Plenty Road Upgrade (Bush Boulevard to Bridge Inn Road) Incorporated Document February 2018

Upload: others

Post on 19-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

Plenty Road Upgrade (Bush Boulevard to Bridge Inn Road)

Incorporated Document

February 2018

Page 2: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

1.0 INTRODUCTION

This document is an incorporated document in the Whittlesea Planning Scheme pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

The land identified in clause 3.0 of this document may be used and developed in accordance with specific control in clause 4.0 of this document.

The control of this document prevails over any contrary or inconsistent provision of the planning scheme.

2.0 PURPOSE

The purpose of the control is to allow the use and development of land described in Clause 3.0 of this document for the purposes of the project.

3.0 LAND

The control of this document applies to land required for the project as shown in the project area maps forming part of this document.

4.0 CONTROL

4.1 EXEMPTION FROM PLANNING SCHEME REQUIREMENTS

Despite any provision to the contrary or any inconsistent provision in the planning scheme, no planning permit is required for, and no planning provision in the planning scheme operates to prohibit, restrict or regulate the use and development of the project land for the purposes of the project.

The project includes, but is not limited to, the following:

a) Roadworks including the upgrading and duplication of approximately 7kms of Plenty Road and approximately 1km of Bridge Inn Road, intersections upgrades along the route, bridges over waterways and shared off-road pedestrian and bicycle paths;

b) Creating or altering access to roads, including roads in a Road Zone Category 1

c) Ancillary activities including, but not limited to:

i) creating and using lay down areas for construction purposes

ii) stockpiling of excavation materials

iii) constructing and using temporary site workshops and storage administration and amenities buildings

iv) removing, destroying and lopping trees and removing vegetation, including native vegetation

v) demolishing and removing buildings and works

vi) relocating, modifying, upgrading and installing services and utilities

Page 3: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

vii) constructing and using temporary access roads, diversion roads and vehicle parking areas

viii) constructing fences, temporary site barriers and site security

ix) constructing or carrying out works to create roads, carparking areas, bunds, mounds, landscaping, excavate land, salvage artefacts and alter drainage

x) earthworks including cutting and spoil removal, and formation of drainage works

xi) displaying construction, directional and temporary business identification signs

xii) restoration and reinstatement works.

4.2 CONDITIONS

The use and development permitted by this document must be undertaken in accordance with the following conditions:

Environmental Management

4.2.1 Prior to the commencement of any works associated with the Project, an Environmental Management Plan, or equivalent i.e. Project Environment Protection Strategy, must be prepared to the satisfaction of the Minister for Planning.

The document must include:

The framework for approvals, consents and related statutory instruments that will underpin environmental management for the project.

The applicable environment management system including the organisational

accountabilities and responsibilities assigned to the project.

The environmental management measures required to address key environment risks and issues.

The environmental performance objectives and indicators for guiding management actions.

The processes for monitoring, reporting, auditing and evaluating performance and

environmental outcomes, as well as revising management measures.

Native Vegetation

4.2.2 Details of the proposed removal, destruction or lopping, and offsetting of native vegetation necessary for the construction of the project, must be prepared in consultation with Whittlesea City Council and in accordance with the Guidelines for the removal, destruction or lopping of native vegetation (Department of Environment, Land, Water and Planning, 2017) to the satisfaction of the Secretary the Department of Environment, Land, Water and Planning (DELWP), except as otherwise agreed by the Secretary to DELWP.

4.2.3 Native vegetation offsets must be provided in accordance with the Guidelines for the removal, destruction or lopping of native vegetation (Department of Environment, Land, Water and Planning, 2017), except as otherwise agreed by the Secretary to DELWP.

Page 4: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

Heritage

4.2.4 Where, but for this incorporated document, a planning permit would be required for buildings and works within a Heritage Overlay, a Conservation Management Plan must be prepared in consultation with Whittlesea City Council and be consistent with the requirements of Clause 22.04 (Heritage Conservation Policy) of the Whittlesea Planning Scheme.

4.2.5 Where, but for this incorporated document, a planning permit would be required to demolish, remove or alter a dry stone wall, a dry stone wall management plan must be prepared in consultation with Whittlesea City Council and be consistent with the requirements of Clause 22.04 (Heritage Conservation Policy) of the Whittlesea Planning Scheme.

Flood Management

4.2.6 Buildings and works on land within the Land Subject to Inundation Overlay must be undertaken to the satisfaction of the relevant floodplain management authority.

Utility Installation

4.2.7 Buildings and works associated with a utility installation (excluding a minor utility installation or any telecommunications facility that is either located within a Road Zone or proposed road zone or, were it not for this incorporated document, would be exempt under Clause 52.19-1 of the planning scheme) must be undertaken in accordance with site plans and elevations prepared to the satisfaction of the Minister for Planning.

Other Conditions

4.2.8 Unless otherwise stated, the plans and other documents listed in Clause 4.2 must be approved prior to the commencement of works. The plans and other documents may be prepared and approved for separate components or stages of the project but each plan or other document must be approved before commencement of works for that component or stage.

4.2.9 The plans and other documents may be amended from time to time to the satisfaction of the Minister for Planning or relevant authority. In deciding whether a plan or other document is satisfactory or whether to consent to an amendment to a plan or other document, the Minister for Planning or relevant approving authority, may seek the views of Whittlesea City Council, or any other relevant authority.

4.2.10 The use and development of land must be undertaken generally in accordance with the approved plans and documents.

4.3 PREPARATORY BUILDINGS AND WORKS

The following buildings and works may commence in the project area before the plans and other documents listed in Clause 4.2 are approved.

4.3.1 Preparatory works for the project including, but not limited to:

a) Works, including vegetation removal, that would not require a planning permit under the provisions of the planning scheme in the absence of this incorporated document.

Page 5: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

b) Investigating, testing and preparatory works to determine the suitability of land, and property conditions surveys.

c) Creation and use of construction access points and working platforms.

d) Site establishment works including temporary site fencing and hoardings, site offices, and hardstand and laydown areas.

e) Construction, protection, modification, removal or relocation of utility services, overhead and associated infrastructure.

f) Establishment of environmental and traffic controls, including designation of “no-go” zones.

g) Establishment of temporary car parking.

h) Demolition to the minimum extent necessary to enable preparatory works.

i) Salvage of aboriginal cultural heritage material and other management actions required to be undertaken in compliance with a cultural heritage management plan approved under the Aboriginal Heritage Act 2006 or other compliance with that Act.

4.3.2 Any native vegetation removed to enable preparatory works under Clause 4.3.1 forms part of the total extent of native vegetation removal necessary for the construction of the Project and native vegetation offsets must be provided in accordance with Clause 4.2.3, except as otherwise agreed by the Secretary to DELWP.

5.0 EXPIRY

This control in this document expires if any of the following circumstances apply:

The development allowed by the control, including preparatory works, is not started by 1 August 2023;

The development allowed by the control is not completed by 1 August 2027.

The Minister may extend these periods if a request is made in writing before the expiry date or within three months afterwards.

Page 6: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

PROJECT AREA MAPS

Page 7: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

PLEN

TY RO

AD

BRIDGE INN ROAD

STAT

ION

ROAD

RIVE

RDAL

E BOU

LEVA

RD

POMADERRIS DRIVE

SCHO

TTER

S ROA

D

HEALS ROAD

BELLINI WAY

OLD PL

ENTY

ROAD

BASILICA VISTA

STATION LANE

FRANCESCA DRIVE

COLIB

AN D

RIVE

POWERS STREET

VILLE

ROY S

TREE

T

MANGO CRESCENT

SISSINGHURST PARADE

PIMPINELLA PASS

APRICOT AVENUE

WATERVIEW DRIVE

PIETAS PLACE

PIPER

S LAN

E

COCK

RELL

ROA

D

LUCCA WALK

TARWIN DRIVE

MORWELL WAY

PLUME DRIVE

EVERTON DRIVE

GOULBURN STREET

TREVI DRIVE

HATHFELDE BOULEVARD

MINTBUSH GRANGE

BURNSIDE WAY

HATFIELD DRIVE

MOE WAY

BLAIMORE WAY

CHATSWORTH AVENUE

POWLETT STREET

POMEGRANATE GROVE

HOME

BUSH

AVEN

UE

VILLA

GE W

ALK

BLACKCURRANT CIRCUIT

KRUGER STREET

GRIMSTHORPHE PLACEST

OURH

EAD

AVEN

UEANNANDALE DRIVE

TANGELO GROVE

DORI

C ME

WS

SAN SISTO GREEN

PETWORTH CLOSE

LegendProject areaCadastre

1:5,000

0 50 100m

Coordinate system: GDA 1994 MGA Zone 55

Engineering and Technical Servicesfor Plenty Road (Bush Blvd to Bridge Inn Road) Upgrade

Project areaMap 1Scale ratio correct when printed at A3

VicRoads

Author: MBMap: 2135645A_GIS_623_B

Date: 2/02/2018 Approved by: WP

www.wsp.com\\Apmelfil01\proj\V\VicRoads\2135645A_OSAR_ENGINEERING_TECHNICAL_SE\10_GIS\Projects\Maps\2135645A_GIS_623_B.mxd

Data source: VicRoads. Copyright © The State of Victoria, Department of Environment,Land, Water & Planning 2017

© WSP I Parsons Brinckerhoff - Asia Pacific (WSP I PB). Copyright in the drawings, information and data recorded is the property of WSP I PB. This document and the information are solely for the use of the authorisedrecipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that which it was supplied by WSP I PB. WSP I PB makes no representation, undertakes no duty and accepts noresponsibility to any third party who may use or rely upon this document or the information. NCSI Certified Quality System to ISO 9001. © APPROVED FOR AND ON BEHALF OF WSP I Parsons Brinckerhoff - Asia Pacific.

Page 8: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

PLEN

TY R

OAD

MCARTHURS ROAD

THE PARKWAY

HUNTERS ROAD

POPPY DRIVE

RIVE

RDAL

E BOU

LEVA

RD

HAWK

STOW

E PAR

ADE

BARM

AH D

RIVE

TARWIN DRIVE

CAREX WAY

CUCKOO STREET

WOOD

RUFF

ROA

D

PANTON GAP DRIVE

MILLSTREAM WAY

HUNT

INGF

IELD

DRIVE

MOUN

T ECC

LES W

AY

TORBRECK AVENUE

KANOOKA AVENUE

BUTT

RESS

CRE

SCEN

T

ST LEONARD DRIVE

GOULBURN STREET

GRAM

PIANS

DRI

VE

FUSCHIA GROVE

ARRO

WGRA

SS ST

REET

WILDERNESS PLACE

AVOC

A AVE

NUE

CHAM

ONIX

PARA

DE

THRUSH STREET

FERNCROFT DRIVE

MITTA MITTA AVENUE

SARGOOD DRIVE

BARKLY PLACE

PETAL COURT

WATERVIEW DRIVE MOE WAY

JONDARVAN DRIVE

TORRESDALE ROAD

GRATTAN STREET

TREEMONT TERRACE

EILDON CIRCUIT

BRACKEN WAY

GROUNDBERRY STREETRI

PPON

LEA P

ARAD

E

THE ROCKS

WIREGRASS COURT

BRINDABELLA GREEN

LARNOOK PLACE

LANCEWOOD WALK

SPIKE

CLO

SE

SORR

EL C

OURT

YERING DRIVE

PARSLEY TERRACE

ST MICHEL PLACE

LABASSA COURT

MONET PLACE

LegendProject areaCadastre

1:5,000

0 50 100m

Coordinate system: GDA 1994 MGA Zone 55

Engineering and Technical Servicesfor Plenty Road (Bush Blvd to Bridge Inn Road) Upgrade

Project areaMap 2Scale ratio correct when printed at A3

VicRoads

Author: MBMap: 2135645A_GIS_623_B

Date: 2/02/2018 Approved by: WP

www.wsp.com\\Apmelfil01\proj\V\VicRoads\2135645A_OSAR_ENGINEERING_TECHNICAL_SE\10_GIS\Projects\Maps\2135645A_GIS_623_B.mxd

Data source: VicRoads. Copyright © The State of Victoria, Department of Environment,Land, Water & Planning 2017

© WSP I Parsons Brinckerhoff - Asia Pacific (WSP I PB). Copyright in the drawings, information and data recorded is the property of WSP I PB. This document and the information are solely for the use of the authorisedrecipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that which it was supplied by WSP I PB. WSP I PB makes no representation, undertakes no duty and accepts noresponsibility to any third party who may use or rely upon this document or the information. NCSI Certified Quality System to ISO 9001. © APPROVED FOR AND ON BEHALF OF WSP I Parsons Brinckerhoff - Asia Pacific.

Page 9: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

PLEN

TY R

OAD

GORDONS ROAD

VINCENT DRIVE

WILLIAMSONS ROAD

RED OAKS WAY

BUSHMANS WAY

BRACKEN WAYMIRRABU

CCA PROMEN

ADE

TURO

SS C

RESC

ENT

STAGECOACH BOULEVARD

COBBLESTONE DRIVE

COAC

HMAN

WAY

EMBL

ING

AVEN

UE

BUSH

LARK W

AY

SAND

PIPER

WAY

MASKED OWL ROAD

SONG

BIRD

CRES

CENT

PIPIT CIRCUIT

GOSHAWK PARADE

OLD PLENTY ROAD

WINGSPAN AVENUE

JENOLAN WAY

GRAN

GE D

RIVE

ROMINA WAY

JEZWING AVENUE

THE LAKES BOULEVARD

KAREELAH LINK

R O W Y

TARO

NGA W

AY

YELL

OWBO

X AVE

NUE

DOVE TERRACE

CARINYA CRESCENT

LEWINS RAIL AVENUE

CRABAPPLE ROAD

BLACK FALCON STREET

FLAME CRESCENT

DANJERA PLACE

FRIAR

BIRD

ROAD

EVER

GREE

N DR

IVE

MARIGOLD STREET

BLUESTONE COURT

GRAS

SWRE

N RI

SE

ZENA DRIVE

BELL

OWS S

TREE

T

THRUSH STREET

NEWELL STREET

TREEVIEW DRIVE

SHEL

DUCK

STRE

ET

ALIN

DA C

OURT

PLEN

TY R

OAD

PLEN

TY R

OAD

LegendProject areaCadastre

1:5,000

0 50 100m

Coordinate system: GDA 1994 MGA Zone 55

Engineering and Technical Servicesfor Plenty Road (Bush Blvd to Bridge Inn Road) Upgrade

Project areaMap 3Scale ratio correct when printed at A3

VicRoads

Author: MBMap: 2135645A_GIS_623_B

Date: 2/02/2018 Approved by: WP

www.wsp.com\\Apmelfil01\proj\V\VicRoads\2135645A_OSAR_ENGINEERING_TECHNICAL_SE\10_GIS\Projects\Maps\2135645A_GIS_623_B.mxd

Data source: VicRoads. Copyright © The State of Victoria, Department of Environment,Land, Water & Planning 2017

© WSP I Parsons Brinckerhoff - Asia Pacific (WSP I PB). Copyright in the drawings, information and data recorded is the property of WSP I PB. This document and the information are solely for the use of the authorisedrecipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that which it was supplied by WSP I PB. WSP I PB makes no representation, undertakes no duty and accepts noresponsibility to any third party who may use or rely upon this document or the information. NCSI Certified Quality System to ISO 9001. © APPROVED FOR AND ON BEHALF OF WSP I Parsons Brinckerhoff - Asia Pacific.

Page 10: Plenty Road Upgrade (Bush Boulevard to Bridge Inn …...The project includes, but is not limited to, the following: a) Roadworks including the upgrading and duplication of approximately

PLENTY ROAD GORGE ROAD

WILLIAMSONS ROAD

DANAHER DRIVE

MCDONALDS ROAD

MCGLYNN AVENUE

REID

STRE

ET

KIPPIN

G RI

SE

OLD PLENTY ROAD

NIRV

ANA D

RIVE

ALLAN AVENUE

THOM

AS ST

REET

SERENITY WAY

JOLL

Y TER

RACE

STAN

LEY J

ONES

DRI

VE

RIVE

RSID

E DRI

VECO

ACHM

AN W

AY

HEATHS COURT

DOREEN ROGEN WAY

FINDON ROAD

MURD

OCH

ROAD

KELV

IN G

ROVE ALLAMANDA CRESCENT

HONEYEATER TERRACE

RONA

LD AV

ENUE

PAYN

E PLA

CEWA

RBLE

R WA

LK

BRIAR

COU

RT

KOONUNGA LANE

DELACOMBE DRIVE

JACKSON STREET

ST JOHNS COURT

CHEVIOT DRIVE

KANG

AROO

TERR

ACE

LEON

IE CL

OSE

CECIL COURT

TIM CLO

SE

WALL

ABY W

ALK

WILTON COURT

YATE

S PLA

CE

BLOO

MFIEL

D DR

IVEKO

OKAB

URRA

WAL

K

KINGF

ISHER

PLAC

E

GLID

ER PL

ACE

GRAN

GE D

RIVE

KYLEMORE DRIVE

OLOUGHLIN PLACE

TAREE PLACE

TAUPO COURT

PACE CIRCUITAMBER COURT

BUSSELL COURT

WILLIAMSONS ROAD

LegendProject areaCadastre

1:5,000

0 50 100m

Coordinate system: GDA 1994 MGA Zone 55

Engineering and Technical Servicesfor Plenty Road (Bush Blvd to Bridge Inn Road) Upgrade

Project areaMap 4Scale ratio correct when printed at A3

VicRoads

Author: MBMap: 2135645A_GIS_623_B

Date: 2/02/2018 Approved by: WP

www.wsp.com\\Apmelfil01\proj\V\VicRoads\2135645A_OSAR_ENGINEERING_TECHNICAL_SE\10_GIS\Projects\Maps\2135645A_GIS_623_B.mxd

Data source: VicRoads. Copyright © The State of Victoria, Department of Environment,Land, Water & Planning 2017

© WSP I Parsons Brinckerhoff - Asia Pacific (WSP I PB). Copyright in the drawings, information and data recorded is the property of WSP I PB. This document and the information are solely for the use of the authorisedrecipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that which it was supplied by WSP I PB. WSP I PB makes no representation, undertakes no duty and accepts noresponsibility to any third party who may use or rely upon this document or the information. NCSI Certified Quality System to ISO 9001. © APPROVED FOR AND ON BEHALF OF WSP I Parsons Brinckerhoff - Asia Pacific.