PORT METRO - - - - vancouver Project Review Application Form In formation supplied in this application may be made public during consultation with adjacent municipalities, First Nations groups and other interested parties, as well as to other members of the public through the Access to In formation Act. Please advise PMV of any commercially or financially sensitive information which you do not want provided to third parties. Company Kerr Wood Leidal Contact August Sheldon No. & Street 200 - 4185A Still Creek Dr. Title Project Engineer City Burnaby Phone 604 294 2088 Fax 604 294 2090 Tenant File Number Contact Kent Smith Company Pacific Coast Terminals Title Mgr. Eng. and Maint. No. & Street 2300 Columbia Street Phone 604 939 7371 City Port Moody Email [email protected] Postal Code V3H 5J9 Fax 604 936 2951 Location/Address/Legal Description City 2300 Columbia St Port Moody Project Description Summary (attach detailed description and rationale as necessary) Pacific Coast Terminals Co. Ltd. is planning to upgrade their wastewater treatment and recycling systems. The proposed structures include a sludge dewatering building, clarifier and clarifier overflow tank, and concrete pump pads. Construction equipment may include, but are not limited to: excavators, backhoes and cranes. The only occupied structure will be the sludge dewatering building. The building has an approximate foundation area of 140 m2 and a floor area of approximately 1 25m2. The building has an approximate height of 5m. Occupancy will be of a temporary nature limited to maintenance personnel on a sporadic basis. Estimated volume of backfill required: 1040 m3 (There is a surplus of backfill stored onsite, which can be used for this project. No backfill will need to be brought to site.) Estimated volume of excavation required for the construction: 270 m3. Estimated volume of concrete for the construction: 215 m3 Floor Area 125 sq. metres Height of proposed structure(s) 5 metres Describe in-water works if any None Required utility connections: Iii power gas III water D sanitary II storm Presently on site: II power gas ij water E sanitary ji storm Modifications required: 11 power gas jj water LI sanitary II storm Other required approvals Approx. construction value Proposed start date Proposed completion date $4.9 million August 2013 November 2013

Upload: others

Post on 05-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Port of Vancouver | - August Sheldon Contact Kerr …...For in-waterworks, are you or Port Metro Vancouver the upland owner? yes El no If no, please attach letter of consent from upland

PORT METRO - - - -

vancouver Project Review Application FormInformation supplied in this application may be made public during consultation with adjacentmunicipalities, First Nations groups and other interested parties, as well as to other members of thepublic through the Access to Information Act. Please advise PMV of any commercially or financiallysensitive information which you do not want provided to third parties.

Company Kerr Wood Leidal Contact August Sheldon

No. & Street 200 - 4185A Still Creek Dr. Title Project Engineer

City Burnaby Phone 604 294 2088

Fax 604 294 2090

Tenant File Number Contact Kent Smith

Company Pacific Coast Terminals Title Mgr. Eng. and Maint.

No. & Street 2300 Columbia Street Phone 604 939 7371

City Port Moody Email [email protected] Code V3H 5J9 Fax 604 936 2951

Location/Address/Legal Description City

2300 Columbia St Port Moody

Project Description Summary (attach detailed description and rationale as necessary)

Pacific Coast Terminals Co. Ltd. is planning to upgrade their wastewater treatment and recycling systems. The proposed structures include asludge dewatering building, clarifier and clarifier overflow tank, and concrete pump pads. Construction equipment may include, but are not limitedto: excavators, backhoes and cranes. The only occupied structure will be the sludge dewatering building. The building has an approximatefoundation area of 140 m2 and a floor area of approximately 1 25m2. The building has an approximate height of 5m. Occupancy will be of atemporary nature limited to maintenance personnel on a sporadic basis.Estimated volume of backfill required: 1040 m3 (There is a surplus of backfill stored onsite, which can be used for this project. No backfill will needto be brought to site.) Estimated volume of excavation required for the construction: 270 m3. Estimated volume of concrete for the construction: 215m3

Floor Area 125 sq. metres Height of proposed structure(s) 5 metres

Describe in-water works if any

None

Required utility connections: Iii power gas III water D sanitary II stormPresently on site: II power gas ij water E sanitary ji stormModifications required: 11 power gas jj water LI sanitary II storm

Other required approvals

Approx. construction value Proposed start date Proposed completion date

$4.9 million August 2013 November 2013

Page 2: Port of Vancouver | - August Sheldon Contact Kerr …...For in-waterworks, are you or Port Metro Vancouver the upland owner? yes El no If no, please attach letter of consent from upland

Currently the site is graded to collect all stormwater run-off into the existing Secondary SettlingPond for treatment. The Secondary Settling Pond will remain in operation throughout the upgradesto the recycled water system. The construction works for the recycled water system upgrades willnot affect existing stormwater run-off collection methods, nor will sediments be conveyed off-siteas a result of construction operations.

Will the proposal involve off-site impacts (e.g. traffic, noise, views, glare, dust)? yes no

Comments:

Does the proposal affect any known historical or archaeological feature? El yes no

Comments:

Does the proposal involve fill? If yes, please specify: yes El no

Length (m) Width (m) Volume (m3) 1040 cu metres

Does the proposal involve dredging? El yes • no

If yes, please complete a dredging application form.

Do you have an existing lease/licence/easement with Port Metro Vancouver for l yes El no

the property or waterlot?

If yes to the above, is the proposal permitted under the terms and conditionsof your agreement? Comments: III yes LI no

Is the proposal entirely within your leasehold area? If not, what arrangements yes El nohave you made with Port Metro Vancouver or other landowners?

For in-water works, are you or Port Metro Vancouver the upland owner? yes El no

If no, please attach letter of consent from upland owner.

Page 3: Port of Vancouver | - August Sheldon Contact Kerr …...For in-waterworks, are you or Port Metro Vancouver the upland owner? yes El no If no, please attach letter of consent from upland

I/we certify that I/we have reached the age of majority and the information provided inthis application and supporting documentation is correct to the best of my/our knowledge.

Applicant A Tenant (when riot applicant): Kent SmithName .-ugust Sheldon Name

Title Project Engineer

DateJuIy 5, 2013Signature

TitleMgr Eng. and Maint.Date

jW-( S C 3Sig nature

This signature signifies the applicant may act on mybehalf durinq the course of the tjermit review vrocess

Application fee submitted: $525 Documentation deposit submitted: $ 10,000See page 16 in Project Review Guide See page 16 in Project Review Guide

Please send all completed applications to:

Port Metro VancouverPlanning and Development Department100 The Pointe, 999 Canada PlaceVancouver, BC Canada V6C 3T4

Applications for Environmental EAP review will be redirected to the appropriate

department.

Page 4: Port of Vancouver | - August Sheldon Contact Kerr …...For in-waterworks, are you or Port Metro Vancouver the upland owner? yes El no If no, please attach letter of consent from upland

S

C

S

0

S

LOCATION - PACIFIC COAST TERMINALSN.T.S.

cTSITE

SCALE 12500

PACIFIC COAST TERMINALS Co. Ltd.RECYCLED WATER UPGRADE

CONTRACT No. 711-106A

2

S

a

S

0

C

KEY PLAN - PACIFIC COAST TERMINALS

z issuedter Issue Date issuedByIIRev.No. Date Designed Drawn Checked DescripuonofRevistes Rev.Na. Date Designed Drawn Checked DescalpdonofRevlsIss PACIFIC COAST TERMINALS CO. LTD.I— -_______ -

Reference S Msy OS/IS NJ DiIA ISSUED FOR CUENT REViEWssn,uItIng engineers GENERALApprovals AS May 03/13 NI

LOCATION_PLAN_AND_KEY PLANTender TO May 15/13

May 5/13 NJ DHA ISSUEDFORTENDER —ii PRELIMINARYlgu KERR WOOD LEIDAL RECYCLED WATER UPGRADE

Scale KWL Prsjest No. I Discipline Drawing Number Renj Permits — _DO NOT USE FOR CONSTRUCTION

PACIFIC COASTTERMINALS CO LTD SHOWN 711-1 06A GENERAL G1 01 I 1Construction

2 Record Drawings Seer Clienir Pacific Coast Terminals Co. US. Sheet — ci —

Page 5: Port of Vancouver | - August Sheldon Contact Kerr …...For in-waterworks, are you or Port Metro Vancouver the upland owner? yes El no If no, please attach letter of consent from upland

INSTALL STEEL PIPING BETWEENEXISTiNG T51T6 FEED PIPE ANDHOPE PIPE STUB. INSTALLBURIED HDPE TO GVRD SEWER.SEE DRAWING SWIRl

I INSTALL HDPE PIPE FROMI CLARIFIER PEED PUMPS.

I SEE DRAWING SWI3I

INSTALL CONCRETE PAD,CLARIFTEE FEED PUMPS (P200.P210). CONCRETE PEDESTALSAND ASSOCEJED FIFING.CONNECT TO OS. PIPE STUBS.SEE DRAWING M23l

PRELIMINARYDO NOT USE FOR CONSTRUCTION

PACIFIC COAST TERMINALS CO. LTD.RECYCLED WATER UPGRADE

GENERALGENERAL SCOPE OF WORK

Soale ‘KWL P0*01 No. I

IOWN 711.106APa0TTTC Coast Teomlrtals Co. Ltd.