pleasant grove star progress powerpoint
DESCRIPTION
Using technology in the classroom. Comparison of technology progress over the last 3 years.TRANSCRIPT
![Page 1: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/1.jpg)
Pleasant Grove Elementary
Texas Campus STaR Chart Summary
Leap into Learning
![Page 2: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/2.jpg)
Table of Contents
• Introduction
• Purpose of School Technology
• STaR Data Comparison Charts
• Teaching & Learning Measures
• Preparation & Development Measures
• Administration & Support Measures
• Technology Infrastructure Measures
• Conclusion
![Page 3: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/3.jpg)
IntroductionSTaR Chart Helps Teachers:
• Determine professional development needs.
• Determine funding based on teacher and classroom needs.
• Provide data to support the need to apply for grants.
• Pleasant Grove Elementary - STaR Data
![Page 4: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/4.jpg)
Don’t Be Afraid Of Technology
![Page 5: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/5.jpg)
Evolving Technology
• Technology is more than computers
• Overhead projectors were high tech in past years
• Now data projectors and smart boards are today’s overhead projectors
• Technology keeps evolving but is still just another tool that needs to be integrated into the classroom
![Page 6: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/6.jpg)
Purpose of School Technology and Readiness Chart (STaR)
• Determine progress toward district long-range technology plan
• Determine progress toward campus improvement goals
• Determine progress toward campus vision
• Gauge yearly progress toward technology integration in the classrooms
![Page 7: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/7.jpg)
Teaching and Learning
19
14
15
0 5 10 15 20
2005-2006
2006-2007
2007-2008
Key Area Total:
Classification: Advanced
Classification: Developing
Classification: Advanced
Texas Campus Star Chart Summary Data
![Page 8: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/8.jpg)
Educator Preparation & Development
21
11
15
0 5 10 15 20 25
2005-2006
2006-2007
2007-2008Classification: Advanced
Classification: Developing
Classification: Target
Key Area Total:Texas Campus Star Chart Summary Data
![Page 9: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/9.jpg)
Leadership, Administration & Instructional Support
15
19
18
0 5 10 15 20
2005-2006
2006-2007
2007-2008
Key Area Total:
Classification: Advanced
Classification: Advanced
Texas Campus Star Chart Summary Data
Classification: Advanced
![Page 10: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/10.jpg)
Infrastructure for Technology
13
17
15
0 2 4 6 8 10 12 14 16 18
2005-2006
2006-2007
2007-2008
Texas Campus Star Chart Summary Data
Key Area Total:
Classification: Advanced
Classification: Advanced
Classification: Advanced
![Page 11: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/11.jpg)
Teaching and Learning Measures
• Teacher Role and Collaborative Learning
• Patterns of Teacher Use
• Frequency/Design of Instructional Setting
• Curriculum Areas
• Technology Applications (TEKS)
• Patterns of Use
![Page 12: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/12.jpg)
Educator Preparation and Development Measures
• Contact of Training
• Capability of Educators
• Leadership and Capability of Administrators
• Models of Professional Development
• Levels of Understanding and Patterns of Use
• Technology Budget Allocated to Technology Professional Development
![Page 13: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/13.jpg)
Administration and Support Services Measures
• Vision and Planning
• Technical Support
• Instructional and Administrative Staffing
• Budget
• Funding
![Page 14: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/14.jpg)
Infrastructure for Technology Measures
• Students Per Computers
• Internet Access Connectivity Speed
• Distance Learning
• LAN/WAN
• Other Technologies
![Page 15: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/15.jpg)
To Grow in Technology
• Connect with others who have developed skills
• Collaborate
• Take healthy technology risks
• Attend professional development
• “We are better together.”
• Leap Into Learning
![Page 16: Pleasant Grove STaR Progress PowerPoint](https://reader034.vdocuments.net/reader034/viewer/2022042700/55953e871a28abe2268b47bc/html5/thumbnails/16.jpg)
Never let technology scare you away!