PM&Es: Through the Looking GlassFERC Perspectives
Jennifer Hill
Federal Energy Regulatory Commission
NHA Annual Conference May 12, 2009
![Page 2: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/2.jpg)
Issue
• Applicants do not always have well-defined PM&E measures in their application.
• It is difficult for Commission staff to assess the benefits and costs of vague measures.
• Implementation of environmental measures are delayed.
![Page 3: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/3.jpg)
What are PM&Es?
Protection, Mitigation and Enhancement Measures (PM&Es) could be:
• Modifications to project facilities and operations
• Construction and O&M of new facilities• Protection or mitigation measures for addressing project-related effects
![Page 4: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/4.jpg)
Typical Environmental PM&Es for Hydro
AestheticsWildlife
Water quality
Cultural
Recreation
Fisheries
![Page 5: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/5.jpg)
Environmental Concerns and Developmental Concerns
![Page 6: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/6.jpg)
Competing Environmental Concerns
![Page 7: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/7.jpg)
National Environmental Policy Act (NEPA)
![Page 8: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/8.jpg)
Goal
• Sufficient information on PM&E measures to be able to recommend to the Commission implementation of those measures that are best adapted to a comprehensive plan for improving or developing the waterway in any license issued.
![Page 9: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/9.jpg)
Information Requirements
• What?• Where?• When?• How?• Why?
![Page 10: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/10.jpg)
What?• A description of the specific measures to be
implemented, including conceptual drawings, depictions, or similar graphic information for any facilities proposed to be constructed.
![Page 11: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/11.jpg)
Where?• A clear description of where any proposed
measures are to be implemented, including reference to the project boundary.
20 cfsX
![Page 12: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/12.jpg)
When?• Preliminary schedules for implementing the
measures should be referenced to the license issuance date.
![Page 13: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/13.jpg)
How?
• A preliminary description of any stepsnecessary to implement measures.
![Page 14: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/14.jpg)
Why?• A description of the purpose of the measures
and the benefits that they would provide.
• The consultation record leading to the measures.
![Page 15: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/15.jpg)
Cost?
• To facilitate Commission staff’s comprehensive development analysis, costs for implementing each measure should be provided.
![Page 16: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/16.jpg)
When should this information be provided?
• After studies
• Preliminary Licensing Proposal or Draft Application
• License Application
![Page 17: PM&Es: Through the Looking Glass FERC Perspectives](https://reader030.vdocuments.net/reader030/viewer/2022013015/61d003d8f1ba8c76f1576611/html5/thumbnails/17.jpg)
Benefits
• Allows for a comprehensive NEPA analysis in a reasonable time frame
• Sets the stage for early agreement on PM&Es and possible settlement (possibly avoiding the need for EPAct hearings)
• Can expedite license decisions• Gives certainty on the measures and costs
at licensing