Platform Life Extension – Identifying Critical Wells
5th October 2016
D Roberts
Learn more at www.2hoffshore.com
![Page 3: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/3.jpg)
3 of 30
Agenda
Introduction – technology > design life
Size of the challenge - cost
Platform well build
Corrosion mechanism – accelerators
Criticality screening
Remediation methods
Summary
Conclusion
Learn more at www.2hoffshore.com
![Page 4: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/4.jpg)
4 of 30
Introduction
70% global production comes from mature assets
Advances in technology have extended production lives of wells > design life
Corrosion related loss of structural integrity and potential for loss of containment
Abnormal movement, clashes, ruptured flowlines, casing failures
Learn more at www.2hoffshore.com
![Page 5: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/5.jpg)
5 of 30
Size of the Challenge
Learn more at www.2hoffshore.com
![Page 6: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/6.jpg)
6 of 30
Structural Failure - Cost Effect
Learn more at www.2hoffshore.com
![Page 7: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/7.jpg)
Platform Well Construction
Well built on the surface casing, conductor acts as a marine protector only.
Well built on the conductor – latched or may lift off when hot (Hybrid). The
GAP
HYBRID – no lockdown? More complex!
Learn more at www.2hoffshore.com
![Page 8: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/8.jpg)
Corrosion mechanism
HAT
MSL
LAT
Mud circulation ports or subsea
breach
O2
HEAT
HEAT
Microbial &
Anaerobic
Corrosion
O2
Corrosion
AcceleratedO2
Corrosion
Debris caps top corrosion
Learn more at www.2hoffshore.com
![Page 9: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/9.jpg)
Criticality Screening
Learn more at www.2hoffshore.com
![Page 10: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/10.jpg)
10 of 30
4 Steps to be Considered
1. Calculate well “as-built” weight – Size of the initial forces
2. Measure remaining wall thickness – Quantity of steel carrying forces
3. Assess well criticality – re-model with reduced performance & added external & operational loads
4. Implement corrective method – Fix if required & re-model
Learn more at www.2hoffshore.com
![Page 11: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/11.jpg)
11 of 30
Step 1. Well Load (Weight)
Option 1 Well Build Predictive Modelling
Reasonable well data, a load / displacement calibration point is useful. Learn more at www.2hoffshore.com
![Page 12: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/12.jpg)
12 of 30
Direct Measurement
Option 2 Direct In-Situ measurement ASTM E837
±3% accuracy
Strain Gauge Rosette
Learn more at www.2hoffshore.com
![Page 13: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/13.jpg)
13 of 30
Health Check
Wellhead
TOC
TOC
TOC
Packer
Do in-situ load and model match?
Has the well maintained its as-built load and GAP?
Are all the springs still working?
If structural spring fails the rest will take its share whether they are capable or not!
Learn more at www.2hoffshore.com
![Page 14: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/14.jpg)
14 of 30
STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC)
method – field proven
Ability to read thickness of “good steel” through thick corrosion / marine product ~ 20mm
Integrated camera
Multiple historic surveys gives corrosion rate
C-PEC measures simultaneously
0
20
40
60
80
100
120
0
5
10
0 5 10 15 20 25 30 35 40 45
PE
C r
ea
din
g [
%]
PE
C r
ea
din
g [
mm
]
Distance from top of Conductor [m]
Platform XYZ - Well TRS-23 - 20" Casing - 2012 PEC wall thickness measurements
D-PEC Nov 2007D-PEC June 2009D-PEC July 2012
LFlu
id
level
2009
H
AT
Learn more at www.2hoffshore.com
![Page 15: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/15.jpg)
15 of 30
Vertical
Position Clock Position [hours]
[mm] 2 4 6 8 10 12
0 16.5 12.5 17.2 16.9 15.1 16.5
-100 16.8 12.4 17.0 16.7 13.8 16.4
-200 16.7 10.4 16.4 16.7 11.3 16.1
-300 16.5 10.5 14.3 16.5 12.2 15.9
-400 17.1 9.6 13.3 16.4 11.1 16.4
-500 16.9 9.7 12.9 16.3 12.5 16.6
-600 16.5 10.2 13.9 16.3 15.3 16.7
-700 16.9 9.1 13.4 16.0 16.5 16.4
-800 16.6 8.6 11.9 16.1 16.4 16.7
-900 16.9 8.4 11.9 16.3 16.5 16.8
-1000 16.5 7.9 12.0 16.4 16.4 16.7
-1100 16.1 8.0 13.5 16.2 14.2 16.6
-1200 14.9 8.1 13.0 16.2 16.5 16.3
-1300 13.9 8.5 13.8 16.3 16.7 16.1
-1400 14.7 8.6 14.0 16.3 16.9 16.6
-1500 15.8 9.1 13.3 16.3 17.0 17.4
-1600 16.5 9.5 12.8 16.3 16.9 16.8
-1700 15.3 11.7 13.2 16.4 16.8 16.8
-1800 16.4 11.6 16.7 16.5 16.7 16.4
-1900 16.4 12.0 16.9 16.4 16.6 16.5
-2000 16.7 12.7 17.0 16.4 16.6 16.5
-2100 16.8 13.7 17.0 16.3 16.6 16.5
-2200 16.8 16.0 16.9 16.3 16.5 16.7
-2300 16.6 16.8 16.9 16.2 16.2 16.3
-2400 15.5 16.5 17.1 16.3 16.5 16.6
-2500 15.2 16.5 16.0 16.3 16.5 16.5
-2600 15.7 16.6 16.9 16.2 16.5 16.5
-2700 16.4 16.5 16.9 16.1 16.6 16.5
-2800 16.8 16.6 16.9 16.2 16.5 16.4
-2900 16.8 16.7 16.7 15.9 16.2 16.3-3000 17.1 17.2 17.5 16.7 17.1 17.0
Colour-coded wall thickness graph Jig with PEC probe
Offshore Riser in Splash Zone
D-PEC & C-PEC with PCE.
C-PEC tool with PCE can bypass access problems in D-annulus Learn more at www.2hoffshore.com
![Page 16: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/16.jpg)
16 of 30
STEP 3. Assess Well Criticality Casing supported
Revisit well model
Insert corroded section/s
Review stress analysis
Learn more at www.2hoffshore.com
![Page 17: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/17.jpg)
Account for the Well’s Slump
Well finds a new equilibrium
Significant load changes
May still be within limits
If slumped distance not known assume next string in is now structural.
Learn more at www.2hoffshore.com
![Page 18: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/18.jpg)
18 of 30
External load sources
Conductor supported wells
Include wave & current loading
Insert corroded section/s, define guides & clearance, soils
Well loads from static applied as distributed axial load in dynamic global model.
x
y
20" Surface Casing
30" ConductorProduction Deck
WellGuide Level 2 Weight
CentralisersMean Sea Level
Guide Level 3
Wave Loading
Guide Level 4
Guide Level 5
Guide Level 6
Guide Level 7
Mudline
P-Y Soil Springs
Surface Tree
Wellhead
Current
Profile
Learn more at www.2hoffshore.com
![Page 19: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/19.jpg)
19 of 30
Operational load sources
Weight of surface equipment – full stack up.
Thermal changes not to be underestimated! Any cold injections in particular
• All future lifecycle operations considered through to abandonment
Well kill operation adding 100 Te!
Learn more at www.2hoffshore.com
![Page 20: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/20.jpg)
Well Condition Known - Remediation Methods
Learn more at www.2hoffshore.com
![Page 21: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/21.jpg)
STEP 4. Corrective/Preventative Methods
Baseline PEC wall thickness & revisit at later date, corrosion problems not always obvious.
Corrosion inhibition
Rapeseed oil top up (N.Sea)
Biocide
Coatings
Measure & record GAP and Wellhead elevation for significant events.
Low Severity
Learn more at www.2hoffshore.com
![Page 22: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/22.jpg)
22 of 30
STEP 4. Corrective/Preventative Methods
Stabilisation
Conductor guide reinstatement
Conductor & surface casing retro-fit centralisers
Increases fatigue life & reduces VME strress
Medium Severity
Conductor guide installation - Claxton
Learn more at www.2hoffshore.com
![Page 23: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/23.jpg)
23 of 30
STEP 4. Corrective/Preventative Methods
Load transfer using shims/clamp
Conductor integrity?
Soil integrity?
D-Annulus access preserved
Grouting D-Annulus
Floating grout retainer for holed conductors
Access to D-Annulus lost
Corrosion inhibition over grouted interval
Hot or cold?
Restricting its movement not necessarily a good thing!
Medium Severity
Re-modelling required? Reinstate tension?
Learn more at www.2hoffshore.com
![Page 24: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/24.jpg)
24 of 30
STEP 4. Corrective/Preventative Methods
Platform Supported
No conductor integrity required
Platform strength – limited number of wells
Ideal for abandonment
Ideal to support well for repair work
Short term solutions
Learn more at www.2hoffshore.com
![Page 25: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/25.jpg)
25 of 30
STEP 4. Corrective/Preventative Methods
Reinforcing Conductors / Casings
Complex
Well supported / lifted during repair
Replacement
Full well integrity restored
Very complex
High Severity
Learn more at www.2hoffshore.com
![Page 26: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/26.jpg)
26 of 30
Summary
Investigate your wells
Identify and repair critical wells APPROPRIATLY & COST EFFECTIVELY.
Prevent FURTHER CASULATIES
Monitor
Learn more at www.2hoffshore.com
![Page 27: Platform Life Extension - 2H Offshore · 2020-05-21 · 14 of 30 . STEP 2. Remaining Wall Thickness Pulsed Eddy Current (PEC) method – field proven Ability to read thickness of](https://reader033.vdocuments.net/reader033/viewer/2022060216/5f0616b67e708231d4163b7e/html5/thumbnails/27.jpg)
27 of 30
Conclusion
The well model is invaluable to predict problems and catch the wells EARLY…$$$.
Generic studies on analogous wells increases efficiency.
Well movement measurements during intervention & operations are invaluable. Is it moving as it should?
Accuracy of the analysis - isolates ONLY the wells requiring attention & defines the optimum solution.
The wrong fix can cause other failures but if it’s not broken – don’t fix it!