PLATO Main Electronics Units (MEU) based on inputs from P. Plasson and the system team. J. Miguel Mas-Hesse Centro de Astrobiología (CSIC-INTA). On-board data processing: Introduction. - PowerPoint PPT PresentationTRANSCRIPT
PLATO Main Electronics Units (MEU)based on inputs from P. Plasson and the system team
J. Miguel Mas-Hesse
Centro de Astrobiología (CSIC-INTA)
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 2
On-board data processing: Introduction
Stellar field PLATO image
• DPS goal: automatically process and extract accurate stellar light curves from the raw, messy CCD images.
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 3
On-board data processing: baseline concept
• The normal-telescopes onboard data processing system will be formed by:
– 4 CCD + 1 FEE per focal plane (telescope)• 32 telescopes
– 1 Data Processing Unit (DPU) per 2 focal planes• 16 DPU boards
– 4 DPUs per 1 Main Electronics Unit (MEU)• 4 MEU boxes
– 1 Instrument Control Unit (ICU) per 4 MEUs• 1 ICU (+ 1 fully redundant ICU)
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 4
On-board data processing: architecture
1 N-DPU for 2 N-cameras
F-cameras
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 5
On-board data processing: architecture
Present MEU baseline concept:
+ 1 DPU per 2 focal planes+ 1 single DPU PSU box, external to the MEU’s
To ICU-M To ICU-R
SpW
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 6
PLATO MEU: FEE – DPU SpW link
• FEE – DPU link baseline:– 2 SpaceWire links per FEE (100 Mbps)
• Alternative:– 1 SpaceWire link per FEE (200 Mbps)
• Feasibility has to be demonstrated.
SpW 100 Mbps
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 7
On-board data processing: architecture
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 8
On-board data processing: architecture
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 9
PLATO MEU: operation
Window Extraction
up to 330.000 stars / 25 sec
FullimageAcquisition x 82 images / 6.25 sec
Data correction and LC extraction
Masks & window positions
updating
6.25 sec
6.25 sec
6.25 sec
5400sec
• Target count for 2 x 4 CCD per DPU (to be processed every 25 sec.):
Nominal sample 2x(110.000 stars/telescope) = 220.000 stars/DPU Extended sample (+50% margin) = 330.000
stars/DPU Background win. 2 x 400 Imagettes up to 2 x 2.000 Offset windows 2 x 2 x 4 half-row (2.255 pixels) Smearing rows 2 x 4 x 10 overscan rows
• Total memory requirement, including 50% margin on star count: 250 Mbytes per DPU
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 10
PLATO MEU: CPU load
• The CPU load has been estimated for various processors, based on current baseline for number of stars + extraction algorithms. At this phase the %CPU load should be ≤ 50%.
• The present concept seems feasible, but:– with 1 DPU/2 telescopes, no margin on star counts acceptable.
– with 1 DPU/telescope an extended sample with +50% margin in star counts could be considered, if required. .
Weighted mask photometry assumed
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 11
PLATO MEU: open points
SpaceWire
Router(M)
SpaceWire
Router(R)
Power Supply(M + R)
N-DPU #1
N-DPU #2
N-DPU #3
N-DPU #4
SpW
MEU
SpW
To redundant ICU
To main ICU
235 kbps
235 kbps
235 kbps
235 kbps
<1 Mbps
Test I/F - SpW
180 Mbps(2 x 64 x 1.4)
4 Mpx/s
SpWI/F
ADC
ADC
FEE #14510 px
4510
px
SpWI/F
ADC
ADC
FEE #24510 px
4510
px
SpWI/F
ADC
ADC
FEE #34510 px
4510
px
SpWI/F
ADC
ADC
FEE #44510 px
4510
px
Power Distribution
HK
Cmd
28 V, Cmd from S/CM + R
Backup concept:
+ 1 DPU board per telescope+ 4 DPUs per MEU+ 8 MEU More powerful, but too heavy
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 12
PLATO MEU: open points
Baseline Alternative
Number of telescopes per DPU
2 1
MEU-PSU 1 MEU-PSU box for 4 MEU boxes
4 MEU-PSU inside each MEU box
FEE / DPU number of SpaceWire links
2 SpaceWire links per FEE (100 Mbps)
1 SpaceWire links per FEE (200 Mbps)
FEE DPU image transfer mechanism and protocol
RMAP DMA transfer tables
DPU Boot mechanism Boot Software in PROM Pure RMAP hardware boot
PLATO Kick Off November 2010 J. Miguel Mas-Hesse 13
PLATO: next steps
• The industrial MEU definition study is starting now.
• Goals: – Definition and dimensioning of the N-DPUs
• Global architecture, choice of processors, number of SpaceWire data links, location of PSUs, mass, power comsumption,…
• Trade off on algorithms potential increase of complexity
– Development of simulators/breadboards for critical interfaces
• Spacewire link FEE – DPU