Planning for the Future Battle Creek’s Approach to Upgrading its Secondary Treatment Processes Michigan Water Environment Association Annual Conference June 21, 2016 Richard Beardslee, City of Battle Creek Nathan Cassity, Donohue & Associates

Upload: others

Post on 03-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Planning for the Future Battle Creek’s Approach to Upgrading its Secondary

Treatment Processes

Michigan Water Environment Association Annual Conference

June 21, 2016

Richard Beardslee, City of Battle Creek Nathan Cassity, Donohue & Associates

Page 2: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Outline and Acknowledgements

• Background

• Energy Evaluation

• Nutrient Evaluation

• Planned Upgrades

Outline

Battle Creek

• Marvin Krause

• Bryan Crawford

Donohue

• Mike Harvey

• Kendra Sveum

Acknowledgements

Page 3: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Battle Creek Background

Page 4: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Background: Battle Creek

Design capacity 27 mgd

Currently operating at 9 mgd

Flows have decreased over the years

Significant loadings from food processors and paper

Influent BOD

• 580 mg/L (2013-2014)

• 650 mg/L (2015)

Page 4 | November 12, 2015 MWEA

Page 5: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Background: Battle Creek

Page 5 | November 12, 2015 MWEA

Page 6: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Process Type: Single-Stage Activated Sludge with Nitrification

Background: Battle Creek

Page 7: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Background: Battle Creek, MI

• Project Drivers

– Energy conservation

– Aged facilities: Blowers cannot be repaired

– Aged facilities: Outdated aeration control

– Process Improvements: Nutrient deficiency issues

– Chemical Savings: Phosphorus control

Page 8: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Energy Evaluation

Page 9: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Energy Use

0%

10%

20%

30%

40%

50%

60%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Pe

rce

nt

of

To

tal E

ne

rgy

Use

Estimated Average Blower Energy Use by Month

40-55% of total energy use with peak use in summer months

Page 10: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Energy Use

Aeration system is the “low-hanging fruit”

45%

4%

1%

50%

Percent of Plant Energy Use

Aeration

Settled Sewage Pumps

RAS Pumps

Other Misc. Loads

Multiple uses and equipment systems

Start with the “Low-Hanging Fruit” for Significant Reductions and Returns on Investment

Page 11: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Existing Blower Systems

(3) Multi-Stage Centrifugal Blowers Turndown: Manual Inlet Throttling Max Flow: 21,000 scfm Min Flow: 13,000 scfm Age: > 30 years, motor replaced recently

(4) Positive Displacement Blowers No Turndown Capability Flow: 7,000 scfm Age: > 40 years, parts not available

Page 12: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Existing Aeration Control

• All adjustments are manual

• Handheld DO profile each shift

• SCADA monitoring

– Blower airflow

– DO at end of basins

• Operator periodically adjusts blowers and butterfly valves

Page 13: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Blowers

Aeration Control

Aeration Energy Picture

Diffusers

Energy Evaluation Approach

Comprehensive Aeration System Study Approach

1. Provide the air more efficiently

a. More efficient blower system

2. Reduce the amount of air Provided

a. Improved automation and controls

b. Increased oxygen transfer efficiency

c. Biological nutrient removal

Page 14: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Provide Air More Efficiently

Page 15: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Blowers

Aeration Control

Aeration Energy Picture

Diffusers

Provide Air More Efficiently

High Efficiency Blowers Will Reduce Aeration Energy

Page 16: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Provide Air More Efficiently

Opportunity : Improve Blower Reliability, Operating Efficiency and Turndown

25% Reduction In Blower Energy Use Turndown to Lowest Operating Requirement

Replacement of Aging Equipment

Page 17: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Existing Blowers

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

0% 20% 40% 60% 80% 100%

Air

flo

w (

scfm

)

Percent of Time Equal or Less Than

Existing blower capacity

Turndown to 20th percentile requirements

Probability Distribution Curve

Page 18: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Propose Blower Upgrades

Improved Turndown

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

0% 20% 40% 60% 80% 100%

Air

flo

w (

scfm

)

Percent of Time Equal or Less Than

Remaining centrifugal blower capacity

New turbo blower capacity

New equipment sized to meet majority of demand

Greater Energy Efficiency Over Operating Range

Page 19: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Estimated Blower Savings

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

Current Blowers New Blowers

Esti

mat

ed

An

nu

al k

Wh

• 25% Reduction in Blower Energy Use • $121,000 in annual electricity cost savings • $139,000 incentive rebate from utility • 10-Year Payback (no control upgrades)

Anticipated Savings:

Page 20: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Reduce Amount of Air Provided

Page 21: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Diffuser Efficiency

SOTE Per Foot of Submergence Based on Air Flow and Basins in Service

4

5

6

7

10,000 15,000 20,000 25,000 30,000

Basins in Service

Air Flow (scfm)

1.90-2.00 2.00-2.10 2.10-2.20 2.20-2.30 2.30-2.40 2.40-2.50

As airflow per diffuser increases, oxygen transfer efficiency decreases

Estimated annual savings of $30,000 by placing a 5th basin in service

Page 22: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Air Required Versus Air Supplied

Goal is to save energy by more closely matching air supply to air requirements:

0

5,000

10,000

15,000

20,000

25,000

2012 2013 2014

Air

flo

w, S

CFM

Average Air Required

Observed Periods of Potential Over-Aeration -> Energy Reduction Opportunity

Estimated Annual Savings Potential: $100K

Page 23: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Improved Control Strategies

Several Options to Consider:

Basic Control

Capital Cost, Energy Savings

Intermediate Control Advanced Control

Control Alternative Aeration Reduction

Potential Achieved (%) Estimated Energy Savings (kWh/yr)

Estimated Cost Savings ($/yr)

Basic 40 569,000 $40,000

Intermediate 60 1,138,000 $80,000

Advanced 100 1,423,000 $100,000

Page 24: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Aeration Control Strategy

Airflow meter and control valve

DO Probe

• DO Control Loops

– Every pass

– Airflow meter + control valve

– Most-open-valve

• Blower Control

– Pressure and Airflow based

Page 25: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Aeration Control Strategy

Blowers

To Other Tanks/Passes

FIT

FIT

Blower Speed Adjusts to the Total

Flow Setpoint

DO

Each of 3 Passes in Every Aeration Tank

DO Control with Direct Blower Air Flow Control

Eliminating Pressure Setpoint Can Provide Additional Energy Savings

Page 26: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Combined Blower and Control Savings

Anticipated Savings:

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

Current System Improved System

Esti

mat

ed

An

nu

al k

Wh

Additional 1,420,000 kWh per year

45% Total Reduction in Aeration Energy Use

Total estimated savings of $220,000 annually

Page 27: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Nutrient Evaluation

Page 28: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

• Phosphorus removal

– Ferric chloride used for chemical phosphorus removal

– Winter effluent limit 1 mg/L

– Summer TMDL limit of 0.5 mg/L

• Nutrient deficiency

– Nutrient addition required

• high food processor BOD loadings

– Nitrogen feed, urea: 25 tons annually

– Phosphorus feed, phosphoric acid: 823 tons annually

Battle Creek Nutrient Balance

Page 29: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

High Calcium Quicklime, $98,758.40

Polymer (K275FLX), $208,845.00

Ferric Chloride, $119,400.00

Sodium Bisulfite, $25,976.00

Chlorine, $68,220.00

Phosphoric Acid, $88,007.50

UAN-28, $8,125.00

Bioxide, $50,055.00

Annual Total: $667,000

More than one third of current chemical use is related to nutrients

Annual Chemical Costs

Page 30: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

• Nutrient Deficiency – BOD:N:P Ratio of 100:5:1 is Good Target

– Nutrient Addition

Page 30 | May 26, 2011

WWOA LMD

Battle Creek Primary Effluent

Date BOD TKN Tot-P

07/12/15 100 8.1 0.6

07/14/15 100 5.8 0.6

07/16/15 100 5.8 0.5

07/19/15 100 5.4 0.6

07/21/15 100 3.9 0.4

07/23/15 100 3.7 0.3

Battle Creek Nutrient Balance

Page 31: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

• Nutrient Deficiency – BOD:N:P Ratio of 100:5:1 is Good Target

– Nutrient Addition – UAN-28 and Phosphoric Acid

Page 31 | May 26, 2011

WWOA LMD

Battle Creek PE including N + P Dosing

Date BOD TKN Tot-P

07/12/15 100 8.1 1.1

07/14/15 100 5.8 1.1

07/16/15 100 5.8 0.9

07/19/15 100 5.4 1.1

07/21/15 100 4.5 0.8

07/23/15 100 4.6 0.8

Battle Creek Nutrient Balance

Page 32: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

• Nitrogen Deficiency

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

PE Pass 1 Pass 2 Pass 3

mgN

/L

Conceptual Profile – Excess Nitrogen

NH3-N NOX-N

Battle Creek Nutrient Balance

Page 33: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

• Nutrient Deficiency – Battle Creek: 3 of 6 days showed similar numbers

0.00

0.50

1.00

1.50

2.00

2.50

Pass 1 Pass 2 Pass 3

mgN

/L

07/15/15 Nitrogen Profile

NH3-N NOX-N

Battle Creek Nutrient Balance

Page 34: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

• Improve nutrient monitoring and control

– Effluent analyzers for ammonia, nitrate, and phosphorus

– Chemical feed based on maintaining minimum effluent concentrations

• Implement biological phosphorus removal

– Modify aeration basins to incorporate selectors

– Utilized BioWin modeling to estimate nutrient requirements and effluent P results

Battle Creek Nutrient Balance

Page 35: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Baffle Wall

Selector Mixer Diffuser

Modifications

Conceptual BPR Layout

Page 36: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Ammonia N

Nitrite + Nitrate

Soluble PO4-P

Chart

Primary Effluent Amended PE Pass 1 Zone 1 Pass 1 Zone 3 Pass 2 Zone 2 Pass 3 Zone 2 Effluent

CO

NC

. (m

g/L

)

11

10

9

8

7

6

5

4

3

2

1

0

6.8

10.9

10.0

0.10.4 0.5 0.5

0.0

1.4

0.0 0.0

1.9

4.9 4.9

1.61.8

3.1

0.6

0.1 0.2 0.2

(Selector)

P release in selector P uptake

Nutrient Profile Predicted in BioWin Model of Bio-P Configuration

Model Results – nutrient profiles

Page 37: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

$0

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

Current Operation Improved Nitrogen Bio-P

Estimated Annual Spending

RAS Chlorine

Ferric Chloride

Phos. Acid

UAN-28

$34,000 Increase for Nitrogen Dosing

Net Savings: $178,000

$11,000 Savings on RAS Chlorination

+

Model Results – chemical cost savings

Page 38: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Summary of Planned Improvements

Page 39: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Summary of Planned Improvements

Improvement Estimated Construction

Estimated Annual Savings

Aeration Blowers $2.55M $121,000

Aeration Controls $1.54M $99,000

BPR Modifications $1.58M $110,000

Nutrient Feed Controls 0.365M $68,000

Total $6.04M $398,000

Page 40: Planning for the Future - mi-wea.org...•Kendra Sveum Acknowledgements . Battle Creek Background . Background: Battle Creek Design capacity 27 mgd ... Improved Turndown 0 10,000 20,000

Planning for the Future Battle Creek’s Approach to Upgrading its Secondary

Treatment Processes

Michigan Water Environment Association Annual Conference

June 21, 2016

Richard Beardslee, City of Battle Creek Nathan Cassity, Donohue & Associates