point meadows 230/26kv substation & …

10
INSTALLATION OF FOR THE CONSTRUCTION DRAWINGS SHEET NO. TITLE FILENAME DRAWING NO. PM152CV1 SHEET NO. TITLE FILENAME INDEX TO TRANSMISSION DRAWINGS INDEX TO SUBSTATION DRAWINGS INVITATION FOR BIDS # 085-16 LOCATION MAP NOT TO SCALE PROJECT LOCATION 7754 POINT MEADOWS DRIVE P o i n t Mea do w s Dr B a y m e a d o w s R o a d B a y mea do w s R d E a s t B a y m e a d o w s R o a d B a y mea do w s R d E a s t 15 OF 15 14 OF 15 13 OF 15 12 OF 15 11 OF 15 10 OF 15 9 OF 15 8 OF 15 7 OF 15 6 OF 15 5 OF 15 4 OF 15 3 OF 15 2 OF 15 1 OF 15 TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG TR1304.DWG P R O J E C T # 8001210 AND8001208 ANDR EL AY E NG I N EE R I NG T R AN S M I SS I ON , S U B S T A T I ON , P R O J E C T D E S I GNS E G M E N T 20410 946/956 INTERCONNECT & TRANSMISSION CIRCUIT 230/26KV SUBSTATION POINT MEADOWS STR #113A TO #114 STRINGING CHART STR #113B TO #113A STRINGING CHART STR #S11(B) TO #113B STRINGING CHART STR #112B TO #S11(A) STRINGING CHART STR #112A TO #112B STRINGING CHART STR #110 TO #112A STRINGING CHART STR #113B CONFIGURATION STR #113A CONFIGURATION STR #112B CONFIGURATION STR #112A CONFIGURATION FOUNDATION DESIGN DETAILS A AND B PLAN / PROFILE NOTES / STANDARDS / LEGEND COVER SHEET 80 OF 80 79 OF 80 78 OF 80 77 OF 80 76 OF 80 75 OF 80 74 OF 80 73 OF 80 72 OF 80 71 OF 80 70 OF 80 69 OF 80 68 OF 80 67 OF 80 66 OF 80 65 OF 80 64 OF 80 63 OF 80 62 OF 80 61 OF 80 60 OF 80 59 OF 80 58 OF 80 57 OF 80 56 OF 80 55 OF 80 54 OF 80 53 OF 80 52 OF 80 51 OF 80 50 OF 80 49 OF 80 48 OF 80 47 OF 80 46 OF 80 45 OF 80 44 OF 80 43 OF 80 42 OF 80 41 OF 80 40 OF 80 39 OF 80 38 OF 80 37 OF 80 36 OF 80 35 OF 80 34 OF 80 33 OF 80 32 OF 80 31 OF 80 30 OF 80 29 OF 80 28 OF 80 27 OF 80 26 OF 80 25 OF 80 24 OF 80 23 OF 80 22 OF 80 21 OF 80 20 OF 80 19 OF 80 18 OF 80 17 OF 80 16 OF 80 15 OF 80 14 OF 80 13 OF 80 12 OF 80 11 OF 80 10 OF 80 9 OF 80 8 OF 80 7 OF 80 6B OF 80 6A OF 80 5B OF 80 5A OF 80 4 OF 80 3 OF 80 2 OF 80 1 OF 80 STATION SERVICE AND YARD PANELS FIBER DETAILS DISTRIBUTION CONDUIT DETAILS CONDUIT DETAILS SHEET 4 CONDUIT DETAILS SHEET 3 CONDUIT DETAILS SHEET 2 CONDUIT DETAILS SHEET 1 FIBER CONDUIT PLAN DISTRIBUTION CONDUIT PLAN SECURITY CONDUIT PLAN SHEET 2 SECURITY CONDUIT PLAN SHEET 1 EQUIPMENT CONDUIT PLAN SHEET 2 EQUIPMENT CONDUIT PLAN SHEET 1 GROUDNING DETAILS SHEET 3 GROUDNING DETAILS SHEET 2 GROUNDING DETAILS SHEET 1 GROUNDING PLAN CONTROL HOUSE DETAILS SHEET 2 CONTROL HOUSE DETAILS SHEET 1 CONTROL HOUSE RACEWAY PLAN CONTROL HOUSE ELECTRICAL PLAN CONTROL HOUSE ARRANGEMENT PLAN CONTROL HOUSE PLUMBING DETAILS CONTROL HOUSE PLUMBING PLAN CONTROL HOUSE CONSTRUCTION DETAILS CONTROL HOUSE SECTIONS SHEET 2 CONTROL HOUSE SECTIONS SHEET 1 CONTROL HOUSE ELEVATIONS CONTROL HOUSE PLAN CONTROL HOUSE NOTES FOUNDATION DETAILS SHEET 3 FOUNDATION DETAILS SHEET 2 FOUNDATION DETAILS SHEET 1 FOUNDATION PLAN ELECTRICAL DETAILS SHEET 3 ELECTRICAL DETAILS SHEET 2 ELECTRICAL DETAILS SHEET 1 26KV ELECTRICAL SECTIONS C, D, E, F, G 230/26KV ELECTRICAL SECTIONS C, D, E, F 230KV ELECTRICAL SECTIONS A, B 26KV ELECTRICAL PLAN 230KV ELECTRICAL PLAN MASTER ELECTRICAL PLAN SINGLE LINE DIAGRAM LANDSCAPE IRRIGATION PLAN SHEET 2 LANDSCAPE IRRIGATION PLAN SHEET 1 LANDSCAPE PLAN SHEET 3 LANDSCAPE PLAN SHEET 2 LANDSCAPE PLAN SHEET 1 PEDESTRIAN TRAFFIC CONTROL TRAFFIC CONTROL SHEET 4 TRAFFIC CONTROL SHEET 3 TRAFFIC CONTROL SHEET 2 TRAFFIC CONTROL SHEET 1 EROSION CONTROL SHEET 3 EROSION CONTROL SHEET 2 EROSION CONTROL SHEET 1 WATER AND SEWER DETAILS WATER AND SEWER PLAN GATE DETAILS FENCING DETAILS SHEET 2 FENCING DETAILS SHEET 1 SITE DETAILS SHEET 3 SITE DETAILS SHEET 2 SITE DETAILS SHEET 1 DRAINAGE PLAN SHEET 2 DRAINAGE PLAN SHEET 1 GRADING PLAN ACCESS ROAD SHEET 3 ACCESS ROAD SHEET 2 ACCESS ROAD SHEET 1 RETAINING WALL SHEET 3 RETAINING WALL SHEET 2 RETAINING WALL SHEET 1 SITE PLAN SHEET 4 SITE PLAN SHEET 3 SITE PLAN SHEET 2 SITE PLAN SHEET 1 CLEARING AND TREE REMOVAL SHEET 2 CLEARING AND TREE REMOVAL SHEET 1 GENERAL NOTES COVER SHEET PM152LV1.DGN PM152CD6.DGN PM152CD5.DGN PM152CD4.DGN PM152CD3.DGN PM152CD2.DGN PM152CD1.DGN PM152CP6.DGN PM152CP5.DGN PM152CP4.DGN PM152CP3.DGN PM152CP2.DGN PM152CP1.DGN PM152GD3.DGN PM152GD2.DGN PM152GD1.DGN PM152GP1.DGN PM152CE5.DGN PM152CE4.DGN PM152CE3.DGN PM152CE2.DGN PM152CE1.DGN PM152PB2.DGN PM152PB1.DGN PM152CH6.DGN PM152CH5.DGN PM152CH4.DGN PM152CH3.DGN PM152CH2.DGN PM152CH1.DGN PM152FD3.DGN PM152FD2.DGN PM152FD1.DGN PM152FP1.DGN PM152ED3.DGN PM152ED2.DGN PM152ED1.DGN PM152E52.DGN PM152E51.DGN PM152E91.DGN PM152EP3.DGN PM152EP2.DGN PM152EP1.DGN PM152SL1.DGN PM152IR2.DGN PM152IR1.DGN PM152LP3.DGN PM152LP2.DGN PM152LP1.DGN PM152TC5.DGN PM152TC4.DGN PM152TC3.DGN PM152TC2.DGN PM152TC1.DGN PM152EC3.DGN PM152EC2.DGN PM152EC1.DGN PM152WD1.DGN PM152WP1.DGN PM152SD6.DGN PM152SD5.DGN PM152SD4.DGN PM152SD3.DGN PM152SD2.DGN PM152SD1.DGN PM152GR3.DGN PM152GR2.DGN PM152GR1.DGN PM152RD3.DGN PM152RD2.DGN PM152RD1.DGN PM152RW3.DGN PM152RW2.DGN PM152RW1.DGN PM152SP6.DGN PM152SP5.DGN PM152SP4.DGN PM152SP3.DGN PM152SP2.DGN PM152SP1.DGN PM152GN1.DGN PM152CV1.DGN

Upload: others

Post on 20-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: POINT MEADOWS 230/26KV SUBSTATION & …

INSTALLATION OF

FOR THE

CONSTRUCTION DRAWINGS

SHEET NO. TITLE FILENAME

DRAWING NO. PM152CV1

SHEET NO. TITLE FILENAME

INDEX TO TRANSMISSION DRAWINGS

INDEX TO SUBSTATION DRAWINGS

INVITATION FOR BIDS # 085-16

LOCATION MAP

NOT TO SCALE

PROJECT LOCATION7754 POINT MEADOWS DRIVE

Point

Meado

ws Dr

Baymeadows Road Baymeado

ws Rd East

Baymeadows Road Baymeado

ws Rd East

15 OF 15

14 OF 15

13 OF 15

12 OF 15

11 OF 15

10 OF 15

9 OF 15

8 OF 15

7 OF 15

6 OF 15

5 OF 15

4 OF 15

3 OF 15

2 OF 15

1 OF 15

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

TR1304.DWG

PROJECT # 8001210 AND 8001208

AND RELAY ENGINEERING

TRANSMISSION, SUBSTATION,

PROJECT DESIGN SEGMENT 20410

946/956 INTERCONNECT

& TRANSMISSION CIRCUIT

230/26KV SUBSTATION

POINT MEADOWS

STR #113A TO #114 STRINGING CHART

STR #113B TO #113A STRINGING CHART

STR #S11(B) TO #113B STRINGING CHART

STR #112B TO #S11(A) STRINGING CHART

STR #112A TO #112B STRINGING CHART

STR #110 TO #112A STRINGING CHART

STR #113B CONFIGURATION

STR #113A CONFIGURATION

STR #112B CONFIGURATION

STR #112A CONFIGURATION

FOUNDATION DESIGN

DETAILS A AND B

PLAN / PROFILE

NOTES / STANDARDS / LEGEND

COVER SHEET

80 OF 80

79 OF 80

78 OF 80

77 OF 80

76 OF 80

75 OF 80

74 OF 80

73 OF 80

72 OF 80

71 OF 80

70 OF 80

69 OF 80

68 OF 80

67 OF 80

66 OF 80

65 OF 80

64 OF 80

63 OF 80

62 OF 80

61 OF 80

60 OF 80

59 OF 80

58 OF 80

57 OF 80

56 OF 80

55 OF 80

54 OF 80

53 OF 80

52 OF 80

51 OF 80

50 OF 80

49 OF 80

48 OF 80

47 OF 80

46 OF 80

45 OF 80

44 OF 80

43 OF 80

42 OF 80

41 OF 80

40 OF 80

39 OF 80

38 OF 80

37 OF 80

36 OF 80

35 OF 80

34 OF 80

33 OF 80

32 OF 80

31 OF 80

30 OF 80

29 OF 80

28 OF 80

27 OF 80

26 OF 80

25 OF 80

24 OF 80

23 OF 80

22 OF 80

21 OF 80

20 OF 80

19 OF 80

18 OF 80

17 OF 80

16 OF 80

15 OF 80

14 OF 80

13 OF 80

12 OF 80

11 OF 80

10 OF 80

9 OF 80

8 OF 80

7 OF 80

6B OF 80

6A OF 80

5B OF 80

5A OF 80

4 OF 80

3 OF 80

2 OF 80

1 OF 80

STATION SERVICE AND YARD PANELS

FIBER DETAILS

DISTRIBUTION CONDUIT DETAILS

CONDUIT DETAILS SHEET 4

CONDUIT DETAILS SHEET 3

CONDUIT DETAILS SHEET 2

CONDUIT DETAILS SHEET 1

FIBER CONDUIT PLAN

DISTRIBUTION CONDUIT PLAN

SECURITY CONDUIT PLAN SHEET 2

SECURITY CONDUIT PLAN SHEET 1

EQUIPMENT CONDUIT PLAN SHEET 2

EQUIPMENT CONDUIT PLAN SHEET 1

GROUDNING DETAILS SHEET 3

GROUDNING DETAILS SHEET 2

GROUNDING DETAILS SHEET 1

GROUNDING PLAN

CONTROL HOUSE DETAILS SHEET 2

CONTROL HOUSE DETAILS SHEET 1

CONTROL HOUSE RACEWAY PLAN

CONTROL HOUSE ELECTRICAL PLAN

CONTROL HOUSE ARRANGEMENT PLAN

CONTROL HOUSE PLUMBING DETAILS

CONTROL HOUSE PLUMBING PLAN

CONTROL HOUSE CONSTRUCTION DETAILS

CONTROL HOUSE SECTIONS SHEET 2

CONTROL HOUSE SECTIONS SHEET 1

CONTROL HOUSE ELEVATIONS

CONTROL HOUSE PLAN

CONTROL HOUSE NOTES

FOUNDATION DETAILS SHEET 3

FOUNDATION DETAILS SHEET 2

FOUNDATION DETAILS SHEET 1

FOUNDATION PLAN

ELECTRICAL DETAILS SHEET 3

ELECTRICAL DETAILS SHEET 2

ELECTRICAL DETAILS SHEET 1

26KV ELECTRICAL SECTIONS C, D, E, F, G

230/26KV ELECTRICAL SECTIONS C, D, E, F

230KV ELECTRICAL SECTIONS A, B

26KV ELECTRICAL PLAN

230KV ELECTRICAL PLAN

MASTER ELECTRICAL PLAN

SINGLE LINE DIAGRAM

LANDSCAPE IRRIGATION PLAN SHEET 2

LANDSCAPE IRRIGATION PLAN SHEET 1

LANDSCAPE PLAN SHEET 3

LANDSCAPE PLAN SHEET 2

LANDSCAPE PLAN SHEET 1

PEDESTRIAN TRAFFIC CONTROL

TRAFFIC CONTROL SHEET 4

TRAFFIC CONTROL SHEET 3

TRAFFIC CONTROL SHEET 2

TRAFFIC CONTROL SHEET 1

EROSION CONTROL SHEET 3

EROSION CONTROL SHEET 2

EROSION CONTROL SHEET 1

WATER AND SEWER DETAILS

WATER AND SEWER PLAN

GATE DETAILS

FENCING DETAILS SHEET 2

FENCING DETAILS SHEET 1

SITE DETAILS SHEET 3

SITE DETAILS SHEET 2

SITE DETAILS SHEET 1

DRAINAGE PLAN SHEET 2

DRAINAGE PLAN SHEET 1

GRADING PLAN

ACCESS ROAD SHEET 3

ACCESS ROAD SHEET 2

ACCESS ROAD SHEET 1

RETAINING WALL SHEET 3

RETAINING WALL SHEET 2

RETAINING WALL SHEET 1

SITE PLAN SHEET 4

SITE PLAN SHEET 3

SITE PLAN SHEET 2

SITE PLAN SHEET 1

CLEARING AND TREE REMOVAL SHEET 2

CLEARING AND TREE REMOVAL SHEET 1

GENERAL NOTES

COVER SHEET

PM152LV1.DGN

PM152CD6.DGN

PM152CD5.DGN

PM152CD4.DGN

PM152CD3.DGN

PM152CD2.DGN

PM152CD1.DGN

PM152CP6.DGN

PM152CP5.DGN

PM152CP4.DGN

PM152CP3.DGN

PM152CP2.DGN

PM152CP1.DGN

PM152GD3.DGN

PM152GD2.DGN

PM152GD1.DGN

PM152GP1.DGN

PM152CE5.DGN

PM152CE4.DGN

PM152CE3.DGN

PM152CE2.DGN

PM152CE1.DGN

PM152PB2.DGN

PM152PB1.DGN

PM152CH6.DGN

PM152CH5.DGN

PM152CH4.DGN

PM152CH3.DGN

PM152CH2.DGN

PM152CH1.DGN

PM152FD3.DGN

PM152FD2.DGN

PM152FD1.DGN

PM152FP1.DGN

PM152ED3.DGN

PM152ED2.DGN

PM152ED1.DGN

PM152E52.DGN

PM152E51.DGN

PM152E91.DGN

PM152EP3.DGN

PM152EP2.DGN

PM152EP1.DGN

PM152SL1.DGN

PM152IR2.DGN

PM152IR1.DGN

PM152LP3.DGN

PM152LP2.DGN

PM152LP1.DGN

PM152TC5.DGN

PM152TC4.DGN

PM152TC3.DGN

PM152TC2.DGN

PM152TC1.DGN

PM152EC3.DGN

PM152EC2.DGN

PM152EC1.DGN

PM152WD1.DGN

PM152WP1.DGN

PM152SD6.DGN

PM152SD5.DGN

PM152SD4.DGN

PM152SD3.DGN

PM152SD2.DGN

PM152SD1.DGN

PM152GR3.DGN

PM152GR2.DGN

PM152GR1.DGN

PM152RD3.DGN

PM152RD2.DGN

PM152RD1.DGN

PM152RW3.DGN

PM152RW2.DGN

PM152RW1.DGN

PM152SP6.DGN

PM152SP5.DGN

PM152SP4.DGN

PM152SP3.DGN

PM152SP2.DGN

PM152SP1.DGN

PM152GN1.DGN

PM152CV1.DGN

Page 2: POINT MEADOWS 230/26KV SUBSTATION & …
Page 3: POINT MEADOWS 230/26KV SUBSTATION & …
Page 4: POINT MEADOWS 230/26KV SUBSTATION & …
Page 5: POINT MEADOWS 230/26KV SUBSTATION & …
Page 6: POINT MEADOWS 230/26KV SUBSTATION & …
Page 7: POINT MEADOWS 230/26KV SUBSTATION & …
Page 8: POINT MEADOWS 230/26KV SUBSTATION & …
Page 9: POINT MEADOWS 230/26KV SUBSTATION & …
Page 10: POINT MEADOWS 230/26KV SUBSTATION & …

BR2

BR2 90°

BASELINE

EAST-WEST

BA

SE

LIN

E

NO

RT

H-S

OU

TH

PP3PP2

PP1

19'-0"

6'-0"

6'-0"

6'-0"

6'-0"

6'-0"

6'-0"

12'-0"

14'-0"

21'-0"16'-0"24'-0"18'-9"15'-6"11'-0"14'-0" 8'-0"21'-0"

5'-0"6'-6"6'-6"5'-0"5'-6"

5'-6"5'-6"

28'-0"

19'-0"

19'-0"

28'-0"

28'-0"

21'-0"

21'-0"

28'-0"

6'-6"

6'-6"

14'-0"

12'-0"

12'-0"

14'-0"

S11 S11

S11S11

S12 S12

S17

S17

1'-0"

S17

S17

S17

S17

1'-0"

S12 S12S12

S12 S12S12

S12 S12

S12 S12

S12

S12 S12

S12

S12

S12

S12 S12

S11

BR1

BR1

BR1

BR1

7'-6"

10'-9"

S1

S1

S1

S1 S1

S1

S1

S1 S1

S2

S3

S3S3

S3

S3

S3

S3

S3

S3S3

S3

S3 S3

S3

S4S4

S1

10'-0"

10'-0"

12'-6" 2'-0"

CB1

BR2

8'-0"21'-0"21'-0"16'-0"24'-0"

5'-0" 6'-6"6'-6"

3'-0"

5'-0"

2'-0"

6'-6"

13'-3"

6'-0"6'-0"5'-0"

ENGINEERING

DRAFTING

BY

BY

DATE

DATE

DESIGN FILENAME:

DRAWING NO.:

SHEET NO.:

SCALE: IFB. NO.:

DESIGNED

CHECKED

APPROVED

PRELIMINARY

FINAL DESIGN

AS BUILT

BY DATE APPROVEDNO. REVISIONS TO DRAWING

PROJECT DESIGN SEGMENT 20410

1

230/26kV LOW PROFILE SUBSTATION

2 JWR

JWR

JWR

3

LJG 4-28-15

4-28-15

4-28-15

4-28-15

INSTALLATION OF POINT MEADOWS SUBSTATION

FOUNDATION PLAN

PM152FP1.DGN

PM-23026-15

47 OF 80

030' 30' 60'15'

1" = 15'

S18

S18

S18

JWR LJG

TR1

085-16

83'-10 7/8 "

4'-2"

3'-4"

1.

FOUNDATION PLAN NOTES

2.

POLES, ETC. ARE SHOWN ELSEWHERE IN THIS DRAWING SET.

FOUNDATIONS FOR THE CONTROL HOUSE, HVAC UNITS, PERIMETER SECURITY

FOUNDATIONS ONLY FOR MAJOR SUBSTATION YARD EQUIPMENT ARE SHOWN HERE.

3.

4.

NOT MOVE IN A HORIZONTAL DIRECTION.

JUMPER FROM BUS WILL DROP IN A STRICTLY VERTICAL DIRECTION AND DOES

(S17) HAVE BEEN OFFSET BY A DISTANCE OF ONE (1) FEET SO THAT THE

A-FRAME. THE FOUNDATIONS FOR THE SINGLE PHASE POTENTIAL TRANSFORMERS

STRUCTURES. THE CENTER OF 230KV BREAKERS SHOULD MATCH THE CENTER OF

BR2 FOUNDATIONS WITHIN THE VICINITY OF THE SUBSTATION A-FRAME

THE CONTRACTOR SHOULD PAY CLOSE ATTENTION WHEN INSTALLING THE S12 AND

REPORT AND ABIDE BY THEM.

ATTENTION TO THE SITE PREPARATION RECOMMENDATIONS OUTLINED BY THE

DOCUMENTS OF THIS PROJECT. THE CONTRACTOR SHALL PAY SPECIFIC

ASSOCIATES ENGINEERING," AND IS ATTACHED AS AN APPENDIX TO BIDDING

SUBSURFACE SOIL CONDITIONS. THIS REPORT WAS PREPARED BY "MESKEL &

GEOTECHNICAL EXPLORATION REPORT FOR INFORMATION REGARDING THE SITE

IT IS OF EXTREME IMPORTANCE FOR THE CONTRACTOR TO REVIEW THE

REMOVAL, SOIL EXCAVATION AND/OR BACKFILLING.

RECOMMENDATIONS FOR SITE PREPARATION, COMPACTION REQUIREMENTS, MUCK

THE CONTRACTOR SHALL FULLY ADHERE TO THE GEOTECHNICAL SOIL REPORT

SEE FD1 NOTE 16 FOR THE INSTALLATION OF 85' PROBE POLES (PP1~PP3)

S4

S2

S11 S11

S11

7'-6"

7'-6"

05-12-16ADDED MORE ANCHOR BOLTS TO BR1

BASELINE

EAST-WEST 90°

SP2

X

X

X

XXXX XXX

X

X

X

X

XX

XX

XX

X

CONTROL HOUSE

XX

X

XX

XX

XX

XX

XXXXX

X

XX

X

X

X

SP3