Independent ReviewPoplar St. Bridge

Page 2: Poplar Street Bridge Independent Review by East West Gateway

Mission Statement• Provide an independent review of Poplar Street Bridge (PSB)/I-55/I-70 Interchange Project

• Review design options under consideration by MoDOT and IDOT

• Assess possibilities for other design alternatives not considered by the state DOTs

• Develop recommendations on a preferred design alternative and prepare a report that examines the benefits, impacts, and costs of the various options

Page 3: Poplar Street Bridge Independent Review by East West Gateway

Directives & Constraints• Work within a totally independent environment, focused

on sound technical engineering principles and guidelines

• Safety is a priority

• Reduce or eliminate the primary causes of congestion, including weaving on the PSB

• Limited funding availability of $55M

• Rigorous examination of the feasibility of keeping the existing Memorial Drive ramp (SB to EB movement)

• Identify options to access IL Route 3 that maintain or improve the existing conditions

Page 4: Poplar Street Bridge Independent Review by East West Gateway

Major Tasks

Task Dates

Assemble & review all available data from DOTs and the EWG Council of Governments

7/16 – 8/3

Participate in a four‐day design charette to review existing options and develop additional alternatives

8/6 – 8/10

Prepare draft report of findings and recommendations

8/11 – 8/31

Prepare final report and draft presentation 9/1 – 9/21

Prepare for and deliver the final presentation to the EWG Board

9/26

Page 5: Poplar Street Bridge Independent Review by East West Gateway

Project Team

Project ManagerBarry Rolle, PE, VP

Geometrics

Dave Meier, PE, VP

Jay Chiglo, PE, VP

Pat Pechnick, PE, VP

Mike Ecker, PE

Dennis LaRose, PE, LEED AP*

Traffic/Planning

Ralph Batenhorst, PE, VP

Christopher Kinzel, PE

Bridge

Cory Imhoff, PE

* CDI Civil Design, Inc.

Page 6: Poplar Street Bridge Independent Review by East West Gateway

Initial Options Studied• Studied by MoDOT and IDOT• Contained in Draft AJR• Five of six at the interchange

Page 7: Poplar Street Bridge Independent Review by East West Gateway

Initial Options StudiedOption 1: Ramp B under I‐64 (right exit), inside merge 

Option 2: Ramp B under I‐64 (left exit), inside merge , I‐44 realign

Option 3: Ramp B under I‐64 (right exit), outside merge

Option 5: Ramp B under I‐64 (right exit), outside merge; Memorial realign

7th Street U‐Turn

Alt 2A: Ramp B under I‐64 (right exit), outside merge; I‐44 slight realign; Memorial realign

Page 8: Poplar Street Bridge Independent Review by East West Gateway

Conclusions on DOT Options• Geometrically, Option 3 could work

with tweaks but still had significant problems (Ramp merge with I-55, congestion, safety).

• Common theme with all was merge point constraints, safety, congestion. Excavation next to I-64 foundations is unacceptable.

• AJR came to the most logical and most technically sound conclusions given the constraints and original purpose for the project.

Page 9: Poplar Street Bridge Independent Review by East West Gateway

Enhancements & New Alternatives• Focused on Ramp B preservation• Three unique options (A, B, C) to preserve

Ramp B• None improved congestion over AJR

recommended alternative

2 lanes

2 lanes

2 lanes

addremove

Memorial Drive braid over SB 44 loop ramp

1 lane

2 lanes2 lanes

1 lane, right exit, from I-44

1 lane, left exit, from I-55

1 lane

2 lanes

2-lane left exit

2 lanes

1 lane

Option A Option B Option C

Page 10: Poplar Street Bridge Independent Review by East West Gateway

6 th

I-64 Corridor Lane Imbalance• Currently 3-2-4-4

• AJR 3-2-4-4

• Option A 3-2-5-4

PSB

A

B

3 2 4 4

PSB

64

6 th

3 2 4 4

PSB

A6 th

3 2 5 4

64

64

AB

Can we fix?

Page 11: Poplar Street Bridge Independent Review by East West Gateway

One Fix: MLK Connector• E.B. MLK to S.B. IL Route 3• 1 – 2 miles additional travel distance• Reduces travel time in P.M. peak

Existing Ramp B

Potential MLK/IL-3 Connector

55 3

3

N

~1.3mi

~0.9mi

~1.0mi

~1.0mi64

70

70

64

55

Page 12: Poplar Street Bridge Independent Review by East West Gateway

• Substructure Modifications• Slide EB Bridge South 9 ft

– Adds 5th EB Lane• Add Crossframes• Infill Orthotropic Decking• One 4-girder bridge• Redundancy, Stiffness,

Improved Performance• Cost-Effective

Two existing two-girder systems (looking east from west bank)

Another Fix: Widen Bridge (Slide)

Page 13: Poplar Street Bridge Independent Review by East West Gateway

PSB Slide PerformanceSubstructure & Foundations

• Current - Load In 6’ Caisson = 1691 kips• After Slide – Load In 6’ Caisson = 2022 kips• Approx. 20% Increase• Allowable = 1979 kips• 2% Overstress

Page 14: Poplar Street Bridge Independent Review by East West Gateway

What’s the Best Use of 5-Lane PSB?• Widen PSB 3-2-5-5: Does not eliminate No. 1

concern of commuters – I-64 congestion.

• 3-3-5-5 would address I-64 congestion. How to get there?

PSB

A3 2 5 5

64

?

6 th

Page 15: Poplar Street Bridge Independent Review by East West Gateway

6 th

What’s the Best Use of 5-Lane PSB?• Widen PSB 3-2-5-5: Does not eliminate No. 1

concern of commuters – I-64 congestion

• 3-3-5-5 would address I-64 congestion. How to get there?

PSB

A3 3 5 5

64

Third Lane on I‐64

Page 16: Poplar Street Bridge Independent Review by East West Gateway

I-64 Capacity Enhancement• Slide PSB• Modify Sixth Street ramps –create third lane on I-64• Eliminates I-64 congestion

Exit includes 3rd EB thru lane

3rd thru lane rejoins I-64

6th St on-ramp joins as 4th lane then tapers

2-lane ramp becomes 4th/5th EB lanes

2 lanes2 lanes

Approximate Sixth Street Ramp Departure Point

Potential 3rd Lane Rejoin Point

New Ramp for 3rd LaneN

64

To PSB

Page 17: Poplar Street Bridge Independent Review by East West Gateway

• Slide PSB• Modify Sixth Street ramps –create third lane on I-64• Eliminates I-64 congestion

I-64 Capacity EnhancementExit includes 3rd EB thru lane

3rd thru lane rejoins I-64

6th St on-ramp joins as 4th lane then tapers

2-lane ramp becomes 4th/5th EB lanes

2 lanes2 lanes

Page 18: Poplar Street Bridge Independent Review by East West Gateway

Cost Estimation: Evaluation• Evaluated estimates for original design options

• Recent bids lower than original estimate

• Miscellaneous items and contingencies further inflate prices

Page 19: Poplar Street Bridge Independent Review by East West Gateway

Cost Estimation: Components of OptionsOption

Estimated by

Subtotal(millions)

Grand Total *(millions)

Base – AJR Alt. 8MoDOTHDR

$32.6$22.3

$49.5$33.9

Option 3MoDOTHDR

$31.0$19.4

$47.1$29.5

Split 64 – InitialSplit 64 – Final 

HDRHDR

$5.1$20.7

$7.7$31.5

Option A (Loop Ramp) HDR $18.0 $27.3

PSB Slide HDR $14.1 $21.4

Option B (I‐44/I‐55 Split) HDR $36.7 $55.7

Option C (I‐55 Left Exit) HDR $34.3 $52.1

MLK/IL‐3 Connector HDR $10.8 $16.9

* Includes removals, mobilization, surveying, engineering, construction administration, and contingency

32% reduction

Page 20: Poplar Street Bridge Independent Review by East West Gateway

Cost Estimation: Options

Options ComponentsEstimated 

bySubtotal(millions)

Grand Total (millions)*

Option 3 Base + Option 3MoDOTHDR

$63.6$41.7

$96.6$63.4

Base, MLK Base + MLK Connector HDR $33.1 $50.8

Alt D, initialBase + MLK + PSB Slide + Split 64 ‐Initial

HDR $52.3 $79.9

Alt D, finalBase + MLK + PSB Slide + Split 64 – Initial + Split 64 ‐ Final

HDR $73.0 $111.4

Option AOption A+

Base + Option ABase + Option A + PSB Slide

HDRHDR

$40.4$54.4

$61.3$82.6

Option BOption B+

Base + Option BBase + Option B + PSB Slide

HDRHDR

$59.0$73.1

$89.7$111.0

Option COption C+

Base + Option CBase + Option C + PSB Slide

HDRHDR

$56.7$70.7

$86.1$107.4

* Includes removals, mobilization, surveying, engineering, construction administration, and contingency

Page 21: Poplar Street Bridge Independent Review by East West Gateway

Recommendations• Based on the findings of this analysis, the study

team recommends a program of phased improvements

• Initial project will alleviate an existing problem, but can also provide a long term, positive, regional benefit in terms of reduced congestion and increased accessibility

• Improves congestion and safety better than all study alternatives

Page 22: Poplar Street Bridge Independent Review by East West Gateway

Recommendations

PSB

MLK

MLK connector

Upgrade C & D, Remove B

1

1

$17.0M

$25.7M

CB

D

TOTALS1 $42.7M 2015

Page 23: Poplar Street Bridge Independent Review by East West Gateway

Recommendations

PSB

MLK

MLK connector

Upgrade C & D, Remove B

PSB Slide

I‐64 Split Initial

1

1

2

2

$17.0M

$25.7M

CB

Upgrade A

DA

2$7.7M

$8.3M$21.3M

TOTALS1 $42.7M2 $37.3M 2016

2015

Page 24: Poplar Street Bridge Independent Review by East West Gateway

Recommendations

PSB

MLK

MLK connector

Upgrade C & D, Remove B

PSB Slide

I‐64 Split Initial

I‐64SplitFinal

1

1

2

2

3

$17.0M

$25.7M

CB

Upgrade A

DA

2$7.7M

$8.3M$21.3M

$31.0M

TOTALS1 $42.7M2 $37.3M3 $31.0M

$111.0M

unfunded

2016

2015