plant palette -

Click here to load reader

Post on 24-Nov-2021

0 views

Category:

Documents

0 download

Embed Size (px)

TRANSCRIPT

MAY PARK RENOVATION: FINAL CONCEPT A U G U S T 2 5 , 2 0 1 6
Project Supervisor: Alice Messer | Project Manager: Cheeneng Yang Contact: 651-266-6412 | 651-266-6414 Email: Alice.Messer@ci.stpaul.mn.us | Cheeneng.Yang@ci.stpaul.mn.us
PLANT PALETTE
KEY IDEAS:
sem false spirea ‘blue’ little blue stem
SOUTH ENTRY
15’
• Path loops around play area
• Plantings define play area
0’ 10’ 20’ 40’N
MAY PARK RENOVATION: FINAL CONCEPT ENLARGEMENT A U G U S T 2 5 , 2 0 1 6
Project Supervisor: Alice Messer | Project Manager: Cheeneng Yang Contact: 651-266-6412 | 651-266-6414 Email: Alice.Messer@ci.stpaul.mn.us | Cheeneng.Yang@ci.stpaul.mn.us
Clayland St
Clayland Pl
traditional monkey bar
whimsical-house w/slide
PLAY ELEMENTS
Which swing element do you prefer? (Place your dot on one)
EXISTING OPEN SPACE
SEAT WALL OPTION -Location for seat wall
TRADITIONAL MONKEY BAR
N
MAY PARK RENOVATION: PUBLIC ART A U G U S T 2 5 , 2 0 1 6
Project Supervisor: Alice Messer | Project Manager: Cheeneng Yang Contact: 651-266-6412 | 651-266-6414 Email: Alice.Messer@ci.stpaul.mn.us | Cheeneng.Yang@ci.stpaul.mn.us
Neighborhood Poetry Poems written by the May Park community engraved into the walkway.
A creative way to sit and lounge at the park.An interactive art located in the sand play area. Artful Seating
Which one do you prefer? (Place your dot on one)
Playful Element