planning authority submission - part a · 2018-05-14 · mildura planning scheme amendment c100...
TRANSCRIPT
MILDURA PLANNING SCHEME
AMENDMENT C100 (PART 2)
SIXTEENTH STREET GREENWAY INTERFACE
PLANNING AUTHORITY SUBMISSION - PART A
Panel Hearing Date: 21 May 2018
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 1 of 17
TABLE OF CONTENTS
AMENDMENT SUMMARY ................................................................................................... 1
1. INTRODUCTION ........................................................................................................... 2
2. AMENDMENT BACKGROUND ..................................................................................... 2
3. CHRONOLOGY OF EVENTS ........................................................................................ 7
4. STRATEGIC CONTEXT AND ASSESSMENT .............................................................. 9
5. INTERACTION BETWEEN ELEMENTS OF THE PLANNING FRAMEWORK ............ 11
6. ISSUES RAISED IN SUBMISSION ............................................................................. 13
7. POST EXHIBITION – PROPOSED CHANGES TO AMENDMENT C95 ...................... 16
8. CONCLUSION ............................................................................................................. 17
AMENDMENT SUMMARY
The Amendment Mildura Planning Scheme Amendment C100 (Part 2)
Area Affected Land on southern side of Sixteenth Street, Mildura between
Deakin Ave and Riverside Ave except for land in UGZ1,
PUZ1 or 623 Deakin Ave.
Purpose of Amendment Amendment implements objectives for pedestrian and
cycling priority environment along Sixteenth Street as in the
Mildura South Strategic Framework Plan 2007, the Mildura
South Precinct Structure Plan 2014 and the Mildura South
(Sixteenth & Deakin West) Development Plan 2014.
The Proponent Mildura Rural City Council
The Planning Authority Mildura Rural City Council
Authorisation 31 October 2017
Exhibition Period 10 November 2017 to 18 December 2017
Number of Submissions 6 Submissions
Council Response to
Submissions
28 March 2018
Panel Hearing 21 May 2018
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 2 of 17
1. INTRODUCTION
1.1. Mildura Rural City Council has prepared Amendment C100 (Part 2) to the Mildura
Planning Scheme. The Amendment implements the objectives for pedestrian and
cycling priority environment along Sixteenth Street as outlined in the Mildura South
Strategic Framework Plan 2007, the Mildura South Precinct Structure Plan 2014 and the
Mildura South (Sixteenth & Deakin West) Development Plan 2014.
1.2. The Amendment applies to land located on the southern side of Sixteenth Street, Mildura
between Deakin Avenue and Riverside Avenue except for land located in the Urban
Growth Zone1, Public Use Zone1 or 623 Deakin Avenue, Mildura located along this
stretch of Sixteenth Street.
1.3. The Amendment will ensure new development responds to the long-term vision of
Sixteenth Street as a Greenway as outlined in the above plans. The Amendment will
ensure that new development, visually addresses the Sixteenth Street Greenway and to
prevent the establishment of vehicle crossovers along this frontage to facilitate a
protected bicycle path in the Greenway corridor. It will further provide Council with a
clear set of design requirements to facilitate assessment of planning applications in this
area.
1.4. Amendment C100 (Part 2), therefore, proposes to make minor amendments to the
Municipal Strategic Statement and introduces the Design and Development Overlay –
Schedule 14 (DDO14).
2. AMENDMENT BACKGROUND
2.1. In the context of Mildura South, numerous planning documents (referenced in the
Mildura Planning Scheme) confirm a strategic vision for the creation of a greenway along
Sixteenth Street. The greenway is to form a high quality landscape corridor which will
facilitate and encourage walking and cycling, reducing an overall reliance on the motor
car and increasing social interactions between residents of this new growth area.
2.2. Structure Planning for Mildura South began in 2002 with the Sunraysia Drainage
Strategy (SDS) which identified the major stormwater drainage corridor through the
Mildura South area to an outlet into Lake Hawthorn. It addressed how urban and
irrigation development will be serviced with surface and sub−surface drainage
infrastructure. The SDS provides a long-term ‘blue print’ for the future management of
surface, sub-surface and stormwater drainage in the Sunraysia Region.
2.3. The Mildura Irymple Residential Land Strategy produced in 2003 projected that the
population of Mildura would increase by 34,750 between 2003 and 2031 which equates
to an annual average population growth rate of almost 2%. The Mildura South area was
identified by this study as one of three areas where this residential growth should occur
with a key recommendation to rezone 108 hectares of land to the south of Sixteenth
Street due to its capacity to be connected to existing or planning drainage infrastructure.
The study also recommended the preparation of a Development Contribution Plan for
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 3 of 17
all existing undeveloped land then zoned as Residential 1 in the study area along with
identifying the need for and location of community facilities in the proposed growth area
of Mildura South.
2.4. Planning Scheme Amendment C28, which resulted from a review of the Planning
Scheme in 2003 and involved a further review of the Mildura and Irymple Residential
Land Strategy also identified the need for additional areas of residential land to provide
for the residential needs to the year 2030. The Mildura South Development Contributions
Plan which complemented the residential land strategy and provided detailed costings
and distribution for the provision of necessary infrastructure.
2.5. Also forming C28 were the Development Plan Overlay (Schedule 1), Salinity
Management Overlay and Development Contributions Plan Overlay which covered,
along with other areas, the greenfield land south of Sixteenth Street located between
Deakin and Ontario Avenues included in the current Mildura South Precinct Structure
Plan.
2.6. The outcome of C28 was the recommendation to prepare a Structure Plan for Mildura
South.
2.7. In 2007, Council along with a team of consultants began work on preparing the Mildura
South Strategic Framework Plan (MSSFP). The purpose of the plan was to ensure that
growth envisaged in the Mildura Irymple Residential Land Strategy met land supply
demand and provided the highest standards of design, planning and sustainable
development.
2.8. The MSSFP identified two communities, one on either side of Deakin Avenue, each with
their own neighbourhood or local Activity centre adjacent to Sixteenth Street, which
would provide open space, play areas, community facilities such as health care uses as
well as medium density housing.
2.9. In March 2011, work was undertaken by Hansen Partnership along with Aurecon, James
Golsworthy Consulting, HillPDA and Capire Consulting to review the 2007 MSSFP and
prepare the Mildura South Urban Design Plan. The work involved reviewing the previous
work against the Growth Area Precinct Structure Plan Guidelines which had been
established since the Mildura South Strategic Framework was undertaken. Community
and stakeholder consultation was carried out in order to identify key issues which would
guide development in the area. Resulting from this work a preliminary draft of the Mildura
South Precinct Structure Plan (PSP) was prepared with further workshops held with
stakeholders and the community to identify any remaining issues.
2.10. In November 2013 the Council adopted the Mildura South Recreation Assessment
(MSRA) which confirmed the location of the future Mildura South sporting facilities on
the south side of the Deakin Avenue/Sixteenth Street Junction with confirmation of the
location for the Indoor Sporting Facility to also at the Deakin Avenue/Sixteenth Street
site.
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 4 of 17
2.11. In March/April 2014 a Draft Mildura South Development Plan, based on the Precinct
Structure Plan for the broader area, was established through further community and
stakeholder involvement.
2.12. The Mildura South Development Plan (MSDP) was adopted in August 2014 with the
Precinct Structure Plan adopted in September 2014. Sixteenth Street is identified in the
MSDP as forming a key ‘green spine’ which will facilitate safe pedestrian and cyclist
movement with a high level of amenity between key places and activities within the
precinct. A higher intensity of development is envisaged along the street and it will
constitute a key part of the neighbourhood’s character. A cross section for the Sixteenth
Street Greenway along with specification of the road layout is identified in the MSDP
Figure1: Sixteenth Street Greenway Cross Section. Adopted from Mildura South
(Sixteenth & Deakin West) Development Plan 2014.
2.13. The MSDP also provides the direction for the lots fronting the southern side of 16th street
greenway including:
a) To promote attractive, informal village streetscapes that emphasise dominance of
native and exotic canopy vegetation and understorey planting.
b) To reinforce and create vegetation dominated views of private allotments when
viewed from the street.
c) To encourage landscaped front setbacks that offer a sense of openness from the
street rather than solid fencing.
d) To ensure that signage, lighting and street infrastructure do not dominate the
streetscape and visual clutter is minimised.
e) To ensure that access is provided to the rear to minimise intrusions on the pedestrian
and cycle experience along this important corridor.
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 5 of 17
f) To increase passive surveillance of the Greenway, i.e. through the incorporation of
upper level balconies or habitable rooms.
2.1. The Mildura South PSP 2014 in turn listed a number of actions as a further work for
implementation which includes the preparation of a streetscape masterplan for the
Sixteenth Street Greenway. This masterplan is the second high priority project in
implementing the Mildura South Precinct Structure Plan. Given the critical role that this
street plays in connecting the existing and future parts of Mildura South Growth Area
and the identified role that landscaping along this street should play in defining the
identity and character of Mildura South, planning for this early is important in ensuring
direction can be provided for early subdivisions. Part of the role of this streetscape
masterplan will be to establish a palette of materials and finishes, as well as street
furniture and suitable plant species to guide proposed landscaping for Mildura South
subdivisions.
2.2. The process of Planning Scheme Amendment C75 commenced in November 2014
which involved the incorporation of the Mildura South Precinct Structure Plan in the
Mildura Planning Scheme along with the facilitation to rezone land at 624–682 Deakin
Avenue, Mildura to Public Park and Recreation Zone to facilitate Stage 1 of the Mildura
South sporting complex. The amendment also included the rezoning of land on the
corner of Ontario Avenue and Sixteenth Street from General Residential Zone to Urban
Growth Zone to support the development of the Neighbourhood Activity Centre. In
September 2016, Amendment C75 was gazetted.
2.3. In June 2017 and further to formal tendering process, Hansen Partnership were
engaged to prepare a greenway MasterPlan for Sixteenth Street west of Deakin Avenue,
and to also prepare appropriate planning tools to provide guidance for the development
along the southern side of the Street as an amendment to the Mildura Planning Scheme.
2.4. One the basis, Hansen assisted Council in the preparation of the draft documentation of
Amendment C100. Consequently, the original DDO14 was drafted (Pre-authorisation
version).
2.5. In October 2017, Council sought authorisation from the Minister for Planning to prepare
Amendment C100 to the Mildura Planning Scheme.
2.6. On 23 October 2017 and in response to Council’s request for authorisation to prepare
Amendment C100, the Department of Environment, Land, Water and Planning (DELWP)
in their letter advised that the proposed Amendment C100 requires further review. The
department advised that further consideration should be given as to whether there is a
need for the proposed DDO14, or whether its broad objectives can be more
appropriately achieved by other means, such as the development plan, or a new
schedule to the General Residential Zone.
2.7. Council further in its letter dated 26 October 2017 acknowledged the need to review the
proposed amendment in light of the department’s comments and prepared a detailed
response to each of the raised points. This included a revised version (26 October 2018
version) of Schedule 14 to the Design and Development Overlay (DDO14), reflecting
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 6 of 17
measures taken to simplify the schedule and to reduce the requirements significantly,
including the following:
a) Removing application requirements for a design response and landscape plan for
applications for buildings and works.
b) Removing objectives to discourage the development of standard detached dwellings
and to provide a quality design response.
c) Removing permit triggers for a fence.
d) Removing all of the design requirements relating to building colours and materials,
service infrastructure and specific building typologies.
2.8. Council in its 26 October letter provided the following justification in support to its
proposed measures:
As noted in your letter, the current Development Plan Overlay – Schedule 1 triggers a
permit for the subdivsion of the land and requires any permit issued to be generally in
accordance with the development plan.
For most of the land subject to the proposed DDO14, subdivision permits have already
been issued. Given that a permit is generally not required for the use and development
of a dwelling in the General Residential Zone, there is no mechanism for Council, apart
from a DDO schedule, to achieve the rear access and greenway interface objectives at
this late stage.
Your comments regarding the use of alternative tools including a Schedule to the
General Residential Zone (GRZ) were given consideration. However, please note that
subdivision permits have been issued for most of the land subject to this amendment,
and a single dwelling generally does not need a planning permit under the GRZ
especially in Mildura’s context where residential lots are generally in excess of 500sqm.
As such, matters of rear access and addressing the frontage to Sixteenth Street will be
left to arbitrary development decisions, which in turn will compromise the delivery of the
vision for the area after years of participative structure planning.
We have reviewed the extent of DDO14 to the north-west, including the area identified
by the Mildura South (Sixteenth & Deakin West) Development Plan 2014, as a
combination of wetland and Public Open Space (POS). Council has not secured that
land yet and it remains in the GRZ1. Given that the location of the public open space
could possibly change if there is a future amended version of the development plan
showing it in a different location or configuration, Council would prefer to keep the DDO
on the frontage of this land. Upon securing the land by Council, DDO14 could be
removed from the land, if deemed unnecessary, in any upcoming Planning Scheme
Review Amendment.
Finally, it is worth noting that throughout the preparation process of the Mildura South
Precinct Structure Plan 2014 and the Mildura South (Sixteenth & Deakin West)
Development Plan 2014, land owners and the general community have been extensively
consulted including about the content reflected in the proposed DDO14. In addition, the
success of the Sixteenth Street Streetscape MasterPlan (currently work in progress) is
heavily reliant on the content of Amendment C100, which will bring about the envisaged
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 7 of 17
greenway abutting the proposed DDO area including success of the protected bicycle
path.
I hereby stress the need for Amendment C100 to bring about community and Council’s
expectations and achieve best practice planning after years of studies for the area that
have been prepared in consultation with the community.
2.9. The Minister for Planning (in a short turnaround), on 31 October 2017, authorised the
preparation of the Mildura Planning Scheme Amendment C100 - Authorisation A03658,
in accordance with a slightly modified version of Council’s 26 October 2018 version of
DDO14.
2.10. Amendment C100 then was placed on public exhibition from 10 November 2017 to 18
December 2017. Any person who may be affected by the amendment was given the
opportunity to provide a written submission to Council about the amendment.
2.11. Amendment C100 remained consolidated until March’s Ordinary Council Meeting after
which Council resolved to split the amendment into two parts in the following manner:
a) C100 (Part 1) - comprising the inclusion of Council land in the Public Park &
Recreation Zone (PPRZ)
b) C100 (Part 2) - comprising the remainder of Amendment C100 (DDO 14 Sixteenth
Street)
2.12. This Panel Hearing of 21 May 2018 concerns only Amendment C100 (Part 2).
3. CHRONOLOGY OF EVENTS
DATE EVENT DETAILS
21 July 2005 C28 – Gazettal Mildura Planning Scheme Amendment C28
rezoned land in Mildura South (Sixteenth Street
and Deakin West) to Residential 1 Zone (R1Z) and
applied the Development Plan Overlay – Schedule
1 (DPO1) to the land.
January 2007 Mildura South
Framework Plan
Council engaged consultant team consisting of
David Lock Associates, Applied Development
Research, PBAI Australia and GHD to prepare the
Mildura South Strategic Framework Plan
13 December 2007 Mildura South
Framework Plan
Adoption of the Mildura South Strategic Framework
Plan 2007 - A Development Plan for the South
West of Mildura
March 2011 Mildura South Urban
Design Plan
Work commenced by Hansen Partnership along
with Aurecon, James Golsworthy Consulting,
HillPDA and Capire Consulting to review the 2007
MSSFP and prepare the Mildura South Urban
Design Plan.
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 8 of 17
November 2013 Mildura South
Recreation
Assessment
Council adopted the Mildura South Recreation
Assessment (MSRA) which confirmed the location
of the future Mildura South sporting facilities on the
south side of the Deakin Avenue/Sixteenth Street
Junction
August 2014 Mildura South DP Council adopted the Mildura South (16th & Deakin
West) Development Plan
September 2014 Mildura South PSP Council adopted Mildura South Precinct Structure
Plan
22 June 2015 C75 – Panel Hearing Mildura Planning Scheme Amendment C75 –
Panel Hearing combined with Amendment C89
31 August 2015 C75 – Panel Report Mildura Planning Scheme Amendment C75 –
Panel Report
22 September 2016 C75 – Gazettal Gazettal of Mildura Planning Scheme Amendment
C75 - Mildura South Precinct Structure Plan as
incorporated document
28 June 2017 C100 & 16th St
Greenway MP
preparation
Further to formal tendering process, Hansen
Partnership were engaged to prepare a greenway
MasterPlan for Sixteenth Street west of Deakin
Avenue, and to also prepare appropriate planning
tools to provide guidance for the development
along the southern side of the Street as an
amendment to the Mildura Planning Scheme.
6 October 2017 C100 – Authorisation
Request
Authorisation request sent to the Minister for
Planning
20 October 2017 C100 – Pre-
Authorisation Review
DELWP letter advising that proposed Amendment
C100 requires further review.
26 October 2017 C100 - Revised
Amendment
Documentation
Council’s response to the DELWP’s letter
regarding the review of Amendment C100 including
a revised DDO14 Schedule and a revised
Explanatory Report.
31 October 2017 C100 – Authorisation Minister authorised the preparation of the Mildura
Planning Scheme Amendment C100 -
Authorisation A03667
10 November to
18 December 2017
C100 – Exhibition Public Exhibition of the Amendment & Receipt of
Submissions
6 February 2018 C100 – Response to
Submissions
Mildura Amendment C100 Response to
Submissions Table by Hansen Partnership
28 March 2018 C100 – Response to
Submissions
C100– Split into Pt1
& Pt2
Council Resolution:
Adopt the response to the submissions
received to Amendment C100
Split Amendment C100 into two parts
Refer submissions received in relation to
Amendment C100 (Part 2) to an Independent
Panel
Adopt Amendment C100 (Part 1) as exhibited
26 April 2018 C100 (Part 2)– Panel
Directions
Amendment C100 Panel Directions Hearing was
held in Mildura
21 May 2018 C100 (Part 2)– Panel
Hearing
Amendment C100 Panel Hearing to be conducted
in Melbourne
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 9 of 17
4. STRATEGIC CONTEXT AND ASSESSMENT
4.1. Numerous planning documents (referenced in the Mildura Planning Scheme) confirm a
strategic vision for the creation of a Greenway along Sixteenth Street. These documents
have been prepared alongside with the community through extensive consultation.
4.2. The Greenway is to form a high quality landscape corridor which will facilitate and
encourage walking and cycling, reducing an overall reliance on the motor car and
increase social interactions between residents of this new growth area.
4.3. As discussed previously in this report, parallel to the Amendment process, Council in
collaboration with Hansen Partnership has prepared the Sixteenth Street Greenway
MasterPlan 2018 which builds on the cross-section concept outlined in the adopted
Mildura South (Sixteenth & Deakin West) Development Plan 2014.
Figure 1: Extract of the Sixteenth Street Greenway MasterPlan, MRCC May 2018
4.4. Key concept of the prepared MasterPlan is to facilitate the creation of a safe and
uninterrupted bike and pedestrian paths along the southern side of Sixteenth Street. The
success of the MasterPlan as such is heavily reliant on planning mechanisms to prevent/
minimise intrusions on the pedestrian and cycle experience along this important corridor.
4.5. Given the land is already zoned GRZ1 and the development has already been prepared.
Council has responded to subdivision permits affecting the subject land. However in
anticipation of greenway master-planning process, conditions on these permits have
been secured to ensure the type of subdivision allowed is consistent with the type of
development envisaged along this stretch of Sixteenth Street.
4.6. However, the use and development of a single dwelling generally does not trigger a
planning permit under the General Residential Zone especially in Mildura’s context
where residential lots can be in excess of 500sqm. As such, matters of rear access and
addressing the frontage to Sixteenth Street will be left to arbitrary development
decisions.
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 10 of 17
4.7. The new DDO Schedule (DDO14) therefore will be essential to ensure that there is a
permit trigger for development to ensure it visually addresses the Sixteenth Street
Greenway and to prevent the establishment of vehicle crossovers along this frontage to
facilitate a protected bicycle path in the Greenway corridor. It will further provide Council
with a clear set of design requirements to facilitate assessment of planning applications
in this area. The amendment as such will bring about Community and Council’s
expectations and achieve best practice planning after years of studies for the area
prepared alongside with the community.
Figure 2: Artist impression of the envisaged development of 16th Street Greenway, MRCC May 2018
4.8. It is worthy to note that the concept of rear access via back lane is well established in
the Mildura region and stems back to the original cadastre (circa 1880s). This includes
established residential areas in what forms now the fringe of Mildura CBD, including
parts of Lemon Avenue, Pine Avenue and Magnolia Ave…etc.
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 11 of 17
Figure 3: Back access through Steadman Lane to properties fronting Lime & Pine Avenues
5. INTERACTION BETWEEN ELEMENTS OF THE PLANNING FRAMEWORK
5.1. The Amendment seeks to apply the Design and Development Overlay – Schedule 14 to
provide guidance for the development of land located on the south-western side of
Sixteenth Street, Mildura and to facilitate the implementation of the Mildura South
Strategic Framework Plan, 2007 and the Mildura South Precinct Structure Plan, 2014
and the Mildura South (Sixteenth & Deakin West) Development Plan, 2014. The
Amendment will ensure that objectives within those documents for pedestrian and
cycling priority environment along the key spine of Sixteenth Street is achieved.
5.2. The Amendment seeks the following changes to the Mildura Planning Scheme:
a) Amend Clause 21.03 (Vision and Strategic Framework) to include reference to the
Sixteenth Street Greenway.
b) Amend Clause 21.10 (Local Areas) to include reference to the Sixteenth Street
Greenway.
c) Insert a new Schedule 14 to Clause 43.02 Design and Development Overlay for
residential land located on the southern side of Sixteenth Street between Deakin
Avenue and Riverside Avenue.
5.3. Planning and Environment Act 1987
5.3.1 The amendment seeks to achieve the objectives of planning in Victoria as set
out in Section 4 (1) of the Planning and Environment Act 1987 including:
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 12 of 17
a) to provide for the fair, orderly, economic and sustainable use, and
development of land;
b) to secure a pleasant, efficient and safe working, living and recreational
environment for all Victorians and visitors to Victoria;
c) to balance the present and future interests of all Victorians.
5.3.2 The Amendment achieves the above objectives by implementing a long standing
vision for the Mildura South Growth Area, ensuing that this area provides a
diversity of housing and that built form outcomes support a range of recreational
opportunities, and the encouragement of sustainable personal transport.
5.4. Compliance with the Minister’s Directions
The amendment is consistent with the following Ministerial Directions:
a) Minister’s Direction No. 11 – Strategic Assessment of Amendments under Section 12
of the Planning and Environment Act 1987
b) The amendment is consistent with the Ministerial Direction on the Form and Content
of Planning Schemes under Section 7(5) of the Act
c) The preparation of the amendment is consistent with the Ministerial Direction No. 15
Planning Scheme Amendment Process under Section 12(2)(a) of the Act.
5.5. State Planning Policy Framework
The proposed amendment will support the relevant objectives of the State Planning
Policy Framework (SPPF). The amendment will assist in achieving objectives in relation
to the following clauses
5.5.1 Clause 11 Settlement
Clause 11 sets out the framework for planning in Victoria and identifies objectives to
manage future growth and development. Specifically it identifies Mildura as a key
regional centre where growth and investment should be supported. Clause 11 contains
objectives related to ensuring the orderly development of residential land and increasing
residential densities in proximity to activity centres.
The Amendment supports this Clause by allowing for increased residential density in
close proximity to a future activity centre along Sixteenth Street.
5.5.2 Clause 15 – Built Environment and Heritage
Clause 11.07 seeks to ensure the creation of urban spaces that are safe, functional and
have a sense of place and cultural identity. Urban design and architectural outcomes
are to contribute positively to the urban character and enhance the public realm.
The Amendment will help to ensure new development on the south-western side of
Sixteenth Street responds to a long term vision which defines Sixteenth Street as a
Greenway as in the development plan. This Greenway will become the focal point for
the local community and assist with creating a ‘neighbourhood’ and associated ‘sense
of place’.
5.5.3 Clause 18 Transport
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 13 of 17
Clause 18 supports the development of integrated sustainable transport networks that
provide access to social and economic opportunities.
In providing guidance for the future development of the south-western side of Sixteenth
Street, the Amendment will help to create an urban environment compatible with the
street’s designation as a pedestrian and cycling prioritised environment.
5.6. Local Planning Policy Framework
The Amendment support or implement the Local Planning Policy Framework, and
specifically the Municipal Strategic Statement:
5.6.1. In helping to implement the Mildura South Strategic Framework Plan, 2007,
Mildura South Precinct Structure Plan, 2014 and the Mildura South (Sixteenth &
Deakin West) Development Plan, 2014 all of which are reference documents
within the Mildura Planning Scheme in clause 21.
5.6.2. In allowing for a diverse housing typology in the form of medium density
development as defined by Clause 21.04 (Settlement and Housing).
5.6.3. In accordance with Clause 21.07 (Built Environment and Heritage) the
Amendment will encourage ‘healthy living’ through the creation of a
neighbourhood design that supports active transport.
5.6.4. By seeking to create a safe and efficient transport system and pedestrian
network in accordance with Clause 21.09 (Transport and Infrastructure).
5.6.5. The Amendment will also amend the LPPF by amending the LPPF at Clause
21.03 and Clause 21.10 to recognise the role of the Sixteenth Street Greenway.
5.7. Victoria Planning Provisions
The Amendment makes use of the Design and Development Overlay which is
specifically designed to control design and built form outcomes on private land. While
no specific Practice Note exists for the Design and Development Overlay, Planning
Practice Note 28 (Using the Neighbourhood Character Provisions in the Planning
Scheme) notes that the Design and Development Overlay is most appropriately used
for when specific urban design outcomes are desired for a site or area. The Design and
Development Overlay is therefore the most appropriate for ensuring a positive interface
with the Sixteenth Street Greenway.
6. ISSUES RAISED IN SUBMISSIONS
6.1. As required by the Planning and Environment Act 1987, the amendment was placed on
public exhibition from 10 November 2017 to 18 December 2017. Any person who may
be affected by the amendment was given the opportunity to provide a written submission
to Council about the amendment.
6.2. The amendment exhibition notice appeared in the Victorian Government Gazette
(gazetted) on 16 November 2017 and was advertised by:
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 14 of 17
a) Advertisement in the local newspaper
b) Council’s website and Facebook page
c) Direct notification via mail out to affected land owners and occupiers (a total of 1645
letters)
d) Direct notification to Government Authorities and past consultation/workshop
attendees (a total of 108 letters).
6.3. During public exhibition, the amendment and any documents that support the
amendment were made available for inspection, free of charge, at various locations
across the Municipality, this has included:
a) Council’s Madden Avenue and Deakin Avenue Service Centres
b) Mildura Library
c) Mildura South Post Office.
6.4. The amendment was also made available for inspection, free of charge, at the
Department of Environment, Land, Water and Planning website
www.delwp.vic.gov.au/public-inspection.
6.5. A combined drop-in session was held for residents to find out more about the proposed
changes through Amendment C95 and Amendment C100 and to have the opportunity
to speak to Council staff. The session was held on 30 November 2017, from 3.30pm-
7.30pm in the Alfred Deakin Centre on Deakin Avenue. A total of nine people attended
the session.
6.6. At the conclusion of the public exhibition period Council received a total of six formal
written submissions including one objection. The submissions received relate only to
part of the amendment which proposes the application of Schedule 14 to the Design and
Development Overlay DDO14 to a stretch of Sixteenth Street.
6.7. All submissions to the amendment were accepted by Council and are responded to
accordingly as outlined in the Response to Submissions Table 6 February 2018 by
Hansen Partnership. Feedback from five submitters has been generally positive with no
issues that require further consideration. The issues raised in the only objection cannot
however be supported.
6.8. Submissions Table
The issues raised and a response to each have been summarised in the table below.
No. Submitter Issue/s Response Recommendations
1 CFA Need to consider interface issues in relation to bushfire and buildings should not have direct interfaces With grasslands. Roads need to consider Emergency access.
n/a The DDO will be applied as land transitions to urban uses and no grassland interface is considered likely to be retained, given primary current use of the land is for viticulture. The DDO does not apply to the roadway.
No change required to Amendment C100 (Part 2).
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 15 of 17
2 EPA No concerns. n/a No change required to Amendment C100 (Part 2).
3 Goulburn Murray Water
Requests that a 5m exclusion zone be implemented around the Lake Ranfurly East – Rising Main Pipeline.
n/a The amendment does not affect land within 5m of the identified asset.
No change required to Amendment C100 (Part 2).
4 DEDJTR Supports amendment. Welcomes any opportunity to advance proposed by-pass route.
Support noted. n/a
No change required to Amendment C100 (Part 2).
5 Freeman & Freeman
Does not believe the amendment is required. Identifies that existing documents do not identify the need for a DDO. Believes that applying a DDO to residential land is “going too far”.
The amendment is required in order to trigger a planning permit which allows Council to consider the built form of development fronting Sixteenth Street. In particular, to consider the impacts of such development on the amenity and safety of the Sixteenth Street Greenway which has been a strategic objective of the Mildura Planning Scheme for a significant period of time. This Greenway is to form the central spine linking the ‘new’ and ‘old’ areas of Mildura South and a walking and cycling link between key destinations in the area. A pattern of development which results in numerous individual crossovers along this frontage would compromise the functionality and safety of this active transport corridor. The Development Plan for the area also highlights the importance of building frontages to this Greenway providing an attractive and engaging edge with low front fencing and opportunities for passive surveillance. Furthermore, all strategic documents highlight the importance of development along this frontage providing a density of development above the ‘typical’ suburban outcomes seen on the northern side of Sixteenth Street in recognition of future commercial, community and recreational facilities that will establish in the area. Without a
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 16 of 17
Existing single dwelling developments fronting Sixteenth Street and the subdivision opportunities of those properties should retain flexibility, which the DDO is removing.
permit trigger, Council’s ability to assess the form of development fronting this important corridor is severely compromised. The need for planning controls often emerges over time as issues or patterns of development develop and it is not considered that the lack of identification of a specific control is problematic, provided there is a clear link between the strategic objectives and the application of any such control. In this case there is. The single dwellings referred to in this submission are contrary to the strategic objectives identified for Sixteenth Street, particularly relation to their provision of crossovers, typology and engagement with the street. The proposed control will allow Council to provide clearer direction to future applicants to ensure that these objectives are prioritised and that development is in keeping with the Mildura South Framework Plan, Mildura South Precinct Structure Plan and Mildura South (Sixteenth & Deakin West) Development Plan, all of which form part of the Mildura Planning Scheme.
No change required to Amendment C100 (Part 2).
6 DELWP No comment. n/a No change required to Amendment C100 (Part 2).
7. POST EXHIBITION – PROPOSED CHANGES TO AMENDMENT C100
7.1. Further to the public exhibition period, and having examined all of the submissions
received it was not recommended to alter Amendment C100.
7.2. The submissions received relate only to part of the amendment which proposes the
application of Schedule 14 to the Design and Development Overlay DDO14 to a stretch
of Sixteenth Street.
Mildura Planning Scheme Amendment C100 (Part 2) - Planning Authority Submission Part A
Panel Hearing 21 May 2018 Page 17 of 17
7.3. It was therefore recommended, to divide the amendment into two parts to expedite the
approval of Part 1 of the amendment which proposes the inclusion of Council owned
land in the Public Park and Recreation Zone (PPRZ) along Deakin Avenue.
7.4. At the March 2018 ordinary meeting, Council endorsed the position taken in response
to the submissions received to Amendment C100 as detailed in the Response to
Submissions Table 6 February 2018 by Hansen Partnership, and resolved to:
a) having examined all submissions received regarding Amendment C100, notes that
no objecting submissions were received for the Council land part of the amendment;
b) split Amendment C100 into two parts being:
C100, Pt 1, comprising the inclusion in the Public Park & Recreation Zone (PPRZ)
of land described as Lot1/TP108783 (as exhibited) and Lot1/LP92247 (Council
land Deakin Avenue); and
C100, Pt 2, comprising the remainder of Amendment C100 (DDO 14 Sixteenth
Street);
c) adopt Amendment C100, Pt 1, as exhibited and with the inclusion of Lot 1/LP92247
and submits the amendment documentation when finalised to the Minister for
Planning requesting approval; and
d) endorse the position to be taken in response to all submissions received pertaining
to Amendment C100, Pt 2, as detailed in the Response to Submissions Table 6
February 2018 by Hansen Partnership (attached to this report); and
e) refer the submissions received in relation to Amendment C100 – Part 2 to an
Independent Panel appointed by the Minister for Planning.
7.5. On the basis of the above, Amendment C100 (Part 2) is now proposed in the version
provided to the Planning Panel Victoria on the 17 May 2018.
7.6. The Panel has already heard from Mrs Jane Keddie of Hansen Partnership in relation
to:
a) Background to planning for Mildura South & the Sixteenth Street corridor
b) Drafting of Amendment C100 (Part 2)
c) Analysis of Exhibited Amendment (Part 2)
d) Response to Submissions.
8. CONCLUSION
8.1. In conclusion the Council respectfully requests that given the strategic justification for
the Amendment and with the proposed complying with all technical requirements for a
planning scheme amendment, after consideration of all relevant matters before it, the
Panel in due course recommends the adoption of the Amendment, as put forward.
8.2. Ammar Habasch
Strategic Planner
Mildura Rural City Council
14 May 2018