please refer to the landscaping drawings. · revision wbs code safety related yes no ... please...

1
Copyright ' 2011 NNB Gen Co. No part of this drawing to be reproduced without prior permission. REASONS FOR REVISION DATE REV. STATUS CHECKED BY APPROVED BY PREPARED BY 1st partner EDF ENERGY NNB GenCo DOCUMENT REFERENCE No. Project Contract No. / Orig. Co / Zone Asset / Building System Doc. type Chrono No. CONTRACTOR REF. No. DESCRIPTION CONTRACTOR COMPANY TRADE NAME APPLICABILITY: U0 = 0, U1 = 1, U2 = 2, U9 = 9, AU = 1&2 "Asset / zone" in the Doc ref. Number above: site (s). The numbers must correspond to the Tick the boxes corresponding to the unit and BUILDING SYSTEM DOCUMENT SUB -TYPE EDF CLASSIFICATION CODE SUBCONTRACTOR COMPANY TRADE NAME SUBCONTRACTOR DOCUMENT REF. No This staff must be entirely readable For A0 and A1 : ABERPFTHLIJOOCGQUVWMNSZXKY zsaeocmuvnwxirfkhbdpqgyjlt 71423855690 INTELLECTUAL PROPERTY: NNB: OWNERSHIP EDF: 0 1 2 3 4 5 6 7 8 9 10 NUCL/REP/EPR/UKX HPC ( doc: HK ) SZC ( doc: SZ ) 2nd partner UK PROTECTIVE MARKING: EDF PROTECTIVE MARKING: SCALE SIZE PAGE REVISION WBS CODE SAFETY related Yes No UK PROTECTIVE MARKING: NOTES: 6. All internal room dimensions are shown as minimum reqiuirement. Please refer to the landscaping drawings. 5. Any hard or soft landscaping shown on this drawing is illustrative only. 4. For all M+E information refer to M+E drawing. 3. For all structural information refer to structural engineering drawing. 2. Do not scale from drawings. Used figured dimensions only. 1. All dimensions are in millimetres unless otherwise stated. Copyright ' 2011 NNB Gen Co. No part of this drawing to be reproduced without prior permission. REASONS FOR REVISION DATE REV. STATUS CHECKED BY APPROVED BY PREPARED BY 1st partner EDF ENERGY NNB GenCo DOCUMENT REFERENCE No. Project Contract No. / Orig. Co / Zone Asset / Building System Doc. type Chrono No. CONTRACTOR REF. No. DESCRIPTION CONTRACTOR COMPANY TRADE NAME APPLICABILITY: U0 = 0, U1 = 1, U2 = 2, U9 = 9, AU = 1&2 "Asset / zone" in the Doc ref. Number above: site (s). The numbers must correspond to the Tick the boxes corresponding to the unit and BUILDING SYSTEM DOCUMENT SUB -TYPE EDF CLASSIFICATION CODE SUBCONTRACTOR COMPANY TRADE NAME SUBCONTRACTOR DOCUMENT REF. No This staff must be entirely readable For A0 and A1 : ABERPFTHLIJOOCGQUVWMNSZXKY zsaeocmuvnwxirfkhbdpqgyjlt 71423855690 INTELLECTUAL PROPERTY: NNB: OWNERSHIP EDF: 0 1 2 3 4 5 6 7 8 9 10 NUCL/REP/EPR/UKX HPC ( doc: HK ) SZC ( doc: SZ ) 2nd partner UK PROTECTIVE MARKING: EDF PROTECTIVE MARKING: SCALE SIZE PAGE REVISION WBS CODE SAFETY related Yes No 0 5 10 20 metres 0.1 30.10.11 MN NB REVIEW MC/NF Metres AOD = Metres Above Ordinance Datum Boundary (the site) Proposed Bridgwater A Development Site KEY: C C +20.00M +15.00M +10.00M Stage D+ 100% Issue +XXXX Level (shown in metres AOD) 0.2 14.12.11 MN NB REVIEW MC/NF Revised Stage D+ 100% Issue 0.3 13.01.12 MN NB REVIEW MC/NF Stage D+ Final Issue 0.4 27.01.12 NR MN NF/ MC Final Issue Stage D+ BPE 0.5 12.11.14 DL NF NF/ MC REVIEW Photovoltaic Array added, Sports Pitch and Sports Building Omitted Accommodation Building E.4 0.6 13.01.16 DL NF added and Photovoltaic Array enlarged Sports Pitch reinstated, Blocks E1 - E4 and ancillary structures NF/ MC 06 06 06 06 Safety, Health and Environment Information with this type of work: Notes below are additional to hazards/risks normally associated Dismantling/Demolition (Future) No significant / unusual residual hazards identified at this stage Maintenance No significant / unusual residual hazards identified at this stage carrying out the work using an approved safe method of working. These notes are based on the use of experienced and competent contractors Operations No significant / unusual residual hazards identified at this stage Construction Ci. Cii. excavation, piling, hoarding, lighting. operations to form and line the rhyne, in particular craneage, particular regard should be given to potential impacts of engineering and embankment. Network Rail permissions should be sought and undertaken with consideration of the proximity of the existing railway Further design and construction operations are to be Railway. Ciii. Civ. groundwater issues. locations/type. The contractors methodology should reflect Clarkebond/WSP for information of temporary drainage excess groundwater. Please refer to the PC information from site and temporary site drainage has been installed to alleviate been subject to flooding. Boreholes to monitor groundwater are on . The groundwater on the site is relatively high and has Ground water Cv. possibility. the site is considered low from preliminary investigations but is still a The probability of the presence of war munitions in the north of Site. structures including the housing to the south of the site not adversely affect the stability of the railway or other adjacent Piling operations, including resultant noise and vibration, must Piling. to be given to post operational removal and disposal. are expected to be removed following operational use. Consideration The proposed site buildings, infrastructure and services Dismantling. Cvi. temporary flood drainage, gas and monitoring bore holes. exception of an existing drainage main to the south of the site, is understood that below services have been largely removed with the Buildings have been removed from site. It Services and Structures. Cvii. clearance and construction methodologies. appropriate measures put in place as part of the contractors site taken should any contamination be identified during construction and However care should still be taken to ensure that appropriate action is documented within the PC Information from Clarkebond/WSP. The nature of contamination and extent of the remediation is The site has undergone a remediation process. Site contamination. Cviii. and the sports pitches along Bath Road. operations, and any third party visitors to the site, Sydenham Manor of this and maintain safe segregation between construction and handover. The contractors methodology should reflect consideration The campus is intended to be delivered as a phased Phasing. Cix. human health, subject to on-going monitoring. Ground gases emissions causing harm to Site contamination. D2 NNB GenCo Copyright 2011 0 - Property of Owner NNB GenCo EDF ENERGY 3/7 A0 1 :200 Not Protectively Marked 0-Property of Owner N/A Canaway Fleming Architects Ltd 000 000 DRW 000 GEN072 HPC AA 001029 0.6 Proposed Site Internal Elevation Elevation CC Bridgwater A Accommodation Campus AA001029 Accommodation Building D.6 Accommodation Building D.5 Accommodation Building D.1 ACCOMMODATION BLOCK D RECREATION FACILITIES 01 AA1029 Proposed Internal Site Street Elevation CC (1 of 2) 01 AA1029 Proposed Internal Site Street Elevation CC (2 of 2) +20.00M +15.00M +10.00M +0.00M +5.00M +0.00M +5.00M Ma t c h L i n e 1 C L Parapet +16.42M Parapet +16.42M Amenity Building behind Ma t c h L i n e 1 C L ACCOMMODATION BLOCK D External lighting External lightning Refuse storage enclosure +20.00M +15.00M +10.00M +0.00M +5.00M +20.00M +15.00M +10.00M +0.00M +5.00M Amenity Grass Photovoltaic Array (in background) security fence Pitch enclosure & Sports Floodlights ACCOMMODATION BLOCK E Plant store enclosure Parapet +16.62M Parapet +16.62M Refuse storage enclosure Parapet +16.27M

Upload: vudieu

Post on 14-Jul-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Please refer to the landscaping drawings. · REVISION WBS CODE SAFETY related Yes No ... Please refer to the landscaping drawings. 5. Any hard or soft landscaping shown on this drawing

Drain

Drain

COLLEGE WAY

Drain

MOSS CLOSE

WY

ND

HA

M

RO

AD

FAIR

FA

X

RO

AD

MA

NO

R R

OA

D

FAIRFAX CLOSE

BATH R

OA

D

SYDENHAM CLOSE

FREDERIC

K R

OA

D

TREVOR R

OA

D

KN

OW

LE R

OA

D

RO

WA

NS CLOSE

Drain

Drain

Pond

Drain

Drain

Drain

Drain

PAR

KW

AY

BATH R

OA

D

TREVOR R

OA

D

BATH R

OA

D

KN

OW

LE R

OA

D

Copyright ' 2011 NNB Gen Co. No part of this drawing to be reproduced without prior permission.

REASONS FOR REVISIONDATEREV. STATUSCHECKED

BY

APPROVED

BY

PREPARED

BY

1st partner

EDF ENERGY

NNB GenCo

DOCUMENT REFERENCE No.

Project Contract No. / Orig. Co/ Zone

Asset

/ Building

SystemDoc. type Chrono No.

CONTRACTOR REF. No.

DESCRIPTION

CONTRACTOR COMPANY TRADE NAME

APPLICABILITY:

U0 = 0, U1 = 1, U2 = 2, U9 = 9, AU = 1&2

"Asset / zone" in the Doc ref. Number above:

site (s). The numbers must correspond to the

Tick the boxes corresponding to the unit and

BUILDING

SYSTEM

DOCUMENT SUB -TYPE EDF CLASSIFICATION CODE

SUBCONTRACTOR COMPANY TRADE NAME SUBCONTRACTOR DOCUMENT REF. No

This staff must be entirely readable

For A0 and A1 : ABERPFTHLIJOOCGQUVWMNSZXKY

zsaeocmuvnwxirfkhbdpqgyjlt 71423855690

INTELLECTUAL PROPERTY: NNB: OWNERSHIP EDF:

0 1 2 3 4 5 6 7 8 9 10

NUCL/REP/EPR/UKX

HPC ( doc: HK )SZC ( doc: SZ )

2nd partner

UK PROTECTIVE MARKING: EDF PROTECTIVE MARKING:

SCALE

SIZE

PAGE

REVISION WBS CODE

SAFETY related Yes No

UK PROTECTIVE MARKING:

NOTES:

6. All internal room dimensions are shown as minimum reqiuirement.

Please refer to the landscaping drawings.

5. Any hard or soft landscaping shown on this drawing is illustrative only.

4. For all M+E information refer to M+E drawing.

3. For all structural information refer to structural engineering drawing.

2. Do not scale from drawings. Used figured dimensions only.

1. All dimensions are in millimetres unless otherwise stated.

Copyright ' 2011 NNB Gen Co. No part of this drawing to be reproduced without prior permission.

REASONS FOR REVISIONDATEREV. STATUSCHECKED

BY

APPROVED

BY

PREPARED

BY

1st partner

EDF ENERGY

NNB GenCo

DOCUMENT REFERENCE No.

Project Contract No. / Orig. Co/ Zone

Asset

/ Building

SystemDoc. type Chrono No.

CONTRACTOR REF. No.

DESCRIPTION

CONTRACTOR COMPANY TRADE NAME

APPLICABILITY:

U0 = 0, U1 = 1, U2 = 2, U9 = 9, AU = 1&2

"Asset / zone" in the Doc ref. Number above:

site (s). The numbers must correspond to the

Tick the boxes corresponding to the unit and

BUILDING

SYSTEM

DOCUMENT SUB -TYPE EDF CLASSIFICATION CODE

SUBCONTRACTOR COMPANY TRADE NAME SUBCONTRACTOR DOCUMENT REF. No

This staff must be entirely readable

For A0 and A1 : ABERPFTHLIJOOCGQUVWMNSZXKY

zsaeocmuvnwxirfkhbdpqgyjlt 71423855690

INTELLECTUAL PROPERTY: NNB: OWNERSHIP EDF:

0 1 2 3 4 5 6 7 8 9 10

NUCL/REP/EPR/UKX

HPC ( doc: HK )SZC ( doc: SZ )

2nd partner

UK PROTECTIVE MARKING: EDF PROTECTIVE MARKING:

SCALE

SIZE

PAGE

REVISION WBS CODE

SAFETY related Yes No

0 5 10 20

metres

0.1 30.10.11 MNNB REVIEW MC/NF

Metres AOD = Metres Above Ordinance Datum

Boundary (the site)

Proposed Bridgwater A Development Site

KEY:

C

C

+20.00M

+15.00M

+10.00M

Stage D+ 100% Issue

+XXXX Level (shown in metres AOD)

0.2 14.12.11 MNNB REVIEW MC/NFRevised Stage D+ 100% Issue

0.3 13.01.12 MNNB REVIEW MC/NFStage D+ Final Issue

0.4 27.01.12 NR MN NF/ MCFinal Issue Stage D+ BPE

0.5 12.11.14 DL NF NF/ MCREVIEW Photovoltaic Array added, Sports Pitch and Sports Building Omitted

Accommodation Building E.4

0.6 13.01.16 DL NF

added and Photovoltaic Array enlarged

Sports Pitch reinstated, Blocks E1 - E4 and ancillary structures NF/ MC

06

06

06

06

Safety, Health and Environment Information

with this type of work:

Notes below are additional to hazards/risks normally associated

Dismantling/Demolition (Future)

No significant / unusual residual hazards identified at this stage

Maintenance

No significant / unusual residual hazards identified at this stage

carrying out the work using an approved safe method of working.

These notes are based on the use of experienced and competent contractors

Operations

No significant / unusual residual hazards identified at this stage

Construction

Ci.

Cii.

excavation, piling, hoarding, lighting.

operations to form and line the rhyne, in particular craneage,

particular regard should be given to potential impacts of engineering

and embankment. Network Rail permissions should be sought and

undertaken with consideration of the proximity of the existing railway

Further design and construction operations are to be Railway.

Ciii.

Civ.

groundwater issues.

locations/type. The contractors methodology should reflect

Clarkebond/WSP for information of temporary drainage

excess groundwater. Please refer to the PC information from

site and temporary site drainage has been installed to alleviate

been subject to flooding. Boreholes to monitor groundwater are on

. The groundwater on the site is relatively high and has Ground water

Cv.

possibility.

the site is considered low from preliminary investigations but is still a

The probability of the presence of war munitions in the north of Site.

structures including the housing to the south of the site

not adversely affect the stability of the railway or other adjacent

Piling operations, including resultant noise and vibration, must Piling.

to be given to post operational removal and disposal.

are expected to be removed following operational use. Consideration

The proposed site buildings, infrastructure and services Dismantling.

Cvi.

temporary flood drainage, gas and monitoring bore holes.

exception of an existing drainage main to the south of the site,

is understood that below services have been largely removed with the

Buildings have been removed from site. It Services and Structures.

Cvii.

clearance and construction methodologies.

appropriate measures put in place as part of the contractor�s site

taken should any contamination be identified during construction and

However care should still be taken to ensure that appropriate action is

documented within the PC Information from Clarkebond/WSP.

The nature of contamination and extent of the remediation is

The site has undergone a remediation process. Site contamination.

Cviii.

and the sports pitches along Bath Road.

operations, and any third party visitors to the site, Sydenham Manor

of this and maintain safe segregation between construction and

handover. The contractors methodology should reflect consideration

The campus is intended to be delivered as a phased Phasing.

Cix.

human health, subject to on-going monitoring.

Ground gases emissions causing harm to Site contamination.

D2

NNB GenCo Copyright 20110 - Property of Owner

NNB GenCo

EDF ENERGY

3/7

A0

1 :200

Not Protectively Marked

0-Property of Owner

N/A

Canaway Fleming Architects Ltd

000

000

DRW000GEN072HPC AA 001029

0.6

Proposed Site Internal Elevation

Elevation CC

Bridgwater A Accommodation Campus

AA001029

Accommodation Building D.6 Accommodation Building D.5

Accommodation Building D.1

ACCOMMODATION BLOCK D

RECREATION FACILITIES

01

AA1029

Proposed Internal Site Street Elevation CC (1 of 2)

01

AA1029

Proposed Internal Site Street Elevation CC (2 of 2)

+20.00M

+15.00M

+10.00M

+0.00M

+5.00M

+0.00M

+5.00M

Matc

h Line 1

CL

Parapet +16.42MParapet +16.42M

Amenity Building behind

Matc

h Line 1

CL

ACCOMMODATION BLOCK D

External lighting

External lightningRefuse storage

enclosure

+20.00M

+15.00M

+10.00M

+0.00M

+5.00M

+20.00M

+15.00M

+10.00M

+0.00M

+5.00M

Amenity Grass

Photovoltaic Array (in background)

security fence

Pitch enclosure & Sports Floodlights

ACCOMMODATION BLOCK E

Plant store enclosure

Parapet +16.62M

Parapet +16.62M

Refuse storage

enclosure

Parapet +16.27M