    A project is a set of activities and their

    associated information that constitutes a planfor creating a product or service. A projecthas a start date and finish date, WBS,

    resource assignments and expenses. It canalso include risks, work documents andproject-specific codes and calendars.

    Jan 2008 Sl ide 2

  • 8/14/2019 Planning and S h d Li Pl

    3/37

    Charac t er is t ic s of a Pro ec t 5 Aspects of a Project

    , , ,

    For a Project Management Software, It covers

    Schedule: Timeline core

    Resource: Man, Material, Plant

    Cost: Mone

    Risk: Identify, classify and quantify Life Span of a Project

    Planning: establish baseline when project starts

    Controlling: monitoring, updating during projectexecu on

    Managing: changes, variations and revision

    ,

    Jan 2008 Sl ide 3

  • 8/14/2019 Planning and S h d Li Pl

    4/37

    - In SMART Way

    Specific: scope of work to be clearly defined Measurable: able to measure progress (%),

    resource (MH) and cost ($)

    Achievable: realistic based on currentroductivit

    Resource Availability: make ready for man,

    Time-bound: have start and finish date

    Jan 2008 Sl ide 4

  • 8/14/2019 Planning and S h d Li Pl

    5/37

    Add a project to EPS and assign one of OBS, ,

    account, duration type, percent completion type

    Project environment Set up project WBS Add a list of activities

    Determine activitys duration based on volume ofwork, production rate and past work experience

    ss gn a to act v ty

    Link activities ocate resources to act v ty rom resource poo Allocate cost to activity

    c e u e pro ect, rev ew an esta s ase neJan 2008 Sl ide 5

  • 8/14/2019 Planning and S h d Li Pl

    6/37

    w a y

    Record progress, manhour and cost and

    Analyze and report project status using

    Revise baseline when there are substantial

    the actual construction any more

    Lean construction (last planner) application

    Jan 2008 Sl ide 6

  • 8/14/2019 Planning and S h d Li Pl

    7/37

    Per form anc e Measurem ent

    w t arne a ue et o :

    ,Work Schedule): Budget x Schedulecom letion % % of ori inal duration time

    elapsed) Actual Cost AC ACWP Actual Cost of Work

    Performed): Actual cost up to data date

    Earned Value EV BCWP Bud eted Cost ofWork Performed): Budget x Actual completion% (PCT)

    Jan 2008 Sl ide 7

  • 8/14/2019 Planning and S h d Li Pl

    8/37

  • 8/14/2019 Planning and S h d Li Pl

    9/37

    Per form anc e Measurem ent

    w i t h Earned Va lue Met hod :

    Suppose we plan to finish an activity by June 1w a u ge o , or . s nowJune 1 (data date, or measurement date), and we

    ave spen , or , u on y(PCT) of the work is complete (EV, or= , x = , . e are no on y

    behind schedule (SV=EV-PV=$7,000-$10,000= -, , u over u ge = - = , -$9,000= - $2,000.

    Jan 2008 Sl ide 9

  • 8/14/2019 Planning and S h d Li Pl

    10/37

    ecor an con ro u ge c anges

    Record and track issues Define and monitor thresholds

    prioritize

    products (deliverables) and documents

    Jan 2008 Sl ide 10

  • 8/14/2019 Planning and S h d Li Pl

    11/37

    Lean Const ruc t ion Conc e t It is weekly execution plan

    Executed under trade-based roduction unit

    What Jobs to Execute?

    Constraints removed, resource sufficient, material on hand,prerequisite work completed, working area available

    Production rate achievable

    Design team leader; Production unit head; Area superintendent;Crew foreman

    Job Assignment

    No overloading. Prefer slightly under-loading to ensure smooth.

    What if the plan fail?

    Find out root reasons. Go alternative work from the backlog

    Jan 2008 Sl ide 11

    (backlog: incomplete make-ready works from previous period)

  • 8/14/2019 Planning and S h d Li Pl

    12/37

    Mast er Sc hedu le, 6 w eek s

    Look ahead and Last Planner

    Master

    Schedule Lookahead Schedule

    Last Planner's Weekly

    Work Plan

    Purpose BaselineCPM sequence, matchlabor & resource Execution of ready activities

    Detail Level Level 2 Level 3 Level 4Entire

    Data Date - W1 past. Plan for W2 to W6

    W1 past. Plan for W2 and

    W3Certainty Low Middle High

    Inherited from master

    Jan 2008 Sl ide 12

  • 8/14/2019 Planning and S h d Li Pl

    13/37

    ou r m avera ro ec

    Jan 2008 Sl ide 13

  • 8/14/2019 Planning and S h d Li Pl

    14/37

    P6 Module Overview

    Jan 2008 Sl ide 14 Global (Enterprise, root of EPS) -> EPS -> Project -> WBS -> Activity

  • 8/14/2019 Planning and S h d Li Pl

    15/37

    Module: Feat ures

    Centralised database for all project data (datares es on server

    Layout presentation and grouping based on

    Work Breakdown Structure (WBS) Hierarchal structure on EPS OBS ro ects

    activities, resources and costs with codes and

    values

    Jan 2008 Sl ide 15

  • 8/14/2019 Planning and S h d Li Pl

    16/37

    Est ab l ish t he Env i ronm ent

    Enterprise Project Structure (EPS) Organisation Breakdown Structure (OBS)

    Global Calendars

    Resource pool Bud et structure

    Coding structure like project code and activity

    code for filterin rou in and data anal sis

    Jan 2008 Sl ide 16

  • 8/14/2019 Planning and S h d Li Pl

    17/37

    an

    Enterprise Project Structure (EPS) Company-wide hierarchical project

    breakdown Structure

    Organisation Breakdown Structure (OBS) -

    managers for the projects

    Jan 2008 Sl ide 17

  • 8/14/2019 Planning and S h d Li Pl

    18/37

    Side

    PM1 PM2 PM3

    PJ1

    PJ2

    PJ3

    Jan 2008 Sl ide 18

    EPS

  • 8/14/2019 Planning and S h d Li Pl

    19/37

    OBSrocess v p ng qu p

    mentnstru

    mentectr ca onstruc

    tion

    A

    B

    Pro ectC

    Pro ectD

    Jan 2008 Sl ide 19

  • 8/14/2019 Planning and S h d Li Pl

    20/37

    OBS Ex am ple

    Jan 2008 Sl ide 20

  • 8/14/2019 Planning and S h d Li Pl

    21/37

    EPS Ex am ple

    Jan 2008 Sl ide 21

  • 8/14/2019 Planning and S h d Li Pl

    22/37

  • 8/14/2019 Planning and S h d Li Pl

    23/37

    (WBS)

    Deliverable-oriented hierarchy

    ,highest level, followed by strings of

    level of work package

    - .customised project-specific WBS

    ay an essent a ro e n . t can eassigned OBS, resource, budget and tracked

    y earne va ue or t e progress

    Jan 2008 Sl ide 23

  • 8/14/2019 Planning and S h d Li Pl

    24/37

    WBS Ex am ple

    Jan 2008 Sl ide 24

  • 8/14/2019 Planning and S h d Li Pl

    25/37

    WBS Ex am ple

    Jan 2008 Sl ide 25

  • 8/14/2019 Planning and S h d Li Pl

    26/37

  • 8/14/2019 Planning and S h d Li Pl

    27/37

    Coding St ruc t ure: Resourc e

    Jan 2008 Sl ide 27

  • 8/14/2019 Planning and S h d Li Pl

    28/37

  • 8/14/2019 Planning and S h d Li Pl

    29/37

    Resourc e and Role

    Resource includes

    Material

    Role

    Required personnel skill and proficiencylevel -> Job title and function

    Resource calendar

    Resource limit (availability) (MH / day) Resource cost ($ / MH)

    Jan 2008 Sl ide 29

  • 8/14/2019 Planning and S h d Li Pl

    30/37

    Resourc e and RoleRole

    (Job Title)

    (Job Title)

    (Job Title)Resource 1

    (Personnel )

    Resource 2

    Resource 3

    ersonne

    Resource

    Jan 2008 Sl ide 30

  • 8/14/2019 Planning and S h d Li Pl

    31/37

    Resourc e Ex am ple

    Jan 2008 Sl ide 31

  • 8/14/2019 Planning and S h d Li Pl

    32/37

    Role Ex am ple

    Jan 2008 Sl ide 32

  • 8/14/2019 Planning and S h d Li Pl

    33/37

    Bud et and Cost

    -

    Bottom-up approach: for accurate estimate u get tota an spen ng p an mont y

    distribution)

    esource ct onary an cost account Budgeted cost=Budgeted unit (man-hour) x

    r ce per un or eac ac v y

    Roll up to Project, EPS or WBS level

    Jan 2008 Sl ide 33

  • 8/14/2019 Planning and S h d Li Pl

    34/37

  • 8/14/2019 Planning and S h d Li Pl

    35/37

    Global EPS Node

    Project-

    specific

    Resource

    -specific RemarksLevel 1 is project. Level2 and down aredeliverables. The

    WBS lowest level is the workpackage (or activity)

    Cost Calandar

    Global (Enterprise, root node of EPS) -> EPS -> Project -> WBS -> Work

    Jan 2008 Sl ide 35

  • 8/14/2019 Planning and S h d Li Pl

    36/37

    P3 Vs. P6

    Jan 2008 Sl ide 36

    P3 V P6

  • 8/14/2019 Planning and S h d Li Pl

    37/37

    P3 Vs. P6

    P3 P6 Remarks

    Sco eProject based projectmana ement

    Enterprise-wide projectmana ement

    ProjectStructure Single

    Multiple (EPS), Global(Enterprise)

    Hierarchical Enterprise Project Structure(EPS)

    Work Project managers for Hierarchical Organisation BreakdownReposibility Project manager multi-projects. OBS. Structure (OBS)

    Have more weightLevel 1: project; Level 2 and down:deliverables (measurable products and

    User Usually single user Multiple usersPC based 16-bit Server based Oracle For standalone, use MS SQL Server

    File StructureMultiple files Single file (.xer)

    PC based.

    Pro ramme and data Database on serverArchitecture

    residing on PC

    Programme on station

    Activity Code Main featuresHave less weight thanP3

    Part of category, grouping and filteringfunction replaced by EPS

    Driven

    Predesessor

    with * before an

    predesessor Solid relationship line