pmo balanced scorecard & agile (scrum) demonstration 9 5-12

42
PMO Balanced Scorecard- Release II (Portfolio Management Tool) Dennis Wiggins, GE FMP, PMP, & SSBB CEO / Managing Director Executive Program Management Dashboard, LLC Website: http://www.exec-pm-dashboards.com Email: [email protected] Telephone: (404) 547-3097 yright 9/1/12 for Executive Program Management Dashboard, LLC PMI Atlanta Chapter VP Professional Growth - Jacqueline Grant Lunch & Learn Website: Http://www.cvent.com/events/downto wn-lunch-meeting-130227/custom-17- 36f97d90bee142b3811d05242f4f7d0a.a spx February 27.2013 11:30 AM – 1:00 PM James H. (Sloppy) Floyd Buildin 2 Martin Luther King, Jr. Drive Atlanta, Georgia 30334

Upload: home-executive-program-management-dashboards-llc

Post on 05-Dec-2014

1.334 views

Category:

Technology


0 download

DESCRIPTION

EPMD Deck for PMO Balanced Scorecard & Agile (Scrum) Demonstration for 9/5/12

TRANSCRIPT

Page 1: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO Balanced Scorecard- Release II(Portfolio Management Tool)

Dennis Wiggins, GE FMP, PMP, & SSBBCEO / Managing Director Executive Program Management Dashboard, LLCWebsite: http://www.exec-pm-dashboards.com Email: [email protected]: (404) 547-3097

Copyright 9/1/12 for Executive Program Management Dashboard, LLC

PMI Atlanta ChapterVP Professional Growth - Jacqueline GrantLunch & Learn Website: Http://www.cvent.com/events/downtown-lunch-meeting-130227/custom-17-36f97d90bee142b3811d05242f4f7d0a.aspx

February 27.2013 11:30 AM – 1:00 PM

James H. (Sloppy) Floyd Building2 Martin Luther King, Jr. DriveAtlanta, Georgia 30334

Page 2: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II TABLE OF CONTENTS

PMO Balanced Scorecard – Release II • PMO Agenda (Slide 3)• PMO High Level & Detail Issues (Slides 3-5)• PMO Balanced Scorecard – RII Execution (Slide 6)• PMO Balanced Scorecard Release II Methodology (Slides 7 - 12)• PMO Balanced Scorecard Release II Screenshots (Slides 13 -26)• PMO Balanced Scorecard Release II – Features /Advantages / Benefits (Slides 27 -27)• PMO Balanced Scorecard Release II Registered User Viewing Instructions (Slides 29 -36)• EPMD End User Registration Process – (Slide 36)

Copyright 9/1/12 for Executive Program Management Dashboard, LLC

DYNAMIC PORTFOLIO MANAGEMENT)

Page 3: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II AGENDA

1. High Level Balanced Scorecard Overview Methodology(1 Hour)• Program / Project Roll-up• Balance Scorecard Methodology• Favorable VS Unfavorable Portfolio Range (+/- 10%)• Portfolio VS Project View • Product Demonstration of Functionality

2. January, 2013 GoToMeeting Demonstration – Registration Required (TBD)• Real Time Communication Bridge Executive to Project Core Team• Program / Project Integrated Project Status Reports• Program / Project Scaling Methodology – Portfolio Score Roll-up• Program / Project Collaborative Effectiveness• Program / Project Analysis Templates• Program / Project Interactive Views• Program / Project Reports• Program / Project Document Repository• Link for End-User Register: http://www.exec-pm-dashboards.com/Training.html

PRODUCTIVITY INCREASE PROJECTED BY 45% TO 60% & INCREASED PORTFOLIO MANAGEMENT BY 90%

Page 1 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 4: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II PMO ISSUES

• Limited Products That Measure Overall PMO Portfolio in Balanced Scorecard Methodology

• Affordable Products Capable of Displaying Projects with Balanced Scorecard at Project Level

• Limited Dashboard Functionality Supported by Homegrown Cottage Tools (e.g. Creating Cottage Tools Via Excel to Perform Balanced Scorecard, Program & Project Reporting, Portfolio Reporting, etc. )

• Products Available are Costly (i.e. $500K +) • Examples: MS Project Server / Clarity / Planview

• High Implementation Costs (e.g. MS Project Server / Clarity / Planview)

• Executives in Reactionary Mode to Re-align Programs / Projects to Perform within Budgeted Costs (.i.e. Time / Schedule / Costs)

• Lack of Reporting Integration in Central Communication Portal

• Inaccurate / Fraudulent Project Overall Status Reporting (i.e. R/Y/G)

Highlighting High Level Issues…

Page 2 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 5: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

Page 3 of 27

PMO BALANCED SCORECARD – RELEASE II Portfolio Management Execution

INFORMATION TECHNOLOGY (IT)PORTFOLIO MANAGEMENT

PRODUCTIVITY FOCUS

Page 6: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II Portfolio Management Execution

Executive Level Monitoring & Communication

Core Project Team Monitoring & Communication

PMO BALANCED SCORECARD – RELEASE II

Central Portal for Cross-functional Communication

REAL TIME BRIDGE FOR “TOP DOWN” (EXECUTIVE) & “BOTTOM UP” (CORE PROJECT TEAM) COMMUNICATION Page 4 of 27

Page 7: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II BALANCED SCORECARD HIERARCHY

BALANCED SCORECARD PORTFOLIO ROLL-UP (Scaled 1- 10)

PROGRAMS PROJECTS

PROJECTS

PROJECTS

Program / Project Roll-up…

BALANCE SCORECARD TREEPage 5 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 8: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

BALANCED SCORECARD “WEIGHT”

BALANCED SCORECARD“ACTUALS”

THRESHOLDSSCALED ACCORDING TO PROJECTION

BALANCED SCORECARD PORTFOLIO ROLL-UP (Scaled 1 – 10)

PROJECT (%) TO

PORTFOLIO

MO OR YTD VAR TO BUDGET

THRESHOLDS EXAMPLEWORST (-10) / RED FLAG (-5) / TARGET (0) / BEST (+5) /

GOAL (+10)

PROJECT MANAGER

PROJECT MANAGER

EXECUTIVE OR PROJECT MANAGER

Balanced Scorecard Scoring Methodology…

PROJECT WEIGHT &

THRESHOLDS

ACTUALVARIANCE TO

BUDGET %PMO SCORE IN SPEEDOMETER

PMO BALANCED SCORECARD – RELEASE II BALANCED SCORECARD HIERARCHY

Page 6 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 9: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

• Executive Lag in Portfolio Management Performance

• No PMO Portfolio Measurement Scaling• No Top Down PMO Portfolio Management• Executive Lagging in Issues / Risks; Timing of

Program / Project Updating• Project Status Reporting (Static)• Subjective Program / Project Color Coding of

Project Manager• Lack of Time to Analyze Projects Because of

Multiple Application and Manual Processes• Numerous & Redundant Project Team Emails• Project Status Reporting Performance Metric

– Not Automated• Cross-function Communication Breakdowns;

Increasing Project Costs (Re-work)• Numerous Cross-functional Meetings• Multiple Applications to Extract Project

Information• Timing Issue for Extracting Project Information • Bottom-up Project Management Reporting;

Executive in Reactionary Mode

• Cross-functional Communication Portal• Portfolio Management Balanced Scorecard

Scaling• Establishment of PMO Performance

Thresholds• Real Time Executive & Project Team

Communication• Real Time Communication Bridge of

Executive and Project Manager• Dynamic Program / Project Management

Status Reporting• Dynamic Program / Project Management

Performance Metric Reporting • Automated Program / Project Color Coding• Automated Milestone Tracking • Automated SDLC Phase Tracking & Color

Coding• Past Due Task Alert Notifications• Automated Link to Microsoft for Email

Preparation • Automated Task Updating to Microsoft

Outlook• Increased Project Management Analysis Time

PMO BALANCED SCORECARD – RELEASE II PMO ISSUES / INNOVATION

Current PMO Issues… PMO Balanced Scorecard Release II…

EPMD RELIABLE & SCALABLE PORTFOLIO MANAGEMENT

Page 7 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 10: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II PORTFOLIO SCORING EXAMPLE

SCALERED = 1.00 – 3.33

YELLOW = 3.34 – 6.67GREEN = 6.68 -10.00

BALANCED SCORECARD SCALED 1-10PMO SCORE 5.54 OUT OF 10

PMO SCORE 5.54

Page 8 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 11: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II PMO BALANCE SCORECARD SCREENSHOTS

PMO BALANCE SCORECARD RELEASE II (SCREENSHOTS)

Page 9 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 12: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT)

Page 10 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 13: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

Page 1 of 14

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT)

Page 11 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 14: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EPMD BALANCE SCORECARD PMO BALANCED SCORECARD – RELEASE II

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT) Page 12 of 27

Page 15: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT)

Page 13 of 27

Page 16: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT) Page 14 of 27

Page 17: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT) Page 15 of 27

Page 18: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT)

Page 16 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 19: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

APPLICATION INTEGRATED NOTE FUNCTIONALITY

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

Page 17 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 20: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT)

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

Page 18 of 27

Page 21: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EXAMPLE INDEPENDENT MONTHLY DATA POINTS (I.E.1 DATA POINT)

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

Page 19 of 27

Page 22: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

Page 20 of 27

PMO BALANCED SCORECARD – RELEASE II Portfolio Management Execution

PROGRAM / PROJECT ANALYSIS FUNCTIONALITY

Page 23: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

REAL TIME EXECUTIVE & PROJECT TEAM NOTES FUNCTIONALITY

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

Page 21 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 24: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

Page 22 of 27

PMO BALANCED SCORECARD – RELEASE II Portfolio Management Execution

BUSINESS REQUIREMENTS FOCUS

Page 25: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

Page 23 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

BUSINESS REQUIREMENTS FOCUS WITH INTEGRATED IT METRIC REPORTING; DYNAMIC REAL TIME UPDATING MONTH TO MONTH

Page 26: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD BALANCE SCORECARD

Page 24 of 27

Page 27: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD FAB’S

EPMD BALANCED SCORECARDFEATURES / ADVANTAGES / BENEFITS

Page 25 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 28: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II EPMD FAB’S

• Central Communication Portal

• Balanced Scorecard

• Dashboards

• Strategy Maps

• Briefing Book

• Task Assignments

• Email Alerts

• Multiple Scorecard Views

• Standard Reports • EPMD Financial

Methodology for Portfolio Scaling

• Portfolio / Program / Project Balance Scorecard Score

• Standardization in Program / Project Color Coding & Metrics

• Top Down & Bottom-up Central Communication

• Central Task Assignment & Tracking

• Proactive Strategy Maps to Realign Projects to Goals

• Customization Regardless of SDLC Methodology

• Balanced Scorecard Scoring for Portfolio

• Executive / PM Productivity Increased

• Dashboards Automatically Updated w/Periods

• Audit for Historical Info

• Tailored to Specific PMO Business Needs

• Implementation Less Than 2 to 3 Months with EPMD Consultant

• Low Entry Service as Software (SaaS) Costs for Balanced Scorecard

Features… Advantages… Benefits…

EPMD BALANCED SCORECARD HIGHLIGHTS

EPMD VALUE ADD BALANCED SCORECARD SOLUTION; INCREASES ACCURACY, PRODUCTIVITY & COST EFFECTIVE !!

Page 26 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 29: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

BALANCED SCORECARD “WEIGHT”

BALANCED SCORECARD“ACTUALS”

THRESHOLDSSCALED ACCORDING TO PROJECTION

BALANCED SCORECARD PORTFOLIO ROLL-UP (Scaled 1 – 10)

PROJECT (%) TO

PORTFOLIO

MO OR YTD VAR TO BUDGET

THRESHOLDS EXAMPLEWORST (-10) / RED FLAG (-5) / TARGET (0) / BEST (+5) /

GOAL (+10)

PROJECT MANAGER

PROJECT MANAGER

EXECUTIVE OR PROJECT MANAGER

Balanced Scorecard Scoring Methodology…

PROJECT WEIGHT &

THRESHOLDS

ACTUALVARIANCE TO

BUDGET %PMO SCORE IN SPEEDOMETER

POW

ER USER ($99) / CO

MU

NICATIO

N U

SER ($30)

APP

Central Communication Portal

PMO BALANCED SCORECARD – RELEASE II BALANCED SCORECARD HIERARCHY

Page 27 of 27Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Page 30: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

PMO BALANCED SCORECARD – RELEASE II Portfolio Management Execution

Contacts & Social Media

Page 31: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

END OF PRESENTATION

Copyright 9/1/12 for Executive Program Management Dashboard, LLC

PMO Balanced Scorecard – Release II Contact Info & Social Media

Contact Information:

Executive Program Management Dashboard: http://www.exec-pm-dashboards.com/

End User Registration: http://www.exec-pm-dashboards.com/Training.html

Social Media:

Facebook: http://www.facebook.com/pages/Executive-Program-Management-Dashboard-LLC/434145646598332

Linkedin: http://www.linkedin.com/in/denniswiggins

Twitter: https://twitter.com/#!/pm_dashboard

EXHIBIT C

Page 32: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

Copyright 9/1/12 for Executive Program Management Dashboard, LLC

Executive Program Management Dashboard Agile Screenshots

AGILE PRODUCT

Page 1 of 11

Page 33: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EPMD Agile – General Tab

Page 2 of 11

Page 34: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EPMD Agile -Stories Tab

Page 3 of 11

Page 35: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EPMD Agile – Tracking Chart Tab

Page 4 of 11

Page 36: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EPMD Agile – Scope Chart Tab

Page 5 of 11

Page 37: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

Page 6 of 11

EPMD Agile – Scope Chart Tab

Page 38: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

Page 7 of 11

EPMD Agile – Scope Chart Tab

Page 39: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EPMD Copyright 9/1/12 Page 8 of 11

EPMD Agile – Story Readiness Report Tab

Page 40: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

Page 9 of 11

EPMD Agile – Summary Report Tab

Page 41: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

EPMD Copyright 9/1/12 Page 10 of 11

EPMD Agile – Workload Report Tab

Page 42: PMO Balanced Scorecard & Agile (Scrum) Demonstration  9 5-12

END OF AGILE (SCRUM ) SCREEN SHOTS

Page 11 of 11