please refer to the landscaping drawings. · revision wbs code safety related yes no ... please...
TRANSCRIPT
Drain
Drain
COLLEGE WAY
Drain
MOSS CLOSE
WY
ND
HA
M
RO
AD
FAIR
FA
X
RO
AD
MA
NO
R R
OA
D
FAIRFAX CLOSE
BATH R
OA
D
SYDENHAM CLOSE
FREDERIC
K R
OA
D
TREVOR R
OA
D
KN
OW
LE R
OA
D
RO
WA
NS CLOSE
Drain
Drain
Pond
Drain
Drain
Drain
Drain
PAR
KW
AY
BATH R
OA
D
TREVOR R
OA
D
BATH R
OA
D
KN
OW
LE R
OA
D
Copyright ' 2011 NNB Gen Co. No part of this drawing to be reproduced without prior permission.
REASONS FOR REVISIONDATEREV. STATUSCHECKED
BY
APPROVED
BY
PREPARED
BY
1st partner
EDF ENERGY
NNB GenCo
DOCUMENT REFERENCE No.
Project Contract No. / Orig. Co/ Zone
Asset
/ Building
SystemDoc. type Chrono No.
CONTRACTOR REF. No.
DESCRIPTION
CONTRACTOR COMPANY TRADE NAME
APPLICABILITY:
U0 = 0, U1 = 1, U2 = 2, U9 = 9, AU = 1&2
"Asset / zone" in the Doc ref. Number above:
site (s). The numbers must correspond to the
Tick the boxes corresponding to the unit and
BUILDING
SYSTEM
DOCUMENT SUB -TYPE EDF CLASSIFICATION CODE
SUBCONTRACTOR COMPANY TRADE NAME SUBCONTRACTOR DOCUMENT REF. No
This staff must be entirely readable
For A0 and A1 : ABERPFTHLIJOOCGQUVWMNSZXKY
zsaeocmuvnwxirfkhbdpqgyjlt 71423855690
INTELLECTUAL PROPERTY: NNB: OWNERSHIP EDF:
0 1 2 3 4 5 6 7 8 9 10
NUCL/REP/EPR/UKX
HPC ( doc: HK )SZC ( doc: SZ )
2nd partner
UK PROTECTIVE MARKING: EDF PROTECTIVE MARKING:
SCALE
SIZE
PAGE
REVISION WBS CODE
SAFETY related Yes No
UK PROTECTIVE MARKING:
NOTES:
6. All internal room dimensions are shown as minimum reqiuirement.
Please refer to the landscaping drawings.
5. Any hard or soft landscaping shown on this drawing is illustrative only.
4. For all M+E information refer to M+E drawing.
3. For all structural information refer to structural engineering drawing.
2. Do not scale from drawings. Used figured dimensions only.
1. All dimensions are in millimetres unless otherwise stated.
Copyright ' 2011 NNB Gen Co. No part of this drawing to be reproduced without prior permission.
REASONS FOR REVISIONDATEREV. STATUSCHECKED
BY
APPROVED
BY
PREPARED
BY
1st partner
EDF ENERGY
NNB GenCo
DOCUMENT REFERENCE No.
Project Contract No. / Orig. Co/ Zone
Asset
/ Building
SystemDoc. type Chrono No.
CONTRACTOR REF. No.
DESCRIPTION
CONTRACTOR COMPANY TRADE NAME
APPLICABILITY:
U0 = 0, U1 = 1, U2 = 2, U9 = 9, AU = 1&2
"Asset / zone" in the Doc ref. Number above:
site (s). The numbers must correspond to the
Tick the boxes corresponding to the unit and
BUILDING
SYSTEM
DOCUMENT SUB -TYPE EDF CLASSIFICATION CODE
SUBCONTRACTOR COMPANY TRADE NAME SUBCONTRACTOR DOCUMENT REF. No
This staff must be entirely readable
For A0 and A1 : ABERPFTHLIJOOCGQUVWMNSZXKY
zsaeocmuvnwxirfkhbdpqgyjlt 71423855690
INTELLECTUAL PROPERTY: NNB: OWNERSHIP EDF:
0 1 2 3 4 5 6 7 8 9 10
NUCL/REP/EPR/UKX
HPC ( doc: HK )SZC ( doc: SZ )
2nd partner
UK PROTECTIVE MARKING: EDF PROTECTIVE MARKING:
SCALE
SIZE
PAGE
REVISION WBS CODE
SAFETY related Yes No
0 5 10 20
metres
0.1 30.10.11 MNNB REVIEW MC/NF
Metres AOD = Metres Above Ordinance Datum
Boundary (the site)
Proposed Bridgwater A Development Site
KEY:
C
C
+20.00M
+15.00M
+10.00M
Stage D+ 100% Issue
+XXXX Level (shown in metres AOD)
0.2 14.12.11 MNNB REVIEW MC/NFRevised Stage D+ 100% Issue
0.3 13.01.12 MNNB REVIEW MC/NFStage D+ Final Issue
0.4 27.01.12 NR MN NF/ MCFinal Issue Stage D+ BPE
0.5 12.11.14 DL NF NF/ MCREVIEW Photovoltaic Array added, Sports Pitch and Sports Building Omitted
Accommodation Building E.4
0.6 13.01.16 DL NF
added and Photovoltaic Array enlarged
Sports Pitch reinstated, Blocks E1 - E4 and ancillary structures NF/ MC
06
06
06
06
Safety, Health and Environment Information
with this type of work:
Notes below are additional to hazards/risks normally associated
Dismantling/Demolition (Future)
No significant / unusual residual hazards identified at this stage
Maintenance
No significant / unusual residual hazards identified at this stage
carrying out the work using an approved safe method of working.
These notes are based on the use of experienced and competent contractors
Operations
No significant / unusual residual hazards identified at this stage
Construction
Ci.
Cii.
excavation, piling, hoarding, lighting.
operations to form and line the rhyne, in particular craneage,
particular regard should be given to potential impacts of engineering
and embankment. Network Rail permissions should be sought and
undertaken with consideration of the proximity of the existing railway
Further design and construction operations are to be Railway.
Ciii.
Civ.
groundwater issues.
locations/type. The contractors methodology should reflect
Clarkebond/WSP for information of temporary drainage
excess groundwater. Please refer to the PC information from
site and temporary site drainage has been installed to alleviate
been subject to flooding. Boreholes to monitor groundwater are on
. The groundwater on the site is relatively high and has Ground water
Cv.
possibility.
the site is considered low from preliminary investigations but is still a
The probability of the presence of war munitions in the north of Site.
structures including the housing to the south of the site
not adversely affect the stability of the railway or other adjacent
Piling operations, including resultant noise and vibration, must Piling.
to be given to post operational removal and disposal.
are expected to be removed following operational use. Consideration
The proposed site buildings, infrastructure and services Dismantling.
Cvi.
temporary flood drainage, gas and monitoring bore holes.
exception of an existing drainage main to the south of the site,
is understood that below services have been largely removed with the
Buildings have been removed from site. It Services and Structures.
Cvii.
clearance and construction methodologies.
appropriate measures put in place as part of the contractor�s site
taken should any contamination be identified during construction and
However care should still be taken to ensure that appropriate action is
documented within the PC Information from Clarkebond/WSP.
The nature of contamination and extent of the remediation is
The site has undergone a remediation process. Site contamination.
Cviii.
and the sports pitches along Bath Road.
operations, and any third party visitors to the site, Sydenham Manor
of this and maintain safe segregation between construction and
handover. The contractors methodology should reflect consideration
The campus is intended to be delivered as a phased Phasing.
Cix.
human health, subject to on-going monitoring.
Ground gases emissions causing harm to Site contamination.
D2
NNB GenCo Copyright 20110 - Property of Owner
NNB GenCo
EDF ENERGY
3/7
A0
1 :200
Not Protectively Marked
0-Property of Owner
N/A
Canaway Fleming Architects Ltd
000
000
DRW000GEN072HPC AA 001029
0.6
Proposed Site Internal Elevation
Elevation CC
Bridgwater A Accommodation Campus
AA001029
Accommodation Building D.6 Accommodation Building D.5
Accommodation Building D.1
ACCOMMODATION BLOCK D
RECREATION FACILITIES
01
AA1029
Proposed Internal Site Street Elevation CC (1 of 2)
01
AA1029
Proposed Internal Site Street Elevation CC (2 of 2)
+20.00M
+15.00M
+10.00M
+0.00M
+5.00M
+0.00M
+5.00M
Matc
h Line 1
CL
Parapet +16.42MParapet +16.42M
Amenity Building behind
Matc
h Line 1
CL
ACCOMMODATION BLOCK D
External lighting
External lightningRefuse storage
enclosure
+20.00M
+15.00M
+10.00M
+0.00M
+5.00M
+20.00M
+15.00M
+10.00M
+0.00M
+5.00M
Amenity Grass
Photovoltaic Array (in background)
security fence
Pitch enclosure & Sports Floodlights
ACCOMMODATION BLOCK E
Plant store enclosure
Parapet +16.62M
Parapet +16.62M
Refuse storage
enclosure
Parapet +16.27M