Independent ReviewPoplar St. Bridge
Mission Statement• Provide an independent review of Poplar Street Bridge (PSB)/I-55/I-70 Interchange Project
• Review design options under consideration by MoDOT and IDOT
• Assess possibilities for other design alternatives not considered by the state DOTs
• Develop recommendations on a preferred design alternative and prepare a report that examines the benefits, impacts, and costs of the various options
Directives & Constraints• Work within a totally independent environment, focused
on sound technical engineering principles and guidelines
• Safety is a priority
• Reduce or eliminate the primary causes of congestion, including weaving on the PSB
• Limited funding availability of $55M
• Rigorous examination of the feasibility of keeping the existing Memorial Drive ramp (SB to EB movement)
• Identify options to access IL Route 3 that maintain or improve the existing conditions
Major Tasks
Task Dates
Assemble & review all available data from DOTs and the EWG Council of Governments
7/16 – 8/3
Participate in a four‐day design charette to review existing options and develop additional alternatives
8/6 – 8/10
Prepare draft report of findings and recommendations
8/11 – 8/31
Prepare final report and draft presentation 9/1 – 9/21
Prepare for and deliver the final presentation to the EWG Board
9/26
Project Team
Project ManagerBarry Rolle, PE, VP
Geometrics
Dave Meier, PE, VP
Jay Chiglo, PE, VP
Pat Pechnick, PE, VP
Mike Ecker, PE
Dennis LaRose, PE, LEED AP*
Traffic/Planning
Ralph Batenhorst, PE, VP
Christopher Kinzel, PE
Bridge
Cory Imhoff, PE
* CDI Civil Design, Inc.
Initial Options Studied• Studied by MoDOT and IDOT• Contained in Draft AJR• Five of six at the interchange
Initial Options StudiedOption 1: Ramp B under I‐64 (right exit), inside merge
Option 2: Ramp B under I‐64 (left exit), inside merge , I‐44 realign
Option 3: Ramp B under I‐64 (right exit), outside merge
Option 5: Ramp B under I‐64 (right exit), outside merge; Memorial realign
7th Street U‐Turn
Alt 2A: Ramp B under I‐64 (right exit), outside merge; I‐44 slight realign; Memorial realign
Conclusions on DOT Options• Geometrically, Option 3 could work
with tweaks but still had significant problems (Ramp merge with I-55, congestion, safety).
• Common theme with all was merge point constraints, safety, congestion. Excavation next to I-64 foundations is unacceptable.
• AJR came to the most logical and most technically sound conclusions given the constraints and original purpose for the project.
Enhancements & New Alternatives• Focused on Ramp B preservation• Three unique options (A, B, C) to preserve
Ramp B• None improved congestion over AJR
recommended alternative
2 lanes
2 lanes
2 lanes
addremove
Memorial Drive braid over SB 44 loop ramp
1 lane
2 lanes2 lanes
1 lane, right exit, from I-44
1 lane, left exit, from I-55
1 lane
2 lanes
2-lane left exit
2 lanes
1 lane
Option A Option B Option C
6 th
I-64 Corridor Lane Imbalance• Currently 3-2-4-4
• AJR 3-2-4-4
• Option A 3-2-5-4
PSB
A
B
3 2 4 4
PSB
64
6 th
3 2 4 4
PSB
A6 th
3 2 5 4
64
64
AB
Can we fix?
One Fix: MLK Connector• E.B. MLK to S.B. IL Route 3• 1 – 2 miles additional travel distance• Reduces travel time in P.M. peak
Existing Ramp B
Potential MLK/IL-3 Connector
55 3
3
N
~1.3mi
~0.9mi
~1.0mi
~1.0mi64
70
70
64
55
• Substructure Modifications• Slide EB Bridge South 9 ft
– Adds 5th EB Lane• Add Crossframes• Infill Orthotropic Decking• One 4-girder bridge• Redundancy, Stiffness,
Improved Performance• Cost-Effective
Two existing two-girder systems (looking east from west bank)
Another Fix: Widen Bridge (Slide)
PSB Slide PerformanceSubstructure & Foundations
• Current - Load In 6’ Caisson = 1691 kips• After Slide – Load In 6’ Caisson = 2022 kips• Approx. 20% Increase• Allowable = 1979 kips• 2% Overstress
What’s the Best Use of 5-Lane PSB?• Widen PSB 3-2-5-5: Does not eliminate No. 1
concern of commuters – I-64 congestion.
• 3-3-5-5 would address I-64 congestion. How to get there?
PSB
A3 2 5 5
64
?
6 th
6 th
What’s the Best Use of 5-Lane PSB?• Widen PSB 3-2-5-5: Does not eliminate No. 1
concern of commuters – I-64 congestion
• 3-3-5-5 would address I-64 congestion. How to get there?
PSB
A3 3 5 5
64
Third Lane on I‐64
I-64 Capacity Enhancement• Slide PSB• Modify Sixth Street ramps –create third lane on I-64• Eliminates I-64 congestion
Exit includes 3rd EB thru lane
3rd thru lane rejoins I-64
6th St on-ramp joins as 4th lane then tapers
2-lane ramp becomes 4th/5th EB lanes
2 lanes2 lanes
Approximate Sixth Street Ramp Departure Point
Potential 3rd Lane Rejoin Point
New Ramp for 3rd LaneN
64
To PSB
• Slide PSB• Modify Sixth Street ramps –create third lane on I-64• Eliminates I-64 congestion
I-64 Capacity EnhancementExit includes 3rd EB thru lane
3rd thru lane rejoins I-64
6th St on-ramp joins as 4th lane then tapers
2-lane ramp becomes 4th/5th EB lanes
2 lanes2 lanes
Cost Estimation: Evaluation• Evaluated estimates for original design options
• Recent bids lower than original estimate
• Miscellaneous items and contingencies further inflate prices
Cost Estimation: Components of OptionsOption
Estimated by
Subtotal(millions)
Grand Total *(millions)
Base – AJR Alt. 8MoDOTHDR
$32.6$22.3
$49.5$33.9
Option 3MoDOTHDR
$31.0$19.4
$47.1$29.5
Split 64 – InitialSplit 64 – Final
HDRHDR
$5.1$20.7
$7.7$31.5
Option A (Loop Ramp) HDR $18.0 $27.3
PSB Slide HDR $14.1 $21.4
Option B (I‐44/I‐55 Split) HDR $36.7 $55.7
Option C (I‐55 Left Exit) HDR $34.3 $52.1
MLK/IL‐3 Connector HDR $10.8 $16.9
* Includes removals, mobilization, surveying, engineering, construction administration, and contingency
32% reduction
Cost Estimation: Options
Options ComponentsEstimated
bySubtotal(millions)
Grand Total (millions)*
Option 3 Base + Option 3MoDOTHDR
$63.6$41.7
$96.6$63.4
Base, MLK Base + MLK Connector HDR $33.1 $50.8
Alt D, initialBase + MLK + PSB Slide + Split 64 ‐Initial
HDR $52.3 $79.9
Alt D, finalBase + MLK + PSB Slide + Split 64 – Initial + Split 64 ‐ Final
HDR $73.0 $111.4
Option AOption A+
Base + Option ABase + Option A + PSB Slide
HDRHDR
$40.4$54.4
$61.3$82.6
Option BOption B+
Base + Option BBase + Option B + PSB Slide
HDRHDR
$59.0$73.1
$89.7$111.0
Option COption C+
Base + Option CBase + Option C + PSB Slide
HDRHDR
$56.7$70.7
$86.1$107.4
* Includes removals, mobilization, surveying, engineering, construction administration, and contingency
Recommendations• Based on the findings of this analysis, the study
team recommends a program of phased improvements
• Initial project will alleviate an existing problem, but can also provide a long term, positive, regional benefit in terms of reduced congestion and increased accessibility
• Improves congestion and safety better than all study alternatives
Recommendations
PSB
MLK
MLK connector
Upgrade C & D, Remove B
1
1
$17.0M
$25.7M
CB
D
TOTALS1 $42.7M 2015
Recommendations
PSB
MLK
MLK connector
Upgrade C & D, Remove B
PSB Slide
I‐64 Split Initial
1
1
2
2
$17.0M
$25.7M
CB
Upgrade A
DA
2$7.7M
$8.3M$21.3M
TOTALS1 $42.7M2 $37.3M 2016
2015
Recommendations
PSB
MLK
MLK connector
Upgrade C & D, Remove B
PSB Slide
I‐64 Split Initial
I‐64SplitFinal
1
1
2
2
3
$17.0M
$25.7M
CB
Upgrade A
DA
2$7.7M
$8.3M$21.3M
$31.0M
TOTALS1 $42.7M2 $37.3M3 $31.0M
$111.0M
unfunded
2016
2015