POMEC AND BUILDING ANALYTICS
David Chokolich,General Technical Services
HFM Asset Management29 October 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management Conference
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
POMEC (Property Operation Maintenance & Energy Cost)
Its not a new thing…
Circa 1998…
POMEC
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
• Engineering Review
• 58 Hotels (Australia-wide)
Group 1 Group 2
• 48 Hotels (Australia-wide)
• HVAC Services Tender / Cost Benchmarks
RECENT PROJECTS
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Building efficiency requires continual assessment and strategies for improvement.REVIEW There is no way of knowing where to go, if you don’t know where you are.VERIFYAre you sure your data is accurate?COMPLYUnderstand your performance and receive industry recognisedacknowledgement of your performance.PROCUREWhy pay more than you should?PERFORMIf we do not change our direction, we are likely to end up where we are headed.IMPROVERetrofit to compete
Building Efficiency
BUILDING EFFICIENCY
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
The first step towards reaching the full potential of any asset is gaining a detailed understanding of the current statusand condition of that asset. Pick a starting point, establish the baseline and then find the opportunities.
• Benchmark Property Operations Maintenance and Energy Costs (POMEC);• Site visit;• Document all major assets and review the condition and status of all infrastructure assets;• Review all infrastructure service contracts;• Benchmark the Essential Services Compliance Status of each hotel;• Review compliance related to electrical (RCD testing, Testing and Tagging) / hydraulic requirements (water
temperatures, tempering valve testing, backflow protection testing);• Provided a condition report and Capital Works Plan - 10 year
Asset Management Review
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
• Reviewed all current HVAC Costs Preventative and Reactive (Breakdown & repairs)• Established some KPI’s including
- Total Expenditure $ / Room- Contract Expenditure $ / Room- Reactive Expenditure $ / Room- Reactive Vs Preventative Ratio- Insourcing Vs Outsourcing Ratio- HVAC Costs / Fire Costs / Elevator Costs
HVAC Service Review
HVAC Services Tender – Group 2
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
Documentation
A formal “Request for Information” (RFI) was issued to all sites, see sample below. On average approximately 36% ofthe requested information was provided. This is considered poor and demonstrates a lack of knowledge of themanagement requirements of these assets.
Staff had Limited knowledge of there role
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
COST CENTRE EXPENDITURE
R&M 33.4%
R&M Payroll 14.2%
Electricity 29.8%
Gas 9.5%
Water 13.1%
TOTAL 100%
Stage 1 – Outcomes, Results and Evidence
Property Operations Maintenance and Energy Costs (POMEC) - Controllable Costs
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
Property Operations Maintenance and Energy Costs (POMEC) - Controllable Costs
Normal Mix R&M – 55% Utilities 45%
Alarm Bells!!
R&M48%
Utilities52%
R&M VS UTILITY EXPENDITURE 2017 - 2018
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
POMEC Cost / Room $6,616
R&M Cost / Room $2,272
Maintenance Wages / Room $899
Insourcing Vs Sourcing Ratio 1 : 2.9 (1 : 11)
1 Maintenance employee 89 rooms
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
Benchmarking
HVAC $ / Room $237
**HVAC Breakdown Vs Contract 2.5 : 1 (0.3 – 5.3)
Fire $ / Room $236
Fire / Breakdown Vs Contract 2.2 : 1 (0.5 – 4.4)
** Note all sites that had a high HVAC ratio had very high energy costs!!
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
Elevator Contracts
Annual Expenditure / elevator / p.a. $8,333 ($6,050 to $16,450)
Annual Expenditure / door opening $1,101
Contracts in rollover 45%
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
Insourced Vs Outsourced Staff
Ratio 1 : 2.9 (Range 1 : 11)
Maintenance personnel with formal qualifications (trade, diploma, certificate or degree)
Australia 6%
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
Essential Services Compliance
• Significant inconsistencies across the properties• Limited Contracts and service reports in place• Significant risk if not addressed
Compliance status 67% (range 12% - 95%)
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
NABERS RATING – 0-6 star
The average “Indicative” NABERS Ratings were
Energy 2.9 star Range 1.0 star – 4 star (Below average)Water 3.0 star Range 1.0 Star – 5 star (Average)
Major concern – all new 5 star hotels were not great performers 2.5 - 3.5 star
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes and Recommendations
Outcomes
- Limited Service contracts in place across all services- No formal management system in place to manage the buildings- Very high POMEC costs- Sites with high maintenance costs had high energy costs (9 : 1)- Poor compliance (Risk)- Limited management of contractors induction etc.- Unskilled workforce, limited knowledge of the Eng. role- Significant capex required to get sites back to the basics- Significant client complaints
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes and Recommendations
Recommendations
- Articulate the issues and recommendations to the hotel GM and the board- Set minimum skills requirements for staff depending on the size of the asset- Deployment of a Asset Management and Maintenance System- Formally tender all services- Engage an energy consultant to have a closer look at utilities issues- Enforce minimum requirements for the Essential services maintenance- Training program for hotel maintenance staff and hotel managers- Deployment of ongoing Analytics (Health Check)- Ongoing financial Benchmarking reviews and site audits- Review capital works requirements ongoing
Engineering Review – Group 1
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Review HVAC Services
Reviewed and Benchmarked all the current costs covering
- Contract Maintenance
- Reactive Maintenance
Contract Expenditure $82 / Room / p.a.
Reactive Maintenance $88 / Room / p.a.
Total Expenditure $170 / Room / p.a.
HVAC Ratio 1.07
“On the surface this outcome looks OK”
Review HVAC Services – Group 2
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
• Benchmarked their current maintenance hours
- Maintenance hours (contracted)
- Maintenance Forecast hours
Current hours p.a. - 4051 Vs Forecast hours (8,000 – 10,000)
Alarm Bells !!
Review HVAC Services – Group 2
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 1 – Outcomes, Results and Evidence
Developed a formal specification and tendered the HVAC services covering
- AC infrastructure maintenance- Room AC maintenance- Hot Water / Boiler Systems- BMS- Water Treatment- Electrical- Statutory Essential Services
Outcomes (based on 3 shortlisted suppliers)Mean average hours of maintenance 8,655 p.a.
** Noting the incumbent contractor had increased his hours from 4051 to 8720
Alarm Bells Confirmed !!!
Review HVAC Services – Group 2
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Stage 2 – Outcomes and Recommendations
- Confirm new contracts as per tendered outcomes- Articulate the lack of maintenance / management to the Hotel GM’s and the board- Deployment of a Asset Management and Maintenance System- Employ a Senior Technical Manager to the group (currently no one in place)- Deployment of ongoing Analytics (Health Check)- Ongoing financial Benchmarking reviews and site audits- Review capital works requirements ongoing
Review HVAC Services – Group 2
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
- The data highlighted the management issues in both organisations.- The review forced a change in management thinking and processes- It was accepted internally that the current maintenance structure was not working- Need to re-educate and reskill and provide training to maintenance staff- Ensure that level playing field is in place when looking at service contracts and system management- Data is critical in better managing assets
Key Learnings
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
There is a clearly a role for industry bodies such as the FMA, Australian Institute of HotelEngineering, Institute of Healthcare Engineering, AIRAH etc. to collect and provide this type ofinformation to members, industry and owners of assets to help them better operate and managethere assets.
Key Learnings
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Engineering Review – Happy Snaps
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
TECHNICAL PARTNERS – BUILDING ANALYTICS
We put data to work, delivering the insights you need to optimize resource
use across your buildings and business.
160 enterprise clients spanning over 130,000 locations in 112 countries.
Provider of world-class Technology Solution exclusively for the Property sector that underpins occupier wellbeing and asset value protection for
building owners. Our years of experience working with key clients and our specialist
technical experts combine in delivering innovative products designed to meet the needs of this demanding sector. Trusted partner, not just
another software provider.myBuildings™ is used in over 7,500 properties of all types and sizes.
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Local and State Governments Have Committed to Efficiency and Renewables
56% of Australian Councils have an
emissions reduction target1
7 Australian states have net zero or
emission reduction targets.
1. Australian Local Government Climate Review report, 2018
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Where Have Councils Committed to Meet Targets?
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
% of councils who are doing or planning to do this
Which of These Have The Best Payback?
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Analytics Can Uncover Savings – At Every Stage of The Data Journey
% S
avi
ng
Re
alis
ati
on
Utility Meter
Sub-Metering
IOT Sensors
Equipment Control
Hardware Investment
Utility Meter | Submetering IOT Devices
Utility Bill
Utility Billing Data
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Time-of-Use Variations by Season
Poor performing sites –
energy intensity
Analytics Uncovers Insights In Billing Data…
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Analytics on Building Data Goes Beyond Energy Savings…
OPERATIONAL IMPROVEMENTPeople| Process| Technology
OPTIMISEEQUIPMENT PERFORMANCE+ Reduce
maintenance costs
+ Extend asset useful life
+ Minimize risk of downtime
REDUCE ENERGYUSAGE+ Identify and
eliminate energy waste
+ Minimize peak demand
MAINTAIN COMFORT CONDITIONS+ Maintain SLA’s and
reduce complaints
+ Improve occupant productivity
IMPROVELABOUREFFICIENCY+ Make FM teams
more productive
+ Optimize contractor resources
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Eq
uip
me
nt
En
erg
y In
ten
sit
y(p
er
un
it)
Eq
uip
me
nt
Nu
mb
ers
P
ort
folio
Wid
e
✓ Large public buildings
✓ Office buildings
✓ Hospitals
✓ Universities
✓ Major HVAC central plant
✓ Site energy spend of $500k+ per annum
Large Buildings Mid-Size Buildings Small Buildings
✓ Retail
✓ Bank branches
✓ Schools
✓ Local police & fire stations
✓ Packaged HVAC, Refrigeration, Operating
Equipment
✓ Site energy spend of $50k+ per annum
✓ Large schools
✓ Supermarkets
✓ TAFEs
✓ HVAC plant, Refrigeration (Compressors),
Lighting
✓ Site energy spend of $150k+ per annum
Cooling Towers
AHU Systems
Boilers
Chillers FansPumps
Compressors Condensers
HVAC Units
Computers
Hot Water
Cost-effective Analytics Varies by Building Type
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
The Technology Varies By Building Type… but the Approach Is The Same
Triage, Action, Resolution
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Building Performance Analytics
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Building Performance Analytics
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Building Performance Analytics
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
Managing the Outputs…
-
POMEC AND BUILDING ANALYTICS
HFM Asset Management © 2019
9th Local Government & Public SectorBuilding Maintenance & Facility Management
David Chokolich,
General Manager, Technical Services