planning board hearing, cushing village, belmont, ma - oct. 9, 2012

19
C U S H I N G V I L L A G E B E L M O N T, M A S S A C H U S E T T S PLANNING BOARD PRESENTATION NO. 8 09 OCT 2012 CUSHING VILLAGE BELMONT, MA

Upload: cushingvillage

Post on 25-Jun-2015

931 views

Category:

Real Estate


0 download

DESCRIPTION

Cushing V

TRANSCRIPT

Page 1: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

C U S H I N G

V I L L A G E B E L M O N T, M A S S A C H U S E T T S

PLANNING BOARD PRESENTATION NO. 8 09 OCT 2012

CUSHING VILLAGE BELMONT, MA

Page 2: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

C O M M O N S T

Cushing Village Site Plan

THE WINSLOW

Revised site plan

CUSHING VILLAGE BELMONT, MA 2

Page 3: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

Revised site plan

CUSHING VILLAGE BELMONT, MA

Cushing Village Site Plan – Winslow Area

The Winslow Summary

• Approximately 10,000-SF commercial space • 3 to 5 commercial spaces

• Approximately 22,500-SF residential space

• Estimated 20-22 units, mostly 2-bedrooms

3

Page 4: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

New Public Plaza

• Ramp relocated

• Public plaza created

• Building footprint reduced • Trash Enclosure relocated

• Space for gathering, dining, play etc.

• Covered area for tables

Previous

Site plan @ the Winslow 4

Page 5: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

New Public Plaza 5

Page 6: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

Special Events Plaza Reduced Parking Area

• Building Projections greatly cut back

• Increased distance between buildings

• Special events plaza created using paving pattern

• Clear pedestrian paths

• One way driveway w/landscaped pedestrian walk

• Reduced on-grade parking

• Trapelo crossing alignment

CUSHING VILLAGE BELMONT, MA

Site plan @ the Winslow & the Pomona 6

Previous

Page 7: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

Increased Sidewalk Width At front of Winslow

• 4’to 6’ of increased width by setting back the Winslow

• Allows for more benches and other amenities

Previous

Site plan @ the Winslow 7

Page 8: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

Floor Plans

Floor Plans @ the Winslow 8

Level 1 Level 2

Page 9: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

Floor Plans

Floor Plans @ the Winslow 9

Level 3 Roof Plan

Page 10: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

Elevation TRAPELO ROAD

Elevation @ the Winslow 10

Page 11: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

• Traditional double hung windows with transoms.

• Strong cornice over central part of building. • Dramatic overhang to give the building a

formal presence. • Elegant curved brackets. • Shingle-style detailing. • Juliette balconies add visual variety to

façade.

• Arts and Crafts front entry. • Reminiscent of a front porch typical of a

house in Belmont.

• Detailing that evokes craftsmanship and beautiful textures.

• Autumn color theme. • Typical materials – ironspot brick, multicolor

siding and trim, colorful awnings, granite base.

CUSHING VILLAGE BELMONT, MA

The Winslow Building Detail

Detail @ the Winslow 11

Page 12: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

Street Elevation TRAPELO ROAD

Elevation @ the Winslow 12

The Pomona Driveway Entry Williston Rd 118 Trapelo

Page 13: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

The Winslow WILLISTON ROAD ELEVATION

CUSHING VILLAGE BELMONT, MA

Elevation @ the Winslow 13

Page 14: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

The Winslow Side and Rear Elevations

Elevations @ the Winslow 14

Page 15: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

The Winslow View from Trapelo Looking Southeast

Perspective @ the Winslow 15

Page 16: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

The Winslow Birds Eye View across Trapelo Rd

Perspective @ the Winslow 16

Page 17: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

The Winslow View from Williston Rd at Horne Rd

Perspective @ the Winslow 17

Page 18: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

The Winslow View from Trapelo Road Looking West

Perspective @ the Winslow 18

Page 19: Planning Board Hearing, Cushing Village, Belmont, MA - Oct. 9, 2012

CUSHING VILLAGE BELMONT, MA

The Winslow View of Public Plaza

Perspective @ the Winslow 19