
ppor
ting
too
ls f
or s
ocia
l ser
vice
s av
aila
ble
at P
MI N
HQ
.
Gui
delin
es/
SoP
on s
ocia
l ser
vice
s co
ntai
ns t
echn
ical
impl
emen
tati
on o
f so
cial
se
rvic
es s
tart
ing
from
pla
nnin
g st
age
to e
valu
atio
n or
clo
sing
.Ex
ampl
e of
sup
port
ing
equi
pmen
t fo
r so
cial
ser
vice
, i.
e. IE
C m
ater
ials
, m
odel
ing
equi
pmen
t, a
nd M
&E
tool
s.
Gui
delin
es/
SoP
docu
men
t An
nual
ly
101
Num
ber
of s
ocia
l ser
vice
s ca
rrie
d ou
t at
PM
I NH
Q/
Chap
ters
/Bra
nche
s.
Soci
al s
ervi
ces
acti
viti
es c
ondu
cted
by
PMI i
nclu
de,
but
not
limit
ed t
o:
m
ater
ial s
uppo
rts
m
ass
circ
umci
sion
f
ree
heal
th s
ervi
ces
(gla
sses
, ca
tara
ct s
urge
ry)
s
ocia
l wor
ks
Acti
vity
re
port
Annu
ally
102
Num
ber
of s
taff
/ vo
lunt
eers
at
PMI
NH
Q/C
hapt
ers/
Bra
nche
s tr
aine
d in
so
cial
ser
vice
s.
Staf
f/KS
R/TS
R w
ho h
as a
tten
ded
mor
e th
an o
ne s
ocia
l ser
vice
tra
inin
gs,
such
as
:
fam
ily c
are
stre
et c
hild
ren
serv
ice
Staf
f/vo
lunt
eer
data
base
Annu
ally
103
PMI h
ospi
tal r
ecei
ves
adva
nced
ac
cred
itat
ion
cert
ifica
te f
rom
the
H
ospi
tal A
ccre
dita
tion
Com
mis
sion
(K
omis
i Akr
edit
asi R
umah
Sak
it-K
ARS)
or
Joi
nt C
omm
issi
on In
tern
atio
nal
(JCI
) fr
om In
done
sian
Hea
lth
Min
istr
y.
The
Hos
pita
l Acc
redi
tati
on C
omm
issi
on (
KARS
) is
an
Inde
pend
ent
Nat
iona
l Ac
cred
itat
ion
Agen
cy e
ndor
sed
by t
he M
inis
try
of H
ealt
h ba
sed
on L
aw N
o 40
44/
2009
re
gard
ing
Hos
pita
ls.
Hos
pita
l acc
redi
tati
on is
an
ackn
owle
dgem
ent
give
n by
the
gov
ernm
ent
to t
he
hosp
ital
man
agem
ent
as t
hey
have
ful
fille
d th
e st
anda
rds.
The
hos
pita
l acc
redi
tati
on
aim
s to
impr
ove
the
qual
ity
of h
ealt
h se
rvic
e, t
here
fore
it is
urg
entl
y ne
eded
by
the
com
mun
itie
s w
ho h
ave
beco
me
mor
e se
lect
ive
and
dese
rve
to r
ecei
ve q
ualit
y se
rvic
es.
Cert
ifica
tion
of
ac
cred
itat
ion
Ever
y 3
year
s (a
t m
inim
al)
104
Ann
ual
Bed
Occ
upan
cy R
ate
(BO
R)
rati
o.Th
e Be
d O
ccup
ancy
Rat
e (B
OR)
rat
io:
perc
enta
ge o
f be
d oc
cupa
ncy
at c
erta
in p
oint
of
tim
e. T
his
indi
cato
r pr
ovid
es in
form
atio
n on
the
rat
e of
bed
occ
upan
cy a
t th
e ho
spit
al.
An id
eal p
aram
eter
of
BOR
rang
es b
etw
een
60 –
85%
.BO
R fo
rmul
a =
(Num
ber
of in
pati
ent
days
at
the
hosp
ital
/ (
Num
ber
of b
ed X
Num
ber
of d
ays
in o
ne p
erio
d) x
100
%.
Hos
pita
l re
port
Mon
thly
105
Perc
enta
ge o
f in
crea
se in
PM
I H
ospi
tals
’ in
com
e pe
r ye
ar.
Clea
r en
ough
.Fi
nanc
ial
repo
rt
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
70
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
106
Num
ber
of P
MI h
ospi
tal e
mpl
oyee
w
ho r
ecei
ves
diss
emin
atio
n of
in
form
atio
n on
KAR
S/ J
CI s
tand
ard
serv
ices
.
Dis
sem
inat
ion
of K
ARS/
JCI s
tand
ards
can
be
done
thr
ough
dif
fere
nt m
etho
ds,
eith
er
thro
ugh
mee
ting
s, w
orks
hops
org
aniz
ed s
epar
atel
y or
inte
grat
ed w
ith
othe
r m
eeti
ngs
at lo
cal o
r na
tion
al le
vels
.
Atte
ndan
ce
list
from
di
ssem
inat
ion
acti
vity
Mon
thly
(if
th
ere
is a
ny
diss
emin
atio
n co
nduc
ted)
107
Num
ber
of P
MI h
ospi
tal e
mpl
oyee
w
ho m
eets
the
sta
ndar
d fo
r co
mpe
tenc
e fo
r pe
rfor
man
ce
asse
ssm
ent.
Stan
dard
of
perf
orm
ance
eva
luat
ion
com
pete
nce
incl
udes
: 1.
lea
ders
hip
2. k
now
ledg
e an
d sk
ill
3. a
ttit
ude
and
beha
vior
s 4.
com
mit
men
t an
d cr
eati
vity
5.
app
eara
nce
6.
att
enda
nce
and
disc
iplin
e
Com
pete
nce
asse
ssm
ent
form
Annu
ally
108
Num
ber
of P
MI h
ospi
tal s
taff
who
m
eets
the
em
ploy
ee t
rain
ed in
IPC/
K3RS
.
The
Infe
ctio
n Pr
even
tion
and
Con
trol
Pro
gram
(IP
CI)
in H
ospi
tals
is a
n ef
fort
to
prev
ent
and
redu
ce in
fect
ion
inci
dent
in h
ospi
tals
to
the
low
est
poss
ible
rat
e.
Infe
ctio
n pr
even
tion
and
con
trol
in h
ospi
tals
is a
n im
port
ant
qual
ity
assu
ranc
e st
anda
rd f
or p
atie
nts,
hea
lth
wor
kers
and
hos
pita
l vis
itor
, co
nduc
ted
to p
rote
ct
pati
ents
, he
alth
wor
kers
, an
d vi
sito
rs f
rom
infe
ctio
n by
tak
ing
into
acc
ount
cos
t ef
fect
iven
ess.
H
ospi
tal O
ccup
atio
nal H
ealt
h an
d Sa
fety
(K3
RS)
is a
pro
gram
man
date
d by
Law
No.
23
/200
3 re
gard
ing
Hea
lth,
whi
ch r
egul
ates
thr
ee m
ain
com
pone
nts
i.e.
wor
k ca
paci
ty,
wor
k lo
ad,
and
wor
king
env
iron
men
t. K
3RS
trai
ning
is t
o be
con
duct
ed in
line
wit
h th
e st
anda
rd K
3RS
proc
edur
es.
Trai
ning
rep
ort
Mon
thly
(if
th
ere
is a
ny
trai
ning
)
109
Num
ber
of o
ut-p
atie
nts
visi
t in
a
year
at
PMI h
ospi
tal.
Cl
ear
enou
gh.
Reca
pitu
lati
on
of o
utpa
tien
t se
rvic
es
Annu
ally
110
Num
ber
of s
peci
aliz
ed/s
ub-
spec
ializ
ed s
ervi
ce p
rovi
ded
at P
MI
hosp
ital
.
Clea
r en
ough
.Re
port
on
type
s of
ho
spit
al
serv
ice
Annu
ally
111
Num
ber
of p
erso
nnel
who
rec
eive
s ed
ucat
ion/
trai
ning
at
PMI H
ospi
tal
The
educ
atio
n an
d tr
aini
ng a
ctiv
itie
s co
unte
d ar
e on
ly a
ctiv
itie
s ut
ilizi
ng f
acili
ties
in
PMI B
ogor
Hos
pita
l, b
oth
orga
nize
d by
PM
I or
exte
rnal
par
ties
. Tr
aini
ng r
epor
t M
onth
ly (
if
ther
e is
any
tr
aini
ng )
Planning and Reporting Guidelines Palang Merah Indonesia
71
STRA
TEG
IC O
BJEC
TIVE
- 5
To in
crea
se t
he a
vaila
bilit
y of
saf
e, a
cces
sibl
e, a
nd q
ualit
y bl
ood
thro
ugho
ut In
done
sia
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
112
UTD
Pro
vinc
es/D
istr
icts
mee
t G
ood
Man
ufac
turi
ng P
ract
ice
(GM
P)
stan
dard
s.
Goo
d M
anuf
actu
ring
Pra
ctic
e (G
MP)
sta
ndar
d en
tails
all
prac
tica
l ele
men
ts t
hat
will
re
sult
in e
nd p
rodu
cts/
serv
ices
tha
t ca
n co
nsis
tent
ly f
ulfil
l the
spe
cific
atio
n ag
reed
(A
ustr
alia
n Co
de o
f G
MP
2000
). T
his
stan
dard
is p
art
of a
qua
lity
assu
ranc
e ef
fort
tha
t en
sure
s th
at t
he s
tand
ard
qual
ity
is in
line
wit
h th
e ut
iliza
tion
pur
pose
s, f
ollo
win
g th
e sp
ecifi
cati
on s
et (
WH
O G
uide
lines
on
GM
P 20
11).
GM
P st
anda
rd
asse
ssm
ent
docu
men
t
Annu
ally
113
UTD
Pro
vinc
es/D
istr
icts
mee
t na
tion
al s
tand
ards
.N
atio
nal S
tand
ard
refe
rs t
o a
num
ber
of r
egul
atio
ns r
egar
ding
blo
od s
ervi
ce
deve
lope
d by
a j
oint
tea
m f
rom
MoH
, PM
I and
rel
evan
t st
akeh
olde
rs b
ased
on
AABB
(A
mer
ican
Ass
ocia
tion
Blo
od B
ank)
sta
ndar
ds,
Euro
pean
Gui
delin
es,
and
WH
O.
Nat
iona
l St
anda
rd
asse
ssm
ent
docu
men
t
Annu
ally
114
Num
ber
of U
TD P
rovi
nce/
Dis
tric
t w
ith
stan
dard
org
aniz
atio
nal
stru
ctur
e.
Stan
dard
of
Org
aniz
atio
n St
ruct
ure
refe
rs t
o M
oH R
egul
atio
n N
o. 8
3/20
14 r
egar
ding
bl
ood
tran
sfus
ion
unit
, ho
spit
al’s
blo
od b
ank,
and
blo
od t
rans
fusi
on s
ervi
ce n
etw
ork
Dec
ree
on
Org
aniz
atio
nal
Stru
ctur
e
Annu
ally
115
Perc
enta
ge o
f U
TD P
rovi
nce/
Dis
tric
t th
at p
asse
s th
e Ex
tern
al Q
ualit
y As
sura
nce
asse
ssm
ent.
Exte
rnal
Qua
lity
Assu
ranc
e (E
QA)
ass
essm
ent
is c
ondu
cted
by
obse
rvin
g th
e re
sult
of
scr
eeni
ng t
est/
cros
s-m
atch
tes
t in
UTD
by
usin
g st
anda
rd s
ampl
e se
nt f
rom
UTD
Pr
ovin
ces.
Repo
rt o
n EQ
A as
sess
men
t re
sult
s
Annu
ally
116
UTD
Nat
iona
l/ P
rovi
nces
/Dis
tric
ts
cond
uct
empl
oyee
per
form
ance
as
sess
men
t ev
ery
year
.
Perf
orm
ance
ass
essm
ent
is c
ondu
cted
thr
ough
Per
form
ance
App
rais
al D
ata
(DP2
).Re
port
of
DP2
re
sult
Annu
ally
117
Num
ber
of U
TD e
mpl
oyee
at
Nat
iona
l/Pr
ovin
ce/D
istr
ict
leve
ls
wit
h ba
sic
sala
ry in
acc
orda
nce
wit
h th
e ci
vil s
erva
nt s
alar
y sc
ale
in
effe
ct.
Sala
ry s
yste
m is
adj
uste
d w
ith
loca
l gov
ernm
ent’
s pa
y sc
ale
in e
ach
Prov
ince
/Dis
tric
t/Ci
ty.
Copy
of
pay
slip
/ pe
rson
nel
docu
men
t
Annu
ally
118
UTD
Nat
iona
l/ P
rovi
nces
/Dis
tric
ts
cond
uct
annu
al e
xter
nal fi
nanc
ial
audi
t.
Audi
t is
an
inde
pend
ent
revi
ew o
f fin
anci
al r
epor
t de
velo
ped
by P
MI t
o ch
eck
the
com
plia
nce
to t
he p
roce
dure
s by
ext
erna
l par
ties
. Au
dit
resu
lt
repo
rtAn
nual
ly
Planning and Reporting Guidelines Palang Merah Indonesia
72
NO
.PE
RNYA
TAA
N IN
DIK
ATO
RD
EFIN
ISI
ALA
T VE
RIFI
KASI
WA
KTU
PE
LAPO
RAN
119
UTD
Nat
iona
l/ P
rovi
nces
/ D
istr
ict
deve
lop
annu
al w
ork
plan
. An
nual
wor
k pl
an is
a w
ork
plan
usi
ng t
he a
ppro
ved
form
at a
nd c
onta
ins
info
rmat
ion
on: 9
Stra
tegi
c O
bjec
tive
s9
Out
com
es,
indi
cato
rs,
and
targ
ets
9
Out
puts
, in
dica
tors
, an
d ta
rget
s9
Acti
viti
es9
Amou
nt o
f bu
dget
per
act
ivit
y an
d ca
tego
ry
Surv
ey
anal
ysis
re
port
Annu
ally
120
UTD
Nat
iona
l/ P
rovi
nces
/Dis
tric
ts
deve
lop
annu
al a
ctiv
ity
repo
rt.
Annu
al a
ctiv
ity
impl
emen
tati
on r
epor
t fr
om U
TD N
atio
nal/
Prov
ince
s/ D
istr
icts
/Cit
ies
is a
rep
ort
on t
he r
esul
t of
wor
k pl
an im
plem
enta
tion
, w
hich
con
tain
s in
form
atio
n on
th
e ac
hiev
emen
t of
: 9
targ
et f
or o
utco
me
indi
cato
r9
targ
et f
or o
utpu
t in
dica
tor
9
brie
f ex
plan
atio
n on
act
ivit
y im
plem
enta
tion
Surv
ey
anal
ysis
re
port
Annu
ally
121
UTD
Dis
tric
ts r
ecei
ve c
oach
ing
visi
t fr
om P
rovi
nce/
Nat
iona
l at
leas
t on
ce
a ye
ar.
Coac
hing
vis
it f
rom
UTD
per
sonn
el o
ne le
vel a
bove
can
be
done
at
any
tim
e by
usi
ng
the
appr
oved
coa
chin
g gu
idel
ines
.Fi
nanc
ial
repo
rtAn
nual
ly
122
Num
ber
of U
TD t
rain
ing
cent
er
accr
edit
ed b
y th
e M
inis
try
of H
ealt
h.Ac
cred
itat
ion
prop
osal
pro
cess
is c
ondu
cted
by
encl
osin
g di
ffer
ent
requ
irem
ents
in
orde
r to
rec
eive
sta
ndar
d ac
know
ledg
emen
t fr
om M
oH
Accr
edit
atio
n do
cum
ent
from
MoH
Annu
ally
123
Num
ber
of U
TD e
mpl
oyee
at
Nat
iona
l/ P
rovi
nce/
Dis
tric
t w
ho
mee
ts 2
5 Pr
ofes
sion
al C
redi
t U
nits
(S
atua
n Kr
edit
Pro
fesi
onal
-SKP
) w
ithi
n 5
year
s.
Prof
essi
onal
Cre
dit
Uni
t (S
KP)
is a
cre
dit
colle
cted
by
tech
nica
l sta
ff in
ord
er t
o ga
in
com
pete
nce
as a
tec
hnic
ian
to b
e al
low
ed f
or p
ract
icin
g w
ork.
List
of
SKP
fulfi
llmen
tAn
nual
ly
124
Num
ber
of U
TD e
mpl
oyee
at
Nat
iona
l/Pr
ovin
ce/D
istr
ict
who
at
tend
s G
MP
trai
ning
.
Clea
r en
ough
.G
MP
trai
ning
re
port
Mon
thly
(if
th
ere
is a
ny
trai
ning
)
125
Num
ber
of U
TD e
mpl
oyee
at
Nat
iona
l/Pr
ovin
ce/D
istr
ict
who
re
ceiv
es t
rain
ing
at le
ast
once
a
year
.
Clea
r en
ough
.Tr
aini
ng
repo
rtAn
nual
ly
Planning and Reporting Guidelines Palang Merah Indonesia
73
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
126
Perc
enta
ge o
f D
iplo
ma
Prog
ram
gr
adua
tes
empl
oyed
by
heal
th
serv
ice
prov
ider
s.
Dip
lom
a Pr
ogra
m o
n Bl
ood
Tran
sfus
ion
Tech
nolo
gy (
TTD
) is
an
educ
atio
n pr
ovid
ed
for
bloo
d tr
ansf
usio
n te
chni
cian
s by
PTT
D in
stit
utio
n in
ord
er t
o pr
ovid
e co
mpe
tent
hu
man
res
ourc
es in
blo
od t
rans
fusi
on t
echn
olog
y.
PTTD
gr
adua
te
data
base
Annu
ally
127
UTD
Nat
iona
l/ P
rovi
nces
/Dis
tric
ts
have
sta
ndar
d eq
uipm
ent
in
acco
rdan
ce w
ith
thei
r se
rvic
e gr
ade.
UTD
ser
vice
, in
line
wit
h M
oH R
egul
atio
n N
o 83
/201
4, is
div
ided
into
Uta
ma
leve
l for
U
TD N
atio
nal,
Mad
ya le
vel f
or U
TD P
rovi
nces
, an
d Pr
atam
a le
vel f
or U
TD D
istr
icts
.In
vent
ory
docu
men
tAn
nual
ly
128
UTD
Nat
iona
l/ P
rovi
nces
/Dis
tric
ts
use
bloo
d ba
gs a
nd r
eage
nt t
hat
com
ply
wit
h na
tion
al s
tand
ards
.
Nat
iona
l Sta
ndar
d fo
r bl
ood
bag
and
reag
ent
use
refe
rs t
o G
over
nmen
t Re
gula
tion
No.
7/
2011
and
MoH
Reg
ulat
ion
No
83/2
014
as w
ell a
s th
e ne
w r
egul
atio
n cu
rren
tly
bein
g fin
aliz
ed a
t th
e M
oH.
Proc
urem
ent
docu
men
tAn
nual
ly
129
UTD
Nat
iona
l/ P
rovi
nces
/Dis
tric
ts
use
Bloo
d D
onor
Uni
t M
anag
emen
t In
form
atio
n Sy
stem
(S
IMU
DD
A).
Bloo
d D
onor
Man
agem
ent
Info
rmat
ion
Syst
em (
SIM
UD
DA)
is a
doc
umen
tati
on s
yste
m o
f al
l blo
od s
ervi
ce a
ctiv
itie
s in
UTD
sta
rtin
g fr
om t
he d
onor
’s v
ein
to t
he p
atie
nt’s
. SI
MU
DD
AM
onth
ly
130
UTD
Pro
vinc
es/
Dis
tric
ts s
ubm
it
bloo
d se
rvic
e re
port
to
UTD
.Se
rvic
e ac
tivi
ty r
epor
t el
abor
ates
all
acti
viti
es in
UTD
, st
arti
ng f
rom
don
or
recr
uitm
ent,
sel
ecti
on a
nd b
lood
sam
plin
g, u
ntil
bloo
d sa
fegu
ards
, pr
oces
sing
, st
orag
e, a
nd d
istr
ibut
ion
for
one
year
.
SIM
UD
DA
Mon
thly
131
Perc
enta
ge o
f bl
ood
dono
r vo
lunt
eer
at U
TD P
rovi
nce/
Dis
tric
t w
ho
dona
tes
bloo
d 3-
4 ti
mes
a y
ear.
Clea
r en
ough
.Bl
ood
dono
r da
taba
se
Annu
ally
132
Amou
nt o
f bl
ood
(bag
) th
at c
an b
e us
ed f
or m
edic
atio
n ev
ery
year
at
UTD
Pro
vinc
e/D
istr
ict.
Clea
r en
ough
.Bl
ood
prod
uct
regi
stry
do
cum
ent
Annu
ally
133
Num
ber
of p
eopl
e re
ache
d th
roug
h Vo
lunt
ary
Bloo
d D
onor
pro
mot
iona
l ac
tivi
ty e
very
qua
rter
by
UTD
N
atio
nal/
Prov
ince
s/ D
istr
icts
.
Prom
otio
nal a
ctiv
itie
s to
rec
ruit
Blo
od D
onor
Vol
unte
ers
thro
ugh
prod
ucti
on o
f le
aflet
s, a
dver
tise
men
t in
pri
nt,
TV,
and
onlin
e m
edia
thr
ough
UTD
web
site
, et
c.Li
st o
f at
tend
ance
, m
edia
co
vera
ge
repo
rt
Mon
thly
134
Num
ber
of U
TD D
istr
icts
tha
t ad
opt
the
cent
raliz
ed s
yste
m.
Cent
raliz
atio
n is
an
atte
mpt
to
cent
raliz
e bl
ood
proc
essi
ng a
nd d
istr
ibut
ion
exis
ting
in
seve
ral U
TD D
istr
icts
into
one
or
seve
ral c
ente
rs w
ithi
n th
e Pr
ovin
ce.
Cent
raliz
atio
n pl
an
docu
men
t
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
74
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
135
Num
ber
of c
entr
aliz
atio
n un
it
esta
blis
hed.
Cl
ear
enou
gh.
Cent
raliz
atio
n pl
an
docu
men
t
Annu
ally
136
Perc
enta
ge o
f bl
ood
requ
est
that
is
rati
onal
and
in li
ne w
ith
the
med
ical
in
dica
tion
in t
he h
ospi
tal f
ulfil
led
at
UTD
Dis
tric
ts.
Clea
r en
ough
.H
ospi
tal
repo
rtAn
nual
ly
137
Num
ber
of r
eage
nt t
ype
prod
uced
.Cl
ear
enou
gh.
Reag
ent
prod
ucti
on
reco
rd
Mon
thly
138
Num
ber
of b
lood
rea
gent
pro
duce
d.Cl
ear
enou
gh.
Reag
ent
prod
ucti
on
reco
rd
Mon
thly
139
Num
ber
of m
inip
ool c
ryop
reci
pita
te
prod
uced
.Cl
ear
enou
gh.
Prod
ucti
on
reco
rdM
onth
ly
140
Perc
enta
ge o
f pr
ogre
ss in
blo
od b
ag
fact
ory
cons
truc
tion
.Pr
ogre
ss o
f fa
ctor
y co
nstr
ucti
on is
mea
sure
d ag
ains
t PM
I NH
Q’s
bus
ines
s pl
an.
Fact
ory
cons
truc
tion
re
port
Mon
thly
141
Perc
enta
ge o
f ba
g ut
iliza
tion
fro
m
Kore
an G
reen
Cro
ss (
KGC)
Ori
gina
l Eq
uipm
ent
Man
ufac
ture
r (O
EM)
in a
ll U
TDs.
Clea
r en
ough
.Pr
ocur
emen
t do
cum
ent
Mon
thly
142
Perc
enta
ge o
f pr
ogre
ss in
pla
sma
frac
tion
ator
con
stru
ctio
n.Pr
ogre
ss o
f fa
ctor
y co
nstr
ucti
on is
mea
sure
d ag
ains
t PM
I NH
Q’s
bus
ines
s pl
an.
Cons
truc
tion
re
port
M
onth
ly
143
Num
ber
of p
lasm
a ba
g se
nt t
o fr
acti
onat
or in
a y
ear.
Cl
ear
enou
gh.
Dis
trib
utio
n re
port
Mon
thly
144
Num
ber
of r
esea
rch
cond
ucte
d by
U
TD N
atio
nal/
Prov
ince
s.Th
e th
eme
for
rese
arch
con
duct
ed a
t ea
ch U
TD N
atio
nal/
Prov
ince
is u
nres
tric
ted,
in
acco
rdan
ce w
ith
the
inte
rest
and
nee
ds o
f ea
ch U
TD.
Rese
arch
re
sult
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
75
STRA
TEG
IC O
BJEC
TIVE
-6
To s
tren
gthe
n th
e pa
rtne
rshi
p w
ith
nati
onal
and
loca
l gov
ernm
ents
, pu
blic
and
pri
vate
sec
tors
, m
ovem
ent
part
ners
, do
nor
agen
cies
, an
d ot
her
stak
ehol
ders
in o
rder
to
assu
me
PMI’s
man
date
and
fun
ctio
ns.
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
145
Num
ber
of p
artn
er t
hat
has
form
al
part
ners
hip
wit
h PM
I NH
Q/C
hapt
ers/
Br
anch
es.
PMI’s
par
tner
s ar
e ce
ntra
l or
loca
l gov
ernm
ent,
pub
lic s
ecto
r, p
riva
te s
ecto
r,
mov
emen
t pa
rtne
rs,
dono
r, a
nd o
ther
sta
keho
lder
s co
llabo
rati
ng w
ith
PMI b
ased
on
a le
gal a
gree
men
t
MoU
or
Coop
erat
ion
Agre
emen
t
Annu
ally
146
Num
ber
of M
oU s
igne
d at
PM
I NH
Q/
Chap
ters
/ Br
anch
es.
MoU
s, C
oope
rati
on A
gree
men
ts,
and
othe
r eq
ually
bin
ding
par
tner
ship
agr
eem
ents
.M
oU o
r ot
her
part
ners
hip
docu
men
ts
Annu
ally
147
Num
ber
of p
rom
otio
nal m
edia
di
stri
bute
d to
pot
enti
al p
artn
ers
by
PMI N
HQ
/ Ch
apte
rs/B
ranc
hes.
Prom
otio
nal m
ater
ials
and
too
ls d
istr
ibut
ed t
o po
tent
ial p
artn
ers.
Prom
otio
nal
med
ia
dist
ribu
tion
re
port
Annu
ally
148
Num
ber
of M
oU f
ollo
wed
up
wit
h Co
oper
atio
n Ag
reem
ent
by P
MI N
HQ
/Ch
apte
rs/
Bran
ches
.
MoU
s pr
esen
ted
in f
orm
of
bind
ing
Coop
erat
ion
Agre
emen
t fo
r a
cert
ain
peri
od o
f ti
me
and
in s
peci
fic a
rea.
Coop
erat
ion
Agre
emen
t do
cum
ent
Annu
ally
149
Num
ber
of a
ctiv
ity
cond
ucte
d by
PM
I NH
Q/C
hapt
ers/
Bra
nche
s in
co
llabo
rati
on w
ith
part
ners
.
Clea
r en
ough
.Ac
tivi
ty
repo
rtM
onth
ly (
if
ther
e is
any
jo
int
acti
vity
)
150
Amou
nt o
f an
nual
inco
me
from
PM
I N
HQ
/Cha
pter
s/ B
ranc
hes’
bus
ines
s un
its.
Inco
me
deri
ved
from
bus
ines
s un
its
of P
MI N
HQ
/Cha
pter
s/Br
anch
es f
or o
ne y
ear.
Fina
ncia
l re
port
Annu
ally
151
Num
ber
of p
ropo
sal s
ubm
itte
d by
PM
I N
HQ
and
app
rove
d by
don
ors.
Cl
ear
enou
gh.
MoU
or
PAAn
nual
ly
152
Amou
nt o
f PM
I Cha
pter
s/ B
ranc
hes’
in
com
e de
rive
d fr
om e
xter
nal
trai
ning
s.
Exte
rnal
tra
inin
gs a
re d
iffe
rent
ser
vice
s/tr
aini
ngs
prov
ided
to
exte
rnal
par
ty,
eith
er
priv
ate,
gov
ernm
ent,
or
educ
atio
n in
stit
utio
n re
sult
ing
in in
com
e fo
r PM
I.In
com
e re
port
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
76
NO
.PE
RNYA
TAA
N IN
DIK
ATO
RD
EFIN
ISI
ALA
T VE
RIFI
KASI
WA
KTU
PE
LAPO
RAN
153
PMI C
hapt
ers
subm
it r
esou
rce
mob
iliza
tion
str
engt
heni
ng s
trat
egy
docu
men
t to
PM
I NH
Q
Reso
urce
Mob
iliza
tion
str
ateg
y do
cum
ent
is a
doc
umen
t co
ntai
ning
dif
fere
nt a
ctiv
itie
s w
ith
vari
ous
stra
tegi
es o
r m
etho
ds t
o de
velo
p PM
I res
ourc
es.
Reso
urce
M
obili
zati
on
stra
tegy
do
cum
ent
Annu
ally
154
Num
ber
of a
ctiv
e an
d op
erat
iona
l PM
I bus
ines
s un
it a
t N
HQ
/Cha
pter
s/
Bran
ches
.
PMI b
usin
ess
unit
is a
wid
e ra
nge
of a
ctiv
itie
s or
ass
et u
tiliz
atio
n to
bri
ng in
inco
me.
Ac
tive
and
ope
rati
onal
mea
ns b
ring
ing
in in
com
e fo
r PM
I.Bu
sine
ss u
nit
finan
cial
re
port
Annu
ally
155
Num
ber
of t
rain
ing
faci
litat
ed b
y PM
I Ch
apte
rs/B
ranc
hes
to e
xter
nal p
arty
.Cl
ear
enou
gh.
See
defin
itio
n of
indi
cato
r no
.152
.Tr
aini
ng
repo
rt
Annu
ally
156
PMI C
hapt
ers/
Bra
nche
s re
ceiv
e re
port
on
pote
ntia
l don
ors
map
ping
fo
r re
sour
ce m
obili
zati
on.
Pote
ntia
l don
or m
ap in
clud
es in
form
atio
n on
cor
pora
tion
s, a
ddre
sses
, co
re b
usin
ess,
in
tere
st o
f CS
R pr
ogra
m,
etc.
Po
tent
ial
dono
r m
ap
Annu
ally
157
PMI C
hapt
ers/
Bra
nche
s re
ceiv
e pu
blic
don
atio
n in
line
wit
h th
e gu
idel
ines
Gui
delin
es o
n do
nati
on r
esul
ts s
hari
ng f
or P
MI a
t di
ffer
ent
leve
ls w
ill b
e re
view
ed,
appr
oved
, an
d di
ssem
inat
ed.
Don
atio
n re
port
Annu
ally
Planning and Reporting Guidelines Palang Merah Indonesia
77
STRA
TEG
IC O
BJEC
TIVE
-7To
impr
ove
PMI’s
acc
ount
abili
ty a
s a
hum
anit
aria
n or
gani
zati
on a
t th
e na
tion
al a
nd in
tern
atio
nal l
evel
s.
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
158
PMI C
hapt
ers/
Bran
ches
pub
lish
fund
rais
ing
repo
rt a
nnua
lly.
Fund
rais
ing
repo
rt is
a c
onso
lidat
ed r
epor
t of
fun
d re
ceiv
ed f
rom
PM
I res
ourc
e m
obili
zati
on a
t al
l lev
els
ever
y ye
ar.
The
repo
rt is
spe
cifie
d ba
sed
on s
ourc
e of
fu
ndin
g, e
ithe
r in
divi
dual
/ins
titu
tion
al d
onat
ion,
gov
ernm
ent
fund
, or
gra
nts
from
do
nor
agen
cies
, to
be
furt
her
publ
ishe
d to
the
com
mun
ity
at la
rge
thro
ugh
repo
rt o
r m
ass
med
ia.
Fund
rais
ing
repo
rtAn
nual
ly
159
Perc
enta
ge o
f fu
nd a
lloca
ted
by P
MI
Bran
ches
for
its
serv
ices
.Fu
nd a
lloca
ted
for
serv
ices
incl
udin
g re
gula
r, e
mer
genc
y se
rvic
es,
incl
udin
g ca
paci
ty
build
ing
acti
viti
es.
Ope
rati
onal
cos
t, s
uch
as p
erso
nnel
sal
ary
and
offic
e op
erat
ions
, is
no
t in
clud
ed in
thi
s al
loca
tion
.
Plan
ning
do
cum
ent
Annu
ally
160
PMI N
HQ
/Cha
pter
s co
nduc
t ex
tern
al
audi
t on
PM
I fun
d ut
iliza
tion
eve
ry
year
Exte
rnal
aud
it is
an
exte
rnal
rev
iew
of
finan
cial
rep
orts
con
duct
ed b
y ex
tern
al p
arti
es
to c
heck
com
plia
nce
to t
he s
tand
ard
proc
edur
es.
Audi
t re
port
Annu
ally
161
Num
ber
of fi
nanc
ial r
epor
t su
bmit
ted
to p
artn
ers
ever
y qu
arte
r by
PM
I N
HQ
/Cha
pter
s/ B
ranc
hes
Fina
ncia
l rep
ort
com
pris
es b
udge
t pl
an a
nd a
ctua
l/ab
sorp
tion
per
act
ivit
y, r
emai
ning
ba
lanc
e bo
th in
cas
h an
d in
the
acc
ount
, as
wel
l as
supp
orti
ng d
ocum
ents
req
uire
d fo
r al
l fina
ncia
l tra
nsac
tion
s.
Fina
ncia
l re
port
Qua
rter
ly
162
PMI B
ranc
hes
cond
uct
finan
cial
aud
it.
Audi
t is
an
inde
pend
ent
revi
ew o
f fin
anci
al r
epor
t de
velo
ped
by P
MI t
o ch
eck
the
com
plia
nce
to t
he p
roce
dure
s, w
hich
can
be
done
by
inte
rnal
or
exte
rnal
par
ties
. Au
dit
repo
rtAn
nual
ly
163
PMI B
ranc
hes
cond
uct
surv
ey t
o co
llect
ben
efici
arie
s’ f
eedb
ack
at
leas
t on
ce a
yea
r.
Feed
back
col
lect
ion
surv
ey is
a s
urve
y to
ass
ess
publ
ic o
pini
on,
espe
cial
ly d
irec
t be
nefic
iari
es,
abou
t PM
I pro
gram
s/se
rvic
es.
This
sur
vey
can
be d
one
thro
ugh
ques
tion
nair
es,
inte
rvie
ws,
FG
Ds,
pho
ne in
terv
iew
s, o
r th
roug
h em
ails
/web
site
(e.
g.
surv
eym
onke
y.co
m).
Surv
ey r
epor
tAn
nual
ly
164
Num
ber
of p
eopl
e re
ache
d by
mas
s m
edia
pub
licat
ion
on P
MI B
ranc
hes’
pr
ogra
m/
serv
ices
.
Num
ber
of p
eopl
e re
ache
d th
roug
h m
ass
med
ia p
ublic
atio
n is
cal
cula
ted
base
d on
th
e nu
mbe
r of
pot
enti
al a
udie
nce
from
PM
I pub
licat
ion
in p
rint
med
ia,
TV,
radi
o, a
nd
inte
rnet
.
New
s an
alys
is
repo
rtM
onth
ly
165
PMI C
hapt
ers/
Bra
nche
s ha
ve a
t le
ast
two
basi
c PR
& c
omm
unic
atio
n eq
uipm
ent.
Basi
c PR
& c
omm
unic
atio
n eq
uipm
ent
is t
he s
uppo
rtin
g eq
uipm
ent
for
PMI’s
PR
task
s,
i.e.
cam
era,
vid
eo c
amer
a, a
nd r
ecor
der.
Asse
t in
vent
ory
Annu
ally
166
Tota
l num
ber
of n
ews
rega
rdin
g PM
I pu
blis
hed
in lo
cal/
nati
onal
med
ia a
t PM
I Bra
nche
s’ w
orki
ng a
rea.
New
s re
gard
ing
PMI i
s ne
ws
abou
t ac
tivi
ties
con
duct
ed o
r su
ppor
ted
by P
MI a
nd
publ
ishe
d at
pri
nt m
edia
, ra
dio,
TV,
and
onl
ine.
N
ews
anal
ysis
re
port
Mon
thly
167
Num
ber
of p
rom
otio
nal m
ater
ials
/pu
blic
atio
ns d
istr
ibut
ed b
y PM
I NH
Q/
Chap
ters
/ Br
anch
es.
Prom
otio
nal m
ater
ial/
publ
icat
ion
is p
rom
otio
nal/
publ
icat
ion
med
ia c
onta
inin
g in
form
atio
n ab
out
PMI s
ervi
ce a
ctiv
itie
s. T
he p
rom
otio
nal/
publ
icat
ion
prod
ucts
ca
n va
ry f
rom
eve
nt p
rom
otio
n ki
t (b
anne
rs,
gian
t ba
nner
s, fl
yers
, ro
ller
bann
ers,
ba
ckdr
ops)
, br
ochu
res,
pos
ters
, m
ulti
med
ia (
vide
o),
phot
os,
cale
ndar
kit
(ca
lend
ar
and
agen
da),
and
mag
azin
es.
Dis
trib
utio
n re
port
Mon
thly
(w
hen
cond
ucti
ng
dist
ribu
tion
)
Planning and Reporting Guidelines Palang Merah Indonesia
78
STRA
TEG
IC O
BJEC
TIVE
8:
To im
prov
e th
e un
ders
tand
ing
of a
ll el
emen
ts o
f co
mm
unit
ies
on h
uman
itar
ian
valu
es,
Fund
amen
tal P
rinc
iple
s of
the
Inte
rnat
iona
l RCR
C M
ovem
ent,
as
wel
l as
Inte
rnat
iona
l Hum
anit
aria
n La
ws
thro
ugh
com
mun
icat
ion,
edu
cati
on,
and
diss
emin
atio
n st
rate
gies
.
NO
.IN
DIC
ATO
R ST
ATEM
ENT
DEF
INIT
ION
MEA
NS
OF
VERI
FICA
TIO
NRE
PORT
ING
PE
RIO
D
168
Perc
enta
ge o
f re
spon
dent
sur
veye
d by
PM
I NH
Q w
ho c
an m
enti
on P
MI
man
date
cor
rect
ly.
Resp
onde
nt is
a c
omm
unit
y m
embe
r ab
ove
17 y
ears
of
age.
‘Ca
n m
enti
on P
MI
man
date
cor
rect
ly’
mea
ns t
hey
can
men
tion
tw
o of
the
fol
low
ings
:9
disa
ster
res
pons
e se
rvic
e9
disa
ster
pre
pare
dnes
s se
rvic
e9
bloo
d do
nor
serv
ice
9
heal
th s
ervi
ce9
soci
al s
ervi
ce
Surv
ey r
epor
tAn
nual
ly
169
Num
ber
of c
erti
fied
diss
emin
ator
s at
PM
I NH
Q/C
hapt
ers/
Bra
nche
s.Ce
rtifi
ed d
isse
min
ator
is a
PM
I per
sonn
el w
ho h
as c
ompl
eted
tra
inin
g on
RCR
C di
ssem
inat
ion
and
been
cer
tifie
d.D
isse
min
ator
ce
rtifi
cate
Annu
ally
170
Num
ber
of p
eopl
e w
ho a
tten
d RC
RC
diss
emin
atio
n ac
tivi
ties
at
PMI
Bran
ch.
RCRC
dis
sem
inat
ion
acti
vity
is a
n at
tem
pt t
o di
ssem
inat
e RC
RC v
alue
s in
gen
eral
, ei
ther
thr
ough
pro
mot
ion,
edu
cati
on,
info
rmat
ion,
or
advo
cacy
to
the
com
mun
ity,
le
gal i
nsti
tuti
ons,
pol
itic
al p
arti
es,
scho
lars
, se
curi
ty a
nd d
efen
se in
stit
utio
ns,
and
elem
enta
ry,
seco
ndar
y, a
nd h
igh
educ
atio
n in
stit
utio
ns.
Atte
ndan
ce
list
for
diss
emin
atio
n ac
tivi
ty
Mon
thly
171
Num
ber
of IE
C m
ater
ial o
n RC
RC
Dis
sem
inat
ion
dist
ribu
ted
by P
MI
NH
Q/C
hapt
ers/
Bra
nche
s.
IEC
mat
eria
ls o
n RC
RC D
isse
min
atio
n ar
e pr
inte
d/el
ectr
onic
info
rmat
ion,
edu
cati
on,
and
com
mun
icat
ion
med
ia d
evel
oped
spe
cific
ally
to
diss
emin
ate
RCRC
val
ues.
D
istr
ibut
ion
repo
rtM
onth
ly (
whe
n co
nduc
ting
di
stri
buti
on)
172
Num
ber
of d
isse
min
atio
n ac
tivi
ties
co
nduc
ted
by P
MI N
HQ
/ Ch
apte
rs/
Bran
ches
in c
olla
bora
tion
wit
h pa
rtne
rs.
RCRC
dis
sem
inat
ion
acti
viti
es a
re c
ondu
cted
in p
artn
ersh
ip w
ith
rele
vant
inst
itut
ions
. D
isse
min
atio
n ac
tivi
ty
repo
rt
Mon
thly
(w
hen
cond
ucti
ng
dist
ribu
tion
)
Planning and Reporting Guidelines Palang Merah Indonesia
79
In general, activities must be identified in accordance with the predefined outputs to deliver outcomes that will ultimately meet the objectives.
Activities can vary widely, according to the needs and context of local PMI branch. The following list of activities provided serves merely as a list of reference for potential activities to deliver the outputs outlined in PMI Operational Plan.
This means that there could probably be other activities which are not listed in the matrix but could still be done by PMI local branch. One important thing that can be learned from this matrix is the way to write down an activity. The rules of writing an activity is that it should be a verb or action, not in objective phrases or language. The key is to use an active sentence and in form of action words.
For example:9 Conduct PMER training for Head of Offices9 Conduct Annual Meeting9 Conduct supervisory visit 9 etc.
For certain outputs, all levels could contribute to deliver them. Yet there are also several outputs that are only relevant to be achieved at certain levels. Therefore, in the activity matrix, if the output is not relevant for a certain level, then it is written as Not Relevant.
2.6. List of References for PMI Operational and Services Activities
Planning and Reporting Guidelines Palang Merah Indonesia
80
LIST
OF
REFE
REN
CES
FOR
PMI O
PERA
TIO
NA
L A
ND
SER
VICE
S A
CTIV
ITIE
S
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
STRA
TEG
IC O
BJEC
TIVE
1:
To b
uild
a w
ell-
func
tion
ing
PMI
at a
ll le
vels
, w
ith
the
capa
city
to
crea
te s
yner
gy b
etw
een
prog
ram
act
ivit
ies
wit
h th
e or
gani
zati
onal
pol
icie
s,
proc
edur
es,
and
syst
em.
1.1.
PM
I’s L
egal
ent
ity
is
stre
ngth
ened
.1.
1.1.
RC
Bill
is in
clud
ed in
th
e N
atio
nal L
egis
lati
on
Prog
ram
Age
nda.
9
Cond
uct
advo
cacy
m
eeti
ng w
ith
parl
iam
ent,
go
vern
men
t, a
nd m
ass
orga
niza
tion
at
the
nati
onal
or
loca
l lev
els.
9
Cond
uct
RCRC
legi
slat
ion
sem
inar
/wor
ksho
p.
9
Prov
ide
inpu
ts t
o RC
Bi
ll.9
Cond
uct
advo
cacy
m
eeti
ng a
t th
e lo
cal
leve
l.
9
Prov
ide
inpu
ts t
o RC
Bi
ll.
1.2.
PM
I’s S
tatu
tes,
O
rgan
izat
iona
l Pr
oced
ures
(PO
),
and
Impl
emen
tati
on
Gui
delin
es (
Jukl
ak),
as
wel
l as
the
lega
l pr
oduc
ts is
sued
are
in
stit
utio
naliz
ed a
t al
l lev
els.
1.2.
1. P
MI S
tatu
tes,
Org
aniz
a-ti
onal
Pro
cedu
res
(PO
) ,
and
Impl
emen
tati
on
Gui
delin
es (
Jukl
ak),
as
wel
l as
lega
l pro
duct
s ar
e in
pla
ce a
nd im
ple-
men
ted
at a
ll le
vels
.
9
Prin
t, d
istr
ibut
e, a
nd
diss
emin
ate
PMI s
tatu
tes
(Bah
asa
Indo
nesi
a an
d En
glis
h).
9
Cond
uct
Annu
al M
eeti
ng.
9
Revi
ew/r
evis
e PO
/Juk
lak.
9
Dis
sem
inat
e PO
/Juk
lak.
9
Org
aniz
e a
wor
ksho
p to
de
velo
p th
e hi
erar
chy
of P
MI
lega
l pro
duct
s an
d to
ols.
9
Cond
uct
Annu
al
Mee
ting
9
Dis
sem
inat
e PO
/Juk
lak
to P
MI B
ranc
hes.
9
Adju
st P
O/J
ukla
k w
ith
the
need
s of
PM
I at
the
loca
l lev
el.
9
Cond
uct
Annu
al
Mee
ting
9
Dis
sem
inat
e PM
I st
atut
es t
o st
aff
and
boar
d m
embe
rs.
9
Impl
emen
t PO
/Juk
lak
base
d on
gui
danc
e fr
om P
MI C
hapt
er.
1.3.
PM
I’s P
lann
ing,
M
onit
orin
g, E
valu
a-ti
on,
and
Repo
rtin
g (P
MER
) sy
stem
is
wel
l-fu
ncti
onin
g at
al
l lev
els.
1.3.
1. P
MI b
oard
mem
bers
an
d st
aff
at a
ll le
vels
ar
e re
gula
rly
coac
hed
on t
he im
plem
enta
tion
of
Pla
nnin
g, M
onit
orin
g,
Eval
uati
on,
and
Repo
rt-
ing
(PM
ER)
syst
em b
y co
mpe
tent
fac
ilita
tors
.
9
Dis
sem
inat
e St
rate
gic
Plan
/O
pera
tion
al P
lan.
9
Revi
ew,
revi
se,
and
diss
emin
ate
PMI P
lann
ing
&
Repo
rtin
g M
anua
l.9
Cond
uct
PMER
tra
inin
g (i
nclu
ding
ToT
).9
Prov
ide
tech
nica
l ass
ista
nce
on P
MER
sub
ject
.
9
Dis
sem
inat
e St
rate
gic
Plan
/Ope
rati
onal
Pla
n9
Cond
uct
PMER
tra
inin
g.9
Prov
ide
tech
nica
l as
sist
ance
on
PMER
su
bjec
t.
N/A
Planning and Reporting Guidelines Palang Merah Indonesia
81
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
STRA
TEG
IC O
BJEC
TIVE
1:
To b
uild
a w
ell-
func
tion
ing
PMI
at a
ll le
vels
, w
ith
the
capa
city
to
crea
te s
yner
gy b
etw
een
prog
ram
act
ivit
ies
wit
h th
e or
gani
zati
onal
pol
icie
s,
proc
edur
es,
and
syst
em.
1.1.
PM
I’s L
egal
ent
ity
is
stre
ngth
ened
.1.
1.1.
RC
Bill
is in
clud
ed in
th
e N
atio
nal L
egis
lati
on
Prog
ram
Age
nda.
9
Cond
uct
advo
cacy
m
eeti
ng w
ith
parl
iam
ent,
go
vern
men
t, a
nd m
ass
orga
niza
tion
at
the
nati
onal
or
loca
l lev
els.
9
Cond
uct
RCRC
legi
slat
ion
sem
inar
/wor
ksho
p.
9
Prov
ide
inpu
ts t
o RC
Bi
ll.9
Cond
uct
advo
cacy
m
eeti
ng a
t th
e lo
cal
leve
l.
9
Prov
ide
inpu
ts t
o RC
Bi
ll.
1.2.
PM
I’s S
tatu
tes,
O
rgan
izat
iona
l Pr
oced
ures
(PO
),
and
Impl
emen
tati
on
Gui
delin
es (
Jukl
ak),
as
wel
l as
the
lega
l pr
oduc
ts is
sued
are
in
stit
utio
naliz
ed a
t al
l lev
els.
1.2.
1. P
MI S
tatu
tes,
Org
aniz
a-ti
onal
Pro
cedu
res
(PO
) ,
and
Impl
emen
tati
on
Gui
delin
es (
Jukl
ak),
as
wel
l as
lega
l pro
duct
s ar
e in
pla
ce a
nd im
ple-
men
ted
at a
ll le
vels
.
9
Prin
t, d
istr
ibut
e, a
nd
diss
emin
ate
PMI s
tatu
tes
(Bah
asa
Indo
nesi
a an
d En
glis
h).
9
Cond
uct
Annu
al M
eeti
ng.
9
Revi
ew/r
evis
e PO
/Juk
lak.
9
Dis
sem
inat
e PO
/Juk
lak.
9
Org
aniz
e a
wor
ksho
p to
de
velo
p th
e hi
erar
chy
of P
MI
lega
l pro
duct
s an
d to
ols.
9
Cond
uct
Annu
al
Mee
ting
9
Dis
sem
inat
e PO
/Juk
lak
to P
MI B
ranc
hes.
9
Adju
st P
O/J
ukla
k w
ith
the
need
s of
PM
I at
the
loca
l lev
el.
9
Cond
uct
Annu
al
Mee
ting
9
Dis
sem
inat
e PM
I st
atut
es t
o st
aff
and
boar
d m
embe
rs.
9
Impl
emen
t PO
/Juk
lak
base
d on
gui
danc
e fr
om P
MI C
hapt
er.
1.3.
PM
I’s P
lann
ing,
M
onit
orin
g, E
valu
a-ti
on,
and
Repo
rtin
g (P
MER
) sy
stem
is
wel
l-fu
ncti
onin
g at
al
l lev
els.
1.3.
1. P
MI b
oard
mem
bers
an
d st
aff
at a
ll le
vels
ar
e re
gula
rly
coac
hed
on t
he im
plem
enta
tion
of
Pla
nnin
g, M
onit
orin
g,
Eval
uati
on,
and
Repo
rt-
ing
(PM
ER)
syst
em b
y co
mpe
tent
fac
ilita
tors
.
9
Dis
sem
inat
e St
rate
gic
Plan
/O
pera
tion
al P
lan.
9
Revi
ew,
revi
se,
and
diss
emin
ate
PMI P
lann
ing
&
Repo
rtin
g M
anua
l.9
Cond
uct
PMER
tra
inin
g (i
nclu
ding
ToT
).9
Prov
ide
tech
nica
l ass
ista
nce
on P
MER
sub
ject
.
9
Dis
sem
inat
e St
rate
gic
Plan
/Ope
rati
onal
Pla
n9
Cond
uct
PMER
tra
inin
g.9
Prov
ide
tech
nica
l as
sist
ance
on
PMER
su
bjec
t.
N/A
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
1.3.
2. P
lann
ing
and
repo
rtin
g do
cum
ents
tha
t ar
e in
lin
e w
ith
the
Plan
ning
an
d Re
port
ing
Gui
de-
lines
are
ava
ilabl
e at
all
leve
ls.
9
Prov
ide
feed
back
on
plan
ning
& r
epor
ting
pr
oces
s.9
Dev
elop
qua
rter
ly r
epor
t fr
om D
ivis
ions
/Bur
eaus
/U
nits
9
Anal
yze
data
fro
m P
MI
Chap
ters
/Bra
nche
s9
Anal
yze
annu
al w
ork
plan
s an
d re
port
s fr
om P
MI
Chap
ters
/Bra
nche
s.
9
Dev
elop
ann
ual w
ork
plan
.9
Dev
elop
mon
thly
, qu
arte
rly,
and
ann
ual
repo
rts
9
Prov
ide
feed
back
to
the
repo
rts
from
PM
I Br
anch
es.
9
Com
pile
sem
este
r re
port
s fr
om P
MI
Bran
ches
.9
Addr
ess
feed
back
fro
m
PMI N
HQ
.
9
Dev
elop
ann
ual w
ork
plan
.9
Dev
elop
mon
thly
, qu
arte
rly,
and
ann
ual
repo
rts.
9
Addr
ess
feed
back
fr
om P
MI C
hapt
er.
1.3.
3. A
sses
smen
t to
ols
(que
s-ti
onna
ires
/ana
lysi
s to
ols)
for
PM
I org
aniz
a-ti
onal
cap
acit
y m
ap-
ping
are
ava
ilabl
e an
d ad
opte
d at
all
leve
ls..
9
Cond
uct
orga
niza
tion
al
capa
city
ass
essm
ent.
9
Prov
ide
tech
nica
l ass
ista
nce
base
d on
org
aniz
atio
nal
capa
city
ass
essm
ent
resu
lts.
9
Mon
itor
the
fol
low
ups
on
orga
niza
tion
al c
apac
ity
asse
ssm
ent
resu
lts.
9
Colle
ct in
form
atio
n fo
r or
gani
zati
onal
cap
acit
y as
sess
men
t.9
Mon
itor
the
fol
low
up
s on
org
aniz
atio
nal
capa
city
ass
essm
ent
resu
lts.
9
Colle
ct in
form
atio
n fo
r or
gani
zati
onal
ca
paci
ty a
sses
smen
t.9
Mon
itor
fol
low
ups
on
org
aniz
atio
nal
capa
city
ass
essm
ent
resu
lts
1.3.
4. P
MI w
ork
plan
s at
all
leve
ls a
re e
valu
ated
ba
sed
on t
he P
lann
ing,
M
onit
orin
g, E
valu
atio
n &
Rep
orti
ng (
PMER
) Re
fere
nce
Book
.
9
Cond
uct
prog
ram
ev
alua
tion
s.
9
Prov
ide
tech
nica
l ass
ista
nce
for
self
-eva
luat
ion
at P
MI
Chap
ters
/Bra
nche
s.
9
Cond
uct
eval
uati
on o
n w
ork
plan
.9
Prov
ide
tech
nica
l as
sist
ance
for
ev
alua
tion
at
PMI
Bran
ches
.
9
Cond
uct
eval
uati
on t
o w
ork
plan
.
1.3.
5. P
MI B
oard
Mem
bers
an
d St
affin
g D
atab
ase
is u
pdat
ed o
n re
gula
r ba
sis.
9
Dev
elop
PM
I boa
rd m
embe
rs
and
staf
fing
data
base
.9
Colle
ct d
ata
for
the
data
base
.
9
Subm
it in
form
atio
n fo
r PM
I boa
rd m
embe
rs
and
staf
fing
data
base
fr
om a
ll PM
I Bra
nche
s .
9
Prov
ide
info
rmat
ion
for
PMI b
oard
m
embe
rs a
nd s
taffi
ng
data
base
.
Planning and Reporting Guidelines Palang Merah Indonesia
82
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
1.4.
Coo
rdin
atio
n, c
om-
mun
icat
ion,
and
co
achi
ng m
echa
nism
is
ope
rati
onal
at
all
leve
ls.
1.4.
1. I
nter
nal a
nd c
ross
-ch
apte
rs/b
ranc
hes
com
mun
icat
ion
and
co-
ordi
nati
on m
echa
nism
ar
e im
plem
ente
d in
line
w
ith
the
proc
edur
es.
9
Cond
uct
inte
rnal
mee
ting
s fo
r Bo
ard
Mem
bers
, H
ead
of
Offi
ce,
and
Staf
f.
9
Issu
e an
SoP
on
cros
s-ch
apte
rs c
oord
inat
ion
and
com
mun
icat
ion.
9
Cond
uct
inte
rnal
m
eeti
ngs
for
Boar
d M
embe
rs,
Hea
d of
O
ffice
, an
d St
aff.
9
Cond
uct
cros
s-br
anch
es c
oord
inat
ion
and
com
mun
icat
ion.
9
Cond
uct
inte
rnal
m
eeti
ngs
for
Boar
d M
embe
rs,
Hea
d of
O
ffice
, an
d St
aff.
1.4.
2. T
iere
d co
achi
ng o
n or
gani
zati
onal
and
pro
-gr
am d
evel
opm
ent
is
carr
ied
out
on r
egul
ar
as w
ell a
s ne
ed b
asis
.
9
Cond
uct
coac
hing
vis
its
to
PMI C
hapt
ers.
9
Cond
uct
coac
hing
vis
its
to P
MI B
ranc
hes.
9
Dev
elop
gui
delin
es o
n de
velo
pmen
t of
PM
I Su
b-D
istr
ict
.
9
Cond
uct
coac
hing
vi
sits
to
PMI S
ub-
Dis
tric
ts (
if a
ny).
9
Init
iate
dev
elop
men
t of
PM
I Sub
-Dis
tric
t.
STRA
TEG
IC O
BJEC
TIVE
2:T
o st
reng
then
the
cap
acit
y of
PM
I’s o
rgan
izat
iona
l res
ourc
es a
t al
l lev
els,
bot
h it
s hu
man
res
ourc
es a
nd t
he f
acili
ties
an
d in
fras
truc
ture
s ne
eded
to
serv
e th
e co
mm
unit
ies.
2.1.
PM
I’s H
R M
anag
e-m
ent
that
incl
udes
re
crui
tmen
t, t
rain
-in
g, a
ssig
nmen
t,
supe
rvis
ion,
rew
ard
and
reco
gnit
ion,
as
wel
l as
perf
or-
man
ce e
valu
atio
n is
im
prov
ed.
2.1.
1. H
uman
res
ourc
es w
ith
tech
nica
l and
man
age-
rial
ski
lls a
re a
vaila
ble
and
trai
ned
to c
arry
out
th
eir
mai
n ta
sks
and
func
tion
s fo
r PM
I at
all
leve
ls..
9
Dev
elop
and
upd
ate
staf
fing
data
base
.9
Cond
uct
tech
nica
l and
m
anag
eria
l tra
inin
gs.
9
Cond
uct
staf
f pe
rfor
man
ce
eval
uati
on.
9
Dev
elop
and
upd
ate
staf
fing
data
base
.9
Cond
uct
tech
nica
l and
m
anag
eria
l tra
inin
gs.
9
Cond
uct
staf
f pe
rfor
man
ce
eval
uati
on.
9
Dev
elop
and
upd
ate
staf
fing
data
base
.9
Cond
uct
tech
nica
l and
m
anag
eria
l tra
inin
gs.
9
Cond
uct
staf
f pe
rfor
man
ce
eval
uati
on
2.1.
2. P
MI p
erso
nnel
rec
eive
ad
equa
te h
ealt
h se
r-vi
ces,
eit
her
in t
erm
s of
pr
omot
ion,
pre
vent
ion,
or
tre
atm
ent.
9
Prov
ide
heal
th s
ervi
ces
(if
ther
e is
any
hea
lth
serv
ice
faci
litie
s).
9
Prov
ide
heal
th in
sura
nce.
9
Faci
litat
e ac
cess
to
Glo
bal
IFRC
’s h
ealt
h in
sura
nce
to
volu
ntee
rs.
9
Prov
ide
heal
th s
ervi
ces
(if
ther
e is
any
hea
lth
serv
ice
faci
litie
s).
9
Prov
ide
heal
th
insu
ranc
e fo
r vo
lunt
eers
.9
Sele
ct v
olun
teer
s w
ho w
ill r
ecei
ve
Glo
bal I
FRC’
s H
ealt
h In
sura
nce.
9
Prov
ide
heal
th
serv
ices
(if
the
re is
an
y he
alth
ser
vice
fa
cilit
ies)
.9
Prov
ide
heal
th
insu
ranc
e.9
Nom
inat
e ca
ndid
ate
volu
ntee
rs w
ho w
ill
rece
ive
Glo
bal I
FRC’
s H
ealt
h In
sura
nce.
Planning and Reporting Guidelines Palang Merah Indonesia
83
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
2.
1.3.
Vol
unte
er (
KSR,
TSR
, in
clud
ing
corp
orat
e/
orga
niza
tion
/ins
titu
tion
vo
lunt
eers
) an
d YR
C m
anag
emen
t gu
idel
ines
is
impl
emen
ted
at a
ll le
vels
.
9
Prov
ide
guid
elin
es o
n vo
lunt
eer
and
YRC
deve
lopm
ent
and
man
agem
ent.
9
Cond
uct
nati
onal
you
th a
nd
volu
ntee
r ga
ther
ings
.
9
Mon
itor
vol
unte
er a
nd
YRC
deve
lopm
ent
and
man
agem
ent.
9
Cond
uct
yout
h an
d vo
lunt
eer
gath
erin
gs a
t th
e pr
ovin
cial
leve
l.
9
Cond
uct
volu
ntee
r an
d YR
C de
velo
pmen
t an
d m
anag
emen
t.9
Cond
uct
yout
h an
d vo
lunt
eer
gath
erin
g at
th
e di
stri
ct le
vel.
2.2.
PM
I’s e
duca
tion
and
tr
aini
ng s
yste
m is
w
ell-
func
tion
ing.
2.2.
1 Tr
aine
rs a
nd f
acili
tato
rs
are
trai
ned,
cer
tifie
d by
PM
I or
the
auth
o-ri
zed
inst
itut
ion,
and
ar
e av
aila
ble
to b
e m
obili
zed
in d
iffe
rent
tr
aini
ngs.
9
Faci
litat
e ce
rtifi
cati
on
proc
ess
for
PMI t
rain
ers.
9
Mob
ilize
cer
tifie
d tr
aine
rs
for
trai
ning
s at
Cha
pter
s/Br
anch
es.
9
Sele
ct t
rain
ers
for
nati
onal
cer
tific
atio
n.9
Mob
ilize
cer
tifie
d tr
aine
rs.
9
Nom
inat
e na
me
of t
rain
ers
to
part
icip
ate
in n
atio
nal
cert
ifica
tion
2.2.
2. T
he n
atio
nal T
rain
ing
Curr
icul
um n
eede
d fo
r in
tern
al/e
xter
nal
purp
oses
is u
pdat
ed b
y PM
I and
acc
redi
ted
by
nati
onal
inst
itut
ions
(M
inis
try
of H
ealt
h,
Min
istr
y of
Wor
kfor
ce
and
Tran
smig
rati
on A
f-fa
irs,
BN
PB).
9
Revi
se t
he c
urri
culu
ms
for
tech
nica
l and
man
ager
ial
trai
ning
s.
9
Prop
ose
trai
ning
cur
ricu
lum
s fo
r ac
cred
itat
ion
proc
ess.
9
Prom
ote
PMI t
rain
ings
to
exte
rnal
par
ties
.9
Mob
ilize
tra
iner
s fo
r ex
tern
al t
rain
ings
.
N/A
N/A
2.2.
3. P
MI t
rain
ings
are
man
-ag
ed in
line
wit
h th
e te
chni
cal g
uide
lines
for
tr
aini
ng m
anag
emen
t.
9
Prov
ide
feed
back
to
trai
ning
re
port
s fr
om P
MI C
hapt
ers/
Bran
ches
.
9
Man
age
trai
ning
s in
lin
e w
ith
the
tech
nica
l gu
idel
ines
.9
Dev
elop
tra
inin
g re
port
.
9
Man
age
trai
ning
s in
lin
e w
ith
the
tech
nica
l gu
idel
ines
.9
Dev
elop
tra
inin
g re
port
.
Planning and Reporting Guidelines Palang Merah Indonesia
84
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
2.3.
Ava
ilabi
lity
of b
asic
su
ppor
ting
fac
iliti
es
and
infr
astr
uctu
res
for
PMI o
pera
tion
is
incr
ease
d.
2.3.
1. P
MI b
asic
ope
rati
onal
fa
cilit
ies
(offi
ce,
disa
s-te
r op
erat
ion
cent
er/
posk
o, w
areh
ouse
, tr
aini
ng c
ente
r) a
re
wel
l-fu
ncti
onin
g.
9
Mai
ntai
n O
ffice
fac
iliti
es.
9
Ope
rate
Pos
ko in
line
wit
h th
e st
anda
rd o
pera
tion
al
proc
edur
es.
9
Cons
truc
t an
d op
erat
e w
areh
ouse
s ba
sed
the
impl
emen
tati
on g
uide
lines
.9
Cons
truc
t an
d op
erat
e N
atio
nal T
rain
ing
Cent
er.
9
Mon
itor
the
ow
ners
hip
stat
us
and
the
utili
zati
on o
f PM
I as
sets
at
all l
evel
s.
9
Mai
ntai
n O
ffice
fa
cilit
ies.
9
Prov
ide
a sp
ace
for
Posk
o an
d op
erat
e it
bas
ed o
n th
e st
anda
rds.
9
Ope
rate
the
Cha
pter
’s
Trai
ning
Cen
ter
in li
ne w
ith
the
impl
emen
tati
on
guid
es.
9
Prov
ide
war
ehou
se/
tem
pora
ry s
tora
ge.
9
Mai
ntai
n O
ffice
fa
cilit
ies.
9
Prov
ide
a sp
ace
for
Posk
o an
d op
erat
e it
bas
ed o
n th
e st
anda
rds.
2.3.
2.
PMI a
sset
s an
d ba
sic
faci
litie
s/in
fras
truc
-tu
res
are
man
aged
in
line
wit
h th
e gu
idan
ce
prov
ided
.
9
Revi
se a
nd d
isse
min
ate
the
Asse
t m
anag
emen
t im
plem
enta
tion
gui
delin
es.
9
Colle
ct a
nd a
naly
ze a
sset
av
aila
bilit
y re
port
fro
m P
MI
Chap
ters
/Bra
nche
s .
9
Cond
uct
trai
ning
on
asse
t m
anag
emen
t to
PM
I Ch
apte
rs/B
ranc
hes.
9
Man
age
asse
ts.
9
Dev
elop
ass
et
inve
ntor
y re
port
.9
Coac
h an
d m
onit
or
asse
t m
anag
emen
t at
PM
I Bra
nche
s.
9
Man
age
asse
ts.
9
Dev
elop
ass
et
inve
ntor
y re
port
.
2.4.
Per
form
ance
and
ut
iliza
tion
of
Info
r-m
atio
n an
d Co
mm
u-ni
cati
on T
echn
olog
y (I
CT)
in s
uppo
rtin
g PM
I’s o
pera
tion
s is
im
prov
ed.
2.4.
1. P
MI’s
Info
rmat
ion
and
Com
mun
icat
ion
Tech
nolo
gy (
ICT)
equ
ip-
men
t an
d fa
cilit
ies
are
avai
labl
e an
d w
ell-
mai
ntai
ned
9
Prov
ide
and
mai
ntai
n co
mpu
ter
faci
litie
s w
ith
inte
rnet
con
nect
ion.
9
Prov
ide
and
mai
ntai
n co
mpu
ter
faci
litie
s w
ith
inte
rnet
co
nnec
tion
.
9
Prov
ide
and
mai
ntai
n co
mpu
ter
faci
litie
s w
ith
inte
rnet
co
nnec
tion
.9
Faci
litat
e ac
cess
to
inte
rnet
(If
not
ha
ving
com
pute
r w
ith
inte
rnet
con
nect
ion)
.
Planning and Reporting Guidelines Palang Merah Indonesia
85
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
2.
4.2.
Com
mun
icat
ion
net-
wor
k an
d so
ftw
are,
e.g
. co
mm
unic
atio
n ra
dio,
em
ail s
yste
m,
form
al
mes
sagi
ng,
and
appl
ica-
tion
, ar
e av
aila
ble
and
func
tion
ing
to s
uppo
rt
PMI’s
ope
rati
on a
nd s
er-
vice
s, in
clud
ing
bloo
d se
rvic
es.
9
Dev
elop
PM
I cor
pora
te
inte
rnet
net
wor
k (f
or e
mai
l an
d m
essa
ging
) 9
Dev
elop
MIS
and
nat
iona
l ap
plic
atio
ns.
9
Cond
uct
sati
sfac
tion
sur
vey
over
the
use
of
PMI I
CT.
9
Ope
rate
PM
I cor
pora
te
inte
rnet
net
wor
k (e
mai
l and
mes
sagi
ng).
9
Uti
lize
the
MIS
and
ap
plic
atio
ns.
9
Ope
rate
PM
I co
rpor
ate
inte
rnet
ne
twor
k (e
mai
l and
m
essa
ging
).9
Uti
lize
the
MIS
and
ap
plic
atio
ns.
STRA
TEG
IC O
BJEC
TIVE
3:
To im
prov
e th
e qu
alit
y of
dis
aste
r an
d he
alth
em
erge
ncy
resp
onse
s ac
ross
Indo
nesi
a, e
ithe
r in
ter
ms
of r
apid
ness
, co
vera
ge,
and
effe
ctiv
enes
s of
the
ser
vice
s.
3.1.
PM
I per
sonn
el’s
ca-
paci
ty s
peci
aliz
ing
in
emer
genc
y re
spon
se
is s
tren
gthe
ned.
.
3.1.
1. D
isas
ter
Resp
onse
(S
atga
na)
team
and
em
erge
ncy
resp
onse
sp
ecia
lists
are
ava
ilabl
e an
d re
ady
for
mob
iliza
-ti
on a
t al
l lev
els,
in-
clud
ing
at t
he r
egio
nal
and
nati
onal
leve
ls,
in
line
wit
h th
e So
P.
9
Esta
blis
h an
d tr
ain
regi
onal
, na
tion
al,
and
inte
rnat
iona
l D
R sp
ecia
list
team
.9
Dev
elop
gui
delin
es o
n em
erge
ncy
resp
onse
and
re
lief
(e.g
. Ca
sh T
rans
fer
Prog
ram
(CT
P),
Dea
d Bo
dies
Man
agem
ent
(DBM
),
and
Dis
aste
r Vi
ctim
s Id
enti
ficat
ion
(DVI
)).
9
Cond
uct
disa
ster
-rel
ated
w
orks
hops
(e.
g. A
sia
Paci
fic s
helt
er t
echn
ical
w
orki
ng g
roup
, Re
gion
al D
M
Com
mit
tee
(RD
MC)
mee
ting
.
9
Sele
ct,
trai
n, a
nd
coac
h S
atga
na a
t PM
I Br
anch
es t
o be
com
e pr
ovin
cial
Em
erge
ncy
Resp
onse
tea
m.
9
Dis
sem
inat
e gu
idel
ines
on
em
erge
ncy
resp
onse
an
d re
lief
guid
elin
es.
9
Dev
elop
ros
ter/
tim
etab
le f
or D
istr
ict/
citi
es S
atga
na t
eam
m
embe
rs.
9
Esta
blis
h, t
rain
, an
d co
ach
Satg
ana
team
.9
Esta
blis
h ro
ster
/ ti
met
able
for
Sat
gana
te
am m
embe
rs.
Planning and Reporting Guidelines Palang Merah Indonesia
86
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
3.
1.2.
Dis
aste
r re
spon
se s
imu-
lati
on is
org
aniz
ed b
y PM
I at
all l
evel
s in
line
w
ith
the
need
s an
d th
e de
velo
ped
cont
inge
ncy
plan
.
9
Coor
dina
te w
ith
BNPB
, AH
A Ce
ntre
, et
c. r
elat
ed t
o D
R M
anag
emen
t.9
Faci
litat
e th
e de
velo
pmen
t of
PM
I con
ting
ency
pla
ns a
t th
e lo
cal l
evel
.9
Faci
litat
e th
e ar
rang
emen
t of
nat
iona
l dis
aste
r re
spon
se
sim
ulat
ion.
9
Dev
elop
con
ting
ency
pl
an a
t th
e ch
apte
r le
vel.
9
Cont
ribu
te t
o th
e de
velo
pmen
t of
co
ntin
genc
y pl
an
for
Prov
inci
al B
PBD
Fa
cilit
ate
the
arra
ngem
ent
of
disa
ster
res
pons
e si
mul
atio
n at
the
ch
apte
r le
vel.
9
Dev
elop
con
ting
ency
pl
an a
t th
e br
anch
le
vel.
9
Dis
sem
inat
e in
form
atio
n on
PM
I Bra
nch’
s ro
le
to r
elev
ant
loca
l st
akeh
olde
rs.
9
Cont
ribu
te t
o th
e de
velo
pmen
t of
co
ntin
genc
y pl
an f
or
loca
l Dis
tric
t BP
BD .
9
Faci
litat
e th
e ar
rang
emen
t of
di
sast
er r
espo
nse
sim
ulat
ion
at t
he
bran
ch le
vel.
3.2.
Ava
ilabi
lity
of
emer
genc
y re
spon
se
equi
pmen
t in
line
w
ith
acco
unt-
abili
ty s
tand
ard
is
incr
ease
d.
3.2.
1. S
tand
ard
equi
pmen
t fo
r em
erge
ncy
resp
onse
, in
clud
ing
com
mun
ica-
tion
equ
ipm
ent
for
coor
dina
tion
as
wel
l as
doc
umen
tati
on a
nd
repo
rtin
g fo
rmat
s ar
e in
pl
ace
and
oper
atio
nal
at a
ll le
vels
.
9
Proc
ure
stan
dard
equ
ipm
ent
for
emer
genc
y re
spon
se
serv
ices
.9
Mob
ilize
bas
ic s
uppo
rtin
g eq
uipm
ent
and
pers
onne
l for
di
sast
er r
espo
nse.
9
Mob
ilize
sta
ndar
d eq
uipm
ent
for
emer
genc
y re
spon
se
to s
uppo
rt d
isas
ter
resp
onse
ope
rati
on a
t th
e br
anch
leve
l.9
Init
iate
pre
par
tner
ship
ag
reem
ent
wit
h tr
ansp
orta
tion
co
mpa
nies
for
tr
ansp
orta
tion
su
ppor
ts.
9
Purc
hase
sta
ndar
d co
mm
unic
atio
n eq
uipm
ent
for
emer
genc
y si
tuat
ion.
9
Proc
ure
indi
vidu
al
gear
s fo
r Sa
tgan
a Te
am m
embe
rs.
3.2.
2. S
uffic
ient
sto
ck o
f em
erge
ncy/
relie
f it
ems
is a
vaila
ble
in r
egio
nal
war
ehou
se a
nd P
MI
Chap
ter’
s lo
gist
ic s
tor-
age
to s
uppo
rt e
mer
-ge
ncy
resp
onse
.
9
Proc
ure
emer
genc
y an
d re
lief
item
s fo
r re
gion
al
war
ehou
ses.
9
Cond
uct
logi
stic
tra
inin
g at
th
e na
tion
al le
vel.
9
Prov
ide
trai
ned
pers
onne
l in
logi
stic
.9
Man
age
the
logi
stic
s st
orag
es/t
rans
its.
9
Asse
ss a
nd d
raw
ac
cess
map
als
o tr
ansp
orta
tion
mea
ns
to d
isas
ter
pron
e ar
eas.
N/A
Planning and Reporting Guidelines Palang Merah Indonesia
87
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
3.3.
Em
erge
ncy
resp
onse
m
anag
emen
t sy
stem
is
impl
emen
ted
at
all l
evel
s.
3.3.
1. F
ram
ewor
k, g
uide
-lin
es,
and
SoP
for
emer
genc
y re
spon
se
oper
atio
n an
d co
ordi
na-
tion
mec
hani
sm a
re in
pl
ace
and
adop
ted
at
all l
evel
s.
9
Revi
ew a
nd u
pdat
e th
e Fr
amew
ork
for
PMI D
isas
ter
Resp
onse
/Hea
lth
Cris
is.
9
Dev
elop
var
ious
SoP
s fo
r re
gion
al,
nati
onal
, an
d in
tern
atio
nal d
isas
ter
resp
onse
ope
rati
ons
(e.g
. “6
hou
rs a
rriv
al”
SoP,
GIS
-M
appi
ng S
oP).
9
Cond
uct
DR/
Hea
lth
Cris
is
sim
ulat
ion,
tes
t re
leva
nt
fram
ewor
ks,
SoPs
.
9
Dis
sem
inat
e re
leva
nt
emer
genc
y re
spon
se
fram
ewor
ks a
nd S
oPs.
9
Adop
t re
leva
nt
emer
genc
y re
spon
se
fram
ewor
ks a
nd S
oPs.
9
Cond
uct
refr
eshe
r tr
aini
ng f
or S
atga
na
Team
rel
ated
to
the
adop
tion
of
emer
genc
y re
spon
se
fram
ewor
ks a
nd S
oPs.
3.3.
2. P
MI a
mbu
lanc
e se
rvic
e be
com
es p
art
of lo
cal
Inte
grat
ed E
mer
genc
y M
anag
emen
t Sy
stem
(I
EMS)
.
9
Dev
elop
and
dis
sem
inat
e op
erat
iona
l gui
delin
es
on in
tegr
ated
Am
bula
nce
Ope
rati
on w
ith
loca
l IEM
S.9
Dev
elop
IEM
S Pa
rtne
rshi
p Ag
reem
ent
wit
h th
e M
inis
try
of H
ealt
h
9
Faci
litat
e PM
I Bra
nche
s in
init
iati
ng a
nd
mai
ntai
ning
net
wor
k w
ith
refe
rral
hos
pita
ls
(IEM
S).
9
Ope
rate
am
bula
nce
serv
ice.
9
Ope
rate
cal
l cen
ter
serv
ice
for
ambu
lanc
e.9
Mai
ntai
n am
bula
nce
and
its
supp
orti
ng
equi
pmen
t.9
Trai
n am
bula
nce
crew
s.9
Init
iate
and
mai
ntai
n ne
twor
k w
ith
refe
rral
ho
spit
als.
3.3.
3. C
onti
ngen
cy P
lan
is
upda
ted
by P
MI a
t al
l le
vels
on
annu
al b
asis
.
9
Upd
ate
the
Nat
iona
l Co
ntin
genc
y Pl
an.
9
Allo
cate
con
ting
ency
fun
d.
9
Upd
ate
the
chap
ter’
s co
ntin
genc
y pl
an.
9
Dis
sem
inat
e in
form
atio
n on
PM
I Ch
apte
r’s
role
to
Prov
inci
al B
PBD
.9
Allo
cate
con
ting
ency
fu
nd.
9
Upd
ate
the
bran
ch’s
co
ntin
genc
y pl
an
9
Dis
sem
inat
e in
form
atio
n on
PM
I Br
anch
’s r
ole
to
Dis
tric
t BP
BD.
9
Allo
cate
con
ting
ency
fu
nd.
Planning and Reporting Guidelines Palang Merah Indonesia
88
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
3.3.
4. E
arly
war
ning
info
rma-
tion
is f
orw
arde
d to
the
co
mm
unit
ies
in t
imel
y m
anne
r
9
Revi
ew,
revi
se a
nd p
ublis
h gu
idel
ines
on
earl
y w
arni
ng
info
rmat
ion
for
the
com
mun
ity.
9
Upd
ate
MoU
wit
h th
e G
over
nmen
t to
link
PM
I Po
sKo
wit
h lo
cal e
arly
w
arni
ng s
yste
m.
9
Dis
sem
inat
e gu
idel
ines
on
ear
ly w
arni
ng
info
rmat
ion
for
the
com
mun
ity
to P
MI
Bran
ches
.9
Link
PM
I Bra
nche
s w
ith
Prov
inci
al
Gov
ernm
ent’
s ea
rly
war
ning
sys
tem
.
9
Adop
t gu
idel
ines
on
ear
ly w
arni
ng
info
rmat
ion
for
the
com
mun
ity
into
lo
cal p
repa
redn
ess
mec
hani
sm
9
Link
PM
I Pos
Ko w
ith
loca
l ear
ly w
arni
ng
syst
em.
9
Esta
blis
h co
mm
unic
atio
n ne
twor
k w
ith
com
mun
itie
s/fo
cal
poin
ts in
dis
aste
r pr
one
area
s.
3.3.
5. T
he n
eed
for
RFL
serv
ice
in b
oth
norm
al
and
emer
genc
y pe
riod
s is
fol
low
ed u
p by
PM
I at
all l
evel
s.
9
Resp
ond
to R
FL r
eque
sts.
9
Mon
itor
RFL
cas
es a
cros
s In
done
sia.
9
Resp
ond
to R
FL
requ
ests
.9
Mob
ilize
vol
unte
ers
to s
uppo
rt R
FL
oper
atio
ns.
Purc
hase
RF
L op
erat
iona
l eq
uipm
ent.
9
Asse
ss R
FL n
eeds
.9
Resp
ond
to R
FL
requ
ests
.
STRA
TEG
IC P
LAN
4:
To s
tren
gthe
n co
mm
unit
y re
silie
ncy
in o
rder
to
redu
ce t
he r
isks
and
impa
ct o
f di
sast
ers
and
dise
ases
thr
ough
dis
aste
r pr
epar
edne
ss,
heal
th,
soci
al p
rogr
ams,
als
o re
ferr
al h
ealt
h se
rvic
es.
4.1.
PM
I’s c
apac
ity
to
man
age
com
mu-
nity
bas
ed d
isas
ter
prep
ared
ness
and
he
alth
pro
gram
is
stre
ngth
ened
.
4.1.
1. G
uide
lines
/SoP
doc
u-m
ents
on
com
mun
ity-
base
d di
sast
er p
re-
pare
dnes
s an
d he
alth
pr
ogra
ms
are
avai
labl
e,
upda
ted
and
appl
ied
by P
MI.
9
Revi
ew,
revi
se,
and
publ
ish
guid
elin
es/S
oPs
on
com
mun
ity-
base
d pr
ogra
ms
in d
isas
ter
prep
ared
ness
and
he
alth
sec
tor
(e.g
. IC
BRR,
CB
HFA
).9
Dev
elop
indi
cato
rs f
or
com
mun
ity-
base
d pr
ojec
ts.
9
Adap
t CB
HFA
e-l
earn
ing
from
th
e IF
RC’s
CBH
FA e
-lea
rnin
g.
9
Dis
sem
inat
e th
e up
date
d gu
idel
ines
/So
Ps o
n co
mm
unit
y-ba
sed
prog
ram
s.9
Dis
sem
inat
e in
dica
tors
fo
r co
mm
unit
y-ba
sed
proj
ects
. 9
Link
PM
I Bra
nche
s th
at
impl
emen
t co
mm
unit
y-ba
sed
prog
ram
s/pr
ojec
ts w
ith
CBH
FA
e-le
arni
ng.
9
Adop
t gu
idel
ines
/So
Ps o
n co
mm
unit
y-ba
sed
prog
ram
s in
to
com
mun
ity-
base
d pr
ogra
ms.
9
Adop
t in
dica
tors
for
co
mm
unit
y-ba
sed
proj
ects
.
Planning and Reporting Guidelines Palang Merah Indonesia
89
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
4.1.
2. A
dequ
ate
supp
orti
ng
mat
eria
ls/t
ools
for
co
mm
unit
y-ba
sed
disa
s-te
r pr
epar
edne
ss a
nd
heal
th p
rogr
ams
(e.g
. IE
C m
ater
ials
, m
odel
ing
equi
pmen
t, M
&E
tool
s)
are
avai
labl
e.
9
Dev
elop
and
pri
nt IE
C m
ater
ials
and
mod
elin
g eq
uipm
ent
for
com
mun
ity-
base
d pr
ogra
ms.
9
Dev
elop
and
dis
sem
inat
e M
&E
tool
s
9
Dis
trib
ute
IEC
mat
eria
ls,
M&
E to
ols,
and
mod
elin
g eq
uipm
ent
to s
uppo
rt
com
mun
ity-
base
d pr
ogra
ms
at P
MI
Bran
ches
.
9
Trai
n PM
I and
vill
age
volu
ntee
rs t
o us
e IE
C m
ater
ials
and
m
odel
ing
equi
pmen
t.9
Mon
itor
dir
ect
bene
ficia
ries
of
com
mun
ity-
base
d pr
ogra
ms.
4.1.
3. C
omm
unit
y-ba
sed
disa
ster
pre
pare
dnes
s an
d he
alth
pro
gram
ac
tivi
ties
are
impl
e-m
ente
d by
com
pete
nt
PMI s
taff
/vol
unte
ers/
fa
cilit
ator
s at
all
leve
ls.
9
Cond
uct
nati
onal
tra
inin
g fo
r pe
rson
nel i
n co
mm
unit
y-ba
sed
prog
ram
s (e
.g.
Hea
lthy
Sch
ool,
Dis
aste
r-Pr
epar
ed S
choo
l/U
nive
rsit
y,
ICBR
R, C
BHFA
).9
Prov
ide
tech
nica
l ass
ista
nce
on d
evel
opm
ent
of
com
mun
ity-
base
d pr
ogra
ms.
9
Prov
ide
tech
nica
l as
sist
ance
on
deve
lopm
ent
of
com
mun
ity-
base
d pr
ogra
ms.
9
Mob
ilize
tra
ined
pe
rson
nel (
spec
ialis
ts)
to c
oach
com
mun
ity-
base
d ac
tivi
ties
.
9
Dev
elop
com
mun
ity-
base
d pr
ogra
ms
and
acti
viti
es.
9
Mob
ilize
vol
unte
ers
to im
plem
ent
com
mun
ity-
base
d ac
tivi
ties
.
4.2.
PM
I’s c
apac
ity
to
prov
ide
soci
al s
ervi
c-es
to
the
com
mun
i-ti
es is
incr
ease
d.
4.2.
1. G
uide
lines
/SoP
doc
u-m
ents
and
sup
port
ing
mat
eria
ls/t
ools
for
so
cial
ser
vice
s (e
.g.
IEC
mat
eria
ls,
mod
elin
g eq
uipm
ent,
M&
E to
ols)
ar
e av
aila
ble,
upd
ated
, an
d ap
plie
d in
PM
I.
9
Dev
elop
and
fina
lize
guid
elin
es o
n so
cial
ser
vice
s (e
.g.
psyc
hoso
cial
sup
port
gu
idel
ines
, Fa
mily
Car
e H
andb
ook)
.9
Dev
elop
and
pri
nt IE
C m
ater
ials
and
mod
elin
g eq
uipm
ent
for
soci
al
serv
ices
.9
Dev
elop
and
dis
sem
inat
e M
&E
tool
s.9
Cond
uct
road
saf
ety
cam
paig
n.9
Cond
uct
soci
al s
ervi
ces
(fre
e ca
tara
ct s
urge
ry,
free
eye
gl
asse
s, o
ther
ass
ista
nces
).
9
Dis
trib
ute
IEC
mat
eria
ls,
M&
E to
ols,
and
mod
elin
g eq
uipm
ent
to s
uppo
rt
soci
al s
ervi
ce a
t PM
I Br
anch
es.
9
Cond
uct
road
saf
ety
cam
paig
n.
9
Trai
n vo
lunt
eers
to
use
IEC
mat
eria
ls a
nd
mod
elin
g eq
uipm
ent.
9
Cond
uct
road
saf
ety
cam
paig
n (i
f th
ere
is n
o am
bula
nce
serv
ice)
. 9
Inte
grat
e am
bula
nce
serv
ice
wit
h ro
ad
safe
ty c
ampa
ign.
9
Mon
itor
dir
ect
bene
ficia
ries
of
soci
al
serv
ices
.
Planning and Reporting Guidelines Palang Merah Indonesia
90
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
4.
2.2.
Soc
ial s
ervi
ce a
ctiv
i-ti
es a
re im
plem
ente
d by
com
pete
nt P
MI
staf
f/vo
lunt
eers
at
all
leve
ls.
9
Cond
uct
nati
onal
tra
inin
g fo
r pe
rson
nel i
n so
cial
ser
vice
pr
ogra
ms/
acti
viti
es .
9
Prov
ide
tech
nica
l ass
ista
nce
on d
evel
opm
ent
of s
ocia
l se
rvic
e ac
tivi
ties
.
9
Prov
ide
tech
nica
l as
sist
ance
on
deve
lopm
ent
of s
ocia
l se
rvic
e ac
tivi
ties
.9
Mob
ilize
tra
ined
pe
rson
nel t
o ca
rry
out
soci
al s
ervi
ce
acti
viti
es.
9
Mob
ilize
tra
ined
pe
rson
nel t
o ca
rry
out
soci
al s
ervi
ces
acti
viti
es.
4.3.
PM
I Hos
pita
l’s s
er-
vice
s an
d ca
paci
ty
are
impr
oved
.
4.3.
1. In
form
atio
n on
hos
-pi
tal s
tand
ard
ser-
vice
s (p
atie
nt s
ervi
ces,
pa
tien
t sa
fety
, se
rvic
es
to p
eopl
e co
ntra
cted
w
ith
TB,
HIV
/AID
S an
d CE
ON
C) b
ased
on
KARS
(H
ospi
tal A
ccre
dita
-ti
on C
omm
issi
on)
or
JCI (
Join
t Co
mm
issi
on
Inte
rnat
iona
l) s
tand
ards
is
dis
sem
inat
ed t
o al
l ho
spit
als’
em
ploy
ees
in
orde
r to
gui
de t
hem
in
perf
orm
ing
thei
r ro
les
and
resp
onsi
bilit
ies.
9
Prov
ide
assi
stan
ce t
o in
tern
al a
sses
smen
t te
am f
or a
ccre
dita
tion
ass
essm
ent
and
coac
hing
on
KARS
impl
emen
tati
on.
9
Cond
uct
trai
ning
and
per
sonn
el o
rien
tati
on f
or K
ARS-
base
d pa
tien
ce s
ervi
ces
on r
egul
ar b
asis
.9
Add
pati
ence
fac
iliti
es f
or m
ater
nity
ser
vice
s.9
Cond
uct
inte
rnal
aud
it,
qual
ity
mon
itor
ing,
and
cus
tom
er s
atis
fact
ion
surv
ey o
n re
gula
r ba
sis.
4.3.
2. M
edic
al a
nd n
on-m
ed-
ical
per
sonn
el a
t th
e ho
spit
al a
re w
orki
ng in
lin
e w
ith
the
hosp
ital
st
anda
rd f
or p
erso
n-ne
l com
pete
nce
(i.e
. ed
ucat
ion
qual
ifica
tion
, cr
eden
tial
com
pete
nce,
cl
inic
al a
utho
rity
, au
dit
com
pete
nce)
.
9
Dev
elop
sta
ndar
d fo
r hu
man
res
ourc
e co
mpe
tenc
e, s
tand
ard
for
titl
es,
and
prof
essi
onal
st
anda
rd .
9
Recr
uit
med
ical
and
non
-med
ical
sta
ff b
ased
on
the
hosp
ital
’s s
tand
ard
for
per
sonn
el
com
pete
nce.
9
Dev
elop
/rev
ise,
dis
sem
inat
e, d
an m
onit
or t
he im
plem
enta
tion
of
serv
ice
guid
elin
es a
nd t
he
SoPs
.
Planning and Reporting Guidelines Palang Merah Indonesia
91
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
4.3.
3. H
ospi
tal q
ualit
y an
d pa
tien
t sa
fety
impr
ove-
men
t pr
ogra
ms
are
impl
emen
ted
thro
ugh
Infe
ctio
n Pr
even
-ti
on a
nd C
ontr
ol (
IPC)
pr
ogra
m,
Hos
pita
l O
ccup
atio
nal H
ealt
h an
d Sa
fety
(K3
RS),
as
wel
l as
Hos
pita
l Pat
ient
Sa
fety
pro
gram
.
9
Cond
uct
trai
ning
of
trai
ners
for
IPC,
K3R
S, a
nd P
atie
nt S
afet
y.9
Mon
itor
the
impl
emen
tati
on o
f IP
C, K
3RS,
and
Pat
ient
Saf
ety
prog
ram
s on
reg
ular
bas
is.
9
Cond
uct
IPC,
K3R
S, a
nd H
ospi
tal P
atie
nt S
afet
y si
mul
atio
ns o
n re
gula
r ba
sis.
4.3.
4. A
dequ
ate
gene
ral
and
spec
ializ
ed/s
ub-
spec
ializ
ed m
edic
al
serv
ices
, in
clud
ing
flag-
ship
ser
vice
for
life
styl
e ne
eds,
are
ava
ilabl
e.
9
Prov
ide
cont
inue
d ed
ucat
ion
for
sub-
spec
ialis
t m
edic
al p
erso
nnel
.9
Recr
uit
exte
rnal
spe
cial
ist
doct
ors.
9
Prov
ide
addi
tion
al d
iagn
osti
c se
rvic
es,
i.e.
Mag
neti
c Re
sona
nce
Imag
ing
(MRI
), C
Arm
, de
ntal
X-
ray,
lapa
rosc
opy,
and
Cat
h La
b.
4.3.
5. E
duca
tion
, tr
aini
ng,
and
deve
lopm
ent,
as
wel
l as
perf
orm
ance
ev
alua
tion
for
hos
pi-
tal’s
sup
port
ing
staf
f ar
e w
ell-
cond
ucte
d.
9
Cons
truc
t an
d se
cure
the
ope
rati
onal
per
mit
for
STI
Kes
build
ing
and
its
supp
orti
ng
infr
astr
uctu
res.
9
Prop
ose
an a
ccre
dita
tion
to
the
Min
istr
y of
Hea
lth
for
the
educ
atio
n an
d tr
aini
ng s
ecti
on,
as
wel
l as
trai
ner
cert
ifica
tion
.
STRA
TEG
IC P
LAN
5:T
o in
crea
se t
he a
vaila
bilit
y of
saf
e, a
cces
sibl
e, a
nd q
ualit
y bl
ood
thro
ugho
ut In
done
sia.
5.1.
Blo
od T
rans
fusi
on
Uni
t’s
(UTD
) ca
pac-
ity
in li
ne w
ith
the
nati
onal
sta
ndar
d is
in
crea
sed.
5.1.
1. P
olic
ies,
pro
cedu
res,
an
d gu
idel
ines
rel
ated
to
Goo
d M
anuf
actu
r-in
g Pr
acti
ce (
GM
P) f
or
bloo
d se
rvic
e ar
e av
ail-
able
and
impl
emen
ted
by U
TD a
t al
l lev
els.
9
Revi
ew,
revi
se,
and
publ
ish
polic
ies,
pro
cedu
res,
and
gu
idel
ines
reg
ardi
ng G
MP
for
bloo
d se
rvic
e.9
Dis
sem
inat
e po
licie
s,
proc
edur
es,
and
guid
elin
es
rega
rdin
g G
MP
for
bloo
d se
rvic
e to
Pro
vinc
ial/
Bran
ch
UTD
s.
9
Dis
sem
inat
e po
licie
s,
proc
edur
es,
and
guid
elin
es r
egar
ding
G
MP
for
bloo
d se
rvic
e to
Dis
tric
t U
TDs.
9
Mon
itor
the
im
plem
enta
tion
of
polic
ies
and
guid
elin
es
rega
rdin
g G
MP
at
Dis
tric
t U
TDs.
9
Impl
emen
t po
licie
s an
d gu
idel
ines
re
gard
ing
GM
P fo
r bl
ood
serv
ice
at
Dis
tric
t U
TD.
Planning and Reporting Guidelines Palang Merah Indonesia
92
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
5.1.
2. U
TD m
anag
emen
t sy
stem
, in
clud
ing
its
orga
niza
tion
al s
truc
-tu
re,
staf
fing,
fina
nce,
pl
anni
ng a
nd r
epor
ting
, is
ope
rati
onal
at
all
leve
ls.
9
Cond
uct
EQA
to U
TDs
and
perf
orm
ance
app
rais
al
(DP2
).
9
Cond
uct
docu
men
tati
on o
n st
affin
g, fi
nanc
e,
plan
ning
, an
d re
port
ing.
9
Cond
uct
docu
men
tati
on o
n st
affin
g, fi
nanc
e,
plan
ning
, an
d re
port
ing.
5.1.
3. C
omm
unic
atio
n, c
oor-
dina
tion
, an
d co
achi
ng
mec
hani
sm is
con
sis-
tent
ly a
pplie
d w
ithi
n in
tern
al U
TD,
acro
ss
UTD
leve
ls,
and
wit
h ex
tern
al s
take
hold
ers
(loc
al g
over
nmen
t,
DH
O,
hosp
ital
s, P
OM
, ve
ndor
s, e
tc.)
.
9
Mon
itor
UTD
at
all l
evel
s in
th
e de
velo
pmen
t of
wor
k pl
an,
annu
al r
epor
t, a
nd
acti
vity
rep
orts
thr
ough
SI
MU
DD
A.9
Audi
t an
d co
ach
UTD
s at
the
lo
cal l
evel
.
9
Cond
uct
nati
onal
an
nual
mee
ting
on
regu
lar
basi
s.9
Cond
uct
inte
rnal
pl
anni
ng m
eeti
ng o
n a
regu
lar
basi
s.
9
Mai
ntai
n co
ordi
nati
on
and
colla
bora
tion
wit
h lo
cal s
take
hold
ers.
9
Cond
uct
nati
onal
an
nual
mee
ting
on
regu
lar
basi
s.9
Cond
uct
inte
rnal
pl
anni
ng m
eeti
ng o
n a
regu
lar
basi
s.9
Mai
ntai
n co
ordi
nati
on
and
colla
bora
tion
wit
h lo
cal s
take
hold
ers.
5.2.
Hum
an r
esou
rces
ca-
paci
ty,
also
fac
iliti
es
and
infr
astr
uctu
re
at U
TD N
atio
nal/
Pr
ovin
ces/
Dis
tric
ts
are
incr
ease
d.
5.2.
1. U
TD e
mpl
oyee
s ar
e tr
aine
d in
impl
emen
t-in
g G
MP
and
nati
onal
st
anda
rds,
in li
ne w
ith
thei
r ro
les
and
resp
on-
sibi
litie
s, a
lso
com
pe-
tenc
es r
equi
red.
9
Cond
uct
GM
P tr
aini
ng a
nd
othe
r tr
aini
ngs
base
d on
ne
eds.
9
Adop
t G
MP
and
othe
r na
tion
al s
tand
ards
in
line
wit
h th
e re
quir
emen
t st
anda
rd
in e
ffec
t.
9
Adop
t G
MP
and
othe
r na
tion
al s
tand
ards
in
line
wit
h th
e re
quir
emen
t st
anda
rd
in e
ffec
t.
5.2.
2. C
ompe
tent
and
pr
ofes
sion
al t
echn
i-ca
l per
sonn
el o
n Bl
ood
Tran
sfus
ion
Tech
niqu
e ar
e ad
equa
tely
pro
-du
ced
from
the
Blo
od
Tran
sfus
ion
Tech
nolo
gy
Dip
lom
a Pr
ogra
m.
9
Mon
itor
and
eva
luat
e th
e qu
alit
y of
gra
duat
es f
rom
th
e Bl
ood
Tran
sfus
ion
Tech
nolo
gy D
iplo
ma
Prog
ram
(D
3 PT
TD).
9
Dev
elop
nee
d m
appi
ng o
f th
e gr
adua
tes
from
D3
PTTD
in
all
Dis
tric
t U
TDs.
9
Recr
uit
and
plac
e D
3 PT
TD
grad
uate
s in
Dis
tric
t U
TCs
in
need
.
9
Dev
elop
rep
ort
on
the
need
of
D3
PTTD
gr
adua
tes
from
Dis
tric
t U
TDs
in it
s op
erat
iona
l ar
eas.
9
Repo
rt t
he n
eed
of t
he
D3
PTTD
gra
duat
es f
or
loca
l Dis
tric
t U
TD t
o PM
I Cha
pter
.
Planning and Reporting Guidelines Palang Merah Indonesia
93
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
5.2.
3. A
dequ
ate
and
stan
dard
fa
cilit
ies
and
infr
astr
uc-
ture
, al
so f
urni
ture
, fix
ture
s an
d eq
uipm
ent
(FF&
E) a
re a
vaila
ble
at
all U
TDs.
9
Regi
ster
and
dev
elop
in
vent
ory
of U
TD e
quip
men
t at
all
leve
ls b
ased
on
the
serv
ice
grad
e, in
clud
ing
the
num
ber
of b
lood
bag
and
re
agen
t.
9
Man
age
infr
astr
uctu
res,
eq
uipm
ent,
and
co
nsum
able
item
s in
line
wit
h th
e gu
idel
ines
.9
Appl
y pr
oced
ures
on
infr
astr
uctu
res
and
equi
pmen
t m
aint
enan
ce in
line
w
ith
the
guid
elin
es.
9
Repl
ace
equi
pmen
t an
d co
nsum
able
it
ems
in li
ne w
ith
the
guid
elin
es.
9
Man
age
infr
astr
uctu
res,
eq
uipm
ent,
and
co
nsum
able
item
s in
line
wit
h th
e gu
idel
ines
.9
Appl
y pr
oced
ures
on
infr
astr
uctu
res
and
equi
pmen
t m
aint
enan
ce in
line
w
ith
the
guid
elin
es.
9
Repl
ace
equi
pmen
t an
d co
nsum
able
it
ems
in li
ne w
ith
the
guid
elin
es.
5.2.
4. B
lood
Don
or U
nit
Man
-ag
emen
t In
form
atio
n Sy
stem
(SI
MU
DD
A) is
w
ell-
func
tion
ing
at a
ll le
vels
to
supp
ort
bloo
d se
rvic
e do
cum
enta
tion
, re
port
ing,
and
tra
ckin
g.
9
Esta
blis
h SI
MU
DD
A im
plem
enta
tion
tea
m.
9
Prov
ide
infr
astr
uctu
re f
or
SIM
UD
DA
data
hos
ting
.
9
Assi
st t
he u
se o
f SI
MU
DD
A in
all
Dis
tric
t U
TDs
in it
s op
erat
iona
l ar
eas.
9
Mon
itor
and
eva
luat
e th
e ut
iliza
tion
of
SIM
UD
DA
in a
ll D
istr
ict
UTD
s in
its
oper
atio
nal
area
s.
9
Cond
uct
bloo
d se
rvic
e re
cord
ing,
rep
orti
ng,
and
trac
king
usi
ng
SIM
UD
DA.
5.3.
Ava
ilabi
lity
of s
afe,
ac
cess
ible
, an
d qu
al-
ity
bloo
d in
all
UTD
is
incr
ease
d.
5.3.
1. In
itia
tive
s to
pro
mot
e Vo
lunt
ary
Bloo
d D
onor
s (D
DS)
are
con
duct
ed
at a
mas
sive
sca
le o
n re
gula
r ba
sis.
9
Dev
elop
and
dis
sem
inat
e pr
omot
iona
l mat
eria
ls o
n D
DS
to lo
cal U
TDs.
9
Cond
uct
DD
S pr
omot
ion
and
recr
uitm
ent
at t
he n
atio
nal
leve
l.
9
Dis
sem
inat
e an
d co
ach
utili
zati
on m
etho
ds
of D
DS
prom
otio
nal
mat
eria
ls t
o lo
cal
UTD
s.9
Cond
uct
DD
S pr
omot
ion
and
recr
uitm
ent
at t
he
prov
inci
al le
vel.
9
Cond
uct
prom
otio
n fo
r D
DS
recr
uitm
ent
usin
g th
e pr
omot
iona
l m
ater
ials
pro
vide
d.
9
Cond
uct
DD
S pr
omot
ion
acti
viti
es
by v
isit
ing
vari
ous
inst
itut
ions
on
regu
lar
basi
s.9
Regi
ster
DD
S w
ith
SI
MU
DD
A.
Planning and Reporting Guidelines Palang Merah Indonesia
94
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
5.3.
2. C
entr
aliz
atio
n of
bl
ood
proc
essi
ng,
bloo
d sc
reen
ing,
and
cr
oss-
mat
ched
tes
t is
co
nduc
ted
for
bloo
d se
rvic
e ef
ficie
ncy
and
effe
ctiv
enes
s.
9
Coor
dina
te t
o es
tabl
ish
cent
raliz
atio
n w
ith
loca
l U
TDs.
9
Coor
dina
te t
o es
tabl
ish
cent
raliz
atio
n w
ith
UTD
Nat
iona
l and
D
istr
ict
UTD
s in
its
oper
atio
nal a
reas
.9
Impr
ove
the
qual
ity
of b
lood
pro
cess
ing,
bl
ood
scre
enin
g an
d cr
oss
mat
ched
tes
t.
9
Coor
dina
te
to e
stab
lish
cent
raliz
atio
n w
ith
UTD
Nat
iona
l and
pr
ovin
cial
UTD
.9
Impr
ove
the
qual
ity
of b
lood
pro
cess
ing,
bl
ood
scre
enin
g a
nd
cros
s m
atch
ed t
est.
5.3.
3. B
lood
is d
istr
ibut
ed in
lin
e w
ith
the
hosp
ital
s’
need
s th
roug
h bl
ood
prov
isio
n se
rvic
e ne
t-w
ork.
9
Mon
itor
blo
od d
istr
ibut
ion
by
loca
l UTD
s.9
Mon
itor
blo
od
dist
ribu
tion
by
loca
l U
TDs
9
Mon
itor
blo
od n
eeds
in
loca
l hos
pita
ls.
9
Take
and
sto
re b
lood
in
line
wit
h th
e st
anda
rd.
9
Dis
trib
ute
bloo
d ba
sed
on t
he n
eeds
at
loca
l ho
spit
als.
5.3.
4. P
rodu
ctio
n of
blo
od
reag
ent,
blo
od b
ag,
and
plas
ma
frac
tion
atio
n is
co
nduc
ted
by U
TD a
nd
PMI N
HQ
inde
pend
entl
y.
9
Pilo
t an
d co
nduc
t qu
alit
y co
ntro
l to
the
type
s of
re
agen
t an
d cr
yo p
rodu
ced.
9
Cons
truc
t bl
ood
bag
and
plas
ma
frac
tion
atio
n fa
ctor
y in
line
wit
h PM
I NH
Q’s
bu
sine
ss p
lan.
N/A
N/A
5.3.
5. R
esea
rch
and
deve
lop-
men
t fo
r bl
ood
serv
ice
is c
ondu
cted
by
UTD
N
atio
nal a
nd P
rovi
nces
.
9
Dev
elop
sta
ndar
d fo
r re
sear
ch a
nd d
evel
opm
ent
(R&
D)
at t
he n
atio
nal a
nd
prov
inci
al le
vels
.9
Equi
p th
e re
sear
ch a
nd
deve
lopm
ent
unit
.9
Cond
uct
rese
arch
and
de
velo
pmen
t on
blo
od
serv
ices
on
regu
lar
basi
s.
9
Equi
p th
e re
sear
ch a
nd
deve
lopm
ent
unit
. 9
Cond
uct
rese
arch
and
de
velo
pmen
t on
blo
od
serv
ices
on
regu
lar
basi
s.
N/A
Planning and Reporting Guidelines Palang Merah Indonesia
95
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
STRA
TEG
IC P
LAN
6:
To s
tren
gthe
n th
e pa
rtne
rshi
p w
ith
nati
onal
and
loca
l gov
ernm
ent,
pub
lic a
nd p
riva
te s
ecto
rs,
mov
emen
t pa
rtne
rs,
dono
r ag
enci
es,
and
othe
r st
akeh
olde
rs in
ord
er t
o as
sum
e PM
I’s m
anda
te a
nd f
unct
ions
.
6.1.
PM
I’s p
artn
ersh
ip
wit
h th
e go
vern
-m
ent,
pub
lic a
nd
priv
ate
sect
ors,
m
ovem
ent
part
-ne
rs,
orga
niza
-ti
ons,
nat
iona
l an
d in
tern
atio
nal
dono
r ag
enci
es,
and
othe
r st
akeh
olde
rs is
st
reng
then
ed a
t al
l le
vels
.
6.1.
1. M
oU a
nd P
roje
ct
Agre
emen
t do
cum
ents
be
twee
n PM
I and
the
go
vern
men
t, p
ublic
an
d pr
ivat
e se
ctor
s,
mov
emen
t pa
rtne
rs,
orga
niza
tion
s, n
atio
nal
and
inte
rnat
iona
l don
or
agen
cies
, an
d ot
her
stak
ehol
ders
are
ava
il-ab
le a
nd im
plem
ente
d by
PM
I at
all l
evel
s.
9
Init
iate
par
tner
ship
wit
h po
tent
ial l
ocal
, na
tion
al,
and
inte
rnat
iona
l par
tner
s.9
Prep
are
lega
l fra
mew
ork
for
coop
erat
ion
wit
h pa
rtne
rs.
9
Cond
uct
plan
ning
mee
ting
to
dev
elop
, di
stri
bute
, an
d di
ssem
inat
e PM
I par
tner
ship
gu
idel
ines
wit
h di
ffer
ent
type
s of
par
tner
.
9
Follo
w u
p an
d im
plem
ent
coop
erat
ion
wit
h pa
rtne
rs.
9
Faci
litat
e pa
rtne
rshi
p be
twee
n PM
I Bra
nche
s an
d lo
cal p
artn
ers.
9
Follo
w u
p an
d im
plem
ent
coop
erat
ion
wit
h pa
rtne
rs.
6.
1.2.
Par
tner
ship
bui
ldin
g in
itia
tive
s, in
clud
ing
the
impl
emen
tati
on o
f Co
oper
atio
n Ag
reem
ent
Stra
tegy
(CA
S),
are
purs
ued
cons
iste
ntly
by
PMI a
t al
l lev
els.
9
Revi
ew,
revi
se,
and
diss
emin
ate
part
ners
hip
guid
elin
es.
9
Iden
tify
pot
enti
al
orga
niza
tion
al d
evel
opm
ent
area
s an
d de
velo
p pr
opos
als.
9
Dev
elop
and
dis
trib
ute
prom
otio
nal a
nd m
arke
ting
m
ater
ials
for
PM
I’s
com
mer
cial
tra
inin
gs a
nd
prog
ram
s.9
Cond
uct
wor
ksho
p to
de
velo
p po
licie
s an
d st
rate
gies
on
trai
ning
for
pa
rtne
rs.
9
Part
icip
ate
acti
vely
in R
CRC
Mov
emen
t fo
rum
s at
the
re
gion
al a
nd in
tern
atio
nal
leve
ls.
9
Iden
tify
pot
enti
al
orga
niza
tion
al
deve
lopm
ent
area
s an
d de
velo
p pr
opos
als.
9
Faci
litat
e de
velo
pmen
t of
par
tner
ship
pro
posa
l by
PM
I Bra
nche
s.9
Appl
y th
e co
nten
t of
pa
rtne
rshi
p gu
idel
ines
.9
Dev
elop
and
sen
d ne
wsl
ette
rs a
nd
repo
rts
to p
artn
ers.
9
Iden
tify
pot
enti
al
orga
niza
tion
al
deve
lopm
ent
area
s an
d de
velo
p pr
opos
als.
9
Appl
y th
e co
nten
t of
par
tner
ship
gu
idel
ines
.
Planning and Reporting Guidelines Palang Merah Indonesia
96
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
6.2.
Res
ourc
e M
obili
za-
tion
cap
acit
y to
en
hanc
e pa
rtic
ipa-
tion
fro
m p
artn
ers
and
com
mun
itie
s is
st
reng
then
ed.
6.2.
1. R
esou
rce
mob
iliza
tion
ca
paci
ty s
tren
gthe
ning
st
rate
gy is
dev
elop
ed
and
impl
emen
ted
by
com
pete
nt p
erso
nnel
in
PMI a
t al
l lev
els
.
9
Cond
uct
nati
onal
tra
inin
gs
for
Reso
urce
Dev
elop
men
t pe
rson
nel.
9
Dev
elop
and
dis
trib
ute
Reso
urce
Dev
elop
men
t gu
idel
ines
.9
Mob
ilize
exp
erts
on
mic
ro
busi
ness
fro
m p
artn
ers
to
prov
ide
tech
nica
l ass
ista
nce
to lo
cal l
evel
s.
9
Sele
ct s
taff
/vol
unte
ers
to p
arti
cipa
te in
Re
sour
ce D
evel
opm
ent
trai
ning
s.9
Enga
ge s
taff
/vo
lunt
eers
tra
ined
in
Reso
urce
Dev
elop
men
t fo
r ac
tivi
ties
und
er
outp
ut 6
.2.2
.
9
Sele
ct s
taff
/vo
lunt
eers
to
part
icip
ate
in
Reso
urce
Dev
elop
men
t Tr
aini
ngs.
9
Enga
ge s
taff
/vo
lunt
eers
tra
ined
in
Reso
urce
Dev
elop
men
t fo
r ac
tivi
ties
und
er
outp
ut 6
.2.2
.
6.
2.2.
Pot
enti
al d
onor
map
-pi
ng f
or r
esou
rce
mob
i-liz
atio
n na
tion
-wid
e is
de
velo
ped
and
diss
emi-
nate
d to
PM
I Cha
pter
s/Br
anch
es.
9
Com
pile
and
ana
lyze
in
form
atio
n on
pot
enti
al
part
ners
and
res
ourc
e de
velo
pmen
t ac
tivi
ties
at
the
loca
l lev
el.
9
Dev
elop
dat
abas
e of
po
tent
ial p
artn
ers
for
PMI a
t al
l lev
els.
9
Dev
elop
and
dis
trib
ute
Map
ping
Rep
ort
on P
oten
tial
Re
sour
ce D
evel
opm
ent
Part
ners
to
the
loca
l lev
el.
9
Link
PM
I Cha
pter
s an
d Br
anch
es w
ith
sour
ces
of
reso
urce
dev
elop
men
t at
the
na
tion
al le
vel.
9
Iden
tify
pot
enti
al
busi
ness
uni
ts.
9
Dev
elop
bus
ines
s pl
an.
9
Com
pile
and
sen
d in
form
atio
n on
po
tent
ial p
artn
ers
and
reso
urce
dev
elop
men
t ac
tivi
ties
in b
ranc
hes
to P
MI N
HQ
.9
Init
iate
str
ateg
ic
part
ners
hip
wit
h lo
cal
part
ners
.
9
Iden
tify
pot
enti
al
busi
ness
uni
ts.
9
Dev
elop
bus
ines
s pl
an.
9
Com
pile
and
sen
d in
form
atio
n on
po
tent
ial p
artn
ers
and
reso
urce
dev
elop
men
t ac
tivi
ties
to
PMI
Chap
ter.
9
Init
iate
str
ateg
ic
part
ners
hip
wit
h lo
cal
part
ners
.
6.
2.3.
Gui
delin
es r
egul
atin
g th
e ut
iliza
tion
of
fund
ge
nera
ted
from
pub
lic
dona
tion
is d
isse
mi-
nate
d an
d im
plem
ente
d by
PM
I.
9
Cond
uct
nati
onal
wor
ksho
p on
the
mec
hani
sm t
o ut
ilize
do
nati
on f
rom
the
nat
iona
l le
vel .
9
Dis
sem
inat
e th
e m
echa
nism
to
uti
lize
dona
tion
to
PMI
Chap
ters
.
9
Dis
sem
inat
e th
e m
echa
nism
to
utili
ze
dona
tion
to
PMI
Bran
ches
.9
Ope
n a
sepa
rate
ac
coun
t fo
r pu
blic
do
nati
on.
9
Adop
t va
riou
s di
rect
/in
dire
ct f
undr
aisi
ng
met
hods
and
link
the
m
wit
h pu
blic
don
atio
n sp
ecifi
c ac
coun
t.
9
Ope
n a
sepa
rate
ac
coun
t fo
r pu
blic
do
nati
on.
9
Adop
t va
riou
s di
rect
/in
dire
ct f
undr
aisi
ng
met
hods
and
link
th
em w
ith
publ
ic
dona
tion
spe
cific
ac
coun
t
Planning and Reporting Guidelines Palang Merah Indonesia
97
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
9
Intr
oduc
e va
riou
s di
rect
/ind
irec
t pu
blic
fu
ndra
isin
g m
etho
ds
to P
MI C
hapt
ers/
Bran
ches
.9
Ope
n a
sepa
rate
ac
coun
t fo
r pu
blic
do
nati
on a
t th
e na
tion
al le
vel.
STRA
TEG
IC P
LAN
7:
To im
prov
e PM
I’s a
ccou
ntab
ility
as
a hu
man
itar
ian
orga
niza
tion
at
the
nati
onal
and
inte
rnat
iona
l lev
els.
7.1.
Pri
ncip
les
of a
c-co
unta
bilit
y an
d tr
ansp
aren
cy a
re
wel
l-im
plem
ente
d by
PM
I acc
ordi
ngly
.
7.1.
1. R
epor
ts o
n fin
anci
al in
-co
me
and
expe
ndit
ures
, in
clud
ing
finan
cial
and
na
rrat
ive
repo
rts,
are
de
velo
ped
on p
erio
dica
l ba
sis
for
inte
rnal
and
ex
tern
al c
onsu
mpt
ion.
9
Dev
elop
per
iodi
cal r
epor
ts
on in
com
e an
d ex
pend
itur
es
from
don
atio
n fo
r bo
th
inte
rnal
and
ext
erna
l pa
rtie
s.9
Prom
ote
and
upda
te t
he
cont
ent
of P
MI O
nlin
e D
onat
ion.
9
Dev
elop
per
iodi
cal
repo
rts
on in
com
e an
d ex
pend
itur
es f
rom
do
nati
on f
or b
oth
inte
rnal
and
ext
erna
l pa
rtie
s.
9
Dev
elop
per
iodi
cal
repo
rts
on in
com
e an
d ex
pend
itur
es f
rom
do
nati
on f
or b
oth
inte
rnal
and
ext
erna
l pa
rtie
s.
7.
1.2.
Aud
it o
n PM
I’s fi
nanc
ial
expe
ndit
ures
is c
on-
duct
ed a
nnua
lly b
oth
by in
tern
al a
nd e
xter
-na
l acc
ount
ant
and
fol-
low
ed u
p ac
cord
ingl
y.
9
Cond
uct
cash
opn
ame,
re
view
on
cash
rec
ord
hand
ling,
as
wel
l as
inte
rnal
co
ntro
l.9
Revi
ew/o
bser
ve P
MI
Hos
pita
ls,
Nat
iona
l UTD
, an
d au
dit
Wis
ma
PMI.
9
Cond
uct
com
plia
nce
audi
t ov
er p
roce
dure
s re
late
d to
PM
I act
ivit
ies.
9
Faci
litat
e ex
tern
al fi
nanc
ial
audi
t.
9
Cond
uct
cash
opn
ame,
re
view
on
cash
rec
ord
hand
ling,
as
wel
l as
inte
rnal
con
trol
.9
Faci
litat
e ex
tern
al
finan
cial
aud
it.
9
Cond
uct
cash
opn
ame,
re
view
on
cash
rec
ord
hand
ling,
as
wel
l as
inte
rnal
con
trol
.9
Faci
litat
e ex
tern
al
finan
cial
aud
it.
Planning and Reporting Guidelines Palang Merah Indonesia
98
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
7.
1.3.
Gui
delin
es o
n be
n-efi
ciar
y fe
edba
ck a
nd
com
plai
nt m
echa
nism
ar
e de
velo
ped
and
impl
emen
ted
by P
MI a
t al
l lev
els.
9
Dev
elop
gui
delin
es o
n fe
edba
ck c
olle
ctio
n m
echa
nism
fro
m
bene
ficia
ries
and
its
supp
orti
ng t
ools
. 9
Colle
ct f
eedb
ack
from
be
nefic
iari
es o
f RC
RC
serv
ices
.
9
Colle
ct f
eedb
ack
from
be
nefic
iari
es o
f RC
RC
serv
ices
.
9
Colle
ct f
eedb
ack
from
be
nefic
iari
es o
f RC
RC
serv
ices
.
7.2.
Out
reac
h, q
ual-
ity,
and
inte
nsit
y of
do
cum
enta
tion
, pu
b-lic
atio
n, p
rom
otio
n,
and
advo
cacy
of
PMI
acti
viti
es/s
ervi
ces
are
incr
ease
d.
7.2.
1. B
asic
PR
and
com
mun
i-ca
tion
equ
ipm
ent
and
tool
s (c
amer
a, v
ideo
ca
mer
a, r
ecor
der)
, as
w
ell a
s in
form
atio
n,
educ
atio
n, a
nd c
omm
u-ni
cati
on (
IEC)
mat
eria
ls
are
adeq
uate
ly a
vail-
able
at
all l
evel
s of
PM
I.
9
Prov
ide
basi
c pu
blic
rel
atio
n eq
uipm
ent.
9
Prov
ide
basi
c pu
blic
re
lati
on e
quip
men
t.9
Prov
ide
basi
c pu
blic
re
lati
on e
quip
men
t.
7.2.
2. A
naly
sis
repo
rt o
n PM
I pu
blic
atio
n in
mas
s m
e-di
a (p
rint
, on
line,
TV,
ra
dio)
and
soc
ial m
edia
(T
wit
ter
dan
Face
book
) is
dev
elop
ed o
n re
gula
r ba
sis
at P
MI N
HQ
/Cha
p-te
rs .
9
Anal
yze
PMI p
ublic
atio
n da
ta
from
mon
itor
ing
serv
ice
com
pany
.9
Upd
ate
new
s in
PM
I med
ia
(web
site
, so
cial
med
ia),
an
d re
gist
er t
he n
umbe
r of
vi
sito
r.9
Dev
elop
ana
lysi
s re
port
on
PMI’s
imag
e.
9
Mon
itor
and
com
pile
PM
I pub
licat
ion
in
loca
l mas
s m
edia
and
so
cial
med
ia (
if a
ny).
9
N/A
7.
2.3.
PR
and
com
mun
icat
ion
prod
ucts
to
prom
ote
PMI p
rogr
am a
nd s
er-
vice
s ar
e di
ssem
inat
ed
to t
he c
omm
unit
ies/
publ
ic o
n re
gula
r ba
sis.
9
Dev
elop
and
dis
trib
ute
vari
ous
advo
cacy
and
pub
lic
rela
tion
mat
eria
ls (
e.g.
br
ochu
res,
new
slet
ters
) to
PM
I at
the
loca
l lev
el .
9
Dis
trib
ute
vari
ous
advo
cacy
and
PR
mat
eria
ls
(e.g
. br
ochu
res,
ne
wsl
ette
rs)
to
com
mun
itie
s.9
Dev
elop
dis
trib
utio
n re
port
s fo
r ad
voca
cy
mat
eria
ls a
nd P
R pr
oduc
ts t
o PM
I NH
Q.
9
Dis
trib
ute
vari
ous
advo
cacy
and
PR
mat
eria
ls (
e.g.
br
ochu
res,
new
slet
ter)
to
com
mun
itie
s.9
Dev
elop
dis
trib
utio
n re
port
s fo
r ad
voca
cy
mat
eria
ls a
nd P
R pr
oduc
ts t
o PM
I NH
Q.
Planning and Reporting Guidelines Palang Merah Indonesia
99
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
9
Doc
umen
t di
stri
buti
on
repo
rts
for
advo
cacy
m
ater
ials
and
pub
lic r
elat
ion
prod
ucts
to
PMI a
t th
e lo
cal
leve
l.
9
Doc
umen
t RC
RC
acti
viti
es w
orth
y to
be
pub
lishe
d at
the
na
tion
al le
vel.
9
Doc
umen
t RC
RC
acti
viti
es w
orth
y to
be
pub
lishe
d at
the
ch
apte
r an
d na
tion
al
leve
l.
STRA
TEG
IC P
LAN
8:
To im
prov
e th
e un
ders
tand
ing
of a
ll el
emen
ts o
f co
mm
unit
ies
on h
uman
itar
ian
valu
es,
Fund
amen
tal P
rinc
iple
s of
the
In
tern
atio
nal R
CRC
Mov
emen
t, a
s w
ell a
s In
tern
atio
nal H
uman
itar
ian
Law
s (I
HL)
thr
ough
com
mun
icat
ion,
edu
cati
on,
and
diss
emin
atio
n st
rate
gies
.
8.1.
Und
erst
andi
ng o
n RC
RC a
nd h
uman
i-ta
rian
val
ues
amon
g PM
I per
sonn
el a
nd
stak
ehol
ders
is im
-pr
oved
.
8.1.
1. U
pdat
ed In
form
atio
n,
Educ
atio
n, a
nd C
omm
u-ni
cati
on (
IEC)
mat
eria
ls
on R
CRC
Dis
sem
inat
ion
are
avai
labl
e ad
equa
te-
ly a
t al
l lev
els.
9
Revi
ew,
revi
se,
and
or
deve
lop
IEC
mat
eria
ls o
n RC
RC d
isse
min
atio
n ba
sed
on t
arge
t gr
oups
(e.
g.
jour
nalis
ts,
scho
ol a
ge a
nd
wor
king
age
gro
ups)
.9
Dis
trib
ute
IEC
mat
eria
ls o
n RC
RC D
isse
min
atio
n to
PM
I Ch
apte
rs/B
ranc
hes.
9
Dis
trib
ute
IEC
mat
eria
ls o
n RC
RC
Dis
sem
inat
ion
to P
MI
Bran
ches
.9
Trai
n vo
lunt
eers
fro
m
PMI B
ranc
hes
to u
se
IEC
mat
eria
ls o
n RC
RC
Dis
sem
inat
ion.
9
Dis
trib
ute
IEC
mat
eria
ls o
n RC
RC
diss
emin
atio
n to
co
mm
unit
ies.
8.
1.2.
Cha
ract
er b
uild
ing
on
hum
anit
aria
n an
d RC
RC
valu
es is
fac
ilita
ted
by
com
pete
nt d
isse
min
a-to
rs a
t al
l lev
els.
9
Prov
ide
tech
nica
l ass
ista
nce
for
diss
emin
atio
n ac
tivi
ties
by
PM
I Cha
pter
s/Br
anch
es.
9
Revi
ew a
nd r
evis
e di
ssem
inat
ion
trai
ning
cu
rric
ulum
.9
Cond
uct
diss
emin
ator
tr
aini
ng a
t th
e na
tion
al
leve
l.9
Publ
ish
diss
emin
atio
n gu
idel
ines
for
dif
fere
nt
targ
et g
roup
s.9
Fina
lize
and
dist
ribu
te
Expl
orin
g H
uman
itar
ian
Law
(E
HL)
gui
delin
es f
or t
each
ers
and
cond
uct
the
trai
ning
.9
Cond
uct
Ten
Step
tra
inin
g at
na
tion
al le
vel.
9
Mob
ilize
dis
sem
inat
ors
for
diss
emin
atio
n ac
tivi
ties
at
PMI
Bran
ches
.9
Cond
uct
diss
emin
atio
n ac
tivi
ties
.9
Cond
uct
Ten
Step
tr
aini
ng a
t th
e ch
apte
r le
vel (
If it
is a
tar
get
area
).
9
Cond
uct
diss
emin
atio
n ac
tivi
ties
.9
Prov
ide
orie
ntat
ion
on t
he u
pdat
ed
diss
emin
atio
n m
ater
ials
to
(tea
cher
s) Y
RC
Faci
litat
ors.
9
Inco
rpor
ate
diss
emin
atio
n m
ater
ials
into
YRC
ac
tivi
ties
at
scho
ols.
Planning and Reporting Guidelines Palang Merah Indonesia
100
OU
TCO
ME
OU
TPU
TEX
AM
PLES
OF
ACT
IVIT
IES
TO A
CHIE
VE O
UTP
UTS
PMI N
HQ
PMI C
hapt
erPM
I Bra
nch
8.
1.3.
Par
tner
ship
wit
h re
leva
nt in
stit
utio
ns
(Mili
tary
, Po
lice,
uni
ver-
siti
es,
scho
ols,
NG
Os)
an
d co
mm
unit
ies
is
esta
blis
hed
to d
isse
mi-
nate
hum
anit
aria
n an
d RC
RC v
alue
s.
9
Init
iate
dis
sem
inat
ion
part
ners
hip
wit
h di
ffer
ent
stak
ehol
ders
at
the
nati
onal
le
vel.
9
Mob
ilize
dis
sem
inat
ors
to
impl
emen
t pa
rtne
rshi
p w
ith
diff
eren
t st
akeh
olde
rs.
9
Cond
uct
com
mem
orat
ion
of R
CRC-
rela
ted
big
days
/ev
ents
.
9
Follo
w u
p PM
I’s
part
ners
hip
wit
h di
ffer
ent
stak
ehol
ders
at
the
cha
pter
leve
l.9
Mob
ilize
dis
sem
inat
ors
to im
plem
ent
part
ners
hip
wit
h di
ffer
ent
stak
ehol
ders
.9
Cond
uct
com
mem
orat
ion
of
RCRC
-rel
ated
big
day
s/ev
ents
.
9
Follo
w u
p PM
I’s
part
ners
hip
wit
h di
ffer
ent
stak
ehol
ders
at
the
bra
nch
leve
l.9
Cond
uct
com
mem
orat
ion
of
RCRC
-rel
ated
big
da
ys/e
vent
s .
PMI a
t al
l lev
els,
sta
rtin
g fr
om N
HQ
, Ch
apte
rs,
to B
ranc
hes
shou
ld m
ove
in t
he s
ame
dire
ctio
n an
d sp
eed
in im
plem
enti
ng
the
2014
-201
9 St
rate
gic
Plan
and
Ope
rati
onal
Pla
n as
a n
atio
nal a
gend
a in
ord
er t
o ac
hiev
e PM
I tha
t de
mon
stra
tes
stro
ng c
hara
cter
, is
pro
fess
iona
l,
self
-sus
tain
ing,
and
res
pect
ed b
y co
mm
unit
ies.
Thus
, PM
I at
the
NH
Q,
33 C
hapt
ers,
460
Bra
nche
s ar
e no
t on
ly u
nite
d by
em
blem
bu
t al
so b
y th
e sa
me
visi
on,
mis
sion
s, a
nd o
bjec
tive
s.
III. PLANNING IMPLEMENTATION
Plan
ning
Im
plem
enta
tion
Planning and Reporting Guidelines Palang Merah Indonesia
101
a. Participatory. PMI planning at all levels should be done by involving all elements within PMI organization, i.e. volunteers, staff, and board members by taking into account the needs of and recommendations from the communities.
b. Priorities. PMI planning at all levels should define at least four out of the eight key program plans above to be the main priorities. Clearly, this should be done based on the need and capacity assessment for PMI at the local level.
c. Result-oriented. PMI planning at all levels should be result-oriented, which means that every program must contribute to the achievement of the organization’s strategic objectives. Therefore, each work plan should refer to the Strategic Plan and Operational Plan 2014-2019 with results indicators adopted from PMI Indicator Registry.
d. Realistic and independent. PMI planning at all levels develops programs based on local capacities and potential resources. PMI should be able to establish strategic partnerships with local stakeholders and through other resource mobilization initiatives to fund operations and services independently.
e. Integrated. Planning should reflect integration and synergy, either between working units within PMI, across levels, or in its relation with local government’s development programs.
f. Sustainable. PMI planning at all levels should be sustainable from year to year in order to achieve the short-term and long-term objectives defined in the Strategic Plan and Operational Plan 2014-2019.
3.1. Principles of Planning Implementation
Planning and Reporting Guidelines Palang Merah Indonesia
102
a. In the first year of implementation of this guidelines, the work plan developed is a work plan, including budget, for two years at the same time. For example in 2015, the work plan developed is work plans for 2016 and 2017. Yet in the following year, i.e. 2016, the indicative work plan for 2017 will be adjusted and the indicative work plan for 2018 is identified; and so on.
b. PMI Sub-districts identify suitable regular programs/activities/ services to the needs and priorities of local communities. This process requires participation from community representatives, such as village leaders and volunteers. Subsequently, PMI Sub-districts will send the identified results to PMI Branch to be accommodated in the annual plan document.
3.2. Inter-Level Planning (read from the bottom up)
PMI Level Bottom-up Planning Process
National Level
1. Development of strategic programs.2. Include sectoral programs for PMI nation-wide.3. Development of PMI coaching strategy nation-wide.4. Endorsed in the National Annual Meeting/Mukernas.
Chapter Level
1. Include coaching strategies/activities for PMI Branches . 2. Include activities proposed by PMI Branches to be implemented by PMI Chapters.3. Include activities proposed by PMI Chapter to be implemented by PMI NHQ.4. Endorsed in PMI Chapter’s Annual Meeting/Mukerprov.
Branch Level
1. Include details of PMI Branch’s regular programs/activities/ services.2. Include coaching activities for PMI Sub-districts and cross-sectoral coordination. 3. Include proposed activities that can be effectively implemented by PMI Chapter.4. Endorsed in PMI Branch’s Annual Meeting/MukerKab/Kota.
Sub-district Level
1. Identify the regular programs/activities/services needed by local communities.2. Proposed to PMI Branch to be accommodated in the work plan development process.
Table 2. Bottom-up Planning Process
3.3. Planning Implementation Process
Planning and Reporting Guidelines Palang Merah Indonesia
103
c. The work plan development, including budget, at PMI Branch level is conducted based on assessment on local needs of regular programs/activities/services. Information from PMI Sub-districts is very helpful for this need analysis. The annual work plan and the following year indicative work plan are then submitted to PMI Chapter.
d. At PMI Chapters, PMI Branches’ annual work plans are compiled and summarized so that PMI Chapters are able to map out PMI Branches activities well, and could thus identify activities that can be facilitated by PMI Chapters, which then become part of PMI Chapter’s work plan.
e. PMI Chapters submit the work plan and the following year indicative work plan to PMI NHQ. Thus, PMI NHQ is able to identify strategic work plans that can be adopted nationally.
f. Endorsement of work plan and budget is conducted through Annual Meetings at each level on the specified timeline.
g. With the availability of the following year indicative work plan, PMI is able to propose the work plan to the local government through the Development Planning Meeting (Musrenbang) scheme.
Planning and Reporting Guidelines Palang Merah Indonesia
104
To synergize the planning between different levels in PMI and also with the Government planning mechanism (Musrenbang), the planning schedule for all PMI levels has been specified. The following table is a scenario of planning and budgeting schedule developed for the 2016 planning and the 2017 proposed/indicative work plan.
In general, the planning process schedule in PMI and its relations with the government planning cycle through Musrenbang is described in the following diagram.
Table 3. Planning Cycle and Schedule
ActivityPMI
BranchPMI
ChapterPMINHQ
Planning meeting:• Endorsement of 2015 Report`• Endorsement of 2017 Work Plan• Endorsement of 2017 Indicative Work Plan
December2015
January2016
February2016
Follow up of Planning Meeting:Participate in2016 Musrenbang, PMI propose the 2017 Work Plan
January2016
Feb/Mar2016
Apr2016
Initiatives of diversify sources of funding for the 2016 Work Plan, including Local Budged (APBD)
During 2016
Jadwal Pelaksanaan Musyawarah Kerja di tingkat-Skenario untuk rencana kerja 2016/2017-
3.4. Planning and Annual Meeting Implementation Schedule
Planning and Reporting Guidelines Palang Merah Indonesia
105
Figure 1. Example of linkage between PMI Planning and Musrenbang
PMI Planning aligned with Musrenbang
Planning in PMI 2016/2017
Government Planning/Musrenbang for 2017
BranchDec2015
ChapterJan
2016
NHQFeb
2016
DistrictJan
2016
ProvinceFeb/Mar
2016
CentralApr
2016
Description
In December 2015, PMI Branches prepare the 2016 work plans and the 2017 indicative work plans, and then submit them to the Chapters. Musrenbang at the district level for the 2017 work plan will be conducted in Feb/March 2016. In this scenario, the 2017 indicative work plan developed by PMI Branches can be submitted in the District Musrenbang process to obtain financial support.
With this scenario, PMI Branches a synergized planning process with the local government’s planning. Certainly, the effort to secure government support requires positive and strong relationships through consistent communication and coordination. In the end, local government support can be optimized if PMI has a clear plan and high accountability.
Planning and Reporting Guidelines Palang Merah Indonesia
106
A bottom-up planning process starting from Sub-districts, Branches, Chapters, and
NHQ levels which is conducted on the assigned schedule and referring to
the Strategic Plan and Operational Plan 2014-2019 will support a more synergized planning.
A successful planning is planning for success.
PMI Strategic Plan 2014-2019 was developed based on the analysis toward the capacities, conditions, and needs of PMI nation-wide, informed by the organizational capacity assessment and different program reports as well as results of monitoring and supervision visits.
PMI Strategic Plan 2014-2019 was developed to become a national reference so that PMI throughout Indonesia can work in synergy to achieve the goal, and finally on the right track to manifest the vision of the organization .
In each term of PMI NHQ board membership, the content or priorities included in the Strategic Plan document are adjusted with the most updated development. The Strategic Plan contains the organization’s mandate, articulated in the vision, mission, and strategic objective statements, therefore adjustments commonly occur slowly from one period to another.
The congress/assembly meeting in PMI at different levels are conducted at varied and different times from the tenure of PMI NHQ board members. Therefore, PMI Chapters need to adjust their Strategic Plan with the Strategic Plan published by PMI NHQ. These adjustments are generally not major and intended to align the Local Strategic Plan with the one published by PMI NHQ. This will be specified in details in a specific policy issued by PMI in a form of a Decree or Circular.
3.5. Adjustment of Provincial Strategic Plan (PMI Chapter)
IV. PLANNING PROCESS
Plan
ning
Pro
cess
Planning and Reporting Guidelines Palang Merah Indonesia
107
First, PMI Sub-districts develop proposed activities by considering the followings:
a. Relevance with local challenges: vulnerability to disaster, health, economy, and social.
b. Relevance with PMI Key Program Plan (RPP)/Operational Plan.
c. Capacity of local communities.
d. Analysis or study on the challenges and opportunity (relations between PMI and local government, communities, NGOs, private sector, and local government plan (RPJM Daerah).
Second, based on the analysis, PMI Sub-districts develop the Annual Activity Plan that contributes to the achievement of outputs/outcomes from the respective PMI Branches, along with PMI Sub-districts’ budget plan in line with the format specified in section 4.2.
4.1. Planning Process in PMI Sub-district
Planning and Reporting Guidelines Palang Merah Indonesia
108
No
Act
ivit
yRa
tion
ale
(rea
sons
why
the
act
ivit
y is
im
port
ant)
Budg
et
Tota
l Bud
get
WO
RK/A
CTIV
ITY
PLAN
OF
PMI “
X” S
UB-
DIS
TRIC
TYe
ar 2
0xx
4.2.
Wor
k Pl
an o
r A
ctiv
ity
Plan
For
mat
for
PM
I Sub
-dis
tric
t
Planning and Reporting Guidelines Palang Merah Indonesia
109
First, as explained in section 4.1., PMI Sub-districts have formulated proposed activities and submitted them to PMI Branches as references to formulate their annual work plan.
Second, PMI Branches review the activities proposed by PMI Sub-districts by considering the followings:
a. Relevance with local challenges: vulnerability to disaster, health, economy, and social.
b. Relevance with PMI Key Program Plan (RPP)/Operational Plan.c. Capacity of local communities.d. Analysis or study on the challenges and opportunity (relations
between PMI and local government, communities, NGOs, private sector, and local government plan (RPJM Daerah).
Third, based on the analysis, PMI Branches develop the Annual Work Plan, along with PMI Branches’ budget plan in line with the format specified in sub-section 4.4.
PMI Branches need to complete all of the following four formats:
Format A – Work Plan of PMI Branch Year 20xxThis format includes details on what to be achieved by PMI in one year period, i.e. Strategic Objectives, Outcomes, Outputs, Indicators and Targets, as well as Activities and Budget. Format B – Budget SummaryThis information is important to know the proportion or percentage of budget allocation in PMI at all levels, either for operational, program service, or emergency response.Format C – Proposed Activity to PMI ChapterThis format summarizes the activities proposed to PMI Chapter, based on the criteria explained in point 10 section 4.5 – Description on Filling Planning Matrices for PMI Branch. Format D – Detailed Planning Implementation This format comprises details of activity implementation schedules/timelines for one year period in monthly unit. Next, this format will be used as a basis for implementation and monitoring throughout the year.
4.3. Planning Process in PMI Branch
Planning and Reporting Guidelines Palang Merah Indonesia
110
Stra
tegi
c O
bjec
tive
-1
(1)
Out
com
e (2
)O
utco
me
Indi
cato
r (3
)Ta
rget
for
Out
com
e In
dica
tor
(4)
Out
put
(5)
Out
put
Indi
cato
r (6
)Ta
rget
for
Out
put
Indi
cato
r Ke
giat
an (
8)An
ggar
an (
9)
(7)
Acti
vity
(8)
Budg
et (
9)
TStr
ateg
ic O
bjec
tive
-2 (
1)
Stra
tegi
c O
bjec
tive
-3 (
1)
Stra
tegi
c O
bjec
tive
-6 (
1)
etc.
Tota
l Bud
get
4.4.
Ann
ual W
ork
Plan
For
mat
for
PM
I Bra
nch
WO
RK P
LAN
OF
PMI “
X” B
RAN
CH
Year
20x
x
Not
e: T
he c
onte
nt o
f St
rate
gic
Obj
ecti
ves,
out
com
es a
nd t
he in
dica
tors
, ou
tput
s an
d th
e in
dica
tors
is t
aken
fro
m P
MI
Ope
rati
onal
Pla
n 20
15-2
019
Mat
rix
on p
age
34.
It w
ill b
e ex
plai
ned
in f
urth
er d
etai
ls in
the
fol
low
ing
page
s.
A.
Form
at o
f W
ork
Plan
Mat
rix
Planning and Reporting Guidelines Palang Merah Indonesia
111
B. F
orm
at o
f Bu
dget
Sum
mar
y
C. F
orm
at o
f Pr
opos
ed A
ctiv
ity
to P
MI C
hapt
er Pr
opos
ed a
ctiv
ity
from
PM
I X B
ranc
h to
PM
I X C
hapt
er (
10):
D.
Form
at o
f PM
I Bra
nch’
s D
etai
led
Impl
emen
tati
on P
lan
D
ETA
ILED
IMPL
EMEN
TATI
ON
PLA
N
WO
RK P
LAN
OF
PMI X
” BR
AN
CH,
Year
20x
x
Budg
et C
ateg
ory
Am
ount
(Ru
piah
)Pe
rcen
tage
(A
mou
nt o
f Ru
piah
/Tot
al x
100
%)
Ope
rati
onal
(sa
lary
, el
ectr
icit
y, t
elep
hone
, fu
el,
stat
iona
ries
, et
c.)
Serv
ices
(Re
gula
r se
rvic
e/pr
ogra
m a
ctiv
itie
s)
Emer
genc
y/Re
spon
se (
spec
ifica
lly f
or e
mer
genc
y as
sist
ance
)
Tota
l Bud
get
No.
Prop
osed
Act
ivit
yIm
plem
enta
tion
Sch
edul
eRe
ason
for
pro
posi
ng t
he a
ctiv
ity
1 2 3 etc.
No
Act
ivit
yBu
dget
Impl
emen
tati
on T
imel
ine
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Des
1 2 3 4 5 etc.
Tota
l Bud
get
Planning and Reporting Guidelines Palang Merah Indonesia
112
1. Strategic Objective Strategic Objective (or often referred to as Strategic Goal) is a simple
and clear statement that describes the long-term result intended to be achieved by a work plan. Strategic Objective reflects the end goal, which is an unsatisfactory condition/situation that in the end has to be changed by a project/program. There are Eight Strategic Objectives of PMI Operational Plan 2015-2019. PMI Branch will select several or all of the Strategic Objectives to be operationalized in the annual work plan.
2. Outcome Outcome is an intermediate result intended to be achieved by a
work plan, normally in form of capacity building, policies/system implementation, increase in knowledge, attitude, and practice. Outcome is an intermediate result that has to be achieved in order to meet the Strategic Objective. Outcomes are selected from the options provided under each Strategic Objective and then copied into the format. The outcome numbering should be the same with the one in the Operational Plan document for easy reference.
3. Outcome Indicator Indicator is a measurement unit that helps determining whether the
progress or achievement of the intended objectives or outcomes occurs. Indicators determine what information should be collected to answer key questions about the progress or achievement of the work plan. The indicator numbering should be the same with the one in the Operational Plan document for easy reference. The indicator statement should be adjusted with the Branch level, for example:
4.5. Description on Filling Planning Matrices for PMI Branch
Original Statement Adjustment
4. PMI NHQ/Chapters/Branches conducted Annual Meeting in accordance with the assigned schedule.
4. PMI X Branch conducted Annual Meeting in accordance with the assigned schedule.
25. PMI NHQ/Chapters/Branches develop annual work plan in line with the Planning and Reporting Guidelines.
25. PMI X Branch develop annual work plan in line with the Planning and Reporting Guidelines.
29. Number of PMI employee at NHQ/Chapters/Branches paid in line with the Provincial/ District minimum wage standard.
29. Number of PMI employee at X Branch paid in line with the District minimum wage standard.
56. PMI Chapters/Branches have active/functioning POSKO.
56. PMI X Branch have active/ functioning POSKO.
Planning and Reporting Guidelines Palang Merah Indonesia
113
4. Target (Outcome Indicator) The number or percentage intended to be achieved for each indicator
is defined based on the needs and capacity. Each indicator should be provided with unit, such as people, unit, and activity. See point 7 for explanation regarding target setting.
5. Output Output is “a tangible product, either material or service or immediate
results that leads to outcome achievement”. Output is an immediate result from activities conducted, which has to be produced in order to achieve outcome, not more, not less. Outputs are selected from the lists provided under each outcome and then copied into the format. The output numbering should be the same with the one in the Operational Plan document for easy reference.
6. Output Indicator Indicator is a measurement unit that helps determining whether the
progress or achievement of the intended objectives or results occurs. Indicators determine what information should be collected to answer key questions about the progress or achievement of the work plan. The indicator numbering should be the same with the one in the Operational Plan document for easy reference. The indicator statement should be adjusted with the Branch level, for example:
The indicator registry is essentially not fixed. Additional indicators can be provided if there is any project/program that cannot be measured with the existing indicators. However, the development of new indicator(s) should meet the good indicator criteria (SMART) or use the existing and tested indicators, also relevant with outcomes or outputs in PMI Operational Plan.
7. Target (Output Indicator) Number or percentage intended to be achieved for each indicator
is defined based on the needs and capacity. Each indicator should be provided with unit, such as people, unit, and activity. The explanation regarding target setting for outcome also applies for output indicators.
Original Statement Adjustment
8. Number of PMI employees who have written employment contracts.
8. Number of PMI X Branch employees who have written employment contracts.
27. PMI Branches receive coaching visit from PMI Chapter’s Board Members at least once a year.
27. PMI X Branch receive coaching visit from PMI Chapter’s Board Members at least once a year.
41. Number of YRC facilitator available in primary/secondary/high school in PMI Branches’ working area.
No adjustment required.
75. Number of SATGANA team members at PMI Branches.
75. Number of SATGANA team members at PMI X Branch.
Planning and Reporting Guidelines Palang Merah Indonesia
114
In the Strategic Plan and Operational Plan Matrices, there are a few indicators of which the targets have been set as national targets. For example, Indicator 6, “PMI Chapters/Branches receive dissemination of information on statutes; the target for 2019 is 33 Chapters and 420 Branches”.
There also some other indicators of which the targets have to be set by each Chapter and Branch, for example Indicator 8 “Number of PMI employees who have written employment contract”. The target for this indicator should be set by each Branch .
Target in general is in a form of number or percentage. However, for certain indicators, targets can be converted to time. For example, Indicator 3 “PMI NHQ/Chapters/Branches conducted the Five-Yearly Assembly Meeting in timely manner”; at the Branch level, the target will certainly be time, when the Assembly Meeting needs to be conducted.
8. Activity Activity is a group of tasks that needs to be performed in order to
achieve output―daily actions that need to be done to deliver program outputs that will in turn achieve the outcomes. Activities are identified and decided by PMI Branches themselves in order to deliver the specified outputs.
On page 81, there is a list of potential activities to help the planning process. Yet, PMI Branches may add other activities that are not in the list but needed to produce outputs.
Activities can be divided into two types, i.e.:9 Regular operational activities, such as meeting, monitoring, report development, and salary payment. 9 Specific activities, such as services or project/program activities in PMI neighborhood and communities (training, coaching, campaign, public campaign, etc.).
Remember, activities are developed based on the objective to be achieved at output level. Activities cannot be developed based on indicators because indicator is a measurement unit to find out whether the objectives are achieved or not. Therefore, it is important to understand the output statement well, and then identify which activities need to be done in order to deliver those outputs.
In this Guidelines, a “List of References for PMI Operational and Service Activities” is provided. You may use the list in order to help identifying activities, but may also add other unlisted activities deemed necessary to deliver the outputs.
Planning and Reporting Guidelines Palang Merah Indonesia
115
9. Budget The amount of budget estimated and allocated to implement each
activity. The budget has to be estimated carefully so that it is close to real expenses.
10. Proposed Work Plan to PMI Chapter It is a work plan that cannot or will not be effective if conducted only
by the Branch, thus can be proposed to PMI Chapter and becomes part of PMI Chapter’s work plan. Those activities should meet the following criteria:
a. Activities that are relatively similar to other Branches, so the implementation can be combined to be organized by PMI Chapter (e.g. certain training).
b. Activities that require external technical support/expertise that can be coordinated by PMI Chapter.
c. Activities that are relatively similar to PMI Chapter’s priorities.
Planning and Reporting Guidelines Palang Merah Indonesia
116
First, PMI Chapters summarize PMI Branches’ work plans. The summary of PMI Branches’ work plans does not need to be sent to PMI NHQ, but only used as a reference for monitoring by PMI Chapter during the implementation of the work plan.
The summary of PMI Branches’ work plans is presented in a matrix format, like format A and B below.
Format A – Summary of Proposed Activities from PMI Branches to PMI ChapterThe summary is important to inform PMI Chapter in developing its Annual Work Plan, including in prioritizing coaching activities for PMI Branches in its operational area.
Format B – Summary of PMI Branches’ Budget The summary provides information on budget allocation in all Branches, either for operational, services, or emergency/response. With this information, PMI Chapter can analyze and map out the budget allocation needs and priorities in its area every year, and is thus informed on the yearly trend.
Second, based on the summary of PMI Branches’ work plans and also the activities proposed to be conducted by PMI Chapter as well as the need assessment of local PMI context, PMI Chapters develop an Annual Work Plan of PMI Chapter which is then broken down in matrices format based on the formats in section 4.7.
PMI Chapters need to complete all of the following four formats:
Format A – Work Plan of PMI Chapter Year 20xxThis format includes details on what to be achieved by PMI in one year period, i.e. Strategic Objectives, Outcomes, Outputs, Indicators and Targets, as well as Activities and Budget.
Format B – Budget SummaryThis information is important to know the proportion or percentage of budget allocation in PMI at all levels, either for operational, program service, or emergency response.
Format C – Proposed Activity to PMI NHQThis format summarizes the activities proposed to PMI NHQ, based on the criteria explained in point 10 section 4.8 – Description on Filling Planning Matrices for PMI Chapter.
Format D – Detailed Planning Implementation This format comprises details of activity implementation schedules/timelines for one year period in monthly unit. Next, this format will be used as a basis for implementation and monitoring throughout the year.
4.6. Planning Process in PMI Chapter
Planning and Reporting Guidelines Palang Merah Indonesia
117
A.
Form
at o
f Su
mm
ary
of P
ropo
sed
Act
ivit
ies
from
PM
I Bra
nche
s to
PM
I Cha
pter
B. F
orm
at o
f Su
mm
ary
of P
MI B
ranc
hes’
Bud
get
No.
Prop
osed
Act
ivit
yIm
plem
enta
tion
Sch
edul
eRe
ason
of
prop
osal
1 2 3 etc.
PMI B
ranc
hA
mou
nt P
er B
udge
t Ca
tego
ry
Area
Cod
eBr
anch
Ope
rati
onal
Serv
ice
Emer
genc
y/Re
spon
seTo
tal
Planning and Reporting Guidelines Palang Merah Indonesia
118
Tuju
an S
trat
egis
-1 (
1)
Out
com
e (2
)In
dika
tor
Out
com
e (3
)Ta
rget
Indi
kato
r O
utco
me
(4)
Out
put
(5)
Indi
kato
r O
utpu
t (6
)Ta
rget
Indi
kato
r O
utpu
t (8
)Ke
giat
an (
8)An
ggar
an (
9)
Stra
tegi
c O
bjec
tive
-2
(1)
Stra
tegi
c O
bjec
tive
-3
(1)
Stra
tegi
c O
bjec
tive
-6
(1)
etc.
Tota
l Bud
get
4.7.
Ann
ual W
ork
Plan
For
mat
for
PM
I Cha
pter
WO
RK P
LAN
OF
PMI “
X” C
HAP
TER
Year
20x
x
Not
e: T
he c
onte
nt o
f St
rate
gic
Obj
ecti
ves,
out
com
es a
nd t
he i
ndic
ator
s, o
utpu
ts a
nd t
he i
ndic
ator
s is
tak
en f
rom
PM
I O
pera
tion
al P
lan
2015
-201
9 M
atri
x on
pag
e 34
. It
wil
l be
exp
lain
ed
in f
urth
er d
etai
ls i
n th
e fo
llow
ing
page
s.
A.F
orm
at o
f W
ork
Plan
Mat
rix
Planning and Reporting Guidelines Palang Merah Indonesia
119
B. F
orm
at o
f Bu
dget
Sum
mar
y
D.
Form
at o
f PM
I Cha
pter
’s D
etai
led
Impl
emen
tati
on P
lan
D
ETA
ILED
IMPL
EMEN
TATI
ON
PLA
N
WO
RK P
LAN
OF
PMI X
” CH
APT
ER,
Year
20x
x
Budg
et C
ateg
ory
Am
ount
(Ru
piah
)Pe
rcen
tage
(A
mou
nt o
f Ru
piah
/Tot
al x
100
%)
Ope
rati
onal
(sa
lary
, el
ectr
icit
y, t
elep
hone
, fu
el,
stat
iona
ries
, et
c.)
Serv
ices
(Re
gula
r se
rvic
e/pr
ogra
m a
ctiv
itie
s)
Emer
genc
y/Re
spon
se (
spec
ifica
lly f
or e
mer
genc
y as
sist
ance
)
Tota
l Bud
get
No.
Prop
osed
Act
ivit
yIm
plem
enta
tion
Sch
edul
eRe
ason
for
pro
posi
ng t
he a
ctiv
ity
1 2 3 etc.
C. F
orm
at o
f Pr
opos
ed A
ctiv
ity
to P
MI N
HQ
Pr
opos
ed a
ctiv
ity
from
PM
I X C
hapt
er t
o PM
I NH
Q (
10):
No
Act
ivit
yBu
dget
Impl
emen
tati
on T
imel
ine
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1 2 3 4 5 etc.
Tota
l Bud
get
Planning and Reporting Guidelines Palang Merah Indonesia
120
1. Strategic Objective Strategic Objective (or often referred to as Strategic Goal) is a simple
and clear statement that describes the long-term result intended to be achieved by a work plan. Strategic Objective reflects the end goal, which is an unsatisfactory condition/situation that in the end has to be changed by a project/program. There are Eight Strategic Objectives of PMI Operational Plan 2015-2019. PMI Chapter will select several or all of the Strategic Objectives to be operationalized in the annual work plan.
2. Outcome Outcome is an intermediate result intended to be achieved by a
work plan, normally in form of capacity building, policies/system implementation, increase in knowledge, attitude, and practice. Outcome is an intermediate result that has to be achieved in order to meet the Strategic Objective. Outcomes are selected from the options provided under each Strategic Objective and then copied into the format. The outcome numbering should be the same with the one in the Operational Plan document for easy reference.
3. Outcome Indicator Indicator is a measurement unit that helps determining whether the
progress or achievement of the intended objectives or outcomes occurs. Indicators determine what information should be collected to answer key questions about the progress or achievement of the work plan. The indicator numbering should be the same with the one in the Operational Plan document for easy reference. The indicator statement should be adjusted with the Chapter level, for example:
The indicator registry is essentially not fixed. Additional indicators can
4.8. Description on Filling Planning Matrices for PMI Chapter
Original Statement Adjustment
4. PMI NHQ/Chapters/Branches conducted Annual Meeting in accordance with the assigned schedule.
4. PMI X Chapter conducted Annual Meeting in accordance with the assigned schedule.
25. PMI NHQ/Chapters/Branches develop annual work plan in line with the Planning and Reporting Guidelines.
25. PMI X Chapter develop annual work plan in line with the Planning and Reporting Guidelines.
29. Number of PMI employee at NHQ/Chapters/Branches paid in line with the Provincial/ District minimum wage standard.
29. Number of PMI employee at X Chapter paid in line with the District minimum wage standard.
56. PMI Chapters/Branches have active/functioning POSKO.
56. PMI X Chapter have active/ functioning POSKO.
Planning and Reporting Guidelines Palang Merah Indonesia
121
be provided if there is any project/program that cannot be measured with the existing indicators. However, the development of new indicator(s) should meet the good indicator criteria (SMART) or use the existing and tested indicators, also relevant with outcomes or outputs in PMI Operational Plan.
4. Target (Outcome Indicator) The number or percentage intended to be achieved for each indicator
is defined based on the needs and capacity. Each indicator should be provided with unit, such as people, unit, and activity. See point 7 for explanation regarding target setting.
5. Output Output is “a tangible product, either material or service or immediate
results that leads to outcome achievement”. Output is an immediate result from activities conducted, which has to be produced in order to achieve outcome, not more, not less. Outputs are selected from the lists provided under each outcome and then copied into the format. The output numbering should be the same with the one in the Operational Plan document for easy reference.
6. Output Indicator Indicator is a measurement unit that helps determining whether the
progress or achievement of the intended objectives or results occurs. Indicators determine what information should be collected to answer key questions about the progress or achievement of the work plan. The indicator numbering should be the same with the one in the Operational Plan document for easy reference. The indicator statement should be adjusted with the Chapter level, for example:
Original Statement Adjustment
43. PMI NHQ/Chapters organize volunteer gathering (Temu Karya).
43. PMI X Chapter organize volunteer gathering (Temu Karya).
76. Number of emergency response specialist at PMI Chapters.
76. Number of emergency response specialist at PMI X Chapter.
90. PMI NHQ/Chapters/Branches develop annual Contingency Plan.
90. PMI X Chapter develop annual Contingency Plan.
144. Number of active and operational PMI business unit at NHQ/Chapters/Branches.
144. Number of active and operational PMI business unit at X Chapter.
Planning and Reporting Guidelines Palang Merah Indonesia
122
7. Target (Output Indicator) Number or percentage intended to be achieved for each indicator
is defined based on the needs and capacity. Each indicator should be provided with unit, such as people, unit, and activity. The explanation regarding target setting for outcome also applies for output indicators.
In the Strategic Plan and Operational Plan Matrices, there are a few indicators of which the targets have been set as national targets. For example, Indicator 6, “PMI Chapters/Branches receive dissemination of information on statutes; the target for 2019 is 33 Chapters and 420 Branches”.
There also some other indicators of which the targets have to be set by each Chapter and Branch, for example Indicator 8 “Number of PMI employees who have written employment contract”. The target for this indicator should be set by each Branch .
Target in general is in a form of number or percentage. However, for certain indicators, targets can be converted to time. For example, Indicator 3 “PMI NHQ/Chapters/Branches conducted the Five-Yearly Assembly Meeting in timely manner”; at the Branch level, the target will certainly be time, when the Assembly Meeting needs to be conducted.
8. Activity Activity is a group of tasks that needs to be performed in order to
achieve output―daily actions that need to be done to deliver program outputs that will in turn achieve the outcomes. Activities are identified and decided by PMI Chapters themselves in order to deliver the specified outputs.
On page 81, there is a list of potential activities to help the planning process. Yet, PMI Chapters may add other activities that are not in the list but needed to produce outputs.
Activities can be divided into two types, i.e.:9 Regular operational activities, such as meeting, monitoring, report development, and salary payment. 9 Specific activities, such as services or project/program activities in PMI neighborhood and communities (training, coaching, campaign, public campaign, etc.).
Remember, activities are developed based on the objective to be achieved at output level. Activities cannot be developed based on indicators because indicator is a measurement unit to find out whether the objectives are achieved or not. Therefore, it is important to understand the output statement well, and then identify which activities need to be done in order to deliver those outputs.
Planning and Reporting Guidelines Palang Merah Indonesia
123
In this Guidelines, a “List of References for PMI Operational and Service Activities” is provided. You may use the list in order to help identifying activities, but may also add other unlisted activities deemed necessary to deliver the outputs.
9. Budget The amount of budget estimated and allocated to implement each
activity. The budget has to be estimated carefully so that it is close to real expenses.
10. Proposed Work Plan to PMI NHQ It is a work plan that cannot or will not be effective if conducted only by
the Chapter, thus can be proposed to PMI NHQ and becomes part of PMI NHQ’s work plan. Those activities should meet the following criteria:
a. Activities that are relatively similar to other Chapters, so the implementation can be combined to be organized by PMI NHQ (e.g. certain training).
b. Activities that require external technical support/expertise that can be coordinated by PMI NHQ.
c. Activities that are relatively similar to PMI NHQ’s priorities.
Planning and Reporting Guidelines Palang Merah Indonesia
124
First, PMI NHQ summarizes and analyzes PMI Chapters’ programs to produce a conclusion of trends and PMI priorities at the local level, which is then presented in format A and B.
Format A – Summary of Proposed Activities from PMI Chapters to PMI NHQThe summary is important to inform PMI NHQ in developing its Annual Work Plan, including in prioritizing coaching activities for PMI Chapters.
Format B – Summary of PMI Chapters’ Budget The summary provides information on budget allocation in all Chapters, either for operational, services, or emergency/response. With this information, PMI NHQ can analyze and map out the budget allocation needs and priorities in its area every year, and is thus informed on the yearly trend.
Second, PMI NHQ will determine the relevant program priorities to the Strategic Plan and Operational Plan as well as Key Policies to support priorities at the local level, which is then developed in form of work plan in the formats in section 4.10.
PMI NHQ needs to complete all of the following four formats:
Format A – Work Plan of PMI NHQ Year 20xxThis format includes details on what to be achieved by PMI in one year period, i.e. Strategic Objectives, Outcomes, Outputs, Indicators and Targets, as well as Activities and Budget.
Format B – Budget SummaryThis information is important to know the proportion or percentage of budget allocation in all Divisions/Bureaus, either for operational, program service, or emergency response.
Format C – Detailed Planning Implementation This format comprises details of activity implementation schedules/timelines for one year period in monthly unit. Next, this format will be used as a basis for implementation and monitoring throughout the year.
4.9. Planning Process in PMI NHQ
Planning and Reporting Guidelines Palang Merah Indonesia
125
A.
Form
at o
f Su
mm
ary
of P
ropo
sed
Act
ivit
ies
from
PM
I Cha
pter
s to
PM
I NH
Q
B. F
orm
at o
f Su
mm
ary
of P
MI C
hapt
ers’
Bud
get
No.
Prop
osed
Act
ivit
yIm
plem
enta
tion
Sch
edul
eRe
ason
of
prop
osal
1 2 3 etc.
PMI C
hapt
erA
mou
nt P
er B
udge
t Ca
tego
ry
Area
Cod
eCh
apte
rO
pera
tion
alSe
rvic
eEm
erge
ncy/
Resp
onse
Tota
l
Planning and Reporting Guidelines Palang Merah Indonesia
126
Stra
tegi
c O
bjec
tive
-1 (
1)
Out
com
e (2
)O
utco
me
Indi
ca-
tor
(3)
Targ
et f
or
Out
com
e In
dica
tor
(4)
Out
put
(5)
Out
put
Indi
cato
r (6
)Ta
rget
for
Out
put
Indi
cato
r (7
)Ac
tivi
ty (
8)Bu
dget
(9)
Stra
tegi
c O
bjec
tive
-2 (
1)
Stra
tegi
c O
bjec
tive
-3 (
1)
Stra
tegi
c O
bjec
tive
-6 (
1)
etc.
Tota
l Bud
get
WO
RK P
LAN
OF
“X”
DIV
ISIO
N/B
URE
AU –
PM
I NH
Q
Year
20x
x
Not
e: T
he c
onte
nt o
f St
rate
gic
Obj
ecti
ves,
out
com
es a
nd t
he i
ndic
ator
s, o
utpu
ts a
nd t
he i
ndic
ator
s is
tak
en f
rom
PM
I O
pera
tion
al P
lan
2015
-201
9 M
atri
x on
pag
e 34
. It
wil
l be
exp
lain
ed i
n fu
rthe
r de
tail
s in
the
fol
low
ing
page
s.
A.
Form
at o
f W
ork
Plan
Mat
rix
4.10
. An
nual
Wor
k Pl
an F
orm
at f
or P
MI N
HQ
Planning and Reporting Guidelines Palang Merah Indonesia
127
No
Act
ivit
yBu
dget
Impl
emen
tati
on T
imel
ine
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
1 2 3 4 5 etc.
Tota
l Bud
get
B. F
orm
at o
f Bu
dget
Sum
mar
y
C. F
orm
at o
f PM
I NH
Q-D
ivis
ion/
Bure
au’s
Det
aile
d Im
plem
enta
tion
Pla
n
D
ETA
ILED
IMPL
EMEN
TATI
ON
PLA
N
WO
RK P
LAN
OF
PMI N
HQ
, Ye
ar 2
0xx
Budg
et C
ateg
ory
Am
ount
(Ru
piah
)Pe
rcen
tage
(A
mou
nt o
f Ru
piah
/Tot
al x
10
0%)
Ope
rati
onal
(sa
lary
, el
ectr
icit
y, t
elep
hone
, fu
el,
stat
iona
ries
, et
c.)
Serv
ices
(Re
gula
r se
rvic
e/pr
ogra
m a
ctiv
itie
s)
Emer
genc
y/Re
spon
se (
spec
ifica
lly f
or e
mer
genc
y as
sist
ance
)
Tota
l Bud
get
Planning and Reporting Guidelines Palang Merah Indonesia
128
1. Strategic Objective Strategic Objective (or often referred to as Strategic Goal) is a simple
and clear statement that describes the long-term result intended to be achieved by a work plan. Strategic Objective reflects the end goal, which is an unsatisfactory condition/situation that in the end has to be changed by a project/program. There are Eight Strategic Objectives of PMI Operational Plan 2015-2019. PMI NHQ will select several or all of the Strategic Objectives to be operationalized in the annual work plan.
2. Outcome Outcome is an intermediate result intended to be achieved by a
work plan, normally in form of capacity building, policies/system implementation, increase in knowledge, attitude, and practice. Outcome is an intermediate result that has to be achieved in order to meet the Strategic Objective. Outcomes are selected from the options provided under each Strategic Objective and then copied into the format. The outcome numbering should be the same with the one in the Operational Plan document for easy reference.
3. Outcome Indicator Indicator is a measurement unit that helps determining whether the
progress or achievement of the intended objectives or outcomes occurs. Indicators determine what information should be collected to answer key questions about the progress or achievement of the work plan. The indicator numbering should be the same with the one in the Operational Plan document for easy reference. The indicator statement should be adjusted with the NHQ level, for example:
Original Statement Adjustment
4. PMI NHQ/Chapters/Branches conducted Annual Meeting in accordance with the assigned schedule.
4. PMI NHQ conducted Annual Meeting in accordance with the assigned schedule.
25. PMI NHQ/Chapters/Branches develop annual work plan in line with the Planning and Reporting Guidelines.
25. PMI NHQ develop annual work plan in line with the Planning and Reporting Guidelines.
4.11. Description on Filling Planning Matrices for PMI NHQ
Planning and Reporting Guidelines Palang Merah Indonesia
129
4. Target (Outcome Indicator) The number or percentage intended to be achieved for each indicator
is defined based on the needs and capacity. Each indicator should be provided with unit, such as people, unit, and activity. In the Strategic Plan and Operational Plan matrices, generally the indicator targets have been established by PMI NHQ, specifically for indicators to be achieved at the National level. At the NHQ level, the targets to be achieved is the ones recorded in the matrices.
Assessment on indicator achievement at the NHQ level will be conducted covering National scope, either through reporting or specific assessment, such as endline survey.
5. Output Output is “a tangible product, either material or service or immediate
results that leads to outcome achievement”. Output is an immediate result from activities conducted, which has to be produced in order to achieve outcome, not more, not less. Outputs are selected from the lists provided under each outcome and then copied into the format. The output numbering should be the same with the one in the Operational Plan document for easy reference.
6. Output Indicator Indicator is a measurement unit that helps determining whether the
progress or achievement of the intended objectives or results occurs. Indicators determine what information should be collected to answer key questions about the progress or achievement of the work plan. The indicator numbering should be the same with the one in the Operational Plan document for easy reference. The indicator statement should be adjusted with the NHQ level, for example:
7. Target (Output Indicator) Number or percentage intended to be achieved for each indicator is
defined based on the needs and capacity. Each indicator should be provided with unit, such as people, unit, and activity.
The explanation regarding target setting for outcome also applies for output indicators.
Original Statement Adjustment
43. PMI NHQ/Chapters organize volunteer gathering (Temu Karya).
43. PMI NHQ organize volunteer gathering (Temu Karya).
90. PMI NHQ/Chapters/Branches develop annual Contingency Plan.
90. PMI NHQ develop annual Contingency Plan.
144. Number of active and operational PMI business unit at NHQ/Chapters/Branches.
144. Number of active and operational PMI NHQ’s business unit.
Planning and Reporting Guidelines Palang Merah Indonesia
130
8. Activity Activity is a group of tasks that needs to be performed in order to
achieve output―daily actions that need to be done to deliver program outputs that will in turn achieve the outcomes. Activities are identified and decided by PMI NHQ themselves in order to deliver the specified outputs.
On page 81, there is a list of potential activities to help the planning process. Yet, PMI NHQ may add other activities that are not in the list but needed to produce outputs.
Activities can be divided into two types, i.e.:9 Regular operational activities, such as meeting, monitoring, report development, and salary payment. 9 Specific activities, such as services or project/program activities in PMI neighborhood and communities (training, coaching, campaign, public campaign, etc.).
Remember, activities are developed based on the objective to be achieved at output level. Activities cannot be developed based on indicators because indicator is a measurement unit to find out whether the objectives are achieved or not. Therefore, it is important to understand the output statement well, and then identify which activities need to be done in order to deliver those outputs.
In this Guidelines, a “List of References for PMI Operational and Service Activities” is provided. You may use the list in order to help identifying activities, but may also add other unlisted activities deemed necessary to deliver the outputs.
9. Budget The amount of budget estimated and allocated to implement each
activity. The budget has to be estimated carefully so that it is close to real expenses.
The Work Plan Matrices have to be approved and signed by the Chairman of PMI PNHQ to be proposed afterward to the National Annual Meeting for endorsement.
V. REPORTING
Repo
rtin
g
Planning and Reporting Guidelines Palang Merah Indonesia
131
A report is a mean of communication that plays a significant role to inform PMI’s organizational development, starting from the Branch, Chapter, and NHQ level. A report is a monitoring tool for the implementation of the planned activities in the annual work plan.
A report provides information to help monitoring, control, and decision making process in implementing PMI’s Work Plan. Writing a report is not merely a routine, but it is a responsibility attached to either the organization or the person/unit in charge for the organization activities.
A report should be clear, concise, and easy to understand by all levels of PMI. Therefore, it requires a standard reporting pattern, and thus requires a technical guidelines for reporting. PMI has had reporting formats issued by PMI NHQ in early 2000. However, with the more diverse activities implemented by PMI and greater need of information to date, the reporting formats need to be improved.
The reporting technical guidelines is expected to guide the use of a simpler content and format yet able to provide the information needs at all levels.
First, a report serves as a monitoring tool. In this case, the report is intended more for internal party, either for board members or office management at different levels of PMI. An internal report helps PMI (Head of Office and Head of Working Unit) to:
a. Analyze the program, identify the strengths and weaknesses, and make decision for better management.
b. Help measuring the progress and performance, as an early warning tool if there are issues.
c. Improve communication between team members.d. Be used as a reference for external reports.
5.1. Background
5.2. Benefits of Report
Planning and Reporting Guidelines Palang Merah Indonesia
132
As such, internal reports, either formal or informal, have to be available on a regular basis and contain relevant information to fulfill the above needs.
Second, a report is an evidence that we are accountable or trustworthy. The report referred to here is intended to external party, whether they be donor, government, partners, etc.
With the external report, PMI is able to:a. Show donors and the public what we have done/achieved with their
funding supports,b. Show (the existing/non-existent) quality and integrity of our works, c. Show accountability and transparency (saying what we do and doing
what we say).
An external report should be formal, which means: a. it contains information on the implemented program/activities, b. it is prepared on behalf on an organization and approved by the highest
leader, c. it is prepared on a paper that includes the organization’s identity, name,
and address,d. it is prepared in a standard reporting format.
Third, a report is a tool for advocacy, marketing, and resource mobilization. A report strengthens the organization’s credibility by demonstrating achievements, success in addressing challenges, and gaining lessons learned as well as future support and funding.
With an understanding on the three benefits above, it can be concluded that a report is for your interest as the organization or program manager, not for others. Our mindset about reporting should be changed from ‘to other people’ into ‘to ourselves’.
You cannot expect other people to read your report if you yourself never read it carefully. Likewise, you also cannot expect your report to be useful or used by other people if you have not been using it beforehand.
The “mindset” that my report is useful for myself so I can better manage the organization or program should be attached in your mind. With that, reporting does not become a burden, but instead you enjoy writing a report.
Planning and Reporting Guidelines Palang Merah Indonesia
133
a. Relevant and useful. Reporting should have specific objective/use. Avoid excessive, unnecessary, or expensive reports or information.
b. Timely. Reporting should be timely to be used. Information will have less value if it comes late or rarely be provided for the intended purpose. Timeliness means planning the report writing and allocating sufficient time for it, not doing it randomly.
c. Complete. Reporting should provide sufficient information to be used. It is critical to make sure that the content of the report fulfills the requirements of a specific report.
d. Reliable. Reporting should provide accurate facts.
e. Simple and easy to use. Reporting should be relevant to the target audiences. The reporting language and format should be clear, concise, and easy to understand.
f. Consistent. Reporting should adopt the units and formats that enable comparison from time to time, so that the progress of indicators can be continuously tracked.
a. Engage other people in the drafting process, but make sure to have one person responsible/in charge. This engagement could be done through discussion or written feedback.
b. Use executive summary or brief information/analysis to summarize the overall status of the project/ program and to highlight challenges or key issues that need to be addressed.
5.3. Characteristics of Quality Report
5.4. Tips for Developing a Useful Report
Planning and Reporting Guidelines Palang Merah Indonesia
134
c. Allocate one part of the report to identify specific actions that have to be taken to address the findings and report recommendation, as well as the people responsible and the timeline for doing them.
d. Clear, succinct, and avoid long sentences- avoid jargon, statistic, and over use of technical terms. Remove unnecessary information and words.
e. Use formats, such as bold or underline graphics, photos, captions, and examples to highlight or explain information.
f. Accurate, balance, not taking side, and use logic to arrange the report.
g. Follow the use of PMI/organization’s format, writing guidelines, and the use of PMI emblem accurately.
h. Check the spelling and grammar.
a. PMI has a standard and simple reporting pattern in order to ease the monitoring and evaluation on PMI’s progress and activities, qualitatively or quantitatively at all levels.
b. PMI at all levels can use the information from the report to improve program performance, to share information for advocacy, and to improve PMI’s accountability.
c. PMI at all levels can document the results of completed activities as valuable promotional materials to the government and other parties such as donors and private companies.
5.5. Purpose of Reporting Guideline
Planning and Reporting Guidelines Palang Merah Indonesia
135
Incidental Report, is a report that should be provided in emergency condition to inform the activities completed and the fund spent in emergency situation. The report consists of:
a. Disaster incident report (the format refers to the Disaster Management Guidelines).
b. Short-term emergency response report, for example during disaster (the format refers to the disaster response guidelines).
Periodical Report, is a regular report on the implementation of work plan, including PMI operations and services in line with the assigned indicators.
Periodical report comprises of:a. Monthly Report b. Quarterly Reportc. Semester Reportd. Annual Report
To develop these reports, an Activity Report is required, prepared as soon as an activity is completed. Formats for these reports are provided in the following page.
For different, more specific types of report, such as financial report, logistic supply report, asset inventory report, training report, and others should be reported separately in line with the technical guidelines for each reporting.
For information which describes the organization capacity, it can be collected in a short term through specific assessment or survey
5.6. Types of Report
Planning and Reporting Guidelines Palang Merah Indonesia
136
In the Quarterly and Annual Report, PMI will also use Indicator Tracking Table (ITT). ITT is a simple monitoring tool to document and monitor project/program indicators performance in a sustainable manner in order to find out progress of the achievement. The information in the ITT is as follow:
1. Title. For example “Indicator Tracking Table for Work Plan of PMI Branch/Chapter/Division/Bureau/Unit Year 20xx”.
2. List of all indicators for each outcome and output.
3. Measurement period (actual per quarter/per year/end of project/program; or cumulative from time to time). The determination of measurement period highly depends on the indicator statement. For example: “Number of Program Report submitted in 3 months”; this will certainly be measured by actual every quarter. Vice versa, “Number of village that completes HVCA for a year”, can be measured cumulatively every quarter.
4. Baseline value and implementation date. The baseline value is normally relevant only for specific indicators at the outcome level (e.g. indicators on knowledge, attitude, and practice). However, at the output level, the baseline value is normally “Not Applicable”.
5. Target value, actual achievement, and comparison between actual and target (in %) for each quarter and end of year.
There are several rules in using the ITT, i.e.:
1. You should understand when to write “0” or “Not Applicable/NA” or “Unknown/UK”.
9 If the achievement is still zero or has no progress then write “0”; 9 If the target or achievement is not relevant to be achieved by the respective period or it has been achieved in the previous period then write “NA”; 9 If there is no information related to a certain indicator because the data is not available yet or incomplete then write “UK”.
2. Target cannot be “0”, it should be greater than “0”, (target can be number or percentage). If there is no target for a certain quarter, the write “NA”.
5.7. Indicator Tracking Table - ITT
Planning and Reporting Guidelines Palang Merah Indonesia
137
3. You cannot change target at will (either the quantity or the timeline). For example, if the target for Quarter I (10 villages that completed HVCA) is not achieved, you cannot move that target to Quarter II.
If you achieve it in Quarter II, the target in Quarter II is “NA”, meanwhile the actual is “10” and % of the actual/target is “NA”. With that, readers will understand that the target was achieved but delayed.
4. You should pay attention to the percentage of actual per target either for each quarter or annual, and during the life of project/program (LoP). Look at the variance or the gap; each gap of less or more than 10-20% should be explained further in the project/program report.
5. If the indicators are assessed regularly, observe when to use the highest or final achievement on annual achievement or LoP achievement. This depends on the indicator statement. Examples will be provided during training.
One of the key role of ITT is to help identifying the gaps or differences between the target and the actual result or the percentage of target achievement. By observing the gap, it will help the analysis and reporting of the project/program performance, as well as target setting. Knowing whether the indicator performance is exceeding or under the target helps to decide if the project/program is on track, or requires an adjustment in the implementation or timeline.
Planning and Reporting Guidelines Palang Merah Indonesia
138
ACTIVITY REPORT
1. Title of Activity
2 Date and location of implementation
3 Budget (IDR): Advance (IDR): Actual (IDR): Balance (IDR)(Advance-Actual)
4 Number of participants/beneficiaries : Total : M : F :
5 Activity Results (Provide information on target and actual, e.g.: Training: number of people trained/certified; Workshop: document completed; Monitoring: findings, issues addressed; Procurement:: number of item.)
6 Challenges/ Issues encountered (i.e. challenges during preparation or implementation of activity, e.g.: administration, finance, logistic, participant/community participation, etc.)
7 Solution conducted/taken (i.e. action taken to address or reduce the impact of challenges/issues in point 6.)
8 Suggestions for improvement ( i.e. recommendation to improve the quality of activity implementation in the future)
9 Follow up required (i.e. follow ups needed in order to sustain the activity results.)
REPORTED BY: ACKNOWLEDGED BY:
*Attach the ToR as well as photos of activity (2-3 pcs)** This format can also be used for trip report, adjust the information to be included (Attach the ToR, Memo, or Assignment Letter).
A. ACTIVITY REPORT
An Activity Report comprises brief information on the implementation of each activity in 1-2 pages. An Activity Report is used as: 1) supporting document for financial report, 2) references for monthly report , and 3) staff performance documentation.
The daily or routine operational activities at the office are not included in this activity report, but can be reflected in the Monthly Report .
An Activity Report is developed by staff and submitted to the Head of his/her Working Unit (Head of Division/Bureau/Department/Section) in 3 days at the latest after activity completion, in format as follow:
5.8. PMI Reporting Formats for All Levels
Planning and Reporting Guidelines Palang Merah Indonesia
139
B. MONTHLY REPORT
A Monthly Report includes information on the implementation of all activities planned, date of implementation, results achieved, brief description of implementation process, challenges encountered, follow up, and activity plan for the following month.
At PMI Branch/Chapter, Monthly Report is developed by the Head of Working Unit and reported to the Head of Office, to be then compiled and reported to the Board Members. At the NHQ, the Monthly Report is submitted by the Head of Division/Bureau/Unit to the Head of Office and copied to the Board Members. A Monthly Report is submitted the 5th of the following month at the latest. For example, the January 2015 Report is submitted by 5 February 2015 at the latest. The Monthly Report is prepared in 2-5 pages using the format below:
MONTHLY REPORT OF PMI BRANCH/CHAPTER/DIVISION/BUREAU/UNIT OF PMI NHQ MONTH___________, YEAR ________
I. Summary of Activity Implementation Matrix
II. Analysis
2.1. Activity and Budget Plan vs Actual (Describe briefly whether all activities planned were implemented.
Were all intended results achieved? If there were any results not achieved/completed, explain why and what should be done afterward. Describe the causes of variance between budget and actual, especially if more than 10 %.)
2.2. Implementation Process (Describe briefly about the implementation quality, e.g. on
training: explain about the quality of facilitator, participant’s participation and results, as well as follow up plan after the training. For awareness raising activity in the community, explain the topic and messages disseminated, what was the role of PMI/village volunteers, what behaviors agreed to be done. For meetings, explain the decisions needed to be followed up. Include photos of activity.)
No Activity Date and Location of Implementation
Budget (3 variables) Actual Activity Results
1
2
3
etc.
Planning and Reporting Guidelines Palang Merah Indonesia
140
2.3. Challenges/Issues Encountered (Describe in specific 1-3 main challenges/issues encountered,
the causes and impact, and what have been/need to be done to address them.)
2.4. Follow up Required (Describe the follow up needed to sustain the activity results.)
III. Information about Regular Activities (Office Operations)
(Describe briefly about the implementation of regular Office activities, as well as challenges encountered and follow up, if any).
IV. Activity Plan for the following Month
Developed/reported by: Acknowledged/approved by
_______________________ _______________________
No Activity Date of Implementation Budget
1
2
3
etc.
Planning and Reporting Guidelines Palang Merah Indonesia
141
C. QUARTERLY REPORT
A Quarterly Report is a compilation and analysis from Monthly Reports that describes the achievement of indicators in PMI work plan. At Branches and Chapters, the Quarterly Report is submitted by the Head of Office to the Board Members. At the NHQ, the Quarterly Report is submitted by the Head of Division/Bureau/Unit to the Head of Office and copied to the Board Members.
The Quarterly Report is submitted by the 10th of the following month at the latest. For example, the January-March 2015 Report is submitted on 10 April 2015. The Quarterly Report is prepared in 10 pages at maximum using the format below.
QUARTERLY REPORT OF PMI BRANCH/CHAPTER/DIVISION/BUREAU OF PMI NHQQUARTER ____________, YEAR __________
I. Summary of Key Achievements(Describe briefly the achievement of key activities in the last 3 months. For example:30 KSR were trained and mobilized200 YRC members received coaching from volunteers500 community members received free medicationetc.)
Planning and Reporting Guidelines Palang Merah Indonesia
142
II.
Indi
cato
r Tr
acki
ng T
able
or
ITT
ITT
is a
sim
ple
tabl
e to
doc
umen
t th
e pr
ogre
ss o
f in
dica
tor
achi
evem
ent
from
tim
e to
tim
e. F
ill in
the
ITT
in li
ne w
ith
the
guid
elin
es p
rovi
ded
unde
r po
int
5.7
on t
he p
revi
ous
page
s.
Not
e/Re
mar
ks:
1.
Incl
ude
obje
ctiv
e st
atem
ents
(St
rate
gic
Obj
ecti
ve,
Out
com
e, a
nd O
utpu
t) fi
rst
befo
re t
he i
ndic
ator
s.
2.
List
rel
evan
t in
dica
tors
und
er o
utco
me
and
outp
ut s
tate
men
ts.
Indi
cato
r nu
mbe
ring
sho
uld
be t
he s
ame
wit
h th
e on
e in
the
Ope
rati
onal
Pla
n.
Wor
k Pl
an In
dica
tors
Qua
rter
I (J
an-M
ar
20xx
)Q
uart
er II
(A
pr-J
un
20xx
)Q
uart
er II
I (Ju
l-Se
p 20
xx)
Qua
rter
IV (
Oct
-Dec
20
xx)
Ye
ar 2
0xx
Targ
etAc
tual
%Ta
rget
Actu
al%
Targ
etAc
tual
%Ta
rget
Actu
al%
Targ
etAc
tual
%St
rate
gic
Obj
ecti
ve 1
Out
com
e 1.
2.
3. 5.
Out
put
1.2.
1.
6. 9.
Out
com
e 1.
3.
13.
Out
put
1.3.
1.
16.
17.
Stra
tegi
c O
bjec
tive
2
Out
com
e 2.
1.
29.
etc.
Planning and Reporting Guidelines Palang Merah Indonesia
143
No Activity Implementation Timeline Budget
1
2
Etc.
Time Total Budget Total Actual % Actual/Budget
Month-1
Month-2
Month-3
Total 3 months
III. Financial Information (Rupiah)
IV. Analysis
a. Description of variance/gaps between target and actual. (Describe factors causing differences between activity planning and
implementation, indicator target and actual, budget versus actual, especially if the gap is more than 10 %.)
b. Description of relations between activity, indicator achievement, output and outcome.
(Describe the links between indicator achievement toward output, and then how the output contributes to outcome. What needs to be done to ensure that such links exist in achieving PMI strategic objectives? Include photos of activity .)
c. Issues/challenges as well as follow up solution. (Describe in specific 2-3 issues/challenges encountered, causes and
impacts, as well as what have/need to be done to address them.)
V. Activity Plan for the Following Quarter
Developed/reported by: Acknowledged/approved by
_______________________ _______________________
Planning and Reporting Guidelines Palang Merah Indonesia
144
D. SEMESTER REPORT
A Semester Report comprises of information needed to be submitted by each National Society to the International Federation of Red Cross and Red Crescent (IFRC). PMI NHQ can fulfill the needs of information if all Branches submit their Semester Reports. The availability of information from PMI at the international level is an indication that documentation and reporting system in all levels of PMI is working well.
Considering the variety of program implemented by different National Societies across the world, it is very difficult or even impossible to measure their performance specifically. Therefore, IFRC uses ‘Proxy Indicators’, i.e. indirect indicators that can describe the performance or capacity of a National Society. The 7 proxy indicators are:
1. Number of volunteers involved in services: people who provide at least four hours per year to support different PMI activities.
2. Number of staff paid: people who work at local PMI office for at least three months period and receive salary.
3. Number of blood donors: people who donate blood at least once a year.
4. Number of PMI Sub-districts, Branches, Chapters.5. Number of people served: people who receive PMI services indirectly,
either from regular or emergency services.6. Amount of total income: amount of money received by PMI every
year, either from the government, donors, private companies, communities, or from different resource mobilization activities.
7. Amount of total expenditures: amount of money used for operational and services need in a year.
This information will be distributed to all PMI stakeholders in Indonesia or at the international level. The Semester Report should be submitted by PMI Branches to PMI Chapters twice a year, i.e. on July 5th and January 5th.
Afterward, PMI Chapters will compile semester reports from all Branches in its areas, and submit it to PMI NHQ on July 20th and January 20th. Below is the format of Semester Report for PMI Branches and Chapters.
Planning and Reporting Guidelines Palang Merah Indonesia
145
Developed/reported by: Acknowledged/approved by
_______________________ _______________________
SEMESTER REPORT OF PMI XXXX BRANCH YEAR 20XX
No Data needed Semester 1 Semester 2
1 Number of Youth Red Cross (YRC) members still active* to date.
Active if involved in the YRC unit activities or with PMI at least
once in the last six month.
Elemen-tary
M
F
Total
Second-ary
M
F
Total
Senior
M
F
Total
2 Number of volunteers (KSR/TSR) involved in PMI activities at least once in the last 6 months.
M
F
Total
3 Number of Voluntary Blood Donors who donated blood at least once in the last 6 months
M
F
Total
4 Number of staff paid (either by PMI, government, or donors). M
F
Total
5 Number of people who received direct benefit from emergency response/ relief services
a. Individual beneficiaries M
F
Total
b. Head of Household beneficiaries Total
6 Number of people receiving direct benefit from non-emergency services
a. Health Services M
F
Total
b. Social Services M
F
Total
c. Community Empowerment (DRR, ICBRR)
M
F
Total
7 Total income (IDR)
8 Total expenditures (IDR)
9 Number of PMI Sub-District
Planning and Reporting Guidelines Palang Merah Indonesia
146
Description on information included in the Semester Report matrix:
1. Active YRC members are YRC members either elementary, secondary, or senior in all schools who participated in YRC activities at school or with local PMI Branch at least once in the last six month. If someone participated in more than one activities in the last 6 months, then he/she is still counted as one person. Data should be disaggregated by sex.
2. If a KSR/TSR member participated in more than one activities in the last 6 months, then he/she is still counted as one person. Data should be disaggregated by sex.
3. If a Voluntary Blood Donor donated more than once in the last 6 months, then he/she is still counted as one person. Data should be disaggregated by sex.
4. Clear. Data should be disaggregated by sex.
5. Direct beneficiaries from emergency response/relief services are divided into two categories, i.e. :
a. Individuals impacted by disaster and received different assistances directly for local PMI Branch, such as field kitchen, health services, water/sanitation services, and other individual services. Data should be disaggregated by sex (if available).
b. Head of Households who received assistance in form of packages (family kit, hygiene kit, tool kit, baby kit, and other package assistance).
If in a specific location affected by disaster (Village A), PMI provided more than one service to individuals, then use data with the highest figure. For example, in Village A District X, 500 people received health services, 800 people received water distribution, and 750 people received public kitchen service. Then, the data used is the highest one, i.e. 800 people who received water distribution. The figure included in point 5.a. is the total individual from the highest figure receiving services in all locations.
Another example for point 5.b., for example 70 HHs received family kit, 85 HHs received hygiene kit, and 45 HHs received baby kit. Then, the figure used is the highest one, i.e. 85 HHs who received hygiene kit. The figure to be included in point 5.b. is the total HHs from the highest figure who received package assistance in all locations.
In order to collect the information accurately, data from the initial assessment results to the population affected by disasters can be a very important reference.
Planning and Reporting Guidelines Palang Merah Indonesia
147
6. Direct beneficiaries from non-emergency assistance are individuals who are targeted by PMI projects/program in normal time, comprises of:
a. PMI health services, e.g. free medication, health clinic service, ambulance service, Siaga Lebaran (Posko during Eid holiday) service, etc. Data should be disaggregated by sex (if available).
b. PMI social services, e.g. free mass circumcision, cataract surgery, special material assistance (optical eyeglasses, crutch, etc.), PSP for non –emergency context, etc. Data should be disaggregated by sex (if available).
c. Community empowerment activities, i.e. activities conducted by mobilizing existing resources in the community. E.g., promoting communities to work together, health/DRR education, disaster risk mitigation, etc. Data should be disaggregated by sex (if available).
7. Total income is the amount of total fund received from different sources per semester. E.g., from local government, donor agencies, community groups, individuals, companies, etc.
8. Total expenditures is the amount of total fund spent per semester, including operational, program services, and emergency responses.
9. Number of PMI Sub-district is the communities supported by PMI located in an area equals to sub-district and affiliated with PMI Branch.
Planning and Reporting Guidelines Palang Merah Indonesia
148
COMPILATION OF PMI BRANCHES SEMESTER REPORT IN XXXX CHAPTER YEAR XXXX
No Data Needed Branch A
Branch B
Branch C Etc.
1 Number of Youth Red Cross (YRC) members still active* to date.
Active if involved in the YRC unit activities or with PMI at least
once in the last six month.
Elemen-tary
M
F
Total
Secondary
M
F
Total
Senior
M
F
Total
2 Number of volunteers (KSR/TSR) involved in PMI activities at least once in the last 6 months.
M
F
Total
3 Number of Voluntary Blood Donor who donated blood at least once in the last 6 months
M
F
Total
4 Number of staff paid (either by PMI, government, or donors). M
F
Total
5 Number of people who received direct benefit from emergency response/ relief services
a. Individual beneficiaries M
F
Total
a. Head of Household beneficiaries Total
6 Number of people receiving direct benefit from non-emergency services
a. Health services M
F
Total
b. Social services M
F
Total
a. Community empowerment (DRR, ICBRR)
M
F
Total
7 Total income (IDR)
8 Total expenditures (IDR)
9 Number of PMI Sub-district
Developed/reported by: Acknowledged/approved by:
__________________________ __________________________
Planning and Reporting Guidelines Palang Merah Indonesia
149
E. ANNUAL REPORT
An Annual Report is the materials prepared for the board members’ accountability to be reported during the Branch/Chapter/National Annual Meeting.
At the Branch, the Annual Report is developed by the Head of Office by compiling the Quarterly Report. Afterward, the Head of Office reports it to the Board Members to receive feedback/approval. The Annual report will be submitted to PMI Chapter and copied to PMI NHQ.
At the Chapter, the Annual Report is developed by each Division/Unit, to be compiled afterward by the Head of Office to become PMI Chapter’s Annual Report. The Head of Office then reports it to the Board members to receive feedback/approval. The Annual Report is submitted to PMI NHQ.
At the NHQ, the Annual Report is developed by the Head of Division/Bureau, to be reported to the Head of Office and Board Members. Afterward, the Head of Office establishes a team to consolidate the Annual Reports from the Divisions/Bureaus to become the Annual Report for the Annual Meeting.
At each level, the Annual Report should be submitted by December/January at the latest. The Annual report is prepared in 30 pages at maximum using the following format:
ANNUAL REPORT OF PMI BRANCH/CHAPTER/DIVISION/BUREAU OF PMI NHQ YEAR__________ 1. Report Summary
Description of Report Summary9 Key activities results 9 Total amount of money received and spent 9 Total number of direct beneficiaries and information on geographical area (sub-district/administrative village, village/RW, hamlet/RT, school/institution)9 Impact of activity implemented on PMI capacity building9 Recommendation for future work plan
Planning and Reporting Guidelines Palang Merah Indonesia
150
2. In
dica
tor
Trac
king
Tab
le
Not
e/Re
mar
ks:
1.
Incl
ude
obje
ctiv
e st
atem
ents
(St
rate
gic
Obj
ecti
ve,
Out
com
e, a
nd O
utpu
t) fi
rst
befo
re t
he i
ndic
ator
s.
2.
List
rel
evan
t in
dica
tors
und
er o
utco
me
and
outp
ut s
tate
men
ts.
Indi
cato
r nu
mbe
ring
sho
uld
be t
he s
ame
wit
h th
e on
e in
the
Ope
rati
onal
Pla
n.
Wor
k Pl
an In
dica
tors
Q
uart
er I
(Jan
-Mar
20
xx)
Qua
rter
II (
Apr
-Jun
20
xx)
Qua
rter
III (
Jul-
Sep
20xx
)Q
uart
er IV
(O
ct-D
ec
20xx
)Ye
ar 2
0xx
Targ
etAc
tual
%Ta
rget
Actu
al%
Targ
etAc
tual
%Ta
rget
Actu
al%
Targ
etAc
tual
%St
rate
gic
Obj
ecti
ve 1
Out
com
e 1.
2.
3. 5.
Out
put
1.2.
1.
6. 9.
Out
com
e 1.
3.
13.
Out
put
1.3.
1.
16.
17.
Stra
tegi
c O
bjec
tive
2
Out
com
e 2.
1.
29.
etc.
Planning and Reporting Guidelines Palang Merah Indonesia
151
Source Amount (Rupiah) Remarks
Donation from communi-ties/ institutions
Business Units
Government
Donors/Partners
Timeline Total Budget Total Actual % Actual/Budget
Quarter I (Jan-Mar)
Quarter II (Apr-Jun)
Quarter III (Jul-Sep)
Quarter IV (Oct-Dec)
Year 20xx
End of year balance (Rupiah):
3. Financial Information
a. Income
b. Expenditures
4. Analysis/Discussion
a. Achievement of outcome indicators and success story (Describe achievement of each outcome indicator for 1 year, what are
the factors supporting the achievements; e.g. leadership from board members/staff, volunteer activeness, stakeholder/communities participation/supports, etc. Select 3-5 success stories about PMI activities and describe each in 1 paragraph.)
b. Description of differences between target and actual. (Describe what causes differences between targets and actual which
are more than 10% for indicator achievement and budget actual.)
Planning and Reporting Guidelines Palang Merah Indonesia
152
c. Description of relations between achievement of output, outcome, and strategic objective.
(Describe how the output achievement contributes to outcome achievement and ultimately leads to strategic objective achievement. What needs to be done to ensure the sustainability of those achievements?)
d. Issues/challenges and follow up solutions. (Describe specific challenges/issues encountered, their causes and
impacts, and what have been/needs to be done to address/solve them.)
e. Organizational management and work plan implementation. (Describe how the board members/Head of Office/Head of Division/
Bureau: 1) manage the activity implementation and assure the quality of results, 2) manage resources (staff, fund, asset), 3) manage time/schedule of activity implementation, 4) communicate and coordinate with PMI stakeholders at different levels and external stakeholders, 5) manage planning, monitoring, evaluation, and reporting process.)
f. Relevance (Relevance is the correspondence between activities or services with
the needs of the organization or the communities. Describe whether the activities or services conducted by PMI are in line with the needs of the organization or the communities served. Mention the activities or services which are considered less/not relevant and why is that so.)
g. Sustainability (What are the results of PMI activities which will potentially be
sustainable in the future, and what are the supporting factors for their sustainability.)
h. Lessons learned (Describe positive lessons learned that should be maintained or
replicated; and also negative lessons that should be anticipated or avoided in the future. These lessons learned focus on three main topics, i.e.1) organizational/work plan management, 2) service to communities, and 3) coordination with stakeholders.)
i. Recommendation for work plan of the following year (Provide several recommendations needed to maintain or expand the
results/positive impact achieved.)
Planning and Reporting Guidelines Palang Merah Indonesia
153
j. Photo Annex (This includes relevant important information, supporting documents,
photos, etc. Photos should represent all types of activities conducted during the year, starting from meetings, program service, training, etc. Visibility of PMI logo should be displayed as much as possible in the photos.)
5. Closing
(Including signatures and name of board members (chairman of respective local PMI.))
Developed/reported by: Acknowledged/approved by:
__________________________ __________________________
Planning and Reporting Guidelines Palang Merah Indonesia
154
A quality and timely report is an evidence that you are accountable and trustworthy.
Your report is useful to inform decision making in managing PMI work plan and organization
in your Office .
VI. ANNEXES
Anne
xes
Planning and Reporting Guidelines Palang Merah Indonesia
155
1. S
AM
PLE
OF
AN
NU
AL
WO
RK P
LAN
MAT
RIX
OF
PMI S
UKA
RIA
BRA
NCH
Ann
ex 1
. Sa
mpl
e of
PM
I Bra
nch
Plan
ning
Doc
umen
t
Out
com
eO
utco
me
Indi
cato
rTa
rget
for
O
utco
me
Indi
cato
rO
utpu
tO
utpu
t In
dica
tor
Targ
et f
or
Out
put
Indi
cato
rA
ctiv
ity
Budg
et
STRA
TEG
IC O
BJEC
TIVE
1:T
o bu
ild a
wel
l-fu
ncti
onin
g PM
I at
all l
evel
s, w
ith
the
capa
city
to
crea
te s
yner
gy b
etw
een
prog
ram
act
ivit
ies
wit
h th
e or
gani
zati
onal
pol
icie
s, p
roce
dure
s, a
nd
syst
em.
Out
com
e 1.
2.PM
I’s S
tatu
tes,
O
rgan
izat
iona
l Pr
oced
ures
(PO
),
and
Impl
emen
tati
on
Gui
delin
es (
Jukl
ak),
as
wel
l as
the
lega
l pr
oduc
ts is
sued
are
in
stit
utio
naliz
ed a
t al
l le
vels
.
4.
PMI N
HQ
/ Ch
apte
rs/
Br
anch
es c
ondu
cted
An
nual
Mee
ting
in
acco
rdan
ce w
ith
the
assi
gned
sch
edul
e.
Dec
embe
r 20
15O
utpu
t 1.
2.1.
PMI S
tatu
tes,
O
rgan
izat
iona
l Pro
cedu
res
(PO
), a
nd Im
plem
enta
tion
G
uide
lines
, as
wel
l as
lega
l pro
duct
s ar
e in
pl
ace
and
impl
emen
ted
at a
ll le
vels
.
6.
PMI C
hapt
ers/
Bran
ches
re
ceiv
e di
ssem
inat
ion
of
info
rmat
ion
on s
tatu
tes.
10 p
eopl
e (B
oard
M
embe
rs
and
Staf
f)
1.
Dis
sem
inat
e PM
I St
atut
es t
o St
aff
and
Boar
d M
embe
rs.
IDR
500,
000
8.
Num
ber
of P
MI e
mpl
oyee
s w
ho h
ave
wri
tten
em
ploy
men
t co
ntra
cts
5 pe
ople
2.
Dev
elop
HR
regu
lati
on.
IDR
1,00
0,00
0
9.
PMI N
HQ
/Cha
pter
s/ B
ranc
hes
deve
lop
asse
t in
vent
ory
in li
ne w
ith
the
tech
nica
l gu
idel
ines
.
Nov
embe
r 20
153.
Re
gist
er a
sset
s ba
sed
on im
plem
enta
tion
/te
chni
cal g
uide
lines
.
IDR
0
10.
PMI C
hapt
ers/
Bran
ches
hav
e H
R re
gula
tion
in p
lace
.M
arch
201
54.
U
pdat
e em
ploy
ee
data
base
.ID
R 0
11.
PMI C
hapt
ers/
Bran
ches
hav
e em
ploy
ee d
atab
ase
that
is
upda
ted
on a
nnua
l bas
is .
Nov
embe
r 20
155.
Co
nduc
t An
nual
M
eeti
ng.
IDR
6,00
0,00
0
Out
com
e 1.
3.PM
I’s P
lann
ing,
M
onit
orin
g, E
valu
atio
n,
and
Repo
rtin
g (P
MER
) sy
stem
is
wel
l-fu
ncti
onin
g at
all
leve
ls.
13.
PMI N
HQ
/ Ch
apte
rs/
Bran
ches
de
velo
p an
nual
w
ork
plan
in li
ne
wit
h th
e Pl
anni
ng
and
Repo
rtin
g G
uide
lines
.
Dec
embe
r 20
15O
utpu
t 1.
3.1.
PM
I Boa
rd M
embe
rs a
nd
staf
f at
all
leve
ls a
re
regu
larl
y co
ache
d on
th
e im
plem
enta
tion
of
Plan
ning
, M
onit
orin
g,
Eval
uati
on,
and
Repo
rtin
g (P
MER
) sy
stem
by
com
pete
nt f
acili
tato
rs.
17.
PMI C
hapt
ers/
Bran
ches
re
ceiv
e in
form
atio
n re
gard
ing
the
Plan
ning
and
Rep
orti
ng
Gui
delin
es.
3 pe
ople
1.
Part
icip
ate
in t
he S
P/O
P di
ssem
inat
ion
wor
ksho
p
IDR
13,2
30,0
00
14.
PMI N
HQ
/ Ch
apte
rs/
Bran
ches
de
velo
p an
an
ual r
epor
t in
line
w
ith
the
Plan
ning
an
d Re
port
ing
Gui
delin
es
Dec
embe
r 20
152.
Co
nduc
t w
orks
hop
to d
evel
op a
nnua
l w
ork
plan
and
ann
ual
repo
rt.
IDR
4,00
0,00
0
Planning and Reporting Guidelines Palang Merah Indonesia
156
Out
com
eO
utco
me
Indi
cato
rTa
rget
for
O
utco
me
Indi
cato
rO
utpu
tO
utpu
t In
dica
tor
Targ
et f
or
Out
put
Indi
cato
rA
ctiv
ity
Budg
et
STRA
TEG
IC O
BJEC
TIVE
2:
To s
tren
gthe
n th
e ca
paci
ty o
f PM
I’s o
rgan
izat
iona
l res
ourc
es a
t al
l lev
els,
bot
h it
s hu
man
res
ourc
es a
nd t
he f
acili
ties
and
infr
astr
uctu
re n
eede
d to
ser
ve t
he c
omm
unit
ies.
Out
com
e 2.
1.PM
I’s H
R M
anag
emen
t th
at in
clud
es
recr
uitm
ent,
tr
aini
ng,
assi
gnm
ent,
su
perv
isio
n, r
ewar
d an
d re
cogn
itio
n as
w
ell a
s pe
rfor
man
ce
eval
uati
on is
im
prov
ed.
29.
Perc
enta
ge o
f br
anch
vol
unte
er
(KSR
/TSR
) in
acti
ve
for
a ye
ar .
<20%
Out
put
2.1.
1.H
uman
res
ourc
es w
ith
tech
nica
l and
man
ager
ial
skill
s ar
e av
aila
ble
and
trai
ned
to c
arry
out
the
ir
mai
n ta
sks
and
func
tion
s at
all
leve
ls..
36.
Num
ber
of b
ranc
h vo
lunt
eer
in s
peci
aliz
ed s
kill
sets
of
prio
rity
I/II/
III s
ervi
ces.
50 p
eopl
e1.
Co
nduc
t Ba
sic
KSR
trai
ning
.ID
R 10
,000
,000
30.
Perc
enta
ge o
f br
anch
vol
unte
er
(YRC
/KSR
/TSR
) w
ho
has
take
n pa
rt in
br
anch
es’
acti
viti
es
on q
uart
erly
bas
is.
>50%
37.
Num
ber
of e
mpl
oyee
of
PMI
NH
Q/C
hapt
ers/
Bra
nche
s w
ho
atte
nd t
echn
ical
tra
inin
g.
3 pe
ople
2.
Send
per
sonn
el
to p
arti
cipa
te in
Am
bula
nce
Crew
Tr
aini
ng.
IDR
5,00
0,00
0
31.
Num
ber
of s
choo
l in
Dis
tric
ts t
hat
has
acti
ve Y
outh
Red
Cr
oss
(YRC
) un
it.
10 s
choo
lsO
utpu
t 2.
1.3.
Volu
ntee
r (K
SR,
TSR,
in
clud
ing
corp
orat
e/
orga
niza
tion
/ins
titu
tion
vo
lunt
eers
) an
d YR
C m
anag
emen
t gu
idel
ines
is
impl
emen
ted
at a
ll le
vels
.
40.
PMI C
hapt
ers/
Bran
ches
or
gani
ze Y
outh
gat
heri
ng
(Jum
bara
).
July
201
51.
Co
nduc
t vo
lunt
eer
coac
hing
eve
ry t
hree
m
onth
s.
IDR
1,00
0,00
0
2.
Upd
ate
volu
ntee
r da
taba
se.
IDR
0
3.
Sele
ct y
outh
gat
heri
ng
part
icip
ants
at
YRC
unit
s.
IDR
2,50
0,00
0
4.
Cond
uct
yout
h ga
ther
ing.
IDR
40,0
00,0
00
Out
com
e 2.
3.Av
aila
bilit
y of
bas
ic
supp
orti
ng f
acili
ties
an
d in
fras
truc
ture
s fo
r PM
I ope
rati
on is
in
crea
sed.
55.
PMI C
hapt
ers/
Br
anch
es h
ave
acti
ve/
func
tion
ing
POSK
O.
Sinc
e Ap
ril
2015
Out
com
e 2.
3.2.
PMI a
sset
s an
d ba
sic
faci
litie
s/in
fras
truc
ture
ar
e m
anag
ed in
line
wit
h th
e gu
idan
ce p
rovi
ded.
61.
PMI C
hapt
ers/
Bran
ches
su
bmit
ass
et in
vent
ory
to P
MI
NH
Q o
n an
nual
bas
is.
Nov
embe
r 20
151.
As
sign
vol
unte
er s
hift
at
Posk
o.ID
R 21
,600
,000
2.
Part
icip
ate
in ‘
apel
si
aga’
of
Chap
ter’
s Po
sko.
IDR
0
3.
Mon
itor
ear
ly w
arni
ng
info
rmat
ion
from
BPB
D
on r
egul
ar b
asis
.
IDR
0
4.
Reco
rd a
nd d
isse
min
ate
earl
y w
arni
ng
info
rmat
ion
to P
MI
Chap
ter.
IDR
0
5.
Dev
elop
and
sub
mit
as
set
inve
ntor
y re
gist
er.
IDR
500,
000
Planning and Reporting Guidelines Palang Merah Indonesia
157
Out
com
eO
utco
me
Indi
cato
rTa
rget
for
O
utco
me
Indi
cato
rO
utpu
tO
utpu
t In
dica
tor
Targ
et f
or
Out
put
Indi
cato
rA
ctiv
ity
Budg
et
STRA
TEG
IC O
BJEC
TIVE
3:
To im
prov
e th
e qu
alit
y of
dis
aste
r an
d he
alth
em
erge
ncy
resp
onse
s ac
ross
Indo
nesi
a, e
ithe
r in
ter
ms
of r
apid
ness
, co
vera
ge,
and
effe
ctiv
enes
s of
the
ser
vice
s
Out
com
e 3.
1.PM
I per
sonn
el’s
ca
paci
ty s
peci
aliz
ing
in
emer
genc
y re
spon
se is
st
reng
then
ed.
69.
Num
ber
of d
isas
ter
resp
onse
sim
ulat
ion
by P
MI B
ranc
hes
in
line
wit
h th
e So
P.
1 ti
me
Out
put
3.1.
1.D
isas
ter
Resp
onse
(S
atga
na)
team
and
em
erge
ncy
resp
onse
sp
ecia
lists
are
av
aila
ble
and
read
y fo
r m
obili
zati
on a
t al
l lev
els,
in
clud
ing
at t
he r
egio
nal
and
nati
onal
leve
ls,
in
line
wit
h th
e So
P.
70.
Num
ber
of S
ATG
ANA
team
m
embe
rs a
t PM
I Bra
nche
s .
30 p
eopl
e1.
Co
nduc
t SA
TGAN
A Tr
aini
ng.
IDR
50,0
00,0
00
2.
Dev
elop
SAT
GAN
A te
am
assi
gnm
ent
cale
ndar
.ID
R 0
Out
put
3.1.
2.D
isas
ter
resp
onse
si
mul
atio
n is
org
aniz
ed
by P
MI a
t al
l lev
els
in li
ne
wit
h th
e ne
eds
and
the
deve
lope
d co
ntin
genc
y pl
an.
72.
Num
ber
of d
isas
ter
resp
onse
si
mul
atio
n ac
tivi
ties
co
nduc
ted
by P
MI a
t N
HQ
/Ch
apte
rs/
Bran
ches
ann
ually
.
1 ti
me
1.
Cond
uct
coor
dina
tion
m
eeti
ng f
or s
imul
atio
n pr
epar
atio
n w
ith
diff
eren
t st
akeh
olde
rs.
IDR
6,00
0,00
0
2.
Cond
uct
pre-
sim
ulat
ion
exer
cise
.ID
R 3,
000,
000
3.
Cond
uct
disa
ster
re
spon
se s
imul
atio
n.ID
R 15
,000
,000
Out
com
e 3.
2.Av
aila
bilit
y of
em
erge
ncy
resp
onse
eq
uipm
ent
in li
ne w
ith
the
acco
unta
bilit
y st
anda
rd is
incr
ease
d.
73.
Num
ber
of
bene
ficia
ries
re
ache
d by
PM
I Bra
nche
s’
emer
genc
y re
spon
se
serv
ices
.
Actu
alO
utpu
t 3.
2.1.
Stan
dard
equ
ipm
ent
for
emer
genc
y re
spon
se,
incl
udin
g co
mm
unic
atio
n eq
uipm
ent
for
coor
dina
tion
as
wel
l as
doc
umen
tati
on a
nd
repo
rtin
g fo
rmat
s ar
e in
pl
ace
and
oper
atio
nal a
t al
l lev
els.
75.
PMI B
ranc
hes
have
at
leas
t fo
ur e
quip
men
t fo
r em
erge
ncy
resp
onse
tea
m.
Augu
st 2
015
1.
Cond
uct
proc
urem
ent
proc
ess
for
emer
genc
y re
spon
se g
ears
.
IDR
60,5
00,0
00
76.
PMI B
ranc
hes
have
at
leas
t tw
o co
mm
unic
atio
n eq
uipm
ent
for
emer
genc
y si
tuat
ion.
Augu
st 2
015
2.
Cond
uct
proc
urem
ent
proc
ess
for
emer
genc
y co
mm
unic
atio
n eq
uipm
ent.
IDR
20,0
00,0
00
3.
Reco
rd b
enefi
ciar
ies
base
d on
gui
delin
es.
IDR
0
Out
com
e 3.
3.Em
erge
ncy
resp
onse
m
anag
emen
t sy
stem
is
impl
emen
ted
by P
MI a
t al
l lev
els.
79.
Num
ber
of
emer
genc
y in
cide
nt
resp
onde
d by
PM
I Br
anch
es w
ithi
n th
e fir
st s
ix h
ours
.
Actu
alO
utpu
t 3.
3.1.
Fram
ewor
k, g
uide
lines
, an
d So
P fo
r em
erge
ncy
resp
onse
ope
rati
on a
nd
coor
dina
tion
mec
hani
sm
are
in p
lace
and
ado
pted
by
PM
I at
all l
evel
s.
83.
Num
ber
of in
cide
nt r
epor
t su
bmit
ted
by P
MI B
ranc
hes
to
PMI N
HQ
/Cha
pter
s.
Actu
al1.
Co
nduc
t di
sast
er
resp
onse
bas
ed o
n So
P.ID
R 5,
000,
000
Planning and Reporting Guidelines Palang Merah Indonesia
158
Out
com
eO
utco
me
Indi
cato
rTa
rget
for
O
utco
me
Indi
cato
rO
utpu
tO
utpu
t In
dica
tor
Targ
et f
or
Out
put
Indi
cato
rA
ctiv
ity
Budg
et
80.
Amou
nt o
f co
ntin
genc
y fu
nd
owne
d by
PM
I NH
Q/
Chap
ters
/ Br
anch
es.
IDR
5.00
0.00
0O
utpu
t 3.
3.3.
Cont
inge
ncy
plan
is
upda
ted
by P
MI a
t al
l le
vels
on
annu
al b
asis
.
85.
PMI N
HQ
/Cha
pter
s/ B
ranc
hes
deve
lop
annu
al C
onti
ngen
cy
Plan
.
Febr
uary
20
151.
D
evel
op/u
pdat
e Co
ntin
genc
y Pl
an.
IDR
6,00
0,00
0
81.
PMI N
HQ
/ Ch
apte
rs/
Bran
ches
dev
elop
re
spon
se o
pera
tion
pl
an w
ithi
n 3x
24
hour
s af
ter
the
emer
genc
y in
cide
nt.
Actu
alO
utpu
t 3.
3.4.
Ea
rly
war
ning
info
rmat
ion
is f
orw
arde
d to
the
co
mm
unit
ies
in t
imel
y m
anne
r.
86.
Num
ber
of e
arly
war
ning
in
form
atio
n fo
rwar
ded
by P
MI B
ranc
hes
to lo
cal
com
mun
itie
s.
Actu
al1.
M
onit
or e
arly
war
ning
in
form
atio
n.ID
R 0
Out
put
3.3.
5.
The
need
for
RFL
ser
vice
in
bot
h no
rmal
and
em
erge
ncy
peri
ods
is
follo
wed
up
by P
MI a
t al
l le
vels
.
87.
Num
ber
of R
FL c
ase
follo
wed
up
by
PMI B
ranc
hes
unti
l the
pr
oced
ure
is c
ompl
eted
.
Actu
al1.
D
evel
op n
etw
orki
ng
wit
h re
leva
nt
stak
ehol
ders
tha
t ca
n pr
ovid
e in
form
atio
n on
RF
L ne
eds
(hos
pita
l,
polic
e, e
tc.)
IDR
500,
000
2.
Faci
litat
e di
ssem
inat
ion
of in
form
atio
n re
late
d to
RFL
.
IDR
500,
000
STRA
TEG
IC P
LAN
4:
To s
tren
gthe
n co
mm
unit
y re
silie
ncy
in o
rder
to
redu
ce t
he r
isks
and
impa
ct o
f di
sast
ers
and
dise
ases
thr
ough
dis
aste
r pr
epar
edne
ss,
heal
th,
and
soci
al p
rogr
ams,
als
o re
ferr
al h
ealt
h se
rvic
es.
Out
com
e 4.
1.PM
I’s c
apac
ity
in
man
agin
g co
mm
unit
y-ba
sed
disa
ster
pr
epar
edne
ss a
nd
heal
th p
rogr
am is
st
reng
then
ed.
82.
PMI B
ranc
hes
have
at
leas
t fiv
e vi
llage
s re
ceiv
ing
inte
rven
tion
sup
port
ev
ery
year
.
2 vi
llage
sO
utpu
t 4.
1.2.
Ad
equa
te s
uppo
rtin
g m
ater
ials
/too
ls f
or
com
mun
ity-
base
d di
sast
er p
repa
redn
ess
and
heal
th p
rogr
ams
(e.g
. IE
C m
ater
ials
, m
odel
ing
equi
pmen
t, M
&E
tool
s)
are
avai
labl
e.
95.
Num
ber
of IE
C M
ater
ial
dist
ribu
ted
to c
omm
unit
ies
by P
MI B
ranc
hes.
Actu
al1.
D
istr
ibut
e IE
C m
ater
ials
to
com
mun
itie
s.ID
R 50
0,00
0
1.
PMI B
ranc
hes
have
at
leas
t fiv
e sc
hool
s re
ceiv
ing
inte
rven
tion
sup
port
ev
ery
year
.
5 sc
hool
sO
utpu
t 4.
1.3.
Co
mm
unit
y -b
ased
di
sast
er p
repa
redn
ess
and
heal
th p
rogr
am a
ctiv
itie
s ar
e im
plem
ente
d by
co
mpe
tent
PM
I sta
ff/
volu
ntee
rs/f
acili
tato
rs a
t al
l lev
els
96.
Num
ber
of c
omm
unit
y-ba
sed
prog
ram
s im
plem
ente
d by
PM
I Bra
nche
s.
1 pr
ogra
m1.
Co
nduc
t tr
aini
ng o
n co
mm
unit
y-ba
sed
prog
ram
to
PMI s
taff
an
d vo
lunt
eers
.
IDR
25,0
00,0
00
2.
Num
ber
of h
ealt
hy
scho
ols
at P
MI
Bran
ches
’ w
orki
ng
area
.
5 sc
hool
s98
. N
umbe
r of
sta
ff/
volu
ntee
rs
at P
MI N
HQ
/Cha
pter
s/
Bran
ches
tra
ined
on
com
mun
ity-
base
d pr
ogra
m.
10 p
eopl
e2.
Se
lect
tar
get
villa
ges/
co
mm
unit
ies
IDR
3,00
0,00
0
Planning and Reporting Guidelines Palang Merah Indonesia
159
Out
com
eO
utco
me
Indi
cato
rTa
rget
for
O
utco
me
Indi
cato
rO
utpu
tO
utpu
t In
dica
tor
Targ
et f
or
Out
put
Indi
cato
rA
ctiv
ity
Budg
et
3.
Num
ber
of d
isas
ter-
prep
ared
sch
ool
at P
MI B
ranc
hes’
w
orki
ng a
rea.
5 sc
hool
s3.
Co
nduc
t H
VCA
at
sele
cted
vill
ages
/co
mm
unit
ies
IDR
5,00
0,00
0
4.
Num
ber
of d
irec
t be
nefic
iary
fro
m P
MI
Bran
ch’s
dis
aste
r pr
epar
edne
ss
prog
ram
.
40 p
eopl
e4.
D
evel
op p
lan
wit
h co
mm
unit
ies.
IDR
5,00
0,00
0
5.
Num
ber
of d
irec
t be
nefic
iary
fro
m
PMI B
ranc
hes’
co
mm
unit
y-ba
sed
heal
th p
rogr
am.
40 p
eopl
e5.
Im
plem
ent
com
mun
ity-
base
d pr
ogra
m b
ased
on
join
t pl
anni
ng w
ith
the
com
mun
ity
IDR
10,0
00,0
00
6.
Reco
rd b
enefi
ciar
ies
base
d on
gui
delin
es.
IDR
0
ROU
TIN
E A
CTIV
ITIE
S AT
TH
E O
FFIC
E1.
Co
nduc
t bo
ard
mem
bers
pl
enar
y m
eeti
ng e
very
m
onth
IDR
1,20
0,00
0
2.
Cond
uct
coor
dina
tion
m
eeti
ng b
etw
een
Hea
d of
Offi
ce w
ith
Staf
f.
IDR
1,20
0,00
0
3.
Cond
uct
Offi
ce a
nd
asse
t m
aint
enan
ce.
IDR
6,00
0,00
0
4.
Pay
elec
tric
ity,
wat
er,
phon
e, a
nd g
as b
ills.
IDR
12,0
00,0
00
5.
Dev
elop
act
ivit
y re
port
an
d pe
riod
ical
rep
orts
(m
onth
ly,
quar
terl
y).
IDR
0
TOTA
L BU
DG
ETID
R 34
0,73
0,00
0
Planning and Reporting Guidelines Palang Merah Indonesia
160
2. Budget Summary
3. Proposed Activity from PMI Sukaria Branch to PMI Suka Suka Chapter (10):
Budget Category Amount (Rupiah) Percentage (Amount of Rupiah/ Total x 100%)
Operational (salary, electricity, telephone, fuel, stationeries, etc.) IDR 102,219,000 30%
Services (regular services/program activities) IDR 170,365,000 50%
Emergency/Response (specifically for emergency assistance) IDR 68,146,000 20%
TOTAL BUDGET IDR 340,730,000 100%
No. Proposed Activity Implementation Schedule Reason for Proposing the Activity
1 Conduct PMER Training. August 2015 To strengthen the capacity of the board members and staff before conducting annual meeting.
2 Provide basic DR equipment (rubber boat, tent, and field kitchen equipment).
July 2015 Sukaria District is a flood prone district, thus it requires equipment supports.
Planning and Reporting Guidelines Palang Merah Indonesia
161
4. D
etai
led
Impl
emen
tati
on P
lan
- W
ork
Plan
of
PMI S
ukar
ia B
ranc
h, Y
ear
2015
No
Act
ivit
yBu
dget
Impl
emen
tati
on T
imel
ine
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Okt
Nov
Dec
1D
isse
min
ate
PMI
Stat
utes
to
Staf
f an
d Bo
ard
Mem
bers
.
IDR
500,
000
X2
Dev
elop
HR
regu
lati
on.
IDR
1,00
0,00
0X
3Re
gist
er a
sset
s ba
sed
on im
plem
enta
tion
/te
chni
cal g
uide
lines
.
IDR
0
X4
Upd
ate
empl
oyee
da
taba
se.
IDR
0X
X5
Cond
uct
Annu
al
Mee
ting
.ID
R 6,
000,
000
X6
Part
icip
ate
in t
he S
P/O
P di
ssem
inat
ion
wor
ksho
pID
R 13
,230
,000
X7
Cond
uct
wor
ksho
p to
de
velo
p an
nual
wor
k pl
an a
nd a
nnua
l rep
ort.
IDR
4,00
0,00
0
XX
8Co
nduc
t Ba
sic
KSR
Trai
ning
.ID
R 10
,000
,000
Xet
c.
TOTA
L BU
DG
ETID
R xx
x xx
x
Planning and Reporting Guidelines Palang Merah Indonesia
162
SAMPLE OF ACTIVITY REPORT
Annex 2. Sample of PMI Branch Reports
ACTIVITY REPORT OF PMI SUKARIA BRANCH
1. Title of Activity SP/OP Dissemination Workshop
2 Date and Location of Implementation PMI Sukaria Office, 26 February 2015
3 Budget (IDR): Advance (IDR): Actual (IDR) Balance (IDR) (Advance-Actual)
13,230,000 10,000,000 8,525,000 1,475,000
4 Number of participants/ beneficiaries Total : M : F :
30 ppl (Board members and Staff)
20 ppl 10 ppl
5 Activity results PMI Strategic Plan and Operational Plan 2014-2019 PMI Planning and Reporting Guidelines
6 Challenges/issues encountered The understanding on Operational Plan outcome and output indicators is still lacking.
Practice session for work plan development is a bit short and not comprehensive.
7 Solution conducted/taken Request for technical support from PMI Chapter in a form of guidance and knowledge exploration to be incorporated into the planning document.
8 Suggestions for improvement It requires a comprehensive Planning, Monitoring, Evaluation, and Reporting training in Sukaria Branch.
9 Follow up required Send a letter to PMI Chapter requesting for technical support in work plan development.
Send letter to PMI NHQ requesting PMER training.
REPORTED BY:
TUTUNG TARUTUNG Staff of Organizational Division
ACKNOWLEDGED BY:
DENDI MAHMUDHead of Office
Planning and Reporting Guidelines Palang Merah Indonesia
163
No Activity Date and Location of Implementation
Budget(3 variables) Actual Activity Results
1 Volunteer coaching in form of coordination meeting between volunteers with board members.
PMI Sukaria Office,2 March 2015
IDR 250,000 IDR 227,000 38 volunteers attended.
The Secretary attended to represent the board members.
SAMPLE OF MONTHLY REPORT
PMI SUKARIA BRANCH MARCH 2015 REPORT
I. Summary of Activity Implementation Matrix
II. Analysis
2.1. Activity and Budget Plan vs Actual Coordination meeting between volunteers and board members is a new initiative implemented for the first time by Sukaria Branch, as a form of volunteer coaching/development activities. This meeting was initiated on 5 March 2015; 38 KSR attended and had a dialogue with the Secretary.
From the total budget amounted of IDR 1,000,000 allocated for a year, four meetings were planned with budget division of IDR 250,000 per meeting. The budget spent for this initial meeting is IDR 227,000; IDR 77,000 was used for consumption and IDR 150,000 for KSR local transport.
2.2. Implementation ProcessThis initial meeting was responded positively by the KSRs; most of them mentioned that this was an opportunity for them to have a dialogue with the board members and to share ideas and challenges they were facing. The participation from participants was good. The main results of this meeting was the request to reactivate basic KSR training sessions, because the last session conducted was more than six months ago. They need a refresher.
The Secretary welcomed this request considering that it had been included in the work plan. The plan is that it will be conducted in April 2015. However, the technical implementation will be discussed further with the staff.
Planning and Reporting Guidelines Palang Merah Indonesia
164
No Activity Date of Implementation Budget
1. Board members plenary meeting 8 April 2015 IDR 100,000
2. Coordination meeting between Head of Office and staff
10 April 2015 IDR 100,000
3. Basic KSR training 23-27 April 2015 IDR 10,000,000
Developed/reported by:
DENDI MAHMUD, Head of Office
Acknowledged/approved by:
JOKO SAMBODO, Chairman
2.3. Challenges/ Issues Encountered To date, PMI Sukaria does not have human resource with sufficient capacity to facilitate basic KSR training.
2.4. Follow up requiredPMI Sukaria will send a letter to PMI Chapter to request for support of trainer to facilitate basic KSR training session to be carried out.
III. Information about Regular Activities (Office Operations)
9 The February 2015 Monthly Report has been submitted to the board members to be discussed in the board plenary meeting.9 The board members plenary meeting was conducted on 11 March 2015, with consumption cost amounted to IDR 85,000.9 Coordination Meeting between Head of Office and Staff was conducted on 13 March 2015 to follow up the results of board members plenary meeting, with consumption cost amounted to IDR 64,000.9 Electricity, water, phone, and gas bills had been paid with a total amount IDR 843,000.
IV. Activity Plan for the following Month
Planning and Reporting Guidelines Palang Merah Indonesia
165
SAMPLE OF QUARTERLY REPORT
QUARTER I (Jan-Mar) 2015 REPORTPMI SUKARIA BRANCH
I. Summary of Key Achievements
Nine personnel of PMI Sukaria Branch received dissemination of PMI Statutes, which consists of 5 staff and 4 board members.
Three personnel of PMI Sukaria Branch participated in SP/OP dissemination workshop organized by PMI NHQ in Jakarta. The workshop was attended by the Secretary, Board Member for OD, and Head of Office.
The first volunteer development activity was initiated on 5 March 2015 in form of coordination meeting between volunteers and board members. This meeting was attended by 38 KSRs, the Secretary, and staff from Volunteer Division.
Planning and Reporting Guidelines Palang Merah Indonesia
166
II. In
dica
tor
Trac
king
Tab
le
Wor
k pl
an In
dica
tors
Qua
rter
I (J
an-M
ar 2
015)
Qua
rter
II (
Apr
-Jun
20
15)
Qua
rter
III (
Jul-
Sep
2015
)Q
uart
er IV
(O
ct-D
es
2015
)Ye
ar 2
015
Targ
etAc
tual
%Ta
rget
Actu
al%
Targ
etAc
tual
%Ta
rget
Actu
al%
Targ
etAc
tual
%
STRA
TEG
IC O
BJEC
TIVE
1:
To b
uild
a w
ell-
func
tion
ing
PMI a
t al
l lev
els,
wit
h th
e ca
paci
ty t
o cr
eate
syn
ergy
bet
wee
n pr
ogra
m a
ctiv
itie
s w
ith
the
orga
niza
tion
al p
olic
ies,
pro
cedu
res,
and
sys
tem
.
Out
com
e 1.
2.
PMI’s
’ St
atut
es,
Org
aniz
atio
nal P
roce
dure
s (P
O),
and
Impl
emen
tati
on G
uide
lines
, as
wel
l as
the
lega
l pro
duct
s is
sued
are
inst
itut
iona
lized
at
all l
evel
s
4. P
MI
Bran
ch c
ondu
cted
Ann
ual
Mee
ting
in
acco
rdan
ce w
ith
the
assi
gned
sch
edul
e.N
AN
AN
AN
AN
AN
A1
NA
NA
Out
put
1.2.
1.PM
I Sta
tute
s, O
rgan
izat
iona
l Pro
cedu
res
(PO
), a
nd Im
plem
enta
tion
Gui
delin
es (
Jukl
ak),
as
wel
l as
lega
l pro
duct
s ar
e in
pla
ce a
nd im
plem
ente
d at
all
leve
ls
6. P
MI
Bran
ch r
ecei
ve d
isse
min
atio
n of
inf
or-
mat
ion
on s
tatu
tes.
109
90%
NA
NA
NA
109
90%
8.
Num
ber
of
PMI
empl
oyee
s w
ho
have
w
ritt
en e
mpl
oym
ent
cont
ract
s N
AN
AN
AN
AN
A5
5N
AN
A
9.
PMI
Bran
ch d
evel
ops
asse
t in
vent
ory
in
line
wit
h th
e te
chni
cal g
uide
lines
.N
AN
AN
AN
AN
A1
1N
AN
A
10.
PMI B
ranc
h ha
s H
R re
gula
tion
in p
lace
.1
00%
NA
NA
NA
10
0%
11.
PMI B
ranc
h h
as e
mpl
oyee
dat
abas
e th
at
is u
pdat
ed o
n an
nual
bas
is .
NA
NA
NA
NA
NA
11
NA
NA
Out
com
e 1.
3.PM
I’s P
lann
ing,
Mon
itor
ing,
Eva
luat
ion,
and
Rep
orti
ng (
PMER
) sy
stem
is
wel
l-fu
ncti
onin
g at
all
leve
ls.
13.
PMI
Bran
ch d
evel
ops
annu
al w
ork
plan
in
lin
e w
ith
the
Plan
ning
and
Rep
orti
ng
Gui
delin
es.
NA
NA
NA
NA
NA
11
NA
NA
14.
PMI B
ranc
h de
velo
ps a
nnua
l re
port
in l
ine
wit
h th
e Pl
anni
ng a
nd R
epor
ting
Gui
delin
es.
NA
NA
NA
NA
NA
11
NA
NA
Out
put
1.3.
1.
PMI b
oard
mem
bers
and
sta
ff a
t al
l lev
els
are
regu
larl
y co
ache
d on
the
impl
emen
tati
on o
f Pl
anni
ng,
Mon
itor
ing,
Eva
luat
ion,
and
Rep
orti
ng (
PMER
) sy
stem
by
com
pete
nt f
acili
ta-
tors
17.
PMI
Bran
ch r
ecei
ve i
nfor
mat
ion
rega
rdin
g th
e Pl
anni
ng a
nd R
epor
ting
Gui
delin
es .
33
100%
NA
NA
NA
33
100%
Etc.
Planning and Reporting Guidelines Palang Merah Indonesia
167
Time Total Budget Total Actual % Actual/Budget
Month-1 IDR 2,200,000 IDR 1,639,000 74.5%
Month-2 IDR 15,930,000 IDR 14,723,000 92%
Month-3 IDR 1,950,000 IDR 1,219,000 62.5%
Total 3 months IDR 20,080,000 IDR 17,581,000 87.6%
III. Financial Information (Rupiah)
III. Analysis
a. Description of variance/gaps between target and actual. Indicator 10 could not be achieved as per target in March 2015 due to the lack
of references needed by OD staff in developing a human resource guidelines. Coordination has been conducted with PMI Chapter to request support for this activity, and this indicator is expected to be achieved in quarter II.
b. Description of relations between activity, indicator achievement, output and outcome.
The completion of internal workshop to disseminate the statutes has contributed to the achievement of indicator 6 by 90%, which contributed to output 1.2.1. However, the delay in the achievement of indicator 10 also reduced the contribution for the respective output. Meanwhile, the participation of PMI Sukaria in SP/OP dissemination workshop contributed to the achievement of indicator 17 by 100%, which further supported the achievement of output 1.3.1.
c. Issues/challenges as well as follow up solutions. Staff and board members still have some difficulties in understanding several
parts of SP/OP, and to operationalize those objectives into the 2016 work plan. OD staff also had challenges in seeking for references to develop the HR regulation.
Both of these challenges will be coordinated with PMI Chapter so that they can provide assistance. Aside from that, the ability of PMI Sukaria in understanding the strategic plan and operational plan as well as in developing objective-based work plan will be strengthened with the forthcoming PMER training facilitated by PMI NHQ.
Planning and Reporting Guidelines Palang Merah Indonesia
168
No Activity Implementation Timeline Budget
1 Conduct basic KSR training April week-4 IDR 10,000,000
2 Send personnel to participate in ambulance training
May week-2 IDR 5,000,000
3 Develop HR regulation May week-2 - 4 IDR 1,000,000
4 Update employee database June week-1 IDR 0
5 Conduct coordination meeting between volunteers and board members
June week-1 IDR 250,000
Developed/reported by:
DENDI MAHMUD, Head of Office
Acknowledged/approved by:
JOKO SAMBODO, Chairman
To address those issues, PMI Sukaria will send a letter to PMI Chapter requesting for an assistance in preparing the work plan and organizational policies, and send a letter to PMI NHQ to request for PMER Training.
IV. Activity Plan for the Following Quarter
PMI’s Planning, Monitoring, Evaluation, and Reporting (PMER) System will be well-functioning if this Planning and Reporting Guidelines is used effectively.
A good PMER system will contribute to the achievement of Strategic Objective 1:“To build a well-functioning PMI at all levels, with the capacity to create synergy between program activities with the organizational policies, procedures, and system.”
Markas Pusat Palang Merah Indonesia
Jl. Jend. Gatot Subroto Kav. 96, Jakarta 12970, IndonesiaTelp. +62 21 7992335, Fax. +62 21 7995188
Email: [email protected]: www.pmi.or.id
PMER is Everybody’s BusinessPMER adalah Tanggung Jawab Bersama