planning for disaster

22
Planning for Disaster Ramesh Ramani CISM CGEIT Paramount-Dubai 07 June 2011

Upload: bisa

Post on 22-Jan-2016

76 views

Category:

Documents


0 download

DESCRIPTION

Planning for Disaster. Ramesh Ramani CISM CGEIT Paramount-Dubai 07 June 2011. Agenda. Disaster Management-Introduction Examples BCP and IT Continuity Process of Disaster Management-PDCA Disaster Management Framework Project Execution Typical Plan Testing the Plan. Disaster Management. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Planning for Disaster

Planning for Disaster

Ramesh Ramani CISM CGEITParamount-Dubai

07 June 2011

Page 2: Planning for Disaster

Agenda

• Disaster Management-Introduction• Examples • BCP and IT Continuity• Process of Disaster Management-PDCA• Disaster Management Framework• Project Execution• Typical Plan• Testing the Plan

Page 3: Planning for Disaster

Disaster Management

• Discipline of dealing with and avoiding risks

• Discipline that involves preparing for disaster BEFORE it occurs,

• Sometimes referred to as Business Continuity Planning (BCP)

Page 4: Planning for Disaster

Definitions-Disaster

“situation or event which overwhelms local capacity, necessitating a request to a national or international level for external assistance.”

“An overwhelming ecological disruption occurring on a scale sufficient to require outside assistance”

“exceptional events that kill or injure a large number of people”

“Strategic and Tactical capability of an organisation to plan for and respond to incidents and business disruptions in order to continue business operations to an acceptable pre defined level”-BS 25999

Page 5: Planning for Disaster

Examples-Disaster-Black Swan•Japan-March 2011-Reactions-Germany•Middle East Uprising

•DHL Express, recently moved its air operations for the Middle East from Bahrain to Sharjah for one week •Egypt to Dubai•Bahrain to Dubai

•Tsunami-December 2006•Haiti Earthquake•Oil Spill-Gulf of Mexico•9-11•Flooding Mumbai-2005•Power Outage Dubai-2005•Flooding Sharjah-2009•Volcano Ash-Europe

Page 6: Planning for Disaster

Middle East• People-Expat Dependency• Volatility• Absence of Laws/Regulations• Monopolistic-Telco/Power etc• BCP-Not generally available in SME• False Sense of Security• ‘In my tent syndrome’• 37 per cent of CFOs in the region believe

financial risk has increased over the past 12 months-Deloitte

Page 7: Planning for Disaster

IT and BCP• Industry age to information age• Information itself is becoming business• International Standards

– ISO 27001:2005-Information Security– BS 25999-Business Continuity Managment– BS 25777-ICT Continuity Management– NFPA 1600: Standard on Disaster/Emergency

Management and Business Continuity Programs – ASIS/BSI BCM.01:2010 Business Continuity

Management Systems: Developed jointly between ASIS and BSI for North America

– AS 5050:2010- Standards Australia

Page 8: Planning for Disaster

PLAN

DO

CHECK

ACTBC&IS

Disaster Management

Page 9: Planning for Disaster

PM Framework-DRVulnerability

Value

Threat

BS 25999

BS 25777

Existing setup / Redundancy / New

Technologies

Page 10: Planning for Disaster

Risk ManagementPlan Risk Assessment

Risk Mitigation Plan

Vulnerability

Threat

People

Processes. Procedures

Technical

Asset Value

Do Risk Mitigation Products, Processes or People Controls

Audit Internal AuditCheck

Continual Improvement

Closing of Audit Gaps/Raising the BarAct

Continue with PDCA Cycle

Page 11: Planning for Disaster

Initial Plan

Acquire/ Analyze Data

Develop BCMS/ISMS

Implement BCMS/ISMS

Test BCM/S/ISMS

Continual Improvement

Aim-Provide initial planning and preparation for the assignment.

1. Scope and Service Acceptance Document C2. ISMS/BCMS Scope definition 3. BC/IS Policy Statement C4. BCM/Information Security Steering

Committee Charter C

Aim- to collect all relevant data pertaining to the scope- develop BIA/Risk Assessment methodology - perform asset enumeration/valuation

1. BIA/Risk Assessment Methodology2. Information Asset Valuation/Critical Asset

Valuation-C,I,A-C3. Critical/ information assets register-C

Aim-Perform BIA/ Risk Assessment on the identified critical /IT assets anddevelop BCP/Risk Treatment Plan.Develop mandatory policies and controls

1. Vulnerability Assessment-C2. Threat Assessment-C3. Risk Assessment Report (IS)4. BIA (RTO/RPO)5. BCP/DRP6. Risk Mitigation & Treatment Plan C7. Statement of Applicability (ISO 27001)8. BCP/DR Policies and Procedures C?9. IS Policies and Procedures C ?10. SOA (ISO 27001)11. BS 25999 Mandatory Controls 12. Control Implementation Roadmap

Aim-Implement BCP/Risk Mitigation Controls based on the BCP/control implementation road map

1. Implement controls identified 2. People (Training/Duties) C3. Implementing products C?4. Implementing Processes

Aim - To Test the BCP/DRP-To audit the ISMSPrepare for ISO 27001/BS 25999 Certification

1. BC/DR Test Results2. ISO 27001 Audit Reports

Aim-Continual Improvement of BCMS/ISMS

Certification against BS 25999/ISO 27001

Project Execution and Deliverables

Page 12: Planning for Disaster

Typical BC Plan•Introduction•Definitions•Abbreviations•Mission, objectives and intent•Key plan assumptions•Business impact analysis•Disaster recovery strategy•Disaster recovery organization•Disaster recovery management team responsibilities•Disaster recovery emergency procedures•Plan administration•Change management•Maintenance of the disaster recovery plan•Testing of the disaster recovery plan

Page 13: Planning for Disaster

Typical Disaster Recovery Organisation

Senior Recovery ManagerSenior Recovery Manager

Recovery ManagerRecovery Manager

Damage Assessment

Damage Assessment Physical SecurityPhysical Security

Infrastructure Restoration Team

Leader

Infrastructure Restoration Team

Leader

Application Restoration Team

Leader

Application Restoration Team

Leader

ERPERP POSPOS

Other ApplicationsOther Applications

AdministrationAssistant

AdministrationAssistant

NetworkNetworkHardwareHardware

Page 14: Planning for Disaster

Basic Principles-DR• Minimize injury to personnel• Minimize damage to equipment and facilities• Achieve a report of injury to personnel and damage

assessment within XX hours of the interruption• Recover IT capabilities and functionality within the

Critical Time Frames specified • In an emergency situation where life is threatened or you

are in danger of physical harm, immediately leave the facility.

Never place yourself in a dangerous situation or take unnecessary risks.

Page 15: Planning for Disaster

Senior Recovery Manager Responsibilities

• Pre-Disaster• Approves the final Disaster Recovery Plan• Ensures the Disaster Recovery Plan is maintained• Ensures Disaster Recovery training is conducted• Authorizes periodic Disaster Recovery Plan testing• Post-Disaster• Declares that a disaster has occurred and the Disaster Recovery Plan is

activated• Determines the plan strategy to be implemented • Determines alternate team members (if any) and other support members of

the recovery process• Authorizes travel and housing arrangements for team members• Authorizes expenditures • Manages and monitors the overall recovery process• Advises Senior Business Managers and user management on the status of

the disaster recovery efforts• Coordinates media and press releases

Page 16: Planning for Disaster

Check Off List-Network Assistant

Mission: To restore networking the capabilities required within the Critical Time Frames specified

• Upon notification of a disaster by the Management Team assemble at the designated site for a briefing on the extent of damages, escalation plan implemented and support required.

• Contact Telco for connecting up DR Site

• Indicate to DRT as to resumption details of network• Work closely with software, hardware and restoration team to restore services• Provide internal communication to team members as required• (Network Assistant should be provided with three additional mobile phones as an emergency measure)

Under no circumstances should the Network Assistant make any public statements regarding the disaster, its cause or its effect on the operations

 

Connectivity Reference Number

Bandwidth Telco Reference Number Telco Contact (land line)

Telco Contact (Mobile)

Page 17: Planning for Disaster

Information Technology Checklist-Plan Administration

• Change in LAN server(s), terminals, or personal computer workstations

• Change in operating system and utility software programs• Change in the design of production systems or files• Addition of deletion of a production system• Change in the scheme of backing up data or equipment• Change in the communications network design• Change in personnel assignments or the Information Technology

organization• Change in off-site storage facilities, location or methods of cycling

items• Improvements or physical change to the current LAN data center• Review of time frames for availability and delivery of replacement

computer components

Page 18: Planning for Disaster

Corporate Checklist-Plan Administration

• Is the Disaster Recovery Plan in conformance with the corporate by laws?

• Are Executive Management and the Board of Directors aware of the state and status of the Disaster Recovery Plan and Processes?

• Has a new division or department been formed?• Has a new system been developed for computer processing?• Has a system for computer processing been discontinued?• Have individuals within the Recovery Team been transferred,

promoted or terminated?• Has an internal system been significantly modified to change the

basic functions, data flow requirements or accounting requirements?• Has a sales office been opened, moved or closed?

Page 19: Planning for Disaster

Testing-Principles

‘Pull the plug’test. Shut down data center

Full-Interruption

Incorporated associated plans. Simulate disaster

Simulation

Extended Checklist check to see interaction & roles of participants

•Scenario•Freeplay•Controlled•Time lapse•Unannounced•Live•Tabletop•Individual components•Integrated Components

Walkthrough

Low

High

High

Low

Review & Challenge the contents of the plan

•Audit•Validation•Verification

Checklist

ComplexityFrequencyParticipantsProcessTechniquesType

Page 20: Planning for Disaster

Testing Check List

Type Techniques Process Participants Frequency Duration

Checklist • Audit• Validation• Verification

1.Review & Challenge the contents of the plan

2.Check all Check off lists are present and updated

3.Check back Up Tapes

4.Visit DR Site and ensure infrastructure/back up tapes available

5.Verify DR Team contacts

• Recovery Manager• Network Assistant• Restoration Team (2

Members)

Once a month 4 Hrs

Simulation 1 • Scenario• Controlled

1.Extended Checklist check to see interaction & roles of participants

2. Actual Restoration of back up tapes

• Recovery Manager• Network Assistant• Software Assistant• Hardware Assistant• Restoration Team (All

Members)

After Completion of minimum six check list type testing

Once in two months thereafter

One Non-working day

Page 21: Planning for Disaster

Testing Check List (Contd)Simulation 2 •Unannounced

•LiveExtended Checklist check to see interaction & roles of participants2. Actual Restoration of back up tapes

Full Recovery Team After Completion of Minimum two Simulation 1 TestingOnce in six months thereafter

One Non-Working Day

Full Interruption Announced Full and thorough check of DRP

Full Recovery Team Businesses

After Completion of Minimum three simulation testingTo be done only onceCan be done without affecting any business if proper timings are chosen to conduct this test

One Non Working Day

Page 22: Planning for Disaster

Planning for Disaster

Ramesh Ramani CISM [email protected]

Questions? Comments?