Production Site DesignRecovery and Processing of VOC Flashing EmissionsMay 11th and 12th, 2011

OIPA Air Emissions Workshops

Page 2: pool site design presentation.pptx

2

Chesapeake SiteWestern Oklahoma

1st 30 Days,Production

10-MMCF/Day Gas1200 BOPD-53

Gravity650 BWPD

Page 3: pool site design presentation.pptx

3

Page 4: pool site design presentation.pptx

4

Oil & WaterStorage Tanks

VaporRecovery Unit

VaporRecovery

TowerProduction

Unit

SalesGas

“cooler”

Sales Gas“Scrubber

”Seperator

6 X 20Horizontal

Heater

N/S Location

FGC SuctionLine

Page 5: pool site design presentation.pptx

5

2 Flash GasCompressor

s

CAT3406

215 HP

CAT3306

145 HP

Page 6: pool site design presentation.pptx

6

Dual 3” SuctionLines to FGC

Page 7: pool site design presentation.pptx

7

CAT3306 FGC

CAT3406FGC

Page 8: pool site design presentation.pptx

8

VRT – vapor recovery tower30” diameter x 30’ tall

Cost: $8K - $10K

Page 9: pool site design presentation.pptx

9

VRUCost: $33K

GeneratorCost: $30K

Page 10: pool site design presentation.pptx

10

Enardo ValveModel: 950w/flare arrestor16 oz B.P.Costs: $2000

Page 11: pool site design presentation.pptx

11

Oil Tank

WaterTank

Page 12: pool site design presentation.pptx

12

4” VentLine

to Flare

Page 13: pool site design presentation.pptx

13

PortableGenerator

M.R.W.Dual Inlet Forced Air

FlareCost: $50K w upgrades

Page 14: pool site design presentation.pptx

14

LP Inletfrom Tanks

Flare

HP Inletfrom HTR

Vent

Page 15: pool site design presentation.pptx

15

Fan

Page 16: pool site design presentation.pptx

16

Arrow GeneratorCost: $15-20K

Page 17: pool site design presentation.pptx

17

12’ x 15’300 B Tanks

Page 18: pool site design presentation.pptx

18

Sales LinePressure – 760

PSI

Page 19: pool site design presentation.pptx

19

Page 20: pool site design presentation.pptx

20

Sale Gas“cooler”

Page 21: pool site design presentation.pptx

21

Page 22: pool site design presentation.pptx

22

South Texas TankTruck Loading VaporRecovery System

Page 23: pool site design presentation.pptx

23

Page 24: pool site design presentation.pptx

24

Page 25: pool site design presentation.pptx

25

Page 26: pool site design presentation.pptx

26

Page 27: pool site design presentation.pptx

27

Pressurized LiquidSample Case Study

Page 28: pool site design presentation.pptx

28

Case Study: Pressurized Liquid Sample

Geographical Location: Colony WashSite Name: Javorsky 1-33HPressurized Liquid Sampling Guidance:

Sample Location

Sample Analysis

ProMax SimulationConcept: Material In = Material Out

Recorded data + lab results

Flash factor per geographical location

Page 29: pool site design presentation.pptx

29

Case Study: Pressurized Liquid Sample

Pressurized Liquid Sampling Guidance:Sample Location (port, fittings, installation, etc.),

sample analysis (GPA standards, and lab analysis)

Page 30: pool site design presentation.pptx

30

Page 31: pool site design presentation.pptx

31

Well open flows to production unit at 3,100 psi, chocked on20/64 at production unit, PU separator operates at linepressure ranging from 375-600 psi.

Bird EquipmentProduction Unit

Permian 6’x20’, 75 psiHorizontal Heater

Treater

2’x10’ Gas Sales LineScrubber Separator

Page 32: pool site design presentation.pptx

32

All oil from HT is dumped into(and all flashing occurs) at this

12’x25’ 500 bbl tank

4” suctionline to VRU

Page 33: pool site design presentation.pptx

33

VRU-The flash gasrecovered from the oil tankis metered and sold downa low pressure gas sales

lineGM 5.7L

GeneratorPowering VRU

VRU 4” SuctionLine

12 oz.Enardo Valve

Page 34: pool site design presentation.pptx

34

Sample Ports

Page 35: pool site design presentation.pptx

35

Prior to Oil and Waterdumps on Heater

Treater

Page 36: pool site design presentation.pptx

36

Lab Analysis

Labs: CRITICAL to tell them what you arelooking for

i.e. Extended gas / liquid analysis, sulfurs, oxygen,N2/ He, and other contaminants

Lab Flash Gas Analysis to obtain GOR

Where and how samples are pulled – use thepressurized HC liquid sampling guidance

Page 37: pool site design presentation.pptx

37

Lab Analysis

General knowledge:

1.Oil production and richer gases will produce richer andmore flash gases

2.N2 releases before CO2, CO2 before Methane, and onand on, as liquids are flashed to lower pressures

3.Heater Treaters should be operated at 15 to 20 psig, justenough pressure to get into tallest tank

4.VRU Vapors are much more valuable per SCF than gasas BTU is much higher, assuming operations and capitalcan support it

Page 38: pool site design presentation.pptx

38

ProMax Inputs

Data Needed:1.Gas from PU (used to mix in first separator), Gas from

Heater Treater (used to match)

2.Liquid from PU before pressure drop (used to mix in firstseparator- has the absorbed vapors)

3.Liquids from downstream equipment (used to match)

4.Pressure, Temperature, Flow of each stream

5.Ambient Temperature during sampling (helps establishfinal discharge temperature of flash gas compressor-matching)

6.Location and quantity of fuel being used on site

Page 39: pool site design presentation.pptx

39

Javorsky P&ID

Page 40: pool site design presentation.pptx

40

ProMax Wrap-up

Operating Conditions: Highest Heat input atoperation pressure in the Production Unit sendsmax vapors to sales gas, run Heater Treater ashot as possible and as low a pressure aspossible if Flash Compressor to again drivevapors out, …

Flash Compressors: Staged flashing of liquidsback to HT has huge effect on Tank vaporlosses

VRUs, Flares, etc. to reduce vapor losses

Flash Factors develop per Play