A project is a set of activities and their
associated information that constitutes a planfor creating a product or service. A projecthas a start date and finish date, WBS,
resource assignments and expenses. It canalso include risks, work documents andproject-specific codes and calendars.
Jan 2008 Sl ide 2
-
8/14/2019 Planning and S h d Li Pl
3/37
Charac t er is t ic s of a Pro ec t 5 Aspects of a Project
, , ,
For a Project Management Software, It covers
Schedule: Timeline core
Resource: Man, Material, Plant
Cost: Mone
Risk: Identify, classify and quantify Life Span of a Project
Planning: establish baseline when project starts
Controlling: monitoring, updating during projectexecu on
Managing: changes, variations and revision
,
Jan 2008 Sl ide 3
-
8/14/2019 Planning and S h d Li Pl
4/37
- In SMART Way
Specific: scope of work to be clearly defined Measurable: able to measure progress (%),
resource (MH) and cost ($)
Achievable: realistic based on currentroductivit
Resource Availability: make ready for man,
Time-bound: have start and finish date
Jan 2008 Sl ide 4
-
8/14/2019 Planning and S h d Li Pl
5/37
Add a project to EPS and assign one of OBS, ,
account, duration type, percent completion type
Project environment Set up project WBS Add a list of activities
Determine activitys duration based on volume ofwork, production rate and past work experience
ss gn a to act v ty
Link activities ocate resources to act v ty rom resource poo Allocate cost to activity
c e u e pro ect, rev ew an esta s ase neJan 2008 Sl ide 5
-
8/14/2019 Planning and S h d Li Pl
6/37
w a y
Record progress, manhour and cost and
Analyze and report project status using
Revise baseline when there are substantial
the actual construction any more
Lean construction (last planner) application
Jan 2008 Sl ide 6
-
8/14/2019 Planning and S h d Li Pl
7/37
Per form anc e Measurem ent
w t arne a ue et o :
,Work Schedule): Budget x Schedulecom letion % % of ori inal duration time
elapsed) Actual Cost AC ACWP Actual Cost of Work
Performed): Actual cost up to data date
Earned Value EV BCWP Bud eted Cost ofWork Performed): Budget x Actual completion% (PCT)
Jan 2008 Sl ide 7
-
8/14/2019 Planning and S h d Li Pl
8/37
-
8/14/2019 Planning and S h d Li Pl
9/37
Per form anc e Measurem ent
w i t h Earned Va lue Met hod :
Suppose we plan to finish an activity by June 1w a u ge o , or . s nowJune 1 (data date, or measurement date), and we
ave spen , or , u on y(PCT) of the work is complete (EV, or= , x = , . e are no on y
behind schedule (SV=EV-PV=$7,000-$10,000= -, , u over u ge = - = , -$9,000= - $2,000.
Jan 2008 Sl ide 9
-
8/14/2019 Planning and S h d Li Pl
10/37
ecor an con ro u ge c anges
Record and track issues Define and monitor thresholds
prioritize
products (deliverables) and documents
Jan 2008 Sl ide 10
-
8/14/2019 Planning and S h d Li Pl
11/37
Lean Const ruc t ion Conc e t It is weekly execution plan
Executed under trade-based roduction unit
What Jobs to Execute?
Constraints removed, resource sufficient, material on hand,prerequisite work completed, working area available
Production rate achievable
Design team leader; Production unit head; Area superintendent;Crew foreman
Job Assignment
No overloading. Prefer slightly under-loading to ensure smooth.
What if the plan fail?
Find out root reasons. Go alternative work from the backlog
Jan 2008 Sl ide 11
(backlog: incomplete make-ready works from previous period)
-
8/14/2019 Planning and S h d Li Pl
12/37
Mast er Sc hedu le, 6 w eek s
Look ahead and Last Planner
Master
Schedule Lookahead Schedule
Last Planner's Weekly
Work Plan
Purpose BaselineCPM sequence, matchlabor & resource Execution of ready activities
Detail Level Level 2 Level 3 Level 4Entire
Data Date - W1 past. Plan for W2 to W6
W1 past. Plan for W2 and
W3Certainty Low Middle High
Inherited from master
Jan 2008 Sl ide 12
-
8/14/2019 Planning and S h d Li Pl
13/37
ou r m avera ro ec
Jan 2008 Sl ide 13
-
8/14/2019 Planning and S h d Li Pl
14/37
P6 Module Overview
Jan 2008 Sl ide 14 Global (Enterprise, root of EPS) -> EPS -> Project -> WBS -> Activity
-
8/14/2019 Planning and S h d Li Pl
15/37
Module: Feat ures
Centralised database for all project data (datares es on server
Layout presentation and grouping based on
Work Breakdown Structure (WBS) Hierarchal structure on EPS OBS ro ects
activities, resources and costs with codes and
values
Jan 2008 Sl ide 15
-
8/14/2019 Planning and S h d Li Pl
16/37
Est ab l ish t he Env i ronm ent
Enterprise Project Structure (EPS) Organisation Breakdown Structure (OBS)
Global Calendars
Resource pool Bud et structure
Coding structure like project code and activity
code for filterin rou in and data anal sis
Jan 2008 Sl ide 16
-
8/14/2019 Planning and S h d Li Pl
17/37
an
Enterprise Project Structure (EPS) Company-wide hierarchical project
breakdown Structure
Organisation Breakdown Structure (OBS) -
managers for the projects
Jan 2008 Sl ide 17
-
8/14/2019 Planning and S h d Li Pl
18/37
Side
PM1 PM2 PM3
PJ1
PJ2
PJ3
Jan 2008 Sl ide 18
EPS
-
8/14/2019 Planning and S h d Li Pl
19/37
OBSrocess v p ng qu p
mentnstru
mentectr ca onstruc
tion
A
B
Pro ectC
Pro ectD
Jan 2008 Sl ide 19
-
8/14/2019 Planning and S h d Li Pl
20/37
OBS Ex am ple
Jan 2008 Sl ide 20
-
8/14/2019 Planning and S h d Li Pl
21/37
EPS Ex am ple
Jan 2008 Sl ide 21
-
8/14/2019 Planning and S h d Li Pl
22/37
-
8/14/2019 Planning and S h d Li Pl
23/37
(WBS)
Deliverable-oriented hierarchy
,highest level, followed by strings of
level of work package
- .customised project-specific WBS
ay an essent a ro e n . t can eassigned OBS, resource, budget and tracked
y earne va ue or t e progress
Jan 2008 Sl ide 23
-
8/14/2019 Planning and S h d Li Pl
24/37
WBS Ex am ple
Jan 2008 Sl ide 24
-
8/14/2019 Planning and S h d Li Pl
25/37
WBS Ex am ple
Jan 2008 Sl ide 25
-
8/14/2019 Planning and S h d Li Pl
26/37
-
8/14/2019 Planning and S h d Li Pl
27/37
Coding St ruc t ure: Resourc e
Jan 2008 Sl ide 27
-
8/14/2019 Planning and S h d Li Pl
28/37
-
8/14/2019 Planning and S h d Li Pl
29/37
Resourc e and Role
Resource includes
Material
Role
Required personnel skill and proficiencylevel -> Job title and function
Resource calendar
Resource limit (availability) (MH / day) Resource cost ($ / MH)
Jan 2008 Sl ide 29
-
8/14/2019 Planning and S h d Li Pl
30/37
Resourc e and RoleRole
(Job Title)
(Job Title)
(Job Title)Resource 1
(Personnel )
Resource 2
Resource 3
ersonne
Resource
Jan 2008 Sl ide 30
-
8/14/2019 Planning and S h d Li Pl
31/37
Resourc e Ex am ple
Jan 2008 Sl ide 31
-
8/14/2019 Planning and S h d Li Pl
32/37
Role Ex am ple
Jan 2008 Sl ide 32
-
8/14/2019 Planning and S h d Li Pl
33/37
Bud et and Cost
-
Bottom-up approach: for accurate estimate u get tota an spen ng p an mont y
distribution)
esource ct onary an cost account Budgeted cost=Budgeted unit (man-hour) x
r ce per un or eac ac v y
Roll up to Project, EPS or WBS level
Jan 2008 Sl ide 33
-
8/14/2019 Planning and S h d Li Pl
34/37
-
8/14/2019 Planning and S h d Li Pl
35/37
Global EPS Node
Project-
specific
Resource
-specific RemarksLevel 1 is project. Level2 and down aredeliverables. The
WBS lowest level is the workpackage (or activity)
Cost Calandar
Global (Enterprise, root node of EPS) -> EPS -> Project -> WBS -> Work
Jan 2008 Sl ide 35
-
8/14/2019 Planning and S h d Li Pl
36/37
P3 Vs. P6
Jan 2008 Sl ide 36
P3 V P6
-
8/14/2019 Planning and S h d Li Pl
37/37
P3 Vs. P6
P3 P6 Remarks
Sco eProject based projectmana ement
Enterprise-wide projectmana ement
ProjectStructure Single
Multiple (EPS), Global(Enterprise)
Hierarchical Enterprise Project Structure(EPS)
Work Project managers for Hierarchical Organisation BreakdownReposibility Project manager multi-projects. OBS. Structure (OBS)
Have more weightLevel 1: project; Level 2 and down:deliverables (measurable products and
User Usually single user Multiple usersPC based 16-bit Server based Oracle For standalone, use MS SQL Server
File StructureMultiple files Single file (.xer)
PC based.
Pro ramme and data Database on serverArchitecture
residing on PC
Programme on station
Activity Code Main featuresHave less weight thanP3
Part of category, grouping and filteringfunction replaced by EPS
Driven
Predesessor
with * before an
predesessor Solid relationship line