Page 1: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Dandi Nine Ltd Vaughan Road Aparthotel

Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Ltd information and use in relation to the Vaughan Road Aparthotel scheme

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Ltd Project Vaughan Road Aparthotel Document Title Planning Stage Drainage Strategy Document Reference 6601343-MLM-ZZ-XX-RP-C-0001 MLM Reference JR 6601343 JJB

Revision Status Description Author CheckedApproved Date

P01 S2 Issued for Comment James Noble Martin Cozens 28082020

P02 S2 Amendments throughout James Noble John Barrell 22092020

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report

Contents

1 Introduction 1

2 Thames Water Asset Map 1

3 Foul Drainage 2

31 Existing Foul Water Drainage 2 32 Proposed Foul Water Drainage 2

4 Flood Risk 3

5 Exceedance Routes 3

6 Surface Water Drainage 4

61 Existing Surface Water Drainage 4 62 Proposed Surface Water Drainage 4

7 Treatment 5

8 Future Maintenance 6

9 Conclusion 6

91 Foul Water 6 92 Surface Water 7

Appendix A - Thames Water Correspondence

Appendix B - Thames Water Pre-planning Enquiry

Appendix C - Flood Exceedance Routes

Appendix D - Drainage Calculations

Appendix E - Drainage Strategy

Appendix F - SuDS Maintenance Plan

Appendix G - Foul Water Pump Specification

Appendix H - Surface Water Pump Specification

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 1

1 Introduction

This report has been prepared for the sole use of Dandi Nine Limited and the contents should not be relied upon by others without the express written authority of MLM Consulting Engineers Limited If any unauthorised third party makes use of this report they do so at their own risk and MLM owes them no duty of care

MLM have been appointed for the Civil and Structural design of a new aparthotel in Harrow

The proposed 129 room aparthotel with associated fifth-floor restaurant gym ground floor commercial space external hard and soft landscaping small car parking area to the rear of the site and external amenity space located on an existing (disused) carpark on Vaughan Road Harrow The current site is approximately 012ha and mostly impermeable with a small area of vegetation verge running along the northern and eastern boundaries

MLM were also appointed in 2017 for Civil and Structural design for a previous residential scheme on the same site which gained various approvals in relation to the sites surface amp foul water connections and flood exceedance routes

This report has been produced in support of the proposed developments planning application and relates to all onsite private drainage proposals within the sites red line boundary only All offsite works beyond the sites boundary is not included within this report

Whilst this report will discuss elements of flood risk a flood risk assessment (FRA) is not required under NPPF guidelines due to the size of the site being below 10ha and its location within flood zone 1

2 Thames Water Asset Map

Figure 1 below is an extract of Thames Water assets located in surrounding the site The map has been extracted from correspondence with Thames Water within Appendix A

Figure 1

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 2

3 Foul Drainage

31 Existing Foul Water Drainage

There are no known existing foul sewers located on the existing car park site With reference to Thames Water Asset plans all potential offsite existing foul sewer connection points have been assessed as follows

There are a number of other existing Thames Water Foul manholes located approximately 45m to the East adjacent to the BP garage Any proposed connection to these sewers would require crossing the busy Bessborough Road therefore connection into this sewer has been discounted

The nearest existing Thames Water Foul sewer is located 25m to the West along Vaughan Road indicated as Manhole EXFW A on the drainage strategy drawing 6601343-MLM-ZZ-XX-DR-C-0001 within Appendix E A number of smaller adoptable sewers connect from the recently built houses (4No) to the West of the development which connect into the head of the existing Thames Water main foul sewer

No manhole reference cover or invert level information has been identified on the Thames Water records and all existing site surveys do not extend to this location It is proposed to connect the developments onsite foul network to a new length of gravity sewer within Vaughan Road discharging into manhole EXFW A

In advance of detail design further survey works will need to be carried out to confirm the assumed invert level of existing Thames water manhole EXFW A

32 Proposed Foul Water Drainage

The Northern lower half of the development is at a lower level that Vaughan Road with an approximate proposed floor level of 649m The proposed private onsite foul network therefore will have an approximate outfall invert level of 6374m

The developments foul outfall connection point at Thames Water manhole EXFW A is assumed to have the water authority minimum standard depth to invert of 12m resulting in an invert level of approximately 6395m

The invert level of existing manhole EXFW A is therefore higher than the onsite invert level which means a full gravity connection will not be feasible

It is therefore proposed to use an onsite private package pump with associated 24hr storage (storage in manhole or tank) and pump flows at an agreed rate with Thames Water to a final onsite gravity manhole Details of the foul pump can be found within Appendix G

From the boundary of the development a new foul gravity sewer will be constructed below Vaughan Road to existing manhole EXFW A The new foul sewer will be constructed in accordance with Thames Water requirements and will be offered for adoption under a Section 104 agreement

A pre-planning enquiry was submitted to Thames Water for the proposed connection into the existing manhole EXFW A at a peak discharge rate of 82ls Thames Water have confirmed in principle that this connection point and discharge rate are acceptable For further detail refer to Thames Water Pre-planning enquiry Appendix B

All proposals are subject to the additional survey work described above a Thames Water Section 106 and Section 104 application (and Thames Water approval) and full coordination with the design team at detailed design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 3

Details of the proposed foul drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

4 Flood Risk

The site is located within flood Zone 1 and is smaller than 10ha therefore the site is considered Low Risk and a scheme specific flood risk assessment (FRA) is not required

The below extract taken from the GOVUK Flood Risk from Surface Water indicates a very low risk with no surface water flooding onsite

There is however Low Risk surface water flooding on the adjacent highway (Vaughan road) A new drop crossing is required to access the site from Vaughan Road This crossing and all works along the existing highway site boundary to the south will retain the existing levels Therefore risk of flooding from offsite will not be effected with the onsite risk remaining very low

5 Exceedance Routes

In accordance with good drainage practice consideration must be given to the effects of drainage system failure or for storm events greater than those used in the design analysis

lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing 6601343-MLM-ZZ-XX-DR-C-0002 shows proposed finished floor and external levels above ground exceedance flow routes (blue arrows) across the site which routes run-off away from the new building and prevents water leaving site In extreme cases the flood waters will overtop into a high level overflow pipe as indicated by the red arrow preventing surface water from entering the building The lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing is included as Appendix C

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 4

6 Surface Water Drainage

61 Existing Surface Water Drainage

An existing 25m diameter 135m deep concrete Thames Water trunk sewer crosses the site in the South East corner

During the previous residential scheme Thames Water requested a build over or near agreement be entered into to ensure the proposed development does not impact the trunk sewer The new Aparthotel scheme has where appropriate ensure that Thames Waterrsquos build over or near requirements have been met when positioning the building and developing the preliminary foundation design A full detailed application will be made to Thames Water at the detail design stage

The scheme site survey has confirmed that the previous car park drained via five existing gullies located on the lower Northern boundary of the car park A CCTV survey confirmed that these gullies discharge to a lsquoyrsquo connection at point 901B as shown on the Thames Water asset map From point 901B the sitersquos surface water discharges into the existing Thames Water network within the adjacent underpass manhole ref 9009

The existing underpass network then outfalls to an existing 28m diameter 812m deep Thames Water surface water catchpit ref 901A located in the South Eastern corner of the site The catchpit then discharges via a 300dia sewer to the trunk sewer below

62 Proposed Surface Water Drainage

The developments proposed surface water run-off from the building will be collected via a combination of green blue roof and rainwater pipes with the external hard paved areas by porous paving

The inclusion of a large roof garden and smaller planted roof terraces (green roofs) not only increases the bio-diversity water treatment and improves air quality of the existing site which currently is predominantly hard paved but also aids with the capture control and delay of surface water runoff at source A portion of the surface water will also be harvested for irrigation purposes The inclusion of porous paving for the external hard paved areas will also contribute to water treatment control and delay of surface water runoff at source

Due to the non-porous nature and restricted external space infiltration is not feasible The surface water run-off will therefore be conveyed to a below ground attenuation tank located below the external car park The attenuation tank and associated network will be installed approximately 2-25m deep due to the low lying level of the adjacent underpass and eastern courtyard

The developments will re-use the existing carparks surface water outfall A new adoptable onsite demarcation chamber will be required at the boundary of the site and a new adoptable manhole (ref 901B) will be built on the line of the existing 150dia lateral sewer The existing offsite 150dia sewer downstream of the new manhole is to be offered for adoption by Thames Water

The surface water offsite discharge rate will be restricted to 50 ls for up to and including the 1 in 100 year storm event plus a 40 allowance for climate change Due to the depth of the proposed drainage network and attenuation it will be necessary to pump surface water flows up into the demarcation chamber From this point surface water will flow by gravity into manhole 901B Details of the surface water pump can be found within Appendix H

A high level overflow from the pump chamber to the demarcation chamber will also be installed to ensure that in the unlikely event of pump failure surface water flows will overtop into the network and not flood the building or leave site

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 5

The proposed discharge rate of 50ls connection point and adoption of the existing 150dia lateral sewer have been approved in principle by Thames Water Correspondence can be found within Appendix A The proposed connection will be subject to full technical approval and a Thames Water Section 106 agreement during the detailed design

The design team have liaised with Harrow InfrastructureHighways team throughout the pre-planning stage and have received confirmation that in principle the strategy is acceptable

It is proposed to attenuate in below ground storage tanks and where achievable within the porous paving sub-base Based on the restricted 50ls an onsite attenuation volume approximately 50m3 ndash 72m3 (with the 40 climate change) will be required for the development For the surface water calculations please refer to Appendix D

Details of the proposed surface water drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

7 Treatment

With reference to the SuDS manualrsquos pollution hazard land use classification table 262 the Aparthotel roof and external pedestrian areas parking spaces are classified as having a very low and low pollution hazard levels respectively

The required hazard indices for a site of this type should achieve or better the hazard indices identified for Total suspended Solids Metals and Hydrocarbons Refer to Figure 1 below indicating the SuDS manual

Table 262 Figure 1 ndash Pollution hazard indices for different land use classification Table 262

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 2: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Ltd information and use in relation to the Vaughan Road Aparthotel scheme

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Ltd Project Vaughan Road Aparthotel Document Title Planning Stage Drainage Strategy Document Reference 6601343-MLM-ZZ-XX-RP-C-0001 MLM Reference JR 6601343 JJB

Revision Status Description Author CheckedApproved Date

P01 S2 Issued for Comment James Noble Martin Cozens 28082020

P02 S2 Amendments throughout James Noble John Barrell 22092020

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report

Contents

1 Introduction 1

2 Thames Water Asset Map 1

3 Foul Drainage 2

31 Existing Foul Water Drainage 2 32 Proposed Foul Water Drainage 2

4 Flood Risk 3

5 Exceedance Routes 3

6 Surface Water Drainage 4

61 Existing Surface Water Drainage 4 62 Proposed Surface Water Drainage 4

7 Treatment 5

8 Future Maintenance 6

9 Conclusion 6

91 Foul Water 6 92 Surface Water 7

Appendix A - Thames Water Correspondence

Appendix B - Thames Water Pre-planning Enquiry

Appendix C - Flood Exceedance Routes

Appendix D - Drainage Calculations

Appendix E - Drainage Strategy

Appendix F - SuDS Maintenance Plan

Appendix G - Foul Water Pump Specification

Appendix H - Surface Water Pump Specification

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 1

1 Introduction

This report has been prepared for the sole use of Dandi Nine Limited and the contents should not be relied upon by others without the express written authority of MLM Consulting Engineers Limited If any unauthorised third party makes use of this report they do so at their own risk and MLM owes them no duty of care

MLM have been appointed for the Civil and Structural design of a new aparthotel in Harrow

The proposed 129 room aparthotel with associated fifth-floor restaurant gym ground floor commercial space external hard and soft landscaping small car parking area to the rear of the site and external amenity space located on an existing (disused) carpark on Vaughan Road Harrow The current site is approximately 012ha and mostly impermeable with a small area of vegetation verge running along the northern and eastern boundaries

MLM were also appointed in 2017 for Civil and Structural design for a previous residential scheme on the same site which gained various approvals in relation to the sites surface amp foul water connections and flood exceedance routes

This report has been produced in support of the proposed developments planning application and relates to all onsite private drainage proposals within the sites red line boundary only All offsite works beyond the sites boundary is not included within this report

Whilst this report will discuss elements of flood risk a flood risk assessment (FRA) is not required under NPPF guidelines due to the size of the site being below 10ha and its location within flood zone 1

2 Thames Water Asset Map

Figure 1 below is an extract of Thames Water assets located in surrounding the site The map has been extracted from correspondence with Thames Water within Appendix A

Figure 1

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 2

3 Foul Drainage

31 Existing Foul Water Drainage

There are no known existing foul sewers located on the existing car park site With reference to Thames Water Asset plans all potential offsite existing foul sewer connection points have been assessed as follows

There are a number of other existing Thames Water Foul manholes located approximately 45m to the East adjacent to the BP garage Any proposed connection to these sewers would require crossing the busy Bessborough Road therefore connection into this sewer has been discounted

The nearest existing Thames Water Foul sewer is located 25m to the West along Vaughan Road indicated as Manhole EXFW A on the drainage strategy drawing 6601343-MLM-ZZ-XX-DR-C-0001 within Appendix E A number of smaller adoptable sewers connect from the recently built houses (4No) to the West of the development which connect into the head of the existing Thames Water main foul sewer

No manhole reference cover or invert level information has been identified on the Thames Water records and all existing site surveys do not extend to this location It is proposed to connect the developments onsite foul network to a new length of gravity sewer within Vaughan Road discharging into manhole EXFW A

In advance of detail design further survey works will need to be carried out to confirm the assumed invert level of existing Thames water manhole EXFW A

32 Proposed Foul Water Drainage

The Northern lower half of the development is at a lower level that Vaughan Road with an approximate proposed floor level of 649m The proposed private onsite foul network therefore will have an approximate outfall invert level of 6374m

The developments foul outfall connection point at Thames Water manhole EXFW A is assumed to have the water authority minimum standard depth to invert of 12m resulting in an invert level of approximately 6395m

The invert level of existing manhole EXFW A is therefore higher than the onsite invert level which means a full gravity connection will not be feasible

It is therefore proposed to use an onsite private package pump with associated 24hr storage (storage in manhole or tank) and pump flows at an agreed rate with Thames Water to a final onsite gravity manhole Details of the foul pump can be found within Appendix G

From the boundary of the development a new foul gravity sewer will be constructed below Vaughan Road to existing manhole EXFW A The new foul sewer will be constructed in accordance with Thames Water requirements and will be offered for adoption under a Section 104 agreement

A pre-planning enquiry was submitted to Thames Water for the proposed connection into the existing manhole EXFW A at a peak discharge rate of 82ls Thames Water have confirmed in principle that this connection point and discharge rate are acceptable For further detail refer to Thames Water Pre-planning enquiry Appendix B

All proposals are subject to the additional survey work described above a Thames Water Section 106 and Section 104 application (and Thames Water approval) and full coordination with the design team at detailed design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 3

Details of the proposed foul drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

4 Flood Risk

The site is located within flood Zone 1 and is smaller than 10ha therefore the site is considered Low Risk and a scheme specific flood risk assessment (FRA) is not required

The below extract taken from the GOVUK Flood Risk from Surface Water indicates a very low risk with no surface water flooding onsite

There is however Low Risk surface water flooding on the adjacent highway (Vaughan road) A new drop crossing is required to access the site from Vaughan Road This crossing and all works along the existing highway site boundary to the south will retain the existing levels Therefore risk of flooding from offsite will not be effected with the onsite risk remaining very low

5 Exceedance Routes

In accordance with good drainage practice consideration must be given to the effects of drainage system failure or for storm events greater than those used in the design analysis

lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing 6601343-MLM-ZZ-XX-DR-C-0002 shows proposed finished floor and external levels above ground exceedance flow routes (blue arrows) across the site which routes run-off away from the new building and prevents water leaving site In extreme cases the flood waters will overtop into a high level overflow pipe as indicated by the red arrow preventing surface water from entering the building The lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing is included as Appendix C

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 4

6 Surface Water Drainage

61 Existing Surface Water Drainage

An existing 25m diameter 135m deep concrete Thames Water trunk sewer crosses the site in the South East corner

During the previous residential scheme Thames Water requested a build over or near agreement be entered into to ensure the proposed development does not impact the trunk sewer The new Aparthotel scheme has where appropriate ensure that Thames Waterrsquos build over or near requirements have been met when positioning the building and developing the preliminary foundation design A full detailed application will be made to Thames Water at the detail design stage

The scheme site survey has confirmed that the previous car park drained via five existing gullies located on the lower Northern boundary of the car park A CCTV survey confirmed that these gullies discharge to a lsquoyrsquo connection at point 901B as shown on the Thames Water asset map From point 901B the sitersquos surface water discharges into the existing Thames Water network within the adjacent underpass manhole ref 9009

The existing underpass network then outfalls to an existing 28m diameter 812m deep Thames Water surface water catchpit ref 901A located in the South Eastern corner of the site The catchpit then discharges via a 300dia sewer to the trunk sewer below

62 Proposed Surface Water Drainage

The developments proposed surface water run-off from the building will be collected via a combination of green blue roof and rainwater pipes with the external hard paved areas by porous paving

The inclusion of a large roof garden and smaller planted roof terraces (green roofs) not only increases the bio-diversity water treatment and improves air quality of the existing site which currently is predominantly hard paved but also aids with the capture control and delay of surface water runoff at source A portion of the surface water will also be harvested for irrigation purposes The inclusion of porous paving for the external hard paved areas will also contribute to water treatment control and delay of surface water runoff at source

Due to the non-porous nature and restricted external space infiltration is not feasible The surface water run-off will therefore be conveyed to a below ground attenuation tank located below the external car park The attenuation tank and associated network will be installed approximately 2-25m deep due to the low lying level of the adjacent underpass and eastern courtyard

The developments will re-use the existing carparks surface water outfall A new adoptable onsite demarcation chamber will be required at the boundary of the site and a new adoptable manhole (ref 901B) will be built on the line of the existing 150dia lateral sewer The existing offsite 150dia sewer downstream of the new manhole is to be offered for adoption by Thames Water

The surface water offsite discharge rate will be restricted to 50 ls for up to and including the 1 in 100 year storm event plus a 40 allowance for climate change Due to the depth of the proposed drainage network and attenuation it will be necessary to pump surface water flows up into the demarcation chamber From this point surface water will flow by gravity into manhole 901B Details of the surface water pump can be found within Appendix H

A high level overflow from the pump chamber to the demarcation chamber will also be installed to ensure that in the unlikely event of pump failure surface water flows will overtop into the network and not flood the building or leave site

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 5

The proposed discharge rate of 50ls connection point and adoption of the existing 150dia lateral sewer have been approved in principle by Thames Water Correspondence can be found within Appendix A The proposed connection will be subject to full technical approval and a Thames Water Section 106 agreement during the detailed design

The design team have liaised with Harrow InfrastructureHighways team throughout the pre-planning stage and have received confirmation that in principle the strategy is acceptable

It is proposed to attenuate in below ground storage tanks and where achievable within the porous paving sub-base Based on the restricted 50ls an onsite attenuation volume approximately 50m3 ndash 72m3 (with the 40 climate change) will be required for the development For the surface water calculations please refer to Appendix D

Details of the proposed surface water drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

7 Treatment

With reference to the SuDS manualrsquos pollution hazard land use classification table 262 the Aparthotel roof and external pedestrian areas parking spaces are classified as having a very low and low pollution hazard levels respectively

The required hazard indices for a site of this type should achieve or better the hazard indices identified for Total suspended Solids Metals and Hydrocarbons Refer to Figure 1 below indicating the SuDS manual

Table 262 Figure 1 ndash Pollution hazard indices for different land use classification Table 262

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 3: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report

Contents

1 Introduction 1

2 Thames Water Asset Map 1

3 Foul Drainage 2

31 Existing Foul Water Drainage 2 32 Proposed Foul Water Drainage 2

4 Flood Risk 3

5 Exceedance Routes 3

6 Surface Water Drainage 4

61 Existing Surface Water Drainage 4 62 Proposed Surface Water Drainage 4

7 Treatment 5

8 Future Maintenance 6

9 Conclusion 6

91 Foul Water 6 92 Surface Water 7

Appendix A - Thames Water Correspondence

Appendix B - Thames Water Pre-planning Enquiry

Appendix C - Flood Exceedance Routes

Appendix D - Drainage Calculations

Appendix E - Drainage Strategy

Appendix F - SuDS Maintenance Plan

Appendix G - Foul Water Pump Specification

Appendix H - Surface Water Pump Specification

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 1

1 Introduction

This report has been prepared for the sole use of Dandi Nine Limited and the contents should not be relied upon by others without the express written authority of MLM Consulting Engineers Limited If any unauthorised third party makes use of this report they do so at their own risk and MLM owes them no duty of care

MLM have been appointed for the Civil and Structural design of a new aparthotel in Harrow

The proposed 129 room aparthotel with associated fifth-floor restaurant gym ground floor commercial space external hard and soft landscaping small car parking area to the rear of the site and external amenity space located on an existing (disused) carpark on Vaughan Road Harrow The current site is approximately 012ha and mostly impermeable with a small area of vegetation verge running along the northern and eastern boundaries

MLM were also appointed in 2017 for Civil and Structural design for a previous residential scheme on the same site which gained various approvals in relation to the sites surface amp foul water connections and flood exceedance routes

This report has been produced in support of the proposed developments planning application and relates to all onsite private drainage proposals within the sites red line boundary only All offsite works beyond the sites boundary is not included within this report

Whilst this report will discuss elements of flood risk a flood risk assessment (FRA) is not required under NPPF guidelines due to the size of the site being below 10ha and its location within flood zone 1

2 Thames Water Asset Map

Figure 1 below is an extract of Thames Water assets located in surrounding the site The map has been extracted from correspondence with Thames Water within Appendix A

Figure 1

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 2

3 Foul Drainage

31 Existing Foul Water Drainage

There are no known existing foul sewers located on the existing car park site With reference to Thames Water Asset plans all potential offsite existing foul sewer connection points have been assessed as follows

There are a number of other existing Thames Water Foul manholes located approximately 45m to the East adjacent to the BP garage Any proposed connection to these sewers would require crossing the busy Bessborough Road therefore connection into this sewer has been discounted

The nearest existing Thames Water Foul sewer is located 25m to the West along Vaughan Road indicated as Manhole EXFW A on the drainage strategy drawing 6601343-MLM-ZZ-XX-DR-C-0001 within Appendix E A number of smaller adoptable sewers connect from the recently built houses (4No) to the West of the development which connect into the head of the existing Thames Water main foul sewer

No manhole reference cover or invert level information has been identified on the Thames Water records and all existing site surveys do not extend to this location It is proposed to connect the developments onsite foul network to a new length of gravity sewer within Vaughan Road discharging into manhole EXFW A

In advance of detail design further survey works will need to be carried out to confirm the assumed invert level of existing Thames water manhole EXFW A

32 Proposed Foul Water Drainage

The Northern lower half of the development is at a lower level that Vaughan Road with an approximate proposed floor level of 649m The proposed private onsite foul network therefore will have an approximate outfall invert level of 6374m

The developments foul outfall connection point at Thames Water manhole EXFW A is assumed to have the water authority minimum standard depth to invert of 12m resulting in an invert level of approximately 6395m

The invert level of existing manhole EXFW A is therefore higher than the onsite invert level which means a full gravity connection will not be feasible

It is therefore proposed to use an onsite private package pump with associated 24hr storage (storage in manhole or tank) and pump flows at an agreed rate with Thames Water to a final onsite gravity manhole Details of the foul pump can be found within Appendix G

From the boundary of the development a new foul gravity sewer will be constructed below Vaughan Road to existing manhole EXFW A The new foul sewer will be constructed in accordance with Thames Water requirements and will be offered for adoption under a Section 104 agreement

A pre-planning enquiry was submitted to Thames Water for the proposed connection into the existing manhole EXFW A at a peak discharge rate of 82ls Thames Water have confirmed in principle that this connection point and discharge rate are acceptable For further detail refer to Thames Water Pre-planning enquiry Appendix B

All proposals are subject to the additional survey work described above a Thames Water Section 106 and Section 104 application (and Thames Water approval) and full coordination with the design team at detailed design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 3

Details of the proposed foul drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

4 Flood Risk

The site is located within flood Zone 1 and is smaller than 10ha therefore the site is considered Low Risk and a scheme specific flood risk assessment (FRA) is not required

The below extract taken from the GOVUK Flood Risk from Surface Water indicates a very low risk with no surface water flooding onsite

There is however Low Risk surface water flooding on the adjacent highway (Vaughan road) A new drop crossing is required to access the site from Vaughan Road This crossing and all works along the existing highway site boundary to the south will retain the existing levels Therefore risk of flooding from offsite will not be effected with the onsite risk remaining very low

5 Exceedance Routes

In accordance with good drainage practice consideration must be given to the effects of drainage system failure or for storm events greater than those used in the design analysis

lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing 6601343-MLM-ZZ-XX-DR-C-0002 shows proposed finished floor and external levels above ground exceedance flow routes (blue arrows) across the site which routes run-off away from the new building and prevents water leaving site In extreme cases the flood waters will overtop into a high level overflow pipe as indicated by the red arrow preventing surface water from entering the building The lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing is included as Appendix C

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 4

6 Surface Water Drainage

61 Existing Surface Water Drainage

An existing 25m diameter 135m deep concrete Thames Water trunk sewer crosses the site in the South East corner

During the previous residential scheme Thames Water requested a build over or near agreement be entered into to ensure the proposed development does not impact the trunk sewer The new Aparthotel scheme has where appropriate ensure that Thames Waterrsquos build over or near requirements have been met when positioning the building and developing the preliminary foundation design A full detailed application will be made to Thames Water at the detail design stage

The scheme site survey has confirmed that the previous car park drained via five existing gullies located on the lower Northern boundary of the car park A CCTV survey confirmed that these gullies discharge to a lsquoyrsquo connection at point 901B as shown on the Thames Water asset map From point 901B the sitersquos surface water discharges into the existing Thames Water network within the adjacent underpass manhole ref 9009

The existing underpass network then outfalls to an existing 28m diameter 812m deep Thames Water surface water catchpit ref 901A located in the South Eastern corner of the site The catchpit then discharges via a 300dia sewer to the trunk sewer below

62 Proposed Surface Water Drainage

The developments proposed surface water run-off from the building will be collected via a combination of green blue roof and rainwater pipes with the external hard paved areas by porous paving

The inclusion of a large roof garden and smaller planted roof terraces (green roofs) not only increases the bio-diversity water treatment and improves air quality of the existing site which currently is predominantly hard paved but also aids with the capture control and delay of surface water runoff at source A portion of the surface water will also be harvested for irrigation purposes The inclusion of porous paving for the external hard paved areas will also contribute to water treatment control and delay of surface water runoff at source

Due to the non-porous nature and restricted external space infiltration is not feasible The surface water run-off will therefore be conveyed to a below ground attenuation tank located below the external car park The attenuation tank and associated network will be installed approximately 2-25m deep due to the low lying level of the adjacent underpass and eastern courtyard

The developments will re-use the existing carparks surface water outfall A new adoptable onsite demarcation chamber will be required at the boundary of the site and a new adoptable manhole (ref 901B) will be built on the line of the existing 150dia lateral sewer The existing offsite 150dia sewer downstream of the new manhole is to be offered for adoption by Thames Water

The surface water offsite discharge rate will be restricted to 50 ls for up to and including the 1 in 100 year storm event plus a 40 allowance for climate change Due to the depth of the proposed drainage network and attenuation it will be necessary to pump surface water flows up into the demarcation chamber From this point surface water will flow by gravity into manhole 901B Details of the surface water pump can be found within Appendix H

A high level overflow from the pump chamber to the demarcation chamber will also be installed to ensure that in the unlikely event of pump failure surface water flows will overtop into the network and not flood the building or leave site

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 5

The proposed discharge rate of 50ls connection point and adoption of the existing 150dia lateral sewer have been approved in principle by Thames Water Correspondence can be found within Appendix A The proposed connection will be subject to full technical approval and a Thames Water Section 106 agreement during the detailed design

The design team have liaised with Harrow InfrastructureHighways team throughout the pre-planning stage and have received confirmation that in principle the strategy is acceptable

It is proposed to attenuate in below ground storage tanks and where achievable within the porous paving sub-base Based on the restricted 50ls an onsite attenuation volume approximately 50m3 ndash 72m3 (with the 40 climate change) will be required for the development For the surface water calculations please refer to Appendix D

Details of the proposed surface water drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

7 Treatment

With reference to the SuDS manualrsquos pollution hazard land use classification table 262 the Aparthotel roof and external pedestrian areas parking spaces are classified as having a very low and low pollution hazard levels respectively

The required hazard indices for a site of this type should achieve or better the hazard indices identified for Total suspended Solids Metals and Hydrocarbons Refer to Figure 1 below indicating the SuDS manual

Table 262 Figure 1 ndash Pollution hazard indices for different land use classification Table 262

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 4: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 1

1 Introduction

This report has been prepared for the sole use of Dandi Nine Limited and the contents should not be relied upon by others without the express written authority of MLM Consulting Engineers Limited If any unauthorised third party makes use of this report they do so at their own risk and MLM owes them no duty of care

MLM have been appointed for the Civil and Structural design of a new aparthotel in Harrow

The proposed 129 room aparthotel with associated fifth-floor restaurant gym ground floor commercial space external hard and soft landscaping small car parking area to the rear of the site and external amenity space located on an existing (disused) carpark on Vaughan Road Harrow The current site is approximately 012ha and mostly impermeable with a small area of vegetation verge running along the northern and eastern boundaries

MLM were also appointed in 2017 for Civil and Structural design for a previous residential scheme on the same site which gained various approvals in relation to the sites surface amp foul water connections and flood exceedance routes

This report has been produced in support of the proposed developments planning application and relates to all onsite private drainage proposals within the sites red line boundary only All offsite works beyond the sites boundary is not included within this report

Whilst this report will discuss elements of flood risk a flood risk assessment (FRA) is not required under NPPF guidelines due to the size of the site being below 10ha and its location within flood zone 1

2 Thames Water Asset Map

Figure 1 below is an extract of Thames Water assets located in surrounding the site The map has been extracted from correspondence with Thames Water within Appendix A

Figure 1

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 2

3 Foul Drainage

31 Existing Foul Water Drainage

There are no known existing foul sewers located on the existing car park site With reference to Thames Water Asset plans all potential offsite existing foul sewer connection points have been assessed as follows

There are a number of other existing Thames Water Foul manholes located approximately 45m to the East adjacent to the BP garage Any proposed connection to these sewers would require crossing the busy Bessborough Road therefore connection into this sewer has been discounted

The nearest existing Thames Water Foul sewer is located 25m to the West along Vaughan Road indicated as Manhole EXFW A on the drainage strategy drawing 6601343-MLM-ZZ-XX-DR-C-0001 within Appendix E A number of smaller adoptable sewers connect from the recently built houses (4No) to the West of the development which connect into the head of the existing Thames Water main foul sewer

No manhole reference cover or invert level information has been identified on the Thames Water records and all existing site surveys do not extend to this location It is proposed to connect the developments onsite foul network to a new length of gravity sewer within Vaughan Road discharging into manhole EXFW A

In advance of detail design further survey works will need to be carried out to confirm the assumed invert level of existing Thames water manhole EXFW A

32 Proposed Foul Water Drainage

The Northern lower half of the development is at a lower level that Vaughan Road with an approximate proposed floor level of 649m The proposed private onsite foul network therefore will have an approximate outfall invert level of 6374m

The developments foul outfall connection point at Thames Water manhole EXFW A is assumed to have the water authority minimum standard depth to invert of 12m resulting in an invert level of approximately 6395m

The invert level of existing manhole EXFW A is therefore higher than the onsite invert level which means a full gravity connection will not be feasible

It is therefore proposed to use an onsite private package pump with associated 24hr storage (storage in manhole or tank) and pump flows at an agreed rate with Thames Water to a final onsite gravity manhole Details of the foul pump can be found within Appendix G

From the boundary of the development a new foul gravity sewer will be constructed below Vaughan Road to existing manhole EXFW A The new foul sewer will be constructed in accordance with Thames Water requirements and will be offered for adoption under a Section 104 agreement

A pre-planning enquiry was submitted to Thames Water for the proposed connection into the existing manhole EXFW A at a peak discharge rate of 82ls Thames Water have confirmed in principle that this connection point and discharge rate are acceptable For further detail refer to Thames Water Pre-planning enquiry Appendix B

All proposals are subject to the additional survey work described above a Thames Water Section 106 and Section 104 application (and Thames Water approval) and full coordination with the design team at detailed design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 3

Details of the proposed foul drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

4 Flood Risk

The site is located within flood Zone 1 and is smaller than 10ha therefore the site is considered Low Risk and a scheme specific flood risk assessment (FRA) is not required

The below extract taken from the GOVUK Flood Risk from Surface Water indicates a very low risk with no surface water flooding onsite

There is however Low Risk surface water flooding on the adjacent highway (Vaughan road) A new drop crossing is required to access the site from Vaughan Road This crossing and all works along the existing highway site boundary to the south will retain the existing levels Therefore risk of flooding from offsite will not be effected with the onsite risk remaining very low

5 Exceedance Routes

In accordance with good drainage practice consideration must be given to the effects of drainage system failure or for storm events greater than those used in the design analysis

lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing 6601343-MLM-ZZ-XX-DR-C-0002 shows proposed finished floor and external levels above ground exceedance flow routes (blue arrows) across the site which routes run-off away from the new building and prevents water leaving site In extreme cases the flood waters will overtop into a high level overflow pipe as indicated by the red arrow preventing surface water from entering the building The lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing is included as Appendix C

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 4

6 Surface Water Drainage

61 Existing Surface Water Drainage

An existing 25m diameter 135m deep concrete Thames Water trunk sewer crosses the site in the South East corner

During the previous residential scheme Thames Water requested a build over or near agreement be entered into to ensure the proposed development does not impact the trunk sewer The new Aparthotel scheme has where appropriate ensure that Thames Waterrsquos build over or near requirements have been met when positioning the building and developing the preliminary foundation design A full detailed application will be made to Thames Water at the detail design stage

The scheme site survey has confirmed that the previous car park drained via five existing gullies located on the lower Northern boundary of the car park A CCTV survey confirmed that these gullies discharge to a lsquoyrsquo connection at point 901B as shown on the Thames Water asset map From point 901B the sitersquos surface water discharges into the existing Thames Water network within the adjacent underpass manhole ref 9009

The existing underpass network then outfalls to an existing 28m diameter 812m deep Thames Water surface water catchpit ref 901A located in the South Eastern corner of the site The catchpit then discharges via a 300dia sewer to the trunk sewer below

62 Proposed Surface Water Drainage

The developments proposed surface water run-off from the building will be collected via a combination of green blue roof and rainwater pipes with the external hard paved areas by porous paving

The inclusion of a large roof garden and smaller planted roof terraces (green roofs) not only increases the bio-diversity water treatment and improves air quality of the existing site which currently is predominantly hard paved but also aids with the capture control and delay of surface water runoff at source A portion of the surface water will also be harvested for irrigation purposes The inclusion of porous paving for the external hard paved areas will also contribute to water treatment control and delay of surface water runoff at source

Due to the non-porous nature and restricted external space infiltration is not feasible The surface water run-off will therefore be conveyed to a below ground attenuation tank located below the external car park The attenuation tank and associated network will be installed approximately 2-25m deep due to the low lying level of the adjacent underpass and eastern courtyard

The developments will re-use the existing carparks surface water outfall A new adoptable onsite demarcation chamber will be required at the boundary of the site and a new adoptable manhole (ref 901B) will be built on the line of the existing 150dia lateral sewer The existing offsite 150dia sewer downstream of the new manhole is to be offered for adoption by Thames Water

The surface water offsite discharge rate will be restricted to 50 ls for up to and including the 1 in 100 year storm event plus a 40 allowance for climate change Due to the depth of the proposed drainage network and attenuation it will be necessary to pump surface water flows up into the demarcation chamber From this point surface water will flow by gravity into manhole 901B Details of the surface water pump can be found within Appendix H

A high level overflow from the pump chamber to the demarcation chamber will also be installed to ensure that in the unlikely event of pump failure surface water flows will overtop into the network and not flood the building or leave site

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 5

The proposed discharge rate of 50ls connection point and adoption of the existing 150dia lateral sewer have been approved in principle by Thames Water Correspondence can be found within Appendix A The proposed connection will be subject to full technical approval and a Thames Water Section 106 agreement during the detailed design

The design team have liaised with Harrow InfrastructureHighways team throughout the pre-planning stage and have received confirmation that in principle the strategy is acceptable

It is proposed to attenuate in below ground storage tanks and where achievable within the porous paving sub-base Based on the restricted 50ls an onsite attenuation volume approximately 50m3 ndash 72m3 (with the 40 climate change) will be required for the development For the surface water calculations please refer to Appendix D

Details of the proposed surface water drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

7 Treatment

With reference to the SuDS manualrsquos pollution hazard land use classification table 262 the Aparthotel roof and external pedestrian areas parking spaces are classified as having a very low and low pollution hazard levels respectively

The required hazard indices for a site of this type should achieve or better the hazard indices identified for Total suspended Solids Metals and Hydrocarbons Refer to Figure 1 below indicating the SuDS manual

Table 262 Figure 1 ndash Pollution hazard indices for different land use classification Table 262

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 5: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 2

3 Foul Drainage

31 Existing Foul Water Drainage

There are no known existing foul sewers located on the existing car park site With reference to Thames Water Asset plans all potential offsite existing foul sewer connection points have been assessed as follows

There are a number of other existing Thames Water Foul manholes located approximately 45m to the East adjacent to the BP garage Any proposed connection to these sewers would require crossing the busy Bessborough Road therefore connection into this sewer has been discounted

The nearest existing Thames Water Foul sewer is located 25m to the West along Vaughan Road indicated as Manhole EXFW A on the drainage strategy drawing 6601343-MLM-ZZ-XX-DR-C-0001 within Appendix E A number of smaller adoptable sewers connect from the recently built houses (4No) to the West of the development which connect into the head of the existing Thames Water main foul sewer

No manhole reference cover or invert level information has been identified on the Thames Water records and all existing site surveys do not extend to this location It is proposed to connect the developments onsite foul network to a new length of gravity sewer within Vaughan Road discharging into manhole EXFW A

In advance of detail design further survey works will need to be carried out to confirm the assumed invert level of existing Thames water manhole EXFW A

32 Proposed Foul Water Drainage

The Northern lower half of the development is at a lower level that Vaughan Road with an approximate proposed floor level of 649m The proposed private onsite foul network therefore will have an approximate outfall invert level of 6374m

The developments foul outfall connection point at Thames Water manhole EXFW A is assumed to have the water authority minimum standard depth to invert of 12m resulting in an invert level of approximately 6395m

The invert level of existing manhole EXFW A is therefore higher than the onsite invert level which means a full gravity connection will not be feasible

It is therefore proposed to use an onsite private package pump with associated 24hr storage (storage in manhole or tank) and pump flows at an agreed rate with Thames Water to a final onsite gravity manhole Details of the foul pump can be found within Appendix G

From the boundary of the development a new foul gravity sewer will be constructed below Vaughan Road to existing manhole EXFW A The new foul sewer will be constructed in accordance with Thames Water requirements and will be offered for adoption under a Section 104 agreement

A pre-planning enquiry was submitted to Thames Water for the proposed connection into the existing manhole EXFW A at a peak discharge rate of 82ls Thames Water have confirmed in principle that this connection point and discharge rate are acceptable For further detail refer to Thames Water Pre-planning enquiry Appendix B

All proposals are subject to the additional survey work described above a Thames Water Section 106 and Section 104 application (and Thames Water approval) and full coordination with the design team at detailed design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 3

Details of the proposed foul drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

4 Flood Risk

The site is located within flood Zone 1 and is smaller than 10ha therefore the site is considered Low Risk and a scheme specific flood risk assessment (FRA) is not required

The below extract taken from the GOVUK Flood Risk from Surface Water indicates a very low risk with no surface water flooding onsite

There is however Low Risk surface water flooding on the adjacent highway (Vaughan road) A new drop crossing is required to access the site from Vaughan Road This crossing and all works along the existing highway site boundary to the south will retain the existing levels Therefore risk of flooding from offsite will not be effected with the onsite risk remaining very low

5 Exceedance Routes

In accordance with good drainage practice consideration must be given to the effects of drainage system failure or for storm events greater than those used in the design analysis

lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing 6601343-MLM-ZZ-XX-DR-C-0002 shows proposed finished floor and external levels above ground exceedance flow routes (blue arrows) across the site which routes run-off away from the new building and prevents water leaving site In extreme cases the flood waters will overtop into a high level overflow pipe as indicated by the red arrow preventing surface water from entering the building The lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing is included as Appendix C

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 4

6 Surface Water Drainage

61 Existing Surface Water Drainage

An existing 25m diameter 135m deep concrete Thames Water trunk sewer crosses the site in the South East corner

During the previous residential scheme Thames Water requested a build over or near agreement be entered into to ensure the proposed development does not impact the trunk sewer The new Aparthotel scheme has where appropriate ensure that Thames Waterrsquos build over or near requirements have been met when positioning the building and developing the preliminary foundation design A full detailed application will be made to Thames Water at the detail design stage

The scheme site survey has confirmed that the previous car park drained via five existing gullies located on the lower Northern boundary of the car park A CCTV survey confirmed that these gullies discharge to a lsquoyrsquo connection at point 901B as shown on the Thames Water asset map From point 901B the sitersquos surface water discharges into the existing Thames Water network within the adjacent underpass manhole ref 9009

The existing underpass network then outfalls to an existing 28m diameter 812m deep Thames Water surface water catchpit ref 901A located in the South Eastern corner of the site The catchpit then discharges via a 300dia sewer to the trunk sewer below

62 Proposed Surface Water Drainage

The developments proposed surface water run-off from the building will be collected via a combination of green blue roof and rainwater pipes with the external hard paved areas by porous paving

The inclusion of a large roof garden and smaller planted roof terraces (green roofs) not only increases the bio-diversity water treatment and improves air quality of the existing site which currently is predominantly hard paved but also aids with the capture control and delay of surface water runoff at source A portion of the surface water will also be harvested for irrigation purposes The inclusion of porous paving for the external hard paved areas will also contribute to water treatment control and delay of surface water runoff at source

Due to the non-porous nature and restricted external space infiltration is not feasible The surface water run-off will therefore be conveyed to a below ground attenuation tank located below the external car park The attenuation tank and associated network will be installed approximately 2-25m deep due to the low lying level of the adjacent underpass and eastern courtyard

The developments will re-use the existing carparks surface water outfall A new adoptable onsite demarcation chamber will be required at the boundary of the site and a new adoptable manhole (ref 901B) will be built on the line of the existing 150dia lateral sewer The existing offsite 150dia sewer downstream of the new manhole is to be offered for adoption by Thames Water

The surface water offsite discharge rate will be restricted to 50 ls for up to and including the 1 in 100 year storm event plus a 40 allowance for climate change Due to the depth of the proposed drainage network and attenuation it will be necessary to pump surface water flows up into the demarcation chamber From this point surface water will flow by gravity into manhole 901B Details of the surface water pump can be found within Appendix H

A high level overflow from the pump chamber to the demarcation chamber will also be installed to ensure that in the unlikely event of pump failure surface water flows will overtop into the network and not flood the building or leave site

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 5

The proposed discharge rate of 50ls connection point and adoption of the existing 150dia lateral sewer have been approved in principle by Thames Water Correspondence can be found within Appendix A The proposed connection will be subject to full technical approval and a Thames Water Section 106 agreement during the detailed design

The design team have liaised with Harrow InfrastructureHighways team throughout the pre-planning stage and have received confirmation that in principle the strategy is acceptable

It is proposed to attenuate in below ground storage tanks and where achievable within the porous paving sub-base Based on the restricted 50ls an onsite attenuation volume approximately 50m3 ndash 72m3 (with the 40 climate change) will be required for the development For the surface water calculations please refer to Appendix D

Details of the proposed surface water drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

7 Treatment

With reference to the SuDS manualrsquos pollution hazard land use classification table 262 the Aparthotel roof and external pedestrian areas parking spaces are classified as having a very low and low pollution hazard levels respectively

The required hazard indices for a site of this type should achieve or better the hazard indices identified for Total suspended Solids Metals and Hydrocarbons Refer to Figure 1 below indicating the SuDS manual

Table 262 Figure 1 ndash Pollution hazard indices for different land use classification Table 262

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 6: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 3

Details of the proposed foul drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

4 Flood Risk

The site is located within flood Zone 1 and is smaller than 10ha therefore the site is considered Low Risk and a scheme specific flood risk assessment (FRA) is not required

The below extract taken from the GOVUK Flood Risk from Surface Water indicates a very low risk with no surface water flooding onsite

There is however Low Risk surface water flooding on the adjacent highway (Vaughan road) A new drop crossing is required to access the site from Vaughan Road This crossing and all works along the existing highway site boundary to the south will retain the existing levels Therefore risk of flooding from offsite will not be effected with the onsite risk remaining very low

5 Exceedance Routes

In accordance with good drainage practice consideration must be given to the effects of drainage system failure or for storm events greater than those used in the design analysis

lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing 6601343-MLM-ZZ-XX-DR-C-0002 shows proposed finished floor and external levels above ground exceedance flow routes (blue arrows) across the site which routes run-off away from the new building and prevents water leaving site In extreme cases the flood waters will overtop into a high level overflow pipe as indicated by the red arrow preventing surface water from entering the building The lsquoSurface Water Flood Flow and Exceedance Routesrsquo drawing is included as Appendix C

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 4

6 Surface Water Drainage

61 Existing Surface Water Drainage

An existing 25m diameter 135m deep concrete Thames Water trunk sewer crosses the site in the South East corner

During the previous residential scheme Thames Water requested a build over or near agreement be entered into to ensure the proposed development does not impact the trunk sewer The new Aparthotel scheme has where appropriate ensure that Thames Waterrsquos build over or near requirements have been met when positioning the building and developing the preliminary foundation design A full detailed application will be made to Thames Water at the detail design stage

The scheme site survey has confirmed that the previous car park drained via five existing gullies located on the lower Northern boundary of the car park A CCTV survey confirmed that these gullies discharge to a lsquoyrsquo connection at point 901B as shown on the Thames Water asset map From point 901B the sitersquos surface water discharges into the existing Thames Water network within the adjacent underpass manhole ref 9009

The existing underpass network then outfalls to an existing 28m diameter 812m deep Thames Water surface water catchpit ref 901A located in the South Eastern corner of the site The catchpit then discharges via a 300dia sewer to the trunk sewer below

62 Proposed Surface Water Drainage

The developments proposed surface water run-off from the building will be collected via a combination of green blue roof and rainwater pipes with the external hard paved areas by porous paving

The inclusion of a large roof garden and smaller planted roof terraces (green roofs) not only increases the bio-diversity water treatment and improves air quality of the existing site which currently is predominantly hard paved but also aids with the capture control and delay of surface water runoff at source A portion of the surface water will also be harvested for irrigation purposes The inclusion of porous paving for the external hard paved areas will also contribute to water treatment control and delay of surface water runoff at source

Due to the non-porous nature and restricted external space infiltration is not feasible The surface water run-off will therefore be conveyed to a below ground attenuation tank located below the external car park The attenuation tank and associated network will be installed approximately 2-25m deep due to the low lying level of the adjacent underpass and eastern courtyard

The developments will re-use the existing carparks surface water outfall A new adoptable onsite demarcation chamber will be required at the boundary of the site and a new adoptable manhole (ref 901B) will be built on the line of the existing 150dia lateral sewer The existing offsite 150dia sewer downstream of the new manhole is to be offered for adoption by Thames Water

The surface water offsite discharge rate will be restricted to 50 ls for up to and including the 1 in 100 year storm event plus a 40 allowance for climate change Due to the depth of the proposed drainage network and attenuation it will be necessary to pump surface water flows up into the demarcation chamber From this point surface water will flow by gravity into manhole 901B Details of the surface water pump can be found within Appendix H

A high level overflow from the pump chamber to the demarcation chamber will also be installed to ensure that in the unlikely event of pump failure surface water flows will overtop into the network and not flood the building or leave site

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 5

The proposed discharge rate of 50ls connection point and adoption of the existing 150dia lateral sewer have been approved in principle by Thames Water Correspondence can be found within Appendix A The proposed connection will be subject to full technical approval and a Thames Water Section 106 agreement during the detailed design

The design team have liaised with Harrow InfrastructureHighways team throughout the pre-planning stage and have received confirmation that in principle the strategy is acceptable

It is proposed to attenuate in below ground storage tanks and where achievable within the porous paving sub-base Based on the restricted 50ls an onsite attenuation volume approximately 50m3 ndash 72m3 (with the 40 climate change) will be required for the development For the surface water calculations please refer to Appendix D

Details of the proposed surface water drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

7 Treatment

With reference to the SuDS manualrsquos pollution hazard land use classification table 262 the Aparthotel roof and external pedestrian areas parking spaces are classified as having a very low and low pollution hazard levels respectively

The required hazard indices for a site of this type should achieve or better the hazard indices identified for Total suspended Solids Metals and Hydrocarbons Refer to Figure 1 below indicating the SuDS manual

Table 262 Figure 1 ndash Pollution hazard indices for different land use classification Table 262

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 7: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 4

6 Surface Water Drainage

61 Existing Surface Water Drainage

An existing 25m diameter 135m deep concrete Thames Water trunk sewer crosses the site in the South East corner

During the previous residential scheme Thames Water requested a build over or near agreement be entered into to ensure the proposed development does not impact the trunk sewer The new Aparthotel scheme has where appropriate ensure that Thames Waterrsquos build over or near requirements have been met when positioning the building and developing the preliminary foundation design A full detailed application will be made to Thames Water at the detail design stage

The scheme site survey has confirmed that the previous car park drained via five existing gullies located on the lower Northern boundary of the car park A CCTV survey confirmed that these gullies discharge to a lsquoyrsquo connection at point 901B as shown on the Thames Water asset map From point 901B the sitersquos surface water discharges into the existing Thames Water network within the adjacent underpass manhole ref 9009

The existing underpass network then outfalls to an existing 28m diameter 812m deep Thames Water surface water catchpit ref 901A located in the South Eastern corner of the site The catchpit then discharges via a 300dia sewer to the trunk sewer below

62 Proposed Surface Water Drainage

The developments proposed surface water run-off from the building will be collected via a combination of green blue roof and rainwater pipes with the external hard paved areas by porous paving

The inclusion of a large roof garden and smaller planted roof terraces (green roofs) not only increases the bio-diversity water treatment and improves air quality of the existing site which currently is predominantly hard paved but also aids with the capture control and delay of surface water runoff at source A portion of the surface water will also be harvested for irrigation purposes The inclusion of porous paving for the external hard paved areas will also contribute to water treatment control and delay of surface water runoff at source

Due to the non-porous nature and restricted external space infiltration is not feasible The surface water run-off will therefore be conveyed to a below ground attenuation tank located below the external car park The attenuation tank and associated network will be installed approximately 2-25m deep due to the low lying level of the adjacent underpass and eastern courtyard

The developments will re-use the existing carparks surface water outfall A new adoptable onsite demarcation chamber will be required at the boundary of the site and a new adoptable manhole (ref 901B) will be built on the line of the existing 150dia lateral sewer The existing offsite 150dia sewer downstream of the new manhole is to be offered for adoption by Thames Water

The surface water offsite discharge rate will be restricted to 50 ls for up to and including the 1 in 100 year storm event plus a 40 allowance for climate change Due to the depth of the proposed drainage network and attenuation it will be necessary to pump surface water flows up into the demarcation chamber From this point surface water will flow by gravity into manhole 901B Details of the surface water pump can be found within Appendix H

A high level overflow from the pump chamber to the demarcation chamber will also be installed to ensure that in the unlikely event of pump failure surface water flows will overtop into the network and not flood the building or leave site

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 5

The proposed discharge rate of 50ls connection point and adoption of the existing 150dia lateral sewer have been approved in principle by Thames Water Correspondence can be found within Appendix A The proposed connection will be subject to full technical approval and a Thames Water Section 106 agreement during the detailed design

The design team have liaised with Harrow InfrastructureHighways team throughout the pre-planning stage and have received confirmation that in principle the strategy is acceptable

It is proposed to attenuate in below ground storage tanks and where achievable within the porous paving sub-base Based on the restricted 50ls an onsite attenuation volume approximately 50m3 ndash 72m3 (with the 40 climate change) will be required for the development For the surface water calculations please refer to Appendix D

Details of the proposed surface water drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

7 Treatment

With reference to the SuDS manualrsquos pollution hazard land use classification table 262 the Aparthotel roof and external pedestrian areas parking spaces are classified as having a very low and low pollution hazard levels respectively

The required hazard indices for a site of this type should achieve or better the hazard indices identified for Total suspended Solids Metals and Hydrocarbons Refer to Figure 1 below indicating the SuDS manual

Table 262 Figure 1 ndash Pollution hazard indices for different land use classification Table 262

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 8: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 5

The proposed discharge rate of 50ls connection point and adoption of the existing 150dia lateral sewer have been approved in principle by Thames Water Correspondence can be found within Appendix A The proposed connection will be subject to full technical approval and a Thames Water Section 106 agreement during the detailed design

The design team have liaised with Harrow InfrastructureHighways team throughout the pre-planning stage and have received confirmation that in principle the strategy is acceptable

It is proposed to attenuate in below ground storage tanks and where achievable within the porous paving sub-base Based on the restricted 50ls an onsite attenuation volume approximately 50m3 ndash 72m3 (with the 40 climate change) will be required for the development For the surface water calculations please refer to Appendix D

Details of the proposed surface water drainage strategy can be found on drawing 6601343-MLM-ZZ-ZZ-DR-C-0001 within Appendix E

7 Treatment

With reference to the SuDS manualrsquos pollution hazard land use classification table 262 the Aparthotel roof and external pedestrian areas parking spaces are classified as having a very low and low pollution hazard levels respectively

The required hazard indices for a site of this type should achieve or better the hazard indices identified for Total suspended Solids Metals and Hydrocarbons Refer to Figure 1 below indicating the SuDS manual

Table 262 Figure 1 ndash Pollution hazard indices for different land use classification Table 262

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 9: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 6

In order to provide adequate treatment the proposed drainage network components should have a total pollution migration index that equals or exceeds the pollution hazard index In order to comply with these requirements a series of individual components within the proposed network is required In line with the SuDS manual factor of 05 is to be used to account for the reduced performance of the secondary or tertiary components associated with already inflow concentrates

Please refer to table 2 for scheme specific pollution mitigation indices

Surface Water Runoff

Treatment -Individual devicesequence

Total suspended solids mitigation index

Total metals mitigation index

Hydrocarbons3

Residential Roof Debris leaf guard within roof gutters

Sealed downpipes

Catchpit Siltrap Manholes

Blue Green Roof

Reference to Chapter 24 of the SuDS manual table 43 Minimum water quality requirements for discharge to receiving surface waters and groundwater

States for very low pollution hazard level the requirement for discharging to groundwater is the lsquoRemoval of gross

solids and sediment onlyrsquo

Private porous external pedestrian areas and parking spaces

Porous Paving with type 3 sub-base

07 06 07

Table 2 ndash Scheme Pollution Mitigation Indices

The total proposed treatment for the private drainage networks will provide appropriate levels of water quality treatment prior to discharge to Thames Water network

8 Future Maintenance

Maintenance of SuDS features shall be carried out in accordance with the MLM document entitled lsquoSurface Water Drainage Maintenance Planrsquo This is included as Appendix F

9 Conclusion

The schemes proposed foul and surface water drainage strategy detailed within the report identifies the intended means of connection and discharge of estimated peak flows The design team have liaised with Harrow Highways Infrastructure team and Thames Water throughout the pre-planning stage and have received confirmation in principle that both the surface water and foul water strategies are acceptable

Summary of foul and surface water drainage strategy

91 Foul Water

911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road

912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 10: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 7

913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level

92 Surface Water

921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral outfall

922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their network

An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details

Both connections will be subject to Thames Water full technical approval at detail design

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 11: Planning Stage Drainage Strategy Vaughan Road Aparthotel

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 8

Appendix A - Thames Water Correspondence

From Siva RajaratnamTo John BarrellCc James NobleSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XDDate 14 August 2020 102423Attachments image001jpg

image003jpgimage004jpg

Hi John This will be acceptable to Thames Water RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1827To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Many thanks for the swift reply Siva Yes we would pump up to a manhole within the site boundary then gravity into a new manhole atlocation 901A We do not believe there is currently a manhole at location 901A we believe there is a lsquoyrsquo connectiononly On this basis we would propose a new manhole (to adoptable standards) at location 901A Wewould then put new manhole 901A and the existing downstream 150mm dia lateral to manhole 9009forward for Thames Water adoption This would of course be subject to a formal adoption process toThames Waters requirements at detail design We have updated the design to reflect the above and also updated manholes pipes that are nowconfirmed to be in Thames Waters ownership Details have been clouded on the attached drawing6601343-MLML-ZZ-XX-DR-C-0001 P03 Please note that the development boundary is indicated by the red dashed line and so the area to theeast is currently highway owned It should also be noted that this existing sewer does pass parallel with the new building frontagehowever all necessary protection measure will be in place and CCTV survey carried out (if required)to ensure all existing sewers are not affected by the works If you could confirm the above is acceptable in principle (subject to Thames Waters adoption S106

requirements) at the previously agreed 5ls SW discharge rate we can confirm back to the plannersthat we have an agreeable solution Thanks again for your help Happy to discuss over the phone Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1416To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Hi John The method of connection would be checked as part of the S106 but an external backdrop (backdrop isoutside of the manhole chamber) would be possible with the connection at the soffit level of theoutgoing pipe Manhole 901B is a private manhole as this is only serving the one property Where the pipe leaves theproperty boundary it becomes Thames Waters responsibility We can only adopt the gravity drainageoutside of the property boundary and the pumped flows should discharge within the site and then bygravity to a Thames Water sewer to be consider for adoption I happy to discuss this further on the phone if you have any further queries Regards

Siva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1349To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Hi Siva No problem thanks for your email it cleared up a number of issues and provides us with a possiblealternative connection which is great Before we look further into a connection at 8002 we would be grateful if you could confirm thefollowing

It seems that it may be feasible to connect into the onsite SW catchpit ref 901A which yourrecords confirm is owned by Thames Water by means of an external backdrop

The developments original connection Option 1 which you previously approved in principleutilises the existing 150 dia pipe from the old car park between the blue dot ref 901B and9009 Can you please confirm if Thames Water own this sewer as it is not clear from theimage If Thames Water do own the car park lateral or would be prepared to adopt it as part ofthe new development then we should be in a position to revert back to the original connectionoption 1 This would negate the need to backdrop or pipe down the road

I would be happy to discuss if it is easier and am avaible on the mobile number below Many thanks again for your continued assistance on this project it is greatly appreciated Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PN

W wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From Siva Rajaratnam [mailtoSivaRajaratnamthameswatercouk] Sent 13 August 2020 1330To John Barrell ltJohnBarrellmlmgroupcomgtCc James Noble ltJamesNoblemlmgroupcomgtSubject RE 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XD Good afternoon John Sorry it appears I have overlooked your original email High level connections will not be accepted and an external backdrop should be used if you wish toconnect to a deep sewer An alternative point of connection is surface water manhole 8002 (next toyour foul water connection) although this is only 151m deep It appears the catch pit manhole you mention is manhole 901A as per below sewer records If so this isa Thames Water manhole

Should you have any further queries please feel free to contact me RegardsSiva RajaratnamDeveloper Services ndash Adoptions Engineer Mobile 07747 640477 Landline 0203 577 9811 sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB Find us online at developersthameswatercouk

From John Barrell ltJohnBarrellmlmgroupcomgt Sent 13 August 2020 1159To Siva Rajaratnam ltSivaRajaratnamthameswatercoukgtCc James Noble ltJamesNoblemlmgroupcomgt Developer ServicesltdeveloperservicesthameswatercoukgtSubject 6601343 - RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA13XDImportance High

This email contains a reference to Coronavirus or COVID-19 Please be aware ofcoronavirus-themed active phishing campaigns and use extra vigilance whenresponding or clicking

Good morning Siva I just tried to reach you on the phone numbers below without success I have however left a messageon your voicemail With reference to my email below (and your previous confirmation that a high level connection would

not be permitted) I would be grateful if you could confirm if Thames Water would permit a SWconnection via and internal external backdrop into either location option proposed We would also be grateful if you could confirm that Thames Water own the onsite catchpit which isnot shown on the 3 year old TW asset plan we have Many thanks for your ongoing assistance Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From John Barrell Sent 24 July 2020 2020To DEVELOPERSERVICESTHAMESWATERCOU ltDEVELOPERSERVICESTHAMESWATERCOUKgtsivarajaratnamthameswatercoukCc James Noble ltJamesNoblemlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD Dear Siva Many thanks for your response in relation to the above mentioned scheme confirm in principle thedevelopments FW and SW rates and connection Whilst liaising with the planning team who have suggest that a direct connect into Thames Watersexisting trunk sewer should be investigated With this in mind and so that I can respond to theplanning team could you please review connection Options 2 and 3 below and as identified on theattached sketch Please note that Option 1 is the current proposal that you have agreed to inprinciple

Option 2 (highlighted yellow) The developments surface water connection made directly into theexisting trunk sewer via manhole TW REF9006 at high level Note that this chamber is 1366m deeptherefore a soffits level connection would not be viable Can you confirm that a high level connectioncascading into this manhole would be acceptable to Thames water Option 3 (highlight green) The developments surface water connection made directly at high levelinto the existing onsite catchpit located over the trunk sewer which has a connection through thebottom down to the trunk sewer below We believe this is owned by Thames Water Note that thecatchpit manhole is 811m deep therefore a soffits level connection would not be viable Can youconfirm that a high level connection cascading into this catchpit would be acceptable to Thameswater All three option suggested result in the developments SW discharge entering the trunk sewer at 5lsIf you could clarify if either option would be acceptable or perhaps suggest an alternative connectionmethod that would not involve digging 13m or 8m below existing ground Many thanks for the time you have spent on this inquiry Kind regards

John BarrellSenior Engineer

D +44 1473 350114M +44 7736 058012T +44 1473 231100E JohnBarrellmlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the link httpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 24 July 2020 0914To James Noble ltJamesNoblemlmgroupcomgt sivarajaratnamthameswatercoukCc John Barrell ltJohnBarrellmlmgroupcomgtSubject RE RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Hi James

Thank you for providing the additional information Please find attached Thames Waters responseletter to your Pre-planning enquiry confirming there is sufficient capacity

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo sivarajaratnamthameswatercouk

CCJohn BarrellltJohnBarrellmlmgroupcomgtDEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

Sent 170720 165138Subject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Hi Siva Please find point by point response to the question you have raised below in blue Hopefully the below is clear but should you have any questions or require any further informationplease do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184

T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

From DEVELOPERSERVICESTHAMESWATERCOU[mailtoDEVELOPERSERVICESTHAMESWATERCOUK] Sent 15 July 2020 1604To James Noble ltJamesNoblemlmgroupcomgtCc John Barrell ltJohnBarrellmlmgroupcomgt sivarajaratnamthameswatercoukSubject RE DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

I have received a response from the Asset Planner and they require further information in regardto your surface water drainage strategy Can you provide the following

1 ndash The existing surface water flow rates for the range of storms (11 110 130 and 1100)Existing surface water flow rates as follows based on the existing car park ndash 100 impermeablerunoff

11 Year = 205ls

110 Year = 414ls

130 Year = 507ls

1100 = 585ls

2 ndash The proposed surface water flow rates for the range of storms (11 110 130 and 1100) Theproposed scheme requires a pumped surface water discharge therefore the maximum flow rate foreach storm event will be restricted to the maximum allowable pump rate Below ground storagewill provided onsite to attenuate the flows generated for each storm event up to and including the1 in 100 year plus an allowance for climate change

11 Year = 5ls

110 Year = 5ls

130 Year = 5ls

1100 Year = 5ls

3 ndash The Greenfield runoff rates for the site The greenfield runoff rate for the site isapproximately 062ls Due to various site constraints a surface water pump is required is per ourpreviously issued drainage strategy drawing and letter The greenfield rate of 062ls is notachievable or practical for a pumped outfall

4 ndash Can you provide further details of how the surface water drainage strategy for thisdevelopment follows policy 513 of the London Plan The hierarchy lists the preference forsurface water disposal as follows

lt[if supportLists]gtlt[endif]gtStore Rainwater for later use ndash The scheme proposes to use aboth green blue roof attenuation to store water at source and to increase biodiversity Therewill also be a small element of rainwater recycling for irrigation purposeslt[if supportLists]gtlt[endif]gtUse infiltration techniques such as porous surfaces in non-clayareas The site lies within an area of London clay therefore the use of infiltration techniques is notpossible Please see attached image from the British Geological Survey (BGS) website highlightingthe strata below and surrounding the sitelt[if supportLists]gtlt[endif]gtAttenuate rainwater in ponds or open water features for gradualrelease Due to the restricted nature of the site ponds or other open water features are notpossible for the storage and gradual release of water lt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a watercourse The nearest watercourse is Wealdstone Brook approximately 3400m to the east of the site therefore outfall to awatercourse would not be practicallt[if supportLists]gtlt[endif]gtDischarge rainwater direct to a surface water sewerdrain It isproposed to discharge the surface water at a restricted pumped 5ls rate utilising the existing carpark on site surface water laterallt[if supportLists]gtlt[endif]gtDischarge rainwater to the combined sewer The surface wateris not proposed to discharge into a combine sewer

6 lt[if supportLists]gtlt[endif]gtndash Can you provide a plan showing the existing surfacewater drainage layout Please find attached plan of existing surface water sewers

6 ndash Can you confirm whether it is possible to restrict the surface water discharge rate furtherReducing the pumped discharge rate is subject achieving a practical pump minimum and balanceof health and safety risks and maintenance

The proposed pump rate of 50ls achieves the correct balance and is significant reduction on thesites current unrestricted surface water discharge rates as stated above

Please note a previous scheme for this site was proposed in 2018 This scheme gained LLFAapproval and Thames Water S106 technical approval for a 50ls pumped surface water dischargerate prior to the scheme being put on hold Previous application approval Thames Waterreference number = DS6045627

The revised scheme remains largely unchanged in terms of the site layout site constraints etc andtherefore the same previously approved drainage strategy is proposed

7 ndash Can you confirm why a gravity discharge is not possible The depth of the existing surfacewater lateral serving the existing carpark gullies is approximately only 300mm deep at the siteboundary Due to the shallow outfall invert the size of the site and the required attenuation due tothe flow rate restriction a gravity discharge is not achievable

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

Original Text

From DEVELOPERSERVICESTHAMESWATERCOUltDEVELOPERSERVICESTHAMESWATERCOUKgt

To jamesnoblemlmgroupcom

CC John Barrell ltJohnBarrellmlmgroupcomgtsivarajaratnamthameswatercoukltsivarajaratnamthameswatercoukgt

Sent 080720 164037Subject DS6075526 - Pre-planning enquiry Car Park Vaughan Road Harrow HA1 3XD

Dear James

Thank you for your Pre-planning enquiry I have consulted with the Asset Planner to confirmwhether there is sufficient capacity and I should have a response in a weekrsquos time

Should you have any further queries please feel free to contact me

Regards

Siva Rajaratnam

Developer Services ndash Adoptions Engineer

Mobile 07747 640477 Landline 0203 577 9811

sivarajaratnamthameswatercouk

Clearwater Court Vastern Road Reading RG1 8DB

Find us online at developersthameswatercouk

From James Noble ltJamesNoblemlmgroupcomgtTo developerservicesthameswatercou ltdeveloperservicesthameswatercoukgtCC John Barrell ltJohnBarrellmlmgroupcomgt

Sent 030720 175106Subject 6601343 - Vaughan Road Pre Planning Enquiry

This email contains a reference to Coronavirus or COVID-19Please be aware of coronavirus-themed active phishingcampaigns and use extra vigilance when responding or clicking

ltcolor=salmongt

Dear Developer services Please find attached pre planning application form and associated plans as required for proposeddevelopment - Vaughan Road Hotel Should you require any further information please do not hesitate to call Kind regards

James NobleHND BRE AcademySenior Technician

D +44 1473 350184T +44 1473 231100E JamesNoblemlmgroupcomA MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipswich Suffolk IP2 8PNW wwwmlmgroupcom

Buildings bull Infrastructure bull Compliance bull Environment

One to Watch Best Company 2020

Twitter bull LinkedIn bull Instagram bull YouTube

Emails are sent on behalf of the MLM company which is named in the relevant signed appointment or if noneexists in our fee proposal or (if MLM is acting as client) in our order Companies Act information for MLM Groupcompanies is available at wwwmlmgroupcomcompanies-act-information

For COVID-19 client service continuity update please click the linkhttpswwwmlmgroupcomnews-centrenewsclient-update-sweco-business-continuity

Disclaimer

The information contained in this communication from the sender is confidential It is intended solely for use bythe recipient and others authorised to receive it If you are not the recipient you are hereby notified that anydisclosure copying distribution or taking action in relation of the contents of this information is strictlyprohibited and may be unlawful

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 9

Appendix B - Thames Water Pre-planning Enquiry

Thames Water Utilities Limited ndash Registered Office Clearwater Court Vastern Road Reading RG1 8DB Company number 02366661 VAT registration no GB 537-4569-15

Mr James Noble MLM Group North Kiln Felaw Maltings 46 Felaw Street Ipwich Suffolk DS6075526 IP2 8PN

24 July 2020

Pre-planning enquiry Confirmation of sufficient capacity

Dear Mr Noble

Thank you for providing information on your development

Carpark at Vaughan Road Harrow Middlesex HA1 3XD

Existing Carpark

Proposed 146 bedroom hotel and restaurant (80 person) Foul water discharging by

pump (82ls) via a new connection to the foul water sewer in Vaughan Road Surface

water to discharge by pump (5ls for all storm events) to the surface water manhole 901B

via an existing connection

We have completed the assessment of the foul water flows and surface water run-off based on the information submitted in your application with the purpose of assessing sewerage capacity within the existing Thames Water sewer network

Foul Water

If your proposals progress in line with the details yoursquove provided wersquore pleased to confirm that

there will be sufficient sewerage capacity in the adjacent foul water sewer network to serve your development This confirmation is valid for 12 months or for the life of any planning approval that this information is used to support to a maximum of three years

Yoursquoll need to keep us informed of any changes to your design ndash for example an increase

in the number or density of homes Such changes could mean there is no longer

sufficient capacity

Surface Water Please note that discharging surface water to the public sewer network should only be considered after all other methods of disposal have been investigated and proven to not be viable In accordance with the Building Act 2000 Clause H33 positive connection to a public sewer will only be consented when it can be demonstrated that the hierarchy of disposal methods have been examined and proven to be impracticable The disposal hierarchy being 1st Soakaways 2nd Watercourses 3rd Sewers

Only when it can be proven that soakage into the ground or a connection into an adjacent watercourse is not possible would we consider a restricted discharge into the public surface water sewer network

If the peak surface water run-off discharge is then restricted to Greenfield run-off ratesa maximum of 5ls as your drainage strategy indicates then we would have no objections to the proposals

Thames Water Planning team would ask to see why it is not practicable on the site to restrict to Greenfield run-off rates if they are consulted as part of any planning application

In considering your surface water needs we support the use of sustainable drainage on development sites Yoursquoll need to show the local authority andor lead local flood authority how yoursquove taken into account the surface water hierarchy that wersquove included

Please see the attached lsquoPlanning your wastewaterrsquo leaflet for additional information

What happens next Please make sure you submit your connection application giving us at least 21 daysrsquo notice of

the date you wish to make your new connections If yoursquove any further questions please contact me on 0203 577 9811

Yours sincerely

Siva Rajaratnam ndash Adoptions Engineer

Thames Water

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 10

Appendix C - Flood Exceedance Routes

(6472)

(6477)

(6502)

(6537)

(6577)

FFL 6520

(6543)

(6554)

(6565)

(6600)

(6609)

FFL 6550

FFL 6494

113

(6512)

(6511)FFL 6494

(6511)(6519)(6520)

FFL 6550

FFL 6550

FFL 6535

FFL 6520

FFL 6520

VAUGHAN ROAD

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ONSITE THAMES WATER CATCHPIT MANHOLE

EXISTING HIGHWAY UNDERPASS RETAININGWALL TO BE REMOVED

DETAIL SUBJECT TO HARROW HIGHWAYSCONFIRMATION REQUIREMENTS REFER TOTHE LANDSCAPE ARCHITECT INFORMATIONFOR FURTHER DETAILS OF THE OFFSITEPUBLIC REALM WORKS

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

HIGHWAYUNDERPASS

ALLOWANCE TO BE MADE TO RAISE THE FFL OF THEPLANT ROOMS THE PROPOSED OFFSITE SURFACEWATER CONNECTION POINT IS ASSUMED TO BE ONLYAPPROXIMATELY 03m DEEP THEREFORE ADEQUATEONSITE COVER TO THE PROPOSED HIGH LEVELOVERFLOW AND RISING MAIN WILL BE REQUIRED

REDUCTION IN BOUNDARY TIE-IN LEVELSSUBJECT TO CONFIRMATION OF OFFSITELEVELS WITHIN NETWORK RAIL LANDAND CONFIRMATION OF THE OFFSITESURFACE WATER CONNECTION POINTINVERT LEVEL

VAUGHAN ROAD

PROPOSED SURFACE FLOOD FLOW LOWPOINT SURFACE STORAGE

HIGH LEVEL OVERFLOW FROM SURFACE WATER PUMPDISCHARGING INTO SITE DEMARCATION CHAMBER TOPROVIDE ECXEEDANCE ROUTE INVERT OF THE HIGHLEVEL OVER FLOW TO ENSURE NO FLOODING OF THEBUILDING IN AN EXCCEDANCE EVENT

KEY

1xx PROPOSED GRADIENT

PROPOSED LEVEL

EXISTING LEVEL

6550

PROPOSED ONSITE EXTERNAL LEVELSSTRATEGY FLOOD FLOW ROUTE

(6550)

ARCHITECT LANDSCAPE ARCHITECTPROPOSED LEVEL amp GRADIENTGRADIENT

1xx6550

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING ADOPTED HIGHWAY UNDERPASSFOOTWAY ACCESS RAMP

EXISTING ADOPTED HIGHWAY UNDERPASS STAIRS

EXISTING ADOPTED HIGHWAY VERGE WITHRETAINING WALL TO BE REMOVED SUBJECTTO HARROW HIGHWAY APPROVAL

ONSITE POROUS PAVING

SURFACE CREASE LINE

PROPOSED SURFACE WATEREXCEEDANCE ROUTES

P01 28072020 FIRST ISSUE JBN JJB JJB

P02 15092020 UPDATED TO INCLUDED THE LATESTEXTERNAL LAYOUT

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

DANDI NINE LTD

VAUGHAN ROAD HOTEL

SURFACE WATER FLOOD FLOWAND EXCEEDANCE ROUTES

JBNJJB1100 A1 6601343

6601343MLM ZZ XX DR C 0005P02

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

ALL WORKS OFFSITE WORKS BEYONDTHE REDLINE BOUNDARY BY OTHERSREFER TO THE LANDSCAPE ARCHITECTTO DETAIL OF THE OFFSITE PUBLICREALM WORKS

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TOCOORDINATE DETAILED DESIGN

NOTE DISCHARGE OF WATER OFF SITEWILL NOT BE PERMITTED WHERE POSSIBLEALL BOUNDARY LEVELS TO FALL ONSITEWHERE LEVELS DICTATE A FALL TOWARDSTHE PUBLIC HIGHWAY SUITABLEDRAINAGE (LINEAR DRAINS GULLIES ampKERB UPSTANDS ETC) WILL BE REQUIREDTO ENSURE SURFACE WATER IS NOTDISCHARGED ONTO THE PUBLIC HIGHWAY

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM amp SUTHERLAND DRAWINGSK_200828_06_312_02 AampS Proposed Levels Plan RECEIVED 28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENSES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6581
AutoCAD SHX Text
6565
AutoCAD SHX Text
6554
AutoCAD SHX Text
6540
AutoCAD SHX Text
6530
AutoCAD SHX Text
6517
AutoCAD SHX Text
6512
AutoCAD SHX Text
6511
AutoCAD SHX Text
6519
AutoCAD SHX Text
6521
AutoCAD SHX Text
6524
AutoCAD SHX Text
6572
AutoCAD SHX Text
6544
AutoCAD SHX Text
6545
AutoCAD SHX Text
6544
AutoCAD SHX Text
6538
AutoCAD SHX Text
6525
AutoCAD SHX Text
6527
AutoCAD SHX Text
6509
AutoCAD SHX Text
6520
AutoCAD SHX Text
6557
AutoCAD SHX Text
6543
AutoCAD SHX Text
6516
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6529
AutoCAD SHX Text
6527
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6581
AutoCAD SHX Text
6358
AutoCAD SHX Text
6359
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
6518
AutoCAD SHX Text
6522
AutoCAD SHX Text
6528
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
PT
AutoCAD SHX Text
6529
AutoCAD SHX Text
6532
AutoCAD SHX Text
6556
AutoCAD SHX Text
6538
AutoCAD SHX Text
6535
AutoCAD SHX Text
6543
AutoCAD SHX Text
6551
AutoCAD SHX Text
6560
AutoCAD SHX Text
6547
AutoCAD SHX Text
6557
AutoCAD SHX Text
6561
AutoCAD SHX Text
6570
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6535
AutoCAD SHX Text
6530
AutoCAD SHX Text
6539
AutoCAD SHX Text
6553
AutoCAD SHX Text
6549
AutoCAD SHX Text
6561
AutoCAD SHX Text
6562
AutoCAD SHX Text
6578
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
CL 6572
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
NDP
AutoCAD SHX Text
NDP
AutoCAD SHX Text
UTF
AutoCAD SHX Text
Scar-line UTT
AutoCAD SHX Text
CTV UTT
AutoCAD SHX Text
Full of
AutoCAD SHX Text
Sediment
AutoCAD SHX Text
D364m
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
1
AutoCAD SHX Text
20001 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
5448
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5451
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65342 (OS)
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
6550+

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 11

Appendix D - Drainage Calculations

MLM Page 1

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Half Drain Time 106 minutes

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

15 min Summer 18047 0747 00 50 50 390 O K

30 min Summer 18216 0916 00 50 50 478 O K

60 min Summer 18303 1003 00 50 50 524 O K

120 min Summer 18256 0956 00 50 50 499 O K

180 min Summer 18193 0893 00 50 50 467 O K

240 min Summer 18131 0831 00 50 50 434 O K

360 min Summer 18018 0718 00 50 50 375 O K

480 min Summer 17910 0610 00 50 50 319 O K

600 min Summer 17810 0510 00 50 50 267 O K

720 min Summer 17718 0418 00 50 50 219 O K

960 min Summer 17563 0263 00 50 50 138 O K

1440 min Summer 17367 0067 00 50 50 35 O K

2160 min Summer 17300 0000 00 44 44 00 O K

2880 min Summer 17300 0000 00 35 35 00 O K

4320 min Summer 17300 0000 00 25 25 00 O K

5760 min Summer 17300 0000 00 20 20 00 O K

7200 min Summer 17300 0000 00 16 16 00 O K

8640 min Summer 17300 0000 00 14 14 00 O K

10080 min Summer 17300 0000 00 12 12 00 O K

15 min Winter 18049 0749 00 50 50 392 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

15 min Summer 149453 00 443 18

30 min Summer 96802 00 575 32

60 min Summer 59609 00 706 60

120 min Summer 35432 00 840 102

180 min Summer 25788 00 919 132

240 min Summer 20465 00 974 166

360 min Summer 14784 00 1050 234

480 min Summer 11725 00 1115 300

600 min Summer 9789 00 1160 364

720 min Summer 8444 00 1202 426

960 min Summer 6682 00 1271 546

1440 min Summer 4798 00 1367 764

2160 min Summer 3440 00 1471 0

2880 min Summer 2715 00 1547 0

4320 min Summer 1942 00 1660 0

5760 min Summer 1530 00 1744 0

7200 min Summer 1271 00 1811 0

8640 min Summer 1092 00 1867 0

10080 min Summer 0960 00 1915 0

15 min Winter 149453 00 443 18

MLM Page 2

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Summary of Results for 100 year Return Period (+40)

copy1982-2019 Innovyze

Storm

Event

Max

Level

(m)

Max

Depth

(m)

Max

Infiltration

(ls)

Max

Control

(ls)

Max

Σ Outflow

(ls)

Max

Volume

(msup3)

Status

30 min Winter 18222 0922 00 50 50 482 O K

60 min Winter 18317 1017 00 50 50 531 O K

120 min Winter 18263 0963 00 50 50 503 O K

180 min Winter 18183 0883 00 50 50 461 O K

240 min Winter 18096 0796 00 50 50 416 O K

360 min Winter 17927 0627 00 50 50 328 O K

480 min Winter 17770 0470 00 50 50 245 O K

600 min Winter 17629 0329 00 50 50 172 O K

720 min Winter 17509 0209 00 50 50 109 O K

960 min Winter 17340 0040 00 50 50 21 O K

1440 min Winter 17300 0000 00 40 40 00 O K

2160 min Winter 17300 0000 00 29 29 00 O K

2880 min Winter 17300 0000 00 23 23 00 O K

4320 min Winter 17300 0000 00 16 16 00 O K

5760 min Winter 17300 0000 00 13 13 00 O K

7200 min Winter 17300 0000 00 11 11 00 O K

8640 min Winter 17300 0000 00 09 09 00 O K

10080 min Winter 17300 0000 00 08 08 00 O K

Storm

Event

Rain

(mmhr)

Flooded

Volume

(msup3)

Discharge

Volume

(msup3)

Time-Peak

(mins)

30 min Winter 96802 00 576 32

60 min Winter 59609 00 709 60

120 min Winter 35432 00 844 112

180 min Winter 25788 00 916 138

240 min Winter 20465 00 971 176

360 min Winter 14784 00 1056 248

480 min Winter 11725 00 1114 316

600 min Winter 9789 00 1162 380

720 min Winter 8444 00 1204 436

960 min Winter 6682 00 1269 530

1440 min Winter 4798 00 1367 0

2160 min Winter 3440 00 1471 0

2880 min Winter 2715 00 1547 0

4320 min Winter 1942 00 1660 0

5760 min Winter 1530 00 1744 0

7200 min Winter 1271 00 1811 0

8640 min Winter 1092 00 1867 0

10080 min Winter 0960 00 1915 0

MLM Page 3

North Kiln Felaw Maltings

46 Felaw Street

Ipswich IP2 8PN

Date 150920 1536 Designed by jamesn

File 6601343-MLM-ZZ-XX-CAL-C Checked by

XP Solutions Source Control 20191

Rainfall Details

copy1982-2019 Innovyze

Rainfall Model FSR Winter Storms Yes

Return Period (years) 100 Cv (Summer) 0950

Region England and Wales Cv (Winter) 0950

M5-60 (mm) 21000 Shortest Storm (mins) 15

Ratio R 0430 Longest Storm (mins) 10080

Summer Storms Yes Climate Change +40

Time Area Diagram

Total Area (ha) 0125

Time

From

(mins)

To

Area

(ha)

0 4 0125

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 12

Appendix E - Drainage Strategy

(6472)

(6477)

(6502)

(6537)

(6577

(6554)

(6565)

(6600)

(6609)

ASSUMED LINE OF EXISTING 225Oslash FOUL WATERSEWER BASED ON THAMES WATER RECORDS

EXISTING 26mOslash THAMES WATER TRUNK SEWER

ASSUMED LINE OF EXISTING 225Oslash SURFACE WATERSEWER BASED ON THAMES WATER RECORDS

26Oslashm TW TRUNK SEWER

26Oslashm TW TRUNK SEWER

TW EXFW AASSUMED CL 6515ASSUMED IL 6395ASSUMPTIONS BASED ONADJACENT TW SWMH 8002ADDITIONAL SURVEY TO BECARRIED OUT TO ESTABLISHINVERT LEVEL

EXISTING CAR PARK GULLIESCONNECTION DISCHARGELATERAL SEWER TOUNDERPASS MANHOLE

EXISTING 26mOslash THAMES WATER TRUNK SEWER

PROPOSED ADOPTABLE OFFSITEMANHOLE 901B TO BE BUILT ONLINE OFEXISTING CARPARK GULLY LATERAL

CL 6502IL 6471 TBC

ASSUMED TWSWMH 8002CL 6515IL 6364151m DEEP

TW SWMH 9006CL 6561IL 5195ASSUMED BACK DROPFROM EXISTING 300OslashSEWER1366m DEEP

CHILTERN RAILWAYS MAINLINE AND METROPOLITAN LINE

ESTIMATED STORAGE BASED ON REVISEDDISCHARGE RATE = 50m3 -72m3

ATTENUATION APPROXIMATELY 25-30mDEEP

EXACT STORAGE REQUIREMENT TO BEDETERMINED FOLLOWING DETAILED DESIGN

ONSITE THAMES WATER CATCHPIT MANHOLEINCOMING 300Oslash HIGHWAYS LATERAL FROMHIGHWAYS UNDERPASS MANHOLE TO THAMESWATER TRUNK SEWER

REF 901A

CL6573IL 5762

811m DEEP

PROPOSED ADOPTABLE FOUL SEWERAND CONNECTION INTO AN EXISTINGTHAMES WATER FOUL MANHOLE

ALLOWANCE FOR SEWER PROTECTION(CONCRETE SURROUND)

DETAIL SUBJECT TO CONFIRMATION OFTHE DOWNSTREAM INVERT AND ATHAMES WATER PRE DEVELOPMENTENQUIRY AND SUBSEQUENT S104 S106 AGREEMENT

SUBJECT TO THE FINAL ONSITE EXTERNALLEVELS AND OFFSITE SITE BOUNDARYTIE-IN LEVELS (BY OTHERS) LINEARDRAINAGE ALONG SITE BOUNDARY MAY BEREQUIRED TO PREVENT WATER FROMENTERING HIGHWAY LAND

EXISTING THAMES WATERUNDERPASS MANHOLEREF9009CL 6483IL 5881602m DEEP

VAUGHAN ROAD

HIGHWAY UNDERPASS

SURFACE WATER PUMP CHAMBERAPPROXIMATELY 30m - 35m DEEP

PUMP RATE = 50ls

HIGH LEVEL OVERFLOWREQUIRED TO PREVENTFLOODING OF THE BUILDINGSHOULD THE PUMP FAIL

FOUL WATER PUMP CHAMBER

PUMP RATE 82ls

NON RETURN VALVE TO SEWERSBELOW THE BUILDING

SUFFICIENT COVER TO HIGHLEVEL AND RISING MAIN TO BEPROVIDED OUTFALL INVERTASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

(6543)

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

EX 300Oslash THAMES WATERLATERAL SEWER SERVINGEXISTING CARPARK GULLIESAND HIGHWAY UNDERPASS

PROPOSED DEMARCATION CHAMBERFOR ONSITE RISING MAIN AND HIGHLEVEL OVERFLOW CONNECTION

EX SW TWMH 9010CL 6596IL 6463133m DEEP

FFL 6520

FFL 6535

FFL 6550

FFL 6550

FFL 6495

FFL 6494

FFL 6520

KEY

PROPOSED SURFACE WATER MANHOLE

PROPOSED SURFACE WATER SEWER

PROPOSED POROUS SURFACE WATER SEWER

PROPOSED SURFACE WATER PUMP

PROPOSED SURFACE WATER RISING MAIN

PROPOSED SURFACE WATER ATTENUATION- INDICATIVE LAYOUT SHOWN SUBJECT TODETAILED DESIGN

PROPOSED FOUL WATER SEWER

PROPOSED FOUL PUMP

PROPOSED FOUL WATER RISING MAIN

PROPOSED ADOPTABLE FOUL WATER SEWER(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE FOUL WATERMANHOLE(SUBJECT TO APPROVED SECTION 104)

PROPOSED ADOPTABLE SURFACE WATERMANHOLE

EXISTING SURFACE WATER SEWER

EXISTING FOUL WATER SEWER

SITE BOUNDARY

ASSUMED HIGHWAY BOUNDARY

EXISTING 150Oslash LATERALSEWER SERVING EXISTINGCARPARK GULLIES TO BEADOPTED BY THAMES WATER

PROPOSED ADOPTABLEOFFSITE MANHOLE 901B TO BEBUILT ONLINE OF EXISTINGCARPARK GULLY LATERAL

DEMARCATION CHAMBER FORONSITE RISING MAIN ANDHIGH LEVEL OVERFLOWCONNECTION

RISING MAIN

HIGH LEVEL OVERFLOW

ATTENUATION TANK

SURFACE WATERPUMP CHAMBER

POROUS PAVING WITH PERFORATEDPIPE SUB-BASE COLLECTION DRAIN

SITE BOUNDARYSUFFICIENT COVER TO HIGH LEVELAND RISING MAIN TO BE PROVIDEDEXISTING 150Oslash OUTFALL LATERALINVERT ASSUMED TO BE ONLY 03mDEEP AT BOUNDARY

P01 03072020 FIRST ISSUE JBN JJB JJB

P02 22072020 SEWER FLOW DIRECTION ARROWSINCLUDED MINOR UPDATE TO NOTES

JBN JJB JJB

P03 13082020 UPDATED TO LATEST THAMES WATER ASSETINFORMATION

JBN JJB JJB

P04 27082020 UPDATED TO SUIT THAMES WATER ANDHARROW COUNCIL COMMENTS

JBN JJB JJB

P05 14092020 UPDATED TO SHOW LATEST EXTERNALLAYOUT TYPICAL SECTION INCLUDED FOULOUTFALL MANHOLE REFERENCE INCLUDED

JBN JJB JJB

3rd Floor Eldon House2 Eldon StreetLondon EC2M 7LSTel 020 7422 7800Website wwwmlmgroupcom

PROJECT

DRAWING TITLE

PURPOSE OF ISSUE

CLIENT

DRAWNDESIGN REVISIONSCALE

REV DATE REVISION MADE CHK

MLM REF

SUITABLE FOR

PRINT ACCURACY INDICATOR 50mm 100mm

100m

m50

mm

APP

STATUS

DRAWING REFERENCE

AU

TOCAD

DANDI NINE LTD

VAUGHAN ROAD HOTEL

DRAINAGE STRATEGYOVERVIEW

JBNJJB1200 A1 6601343

6601343MLM ZZ XX DR C 0001P05

PRELIMINARYCOMMENTINITIAL STATUS OR WIPS0

INFORMATION SHOWN IS INDICATIVEONLY AND IS SUBJECT TO FULLCOORDINATE DETAILED DESIGNPLANNING CONDITIONS LLFA ANDTHAMES WATER S104 S106APPROVALS

1 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANTENGINEERS ARCHITECTS AND SPECIALISTS DRAWINGS AND THESPECIFICATION

2 DO NOT SCALE FROM THIS DRAWING MANUALLY ORELECTRONICALLY WRITTEN PERMISSION MUST BE OBTAINED FROM MLMPRIOR TO SCALING ELECTRONICALLY OR USING THIS ELECTRONIC FILE

3 ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE RELEVANTBRITISH STANDARDS EUROPEAN NORMS CODES OF PRACTICE ANDBUILDING PRACTICE

4 PRIOR TO COMMENCEMENT OF THE WORKS THE CONTRACTOR SHALLDETERMINE THE LOCATION AND DEPTH OF EXISTING UTILITIES ACROSSTHE SITE LIAISE WITH ALL RELEVANT AUTHORITIES AND SERVICEPROVIDERS TO ENSURE THAT ALL PIPES CABLES AND OTHER PLANTISARE LOCATED PROTECTED AND WHERE NECESSARY DIVERTED

5 ALL DIMENSIONS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TOSTARTING THE WORKS ON SITE ANY DISCREPANCIES ARE TO BEREPORTED TO THE ENGINEER IMMEDIATELY

6 FOR CIVIL amp STRUCTURAL HEALTH amp SAFETY HAZARDS PLEASE REFER TODESIGNERS RISK ASSESSMENTS

7 IF YOU DO NOT UNDERSTAND FULLY ANY OF THE DETAILS SHOWN ONTHIS DRAWING CONTACT THE ENGINEER FOR CLARIFICATION

8 SURVEY INFORMATION TAKEN FROM G8633-1-R1 BY Laser SurveysDATED FEB 2017 AND DRAWING MJ REES 8722 BY MJ REES DATED APRIL2017

9 ARCHITECTURAL LAYOUT BASED ON DRAWING AKA_085_L100_ Level 00Floor Plan BY ADAM KHAN ARCHITECTS RECEIVED 26082020

10 EXTERNAL LAYOUT BASED ON ADAM AND SUTHERLAND DRAWINGSK_200828_06_312_012 AS Proposed Levels Plandwg RECEIVED28082020

11 THE CONTRACTOR SHALL OBTAIN PRIOR APPROVAL AND ALL NECESSARYLICENCES FROM THE THE HIGHWAY AUTHORITY BEFORE CARRYING OUTANY WORKS WITHIN THE EXISTING PUBLIC HIGHWAY

GENERAL NOTES

INDICATIVE SECTION THROUGH PROPOSEDSURFACE WATER DRAINAGE

AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6508
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6595
AutoCAD SHX Text
+6510
AutoCAD SHX Text
+6485
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
+6506
AutoCAD SHX Text
+6480
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
126
AutoCAD SHX Text
+6518
AutoCAD SHX Text
121
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6530
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6522
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6435
AutoCAD SHX Text
+6432
AutoCAD SHX Text
120
AutoCAD SHX Text
117
AutoCAD SHX Text
+6376
AutoCAD SHX Text
+6399
AutoCAD SHX Text
+6434
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
121
AutoCAD SHX Text
Fall
AutoCAD SHX Text
127
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
6586
AutoCAD SHX Text
6573
AutoCAD SHX Text
6532
AutoCAD SHX Text
6526
AutoCAD SHX Text
6543
AutoCAD SHX Text
6546
AutoCAD SHX Text
6537
AutoCAD SHX Text
6532
AutoCAD SHX Text
6560
AutoCAD SHX Text
6555
AutoCAD SHX Text
6550
AutoCAD SHX Text
6592
AutoCAD SHX Text
6568
AutoCAD SHX Text
6618
AutoCAD SHX Text
6604
AutoCAD SHX Text
6620
AutoCAD SHX Text
6616
AutoCAD SHX Text
6618
AutoCAD SHX Text
6631
AutoCAD SHX Text
6602
AutoCAD SHX Text
6620
AutoCAD SHX Text
6629
AutoCAD SHX Text
6644
AutoCAD SHX Text
6692
AutoCAD SHX Text
6663
AutoCAD SHX Text
6641
AutoCAD SHX Text
6701
AutoCAD SHX Text
6467
AutoCAD SHX Text
6472
AutoCAD SHX Text
6477
AutoCAD SHX Text
6502
AutoCAD SHX Text
6537
AutoCAD SHX Text
6577
AutoCAD SHX Text
6609
AutoCAD SHX Text
6600
AutoCAD SHX Text
6603
AutoCAD SHX Text
6596
AutoCAD SHX Text
6540
AutoCAD SHX Text
6499
AutoCAD SHX Text
6475
AutoCAD SHX Text
6500
AutoCAD SHX Text
6453
AutoCAD SHX Text
6479
AutoCAD SHX Text
6440
AutoCAD SHX Text
6455
AutoCAD SHX Text
6439
AutoCAD SHX Text
6429
AutoCAD SHX Text
6475
AutoCAD SHX Text
6463
AutoCAD SHX Text
6370
AutoCAD SHX Text
6403
AutoCAD SHX Text
6455
AutoCAD SHX Text
6366
AutoCAD SHX Text
6388
AutoCAD SHX Text
6377
AutoCAD SHX Text
6390
AutoCAD SHX Text
6411
AutoCAD SHX Text
s 400
AutoCAD SHX Text
d 016
AutoCAD SHX Text
h 800
AutoCAD SHX Text
6516
AutoCAD SHX Text
6516
AutoCAD SHX Text
6505
AutoCAD SHX Text
6505
AutoCAD SHX Text
6504
AutoCAD SHX Text
6518
AutoCAD SHX Text
6504
AutoCAD SHX Text
6380
AutoCAD SHX Text
6361
AutoCAD SHX Text
6368
AutoCAD SHX Text
6617
AutoCAD SHX Text
6600
AutoCAD SHX Text
6581
AutoCAD SHX Text
6348
AutoCAD SHX Text
6358
AutoCAD SHX Text
6357
AutoCAD SHX Text
6388
AutoCAD SHX Text
6361
AutoCAD SHX Text
6352
AutoCAD SHX Text
6364
AutoCAD SHX Text
6345
AutoCAD SHX Text
6346
AutoCAD SHX Text
6350
AutoCAD SHX Text
6356
AutoCAD SHX Text
6346
AutoCAD SHX Text
6354
AutoCAD SHX Text
6357
AutoCAD SHX Text
6352
AutoCAD SHX Text
6355
AutoCAD SHX Text
6344
AutoCAD SHX Text
6341
AutoCAD SHX Text
6338
AutoCAD SHX Text
6334
AutoCAD SHX Text
6359
AutoCAD SHX Text
6357
AutoCAD SHX Text
6355
AutoCAD SHX Text
6661
AutoCAD SHX Text
6334
AutoCAD SHX Text
6336
AutoCAD SHX Text
6339
AutoCAD SHX Text
6343
AutoCAD SHX Text
6641
AutoCAD SHX Text
6690
AutoCAD SHX Text
6725
AutoCAD SHX Text
6743
AutoCAD SHX Text
6718
AutoCAD SHX Text
6707
AutoCAD SHX Text
6744
AutoCAD SHX Text
6719
AutoCAD SHX Text
6707
AutoCAD SHX Text
6674
AutoCAD SHX Text
6675
AutoCAD SHX Text
GP
AutoCAD SHX Text
6507
AutoCAD SHX Text
6509
AutoCAD SHX Text
GP
AutoCAD SHX Text
6516
AutoCAD SHX Text
ER
AutoCAD SHX Text
6502
AutoCAD SHX Text
GP
AutoCAD SHX Text
GP
AutoCAD SHX Text
6504
AutoCAD SHX Text
6511
AutoCAD SHX Text
6502
AutoCAD SHX Text
6516
AutoCAD SHX Text
6510
AutoCAD SHX Text
6516
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
6549
AutoCAD SHX Text
6555
AutoCAD SHX Text
6563
AutoCAD SHX Text
6559
AutoCAD SHX Text
6567
AutoCAD SHX Text
6555
AutoCAD SHX Text
6547
AutoCAD SHX Text
6547
AutoCAD SHX Text
6546
AutoCAD SHX Text
PT
AutoCAD SHX Text
PT
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
RS
AutoCAD SHX Text
6568
AutoCAD SHX Text
6586
AutoCAD SHX Text
6637
AutoCAD SHX Text
6638
AutoCAD SHX Text
6607
AutoCAD SHX Text
6586
AutoCAD SHX Text
6664
AutoCAD SHX Text
6698
AutoCAD SHX Text
6656
AutoCAD SHX Text
6695
AutoCAD SHX Text
RS
AutoCAD SHX Text
6576
AutoCAD SHX Text
6532
AutoCAD SHX Text
6571
AutoCAD SHX Text
6625
AutoCAD SHX Text
6616
AutoCAD SHX Text
6442
AutoCAD SHX Text
6403
AutoCAD SHX Text
6358
AutoCAD SHX Text
6492
AutoCAD SHX Text
6492
AutoCAD SHX Text
6409
AutoCAD SHX Text
Bin
AutoCAD SHX Text
BL
AutoCAD SHX Text
6405
AutoCAD SHX Text
6379
AutoCAD SHX Text
ER
AutoCAD SHX Text
6368
AutoCAD SHX Text
BL
AutoCAD SHX Text
6374
AutoCAD SHX Text
6364
AutoCAD SHX Text
6389
AutoCAD SHX Text
6351
AutoCAD SHX Text
6343
AutoCAD SHX Text
6346
AutoCAD SHX Text
6345
AutoCAD SHX Text
6341
AutoCAD SHX Text
6376
AutoCAD SHX Text
6399
AutoCAD SHX Text
RS
AutoCAD SHX Text
6676
AutoCAD SHX Text
6677
AutoCAD SHX Text
CL 6614
AutoCAD SHX Text
MH X2
AutoCAD SHX Text
CTV
AutoCAD SHX Text
BT
AutoCAD SHX Text
BT
AutoCAD SHX Text
CL 6554
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6560
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6606
AutoCAD SHX Text
MH X2 SW
AutoCAD SHX Text
CL 6505
AutoCAD SHX Text
MH
AutoCAD SHX Text
WM
AutoCAD SHX Text
CL 6502
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6482
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6467
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6463
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6354
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6368
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6361
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6336
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6357
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
CL 6737
AutoCAD SHX Text
MH SW
AutoCAD SHX Text
RS
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
Concrete Wall Ht 030
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Ht 060
AutoCAD SHX Text
6511
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
6690
AutoCAD SHX Text
Concrete Wall
AutoCAD SHX Text
Steel Fence Ht 130
AutoCAD SHX Text
SC
AutoCAD SHX Text
D071m
AutoCAD SHX Text
D061m
AutoCAD SHX Text
D072m
AutoCAD SHX Text
D062m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D052m
AutoCAD SHX Text
D048m
AutoCAD SHX Text
D049m
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
FH UTT
AutoCAD SHX Text
Plastic
AutoCAD SHX Text
UTT
AutoCAD SHX Text
D071m
AutoCAD SHX Text
Mixed Unknown
AutoCAD SHX Text
Signals
AutoCAD SHX Text
Mixed Cables
AutoCAD SHX Text
IL 6401
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 5891
AutoCAD SHX Text
IL 6315
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
Catch Pit
AutoCAD SHX Text
IL 6116
AutoCAD SHX Text
WL 6160
AutoCAD SHX Text
Mixed
AutoCAD SHX Text
Cables
AutoCAD SHX Text
IL 6512
AutoCAD SHX Text
IL 6556
AutoCAD SHX Text
IL 6132
AutoCAD SHX Text
WL 6163
AutoCAD SHX Text
D364m
AutoCAD SHX Text
Pipes Offset from Cover
AutoCAD SHX Text
1) Although every effort has been made to trace underground services using
AutoCAD SHX Text
radiodetection no guarantee can be given that all have been found Due to their
AutoCAD SHX Text
non-conductivity it may not been possible to trace certain types of plastic service pipes
AutoCAD SHX Text
2) In the absence of evidence to the contrary the routes of confirmed manhole connections
AutoCAD SHX Text
3) This survey has been carried out in accordance with the RICS specification for tracing
AutoCAD SHX Text
are assumed to be direct and straight
AutoCAD SHX Text
eg Gas amp Water Service trial holes must be dug prior to excavation
AutoCAD SHX Text
underground utilities at scales of 1500 amp larger
AutoCAD SHX Text
UNDERGROUND SERVICES
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
(R)
AutoCAD SHX Text
2
AutoCAD SHX Text
20584 (local)
AutoCAD SHX Text
7
AutoCAD SHX Text
19953
AutoCAD SHX Text
CL 6521
AutoCAD SHX Text
MH
AutoCAD SHX Text
CL 6522
AutoCAD SHX Text
MH
AutoCAD SHX Text
5448
AutoCAD SHX Text
5458
AutoCAD SHX Text
5457
AutoCAD SHX Text
5457
AutoCAD SHX Text
5455
AutoCAD SHX Text
5454
AutoCAD SHX Text
5452
AutoCAD SHX Text
5452
AutoCAD SHX Text
5445
AutoCAD SHX Text
5440
AutoCAD SHX Text
5441
AutoCAD SHX Text
5440
AutoCAD SHX Text
5438
AutoCAD SHX Text
5434
AutoCAD SHX Text
5446
AutoCAD SHX Text
5445
AutoCAD SHX Text
5447
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Soffit Levels
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Chamber Extents
AutoCAD SHX Text
Shaft Extents
AutoCAD SHX Text
65924 (OS)
AutoCAD SHX Text
Vaughan Road
AutoCAD SHX Text
Electrical Substation
AutoCAD SHX Text
Commercial space
AutoCAD SHX Text
Commercial Space
AutoCAD SHX Text
LV
AutoCAD SHX Text
Water Tank Room
AutoCAD SHX Text
Laundry room
AutoCAD SHX Text
Reception
AutoCAD SHX Text
WCs
AutoCAD SHX Text
Mailboxes
AutoCAD SHX Text
Food PrepBar
AutoCAD SHX Text
Kitchen
AutoCAD SHX Text
Drink Store
AutoCAD SHX Text
Bin Store
AutoCAD SHX Text
Hotel delivery
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Water tank room
AutoCAD SHX Text
Bessborough Road
AutoCAD SHX Text
Underpass
AutoCAD SHX Text
Stairs to bridge
AutoCAD SHX Text
Reception
AutoCAD SHX Text
Bike store
AutoCAD SHX Text
10 Bikes capacity
AutoCAD SHX Text
Car Park
AutoCAD SHX Text
2 no WCs
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6529
AutoCAD SHX Text
+6543
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6518
AutoCAD SHX Text
+6570
AutoCAD SHX Text
+6578
AutoCAD SHX Text
+6552
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6520
AutoCAD SHX Text
+6527
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6535
AutoCAD SHX Text
+6563
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6545
AutoCAD SHX Text
+6494
AutoCAD SHX Text
+6550
AutoCAD SHX Text
+6555
AutoCAD SHX Text
+6442
AutoCAD SHX Text
+6403
AutoCAD SHX Text
+6409
AutoCAD SHX Text
+6532
AutoCAD SHX Text
+6618
AutoCAD SHX Text
+6480
AutoCAD SHX Text
+6576
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6517
AutoCAD SHX Text
+6576
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
Fall
AutoCAD SHX Text
+6510
AutoCAD SHX Text
2 no WCs + 1 no Wheelchair accessible WC
AutoCAD SHX Text
Staff WCs
AutoCAD SHX Text
Chemical Store
AutoCAD SHX Text
Management Security office
AutoCAD SHX Text
Vending machines
AutoCAD SHX Text
IT
AutoCAD SHX Text
Luggage
AutoCAD SHX Text
Parcel Room
AutoCAD SHX Text
Wheelchair accessible
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff Shower
AutoCAD SHX Text
Staff WC amp Shower
AutoCAD SHX Text
+6535
AutoCAD SHX Text
Staff Refuge
AutoCAD SHX Text
+6495
AutoCAD SHX Text
Telecom
AutoCAD SHX Text
GL 1974
AutoCAD SHX Text
GL 2032
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
Visible tarmac scar
AutoCAD SHX Text
1WD d08
AutoCAD SHX Text
188000N
AutoCAD SHX Text
188040N
AutoCAD SHX Text
514960E
AutoCAD SHX Text
514920E

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 13

Appendix F - SuDS Maintenance Plan

Dandi Nine Ltd Vaughan Road Aparthotel Harrow

Surface Water Maintenance Plan

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Notice

This document and its contents have been prepared and intended solely for Dandi Nine Limited and use in relation to Vaughan Road Aparthotel Harrow Development

MLM Consulting Engineers Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document andor its contents

Document History

Client Dandi Nine Limited Project Vaughan Road Aparthotel Harrow Document Title Surface Water Maintenance Plan Document Reference 6601343-MLM-ZZ-XX-RP-C-0010 MLM Reference JJB6601343

Revision Status Description Author CheckedApproved Date

00 S2 First Issue James Noble 28082020

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP

Contents

1 General 1

2 Permeable Car Park and External Areas 1

3 Manholes and Pipelines 1

4 Geo-cellular Storage System 1

5 GullyDrainage Channels 2

6 Surface Water Package Pump 2

7 Maintenance Responsibility 2

Appendix A ndash SUDS Maintenance amp Management Regime

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 1

1 General

All maintenance and cleaning should be carried out by suitably trained and experienced personnel Prior to starting works the immediate area should be made safe and secure

2 Permeable Car Park and External Areas

Visual inspection of permeable surfaces and system outfalls should be carried out monthly

All permeable hard paving areas should be brushed vacuumed and cleared of debris weeds etc annually to ensure the surface is free of siltdebris and any build-up of hydrocarbons This process should be carried out following autumn leaf fall

Following brush and vacuum it may be necessary to re-grit the paving in accordance with manufacturerrsquos specification to ensure the structural and hydraulic performance of the surface is maintained

Accidental petroloil spillages should be cleaned up as soon as possible Spillages to be contained within the car park area by temporary stopping up of relevant gullies or blocking of over ground flow routes until contamination can be removed from the site and disposed of by a licenced contractor

3 Manholes and Pipelines

All manholes and pipework (inletsoutlets) to be inspected annually and removed of accumulated silt and debris Any flap valves are also to be inspected to ensure free unrestricted movement

4 Geo-cellular Storage System

The following should be undertaken on a monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (for three months following installation)

bull Inspect systems as specified by the manufacturer

The following should be undertaken on a six monthly basis or as required

bull Inspect and identify any areas that are not operating correctly If required take remedial action (following initial three month period)

The following should be undertaken annually as required

bull Remove sediment from pre-treatment structures bull De-silt geo-cellular system where required (high pressure water jetting) bull Inspect and document the presence of wildlife

Vaughan Road Harrow Surface Water Maintenance Plan copy MLM Consulting Engineers Limited

RGMLMIPSCOMWORKMLM6_660_66013_6601343REP 2

5 GullyDrainage Channels

The following should be undertaken on a monthly basis or as required

bull Remove litter and debris bull Inspect inlets outlets and gratings for blockages and clear if required

The following should be undertaken on a half yearly basis

bull Inlets outlets and channel gratings should be inspected for silt with silt removed and disposed of in appropriate location

6 Surface Water Package Pump

Maintenance of the package pump station is to be carried out as required in accordance with the manufactures recommendations

A specialist maintenance company is to be to be employed to inspect and maintain all aspects of the pump station including both duty and standby pumps high level alarms high level over flows and all other maintainable elements as idenfieed by the manufacture

7 Maintenance Responsibility

Maintenance of the above surface water drainage features will be the responsibility of new Aparthotel owner and will be undertaken by their appointed maintenance contractor

A log of all inspections should be maintained and be available for examination by the relevant authorities

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 14

Appendix G - Foul Water Pump Specification

Reference QK22480 Rev C FWDate 06072020

MLM Consulting EngineersNorth KilnFelaw Maltings46 Felaw StreetIpswichSuffolkIP2 8PN

Tel No 01473 231100

E Mail jamesnoblemlmukcom

Attention of James Noble

Dear Sirs

Re Vaugh Road Hotel

We thank you for your valued enquiry and now have pleasure in submitting our best offer for the most suitable equipment for the above scheme on a supply only basis as detailed in the following

1 No XXL25000 Package Pumping Station Supply Only Basis

Please Note To Generate sufficient head we have gone to the depth of 5m therefore extended guide rails and turret will besupplied loose and will need to be fitted by site For this type of scheme we would normaly select a macerator type impellerhowever due to the low head we have chosen 100mm vortex on this occasion

Packaged Pumping Station incorporating 100 mm pipework and valves all assembled andhoused in a strong GRP chamber with a FACTA B (Up to 25 tonne GLVW) access coverA fully automatic control panel activated by level switches complete with pump trip high level alarm withaudiovisual warning are incorporated as standard

Full details of our offer are included on pages 2 and 3 of our quotation which is further supported by our Package Pumping Station literature

The Package Pumping Station is supplied fully assembled and ready for installation on site A detailedInstallation Manual is supplied allowing for easy installation by a competent builder or groundworker The pumping station can be fully operable within a couple of days from delivery

For the future we strongly recommend that you take advantage of our Service Agreement Scheme to ensure that the pumping station has a long trouble-free life We are pleased to offer this at a fixed rate for the first 2 years if the Service Agreement is taken out when the pumping station is ordered For details see seperate Service quote if you have not received this this can be requested separately

We trust that our offer and enclosed information meets with your approval and hope your interest willprogress into a future order with T-T PUMPS in the meantime if you have any queries or require any additional information please contact the undersigned

Yours faithfullyT-T Pumps Limited

Karl TaylorTendering EngineerTel - 01630 647200

Encls PPS Leafletcopy Copyright T-T PUMPS Ltd 2019 Page 1

Reference QK22480 Rev C FWDate 06072020

QuotationT-T PUMPS PACKAGE PUMPING STATION

Serving Foul Water serving 80 bed hotel

Pump Duty Flow 1147 lsTotal Duty Head 451 metres

Pump Qty 2Model DGG 2004100 E0ET5 Motor Submersible

100mm Solids Handling kW Rating 150 kW FLC Amps 34 Voltage 400 Phase 3

Cable Length 10 mOperation Mode Auto (dutystandby)

Control Specification

Panel IP54 Steel enclosure cw runtrip indicators pump trip high level warning alarm amp volt free contactsNot suitable for outdoor use unless installed within a kiosk please see optional extrasLevel Control 3 No Float Switches Cable Length 10 m

Chamber Model XXL25000 Product Reference - PP XXL25000

Internal Diameter 3200 metres Internal Chamber Depth 3600 metres (Including pump sump) Total Depth 5000 metres (including extension turrets included in with price) Internal Length 3760 metres Inlet Size 150 mm ID 160 mm Outside Diameter

Chamber Pipework 100 mm

Valves Gate Valve 100 mmReflux Valve 100 mm

Access Cover Size mm 1 No 1550 x 1000 (main access) amp 1 No 600 x 600 (maintenance access)Loading FACTA B (Up to 25 tonne GLVW)Suitiable for

Outlet Pipework (not included for provision by others)

Recommended Rising Main 101 mm Inside Diameter Black HPPE (PE100) SDR 11Size of HPPE adaptor 125 mm Outside Diameter

Pumping Station Pipework Termination Point 125 mm HPPE Adapter (included)

Unit Price for Supply Only pound1983268 Net + VAT at prevailing rates where applicableDelivery Period 4 to 5 Weeks from receipt of an official orderCarriage Included All deliveries are to be offloaded by client

Extra for M amp E Commissioning pound70000 Net + VAT (Based upon a Single Specific Visit)Please allow a minimum of 28 working days from return of Pre Commissioning Check List to site attendance date

Optional Extras

IP55 Control Kiosk pound55500 Net + VAT at prevailing rates where applicable1250 H x 750 W x 400 D for a Single Door Mild Steel Kiosk (Green) 160 mm Inlet Assembly pound19500 Net + VAT at prevailing rates where applicable

A full range of pump lifting equipment is available prices and information is available upon request please contactour sales team for further information

copy Copyright T-T PUMPS Ltd 2019 Page 2

Pedestrian precincts forecourts light commercial delivery and parking areas

Reference QK22480 Rev C FWDate 06072020 Quotation

T-T PUMPS PACKAGE PUMPING STATIONExclusions

a) Civil works relating to installation of package pumping stationb) Excavation Backfilling c) Pipework connection outside of package pumping stationd) Installation Commissioning

Notes

1) The above prices are net and do not include for any main contractor discounts or retentions 2) T-T PUMPS does not accept liquidated damages 3) A comprehensive Installation Manual is provided any requirement beyond the standard

Conditions of Contract must be specifically agreed with T-T PUMPS and confirmed in writing 4) The cable lengths offered for the pumps and level control will allow the control panel to be

sited a maximum distance of 1500 metres from the pump chamber with the control panel positioned not more than 15 metres above the cover level having the cable ducting running in the most direct routeIf you have doubts about the cabling requirements please contact us and we will be happyto assist

5) The pump offered are designed to transfer bodily waste toilet paper and household wash waters only Sanitary towels condoms cotton wool and other such items should not enterthe pumping station

Validity This quotation is valid 30 days from the date of issue

Terms Terms and Conditions of Sale are available on our Website ( wwwttpumpscom ) or by request

Storage and Retention

We can confirm that our offer complies with the storage requirements to current building regsassuming that the cover level is the first point of overflow

If you have a specific retention requirement other than that which we have confirmed as above pleaseconfirm the details of your requirements and we shall revise our offer where possible to suit

Design Statement

Please note that as part of this quotation we endeavour to include all design features as per your request If however we have failed to include a specific requirement within our quotation that you do require please confirm so by return so that the quotation can be quickly revised Any items not included for within this quotation will be fully chargeable should they be required at a later date

Discharge Consent

Prior to order please ensure that you have raised the appropriate sewer connection application with your local water authority to confirm that the flow rate proposed from this pumping station design is acceptable should the system be discharging into an existing sewer network

We endeavour to offer the correct pumping station design for the application however your local water authority may apply flow rate restrictions which in turn will affect the pumping station design

TT will not accept or reimburse any costs should you choose to install a pumping station at your own risk without the necessary consent in place

Septicity

Steps have been taken within this design to keep the risk of septicity occurring to a minimum Our calculations based upon the information provided at enquiry stage additional septicity control methods are availableshould this be of interest to you

Warranty

All T-T package pumping stations come complete with a manufacturers comprehensive 12 month warrantywhich will run from the date that the system is delivered to site or from the date of commissioning shouldT-T complete this element of the installation

copy Copyright T-T PUMPS Ltd 2019 Page 3

Reference QK22480 Rev C FWDate 06072020

Key Features

A Single Sourced T-T PUMPS offers a single source for your pumping system needs with expertise Engineered Product in pumping system design which is further supported by T-T Controls our

controls division and Aquaflow our valve and pipework division

Our in-house capability ensures that we can respond quickly and high quality levels are maintained

Chamber Each chamber is made from strong GRP The smooth internal walls aid thehygienic disposal of effluent to avoid smells and septicity

Pumps High reliability pumps are selected from our extensive range and chosenon the basis that the pumps are the best selection for each specific application with emphasis on efficiency and reliability

Controls All control panels are specifically designed and manufactured in house incorporating the latest technologyStandard features such as door interlocked mains isolator suitable for incoming 25mm meter tails running tripped and high level indication automatic duty cycle rotation (on dual stations only) and volt free status contacts for use with remote monitoring are all standard incorporated features

Technical Support

Product Selection Our trained and experienced engineers aim to select most effective and efficient products for your application and will assist you throughout the installation of yourpumping station

Installation Special Consideration has been given to ease of installation and making good positive connections for the gravity drainage pipeworkEvery pumping station is provide with 2 comprehensive installation manuals which gives a straight forward guide allowing the builder rapid installation

Commissioning You may require to use the services of commissioning engineers who will check the installation and put the pumping station in to operation

After Sales Full After Sales Service is available including our planned maintenance Service Agreement Scheme

copy Copyright T-T PUMPS Ltd 2019 Page 4

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

2

3

4

5

6

7

∆p MPa

002

003

004

005

006

007

₂P kW

12

η

0

10

20

Q ls0 2 4 6 8 10 12 14 16 18 20

NPSH m

15

155

16

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Ch

ara

cte

rist

ic c

urv

es

acc

ord

ing

to

UN

I E

N IS

O 9

90

62

01

2

P2

lt1

0kW

p

ara

gra

ph

44

2

10

kWlt

P2

lt1

00

kW

G

rad

e 3

B

P2

gt1

00

kW G

rad

e 2

B

Technical specification

Pump name

Series

Free passage

Discharge

Rated voltage

Rated power P2

Number of poles

cos φ

Insulation class

1419 1min

IP 68

100 mm

400 V

4

H

Impeller type

Suction

Frequency

rpm

Efficiency

Rated current

Rated torque

Degree of protection

Configuration

Pump

NGTSB51040N00NN

Hydraulic

Max hydraulic efficiency 362

Motor data

Direct startingStart

Operating limits (standard pumps)

40 degCMax ambient temperature

pH treated liquid

Max density treated liquid

Max start per hour (equally distributed)

1100 kgmsup3

6 divide 14

30

Construction features

Case

Motor phases

Cast iron EN-GJL 250

Shaft

Mechanical seals

PaintingCoating

Hydraulic

Impeller

Stainless steel - Class A2-70

Stainless steel AISI 431

Cast iron EN-GJL 250

Wetdry use

Incoming power P1

Construction materials

Main cable

50 Hz

70 dBMax acoustic pressure level

Standard CE

DN 100 UNDRILLED

DN 100 EN 1092-2

Operating mode S1 - Continuous use

Gaskets

582 kgWeight

cable and fixing system excluded

Screws

GREY series

DGG 2004100 E0ET5

3~

101 Nm

Bi-epoxy 200 microm sea waterresistant

NBR

2 in silicon carbide (2SiC)

Cooling system

10 mt

Electrical variant Thermal protection and leakagesensor

Additional drilling -

No cooling jacket

WET

Cast iron EN-GJL 250

Cable length

4G15 + 3x1

34 A

184 kW

150 kW

0784

813

Capacitor

Starting Capacitor

Starting current 161 A

Set-back Vortex impeller

3~ 50 Hz

Rev 0 - 16-12-2014

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 1 3

DGG 2004100 E0ET5

Eff 362

Head

Shaft power P2

Hydraulic efficiency

NPSH-values

H m

12

16

2

24

28

32

36

4

44

48

52

56

6

64

68

72

76

8

∆p MPa

0012

0016

002

0024

0028

0032

0036

004

0044

0048

0052

0056

006

0064

0068

0072

0076

₂P kW

11

12

13

14

η

0

5

10

15

20

25

30

Q ls0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

NPSH m

152

156

16

164

A1

4514 00444514 0044

14171417

35763576

1147

1534

1147

1534

Density

9983 kgmsup3

Flow

115 ls

DUTY POINT

Viscosity

1005 mmsup2s

Head

45 m

Shaft power P2

14 kW

Impeller type Discharge

DN 100

Hydraulic efficiency

358

Free passage

100 mm

Suction

Set-back Vortex impeller

Pump performance curves

Chara

cte

ristic c

urv

es a

ccord

ing t

o U

NI

EN

IS

O 9

9062

012

P2lt

10kW

p

ara

gra

ph 4

42

10kW

ltP

2lt

100kW

G

rade 3

B

P2gt

100kW

G

rade 2

B

3~ 50 Hz

DN 100

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 2 3

DGG 2004100 E0ET5

Dimensional drawing

Discharge Suction

Installation typeInstallation with bottom coupling device - Vertical outlet

Wetdry use

DN 100 UNDRILLEDDN 100 EN 1092-2 -PN 10

Pressure rating (suctiondischarge)

DAC 100100V+KAF 116-2 EN (P) 9001033

Note Accessory must be ordered separately

Accessory Accessory code

-

Flushing valve - drilling

N

Drilling variant

WET

3~ 50 Hz

L2 Minimum operating level for discontinuous use (excluding -EXFM models)

L1 Minimum operating level for continuous use

All data shown are not binding Zenit reserves the right to change data and dimensions without notice

zenitcom2020-07-03Created on

Data sheet

Page 3 3

DGG 2004100 E0ET5

Vaughan Road Aparthotel Planning Stage Drainage Strategy copy MLM Consulting Engineers Limited

mlmipscomworkTier2MLM66010006601343MLMREPDrainage Report 15

Appendix H - Surface Water Pump Specification

CUSTOMER QUOTATION NO 315118

Page 13

Mr James Noble MLM Group Ipswich Felaw Maltings North Kiln 46 Felaw Street Ipswich Suffolk IP2 8PN

Dear James

Thank you for your valued enquiry for a private packaged pumping station at the above project

The pumping station detailed in the following costing proposal has been designed using the information sent by email on 10092020

As experienced pump station technicians and manufacturers we ensure you are provided with the most cost effective solution for your project requirement Our systems are built in accordance with the latest guidance and standards for wastewater pumping systems Further project specific calculation documents can be supplied upon request

System Type Surface Water Invert Depth 300m Flow Rate 500 lsec

1 Pump Chamber - 1 no GRP holding tank 1250mm diameter x 4000mm deep fitted with 600mm x 600mm opening and SWL 5 Tonne cover (supplied loose) Chamber is manufactured with external heavy duty reinforcement ribs Design Notes Due to the depth of excavation and ground pressures present this pumping station has been designed with reinforcement ribs

2 Submersible Pumps ndash 2no three phase 12kW heavy duty CP 3045 submersible pumps 50 lsec on dutystandby configuration with multi-vane vortex impeller Pumps are fitted with quick release couplings and lifting chains and shackles for easy maintenance removal and include 10m cable Design Notes A multi-vane vortex impeller has been selected to reduce the risk of blockages in the pumping system and to ensure hydraulic efficiency

3 Pipework - Set of dual high pressure 65mm Class E U-PVC pipework with dual GG25 Cast Iron epoxy coated non- return valves and sluice valves dual pump auto couplings and guiderails to be pre-installed in the chamber terminating in a 90mm compression outlet for connection by contractor Design Notes Class E U-PVC has been selected for this pumping station due to the durability and chemical resistance qualities

4 Control Panel - 1no 415V Dual Pump Control Panel with automatic duty changeover to ensure consistent pump operation Control Panel is built to the following specification - 500mm (high) x 400mm (wide) x 200mm (deep) wall mounted enclosure with a lockable door for internal installation - Contactor starter(s) incorporating thermal overload and single phasing protection - HandOffAuto selection switches - Automatic duty pump alternator - Audible amp Visual High Level alarm - Set of volt free contacts for External Contractorrsquos BMS

Design Notes This is a standard Heavy Duty 4kW specification Paradigm panel selected because of its capacity to support an external BMS system as well has having integral audible amp visual alarms Contractor will need to mount and power panel prior to commissioning

Quote No 315118 Date 14092020 Site Vaughan Road Hotel Salesperson Timothy Gulley Valid For 30 Day(s)

CUSTOMER QUOTATION NO 315118

Page 23

12 Level Controls - 4no 10m Heavy duty mercury-free float switches with counter-weights to be installed and set by Paradigm Engineers at point of commissioning

13 Commissioning - Electrical and Mechanical commissioning and pump installation to be carried out by Paradigm Engineers (when required) with reports and lsquoas builtrsquo drawings to be supplied with comprehensive OampM Manual

14 Rising Main Specification - The rising main for this system is to be a 90mm OD Black HDPE SDR17 and is to be supplied fitted and tested by others

15 Power Required - A 415V three phase neutral and earth power supply is required into a nearby isolator by others The power loading is approximately 8kVA

Thank you Sub-Total ex VAT pound637907 VAT 20 pound127581

Total inc VAT pound765488

Page 33

PARADIGM SYSTEMS TERMS amp CONDITIONS OF SUB-CONTRACT

These Terms amp Conditions shall apply to all orders placed with the Sub-Contractor and any stipulations or conditions in a Contractorrsquos order which conflict with qualify or seek to negate any of these Terms amp Conditions shall be inapplicable and have no force or effect 1 Definitions (a) ldquoSub-Contractorrdquo Paradigm Systems (b) ldquoContractorrdquo means the Sub-Contractorrsquos Customer for the Works (c) ldquoWorksrdquo means the building works the subject of the contract in accordance with the Quotation (d) ldquoQuotationrdquo means the quotation issued by the Sub-Contractor 2 The Works (a) The Sub-Contractor will carry out and complete the Works in accordance with the Quotation in a good and workmanlike manner (b) The Sub-Contractor is entitled to rely on the accuracy and completeness of Contractors plans specifications and reports provided to the Sub- Contractor (c) Unless expressly agreed the Sub-Contractor will not carry out any form of design for these Works Insofar as the Sub-Contractor will use best endeavours to comply with current legislation Building Regulations and best practice no warranty or other liability on the part of the Sub-Contractor shall be created or implied in regard to the suitability or fitness for purpose of components or systems recommended or any calculations undertaken Structural and other calculations shall be undertaken by the Contractor (d) In the case where design forms part of the works the Contractor shall allow a period of 4 weeks from the date of instruction for the Sub- Contractor to complete the design and produce design drawings required by the Contractor and shall allow a further 6-8 weeks from the date upon which the Contractor approves design drawings to manufacture the Works Copyright in all design drawings or documents prepared by the Sub- Contractor shall remain vested in the Sub-Contractor 3 Materials Samples submitted for approval show substance and general character only Colour size thickness or shape cannot be guaranteed 4 Title All materials will remain the Sub-Contractorrsquos property with title fully vested in the Sub-Contractor until the Contractor has paid for the Works in full 5 Variations and Extras (a) The prices quoted are based upon dimensions quantities drawings and specifications given at time of tender The Sub-Contractor reserves the right to require re-calculation and apply supplemental charges if any of these parameters change or to increase the contract price to reflect increases in the cost of materials or labour between the end of the fixed price period specified in the Quotation and the date of completion (b) If additional work is requested by the Contractor a quotation will be submitted and the additional work will not be started until the Contractor has placed an order and agreed the price to be paid for the additional works The Sub-Contractor shall not be liable for the consequences of late acceptance 6 Payment (a) The Sub-Contractor may invoice or provide applications for payment for interim payments each month as the Works proceed The sums on each interim invoice or application become due upon the date of issue The payment mechanism and timetable shall be in accordance with the Scheme for Construction Contracts (England amp Wales) Regulations 1998(As amended from time to time)(The Scheme) (1) 40 on Design 55 on Delivery 5 on Commissioning (2) Account holders 30 days end of month following Non account holding customers payment on pro-forma (b) The Contractor will not be entitled to withhold payment in whole or in part of any sum due unless and until he issues a valid Pay-less Notice in accordance with The Scheme No set-off or abatement will be permitted by reference to any sum due under one or more other contracts (c) The Contractor will not be entitled to make any retention unless agreed in writing The Sub-contractor retains the entitlement to issue a Retention Bond in lieu of cash retentions It is a condition precedent that the first moiety of retention is to be released in full together with VAT upon practical completion of the Sub-Contractors works The second moiety of retention shall be released 12 calendar months later (d) If any payment is not made by the Contractor by the expiry of its respective Final date for Payment the Sub-Contractor will be entitled to statutory compensation and to charge interest pursuant to the Late Payment of Commercial Debt Regulations 2013 The applicable rate is 8 per annum above Bank of England base rate In addition the Sub-Contractor will after the expiry of seven days from the giving of written notice to this effect to the Contractor be entitled to suspend the Works and any works under any other contract with the Contractor until such outstanding sum is paid The sub-contractors reasonable costs incurred by such suspension will be reimbursed by the Contractor (e) The Sub-Contractor reserves the right to refuse to execute any order or contract if the arrangements for payment of the Contractorrsquos credit are not satisfactory In the case of non-payment of any account by its Final date for Payment or in the case of death incapacity bankruptcy or insolvency of the Contractor or when the Contractor is a Limited Company in the case of liquidation or the appointment of a receiver the purchase price of all goods delivered to date andor any sums already due from the Contractor shall become payable immediately from the Contractor and in addition the Sub-Contractor has the right to cancel every contract made with the Contractor or to cancel suspend or discontinue delivery of goods and materials for same This provision acts without prejudice to the Sub-Contractorrsquos right to recover any loss sustained caused by the above circumstances 7 Time for Completion Time shall not be of the essence The Sub-Contractor will use reasonable endeavours to ensure that the Works are completed within the time (if any) stated in the Sub-contractors Quotation otherwise completion shall be within a reasonable time The Contractor expressly waives all claims for delay charges or Liquidated Damages 8 Defects The Sub-Contractor will rectify at its own cost any defects or faults which appear and are notified by the Contractor to the Sub-Contractor in writing within 12 months of completion of the Works and are due to defective workmanship by the Sub-Contractor or defective materials supplied by the Sub-Contractor The Sub-Contractor shall be afforded reasonable opportunity and facilities to investigate such claims 9 Consequential Damage The Contractor expressly waives all claims for special incidental or consequential damages it may have against the Sub-Contractor including without limitation damages for principal office expenses financing costs loss of business and reputation and loss of use 10 Liability The Sub-Contractorrsquos liability for death or personal injury to any individual caused by negligence of the Sub-Contractor or its Sub-Sub-Contractors or agents is not limited Without prejudice to the above the maximum liability of the Sub-Contractor for all other events shall not exceed the contract price 11 Disputes (a) The Sub-Contractor and Contractor agree that either party may refer a dispute to adjudication at any time following the rules and procedures of the Scheme for Construction Contracts Part 1 (the Scheme) The Decision of the Adjudicator shall be binding on the parties until the dispute is finally resolved through agreement or by Arbitration under the CIMAR rules (b) Save in the circumstances provided for below the parties shall each bear their own legal costs and other expenses incurred in the adjudication (c) Where the referring party is awarded in the aggregate a sum more than 50 of the amount claimed the non-referring party shall reimburse the referring partyrsquos legal costs and other expenses which the referring party incurred in the adjudication process (d) The adjudicator shall decide how his fee and reasonable expenses are to be apportioned between the parties (e) The adjudicator shall be permitted to correct his decision so as to remove clerical or typographical errors arising by accident or omission 12 Jurisdiction This contract is governed by the law of England and Wales

Paradigm Systems | 35 Boulton Road | Reading | Berkshire | RG2 0NH T +44 (0)118 986 6101 W wwwpumpnet

40 degC

Shrouded single or multi-channel impeller pumps with large throughletsand single volute pump casing for liquids containing solids and fibresCast iron design with double sealing technology Some modelsavailable as stainless steel versions

Head

Pump efficiency

Shaft power P2

Speed

252 90mm

38 52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm (P2)

52 m

38

0673 kW

28909 rpm

501 ls

252 90mm

52 m

38

0673 kW

28909 rpm

501 ls

00

10

20

30

40

50

60

70

80

90

100

110

[m]

0102030[]

040

050

060

[kW]

280028402880[rpm]

0 1 2 3 4 5 6 7 8 [ls]

A1

CP 3045 HT 3~ 252

90 mm

Number of blades1

Technical specification

P - Semi permanent Wet

Configuration

50 mm

Impeller diameter90 mm

Discharge diameter50 mm

Motor number Installation typeC3045181 12-08-2BB-W12KW

Inlet diameter

Maximum operating speed

Throughlet diameter

2785 rpm

Materials

Grey cast ironStator housing material

Curves according to

Pump information

Discharge diameter

50 mm

Impeller diameter

Impeller

44 mm

Polyamide 66

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

Max fluid temperature

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Technical specificationMotor - General

Frequency Rated voltage

Rated powerRated speed

Rated current

400 V

12 kW2785 rpm

28 A

3~C3045181 12-08-2BB-W12KW

Phases

Total moment of inertia00013 kg msup2

Power factor - 11 Load079

070

056

785

790

770

Motor number

ATEX approved

50 Hz

Number of poles2

Stator variant1

Insulation classF

Type of Duty

Motor - Technical

Power factor - 34 Load

Power factor - 12 Load

Motor efficiency - 11 Load

Motor efficiency - 34 Load

Motor efficiency - 12 Load

Starting current direct starting

Starting current star-delta

17 A

567 A

S1

Starts per hour max15

No

Version code181

0Last update

Created on 9142020Created byProject

Block

CP 3045 HT 3~ 252Performance curveDuty point

52 m5 lsHeadFlow

Curves according toHead

Pump efficiencyOverall efficiency

Power input P1Shaft power P2

252 90mm

38 52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P2)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

252 90mm (P1)

52 m

38

297

0673 kW

501 ls

0859 kW

501 ls

00

05

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

110

115

[m]

0

4

8

12

16

20

24

28

32

36

[]

040

045

050

055

060

065

070

075

080

085

[kW]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Water pure [100]4 degC9999 kgmsup31569 mmsup2s

Curve ISO 9906

0Last update

Created on 9142020Created byProject

Block

Pumps Flow Head Shaft power Flow Head Shaft power Hydreff Specific NPSHreSystems Energy

A1 5 ls 52 m 0672 kW 5 ls 52 m 0672 kW 38 00477 kWhmsup3

CP 3045 HT 3~ 252Duty Analysis

Curves according to Water pure [100] 4degC 9999kgmsup3 1569mmsup2s

Head

252 90mm

38 52 m

501 ls0004

08

12

16

20

24

2832

36

40

44

48

52

56

6064

68

72

76

80

84

88

9296

100

104

108

112

116

[m]

00 05 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 [ls]

Operating characteristics

Last updateCreated on 9142020Created byProject

Block

CP 3045 HT 3~ 252Dimensional drawing

34

102275

18085

2-11 NPTISO-G 2

276

168

134 30

ZZ20

VIEW Z - Z

525

100

105

Oslash12(4x)

32

28 7S cale Date

RevisionDrawing number

S uctioninlet

P ump inlet

P umpoutlet

DischargeoutletCPDP 3045 MTHT

ISO-G 2

DN 50 110 181123

6272300 5

(kg)Pump DischWeight

Guide bars

21

Altdes

Out

let c

ente

r line

BOLT

Refline

Min

wate

r lev

el

0Last update

Created on 9142020Created byProject

Block

wwwmlmgroupcom

T +44 1223 632 800

A Building 7200 Cambridge Research Park Cambridge CB25 9TL

  • 1 Introduction
  • 2 Thames Water Asset Map
  • 3 Foul Drainage
    • 31 Existing Foul Water Drainage
    • 32 Proposed Foul Water Drainage
      • 4 Flood Risk
      • 5 Exceedance Routes
      • 6 Surface Water Drainage
        • 61 Existing Surface Water Drainage
        • 62 Proposed Surface Water Drainage
          • 7 Treatment
          • 8 Future Maintenance
          • 9 Conclusion
            • 91 Foul Water
              • 911 The developments foul water connection is based on a peak flow rate of 82 ls discharging into the existing Thames Water manhole EXFW A to the West of the development in Vaughan Road
              • 912 Thames Water have confirmed that the proposed peak flow rate and connection into their foul sewer in Vaughan Road is acceptable in principle and will not have a detrimental effect on their network
              • 913 Connection details of the proposed Section 104 gravity sewer within Vaughan Road into the existing Thames Water foul manhole will be subject to confirmation of the invert level
                • 92 Surface Water
                  • 921 The developments surface water will discharge at a maximum of 5ls for all storms up to and including the 1 in 100 year storm event plus 40 allowance for climate change The development will discharge via the existing car parks outfall lateral
                  • 922 Thames Water have confirmed that the proposed surface water discharge rate adoption of the 150dia lateral and ultimate connection into their trunk sewer below site is acceptable in principle and will not have a detrimental effect on their netw
                    • An approved Thames Water pre-planning enquiry has been received for the developments foul and surface water discharge Refer to Appendix B for details
                    • Both connections will be subject to Thames Water full technical approval at detail design
                      • 6601343-MLM-ZZ-XX-DR-C-0005-P02 Surface Water Flood Flowpdf
                        • Sheets and Views
                          • 0002
                              • 6601343-MLM-ZZ-XX-DR-C-0001-P05 - Drainage Strategypdf
                                • Sheets and Views
                                  • 0001
                                      • ADPE555tmp
                                        • 1 General
                                        • 2 Permeable Car Park and External Areas
                                        • 3 Manholes and Pipelines
                                        • 4 Geo-cellular Storage System
                                        • 5 GullyDrainage Channels
                                        • 6 Surface Water Package Pump
                                        • 7 Maintenance Responsibility
Page 12: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 13: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 14: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 15: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 16: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 17: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 18: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 19: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 20: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 21: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 22: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 23: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 24: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 25: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 26: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 27: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 28: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 29: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 30: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 31: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 32: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 33: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 34: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 35: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 36: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 37: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 38: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 39: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 40: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 41: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 42: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 43: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 44: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 45: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 46: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 47: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 48: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 49: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 50: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 51: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 52: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 53: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 54: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 55: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 56: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 57: Planning Stage Drainage Strategy Vaughan Road Aparthotel
Page 58: Planning Stage Drainage Strategy Vaughan Road Aparthotel