planning for and collecting valid and meaningful drinking water samples

33
Planning for and Collecting Valid and Meaningful Drinking Water Samples 1 James Latimer Environmental Program Specialist Drinking Water Program AK Dept. of Environmental Conservation E-mail: [email protected] 2010 Sustained Compliance Workshop Anchorage, AK Sept 23-24, 2010

Upload: keagan

Post on 09-Feb-2016

36 views

Category:

Documents


0 download

DESCRIPTION

James Latimer Environmental Program Specialist Drinking Water Program AK Dept. of Environmental Conservation E-mail: [email protected]. Planning for and Collecting Valid and Meaningful Drinking Water Samples. 2010 Sustained Compliance Workshop Anchorage, AK Sept 23-24, 2010. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Planning for and Collecting Valid and Meaningful Drinking Water Samples

1

James Latimer Environmental Program Specialist

Drinking Water ProgramAK Dept. of Environmental Conservation

E-mail: [email protected]

2010 Sustained Compliance WorkshopAnchorage, AK

Sept 23-24, 2010

Page 2: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Presentation Summary

Sample Planning – generalized and detailed

Collecting Samples – preparations and procedures

Sample Demonstration – total coliform & chemical Sample Results – understanding results and following through

as needed

Questions

2

Page 3: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Sample Planning

3

Planning Tools

Total Coliform Sample Siting Plan

Lead & Copper Sample Plan

Page 4: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Planning ahead can be critical to maintaining

an adequate supply of safe and healthy water

To succeed, we need to know (and do):

1. what needs to be done

2. when & where to sample

4

Importance of Planning

Page 5: Planning for and Collecting Valid and Meaningful Drinking Water Samples

A Monitoring Summary includes:

5

What to sample for & where to sample

How often to sample

Date of last sample

Date next sample is due

Definitions and explanations

DEC contact information

Page 6: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Other Examples of Monitoring Summaries

6

Page 7: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Other Planning ToolsPrinted media

e.g., wall or desk calendarElectronic media

e.g., email alerts

7

Quarter

Page 8: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Specific Sample PlansThe following sampling plans will not be covered

today:

A source water monitoring plan for Long Term 2 Enhanced Surface Water Treatment Rule (LT2); or

A Stage 2 Disinfectant and Disinfection Byproducts Rule (Stage 2 DBPR) Initial Distribution System Evaluation (IDSE) sampling plan

8

Page 9: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Creating, Using, & Modifying a Total Coliform Rule (TCR)

Sample Siting Plan

9

Page 10: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Total Coliform Sample Siting Plan (18 AAC 80.410)Who is required to have one?

Applies to Community, Non Transient Non-community, & Transient Non-community public drinking water systems

What it is?Where and when to sample

Routine sampling; and In the event of total coliform positive result:

Within 24 hours, and the following month

Sample site selection is important

Keep a copy readily available onsite, & revise as needed

10

Page 11: Planning for and Collecting Valid and Meaningful Drinking Water Samples

DEC TCR Sample Siting Plan* “Template”

* for smaller systems, serving 1000 or less people

11

http://dec.alaska.gov/eh/dw/publications/forms.html

Page 12: Planning for and Collecting Valid and Meaningful Drinking Water Samples

System Information

12

Page 13: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Quarterly-Monthly Sampling Chart

13

Page 14: Planning for and Collecting Valid and Meaningful Drinking Water Samples

What to do if a result is positive/present for total coliform bacteria or E. coli

14

Page 15: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Distribution System Schematic

Any formatE.g., engineer schematic, hand-

drawn, notes on satellite image, and others

DEC Drinking Water Program staff review & approve all Total Coliform Sample Siting Plans

15

Page 16: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Lead and Copper Sampling Plan (CWS and NTNCWS)

Site selectionBased on materials

evaluation (pipes and fixtures containing lead and/or copper), & use (i.e. residential vs. commercial)

Do not include sites with point-of-use or point-of-entry treatment devices for inorganics (1 exception)

What to do if not enough sites.

Names or IDs of sites should be clear and consistent

Consistent locations provide results that can be compared over time

Accessibility - changesActivity/Inactivity (i.e. , schools)First Draw, after 6 hours with

no-flow Newly replaced pipes or

fixtures may influence results

16

Page 17: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Lead and Copper Sampling Plan EssentialsProvide an explanation for selection of sitesProvide clear and complete descriptions and

names for each site, and include alternative sites

Note sample proceduresFlushing proceduresDescribe how 6-hour idle flow time will be met Note if residents will collect samples Emphasize collection from cold water tapEmphasize use of consumptive taps

17

Page 18: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Collecting SamplesPreparations

Supplies, Instructions, FormsCollecting samples

Tap or site issuesPotential contaminationContainer specifics

Demonstrations Total ColiformVolatile Organics (VOCs)

Recording & reporting data

18

Page 19: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Pre-collection PreparationsSupplies

Sample bottlesValid free chlorine

residual powder packets

Tools & paper towelsCooler (s)Ice & packing

materialsDisinfectant FormsOther items as needed

ArrangementsLab hoursFlightsCoordinate with any

relevant contractorsCourtesy reminders

to home or business owners –ensure access

PaymentsOther items as

situation warrants

19

Page 20: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Quiz & Clues –Distribution System

Free Chlorine ResidualSame Time & Location

as each Total Coliform Sample

Collect prior to Total Coliform sample

Free - and check powder packet type & expiration date

There is at least one approved free chlorine residual test strip

When and where do we sample distribution chlorine residual?

Do we sample before or after total coliform sampling, and does it matter?

Is this a free or total chlorine measurement?

How about test strips?

20

Page 21: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Distribution Chlorine Residual

21http://dec.alaska.gov/eh/dw/publications/sample.html

Page 22: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Common Methods of Determining Free Chlorine Residual

22

Follow instructions provided by the manufacturer

Page 23: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Total Coliform BacteriaSampling Reminders

Arrange transportationKeep enough extra sample

bottles on siteConfirm sample location on

the sample siting planPersonal and area sanitation

is important

Prepare faucet (avoid sampling at drinking water fountains):Disinfect then flush

Fill to 100+ ml - not too little < 100ml gets rejected

Not too much Sample bottles are brittle

Pad for shipping, and do not submit if damaged

Cool, yet not frozenDouble check formsLimited hold time

23

Page 24: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Total Coliform Bacteria Sampling

24http://dec.alaska.gov/eh/dw/publications/sample.html

Page 26: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Non-TCR SamplesToday’s Special - VOCs

Volatile Organic Compounds (VOCs)

Total Trihalomethanes (TTHM) & Haloacetic Acids (HAA5)

Lead & CopperInorganicsArsenicFluorideand more...

Special bottle/lidOpen septa lid prevents

contamination while allowing for sample extraction at lab

Do not rinse bottleLow tap flowClose to tapBottle angledFill completely - no air

spaceMinimize overflow

26

Page 27: Planning for and Collecting Valid and Meaningful Drinking Water Samples

VOC Sampling

27http://dec.alaska.gov/eh/dw/publications/sample.html

Page 28: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Lab Forms

28

Page 29: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Partially Completed Forms

29

the lab

the lab

Page 30: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Sampling Demonstrations

West aisle Kelly Cobbs (DEC)

East aisle Leticia Tadina

(DEC)

30

Page 31: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Reporting Ensure that time and

money are not wasted:Recheck forms &

labels for accuracy & completeness

Label on bottle

Labs are required to report results directly to DEC

PWSs are responsible to ensure that DEC receives results

31

Page 32: Planning for and Collecting Valid and Meaningful Drinking Water Samples

Points To Ponder & To Act OnPlan & sample as far

ahead as possibleDevelop, revise, and

keep handy TCR and Pb/Cu sample plans

Understand and use the Monitoring Summary, and use in combination with a calendar or other sample scheduling or tracking media.

Sampling begins and ends with accurately and completely filling out forms

Understand & address sample issues specific to each type of sample collected

Accurate results are very importantWater is very importantYour job is very

important 32