pointe du bois - manitoba

5
± DATA SOURCE: Pointe du Bois Spillway Replacement Project Coordinate System: UTM NAD 1983 Z15 Manitoba Hydro, North/South Consultants DATE CREATED: CREAT ED BY: REVISION NO: REVISION DATE: QA/QC: VERSION 1.0 SB/MWZ 0 0.04 0.08 Miles 0 0.1 0.2 Kilometres 24 May 11 North/South Consultants 07 Jun 11 50 th Percentile Flow Walleye Habitat Suitability Index Post Project Figure: 8.9A File Location: G:\EIS\Pointe_du_Bois\PublishedMXD\Figures20110526\20110607_PDB_WalleyeHSI_PP50_BTB_sg_cp.mxd Legend Pointe du Bois G.S. Existing Infrastructure Suitable Walleye Habitat (Spawning/Egg Deposition) Post Project Infrastructure

Upload: others

Post on 16-Jun-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pointe du Bois - Manitoba

±

DATA SOURCE: Pointe du BoisSpillway Replacement ProjectCoordinate System: UTM NAD 1983 Z15 Manitoba Hydro, North/South Consultants

DATE CREATED: CREATED BY:

REVISION NO: REVISION DATE: QA/QC:

VERSION 1.0 SB/MWZ0 0.04 0.08 Miles

0 0.1 0.2 Kilometres 24 May 11 North/South Consultants

07 Jun 11

50th Percentile FlowWalleye Habitat Suitability IndexPost Project

Figure:8.9A

File L

ocat

ion: G

:\EIS\

Poin

te_du

_Boi

s\Pub

lishe

dMXD

\Figu

res20

1105

26\2

0110

607_

PDB_

Walle

yeHS

I_PP5

0_BT

B_sg

_cp.m

xd

Legend

Po inte du Bo is G.S .

Existing Infrastructure

Suitable Walleye Habitat (Spawning/Egg Deposition)Post Project Infrastructure

Page 2: Pointe du Bois - Manitoba

±

DATA SOURCE: Pointe du BoisSpillway Replacement ProjectCoordinate System: UTM NAD 1983 Z15 Manitoba Hydro, North/South Consultants

DATE CREATED: CREATED BY:

REVISION NO: REVISION DATE: QA/QC:

VERSION 1.0 SB/MWZ0 0.04 0.08 Miles

0 0.1 0.2 Kilometres 24 May 11 North/South Consultants

07 Jun 11

95th Percentile FlowWalleye Habitat Suitability IndexPost Project

Figure:8.9B

File L

ocat

ion: G

:\EIS\

Poin

te_du

_Boi

s\Pub

lishe

dMXD

\Figu

res20

1105

26\2

0110

607_

PDB_

Walle

yeHS

I_PP9

5_BT

B_sg

_cp.m

xd

Legend

Po inte du Bo is G.S .

Existing Infrastructure

Suitable Walleye Habitat (Spawning/Egg Deposition)Post Project Infrastructure

Page 3: Pointe du Bois - Manitoba

WINNIPEG RIVER

LAC DU BONNET

LAKE WINNIPEG

Pinawa Channel

307

317

315

314

213

435

313

302

214 520

408 309206 212

302

Libau

Pinawa

Dugald

Gimili

Teulon

SelkirkStonewall

Powerview

Birds Hill

Pine Falls

Fraserwood

Clandeboye

Whitemouth

Beausejour

Grand Beach

Milner Ridge

Lac du Bonnet

Stony Mountain

Victoria Beach

Winnipeg

Selkirk G.S.

McArthur G.S.

Pine Falls G.S.

Great Falls G.S.

Slave Falls G.S.

Seven Sisters G.S.

Pointe du Bois G.S.

DATA SOURCE: Pointe du BoisSpillway Replacement Project

File L

ocati

on: W

:\War

ehou

se_G

roup

s\Pow

er_S

upply

\Pro

jects\

Point

eDuB

ois\M

aps\E

IS_F

igure

s_20

11\P

DB_F

IGxx

_Pro

jectP

refer

ence

Zone

.mxd

Manitoba Hydro, Government of Canada,Province of Manitoba

DATE CREATED: CREATED BY:

REVISION NO: REVISION DATE: QA/QC:

VERSION 1.0 MWZ0 3 6 Miles

0 8 16 Kilometres 24 MAY 2011 HPP - GIS & Special Studies

24 MAY 2011

Legend

Preference Zone

Generating Stations (G.S)

Provincial Parks

Reserve Land

ROAD - GENERAL

RAIL LINE Project Preference ZoneFigure:

8.10

GillamThompson

Winnipeg

Churchill Hudson Bay

Flin Flon

LakeManitoba

Brandon

LakeWinnipeg

The Pas

Dauphin

90°W

90°W

95°W

95°W

100°W

100°W

105°W

105°W60°N

55°N55°N

50°N50°N

Page 4: Pointe du Bois - Manitoba

DATA SOURCE: Pointe du BoisSpillway Replacement Project

File L

ocati

on:

Manitoba Hydro, SMM Inc.

DATE CREATED: CREATED BY:

REVISION NO: REVISION DATE: QA/QC:

VERSION 1.0 RHP, MWZ

10 JUNE 2011 HPP - Pointe du Bois Planning

14 JUNE 2011Artistic Rendition - View of Spillway Structures,

Facing DownstreamFigure:8.11A

Primary SpillwaySecondary Spillway

East Bank

Page 5: Pointe du Bois - Manitoba

DATA SOURCE: Pointe du BoisSpillway Replacement Project

File L

ocati

on:

Manitoba Hydro, SMM Inc.

DATE CREATED: CREATED BY:

REVISION NO: REVISION DATE: QA/QC:

VERSION 1.0 RHP, MWZ

10 JUNE 2011 HPP - Pointe du Bois Planning

14 JUNE 2011Artistic Rendition - View of Spillway Structures,

Facing UpstreamFigure:8.11B

Primary SpillwaySecondary Spillway

East Bank