Planning for B s Mixing for Winter 2005. Joseph Kroll (Penn) Franco Bedeschi (Pisa) Mixing Analysis Coordinators B meeting 16 September 2004. 12/25/03 Manasquan, NJ. The Big Picture. Goal : limit on (or measurement of) m s for Winter 2005. Winter 2005 : La Thuile starts 2/27. - PowerPoint PPT PresentationTRANSCRIPT
Planning for Bs Mixing for Winter 2005
Joseph Kroll (Penn)Franco Bedeschi (Pisa)
Mixing Analysis CoordinatorsB meeting 16 September 2004
12/25/03 Manasquan, NJ
16 September 2004 Kroll/Bedeschi B Mixing Planning 2
The Big Picture
Goal: limit on (or measurement of) ms for Winter 2005
Winter 2005: La Thuile starts 2/27
Short time: this conference is only 5 ½ months from today
Must organize & direct effort now or will not have result
Preferred MAC Winter activity need to move La Thuile
16 September 2004 Kroll/Bedeschi B Mixing Planning 3
Speaking of December 25, 2003: Chunhui got married that day
in Las Vegas!
16 September 2004 Kroll/Bedeschi B Mixing Planning 4
Calendar
on week
proposedB mixingworkshop
Collaborationmeeting
last Thursdaymeeting
We are here
La Thuile begins here
holiday
16 September 2004 Kroll/Bedeschi B Mixing Planning 5
• Reconstruct Bs signal with adequate signal to noise
– semileptonic: lepton + Ds
– hadronic: Ds, Ds
• Measure Bs Lifetime– resolve lifetime problem in semileptonics
– demonstrate lifetime measurement in SVT-biased hadronics
• Identify Bs Flavor at production (flavor tagging)
– challenge: estimating D for SST in Bs (for limit)
• Demonstrate technique with B0 mixing (md)
– use this step to calibrate opposite side flavor tags for Bs
– require unbinned likelihood fit now
• Measure (place limit on) ms
Bs Mixing Ingredients
also have the equivalent B0 & B+ signals
calibration/check is B0 & B+ lifetimes
16 September 2004 Kroll/Bedeschi B Mixing Planning 6
HFAG:Current Experimental Results on ms
Winter 2004 summary, PDG 2004 similar
16 September 2004 Kroll/Bedeschi B Mixing Planning 7
ICHEP 2004: Our Projected Sensitivity
Baseline: D2 = 1.6% (OST only) = 67 fs (achieved)
Stretch: D2 = 2.6% (add SST) = 47 fs (L00, event by evt. PV)
Uses full unbinned likelihood to estimate sensitivity for l Ds
See M. Tanaka CDFNOTE 7170 v2.0
(more like 74 fs)
(OST is SLT(e) = 0.35% + SLT() = 0.7% + JQT = 0.5%)
16 September 2004 Kroll/Bedeschi B Mixing Planning 8
ICHEP 2004 Projected Sensitivity (cont)
Hadronic Semileptonic
16 September 2004 Kroll/Bedeschi B Mixing Planning 9
ICHEP 2004 Projected Sensitivity (cont)
Message: even with only OSTmay have sensitivity comparableto best experiment.
Combined
16 September 2004 Kroll/Bedeschi B Mixing Planning 10
Highest Priority Items
1. Unbinned likelihood fit for md exploiting fully power of flavor tags, event by event t, S/B in different modes, etc.
2. Resolve lifetime problem in semileptonic modes (l Ds)
3. Measure lifetime in SVT-biased hadronic modes (Ds, etc.)
With blessed OST’s, 1, 2, & 3 may be enough to say something
to accomplish 1. we must
in parallel with 1, 2, 3 4. Study SSKT – determine defensible D from data and MC
16 September 2004 Kroll/Bedeschi B Mixing Planning 11
1. Signals
• Need to finalize our signal selections for basic modes– Semileptonic:
• Selection is CDFNOTE 6780?
• B0d modes: e/ + D0, D+, D*various D decay modes
• B0s modes: e/ + Ds, with Ds! (K*K, ?)
– Hadronic:• final selection?
• B0d modes: J/ K*0, D+, , D*+(?) (also B+ modes for OST, lifetime check)
• B0s modes: see list from projection study, add Ds? K*K can be used?
• What is our data set? – 5.3.X
– Data up to 8/23/04 excluding COT compromised data (which is?)
• Do we have MC required for background/signal templates?
Goal: present final signals at Collaboration meeting on 10/15/04
16 September 2004 Kroll/Bedeschi B Mixing Planning 12
2. Lifetimes
• Need to understand semileptonic lifetimes– discrepancy has existed since Winter 2003
– see plan outlined later – and also talk by M. Tanaka today
• Need to measure lifetime in SVT-biased hadronic modes– two groups (Oxford, Padova) asked to converge on common analysis
– goal was to try for ICHEP – last presentations on 18 July 2004
– issues: SVT bias, determining resolution without prompt background
• Need to check with unbiased J/ K signals – 1st signal from almost full data set shown (J/ K+ on 9/14/04)
– not clear if anyone is looking at whole data set for lifetimes (J/ V0)
– B! looking at whole J/ sample (Herndon) for resolution, PV, L00
Timescale?
16 September 2004 Kroll/Bedeschi B Mixing Planning 13
Semileptonics Plan
From discussionon 8 Sept 2004
Fast
16 September 2004 Kroll/Bedeschi B Mixing Planning 14
3. Flavor Tags
• Use OSTs blessed for ICHEP: SLT(e), SLT(), JQT– put SLT(e) in repository, code clean-up for SLT() – all imminent
– make OSTs mutually exclusive by construction (lepton L requirement)
– apply to B+, B0 (semileptonic, hadronic) in unbinned L with D binning
– are we getting projected 1.6%?
– work on new tags/refinement (D*, OSKT etc.) okay – not for Winter 04
• Determine D for SSKT (big potential gain here)– need defensible prediction from MC of D if no oscillations observed
– measuring particle content around B’s in data
– need to compare to MC (generate larger sample)
– issues: MC tuning, B** fraction in B0, B+, …
– requires coherent, focused effort
– present plan at next workshop on 1 October 2004
Timescale?
16 September 2004 Kroll/Bedeschi B Mixing Planning 15
4. Determining md to Check Procedure
• This step implicit in previous slide on flavor tags
• 1st step is unbinned likelihood lifetime fits
• Two groups so far working on full mixing fit– MIT/Cantabria – showed J/ K* w SST at B semileptonics on 9/14/04
– Semileptonics lifetime group + CMU
– Proposal: two independent groups check each other common result
• Fits must be validated with toy MC “data”
• Issues (other than lifetime)– description of backgrounds – are we ready?
– Okay on D correlation of flavor tags if OST made mutually exclusive
– we need a timeline
16 September 2004 Kroll/Bedeschi B Mixing Planning 16
5. Amplitude Scan for ms
• This has to be put together as well– assuming this will be done by groups on previous slide
• Are we doing a blind analysis?– if so, how do we set it up (formulation)?
– how do we organize it?
Big brother will be watching you
16 September 2004 Kroll/Bedeschi B Mixing Planning 17
Required Tools (BPAK)
• Start with tools as they are now– dE/dx
• urgent issue: calibration of data after 13 February 2004
– TOF• urgent issue: calibration problem with time-walk correction
• calibration for post 2/13/04 data needs validation
– common PID
– event by event primary vertex with L00• being utilized by B! group
• schedule for next tool upgrade is mid-November 2004– Collaboration (Oct. 15th) meeting would be better goal
16 September 2004 Kroll/Bedeschi B Mixing Planning 18
Making a Schedule
• At 3rd B mixing workshop on Friday, 1 October 2004 hope to present plan with names associated to tasks and timeline– this has been very difficult to achieve so far – especially the timescale
• Based on constraints we make some general observations:– we better have the full fit working for B0
d before 12/23/04 with all the necessary ingredients for B0
s blessed
– 1st two months of 2005 devoted to unblinding result on Bs, documenting, & blessing
– are we publishing? early godparents? Can decide later.
16 September 2004 Kroll/Bedeschi B Mixing Planning 19
Blessings Along the Way
• B signals (10/14/04?)
• B lifetimes (11/11/04?)
• combined OST efficiency & dilution (12/9/04?)
• md (12/9/04?)
• procedure for blinding and unblinding result on ms (12/9/04?)
• SSKT & D (in parallel with above) (prebless 12/9/04?)
• result on ms (Collaboration meeting? 1/20/05?)– just use OST if SSKT not ready
• Many potential publications along the way– relative BFs, lifetimes, fragmentation particles around B’s
16 September 2004 Kroll/Bedeschi B Mixing Planning 20
Summary and Plans
• 3rd B mixing workshop planned for 1 October 2004– trying to get a video room – usual problems
– hope to present list of tasks and names with timescales
• 4th and 5th workshops planned November, December– go to bimonthly meeting on off-week Thursdays?
• Assume we need workshop or dedicated offweek meetings in January &/or February
B Group must work coherently and be very focusedYou must take the initiative; do not wait for us to ask – keep usinformed – and think about how you can help make this happen