port reform and development in indonesia
DESCRIPTION
Reformasi pelabuhan di IndonesiaTRANSCRIPT
-
SEMINAR OF
CHALLENGES AND OPPORTUNITIES IN THE IMPLEMENTATION OF THE NATIONAL LOGISTICS STRATEGY
IN INDONESIA
Jakarta November 2013
-
ONE OF THE LARGEST MARITIME COUNTRY IN THE WORLD
THE LARGEST ARCHIPELAGIC COUNTRY IN THE WORLD
MALACCA & SINGAPORE STRAIT (WITH MALAYSIA & SINGAPORE)
BETWEEN TWO CONTINENTS, ASIA AND AUSTRALIA
3 ARCHIPELAGIC SEA LANES
INDONESIA :
*
-
1
2
3
4
5
6
7
-
FEEDER PORTS
Sabang, Belawan, Dumai, Batam (3 terminal), Palembang, Panjang, Banten, Tanjung Priok, Cilamaya, Cilacap, Semarang, Tanjung Perak, Tanjung Bulu Pandan, Benoa, Socah, Teluk Lamong, Pontianak, Sampit, Banjarmasin, Tanah Ampo, Kupang, Balikpapan, Bitung, Makassar, Ternate, Pantoloan, Ambon, Sorong, Jayapura, Merauke
Malahayati, Tanjung Balai Asahan, Selat Panjang, Bengkalis, Tanjung Buton, Pekanbaru, Tanjung Batu, Tanjung Pinang, Jambi, Pangkal Balam, Tanjung Pandan, Bojonegara, Sunda Kelapa, Kep. Seribu, Tegal. Batang, Gresik, Sampang, Bima, Kumai, Pelaihari, Garongkong, Luwuk, Tangkiang, Nunukan, Tarakan, Samarinda, Maloy, Manado, Banggai, Bau-bau, Waingapu, Ende, Manado, Pare-Pare, Kendari, Biak, Manokwari, Fak-Fak
Susoh, Idi, Air Bangis, Serasan, Nipah Panjang, Malakoni, Bagan Siapi-Api, Toboali,
Karang Agung, Teluk Betung,
Brebes, Jepara, Tuban, Tuban, Buleleng,
Sape, Reo, Lirung, Lawele, Jailolo, Sanana, Serui
TOTAL : 1240 PORTS
MAIN PORTS
COLLECTOR PORTS
BASED ON MINISTER OF TRANSPORTATION DEGREE NO. KP. 414 YEAR 2013
- TYPE OF CARGOYEAR2012(Million Ton)2030(Million Ton)TOTAL1122.22114.2DRY BULK599 (53,4 %)75% Coal960.2LIQUID214.5 (19,1%)86 % Petroleum & CPO413.2GENERAL CARGO182.1 (16,2%)293.2CONTAINER CARGO126.6 (11,3%)477.7
-
INDONESIAN CONTAINER THROUGHPUT INCREASING FROM 12 MILLION TEUs IN 2012 BECOME MORE THAN 40 MILLION TEUs IN 2030
DOMESTIC(TEUs)INTERNATIONAL(TEUs)TOTAL(TEUs)2012 4.768.192 7.873.150 12.641.342203018.344.64429.423.40347.768.047 - ECONOMIC CORRIDORSTERMINALCDC/MULTIMODECRUISE TERMINALLAND/INFRASTRUCTURETOTAL(US$ BILLION)CONTAINERCPOPETROLEUMCOALOTHERS BULKOTHERS TERMINAL SUMATERA6.9751.7581.3951.2830.4320.1630.025-0.83512.866 JAVA8.5560.0081.6740.2400.2360.6240.7200.6202.64215.321 BALI-NT0.097-0.080-0.1460.850-0.8620.3732.408 KALIMANTAN0.6440.5500.3561.4050.5350.924--0.2134.626 SULAWESI0.4770.0430.282-0.4832.0530.075-0.4593.871 PAPUA0.5500.0100.179-0.4395.443--1.3517.972 TOTAL17.2992.369 3.965 2.9272.27310.0580.8201.4825.87247.064
- NOPLANTOTALGOVERNMENTPRIVATEUS$ BILLION%US$ BILLION%US$ BILLION%1232011-20152016-20202021-203012.21212.38922.4641001001005.2023.4236.28142.627.628.07.0108.96516.18357.472.472.0TOTAL47.06410014.90631.732.15868.3
-
YEAR 2014
YEAR 1990
YEAR 2013
- Critical Project Fast TrackTanjung PriokNew Container TerminalsTanjung PerakNew Container TerminalsBelawanExtension of Container TerminalPort projects to be completed in next five yearBanjarmasinNew Container TerminalPontianakExtension of Container TerminalBatamContainer TerminalMaduraDevelopment of new port areaCilamaya (West Java)Development of new port areaPalembangGeneral cargo or bulk handling facilitiesKuala TanjungNew Container TerminalPanjang General cargo or bulk handling facilitiesAmbon, Dumai, Teluk Bayur, Makassar, Banjarmasin, Bitung, Tanjung Emas, Probolinggo, Balikpapan/Kariangau, Jayapura, Sorong, Pasean, Maloy, Pelaihari, Sei Gintung, Gorontalo, Pantoloan, Pare-pare.General Cargo, Container and Bulk Terminal
-
BIDDING PROCESS :
DEVELOPMENT OF CRUISE TERMINAL IN TANAH AMPO
SURABAYA WEST ACCESS CHANNEL
PRIORITY PROJECTS :
CILAMAYA PORT DEVELOPMENT PROJECT
POTENTIAL PROJECTS (BASED ON DEMAND) :
GARONGKONG PORT DEVELOPMENT PROJECT
BAU-BAU PORT DEVELOPMENT PROJECT
LUWUK (TANGKIANG) PORT DEVELOPMENT PROJECT
PROBOLINGGO PORT DEVELOPMENT PROJECT
MAKASSAR NEW PORT DEVELOPMENT PROJECT
-
KUALA TANJUNG PORT
KALIBARU TERMINAL
MALOY PORT
MAKASSAR NEW PORT
BITUNG PORT
DEVELOPMENT PROJECTS :
KUALA TANJUNG PORT - NORTH SUMATERABATAM PORT KEPULAUAN RIAUKALIBARU TERMINAL JAKARTACILAMAYA PORT WEST JAVAGRESIK PORT EAST JAVASOCAH TERMINAL EAST JAVATELUK LAMONG TERMINAL EAST JAVAMALOY PORT - EAST KALIMANTANMAKASSAR NEW PORT - SOUTH SULAWESIBITUNG PORT - NORTH SULAWESISORONG/SEGET TERMINALBATAM PORT
CILAMAYA PORT
TELUK LAMONG TERMINAL
GRESIK PORT
SOCAH TERMINAL
SORONG/SEGET TERMINAL
-
PORT OF KUALA TANJUNG
TOTAL LAND AREA : 19,07 Ha
WHARF OF MNA COMPANY
C WHARF (PELINDO I)
A B WHARF (INALUM)
EXISTING CONDITION
PROPOSED
HUB INTERNATIONAL PORT
-
TOTAL AREA OF PORT DEVELOPMENT : 1400,02 Ha
Container: 1078.00Ha
Container Depot: 114.47 Ha
Liquid Bulk: 44.26 Ha
Dry Bulk: 143.00Ha
Multipurpose: 15.40 Ha
Office Area: 4,99 Ha
PROJECT UPDATE :
PORT MASTERPLAN HAS ESTABLISHEDAMDAL (EIA) ON GOINGCONTAINER TERMINAL
Length : 9237,43 m
CONTAINER TERMINAL
Length : 9237,43 m
CONTAINER TERMINAL
Length : 3000 m
DRY BULK TERMINAL
Length : 2000 m
CONTAINER YARD
CPO TERMINAL
MULTIPURPOSE TERMINAL
-
KABIL TERMINAL/TG. SAUH
Kabils CPO Terminal
Container Cargo Zone
General Cargo Zone
Domestic Passenger Terminal
Commercial Terminal
Port Management Area
SEKUPANG TERMINAL
General Cargo Zone
Domestic Passenger Terminal
Commercial Terminal
Port Management Area
NONGSA TERMINAL
Domestic Passenger Terminal
Intl Passenger Terminal
Commercial Terminal
Port Management Area
BATU AMPAR PORT
Passenger and govermnent shipping zone
General Cargo Zone
Container Cargo Zone
Commercial Terminal
Port Management Area
BATAM CENTER TERMINAL
Domestic Passenger Terminal
Intl Passenger Terminal
Commercial Terminal
Port Management Area
BASED ON MINISTERIAL DECREE NO. 77 YEARS 2009 REGARDING MASTERPLAN OF BATAM PORT
/Tg. Sauh
-
KALIBARU TERMINAL
-
NEW PORT CILAMAYA DEVELOPMENT PROJECT
VILLAGE: SUMBERJAYA
DISTRICT: TEMPURAN
REGENCY: KARAWANG
PROVINCE: WEST JAVA
*
-
TELUK LAMONG TERMINAL
TANJUNG PERAK PORT
TELUK LAMONG TERMINAL
EXTENSION OF TANJUNG PERAK PORT
MULTIPURPOSE TERMINAL
-
24.45 HA
36.80 HA
26.00 HA
88.90 HA
210.10 HA
ULTIMATE PHASE
ITEMDIMENSIONINT WHARF1780 X 50 MDOMESTIC WHARF2390 X 30 MC2 TRESTLE1000 X 16 MCAUSEWAY1931 X 50 MC1 TRESTLE800 X 20 M X 2ACCESS ROAD1130 X 50 MTOTAL RECLAMATION386,12 HA -
GRESIK PORT
TANJUNG PERAK PORT
-
DRY AND LIQUID BULK ZONE
PARKING ZONE
GREEN AREA
WAREHOUSE ZONE
OFFICE AREA
MULTIPURPOSE ZONE
INDUSTRIAL ZONE
-
TANJUNG PERAK PORT
WHARF AREA
GENERAL CARGO ZONE
CONTAINER YARD AREA
DRY BULK ZONE
LIQUID BULK ZONE
INDUSTRIAL & LOGISTIC ZONE
OFFICE AND BUSSINESS AREA
PUBLIC UTILITY AREA
ACCESS ROAD
-
INDUSTRIAL AREAS & INTERNATIONAL PORT
INDUSTRIAL AREAS & INTERNATIONAL PORT OF MALOY
PROJECT BACKGROUND
INTEGRATED RESOURCES & PLANTATION ZONE INDUSTRIAL AREAS AND INTERNATIONAL PORT
MALOY IS ONE OF PRIORITY PROJECT LOCATION FOR ECONOMIC ACCELERATION BASED ON MP3EI (INDUSTRIAL AREAS & INTERNATIONAL PORT OF MALOY)
HAS A STRATEGIC POSITION (SEA LANE ALKI II)
MALOY PORT IS DESIGNED INITIALLY TO HANDLE CPO EXPORTS. TERMINALS ARE ALSO PLANNED FOR COAL, CONTAINERS AND GENERAL CARGO (SUPPORTED INDUSTRIAL AREAS AND NATURAL RESOURCES DISTRIBUTION)
-
DEVELOPMENT PLANNING
GENERAL CARGO & CONTAINER TERMINAL
FISHERY PORT OF BUAL-BUAL
COAL TERMINAL
INTERNATIONAL CPO TERMINAL
EXISTING PORT FOR SHIP < 5000 DWT
INDUSTRIAL AREA
CPO YARD & TANK FOR LIQUIDS: 51.00 HA
CARGO & CONTAINER YARD: 205.00 HA
SUPPORTING FACILITIES: 81.00 HA
BUFFER ZONE: 86.10 HA
MANGROVE AND REEF : 450.90 HA
AMOUNT OF TOTAL AREA : 874.00 HA
PROJECT UPDATE :
PORT MASTERPLAN HAS ESTABLISHEDFS AND DED OF AREA HAS ESTABLISHED -
EXISTING FACILITIES
HATTA TERMINAL
Wharf: 850 M
Depth: - 12 M Lws
Warehouse CFS: 4.000 M2
CY: 11,4 Ha
Capacity: 700.000 TEUs
SOEKARNO TERMINAL
Wharf: 1.360 M
Depth: - 9 M Lws
Warehouse : 19.800 M2
Storage Yard: 6,4 Ha
Capacity: 5 Million Ton
PAOTERE TERMINAL
Wharf: 526 M
Depth: - 4 M Lws
PORT WORKING AREA :
Land: 119,3 Ha
Water: 2.978 Ha
BASIN: 319 Ha
*
-
LONG TERM PLAN
PROJECT UPDATE :
PORT MASTERPLAN ON GOING
CONTAINER TERMINAL
IN SHORT & MEDIUM TERM PLANNING
(78 HA)
CONTAINER TERMINAL (30,8 HA)
RO-RO TERMINAL (5,8 HA)
DREDGING AREA (27 HA)
*
-
PROPOSED
HUB INTERNATIONAL PORT
-
EXISTING WHARF
OFFICE AREA
CONTAINER YARD
RESERVE AREA
PARKING ZONE
WHARF ZONE
WAREHOUSE ZONE
PUBLIC UTILITY ZONE
*
-
MINISTRY OF TRANSPORTATION - REPUBLIC OF INDONESIA
Merdeka Barat Street No. 8, Jakarta 10110, Indonesia
www.dephub.go.id
NO DEVELOPMENT PLANNING
SHORT TERM MEDIUM TERM LONG TERM
TOTAL
2012-2017 2012-2023 2012-2030
A INTERNATIONAL CONTAINER TERMINAL
1 Container Terminal Wharf Length (m) 900,0 800,0 800,0 2.500,0
2 Container Terminal Yard Area (Ha) 32,0 48,0 48,0 128,0
B LIQUID BULK TERMINAL
1 Liquid Bulk Wharf Length (m) - 800,0 800,0 1.600,0
2 Liquid Bulk Terminal Area (Ha) - 24,0 24,0 48,0
C RESERVE AREA
Area (Ha) - 36,0 - 36,0
D HANDLING EQUIPMENTS
1 Quay Container Crane Unit 10,0 10,0 10,0 30,0
2 MRGC Unit 30,0 30,0 30,0 90,0
3 Terminal Tractor Unit 70,0 70,0 70,0 210,0
4 Chasis Unit 80,0 80,0 80,0 240,0
E ACCESS ROAD
Length (m) 2.803,0 - - 2.803,0
F DREDGING
Volume (m3) 27.801.655,0 - - 27.801.655,0
26 Ha
88,9 Ha
GARIS PANTAI
-14.00
basin
turning
GARIS PANTAI
210,1 Ha
-14.00-14.00
5.6 Ha
10.3 Ha
36.8 Ha
CONTAINER
TERMINAL AREA
DRY BULK
TERMINAL AREA
CONTAINER DEPO & CONSOLIDATION/DISTRIBUTION
CONTAINER AREA
PAI (PORT ASSOCIATED INDUSTRIES)
151,7 Ha
57,6 Ha
PAI (PORT ASSOCIATED INDUSTRIES)
DRY BULK
BATAS KLHS UNIBRAW
TAHAP III
1
3
5
7
9
1
3
5
7
9
11
13
15
17
19
23
21
CFS