PLUMBING WORK BOQ

TRANSCRIPT

Page 1: PLUMBING BOQ R1- 29-08-2013

document

Page 1

!"#$%&'()*+Calibri1��Calibri1��Calibri1��Calibri1����Arial1����Arial1��Calibri1����Arial1����Arial1��Arial1.����Times New Roman1��Arial1����Calibri1����Calibri1���Calibri1��Calibri1��Calibri1��Calibri1 4� �Calibri1��Calibri1��Calibri1��Calibri1Calibri18�Calibri1 8� �Calibri1 >� �Calibri1 4� �Calibri1 <� �Calibri1 ?� �Calibri1h8�Cambria1��Calibri1��Calibri1����Calibri1����Calibri1��Calibri1��Calibri1�����Arial1��Calibri1��Calibri1��Calibri1��Calibri1��Calibri"$"#! ( !8@ @ !8@ @ !"8@ @ !!8@ @ !�� �� �� �� ��8@ @ x@ @ ���

!x@ @ ����

�� >�� � 3 b 6���� ��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

Page 2: PLUMBING BOQ R1- 29-08-2013

document

Page 2

x@ @ ���|@ @ ! h �� ���|@ @ |@ @ � ��!!�@ @ � ��!"�@ @ � �!"8@ @ � ��!#�@ @ � ��!#�@ @ � ��|@ @ � �!8� �������������������������������|@ @ ! (@ @ !"<@ @ � �!8@ @ � ���!�� �!8@ @ � �! (� ��|@ @ � ��|@ @ � ��!<@ @ � ��x@ @ �� ��������������������������

x@ @ ��x@ @ ��#|@ @ ���x@ @ ��

��x@ @ !"�@ @ � ��x@ @ � ��x@ @ � �������������

x !"�� �� �������x |@ @ � ��!�@ @ � ����������!8 !8 !8@ @ �!8@ @ � �!8� �!�@ @ � �#� �#�� �# � �!��@ @ � �#�@ @ � �#�!@ @ � �#�@ @ � ��|@ @ � ��� �� ����������������������������������!8 !<@ @ ! @ @� �!��!@ @� �!�x@ @ + �!�x@ @ + �!�x@ @ + �!��@ @ + �!�x!@ @ + �!�x!@ @ + �!��!@ @ + �!��!@ @ + �!+��!!@ @ + �!��@ @ � �!+��!@ @ � �#�!@ @ � �#�@ @ � �#�!@ @ � �#�@ @ � �#�!@ @ � �#|"@ @ �x@@ �x@ �x @ ��� �����������������������������������������������������������x"@ @ ��x"@ @ ��x@ @ <!@ @ �� ��x@ @ <!@ @ |!@ @ x@ @ |!@ @ |!@ @ �� �� �� �� �� ��x"@ @ ��|"@ @ ��|!"@ @ ��x " @ ��|@ @ ��x@ @ ��x"@@ ��8@@ ��<@@ ��<@ @ ��|@ @ ��|@ @ ��

@. � �. � � . � � @ . � � . � � . � �

"8@ @ ��"8@ @ ��"8@@ ��"8!@ @ ! x@ @ ! x@ @ ! x@@ ! x@ ! x @ ! @� �!�� @� �!��� �!�� � �!�� � �!�� � �!��@� �!�� @� �!��@ @ + �!+��@ @ + �!+��!@ @ + �!�x!@ @ � �!�x!@ @ � �!�� @� �!��@ @� �!�x@ @ � �!�x@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �#|@ @� �#�@ @ � �#�!@ @ � �$�@ @ � �"8@ @ � �"x@ @ � �"8@ @ � �"<@ @ � �"8@ @ � �"<@ @ � �"<@ @ � �"8@ @ � �!x@ @ � �"8@ @ � �"�<@ @ � �"x@ @ � �!x@ @ � �"��@ @ � �"�<@ @ � �"8@ @ � �"8@ @� �#�@ @� �"x"@ @ �#�"@ @ �#�!"@ @ �"8@ @ � �"x@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �!x"@ @ �"|"@ @ �"x@ @ � �"�@ @ � �"<@ @ � �"�@ @ � �"!<@ @� �"8@ @ � �"x@ @ � �!x"@ @ �"<@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �"<@ @� �!8@ @ � �!8@ @ � �!8@ @ � �!<@ @ � �"8@ @ � �"x@ @ � �$�!@ @ � �"8@ @� �#�!@ @� �"!|@ @� �#�"@ @ �#�!"@ @ �!x@ @ � �"!8@ @ � �"!8@ @ � �"��@ @ � �"�@ @ � �"8@ @� �!x"@ @ �!x"@ @ �!x@ @ � �!x@ @ � �!x@ @ � �"|@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �"!8@ @ � �)8@ @ � �"<@ @ � �"!|@ @� �"<@ @ � �#�@ @� �#�!@ @� �#�@ @� �#�!@ @� �"|@ @ � �"<@ @ � �!x@ @ � �"x@ @ � �"8@ @ � �"8@ @� �!x"@ @ �"x"@ @ �"|"@ @ �&|@ @ � �&|@ @ � �"<@ @� �"x@ @ � �"�@ @ � �"#�@ @ � �"8@ @� �"|@ @� �"x"@ @ �"|"@ @ �"|@ @� �"�<@ @ � �"|@ @ � �!8@ @ � �"�<@ @� �"�|"@ @ �!|"@ @ �"�|"@ @ �"|@ @ � �"|@ @ � �#�@ @ � �#�!@ @ � �"�|@ @ � �!|@ @ � �!|@ @ � �"�<@ @ � �"�@ @ ��� ��� ��� ��� ��� ���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

"x@ @ �!x"@ @ !|"@ @ " <@ @ !x"@ @ " |"@ @ !x@ @ " @ @ � �!�|@ @ � �"�@ @ � �!�<@ @ � �"x@ @� �#�"@ @ �#�!"@ @ �"�|"@ @ 3 �!x"@ @ 3 �"�|"@ @ 3 �#�"@ @ 3 �#�!"@ @ 3 �� � � � �� � � � �� ����������������������������

|@ @ ||^ }-}� ����00\);_(*}-}00\);_(*}-}00\);_(*}-}00\);_(*}-}00\);_(*}-}00\);_(*}-}00\);_(*}-}00\);_(*}-}00\);_(*}-}

Page 3: PLUMBING BOQ R1- 29-08-2013

document

Page 3

00\);_(*}-}

00\);_(*}-}00\);_(*}-}00\);_(*}-}

00\);_(*}-}00\);_(*}-}00\);_(*}A}00\);_(*ef;_(@_) }A}00\);_(*ef;_(@_) }A}00\);_(*ef;_(@_) }A}00\);_(*ef;_(@_) }A}00\);_(*ef;_(@_) }A}00\);_(*ef;_(@_) }A}00\);_(* L;_(@_) }A}�00\);_(* L;_(@_) }A}�00\);_(* L;_(@_) }A}�00\);_(* L;_(@_) }A}�00\);_(* L;_(@_) }A}�00\);_(* L;_(@_) }A}�00\);_(*23;_(@_) }A}00\);_(*23;_(@_) }A}00\);_(*23;_(@_) }A}00\);_(*23;_(@_) }A} 00\);_(*23;_(@_) }A}!00\);_(*23;_(@_) }A}"00\);_(*;_(@_) }A}#00\);_(*;_(@_) }A}$00\);_(*;_(@_) }A}%00\);_(*;_(@_) }A}&00\);_(*;_(@_) }A}'00\);_(*;_(@_) }A}(

00\);_(*���;_(@_) }�})������} 00\);_(* ;_(@_) � � ��� � � ���� ��� ���} }*� ����

00\);_(* ;_(@_) ??? ??? ???���� � � �??? }-}+�00\);_(*}-}00\);_(*}-}/00\);_(*}-}000\);_(*}-}3

00\);_(*}A}4����a 00\);_(* ;_(@_) }A}5� ���00\);_(*;_(@_) }A}600\);_(* ?;_(@_) }A}7�00\);_(*23;_(@_) }-}800\);_(*} }9�??v 00\);_(* ;_(@_) � ��� � � �

}A}:����} 00\);_(* ;_(@_) }A};� � ���e 00\);_(* ;_(@_) } }?� � �� �

00\);_(* ;_(@_) ��� ���� ���� ����

Page 4: PLUMBING BOQ R1- 29-08-2013

document

Page 4

} }@���� �??? 00\);_(* ;_(@_) ??? ??? ???� ��� � � �??? }-}A�00\);_(*}-}C00\);_(*}U}D00\);_(*;_(@_) }-}E

00\);_(*}-}v��00\);_(*}-}z00\);_(*}-}{00\);_(*}-}|00\);_(*}}}}-}~00\);_(*}-} �00\);_(*}-}�00\);_(*}} }} }-} _(*}-}��_(*}-}��_(*}-}��_(*}-}��_(*}-}��_(*}-}��_(*}-}��_(*}-}��_(*}}�}}�}-}�� � ���������������������

_(*}-}� �_(*}-}� �_(*}-}� �_(*}-}� �_(*}A}� �_(*ef;_(@_) }} }} }} }} }} }} }} }} }} }} }} }} }} }-} _(*}-}��_(*}-}��_(*}}�}}�}}�}}�}}�}}�}-}�� � � � � � � � � � � � � � �������������_(*}-}� �_(*}-}� �_(*}-}� �_(*}-}� �_(*}-}� �_(*}-}� �_(*}} }} }} }} }} }} }} }} }} }} }} }} }} }} }} }} }} }-}� � � � � � � � � � � � � � � � � � �_(*}-} ef_(*}A}� � �

f_(*ef;_(@_) }A}�f_(*ef;_(@_) }} }} }} }} }} }} }-} ef_(*}-} ef_(*}} }} }} }} }} }} }} }-} ef_(*}} }} }} }} }}}}}}}}}}}}}}}}}-}� � � � � � � � � � � � � � � � � � � �f_(*}}}-}

f_(*}}}A}f_(*ef;_(@_) }A}

f_(*ef;_(@_) }}}}}}}}}}}}}-}ef_(*}-}ef_(*}}}}}}}}}-}f_(*}-}f_(*}-}f_(*}}}-}

f_(*}}}} }}!}-}"��f_(*}-}#f_(*}-}$f_(*}-}%f_(*}}&}}'}}(}})}}*}}+}-}f_(*}-}Df_(*}}E}}F}}G}}H}}I}}J}-}Kef_(*}-}Lef_(*}}M}-}Nef_(*}-}Oef_(*}}P}}Q}}R}}S}}T}}U}A}Vf_(*ef;_(@_) }A}Wf_(*ef;_(@_) }-}X L_(*}-}Y L_(*}-}Z L_(*}A}[� � �L_(* L;_(@_) }A}\�L_(* L;_(@_) � �20% - Accent1 M� ��20% - Accent1ef %������20% - Accent2 M "� � �

Page 5: PLUMBING BOQ R1- 29-08-2013

document

Page 5

20% - Accent2ef %������20% - Accent3 M &� � �20% - Accent3ef %������20% - Accent4 M *� � �20% - Accent4ef %������20% - Accent5 M .� ��20% - Accent5ef %������20% - Accent6 M 2� � �20% - Accent6ef %������40% - Accent1 M� ��40% - Accent1 L %�� �����40% - Accent2 M #� � �

40% - Accent3 M '� ��40% - Accent3 L %�� ����40% - Accent4 M +� � �40% - Accent4 L %�� �����40% - Accent5 M /� ��40% - Accent5 L %�� �����40% - Accent6 M 3� � �40% - Accent6 L %�� �մ���60% - Accent1 M � ��60% - Accent123 %���������60% - Accent2 M $� � �

60% - Accent3 M (� � �

60% - Accent4 M� �60% - Accent423 %� ��������60% - Accent5 M 0� � �60% - Accent523 %�!��������60% - Accent6 M 4� � �60% - Accent623 %�"Accent1�A��Accent1O�������%�#Accent2�A�!�Accent2�PM�����%�$Accent3�A�%�Accent3��Y�����%�%Accent4�A�)�Accent4�d������%�&Accent5�A�-�Accent5K������%�'Accent6�A�1�Accent6�F�����%�(Bad�9��Bad�������%�)Calculation����Calculation������}�%���������������������*������������������������������������������������������������������������������������������������������������������Check Cell����Check Cell %�???��???��???��???��+��� ��Comma�������������������������9Input u Input��Z��??v�%���������������������:Linked Cell�K��Linked Cell��}�%�����;Neutral�A��Neutral�����e�%����3��Normal�%�� ���������������������������������������������������������<Normal 2�

Err:501Normal_Sheet1 ?Note b� � �

Note @Output�w��Output�����???�%�???��???��???��???��A���$��Percent�BStyle 1�� ��������������������������������������������������CTitle 1 TitleI}�%�� ����DTotal M Total�%O���O����EWarning Text�?��Warning Text���%�X��TableStyleMedium2PivotStyleLight16`�Y�� ���������������������Summary Sheet BOQ���Fire (2)����������-__xlnm.Print_Titles;�-__xlnm.Print_Titles;� ; ; ; ;� ;���g�� �0Project : Expansion of Yashoda Hospital- Phase-1Client:Yashoda Hospitals BOQArchitect: SMJ Design IncPMC: KP Management Associates1Interior Consultant: M/s. Prasad Badle ArchitectsLoca�������������������������a) 100mm dia Supply and installation of CI Butterfly valves (heavy) tested to 250 psi hydraulic pressure with Vertical/horizontal gear unit with appropriate handle conforming to IS:13039 with necessary companion flanges�a)80mm diasSupply and installationc) 100 mm diad) 80 mm diae) 50 mm diaf) 25 mm diaa) 200mm diab) 150 mm diac) 100mm diad) 80mm diab) 150mm diac) 80mm diaZSupplyingb) 100mm dia[Supplyinga) 150 mm diad) 65mm diaf) 40 mm dia.g) 32 mm diah) 25 mm diaSSupplyingb)80mm dia Supplying�

40% - Accent2 L� 湸� %� �

60% - Accent223 ٗ�� %���� �

60% - Accent323��֚֚֚֚֚֚֚֚֚֚֚֚֚ ֚ %���� �

Page 6: PLUMBING BOQ R1- 29-08-2013

document

Page 6

a) 50 mm dia a) 25 mm dia WATER CURTAIN SYSTEM. Supplying�TOTAL AMOUNT In Words: TotalRemarks^Package: Supplya) 20 mm DiaNo sb) 25 mm Diac) 32 mm Diad) 40 mm Diae) 50 mm Diaa) 65 mm Diab) 80 mm Diac) 100 mm DiaEach Supplying and fixing of digital percentage level indicator for water storage tanks consisting of display unit and level sensor. The display unit should have 2-1/2 digit seven segment LED to display the levels as 0%�c) 100mm dia.d) 160mm dia.e) 250mm dia.f) 50mm dia.g) 40mm dia.b) 32mm dia.c) 25mm dia.d) 20mm dia.a) 25mm Dia.a) 65mm dia.b) 50mm dia.TOTAL FOR WATER SUPPLY SYSTEMPUMPS & MOTORS&Each Pump capacity : 10.0 cu.m/Hr4No of Pumps : 1 working + 1 standby'Delivery head : 65 m Suction : Negative of 3.0 meters%Each Pump capacity : 5.0 cu.m/Hr&Each Pump capacity : 50.0 cu.m/Hr'Delivery head : 20 m %Delivery head : 20 m 2Pressure Vessel for Auto ON/OFF : 25 Ltrs CapacityTOTAL FOR PUMPS & MOTORS*INTERNAL & EXTERNAL SANITARY PIPING SYSTEMa) 110mm dia.NO'sb) 75mm dia.a) 40mm Dia.RMTb) 75mm Dia.c) 110mm Dia.a) 75mm Dia.b) 110mm Dia.c) 160mm Dia.i) 160MM DIA.ii) 110MM DIA.iii) 75MM DIA.iv) 200MM DIA. Supply �b) 110 mm diac) 160 mm diad) 200 mm diaeSupply of vent pipes mosquito proof grating suitable for the ventilation purpose of the various tanks Drilling with core cutting machine in RCC floor slab etc.�b) 160mm dia.c) 65mm dia.SupplyingDesign Pressure: 3 Kg per Cm23Floating message for operation and regeneration as ~Multiport valve < with necessary accessories etccement concrete pedestals of 1:2:3 ratio or any other specific provision suitable to site.To ensure the stability against heavy storm etc. but not less than 1 x1 x6 dimensions. External of the tank should be properly insulated so that hot water temperature does not decrease by more than 5 deg.C in about 16 hrs. Times. Necessary valves & internal piping shall be made!"!"cSupply & fixing of approved make soap dish fixed to wall with CP screws etc.complete.(Near Shower )!!*"V!b"6Supply!"#!>" Fixing of CP long body pillar tap for lab sinks conforming to IS specifications.The scope includes supply of necessary accessories etc�!"!!">Supply and fixing of electric storage type verticle/horizontal Instant water heater of approved make & colourProvidingSupply !"!*"+!/"G&}" &t" ! Supply of Vertical Multi stage Centrifugal Pump with suitable capacity 415V� ��!*"+!/"G&}" &s" ! Supply� ��&" !"5Providing�"! Note: The length of the bracket shall be equal to the sum of the outer diameters of all pipe and 50mm for working space per pipe of size 15 to 75mm and 100mm for working space per pipe for pipes of size 75mm and above diameters."Construction of Inspection Chamber with best quality�"&%"&()"VPressure guages to indicate loss of head (Which indicates when back wash is necessary)(!)" Supply�Supply of Vertical Multi stage Centrifugal Pump with suitable capacity 415V!"!+"Supplyk7Yk k�MszUz�c~����(�1^�g!����������������x��r)��u�6Z���f��+����|3��3����H%��`��������������������������������������������������������

3��B���O��3o�=�%�0+�c$��)bX4��CzJ�S6�g�8uE����������������������cc B������ ��������

d MbP?_*+ %��� ��odXXLetterPRIV 0'''' \P4( KL� � ��

SMTJxPDFCreatorResolution600dpiPageSizeA4PageRegion�"dXX333333�?333333�?�&�<3U}�������:@:@ :@

@ @ � � �

�ݔ���

Page 7: PLUMBING BOQ R1- 29-08-2013

document

Page 7

�������������������������������

~��? PR Z�� � �����

SANITARY FIXTURES ~� �����@ T Z5�WATER SUPPLY SYSTEM�����~� �� ����������@ Zz�PUMPS & MOTORS�����~� ������������@ Z��-*INTERNAL & EXTERNAL SANITARY PIPING SYSTEM�����~� ������������@ F Z��RAIN WATER DISPOSAL SYSTEM�����~� � �����������

@�] Z��WATER TREATMENT PLANT WORKS���������

~����@ P2� � ���Z HOT WATER SYSTEM�������� ���������

��������

��� �""TY[VrccX*"����>�@<_���������������������������

gg D����4[�����@�*�D���c�q����������������

d MbP?_*+ %;���0-&LFor Employer&CPage &P of &N&RFor Contractor��&ffffff�?'ffffff�?(�?)�?M:PDFCreator�\S����� ��������������oMXXLetterPRIV 0'''' \P4( KL� � ��

SMTJxPDFCreatorResolution600dpiPageSizeA4PageRegion�"MXX333333�?333333�?�&�<3U}$|}z}@z}$�������z}${}I{}{}${}$|J @ @ @ @ @ @ @ h@ @ � � � � � � � �

@v� ��

@'�����@bb ve@e@�@s@@v�����������������������������������������������������������������������������������������������

Page 8: PLUMBING BOQ R1- 29-08-2013

document

Page 8

�������������������

��

��} ~����

Z� �~��

Y@� ������[��������

���~������

�\��

~�� @� ������

����������~���������

�]��

~��[@ ~� �����

@�^� �

~��8@� ������

����������_� ��������

~���������@�

`� �~��

\@� ������a� ��������

~���������@�

b� �~��

[@ ~� �����@�

c� �@P@��A�����~����������

@�d� �

Page 9: PLUMBING BOQ R1- 29-08-2013

document

Page 9

@P@�A�����~���������"@�

e� �~��

[@ ~� �����$@�

f��~��

@ ~� �����&@�

g� �~��H@ ~�� �����

(@�h� �

~��H@ D�l<&&&<&HhJ2J..J..JJ...J..JYYJJJ �!�"v#v$�%v&v'�(�)v*'+��� �������������

*@� i�� ~�� @@ ~� �����!! j��! ~��! <@ ! ~� �����

# # $��� ������ �$ l $ ~�� ������%0@�% m� �%���% % &��� ���� �& & '��� �������' ' ~���������(1@�( n� �( ~��( $@ ( )� � ���� �) ) *��� ������ �* * ~��� ������+2@�+ o� �+ + @ +����~�� � ������

-4@�- q� �- ~��

".@�" k� �" ~��" H@ " #�� � ���� �

Page 10: PLUMBING BOQ R1- 29-08-2013

document

Page 10

-4@ - ~� ����.5@�. r� �. ~��. @ . ~� �����/6@�/ s� �/ ~��/ @ / ~� �����07@�0 t��0 ~��0 [@ 0 ~�� � ����18@�1 u� �1 ~��1 4@ 1 ~� � ���29@�2 v� �2 2 (@+ 2����~�� � ������3:@�3 w� �3 ~��3$@ 3� ���4��4 4��� �������5��5 5~��6�6 x 6 7� � ������ �7 7 8��� ������ �

Page 11: PLUMBING BOQ R1- 29-08-2013

document

Page 11

-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`ac defghijklmnopqrstuvwxyz{|}~ Root Entry F 0 4@Workbook��������L]SummaryInformation(�����DocumentSummaryInformation8��������������������\pVISHUe1 B�a�=���=�<�NJ8X@�"��1����� � ��������� ����� �������������������������������������������������� �

8�

##0_);\("$"#

b 6���� ��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

Page 12: PLUMBING BOQ R1- 29-08-2013

document

Page 12

"8!@ @ ! x@ @ ! x@ @ ! x@@ ! x@ ! x @ ! @� �!�� @� �!��� �!�� � �!�� � �!�� � �!��@� �!�� @� �!��@ @ + �!+��@ @ + �!+��!@ @ + �!�x!@ @ � �!�x!@ @ � �!�� @� �!��@ @� �!�x@ @ � �!�x@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �#|@ @� �#�@ @ � �#�!@ @ � �$�@ @ � �"8@ @ � �"x@ @ � �"8@ @ � �"<@ @ � �"8@ @ � �"<@ @ � �"<@ @ � �"8@ @ � �!x@ @ � �"8@ @ � �"�<@ @ � �"x@ @ � �!x@ @ � �"��@ @ � �"�<@ @ � �"8@ @ � �"8@ @� �#�@ @� �"x"@ @ �#�"@ @ �#�!"@ @ �"8@ @ � �"x@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �!x"@ @ �"|"@ @ �"x@ @ � �"�@ @ � �"<@ @ � �"�@ @ � �"!<@ @� �"8@ @ � �"x@ @ � �!x"@ @ �"<@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �"<@ @� �!8@ @ � �!8@ @ � �!8@ @ � �!<@ @ � �"8@ @ � �"x@ @ � �$�!@ @ � �"8@ @� �#�!@ @� �"!|@ @� �#�"@ @ �#�!"@ @ �!x@ @ � �"!8@ @ � �"!8@ @ � �"��@ @ � �"�@ @ � �"8@ @� �!x"@ @ �!x"@ @ �!x@ @ � �!x@ @ � �!x@ @ � �"|@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �"!8@ @ � �)8@ @ � �"<@ @ � �"!|@ @� �"<@ @ � �#�@ @� �#�!@ @� �#�@ @� �#�!@ @� �"|@ @ � �"<@ @ � �!x@ @ � �"x@ @ � �"8@ @ � �"8@ @� �!x"@ @ �"x"@ @ �"|"@ @ �&|@ @ � �&|@ @ � �"<@ @� �"x@ @ � �"�@ @ � �"#�@ @ � �"8@ @� �"|@ @� �"x"@ @ �"|"@ @ �"|@ @� �"�<@ @ � �"|@ @ � �!8@ @ � �"�<@ @� �"�|"@ @ �!|"@ @ �"�|"@ @ �"|@ @ � �"|@ @ � �#�@ @ � �#�!@ @ � �"�|@ @ � �!|@ @ � �!|@ @ � �"�<@ @ � �"�@ @ ��� ��� ��� ��� ��� ���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

Page 13: PLUMBING BOQ R1- 29-08-2013

document

Page 13

Page 14: PLUMBING BOQ R1- 29-08-2013

document

Page 14

ef_(*}-}-ef_(*}-}.ef_(*}}/}}0}}1}}2}}3}}4}}5}}6}-}7ef_(*}-}8ef_(*}}9}}:}};}}<}}=}-}>ef_(*}-}?ef_(*}-}@ef_(*}}A}}B}-}C

Page 15: PLUMBING BOQ R1- 29-08-2013

document

Page 15

60% - Accent623 %�"Accent1�A��Accent1O�������%�#Accent2�A�!�Accent2�PM�����%�$Accent3�A�%�Accent3��Y�����%�%Accent4�A�)�Accent4�d������%�&Accent5�A�-�Accent5K������%�'Accent6�A�1�Accent6�F�����%�(Bad�9��Bad�������%�)Calculation����Calculation������}�%���������������������*������������������������������������������������������������������������������������������������������������������

(��Comma [0]�-Comma 2�.Comma 3�/���&��Currency�0���.��Currency [0]�1Excel Built-in Normal�2Excel Built-in Normal 2�3Explanatory Text�G�5�Explanatory Text�����%�4Good�;��Good�����a�%�5Heading 1�G��Heading 1I}�%O����6Heading 2�G��Heading 2I}�%�?����7Heading 3�G��Heading 3I}�%23����8Heading 4�9��Heading 4I}�%������������������������������������������������������������������������

bolts Gaskets neoprene gaskets with necessary companion flanges and fixing of 1.1KV PVC XLPE insulated cables of copper conductor with double compression type cable gland and heavy duty tinned copper cable sockets as per the relevant IS standards. Rate shall be inclusive of all sundry materials like adhesive tape

installation testing and commissioning Foot valve/strainer with Flanged ends. installation testing and commissioning of G.M. gate valves conforming to IS 778aSupplying

installation testing and commissioning of the CPVC pipes as per IS:16088 Above ground piping with necessary flanges & fittings such as elbows� fixing and testing approved make gun metal ball valve conforming to IS 778 with unions etc.

Page 16: PLUMBING BOQ R1- 29-08-2013

document

Page 16

installation testing and commissioning of the following (Class 'C') GI pipes and fittings confirming to IS 1239 PI & II

Installation

10% --- 100%. The unit should be weather proof and wall / panel mounted input to the unit should be 230V AC. The level sensor should consists of float operated magnetic float switch with one PUF float suitable mounting flange and flame proof enclosure. a) 50mm dia.a) 40mm dia.b) 65mm dia.a) 25mm dia. The external water piping system in part or as a whole has to�

e) 250mm dia.f) 50mm dia.g) 40mm dia.b) 32mm dia.c) 25mm dia.d) 20mm dia.a) 25mm Dia.a) 65mm dia.b) 50mm dia.TOTAL FOR WATER SUPPLY SYSTEMPUMPS & MOTORS&Each Pump capacity : 10.0 cu.m/Hr4No of Pumps : 1 working + 1 standby'Delivery head : 65 m Suction : Negative of 3.0 meters%Each Pump capacity : 5.0 cu.m/Hr&Each Pump capacity : 50.0 cu.m/Hr'Delivery head : 20 m %Delivery head : 20 m 2Pressure Vessel for Auto ON/OFF : 25 Ltrs CapacityTOTAL FOR PUMPS & MOTORS*INTERNAL & EXTERNAL SANITARY PIPING SYSTEM

fixing of pipe support system for pipes using brackets of length as per details fabricated from 50x50x6mm or suitable MS angles etc.

for laying pipes and rendering the same in RCC 1:2:4

installing and commissioning of the ACO make grease separators model no ECO-FPI NS-2 with necessary Extension RCC ringscomplete and the scope includes Brine solution tank with necessary connections.6Size of the Vessel : As per Manufacture Standard sizes9Multiport valve with necessary accessories etc

with ISI fittings or equivalent as directed by the Engineer-in -charge.Capacity : 4

Installationcomplete.

storage tank manufactured from 99% pure Copper which is suitable for both hard & soft water with all other internal fittings layinginstallation of Electrically operated Solenoid valve to be mounted on the over head tank incoming line 3-phase delivery laying approved fly ash bricks in CM 1:6 installation 3-phase!0"H&~" &v" Supply� � delivery

0-&LFor Employer&CPage &P of &N&RFor Contractor��&ffffff�?'ffffff�?(�?)�?M:PDFCreator�\S�������������

} }$}} ; @ @ @ :@:@:@:@:@� � � � �

Page 17: PLUMBING BOQ R1- 29-08-2013

document

Page 17

v-b. / 0v1 2 3] 4J 5;6@7 8;9;:;; < =;>;?;~�� � � � � �

@�

3@�p� �

~��H@�� �

Page 18: PLUMBING BOQ R1- 29-08-2013

document

Page 18

-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`ac defghijklmnopqrstuvwxyz{|}~ Root Entry F 0 4@Workbook��������L]SummaryInformation(�����DocumentSummaryInformation8��������������������\pVISHUe1 B�a�=���=�<�NJ8X@�"��1����� � ��������� ����� �������������������������������������������������� �

##0\)!"$"#

b 6���� ��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

Page 19: PLUMBING BOQ R1- 29-08-2013

document

Page 19

"8!@ @ ! x@ @ ! x@ @ ! x@@ ! x@ ! x @ ! @� �!�� @� �!��� �!�� � �!�� � �!�� � �!��@� �!�� @� �!��@ @ + �!+��@ @ + �!+��!@ @ + �!�x!@ @ � �!�x!@ @ � �!�� @� �!��@ @� �!�x@ @ � �!�x@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �#|@ @� �#�@ @ � �#�!@ @ � �$�@ @ � �"8@ @ � �"x@ @ � �"8@ @ � �"<@ @ � �"8@ @ � �"<@ @ � �"<@ @ � �"8@ @ � �!x@ @ � �"8@ @ � �"�<@ @ � �"x@ @ � �!x@ @ � �"��@ @ � �"�<@ @ � �"8@ @ � �"8@ @� �#�@ @� �"x"@ @ �#�"@ @ �#�!"@ @ �"8@ @ � �"x@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �!x"@ @ �"|"@ @ �"x@ @ � �"�@ @ � �"<@ @ � �"�@ @ � �"!<@ @� �"8@ @ � �"x@ @ � �!x"@ @ �"<@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �"<@ @� �!8@ @ � �!8@ @ � �!8@ @ � �!<@ @ � �"8@ @ � �"x@ @ � �$�!@ @ � �"8@ @� �#�!@ @� �"!|@ @� �#�"@ @ �#�!"@ @ �!x@ @ � �"!8@ @ � �"!8@ @ � �"��@ @ � �"�@ @ � �"8@ @� �!x"@ @ �!x"@ @ �!x@ @ � �!x@ @ � �!x@ @ � �"|@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �"!8@ @ � �)8@ @ � �"<@ @ � �"!|@ @� �"<@ @ � �#�@ @� �#�!@ @� �#�@ @� �#�!@ @� �"|@ @ � �"<@ @ � �!x@ @ � �"x@ @ � �"8@ @ � �"8@ @� �!x"@ @ �"x"@ @ �"|"@ @ �&|@ @ � �&|@ @ � �"<@ @� �"x@ @ � �"�@ @ � �"#�@ @ � �"8@ @� �"|@ @� �"x"@ @ �"|"@ @ �"|@ @� �"�<@ @ � �"|@ @ � �!8@ @ � �"�<@ @� �"�|"@ @ �!|"@ @ �"�|"@ @ �"|@ @ � �"|@ @ � �#�@ @ � �#�!@ @ � �"�|@ @ � �!|@ @ � �!|@ @ � �"�<@ @ � �"�@ @ ��� ��� ��� ��� ��� ���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

Page 20: PLUMBING BOQ R1- 29-08-2013

document

Page 20

(��Comma [0]�-Comma 2�.Comma 3�/���&��Currency�0���.��Currency [0]�1Excel Built-in Normal�2Excel Built-in Normal 2�3Explanatory Text�G�5�Explanatory Text�����%�4Good�;��Good�����a�%�5Heading 1�G��Heading 1I}�%O����6Heading 2�G��Heading 2I}�%�?����7Heading 3�G��Heading 3I}�%23����8Heading 4�9��Heading 4I}�%������������������������������������������������������������������������

GI chain twist release type plug. including fabricated tee connection bolts PVC sleeves

installation testing and commissioning of G.M. Non-return valves conforming to IS 778a) 25mm dia?Supplying and fixing MS fabricated air vessel at pump room about 250mm dia and 1500mm high on MS stand with necessary cut off drain and air release arrangements and leading the drain pipe to the sump at pump room with painting with red oxide primer and finished with

tees and supports and Orifice plates if any necessary for the fire protection system complete as per the requirement of Local fire service department. a)50 mm diab)40 mm diac)25 mm diaa)100mm dia complete as per specifications.

Page 21: PLUMBING BOQ R1- 29-08-2013

document

Page 21

for water curtain system . The pipes complete with necessary specials such as tees

Testing and Commissioning of Internal and External Plumbing WorksSANITARY FIXTURES~25mm Concealed flush valve immediate releasing spring type having all parts made of corrosion resistant materials and of approved make with necessary piping from flush valve to the water closet as per water closet manufacturer's specification for satisfactory operation of system. Th

pillar cocks

as per approved design and drawings. The brackets shall be fixed to the wall at all levels at a distance not less than 2.0m c/c at all heights up to 80m above ground level with necessary scaffolding as necessary with 4 Nos of 10mm dia.expansion fasteners having a safe working load of 150 kg each with necessary nuts

finishing the same to the satisfaction of the owner or his authorized representative etc.

with direct suction with concrete cover and cover and cover plate of load class D 400 with 120 lites and sludge storage of 400 liters.4TOTAL FOR INTERNAL & EXTERNAL SANITARY PIPING SYSTEMRAIN WATER DISPOSAL SYSTEMa) 160mm diameterb) 110mm diameterSupplycomplete .

000 Ltrs%Each Pump capacity : 2.0 cu.m/Hr%Delivery head : 15 m &Timer controller : 24Hours Operated TOTAL FOR HOT WATER SYTEMqSupply

testing and commissioning of commercial water p< urifier of water flow rate 15.0 Ltr/Hr

internal insulation jointing 220V/24V/50 Hz50Hz motor and coupling with base frame having discharge capacity of 5 Cum/Hr against total head of 65m from all causes testing jointing MDPE pipes and specials PE-80 grade (PN 6 Class )conforming to As per ISO4427-1996 Suitable for Max allowable design stress of 6.3MPA (SDR11) by electrofusion jointing as per manufacturers specifications 600x600x1000mm depth over a bed of 150mm thick PCC 1:4:8 Testing & commissioning of Pressure Sand Filter with necessary accessories complete with frontal piping50Hz motor and coupling with base frame having discharge capacity of 7.5 Cum/Hr against total head of 35m from all causes installation testing

Page 22: PLUMBING BOQ R1- 29-08-2013

document

Page 22

~����

Page 23: PLUMBING BOQ R1- 29-08-2013

document

Page 23

##0_);[Red]\("$"#

Page 24: PLUMBING BOQ R1- 29-08-2013

document

Page 24

"8!@ @ ! x@ @ ! x@ @ ! x@@ ! x@ ! x @ ! @� �!�� @� �!��� �!�� � �!�� � �!�� � �!��@� �!�� @� �!��@ @ + �!+��@ @ + �!+��!@ @ + �!�x!@ @ � �!�x!@ @ � �!�� @� �!��@ @� �!�x@ @ � �!�x@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �#|@ @� �#�@ @ � �#�!@ @ � �$�@ @ � �"8@ @ � �"x@ @ � �"8@ @ � �"<@ @ � �"8@ @ � �"<@ @ � �"<@ @ � �"8@ @ � �!x@ @ � �"8@ @ � �"�<@ @ � �"x@ @ � �!x@ @ � �"��@ @ � �"�<@ @ � �"8@ @ � �"8@ @� �#�@ @� �"x"@ @ �#�"@ @ �#�!"@ @ �"8@ @ � �"x@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �!x"@ @ �"|"@ @ �"x@ @ � �"�@ @ � �"<@ @ � �"�@ @ � �"!<@ @� �"8@ @ � �"x@ @ � �!x"@ @ �"<@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �"<@ @� �!8@ @ � �!8@ @ � �!8@ @ � �!<@ @ � �"8@ @ � �"x@ @ � �$�!@ @ � �"8@ @� �#�!@ @� �"!|@ @� �#�"@ @ �#�!"@ @ �!x@ @ � �"!8@ @ � �"!8@ @ � �"��@ @ � �"�@ @ � �"8@ @� �!x"@ @ �!x"@ @ �!x@ @ � �!x@ @ � �!x@ @ � �"|@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �"!8@ @ � �)8@ @ � �"<@ @ � �"!|@ @� �"<@ @ � �#�@ @� �#�!@ @� �#�@ @� �#�!@ @� �"|@ @ � �"<@ @ � �!x@ @ � �"x@ @ � �"8@ @ � �"8@ @� �!x"@ @ �"x"@ @ �"|"@ @ �&|@ @ � �&|@ @ � �"<@ @� �"x@ @ � �"�@ @ � �"#�@ @ � �"8@ @� �"|@ @� �"x"@ @ �"|"@ @ �"|@ @� �"�<@ @ � �"|@ @ � �!8@ @ � �"�<@ @� �"�|"@ @ �!|"@ @ �"�|"@ @ �"|@ @ � �"|@ @ � �#�@ @ � �#�!@ @ � �"�|@ @ � �!|@ @ � �!|@ @ � �"�<@ @ � �"�@ @ ��� ��� ��� ��� ��� ���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

Page 25: PLUMBING BOQ R1- 29-08-2013

document

Page 25

as per IS 5290installation&Supplying & fixing fire hydrant MS cabinet type shutter enclosure of following size made up of 16 guage MS plate continuously welded on all edges or fabricated with bends at all edges using single plate capable of accommodating the 2 nos. 15 m fire hose And 1 nos.SS branch pipe. Including railway coach lock up arrangement & lever for nuts bolts and nuts

valves

Page 26: PLUMBING BOQ R1- 29-08-2013

document

Page 26

bends

with necessary 25mm diameter GI/ Threaded PVC piping not exceeding 1m in length from flush valve to water closet for satisfactory operation of system. No's White vitreous China Floor mounted pan with `P' or `S' trap of Make�

flushing cistern etc.

washers etc.

including nominal reinforcement wherever required

fixing of PVC grating for inlet of rain water pipes at terrace level in CM 1:2Pump Capacity : 7.5 Cum/Hour @ 35 meter Head#No of pumps : 1Working + 1 Stand bySuction : Negative (3.0 meter)Flow Capacity : 7.5 Cum/Hour"Max.Working Pressure = 3.0 Kg/SqCm(Max.Flow Rate = 1 Litre/Hr @ 20 Hr CycleLot%TOTAL FOR WATER TREATMENT PLANT WORKSHOT WATER SYSTEMCapacity : 2000 LtrSet a) 32 mm nominal diaa) 25 mm nomin

Fixing in position of Wall mounted European Water Closet suite of approved make & colour

Including all components as per manufacture specifications

inside non-return valve as per IS 2083-1978 with three core heavy duty copper cable 1m long fixing de-energized closing following mentioned dia.with necessary cabling from Over Head Tank to Under Ground Sump & required accessories complete.!-".!<" Supplying� with starter consists of suitable MPCB commissioning of De-watering submersible pump made of Cast Iron Construction .Impeller shaft shall be S.S construction with mechanical seal suitable for building application..The unit shall include TEFC motor suitable for 415V providing flanges for fixing of valves as required walls plastered smooth inside in CM 1:3 and outside with CM 1:3 with sponge finish benching and channeling in PCC 1:2:4. The Inspection Chamber shall be provided with 600x600mm rectangular medium duty approved make frame and cover etc.valves with starter consists of suitable MPCB Testing & commissioning of UV - sterilization plant .The plant consists of Rinsing set for UV-disinfection plants for cleaning of deposits on quartz and internal surface of protective tube.2!J" Supply� commissioning of two stage centrifug<.al pump with suitable capacity 230V

Page 27: PLUMBING BOQ R1- 29-08-2013

document

Page 27

##0\)""$"#

Page 28: PLUMBING BOQ R1- 29-08-2013

document

Page 28

"8!@ @ ! x@ @ ! x@ @ ! x@@ ! x@ ! x @ ! @� �!�� @� �!��� �!�� � �!�� � �!�� � �!��@� �!�� @� �!��@ @ + �!+��@ @ + �!+��!@ @ + �!�x!@ @ � �!�x!@ @ � �!�� @� �!��@ @� �!�x@ @ � �!�x@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �#|@ @� �#�@ @ � �#�!@ @ � �$�@ @ � �"8@ @ � �"x@ @ � �"8@ @ � �"<@ @ � �"8@ @ � �"<@ @ � �"<@ @ � �"8@ @ � �!x@ @ � �"8@ @ � �"�<@ @ � �"x@ @ � �!x@ @ � �"��@ @ � �"�<@ @ � �"8@ @ � �"8@ @� �#�@ @� �"x"@ @ �#�"@ @ �#�!"@ @ �"8@ @ � �"x@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �!x"@ @ �"|"@ @ �"x@ @ � �"�@ @ � �"<@ @ � �"�@ @ � �"!<@ @� �"8@ @ � �"x@ @ � �!x"@ @ �"<@ @ � �"|@ @ � �"|@ @ � �"<@ @ � �"�@ @ � �"<@ @� �!8@ @ � �!8@ @ � �!8@ @ � �!<@ @ � �"8@ @ � �"x@ @ � �$�!@ @ � �"8@ @� �#�!@ @� �"!|@ @� �#�"@ @ �#�!"@ @ �!x@ @ � �"!8@ @ � �"!8@ @ � �"��@ @ � �"�@ @ � �"8@ @� �!x"@ @ �!x"@ @ �!x@ @ � �!x@ @ � �!x@ @ � �"|@ @ � �#|@ @ � �#�@ @ � �#�!@ @ � �"!8@ @ � �)8@ @ � �"<@ @ � �"!|@ @� �"<@ @ � �#�@ @� �#�!@ @� �#�@ @� �#�!@ @� �"|@ @ � �"<@ @ � �!x@ @ � �"x@ @ � �"8@ @ � �"8@ @� �!x"@ @ �"x"@ @ �"|"@ @ �&|@ @ � �&|@ @ � �"<@ @� �"x@ @ � �"�@ @ � �"#�@ @ � �"8@ @� �"|@ @� �"x"@ @ �"|"@ @ �"|@ @� �"�<@ @ � �"|@ @ � �!8@ @ � �"�<@ @� �"�|"@ @ �!|"@ @ �"�|"@ @ �"|@ @ � �"|@ @ � �#�@ @ � �#�!@ @ � �"�|@ @ � �!|@ @ � �!|@ @ � �"�<@ @ � �"�@ @ ��� ��� ��� ��� ��� ���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

Page 29: PLUMBING BOQ R1- 29-08-2013

document

Page 29

etc. Complete As directed by Architect in charge. Supply and fixing of S.S. branch pipe with 63mm dia female inlet and male threaded outlet with hexagonal based nozzle as per IS 903 Supplying & fixing first aid fire hosereel of Synthetic rubber suitably reinforced Dunlop/NEWAGE/EQV make 20mm /25 MMsize & 30m standard length with PVC nozzle with cut off valve at� � gasket packing and any other spares washers etc. including plugging unused holes. a) 3C x 1.5.sqmm rSupply

specials upto pump header and other accessories as per Local fire service department standard / requirement. including TAC approved pressure gauge with cork and of suitable range as for Providing required pressure etc. complete. Supplying�

Page 30: PLUMBING BOQ R1- 29-08-2013

document

Page 30

flanges

model

shall be operated with this water for effective disinfection Care shall be taken to see that this water is not used for drinking and other purposes. The system shall be flushed with potable water before commissioning.LS Liaison charges for Making water supply connection to municipal Water supply main with all the necessary works which shall be paid as per actual includi�

complete. The brackets shall be installed true to plumb vertically with necessary insertions

. The quoted rate shall also include for providing EPOXY based water proofing compound for sealing the joints around the pipes as approved by site incharge.

including making bores in the roofinstallation & testing of MS fabricated floor supported Horizontal type/ Vertical type storage tank

comprising of :!@" Glazed vitreous chin aware Wall mounted European water closet of approved make and co lour with wash down pattern fixed to wall with necessary CI / MS chair bracket�

including connections from water supply line and final connection to water cooler electric wiring & plug top etc.with all accessories complete.>!L" Grab bar -Supplying & fixing floor - wall mounted safety armrest for handicapped�

15Amps 3 pin plug testing fixing in position approved make following mentioned diameter Foot Valve conforming to IS 778 with unions etc. Cont actor3Phase including hydrostaitc pressure testing the pipe system to a hydraulic pressure of 7kg/sq.cm or 3 times the working pressure whichever is higher complete. The quoted rate shall also include for necessary excavationsuitable supports for mounting pressure gauges Cont actorInstallation 1-phase

Page 31: PLUMBING BOQ R1- 29-08-2013

document

Page 31

##0.00_);\("$"#

Page 32: PLUMBING BOQ R1- 29-08-2013

document

Page 32

nuts including indicator for open and Shut position as per fire practice etc complete.hSupply installation

installation testing and commissioning of Pressure gauge (0-14 Kg./sqcm) of 100 mm dia Dial size with required fittings and accessories|Supplying

Page 33: PLUMBING BOQ R1- 29-08-2013

document

Page 33

reducers

size as specified in the enclosed list. Matching color polypropylene seat cover with necessary C.P. brass hinges

complete (only statutory charges to be paid by the client)a) 20mm dia.b) 80mm dia.

spacer blocks etc as required etc.

setting in position and forming smooth rain water inlet gutter to direct rain water into the rain water pipe etc.internally lined with SS with an adequate wall thickness

GI bolts & nuts

made of stainless steel profiled tube with multi-functional

CP brass angle valves commissioning of Composite PL pipes with Brass & crimp fittings conforming to IS 15450:2004. The scope includes providing threaded fittings having brass threaded ring for outlets for connecting metallic pipes and fittings complete.I!S" Supply of Vertical Multi stage Centrifugal Pump with suitable capacity 415V� Overload relay50Hz & Insulation -Class F the pipe system shall be observed for a period of not less than 6 hours refillingorifice plates. The filter shall be made of FRP with necessary accessories. The cost of filter shall also include initial charge of under bed with pebbles & Coarse Sand media to suit the requirement etc.complete as per standards.&.'/&1'G&2Filter Media: Coarse Sand Overload relayTesting & Commissioning approved make Electronic dosing system for dosing Hypo chlorite solution or any other equivalent to the bio medical waste with pre-set dosage based on the quantity of water.The dosing system shall consist of Electronic dosing pump with positive displacement type with adjustable stroke length and frequency.The quoted rate shall also include50Hz motor and coupling with base frame having discharge capacity of 2.0 Cum/Hr against total head of 15m from all causes

Page 34: PLUMBING BOQ R1- 29-08-2013

document

Page 34

##0.00\)'""$"#

Page 35: PLUMBING BOQ R1- 29-08-2013

document

Page 35

bolts installation testing & commissioning of 16 WINDOW ANNUNCIATION PANEL FOR FIRE INDICATION from flow switchNOS$FIRE HYDRANT INSTALLATION (EXTERNAL)JProviding and fixing 63 mm dia (2.1/2 ) N.B. hydrant single headed oblique landing Valve in SS Morris Pattern instanteous coupling type ISI certified heavy type hydraulically tested to 250 psi working pressure

installation testing and commissioning of Pressure switch (0-15 Kg./sqcm) with required fittings and accessoriesDSupply fabrication and erection of MS angle supports for Pipe lines TonrSupplying

Page 36: PLUMBING BOQ R1- 29-08-2013

document

Page 36

etc. Rate quoted shall include for painting of pipe with a coat of primer and two coats of synthetic enamel paint of approved colour / make for aboveground piping and coating & wrapping for under ground piping as per the TAC / IS standards and Local fire service department requirement complete including supply and installation of pipe supports from column/wall or susp

rubber bushes etc. of Make as specified in the enclosed list Glazed vitreous china ware oval counter top wash hand basin of approved make of size 650x410mm .The gap between the counter and the top of the basin shall in no case exceed 5mm�

complete. The clamps shall be painted with 2 coats of approved synthetic enamel paint over a coat approved metal primer.Kg Supplying�

complete all as specified and directed.a) 160x160mmb) 110x110mm Supply & installion of Heavy moulded(with stand up to 25.0 tons of vehicle load) 150mm wide x 150mm Depth x 1000 Length PVC ramp drain grating at entrance of the ramps(Each Ramp two No's) . Make : ECO TOTAL RAIN WATER DISPOSAL SYSTEMWATER TREATMENT PLANT WORKSCapaci� fabrication with dish ends and 500mm of top manhole with pad plates .It consists of Solar water Input & Output

WC connector with rubber gaskets as per manufacturer's specifications

ergonomic grip area

fusible plug automatic pressure releaf valve including chasing the walls / floors 3-phase Single Phase Prevent orIP 68 Protection and Automatic ON/OFF Level Switch making good leaks if any etc. disposing off surplus earth with in a lead of 300M etc. Capacity : One Charge("("'((& Supply� Single Phase Prevent ornecessary electricals etc.complete to make the operation automatic.X! " Supply� � without starter

Page 37: PLUMBING BOQ R1- 29-08-2013

document

Page 37

##0.00_);[Red]\("$"#

Page 38: PLUMBING BOQ R1- 29-08-2013

document

Page 38

gaskets etc. complete. Supplying� testing & commissioning of Gun metal Air release valve with ball valve - 25mm dia eSupply installation and fixing of flow switches in the following Pipe line with 1NO+1NC Contacts bolts Gaskets

installation testing and commissioning of End termination for 1.1KV cables with double compression type cable gland and heavy duty tinned copper cable sockets as per the relevant IS standards. Rate shall be inclusive of all sundry materials like adhesive tape

Page 39: PLUMBING BOQ R1- 29-08-2013

document

Page 39

a) 80mm dia Supply�

silicone sealant shall be applied to the top of the basin before fixing in position so as to completely seal the gap. The excess sealant shall be wiped out using a clean blade flush with the basin inner profile.iOne 32mm heavy quality CP bras< s waste coupling & CP brass bottle trap with extension piece & wall flange of approved make and conforming to IS specificati

installing

installation of 500 Ltrs Food Grade HDPE/PVC water storage tank with required necessary accessories etcIncoming connections for Re Circulation Water

including cutting and making good the walls & flooring etc. complete. Providing and fixing matching colour solid plastic seat & cover of approved make conforming to IS: 2548 specifications and bearing ISI mark.!=" Providing and fixing of Floor Mounted European water closet comprising the following including cutting and making good the walls /floor wherever requir�

antislip profile

600mm CP copper connecting pipe with end nuts for hot & cold water connections etc. complete. Capacity : 25 Ltrs(Each) (For Delux Rooms)G!S&'� making holes50Hz motor and coupling with base frame having discharge capacity of 10 Cum/Hr against total head of 65m from all causes Push buttons Base plates complete.The scope includes necessary Electrofusion Couplers complete.!#"qProviding & layi< ng best quality Salt glazed stoneware gully trap of size 100mm square with 100mm outlet embedded in plain cement concrete 1:4:8 (20mm metal) installation Push buttonsInstallation complete as required.(Hot Water re-circulation pump).

Page 40: PLUMBING BOQ R1- 29-08-2013

document

Page 40

##0.00\)7*2_("$"* #

Page 41: PLUMBING BOQ R1- 29-08-2013

document

Page 41

installation testing and commissioning of the following (Class 'B') MS pipes and fittings confirming to IS 1239 PI & II

GI chain twist release type plug. including fabricated tee connection

PVC sleeves

Page 42: PLUMBING BOQ R1- 29-08-2013

document

Page 42

installation

fitting & necessary sealent to connect Floor Trap etc

testing and commissioning of R.C.C Socket and Spigot Pipes(NP2 CLASS) conforming to BIS 458/1988

complete.@Capacity :7.5 Cum/Hour @ 75 Cum OBR(Output Between Regenaration) One vertical cylindrical pressure filter with dished ends made of Fibre with suitable nozzles and manhole. � thermostat

Fixing of CP brass Health faucet of approved make comprising of: heavy casted CP brass wall flange and one CP brass Health faucet of approved make with 1m long PVC tube of 8mm dia.Complete all as specified and directed with approved fittings.!(" Supply�

diameter 32 mm with one 90 deg. & one 180 deg.and two extruded fastening flanges with two holes each

clamping to walls and restoring the same to original conditions etc. with starter consists of suitable MPCB LED on indicatorsCouplingTees providing & fixing 100mm square CI grating on top of the trap Testing & commissioning of Activated Carbon Filter with necessary accessories complete with frontal piping LED on indicatorsTesting & Commissioning approved make Electronic dosing system for dosing residual chlorine to the stp treated water at terrace over head tank with pre-set dosage based on the quantity of water.The dosing system shall consist of Electronic dosing pump with positive displacement type with adjustable stroke length and frequency.The quoted rate shall also include FR!/"0!5"6!F"a& "!+"Supply �

Page 43: PLUMBING BOQ R1- 29-08-2013

document

Page 43

##0_);_("$"* \(#

Page 44: PLUMBING BOQ R1- 29-08-2013

document

Page 44

with flanges welded /welded joints) as required including pipe of shorter lengths

as per IS 908$Supplying & fixing fire hydrant MS cabinet type shutter enclosure of following size made up of 16 guage MS plate continuously welded on all edges or fabricated with bends at all edges using single plate capable of accomodating the 2 nos. 15 m fire hose And 1 nos SS branch pipe. Including railway coach lock up arrangement & lever for opening the door

bolts and nuts

Page 45: PLUMBING BOQ R1- 29-08-2013

document

Page 45

testing and commissioning of Motorized Butterfly valve with actuator for Water curtains with electrical motors suitable for 220V

complete.}Fixing of 15mm n.b C.P pillar cock

laid to the required level and grade with rubber rings / joining in CM 1:3 and filling the excavated trench with approved quality saturated sand on sides

auto air vent & drain valves to be provided for the system.Tank shall be insulated with 100 mm thick rock wool insulation of 48 kg/cu.m. density having approx. k value_0.03 W/mk and R value 3.34 sq.m deg.C/W to withstand a temp. of 250deg.c.Thin polythene sheet shall be used as covering between the glass wool and the cladding sheet besides the retain

Fixing of oval under counter wash basin with CP bottle trap of approved colour

made of stainless steel 8 mm diameter

complete all as specified and directed and as per manufacturer's specification.The scope includes ceiling suspended 8mm dia.GI Hitech clamps/anchor rods (Spacing between two supports as per specifications )for suspended pipes wherever it necessary. Note: Brass fittings are used for utility connections & crimp fittings for all vertical & external pipes. ?!K"L!Q"W!m" (� � Cont actor all in comings in Weather Proof box and necessary suitable copper cables from starter panel to pump etc.Nylon ropes for lifting pumps with necessary control cables etcbends and all the above encased in a chamber of 300x300mm built with 115mm thick brick masonry using first class country bricks in CM 1:3 over a bed of CC 1:4:8 using 40mm down size metal 100mm thickvalves all in comings in Weather Proof box and necessary suitable copper cables from starter panel to pump etc.necessary electricals etc.complete to make the operation automatic.X! " Providing� � fixing of approved make manually operated 25mm dia .drain valve on terrace ring mains (Ball Valve) made of cast iron TFE coated

Page 46: PLUMBING BOQ R1- 29-08-2013

document

Page 46

##0\);_("$"* "-"_);_(@_).))_(* #

Page 47: PLUMBING BOQ R1- 29-08-2013

document

Page 47

tapering connecting pieces

etc. Complete As directed by Architect in charge.Supplying

washers etc. including plugging unused holes.

Page 48: PLUMBING BOQ R1- 29-08-2013

document

Page 48

Single Phase 50Hz AC supply operation Supply and installation�

32mm heavy quality CP brass waste coupling & CP brass bottle trap with extension piece & wall flange of approved make and conforming to IS specifications. 40mm PVC waste pipe with specials from extension piece of bottle trap to the floor trap

bottom and top surface of pipe with all leads and lifts

girder

comprising of : (Common toilets for Ground Floor to 3rd Floor)!0"i! "9One 15mm CP brass quarter turn type pillar cock wth one no of 15mm CP brass quarter turn type angle stop cock with ceramic disc cartridge of approved make with necessary wall flanges and two 15mm PVC flexible inlet connection pipe 600mm long with CP brass nuts at both ends and necessary r�

3 mm thick

laying Overload relay complete as required.(Flush Water Lifting Pump)complete.(De water Pumps for Lower Basement floor Drain)necessary tapping saddles etc.complete.Rate shall also includes the cost of GI 'U' clamps to be provided at not more than 1.0m c/c for horizontal pipes . The GI 'U' clamps shall be made of hot dip galvanized 10mm dia MS rod threaded at both ends and of length to suit the secure fixing of the pipe on the bracket of the clamping system with necessary nuts plastering with CM 1:3suitable supports for mounting pressure gauges complete as required. laying hand wheel operated with Screwed ends for two sides & one end threaded outlet for Drain Water as per ASTM 150 standards(PN 1.0)=!_" i�j������

Page 49: PLUMBING BOQ R1- 29-08-2013

document

Page 49

##0_);_(* \(#

Page 50: PLUMBING BOQ R1- 29-08-2013

document

Page 50

short or long bends

installation testing and commissioning of the following (Class 'B') MS pipes and fittings confirming to IS 1239 PI & II

a) 3C x 120.sqmm AYFY cable ( to main pump )@b) 4C x .16sqmm AYFY cable ( for jockey pump & booster pumps) Lc) 3C x 1.5.sqmm copper control cable ( To Pressure switches controllers) Supply�

Page 51: PLUMBING BOQ R1- 29-08-2013

document

Page 51

of control panel for water curtain motor consisting of suitable relay MPCB

length not exceeding 1m concealed in the wall

making necessary connections as required etc.

Fixing of wash basin comprising the following including cutting and making good the walls/ floors wherever necesssary all complete as per specifications .(For all Guest rooms & Consultant rooms) ! " Wall hung wash basin (without pedestal) from approved make white/Colour Wash basin including cutting and making good the walls/ floors wherever necesssary all compl�� �

with plastic collar

jointing Single Phase Prevent or

!7"8!I" &]Supply� plate washers and rubber insertions etc.13mm thick insideorifice plates. The filter shall be made of FRP with necessary accessories. The cost of filter shall also include initial charge of under bed with pebbles & Activated carbon filter media to suit the requirement etc.complete as per standards.&.'/&1'I&4Filter Media: Activated Carbon Capacity : One Charge("("�

jointing

Page 52: PLUMBING BOQ R1- 29-08-2013

document

Page 52

##0\);_(* "-"_);_(@_)?

Page 53: PLUMBING BOQ R1- 29-08-2013

document

Page 53

specials like sockets

with flanges welded /welded joints) as required including pipe of shorter lengths

fixing

Page 54: PLUMBING BOQ R1- 29-08-2013

document

Page 54

DOL starter with contactor

including cutting and making good the floors and walls. o15 mm CP brass overhead shower with hand shower and heavy casted shower arm with wall flange of approved make. Fixing of wall mixer with bend provision for overhead shower of approved make. Complete all as specified & directed with approved fittings. The scope includes supply of necessary accessorie�

complete.Ka) 225mm Dia Sb) 300mm Dia Providing weep hole for raised floor toilet area with 40mm pipe for draining moisture�

Fixing of approved make Coat Hook fixed to wall with cp screws and required all accessories etc

including fastening set. Execution selectable right-hand or left-hand.%!P" Providing & fixing of Glazed vitreous china ware Lab sink with drain board (SD) comprising of :drain board of approved make size 450x370mm supported on suitable RC or granite platform .One 15mm CP brass quarter turn type sink mixer and two no's of 15mm CP brass quarter turn type angl�

fixing Push buttons

delivery complete(7th & 6th Floor ceiling suspended & basement header pipes) !�exposed to surface

fixing

Page 55: PLUMBING BOQ R1- 29-08-2013

document

Page 55

:_("$"* #

Page 56: PLUMBING BOQ R1- 29-08-2013

document

Page 56

union nuts

tapering connecting pieces

testing and commissioning & installation of alarm gong valve assemble contains of 1-no. Alarm valve

Page 57: PLUMBING BOQ R1- 29-08-2013

document

Page 57

over load relay

complete.URORTwo No's 15mm sink cocks with swivel casted spout conforming to IS specifications.)One 40mm heavy quality CP brass waste coupling of approved make with removable crumb cup strainer. 40mm dia. UPVC pipe with specials from extension piece of bottle trap to the ceiling suspended trap.The scope includes necessary UPVC fittings & necessary sealen

including making necessary holes in the sunk slab

complete. !)" Supply�

complete.(For Scrub Area)1!4"5!J" ! "MSupply ��

testing LED on indicators

testing

finished smooth with a floating coat of neat cement

testing & commissioning of piping sytem with UPVC SCH-40 pipes fittings

Page 58: PLUMBING BOQ R1- 29-08-2013

document

Page 58

##0.00_);_("$"* \(#

Page 59: PLUMBING BOQ R1- 29-08-2013

document

Page 59

elbows

short or long bends

1 no. Main stop valve

Page 60: PLUMBING BOQ R1- 29-08-2013

document

Page 60

auto/manual switch

complete.TOTAL FOR SANITARY FIXTURESWATER SUPPLY SYSTEM The entire piping system in part or as a whole has to be tested to a hydraulic test pressure of 7 kg/sq.cm for a period of not less than 24 hours. the piping shall be concealed / commissioned only after satisfactory testing of the system.a) 20MM (Internal Dia)b) 25MM (Internal Dia)c) 32MM (Internal Dia)a) 20MM Dia.b) 25MM Dia.c) 32MM Dia.d) 40MM Dia.e) 50MM Dia. f) 65MM Dia.�

placing pipe sleeve in position

Fixing of approved make Soap Dispenser fixed to wall with cp screws and required all accessories etc

installation of hand sanitizer with require accessories etc

painting all in comings in Weather Proof box and necessary suitable copper cables from starter panel to pump etc.

commissioning of In line Booster pump with suitable capacity 230V

providing & fixing SFRC frame & cover of size 300x300mm etc.

required valves and instruments for processing in treatment plant. The scope includes cutting the pipes to required lengths

Page 61: PLUMBING BOQ R1- 29-08-2013

document

Page 61

##0.00\);_("$"* "-"??_);_(@_)6+1_(* #

Page 62: PLUMBING BOQ R1- 29-08-2013

document

Page 62

reducers

specials like sockets

1 no. water meter with alarm gong

Page 63: PLUMBING BOQ R1- 29-08-2013

document

Page 63

push buttons in manual mode and ON/OFF trip indicators all prewiredrSupply

complete.TOTAL FOR SANITARY FIXTURESWATER SUPPLY SYSTEM The entire piping system in part or as a whole has to be tested to a hydraulic test pressure of 7 kg/sq.cm for a period of not less than 24 hours. the piping shall be concealed / commissioned only after satisfactory testing of the system.a) 20MM (Internal Dia)b) 25MM (Internal Dia)c) 32MM (Internal Dia)a) 20MM Dia.b) 25MM Dia.c) 32MM Dia.d) 40MM Dia.e) 50MM Dia. f) 65MM Dia.�

grouting the opening in CM 1:2 etc.

complete.(For all common toilets & OP Rooms) !."w! "tSupply�

complete.!&" Fixing of CP angular stop cock for water cooler and �

commissioning GI medium quality type pipe of approved make conforming to IS:1239 complete as required.(Domestic Water Lifting Pump)

1-phase

complete all as specified & directed. !@"TRain water recharge pit of size 2mx1.5m x3m clear size

jointing the pipes using solvent joint type. And necessary chasing the walls / floors

Page 64: PLUMBING BOQ R1- 29-08-2013

document

Page 64

##0.00_);_(* \(#

Page 65: PLUMBING BOQ R1- 29-08-2013

document

Page 65

plugs

union nuts

Pressure guage drain valve and drain piping etc.

Page 66: PLUMBING BOQ R1- 29-08-2013

document

Page 66

installation

complete. Supplying and fixing cast brass clean out plug with suitable insert keys for opening male threaded plug jointed to GI socket caulked to soil & waste pipe as required & completed& a) 75 mm dia�

Fixing of CP brass Towel Ring of 150mm dia.fixed to wall

RO plant water supply conforming to IS specifications.The scope includes supply of necessary accessories etc

including cost of GI specials

50Hz motor and coupling with base frame having discharge capacity of 5 Cum/Hr against total head of 20m from all causes

two layers are top & bottom filled with 60mm metals up to depth of 600mm each

making holes

Page 67: PLUMBING BOQ R1- 29-08-2013

document

Page 67

##0.00\);_(* "-"??_);_(@_) 0.0 General_) 0_) General\ 0.00\ 5 0_(* #� � � � � �

Page 68: PLUMBING BOQ R1- 29-08-2013

document

Page 68

Tees etc.Complete to make the system operative as required by local fire authorities. including welding

elbows

Set Supply and installation of GI Perforated cable trays of following sizes made out of 2mm thick GI sheet including all supports as required a)300mmX50mmzSupply and laying of following size hot dip galvanized GI strips to run along with cable trays for erathing of all motors a)50X6mm GI stripb)25X3mm GI stripc) 8SWG GI WireSupplying�

Page 69: PLUMBING BOQ R1- 29-08-2013

document

Page 69

testing and commissioning of 15mm Dia open type water curtain nozzles with k-factor of 25-32.Qc) 3C x 2.5.sqmm copper control cable ( To motorized butterfly valve to panel)#Supply

with CP screws.(For all common toilets & OP Rooms)!&"R!s"|Supply

complete.

cutting the pipes to the required lengths

without starter

middle layer is filled with 40mm thick metal up to depth of 600mm thick

clamping to walls and restoring the same to original conditions etc.

Page 70: PLUMBING BOQ R1- 29-08-2013

document

Page 70

##0.00_);_(* \(#

Page 71: PLUMBING BOQ R1- 29-08-2013

document

Page 71

cutting

reducers

installation testing and commissioning priming HDPE tank (Sintex) of 500Ltrs capacity at required level including MS angle supports

Page 72: PLUMBING BOQ R1- 29-08-2013

document

Page 72

fixing

Fixing of approved make Toilet Paper Holder fixed to wall with cp screws and required all accessories etc

threading

complete as required .The scope includes necessary pressure vessel & switch for the auto on/off of the pump.

1-2mm coarse sand of 200mm depth layers on the top of filter media

complete all as specified and directed and as per manufacturer's specification.?*@"Q*R!c" * "hSupply � �

Page 73: PLUMBING BOQ R1- 29-08-2013

document

Page 73

##0.00\);_(* \-??_);_(@_) � �� � �� � �� � �� � �� � �� � �� � �� � �� � �� � �� � �� � �� � �� � � � �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �� �������������������������������������������������������������������������������������������������������������������������������������������������������

Page 74: PLUMBING BOQ R1- 29-08-2013

document

Page 74

fixing in / on walls

plugs

with inlet

Page 75: PLUMBING BOQ R1- 29-08-2013

document

Page 75

testing and commissioning of the following number of Loops Microprocessor based analogue addressable type Fire Control panel with Zonal Indications

complete. !3" Supply�

jointing the pipes

!@"[& " Supply� �

including with boring & laying of 150mm slotted G I epoxy coated pipes up to a depth of 6mtr long as directed includes with full size slotted RCC reinforced cover of 600x600x50mm on top and with necessary excavation

Installation

Page 76: PLUMBING BOQ R1- 29-08-2013

document

Page 76

* � �� � �� �� �� �� �� �P� �� �P� �� � � �� �� �� ���� �� �`� �� �� �� � �� � �� � �� �� �� ���� �� �� �%� � �� �� �� �a>� � � �� �!8@ @ � ����� ����������������������������������������������������������������������������������������

Page 77: PLUMBING BOQ R1- 29-08-2013

document

Page 77

under ground etc.

Tees etc.Complete to make the system operative as required by local fire authorities. including welding

outlet

Page 78: PLUMBING BOQ R1- 29-08-2013

document

Page 78

The system should have BMS compatibility

Fixing of approved make automatic hand drier operated with sensors

chasing

delivery

refilling etc. complete as directed & including all taxes

testing and commissioning of Solar water heater comprising of solar collectors

Page 79: PLUMBING BOQ R1- 29-08-2013

document

Page 79

* � �� � �� �� �� �� �� �P� �� �P� �� � � �� �� �� ���� �� �`� �� �� �� � �� � �� � �� �� �� ���� �� �� �%� � �� �� �� �a>� � � �� �!8@ @ � ����� ����������������������������������������������������������������������������������������

Page 80: PLUMBING BOQ R1- 29-08-2013

document

Page 80

the pipes will have to be laid and fixed in trenches on walls

cutting

overflow & drain pipes including controlling valves

Page 81: PLUMBING BOQ R1- 29-08-2013

document

Page 81

The system shall have a built-in relay & Hooter to initiate failure of FACP. L6 Loop fire alarm panel (with each loop supporting 125 Detectors & Devices). Supply testing and laying of PVC insulated�

air flow up to 15cms

making holes necessary in walls & floors

testing

duties finish to complete item. "_Supply

storage tank

Page 82: PLUMBING BOQ R1- 29-08-2013

document

Page 82

ceilings

fixing in / on walls

welding of supports bolts and nuts etc.

Page 83: PLUMBING BOQ R1- 29-08-2013

document

Page 83

1.5sq.mm shielded armoured twisted pair copper cable including all fixing accessories when laid inside the building including complete with end terminations at both sides.Mtr Supply installation testing and commissioning of analogue addressable type Multi (smoke& Heat ) photo electric detectors with LED indication lamp and with in built fault isolator.(Below false cei�

fixed to wall with cp screws and required all accessories etc

clamping to walls / supports using fabricated MS brackets(40x40x5mm Angle or 40 x6mm Flat) of approved design

commissioning of De-watering submersible pump made of Cast Iron Construction .Impeller shaft shall be S.S construction with mechanical seal suitable for building application..The unit shall include TEFC motor suitable for 415V

installation

associated piping and controls. The collectors shall consists of 1.4mm thick Aluminum collector frame

Page 84: PLUMBING BOQ R1- 29-08-2013

document

Page 84

into brick walls or RCC with lead anchor fastners.The work includes excavation in all types of soils and back filling and making holes in brick or RCC walls

under ground etc.

complete accessoriesAUTOMATIC SPRINKLER SYSTEM. Supply and installation�

Page 85: PLUMBING BOQ R1- 29-08-2013

document

Page 85

hammer and monitor module and fixing accessoriesCSupply and fixing of Exit Light fixtures with 1.5hrs battery backup Supply installation testing and commissioning of analogue addressable type monitor modules for monitoring the sprinkler flow switches Supply installation testing and commissioning of analogue addressable type control relay / control modules for � �

complete. !)"*!K"|Supply

GI threaded U clamps on the bracket

3Phase

Testing & commissioning of Reverse Osmosis Plant(RO)

toughened clear glass for covering

Page 86: PLUMBING BOQ R1- 29-08-2013

document

Page 86

slabs/ roofs and making good the damages by bringing to the original condition to the satisfaction of the Architect and painting two coats of approved shade of enamel paint over a coat of approved primer.a) 150mm diab) 100mm diac) 80mm diad) 50mm diae) 25mm dia Supplying�

Underground piping with necessary flanges < & fittings such as elbows

Providing and fixing approved make 15mm orifice quartzoid bulb type sprinklers

Page 87: PLUMBING BOQ R1- 29-08-2013

document

Page 87

Electrical circuit tripping

Fixing of approved make CP Brass Towel Rail of 20mm dia.600mm long fixed to wall with CP brass screws etc.

HITECH pipe supports & restoring the walls & floors to the original conditions etc.

50Hz & Insulation -Class F

the features of the plant is

50mm Rock wool Insulation for bottom & 25mm insulation for sides. The absorber plate shall be of 36 SWG copper & NaLSUN coating. Reflective foil of 0.05mm thick & Grommet is of EPDM

Page 88: PLUMBING BOQ R1- 29-08-2013

document

Page 88

installation testing and commissioning Cast Iron Body Sluice valve PN 1.6 Non-rising stem type conforming to IS:780

tees and providing and fixing anchor blocks in PCC 1:2:4 at all bends

68 C rating�

Page 89: PLUMBING BOQ R1- 29-08-2013

document

Page 89

and PA amplifier activation in case of fire alarm. CSupply and fixing of duct detectors for AHU's at different levels. Supply�

complete !""#!(")!4"HSupply

complete all as specified and directed. The exposed pipes shall be painted with 2 coats of approved synthetic enamel paint over a coat of metal primer

IP 68 Protection and Automatic ON/OFF Level Switch

Plant skid made from MS (Powder coated) Pre filtration in FRP/ SS vessel. Pre filter with sediment and housing. High pressure pumps (Rotary vane type/ vertical) Anti scalene dosing pump. Membrane housing (FRP)/ Stainless Steel) High pressure &amp; Low pressure control switch. Full electronic/ MCB panel with Auto water level sensor. High quality Astral PVC/ S

riser & inlet shall be of copper. The collector size shall be 2080mm x 1070mm x 100mm. & the absorber area is 2 Sq.Mt. 9 No. of riser tubes & absorber plate per collector with 88% glazing transmitivity. The coating absorptivity is 0.95 & coating emissivity is 0.16. The absorber riser bonding shall be continuous bonding. The storage tank shall be SS 304 grade(Wall Thickn

Page 90: PLUMBING BOQ R1- 29-08-2013

document

Page 90

with flanged endsa) 100mm diaFSupplying

tees

recessed pendent type with roset plate (adjustable) off white finish wherever required and all accessories

Page 91: PLUMBING BOQ R1- 29-08-2013

document

Page 91

installation

Fixing of CP brass Tumbler Holder fixed to wall

including making the necessary colour bands as specified in the tech.spects. F!O"P!\" Supply & fixing of heavy quality Ball valves shall have body of carbon steel. The ball and the shaft shall be of stainless steel. The seat shall be of PTFE. The valve shall be complete with socket weld ends and the float of copper sheet. The minimum thickness of copper sheet us�

flow meter &amp; pressure gauge . (For Drinking Water Purpose only)2!K"BSupply

auto air vent & drain valves to be provided for the system

Page 92: PLUMBING BOQ R1- 29-08-2013

document

Page 92

installation testing and commissioning C.I. Non-return valve conforming to IS : 5312 with flanged ends (heavy) tested to 250 psi hydraulic pressure with necessary companion flanges

alongwith pipe coating and wrapping of underground pipes with `PYPKOTE' 4mm thick conforming to IS : 10221. It includes providing and fixing pypkote (corrosion protection tape) including supply and application of pipe coating and spiral Wrapping (wrapping should have overlap of 15 to 20 mm) etc. complete as per ASTM standards for corrosion protection of pipes that

supports and painting etc. Supply and installation��

Page 93: PLUMBING BOQ R1- 29-08-2013

document

Page 93

testing and commissioning of intelligent Addressable network control Active Repeater panel on FACP network configuration to monitor and control all local fire alarm control panels with RS 485 port on CPU board with optional network software connectivity

with CP screws.!*" Supply&Fixing of Flat back Half White Large URINAL fixed with screws to wall with waste coupling�

conforming to IS:1703: 1977

Base plates

installation

insulation of the tank shall be of Rock wool with Aluminum cladding material. Necessary valves & internal piping shall be made

Page 94: PLUMBING BOQ R1- 29-08-2013

document

Page 94

bolts

installing and commissioning of fire brigade inlet connection conforming to IS 5290 comprising of 2nos.SS 63mm dia instantaneous couplings complete with CI non-return valve

Providing and fixing approved make 15mm orifice quartzoid bulb type sprinklers

Page 95: PLUMBING BOQ R1- 29-08-2013

document

Page 95

fire/ fault indicators

bottle trap

PN 1.0 and bearing ISI mark

Coupling

Testing & commissioning of Water Softener with strongly acidic cation exchanger in sodium ions and thus produce soft water of less than 50ppm ( Raw Water Hardness - 450 ppm).the plant for soft water in a period of 10 hours operation for following OBR with necessary accessories complete with frontal piping

with ISI fittings or equivalent as directed by the Engineer-in -charge.3!E" Supplying�

Page 96: PLUMBING BOQ R1- 29-08-2013

document

Page 96

nuts

CI butterfly valve

68 C rating�

Page 97: PLUMBING BOQ R1- 29-08-2013

document

Page 97

audio visual signals

waste pipe drop to lower floor&connected to P-Trap with 50mm dia.Galvanized Iron pipe .The scope includes necessary GI fittings(T-Joint) & necessary sealent to connect P- Trap etc

including testing

Nylon ropes for lifting pumps with necessary control cables etc

valves

installing

Page 98: PLUMBING BOQ R1- 29-08-2013

document

Page 98

gasket packing and any other spares

connected to 150 mm dia Fire TANK FILLINGand fire hydrant wet riser pipe. Supplying�

recessed wall mounted type with roset plate (SINGLE ) off white finish wherever required and all accessories

Page 99: PLUMBING BOQ R1- 29-08-2013

document

Page 99

battery

complete.. Concealed Sensor for URINALS with installation box &control cock

making good the leakages etc.

complete.(Drain water lifting pump at pump room)

suitable supports for mounting pressure gauges

testing and commissioning approved make cast brass body Digital water meter with necessary unions

Page 100: PLUMBING BOQ R1- 29-08-2013

document

Page 100

including indicator for open ands hut position as per fire practice etc complete.

installing and commissioning of fire brigade inlet connection conforming to IS 5290 comprising of 4nos.SS 63mm dia instantaneous couplings complete with CI non-return valve

supports and painting etc. Supply and installation���

Page 101: PLUMBING BOQ R1- 29-08-2013

document

Page 101

battery charger

CP Dome and all accessories completed provision for manual operation to be made with concealed stop cock.

complete."!-"JProviding & fixing butterfly valve (Body : Grey Cast Iron

!7"8!I" &>Supply�

orifice plates. The filter shall be made of FRP with necessary accessories. The cost of filter shall also include initial charge of media to suit the requirement etc.complete as per standards.&.'/&1'C&3Filter Media: acidic cation exchanger

valves for fixing on the cold water main

Page 102: PLUMBING BOQ R1- 29-08-2013

document

Page 102

CI butterfly valve

testing and commissioning of Sprinkler flexible Pipe required length of 1.5M including angles and supports Supply and installation of CI Butterf� �����������������������������������������������������������������������������������������������������������������������������

Page 103: PLUMBING BOQ R1- 29-08-2013

document

Page 103

central processing unit 80 character display unit complete in all respects. Supply�

!2"pSupply&Fixing of Granite Urinal Division Plates of 1200mmx600mm size with wall cutting and making good completed!0"HSupply

Shaft: SS

fixing of 150mm deep Multi floor traps of self cleansing design with following mentioned outlet diameter of approved make

One Charge(

etc.

Page 104: PLUMBING BOQ R1- 29-08-2013

document

Page 104

connected to 150 mm dia forRING MAIN Constructing masonry Chamber 1200x1200x1000 mm�

neoprene gaskets with necessary companion flanges

Page 105: PLUMBING BOQ R1- 29-08-2013

document

Page 105

installation

Fixing of CP brass Shower assembly comprising of the following :!"" One quarter turn type with ceramic disc cartridge�

Disc : SG Iron (Rilson coated)

including making connection with PVC soil/waste pipes using rubber gaskets and top shall be covered with removable CP strainer & cockroach jolly etc.

complete =!a" Supplying�

Page 106: PLUMBING BOQ R1- 29-08-2013

document

Page 106

inside with 75 class designation brick work in cement mortar 1:6 ( 1 cement : 6 fine sand ) for sluice valve

bolts

Page 107: PLUMBING BOQ R1- 29-08-2013

document

Page 107

testing and commissioning of Fire alarm management software system and graphical display interface to network the installed fire alarm panels using a network manager program and the following shall be pre-equipped with : a) Preparation of graphics compatible to fire alarm monitoring software of buildings and connected with slave panels including layout of the bu�

CP brass Single Lever Diverter with built in spout & CP bend for overhead shower of approved make. Complete all as specified & directed with approved fittings. 3!e"HSupply

Liner: HT - EPDM) (upto 150mm dia with hand lever operation & above with gear box operation). Tested to a pressure not less than 10Kg/Sq.cm. Including rubber gasket

complete all as specified & directed.!-"iSupply

installing

Page 108: PLUMBING BOQ R1- 29-08-2013

document

Page 108

with C.I.surface box 100mm top diameter

nuts

Page 109: PLUMBING BOQ R1- 29-08-2013

document

Page 109

500GB HDD

Fixing of CP brass Shower assembly comprising of the following :!"" Supply�

flanges

laying of under floor UPVC drainage pipes

testing and commissioning approved make cast brass body Digital water meter with necessary unions

Page 110: PLUMBING BOQ R1- 29-08-2013

document

Page 110

160mm bottom diameter and 180mm deep (inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) necessary excavation foundation concrete 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand ) 12mm

gasket packing and any other spares

Page 111: PLUMBING BOQ R1- 29-08-2013

document

Page 111

with per-loaded software's shall include UPS with 15 min backup and along with all fixing accessories. ( The above said item shall be in client scope ) Supply and installation testing and commissioning of 6Watt 180mm dia recessed/ surface mounted white color speakers (along with junction boxes to be used in no false ceiling area). �Supply and surface laying of���

Fixing of Stainless steel sink & drain board of approved make of size 61cmx25cmx45cm supported on suitable RC or Granite platform."!." Fixing of CP long body bib cock for wash area water supply conforming to IS specifications.The scope includes supply of necessary accessories etc�

nuts

specials of approved make conforming to to IS:13592 Type 'B' (6 kg/sq.cm.) using lubricant as per manufacturer's specification

valves for fixing on the Hot water main

Page 112: PLUMBING BOQ R1- 29-08-2013

document

Page 112

back filling of the chamber sides with the excavated soil

including indicator for open ands hut position as per fire practice etc complete.b) 80mm diac) 50mm diaSupplying�

Page 113: PLUMBING BOQ R1- 29-08-2013

document

Page 113

fitted with discharge control valve ( squeeze grip type )

complete.

bolts

including cutting the pipes square to the required lengths

etc.

Page 114: PLUMBING BOQ R1- 29-08-2013

document

Page 114

disposing of the surplus earth after back filling with initial lead of 30 meters. Providing medium duty cast iron frame and cover etc.

installation testing and commissioning of the following (Class 'B') MS pipes and fittings confirming to IS 1239 PI & II

Page 115: PLUMBING BOQ R1- 29-08-2013

document

Page 115

inside STORED PRESSURE with ISI mark

washers & painting complete as required.!#" Supply�

necessary wall cutting

complete .=!a"]Supply

Page 116: PLUMBING BOQ R1- 29-08-2013

document

Page 116

complete. ( weight: 110kgs.) as per specification. Supply�

The pipes complete with necessary specials such as tees

Page 117: PLUMBING BOQ R1- 29-08-2013

document

Page 117

with discharge hase and open nozzel overall conforming to IS: 15683 with ISI mark along with wall bracket and initial refilling at site . Fire Rating 2A. Supply installation testing and commissioning of CO2 type Fire Extinguisher of 4.5 kgs capacity made from brand new seamless drawn steel cylinder as per IS : 7285 with ISI mark and Chief of controller of explosives ap�

delivery

chasing & restoring to the original condition

intallation

Page 118: PLUMBING BOQ R1- 29-08-2013

document

Page 118

installation

bends

Page 119: PLUMBING BOQ R1- 29-08-2013

document

Page 119

fitted with wheel valve as per IS: 3224 with ISI mark

installation

testing for water tightness etc. (Specials at junctions of lateral pipe must have access doors for inspection).The formation of pipe sockets by heating the pipe shall not be permitted the joints for plain ended pipes shall be made using couplers if necessary. Rate shall also include the cost of GI 'U' clamps of 12/16mm thick to be provided at not more than 1.5m c/c for ho

testing & commissioining of of Air Source Water Heating System including the necessary accessories and safeties and capable of delivering hot water at 60 Deg.C.The scope includes automatic control panel microprocessor controller along with necessary accessories. Please refer specifcations for rated input & output capacities.3!R"aSupply

Page 120: PLUMBING BOQ R1- 29-08-2013

document

Page 120

testing & commissioning of Cast Iron Body Sluice valve PN 1.6 Non-rising stem type conforming to IS:14846

flanges

Page 121: PLUMBING BOQ R1- 29-08-2013

document

Page 121

with discharge hose and horn and supplied complete with initial charge overall conforming to IS: 15683 with ISI mark and wall bracket. Fire Rating 21B Supply installation testing and commissioning of ABC Dry Chemical Powder 6.0 kg capacity fitted with discharge control valve ( squeeze grip type )�

testing

laying of under floor UPVC drainage pipes

delivery

Page 122: PLUMBING BOQ R1- 29-08-2013

document

Page 122

with flanged ends Supply�

reducers

Page 123: PLUMBING BOQ R1- 29-08-2013

document

Page 123

inside STORED PRESSURE with ISI mark and ABC powder as per IS: 14609 ( for ABC class ) with ISI mark packed in 6kgs HDPE b

commissioning of digital water level controller

specials & rubber rings of approved make conforming to to IS:13592 Type 'B' (6 kg/sq.cm.) and as per manufacturer's specification

testing

Page 124: PLUMBING BOQ R1- 29-08-2013

document

Page 124

installation

etc. Rate quoted shall include for painting of pipe with a coat of primer and two coats of synthetic enamel paint of approved colour / make for aboveground piping and coating & wrapping for under ground piping as per the TAC / IS standards and Local fire service department requirement complete including supply and installation of pipe supports from column/wall or suspenders from roof slab to suit various dia of pipes made out of GI adjustable rods threaded for a sufficient length to adjust the height of support along with clamping arrangement for holding pipes of anchor fastening arrangement design of hanger and should confirm to specification as indicated NFPA 13. etc.

Page 125: PLUMBING BOQ R1- 29-08-2013

document

Page 125

with discharge hose and open nozzel and supplied complete with initial charge overall conforming to ISI: 15683 ISI mark and wall bracket . Fire Rating 3A.34B.`Supply installation testing and commissioning of Clean Agent Fire Extinguishers

digital display of water level in the tank

including cutting the pipes square to the required lengths

commissioning of Hot Water distribution pump with suitable capacity 230V

Page 126: PLUMBING BOQ R1- 29-08-2013

document

Page 126

testing & commissioning of R.C.C NP2 class Hume pipe laid to the required level and grade with collars jointed with in CM1:3. Including encasing the pipe around a depth of not less than 15cm thick with selected earth (fine aggregate) available from the excavation as per specification and direction of the engineer. The excavated soil shall be deposited on banks with all

etc. Rate quoted shall include for painting of pipe with a coat of primer and two coats of synthetic enamel paint of approved colour / make for aboveground piping and coating & wrapping for under ground piping as per the TAC / IS standards and Local fire service department requirement complete including supply and installation of pipe supports from column/wall or suspenders from roof slab to suit various dia of pipes made out of GI adjustable rods threaded for a sufficient length to adjust the height of support along with clamping arrangement for holding pipes of anchor fastening arrangement design of hanger and should confirm to specification as indicated NFPA 13. etc.

Page 127: PLUMBING BOQ R1- 29-08-2013

document

Page 127

2.0 kg capacity Sealing of Fire shafts at all floor levels by using M.S. angle Iron frame around the shaft M.S. chequered plate and PCC of 1:2:4 (100mm thick) on the plate for whole shaft area as per drawings and engineer- in - charge.Sq.ftRev: R0Instalation0MEP Consultant: Synergy Infra Consultant Pvt LtdDate: 28-Aug-2013ABCGRAND TOTALDEFG?PROJECT: Construction of Expansion of Yashoda Hospital- Phase-1GRAND SUMMARY S NoItem�

trigger for automatic operation of pump set when the water level reaches low level

necessary wall cutting

1-phase

Page 128: PLUMBING BOQ R1- 29-08-2013

document

Page 128

lift

Page 129: PLUMBING BOQ R1- 29-08-2013

document

Page 129

2.0 kg capacity Sealing of Fire shafts at all floor levels by using M.S. angle Iron frame around the shaft M.S. chequered plate and PCC of 1:2:4 (100mm thick) on the plate for whole shaft area as per drawings and engineer- in - charge.Sq.ftRev: R0Instalation0MEP Consultant: Synergy Infra Consultant Pvt LtdDate: 28-Aug-2013ABCGRAND TOTALDEFG?PROJECT: Construction of Expansion of Yashoda Hospital- Phase-1GRAND SUMMARY S NoItem�

including fixing necessary stainless steel sensors

chasing & restoring to the original condition

50Hz motor and coupling with base frame having discharge capacity of 5 Cum/Hr against total head of 20m from all causes

Page 130: PLUMBING BOQ R1- 29-08-2013

document

Page 130

including necessary wooden/steel form work where ever required. Depositing of the surplus earth after backfilling to a initial lead of 30 meters. Refilling of the pipe line trenches and foundation with selected earth available from the trench excavation including watering consolidation in layers of 15cm thickness complete as per specifications. The back fill soil shall be grade

Page 131: PLUMBING BOQ R1- 29-08-2013

document

Page 131

float level switch

testing for water tightness etc.

without starter

Page 132: PLUMBING BOQ R1- 29-08-2013

document

Page 132

pebbles

Page 133: PLUMBING BOQ R1- 29-08-2013

document

Page 133

probes

(Specials at junctions of lateral pipe & vertical stack must have access doors for inspection and vent cowls for soil

complete as required. The scope includes necessary pressure vessel & switch for auto on/off for the pumps.

Page 134: PLUMBING BOQ R1- 29-08-2013

document

Page 134

clay lumps and vegetation etc.

Page 135: PLUMBING BOQ R1- 29-08-2013

document

Page 135

etc. The control cabling from panel to sump

waster water & anti siphonage pipes). The formation of pipe sockets by heating the pipe shall not be permitted the joints for plain ended pipes shall be made using couplers if necessary. Rate shall also includes the cost of GI 'U' clamps to be provided at not more than 2.0m c/c for vertical pipes . The GI 'U' clamps shall be made of hot dip galvanized 10mm dia MS rod thr

!H"b& ".�

Page 136: PLUMBING BOQ R1- 29-08-2013

document

Page 136

complete as per the specifications

Page 137: PLUMBING BOQ R1- 29-08-2013

document

Page 137

making connections from the level controller to the pump starter

plate washers and rubber insertions etc.

Page 138: PLUMBING BOQ R1- 29-08-2013

document

Page 138

and drawings. a) 300mm diaSupplying & installing completely testing & commissioning of electrically Driven End suction and back pull out pump with cast iron casing & bronze or phosphor bronze internal parts

Page 139: PLUMBING BOQ R1- 29-08-2013

document

Page 139

necessary conduiting shall have to be done by qualified electrical contractor only.:!X" Providing and fixing in position 65mm dia flanged Cast Iron dirt box Y-Type Strainer having body fabricated in Cast Iron and strainer made of SS perforated sheet having perforations of suitable size.D!T" Constructing water meter chamber or valve chamber of sizes as mentioned � �

complete (Vertical Down Take Pipes).!#">!J"

Page 140: PLUMBING BOQ R1- 29-08-2013

document

Page 140

for fire duty

Page 141: PLUMBING BOQ R1- 29-08-2013

document

Page 141

100mm thick CC 1:3:6 for foundation with 150mm offset around

Page 142: PLUMBING BOQ R1- 29-08-2013

document

Page 142

complete with coupling guard necessary RCC foundation

Page 143: PLUMBING BOQ R1- 29-08-2013

document

Page 143

230mm thick brick masonry in CM 1:3 using table mold bricks

Page 144: PLUMBING BOQ R1- 29-08-2013

document

Page 144

capable of discharging 2850 lt/min against 88 metre head at 8.8 bar against all losses complete electrically operated TEFC 3-ph

Page 145: PLUMBING BOQ R1- 29-08-2013

document

Page 145

12mm thick plaster on outside

Page 146: PLUMBING BOQ R1- 29-08-2013

document

Page 146

440-V 50 Hz

Page 147: PLUMBING BOQ R1- 29-08-2013

document

Page 147

inside surfaces in CM 1:3 providing

Page 148: PLUMBING BOQ R1- 29-08-2013

document

Page 148

2900 RPM motor of F class winding

Page 149: PLUMBING BOQ R1- 29-08-2013

document

Page 149

fixing frame & cover in 100mm thick RCC 1:2:4 using 20mm metal

Page 150: PLUMBING BOQ R1- 29-08-2013

document

Page 150

make as approved by TAC with automatic direct on line starter complete with single phasing preventor & No volt release as per LPA requirements common base plate

Page 151: PLUMBING BOQ R1- 29-08-2013

document

Page 151

finishing top surface with CM 1:3 plaster and finished smooth.!1" 1200x1200mm internal clear dimension with 900x900mm SFRC frame & cover of medium duty (MD-10 grade)(For Municipal Water Incoming Line)d! " Supply and fixing of following mentioned dia. Water meter inclusive of 2 isolating ball valves� � �

Page 152: PLUMBING BOQ R1- 29-08-2013

document

Page 152

foundation bolts

Page 153: PLUMBING BOQ R1- 29-08-2013

document

Page 153

GI union and strainer inside the valve chamber. )!9" Supply�

Page 154: PLUMBING BOQ R1- 29-08-2013

document

Page 154

suitable cable entry gland box for A-AL cable (95 sq.mm) pressure guages & wired for automatic start of the water pump on drop of pressure in the wet riser/ hydrant and sprinkler system. The motor starter and pump should confirm to LPA / BSES & and IE Regulations. The pump shall be capable of giving not less than 150% discharge at a head not less than 65% of

Page 155: PLUMBING BOQ R1- 29-08-2013

document

Page 155

Laying of 50mm(28 Gauge) thick Rock Wool insulation with mechanical protection

Page 156: PLUMBING BOQ R1- 29-08-2013

document

Page 156

testing & commissioning of End suction and back pull out diesel engine driven pump of capacity 2850 Litr/Min

Page 157: PLUMBING BOQ R1- 29-08-2013

document

Page 157

GI wire mesh( 14 Gx3/4 ) and Al(28 Gauge) cladding.(All Terrace

Page 158: PLUMBING BOQ R1- 29-08-2013

document

Page 158

88 Mtrs head Common Standby pumpset for wetriser & sprinkler system at 8.8 Bar and 2900 rpm with all necessary accessories like bronze impeller

Page 159: PLUMBING BOQ R1- 29-08-2013

document

Page 159

Vertical Down Takes & internal toilet Hot Water Pipes) .'!;"YSupply

Page 160: PLUMBING BOQ R1- 29-08-2013

document

Page 160

stainless steel shaft and mechanical seal along with anti-vibration mounting

Page 161: PLUMBING BOQ R1- 29-08-2013

document

Page 161

fixing in position auto air release valve (ARV)of 25mm n.b. of approved make with body made of Cast Iron and Rubber Coated Wooden Brass with Brass Plug and other moving parts of stainless steel & Screwed Ends as per IS 14845

Page 162: PLUMBING BOQ R1- 29-08-2013

document

Page 162

coupling

Page 163: PLUMBING BOQ R1- 29-08-2013

document

Page 163

PN 1.0.The scope includes provision of ball valve (between ring main & ARV ) for any maintenance shall be made.!!2"4!7" & Supplying & fixing Flanged CI non return valve with necessary nuts� �

Page 164: PLUMBING BOQ R1- 29-08-2013

document

Page 164

gear box

Page 165: PLUMBING BOQ R1- 29-08-2013

document

Page 165

bolts

Page 166: PLUMBING BOQ R1- 29-08-2013

document

Page 166

base plate for pump

Page 167: PLUMBING BOQ R1- 29-08-2013

document

Page 167

rubber gaskets etc. complete. of approved make. (To be placed at pump room )!/" Providing and fixing of following mentioned dia dial pressure gauge to read up to 15kg/sq.cm�

Page 168: PLUMBING BOQ R1- 29-08-2013

document

Page 168

fabricated mild steel channel with foundation bolts etc.

Page 169: PLUMBING BOQ R1- 29-08-2013

document

Page 169

to be fixed on delivery main of pump sets with isolation cock.0!C"yConstruction of P.C.C/ Brick Masonry pedestals 600mmx300mmx150mm with MS brackets & GI clamps for laying pipes on terrace!."]Supplying & fixing of 20 mm dia. hose bib with valve of 20 mm dia. (For external gardening) .!!4" Supply�

Page 170: PLUMBING BOQ R1- 29-08-2013

document

Page 170

It includes providing and fixing fuel oil tank (capacity as perTAC requirements) with supports and necessary pipe works for diesel engine

Page 171: PLUMBING BOQ R1- 29-08-2013

document

Page 171

installation

Page 172: PLUMBING BOQ R1- 29-08-2013

document

Page 172

battery and battery charger to be connected to control panel of diesel engine and exhaust silencer including necessary pipe work insulation and cladding

Page 173: PLUMBING BOQ R1- 29-08-2013

document

Page 173

testing & commissioning of Ductile iron(DI ) medium duty rectangular manhole cover with frame for the feasibility of access in the tank Size : 600 x 600 (65 kg)1!="@!i" Providing and fixing in position G.I. vent with brass mosquito proof coupling an< d air filter including return bend�

Page 174: PLUMBING BOQ R1- 29-08-2013

document

Page 174

etc.

Page 175: PLUMBING BOQ R1- 29-08-2013

document

Page 175

complete as required. The entire fitting shall be hot dip galvanised.!!+"hProviding and fixing PPP Water hammer arrestors complete with necessary fittings for inlet dia of 20mm. !/"/Providing & fixing manhole foot rests; poly propylene

Page 176: PLUMBING BOQ R1- 29-08-2013

document

Page 176

and shall be automatic in operation with diesel engine control diesel engine control panel with 24V DC storage battery & its battery charger. (diesel engine) Supplying

Page 177: PLUMBING BOQ R1- 29-08-2013

document

Page 177

steel reinforcement The polypropylene shall confirm to ASTM D-410 and shall be injection molded around 12mm dia Fe-415 Steel reinforcing bar. The foot rest shall be provided in RCC walls / brick walls as per requirement of design / project manager.!%"!Supply & Fixing of G.I Puddle Flanges of various dia and size made out of G.I. with screwed ends

Page 178: PLUMBING BOQ R1- 29-08-2013

document

Page 178

installing

Page 179: PLUMBING BOQ R1- 29-08-2013

document

Page 179

cap and plain for embedment n concrete as necessary with suitable accessories

Page 180: PLUMBING BOQ R1- 29-08-2013

document

Page 180

testing and commissioning of electrical motor Driven jockey pump for hydrant system with discharge 180 lpm against head 88 mtrs at 8.8 bar with M.S. frame and clamps as necessary for fixing the pumps on the foundation slab as per site conditions Supplying

Page 181: PLUMBING BOQ R1- 29-08-2013

document

Page 181

consumables welding accessories including placing in position

Page 182: PLUMBING BOQ R1- 29-08-2013

document

Page 182

installing

Page 183: PLUMBING BOQ R1- 29-08-2013

document

Page 183

complete for Under Ground Sumps & Overhead Tanks.!%"! " Supplying�

Page 184: PLUMBING BOQ R1- 29-08-2013

document

Page 184

testing and commissioning of electrical motor Driven Booster pump for hydrant system with discharge 900 lpm against head 35 m with M.S. frame and clamps as necessary for fixing the pumps on tthe foundation of slab as per site conditions RO Supply�

Page 185: PLUMBING BOQ R1- 29-08-2013

document

Page 185

installing

Page 186: PLUMBING BOQ R1- 29-08-2013

document

Page 186

Installation

Page 187: PLUMBING BOQ R1- 29-08-2013

document

Page 187

testing and Commissioning approved make GM/Brass pressure reducing station(PRS) with union

Page 188: PLUMBING BOQ R1- 29-08-2013

document

Page 188

Testing and Commissioning of Indoor / outdoor

Page 189: PLUMBING BOQ R1- 29-08-2013

document

Page 189

ball valve / butterfly valve 3 nos of required dia

Page 190: PLUMBING BOQ R1- 29-08-2013

document

Page 190

weatherproof 3 phase 415V 4 wire Free Standing Floor mounted MV panel made out of 14 SWG CRCA sheet after seven tank process and painting with Epoxy powder coating including all switchgear as detailed below. The panel shall consist of suitable rating TPN Aluminium/Copper busbar (at the rating of 0.8A/Sq.mm/1.6A/sq.mm) supported with DMC/ SMC barriers and co

Page 191: PLUMBING BOQ R1- 29-08-2013

document

Page 191

pressure gauge 2 nos with all necessary accessories etc. complete all conforming to IS. H!f"

Page 192: PLUMBING BOQ R1- 29-08-2013

document

Page 192

installation

Page 193: PLUMBING BOQ R1- 29-08-2013

document

Page 193

testing and commissioning of electrical control panel diesel engine main motor and jockey pump

Page 194: PLUMBING BOQ R1- 29-08-2013

document

Page 194

comprising of following. All contactors shall have status feed back provision to BMS."Incoming 400A

Page 195: PLUMBING BOQ R1- 29-08-2013

document

Page 195

50KA FP MCCB -1setA(with Mechanical interlocking between incommers and Bus couplers)*Busbars : 400A TPN aluminium BUSBARS- 1SET Outgoings : (1) DOL starter with MCCB and contactor�

Page 196: PLUMBING BOQ R1- 29-08-2013

document

Page 196

< over load relay

Page 197: PLUMBING BOQ R1- 29-08-2013

document

Page 197

single phasing preventor and ON/OFF/TRIPindication lamps for motor -2sets3(2) DOL starter same as above for 15HP motor - 1set4(3) 63A

Page 198: PLUMBING BOQ R1- 29-08-2013

document

Page 198

TPN MCCB for terrace booster pump - 1 Set6(4) 32A

Page 199: PLUMBING BOQ R1- 29-08-2013

document

Page 199

TPN MCB feeder for Engine control panel-1 Set Metering ; Voltmeter� Ammeter

Page 200: PLUMBING BOQ R1- 29-08-2013

document

Page 200

LED phase Indication lamps

Page 201: PLUMBING BOQ R1- 29-08-2013

document

Page 201

Ammeters for both outgoings The Rate shall include supply and fixing of all The Rate shall include supply and fixing control devices for auto operation of pump of all motors Supply�

Page 202: PLUMBING BOQ R1- 29-08-2013

document

Page 202

installation

Page 203: PLUMBING BOQ R1- 29-08-2013

document

Page 203

testing and commissioning of weather proof type starter consisting of following and made of 2mm thick CRCA sheet including painting with epoxy powder coating for 15HP Booster pump motor. The box shall be suitable for terminating AYFY cable of 3core 6sq.mm size. The box shall be mounted on suitable angle frame work of 450mm height on a PCC pedestal includ

Page 204: PLUMBING BOQ R1- 29-08-2013

document

Page 204

over load relay

Page 205: PLUMBING BOQ R1- 29-08-2013

document

Page 205

single phasing preventor and ON/OFF/TRIP indication A/M selection switch & push button for manual operations and with volt meter

Page 206: PLUMBING BOQ R1- 29-08-2013

document

Page 206

Ammeter with selector switchesBSupplying

Page 207: PLUMBING BOQ R1- 29-08-2013

document

Page 207

installation testing and commissioning of the following (Class 'B') MS pipes and fittings confirming to IS 1239 PI & II. The pipes complete with necessary specials such as tees

Page 208: PLUMBING BOQ R1- 29-08-2013

document

Page 208

bends flanges reducers

Page 209: PLUMBING BOQ R1- 29-08-2013

document

Page 209

etc. Rate quoted shall include for painting of pipe with a coat of primer and two coats of synthetic enamel paint of approved colour / make for aboveground piping and coating & wrapping for under ground piping as per the TAC / IS standards and Local fire service department requirement complete including supply and installation of pipe supports

Page 210: PLUMBING BOQ R1- 29-08-2013

document

Page 210

fasteners etc. Above ground piping with necessary flanges & fittings such as elbows�

Page 211: PLUMBING BOQ R1- 29-08-2013

document

Page 211

tees and Painting

Page 212: PLUMBING BOQ R1- 29-08-2013

document

Page 212

supports and Orifice plates if any necessary for the fire protection system complete as per the requirement of Local fire service department. a) 200mm diab) 150mm dia