portfolio additional estimates statements … · us e r gudi e introduction the purpose of the...

115
PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS 2007–08 FAMILIES, HOUSING, COMMUNITY SERVICES AND INDIGENOUS AFFAIRS PORTFOLIO

Upload: others

Post on 06-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS

2007–08

FAMILIES, HOUSING, COMMUNITY SERVICES AND INDIGENOUS AFFAIRS PORTFOLIO

Page 2: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

© Commonwealth of Australia 2008

ISBN 978-1-921380-83-9

This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written permission from the Commonwealth. Requests and inquiries concerning reproduction and rights should be addressed to the:

Commonwealth Copyright AdministrationAttorney-General’s DepartmentRobert Garran OfficesNational CircuitBARTON ACT 2600

Or posted atWebsite: www.ag.gov.au/cca

Printed by CanPrint Communications Pty Ltd

Page 3: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

MINISTER FOR FAMILIES, HOUSING, COMMUNITY SERVICES AND INDIGENOUS AFFAIRS

PARLIAMENT HOUSE CANBERRA 2600

President of the SenateAustralian SenateParliament HouseCANBERRA ACT 2600

SpeakerHouse of RepresentativesParliament HouseCANBERRA ACT 2600

Dear Mr PresidentDear Mr Speaker

I hereby submit Portfolio Additional Estimates Statements in support of the 2007–08 Additional Estimates for the Families, Housing, Community Services and Indigenous Affairs Portfolio.

These statements have been developed, and are submitted to the Parliament, as a statement on the funding requirements being sought for the portfolio.

I present these statements by virtue of my ministerial responsibility for accountability to the Parliament and, through it, the public.

Yours sincerely

The Hon. Jenny Macklin, MP

Page 4: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget
Page 5: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

TAbLE OF CONTENTS

User Guide .................................................................................................................... i

Introduction ................................................................................................................i

Structure of the Portfolio Additional Estimates Statements ...................................... ii

Styles and conventions used ................................................................................... iii

Enquiries .................................................................................................................. iii

Portfolio Overview ...................................................................................................... 3

Agencies of the Portfolio .......................................................................................... 3

Additional estimates and variations — Portfolio level .............................................. 5Figure 1: Portfolio Structure and Outcomes ......................................................................6

Agency Additional Estimates Statements Figure 1 ...........................................................7

Department of Families, Housing, Community Services and Indigenous Affairs (FaHCSIA) .................................................................................................................... 9

Section 1: Agency overview and resources; variations and measures .................... 9

Overview .................................................................................................................. 9Table 1.1: FaHCSIA Outcomes and Output Groups .......................................................10

Table 1.1a: Outcomes / functions transferred from former FaCSIA ................................ 11

Table 1.1b: Outcomes / functions transferred to FaHCSIA ............................................. 11

Additional estimates and variations to outcomes ....................................................12Table 1.2: Additional estimates and variations to outcomes – measures ...................... 12

Table 1.2a: Portfolio Agencies only affected by measures relating to Election Commitment Savings: 2 per cent Efficiency Dividend ....................................................16

Table 1.3: Additional estimates and variations to outcomes – other variations .............16

Measures—Agency summary.................................................................................18Table 1.4: Summary of measures since the 2007–08 Budget ....................................... 18

Breakdown of additional estimates by appropriation bill ........................................ 32Table 1.5: Appropriation Bill (No. 3) 2007–08 ................................................................32

Table 1.6: Appropriation Bill (No. 4) 2007–08 ................................................................34

Summary of staffing changes ................................................................................ 34Table 1.7: Average Staffing Level (ASL) .........................................................................34

Other receipts available to be used ...................................................................... 34Table 1.8: Other receipts available to be used ...............................................................34

Estimates of expenses from special appropriations .............................................. 35Table 1.9: Estimates of expenses from special appropriations ......................................36

Estimates of special account flows ........................................................................ 36Table 1.10: Estimates of special account flows ..............................................................36

Page 6: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

Section 2: Revisions to agency outcomes .............................................................37

Outcomes, administered items and outputs ............................................................37Figure 2: Outcome and Output structure for FaHCSIA ..................................................37

Outcome 1—Greater self-reliance and economic, social and community engagement for Indigenous Australians ................................................................ 39

Table 2.1.1: Total Resources for Outcome 1 ....................................................................40

Outcome 2—Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged to participate in the community .............. 43

Table 2.2.1: Total Resources for Outcome 2 ...................................................................44

Outcome 3—Families and children have choices and opportunities .....................47Table 2.3.1: Total Resources for Outcome 3 ...................................................................48

Outcome 4—Strong and Resilient Communities ....................................................51Table 2.4.1: Total Resources for Outcome 4 ...................................................................52

Section 3: Budgeted financial statements ............................................................. 55

Analysis of Budgeted financial statements ............................................................ 55

Balance Sheet ........................................................................................................ 56

Budgeted financial statements ............................................................................... 57Table 3.1: Budgeted departmental income statement (for the period ended 30 June) ..58

Table 3.2: Budgeted departmental balance sheet as at 30 June ...................................60

Table 3.3: Budgeted departmental statement of cash flows (for the period ended 30 June) ........................................................................................62

Table 3.4: Departmental statement of changes in equity — summary of movement (Budget 2007–08) ............................................................................................................64

Table 3.5: Departmental capital budget statement ........................................................65

Table 3.6: Departmental property, plant, equipment and intangibles - summary of movement (Budget year 2007–08) ..................................................................................66

Schedule of administered activity .......................................................................... 67 Table 3.7: Schedule of budgeted income and expenses administered on behalf of government (for the period ended 30 June) ....................................................................67

Table 3.8: Schedule of budgeted assets and liabilities administered on behalf of government (as at 30 June) .............................................................................................69

Table 3.9: Schedule of budgeted administered cash flows (for the period ended 30 June) ........................................................................................ 71

Page 7: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

INDIGENOUS BUSINESS AUSTRALIA .....................................................................75

Section 1: Agency overview and resources; variations and measures ..................75

Overview .................................................................................................................75Table 1.1: Agency Outcomes and Output Groups ..........................................................76

Additional estimates and variations to outcomes ................................................... 77

Table 1.2: Additional estimates and variations to outcomes — measures ............ 77

Measures — Agency summary ...............................................................................78Table 1.4: Summary of measures since the 2007–08 Budget .......................................78

Breakdown of additional estimates by appropriation bill ........................................ 79Table 1.5: Appropriation Bill (No. 3) 2007–08 ................................................................79

Table 1.6: Appropriation Bill (No. 4) 2007–08 ................................................................80

Summary of staffing changes .................................................................................81Table 1.7: Average Staffing Level (ASL) .........................................................................81

Other receipts available to be used ........................................................................81Table 1.8: Other receipts available to be used ...............................................................81

Section 2: Revisions to agency outcomes ............................................................ 82

Outcomes, administered items and outputs ........................................................... 82Figure 2: Outcome and Output structure for Indigenous Business Australia ................82

Outcome 1.............................................................................................................. 83Table 2.1.1: Performance information for outputs affected by additional estimates — Outcome 1 .......................................................................................................................83

Section 3: Budgeted financial statements ............................................................. 84Table 3.1: Budgeted departmental income statement (for the period ended 30 June) ..85

Table 3.2: Budgeted departmental balance sheet as at 30 June ...................................86

Table 3.3: Budgeted departmental statement of cash flows (for the period ended 30 June) ........................................................................................88

Table 3.4: Departmental statement of changes in equity - summary of movement (Budget 2007–08) ............................................................................................................90

Table 3.5: Departmental capital budget statement ........................................................91

Table 3.6: Departmental property, plant, equipment and intangibles ............................92

ABBREVIATIONS .................................................................................................. 93

GLOSSARY ........................................................................................................... 95

INDEX .................................................................................................................. 100

Page 8: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget
Page 9: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

User GUide

To The

PorTfolio AddiTionAl

esTimATes sTATemenTs

Page 10: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget
Page 11: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

i

USER GUIDE

Introduction

The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget Statements, is to inform Senators and Members of Parliament and the public of the proposed allocation of resources to Government outcomes by agencies within the portfolio. However, unlike the Portfolio Budget Statements, the PAES summarise only the changes in resourcing by outcome since the Budget, that is, they do not include a complete resourcing table for the agency. The PAES include new Measures, summarise the changes by Appropriation Bill, and, where relevant, by Special Appropriation and Special Account. The 2007–08 PAES also cover any significant changes to the portfolio which may have arisen from the Administrative Arrangements Order (AAO) which was released on 3 December 2007 and subsequently revised on 25 January 2008, following the change in government.

The PAES facilitate understanding of the proposed appropriations in Appropriation Bills (No. 3 and No. 4) 2007–08. In this sense the PAES is declared by the Additional Estimates Appropriation Bills to be a ‘relevant document’ to the interpretation of the Bills according to section 15AB of the Acts Interpretation Act 1901.

Whereas the Mid-Year Economic and Fiscal Outlook 2007–08 is a mid-year budget report which provides updated information to allow the assessment of the Government’s fiscal performance against its fiscal strategy, the PAES update the most recent budget appropriations for agencies within the portfolio.

Page 12: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

ii

Structure of the Portfolio Additional Estimates Statements

The PAES are presented in three parts with subsections.

User guide

Provides an introduction explaining the purpose of the PAES as well as information in relation to the styles and conventions used.

Portfolio overview

Provides an overview of the portfolio, including a chart that outlines the outcomes for agencies in the portfolio.

Agency additional estimates statements

A statement (under the name of the agency) for each agency affected by Additional Estimates.

Section 1: Agency overview, variations and measures

This section details the link between the resources appropriated, the impact of any post-Budget measures, and their application to the outputs and administered items (usually programs) that contribute to the achievement of outcomes. This section also reports changes to receipts from independent sources, changes to estimates of expenses from Special Appropriations, and changes to estimated Special Account flows.

Section 2: Revisions to outcomes, administered items and outputs

This section details changes to planned Government outcomes and / or to the contributing administered items and agency outputs.

Section 3: Budgeted financial statements

This section contains revisions to the Budgeted financial statements in accrual format covering Budget year, previous year and the three out-years for each agency.

Glossary Explains key terms.

Index (Optional) Alphabetical guide to the Statements.

Page 13: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

iii

Styles and conventions used

(a) The following notations may be used: NEC/nec not elsewhere classified AEST Australian Eastern Standard Time - nil .. not zero, but rounded to zero na not applicable (unless otherwise specified) nfp not for publication $m $ million

Figures in tables and in the text may be rounded. Discrepancies in tables between totals (b) and sums of components are due to rounding.

Enquiries

Should you have any enquiries regarding this publication please contact the Branch Manager, Budget Development Branch in the Department of Families, Housing, Community Services and Indigenous Affairs on (02) 6244 5571.

A copy of this document can be located on the Australian Government Budget website at: http://www.budget.gov.au.

Page 14: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget
Page 15: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

PorTfolio overview

Page 16: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget
Page 17: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

3

PORTFOLIO OVERVIEw

Agencies of the Portfolio

There have been significant changes to the portfolio since the 2007–08 Budget, arising from the Administrative Arrangements Order (AAO) which was released on 3 December 2007 and subsequently revised on 25 January 2008, following the change in government. The new Ministers responsible for the portfolio and its agencies are: the Hon. Jenny Macklin, MP; Minister for Families, Housing, Community Services and Indigenous Affairs; the Hon. Tanya Plibersek, MP; Minister for Housing and Minister for the Status of Women and the Hon. Bill Shorten, MP; Parliamentary Secretary for Disabilities and Children’s Services. The department’s significant housing responsibilities are now included as part of the portfolio name. Responsibility for a range of functions relating to child care, early childhood and youth have transferred to the new Department of Education, Employment and Workplace Relations (DEEWR).

The portfolio now comprises six agencies:

The Department of Families, Housing, Community Services and Indigenous Affairs • (FaHCSIA)

Aboriginal Hostels Limited (AHL) — (subject to the • Commonwealth Authorities and Companies Act 1997)

Equal Opportunity for Women in the Workplace Agency (EOWA)•

Indigenous Business Australia (IBA) — (subject to the • Commonwealth Authorities and Companies Act 1997)

Indigenous Land Corporation (ILC) — (subject to the • Commonwealth Authorities and Companies Act 1997)

Torres Strait Regional Authority (TSRA) — (subject to the • Commonwealth Authorities and Companies Act 1997)

The Social Security Appeals Tribunal (SSAT) is a statutory body that reports to the Minister for Families, Housing, Community Services and Indigenous Affairs. Support for the operations of the SSAT is provided under longstanding administrative arrangements. Funding for the SSAT is included in the prices of FaHCSIA’s departmental outputs.

The portfolio includes the following independent bodies established under the Aboriginal Land Rights (Northern Territory) Act 1976 and subject to the Commonwealth Authorities and Companies Act 1997 (CAC Act 1997):

Anindilyakwa Land Council•

Central Land Council•

Northern Land Council•

Page 18: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

4

Tiwi Land Council.•

The Wreck Bay Aboriginal Community Council is an independent statutory body established by the Aboriginal Land Grant (Jervis Bay Territory) Act 1986 and subject to the Commonwealth Authorities and Companies Act 1997 (CAC Act 1997):

Wreck Bay Aboriginal Community Council.•

The portfolio includes the following independent statutory office holder appointed by the Minister and subject to the Aboriginal Councils and Associations Act 1976 (ACA Act 1976):

Registrar of Aboriginal and Torres Strait Islander Corporations.•

The Aboriginal Land Commissioner is an independent statutory office holder appointed by the Governor-General under the Aboriginal Land Rights (Northern Territory) Act 1976:

Aboriginal Land Commissioner.•

Page 19: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

5

ADDITIONAL ESTIMATES AND VARIATIONS — PORTFOLIO LEVEL

Revised funding for annually appropriated items is being sought for FaHCSIA and IBA.

These statements also provide revised estimates of expenses from special appropriations and revised financial statements.

Estimates shown in these statements have been revised since those published in the 2007–08 Mid-Year Economic and Fiscal Outlook (MYEFO) to include the impacts of decisions taken since that time.

An increase of $204.7 million in annual appropriations is being sought. This is offset by a saving of $0.8 million against Appropriation Act (No.1) 2007–08 and Appropriation Act (No.2) 2007–08.

Estimates of expenditure on special appropriations have increased by a net amount of $4,683.0 million. The following table provides a breakdown of the additional funding and savings by agency.

Agency* Budget 2007-08 Appropriation

($’000)

Additional Estimates

($’000)

Savings

($’000)

Department of Families, Housing, Community Services and Indigenous Affairs 4,992,818 199,744 - 800

Aboriginal Hostels Limited 50,060 - -

Equal Opportunity for Woman in the Workplace Agency 2,972 - -

Indigenous Buisiness Australia 116,278 5,000 -

Torres Strait Regional Authority 51,778 - -

Total Annual Appropriations 5,213,906 204,744 - 800

Special Appropriations 45,673,779 5,997,821 - 1,314,831

Total Appropriations 50,887,685 6,202,565 - 1,315,631

*The Indigenous Land Corporation does not receive funding from Appropriations

Page 20: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

6

Figure 1: Portfolio structure and outcomes

Minister for Families, Housing, Community Services and Indigenous AffairsThe Hon. Jenny Macklin, MP

Minister for Housing and Minister for the Status of WomenThe Hon. Tanya Plibersek, MP

Parliamentary Secretary for Disabilities and Children’s ServicesThe Hon. Bill Shorten, MP

Department of Families, Housing, Community Services and Indigenous Affairs

Secretary: Dr Jeff Harmer

Outcome 1 Greater self-reliance and economic, social and community engagement for Indigenous Australians

Outcome 2 Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged to participate in the community

Outcome 3 Families and children have choices and opportunities

Outcome 4 Strong and resilient communities

Social Security Appeals Tribunal

Executive Director: Mr Les Blacklow

Outcome: Conducts merit reviews of administrative decisions made under a number of enactments, in particular social security law, family assistance law, and child support law.

Aboriginal Hostels Limited

General Manager: Mr Keith Clarke

Outcome: Provide temporary accommodation that assists Aboriginal and Torres Strait Islander people to achieve personal goals to obtain dignity and equity in the Australian community.

Indigenous Land Corporation

Chair: Ms Shirley McPherson

Outcome: Provide economic, environmental, social and cultural benefits for Aboriginal persons and Torres Strait Islanders by assisting in the acquisition and management of land.

Torres Strait Regional Authority

Chair: Mr John (Toshie) Kris

Outcome: Achieve a better quality of life and develop an economic base for Torres Strait Islander and Aboriginal persons living in the Torres Strait.

Northern Territory Land Councils

Northern Land Council

Central Land Council

Anindilyakwa Land Council

Tiwi Land Council

Outcome: Represent Aboriginal interests in various processes under the Aboriginal Land Rights (Northern Territory) Act 1976.

Registrar of Aboriginal and Torres Strait Islander Corporations

Registrar: Mr Anthony Beven

Outcome: Administers the Corporations (Aboriginal and Torres Strait Islander) Act 2006 (CATSI Act).

Aboriginal Land Commissioner

Commissioner: The Hon. H.W. Olney AM QC

Outcome: Consider applications for claims to traditional land and make recommendations to the Minister for the granting of land.

Aboriginals Benefit Account Advisory Committee

Chair: Ms Miriam Rose Baumann AM

Outcome: Advise the Minister in relation to payments under the Aboriginals Benefit Account.

Wreck Bay Aboriginal Community Council

Outcome: Established by the Aboriginal Land Grant (Jervis Bay Territory) Act 1986 to hold title to land and provide council services to the Aboriginal Community of Jervis Bay.

Indigenous Business Australia

General Manager: Mr Ron Morony

Outcome: Stimulating the economic advancement of Aboriginal and Torres Strait Islander peoples.

Equal Opportunity for Women in the Workplace Agency

Director: Anna McPhee

Outcome: Equality of opportunity in employment for women.

Page 21: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

7

AGency AddiTionAl esTimATes sTATemenTs

Department of Families, Housing, Community Services and Indigenous Affairs .........9

Indigenous Business Australia ......................................................................................... 75

Page 22: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget
Page 23: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

9

DEPARTMENT OF FAMILIES, HOUSING, COMMUNITY SERVICES AND INDIGENOUS AFFAIRS

Section 1: Agency overview and resources; variations and measures

Overview

Significant changes to the portfolio arose from the AAO, which was released on 3 December 2007 and subsequently revised on 25 January 2008.

Under the AAO, two agencies have joined FaHCSIA’s portfolio from the former Employment and Workplace Relations portfolio: IBA and EOWA. The Australian Institute of Family Studies and responsibility for Family Impact Statements have transferred to the portfolio of Prime Minister and Cabinet.

FaHCSIA is gaining the following programs: Disability Support Pension and Community Development and Employment Projects. Disability Support Pension will be an addition to Output Group 2.2—Support for people with disabilities. Community Development and Employment Projects will form part of Output Group 1.2—Services for Indigenous Australians.

Most of FaHCSIA’s programs and functions relating to early childhood policy and child care policy and programs have transferred to the new portfolio of Education, Employment and Workplace Relations. This includes the whole of Output Group 3.3— Child Care Support as well as other functions across Outcome 3.

The early childhood and child care programs and functions that have transferred include Child Care Benefit; Jobs, Education and Training Child Care Fee Assistance; Child Care Tax Rebate; Child Care Management System; Child Care Support Program; National Child Care Accreditation Council; Australian Government Accreditation Review Council; Australian Early Development Index; Home Interaction Program; Support for Child Care Specific Purpose Payment and Children’s Services Local Government Area.

The majority of youth programs and policy functions, including income support policies and programs, but with the exception of the Reconnect and Newly Arrived Youth Support Services programs, have transferred to the Department of Education, Employment and Workplace Relations. These functions have transferred out of Output Group 2.4—Support for Youth.

The youth programs and functions that will be transferring include the Source website, the Transition to Independent Living Allowance, Mentor Marketplace, the National Youth Affairs Research Program, the National Youth Roundtable, the Ship for World Youth Program, YouthLinx and the Youth Bureau.

Page 24: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

10

Table 1.1 contains descriptions of the department’s outcomes and outputs, the structure of which is summarised in Figure 2 at page 37.

Table 1.1: FaHCSIA Outcomes and Output GroupsOutcome Description Output groups

Outcome 1

Greater self-reliance and economic, social and community engagement for Indigenous Australians

Services and assistance that promote greater self-reliance and engagement for Indigenous families and communities through: shared responsibility; practical support; and innovative whole-of-government policy

Output Group 1.1 Whole-of-government coordination of policy development and service delivery for Indigenous Australians

Output Group 1.2 Services for Indigenous Australians

Output 1.3 Incorporation, regulation and capacity building of Indigenous corporations

Outcome 2

Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged to participate in the community

Services and assistance that help people to: participate actively in community and economic life; access a responsive and sustainable safety net; and develop their capabilities

Output Group 2.0 Appropriations Applicable across Outcome 2

Output Group 2.1 Support for the Aged

Output Group 2.2 Support for People with Disabilities

Output Group 2.3 Support for Carers

Output Group 2.4 Support for Youth

Output Group 2.5 Support for Women

Outcome 3

Families and children have choices and opportunities

Services and assistance that: help children have the best possible start in life; promote healthy family relationships; help families adapt to changing economic and social circumstances; and assist families with the costs of children

Output Group 3.1 Support for families

Output Group 3.2 Child Support

Output Group 3.3 Child Care Support

Outcome 4

Strong and resilient communities Services and assistance that: help homeless people and low-income households to gain affordable and appropriate housing; promote community partnerships; and encourage participation in the local community by individuals, families, business and government

Output Group 4.1 Housing Support

Output Group 4.2 Supporting Financial Management

Output Group 4.3 Community Recovery

Output Group 4.4 Community Partnerships and Delivery

Page 25: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

11

Table 1.1a: Outcomes / functions transferred from the former Department of Families, Community Services and Indigenous Affairs

Outcomes / Functions Agency / Department

The Australian Institute of Family Studies This agency transferred from the former portfolio of Families, Community Services and Indigenous Affairs to the Portfolio of Prime Minister and Cabinet

Early childhood and child care programs and policy functions under Output Group 3.3 and other functions across Outcome 3. Programs and functions that transferred include: Child Care Benefit; Jobs, Education and Training Child Care Fee Assistance; Child Care Tax Rebate; Child Care Management System; Child Care Support Program; National Child Care Accreditation Council; Australian Government Accreditation Review Council; Australian Early Development Index; Home Interaction Program; Support for Child Care Specific Purpose Payment; and Children’s Services Local Government Area.

These programs and functions transferred from the former Department of Families, Community Services and Indigenous Affairs (FaCSIA) to DEEWR.

Youth programs and policy functions under Output 2.4, including: the Source website, the Transition to Independent Living Allowance, Mentor Marketplace, the National Youth Affairs Research Program, the National Youth Roundtable, the Ship for World Youth Program, YouthLinx and the Youth Bureau.

These programs and functions transferred from FaCSIA to DEEWR.

Table 1.1b: Outcomes / functions transferred to the Department of Families, Housing, Community Services and Indigenous Affairs

Outcomes / Functions Agency / Department

Indigenous Business Australia This agency transferred to FaHCSIA from the former portfolio of Employment and Workplace Relations.

Equal Opportunity for Women in the Workplace Agency This agency transferred to FaHCSIA from the former portfolio of Employment and Workplace Relations.

Disability Support Pension This program transferred to FaHCSIA from the former DEWR, from Outcome 1: Efficient and effective labour market assistance, specifically Output Group 1.1—Working Age Payments.

Community Development and Employment Projects This program transferred to FaHCSIA from the former DEWR, from Outcome 3: Increased workforce participation, Output Group 3.2—Labour Market Strategies.

Page 26: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

12

Additional estimates and variations to outcomes

A net increase of $198.9 million in annual appropriations is being sought for the Department. Tables 1.2 and 1.3 identify the components of the variations.

Table 1.2 lists variations to annual appropriations by outcome resulting from new measures since the 2007–08 Budget.

Table 1.2: Additional estimates and variations to outcomes – Measures ($’000)

Measures 2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1

Increase in estimates (administered)

Yamatji - native title representative body - additional funding for resolution of native title claim issues 5,500 - - -

Welfare reform - Cape York trial* 1,469 4,597 4,175 3,127

Northern Territory Emergency Response – employment and welfare reform* 41,074 67,955 68,039 -

Administered Total 48,043 72,552 72,214 3,127

Increase in estimates (departmental)

Welfare reform - Cape York trial 2,751 1,901 1,440 1,574

Northern Territory Emergency Response – employment and welfare reform* 5,388 7,931 7,874 -

Tuggeranong Office Park – transitional accommodation costs 2,066 3,524 - -

Departmental Total 10,205 13,356 9,314 1,574

Decrease in estimates (administered)

Northern Territory Emergency Response Night Patrol Services - 1,000 - - -

Welfare reform - Cape York trial* -5,681 - 13,949

Administered Total - 6,681 - 13,949 - -

Decrease in estimates (departmental)

Additional 0.25 per cent Efficiency Dividend in MYEFO - - 132 - 249 - 376

Election Commitment Savings: 2 per cent Efficiency Dividend* - 224 - 1,008 - 991 - 1,020

Departmental Total - 224 - 1,140 - 1,240 - 1,396

Total for Outcome 1 51,343 70,819 80,288 3,305

* This measure has been funded across multiple outcomes.

Page 27: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

13

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2

Increase in estimates (administered)

Disability assistance - support for people with disabilities their families and carers 40,274 49,818 45,865 22,836

Movement of disability assistance package funds to the CSTDA 33,036 91,355 154,386 252,630

Children with autism spectrum disorders - support for families and carers - 25,730 34,871 35,535

National plan to reduce violence against women and children 250 450 250 250

Administered Total 73,560 167,353 235,372 311,251

Increase in estimates (departmental)

Children with autism spectrum disorders - support for families and carers 5,694 3,630 2,120 856

Disability assistance - support for people with disabilities their families and carers 20,221 3,738 2,864 3,034

Seniors Concession Allowance - increase 1,117 112 112 113

Utilities Allowance - increase and extend eligibility to include all recipients of Disability Support Pension, Service Pension and Carer Payment 10,979 331 334 261

Carer Bonus - supplementation 1,610 - - -

Seniors’ Bonus - supplementation 261 - - -

Tuggeranong Office Park – transitional accommodation costs* 1,536 2,634 - -

Departmental Total 41,418 10,445 5,430 4,264

Decrease in estimates (departmental)

Social Inclusion Unit - 258 - 468 - 472 - 478

Savings for Labor’s Better Priorities – Abolition of the Access Card* - 36 - 37 - 37 - 38

Additional 0.25 per cent Efficiency Dividend in MYEFO* - - 1,159 - 2,260 - 3,407

Election Commitment Savings: 2 per cent Efficiency Dividend* - 2,165 - 8,855 - 8,742 - 8,833

Departmental Total - 2,459 - 10,519 - 11,511 - 12,756

Total for Outcome 2 112,519 167,279 229,291 302,759

Table 1.2: Additional estimates and variations to outcomes – measures (continued)

* This measure has been funded across multiple outcomes.

Page 28: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

14

Outcome 3

Increase in estimates (administered)

Drought Package 2007 – additional financial, social and emotional counselling 2,421 6,369 - -

Early Development and Learning Services - Parenting Support 612 3,118 4,775 8,118

Channel 7 Telethon Trusts - contribution 500

Administered Total 3,533 9,487 4,775 8,118

Increase in estimates (departmental)

Drought Package 2007 – additional financial, social and emotional counselling 781 1,051 - -

Tuggeranong Office Park – transitional accommodation costs* 1,685 2,866 - -

Departmental Total 2,466 3,917 - -

Decrease in estimates (administered)

National Rollout of the Australian Early Development Index - 673 - 1,004 - 1,154 -

Administered Total - 673 - 1,004 - 1,154 -

Decrease in estimates (departmental)

Office of Work and Family - 327 - 531 - 363 - 368

Savings for Labor’s Better Priorities – Abolition of the Access Card* - 30 - 30 - 31 - 31

Additional 0.25 per cent Efficieny Dividend in MYEFO* - - 1,570 - 3,048 - 4,591

Election Commitment Savings: 2 per cent Efficiency Dividend* - 2,909 - 12,002 - 11,815 - 11,941

Departmental Total - 3,266 - 14,133 - 15,257 - 16,931

Total for Outcome 3 2,060 - 1,733 - 11,636 - 8,813

Table 1.2: Additional estimates and variations to outcomes – measures (continued)

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

* This measure has been funded across multiple outcomes.

Page 29: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

15

Outcome 4

Increase in estimates (administered)

Brendan’s Fund - ex-gratia payment 350 - - -

Daughters of Charity - funding 2,500 - - -

Drought Package 2007 - additional funding for the Emergency Relief Program 1,500 2,775 - -

Equine influenza - assistance 17,887 - - -

Equine influenza - twelve week extension of assistance 10,362 - - -

Foodbank SA - financial assistance 100 100 - -

Home in Queanbeyan Mental Health Service 2,000 - - -

Welfare reform - Cape York trial* 222 483 493 503

Administered Total 34,921 3,358 493 503

Increase in estimates (departmental)

Disaster relief funding - Hunter, Central Coast and Gippsland regions 5,664 156 - -

Equine influenza - assistance 3,398 - - -

Drought Package 2007 - additional funding for the Emergency Relief Program - 225 - -

Establishment of an Office for Housing 339 828 835 843

National Housing Supply Research Council 890 2,304 2,323 2,345

Tuggeranong Office Park – transitional accommodation costs* 1,159 1,981 - -

Departmental Total 11,450 5,494 3,158 3,188

Decrease in estimates (administered)

Abolish Community Business Partnership - 300 - 500 - -

Administered Total - 300 - 500 - -

Decrease in estimates (departmental)

Abolish Community Business Partnership - 410 - - -

Additional 0.25 per cent Efficieny Dividend in MYEFO* - - 238 - 471 - 710

Election Commitment Savings: 2 per cent Efficiency Dividend* - 449 - 1,827 - 1,823 - 1,846

Departmental Total - 859 - 2,065 - 2,294 - 2,556

Total for Outcome 4 45,212 6,287 1,357 1,135

Total for All 211,134 242,652 299,300 298,386

*This measure has been funded across multiple outcomes

Table 1.2: Additional estimates and variations to outcomes – measures (continued)

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Page 30: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

16

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Agency DetailsDepartment of Families, Housing, Community Services and Indigenous Affairs - 5,747 - 23,692 - 23,371 - 23,640

Aboriginal Hostels Limited - 155 - 694 - 744 - 765

Equal Opportunity for Women in the Workplace Agency - 14 - 60 - 61 - 61

Indigenous Business Australia - - - -

Torres Strait Regional Authority - 238 - 1,062 - 1,082 - 1,114

Table 1.3 lists variations to annual appropriations by outcome resulting from adjustments other than measures since the 2007–08 Budget.

Table 1.3: Additional estimates and variations to outcomes – other variations ($’000)

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1Variations (administered)

Changes in price and wage indices - 937 951 970

Estimates variations - 76,342 - - -

Modification to previous budget measures 1,969 2,013 2,063 2,115

Movement of Funds Between Years 60,000 - - -

Subtotal -14,373 2,950 3,014 3,085

Variations (departmental)

Changes in price and wage indices - 98 91 138

Subtotal - 98 91 138

Total for Outcome 1 -14,373 3,048 3,105 3,223

Outcome 2

Variations (administered)

Application of Efficiency Dividend - - 765 - 1,599 - 2,383

Changes in price and wage indices - 671 676 693

Modification to previous budget measures 700 700 700 700

Subtotal 700 606 - 223 - 990

Variations (departmental)

Changes in price and wage indices - 883 860 1,297

Subtotal - - 9,131 860 1297

Total for Outcome 2 700 1489 637 307

Table 1.2a: Portfolio Agencies only affected by Measure relating to Election Commitment Savings: 2 per cent Efficiency Dividend

Page 31: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

17

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 3

Variations (administered)

Application of Efficiency Dividend - - 167 - 339 - 504

Changes in price and wage indices - 239 227 302

Movement of Funds Between Years 340 - - -

Subtotal 340 72 -112 - 202

Variations (departmental)

Changes in price and wage indices - 1,197 1,159 1,748

Subtotal - 1,197 1,159 1,748

Total for Outcome 3 340 1,269 1,047 1,546

Outcome 4

Variations (administered)

Application of Efficiency Dividend - - 2,459 - 4,968 - 7,531

Changes in price and wage indices - 2,358 2,331 2,411

Movement of Funds Between Years 1,143 - - -

Subtotal 1,143 - 101 - 2,637 - 5,120

Variations (departmental)

Changes in price and wage indices - 182 179 270

Subtotal - 182 179 270

Total for Outcome 4 1,143 81 - 2,458 - 4,850

TOTAL OTHER VARIATIONS -12,190 5,887 2,331 226

Table 1.3: Additional estimates and variations to outcomes – other variations ($’000)(continued)

Page 32: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

18

Mea

sure

Out

com

eO

utpu

t

grou

ps20

07-0

820

08-0

920

09-1

020

10-1

1

affe

cted

($’0

00)

($’0

00)

($’0

00)

($’0

00)

Adm

inD

ept

Adm

inD

ept

Adm

inD

ept

Adm

inD

ept

item

sou

tput

sTo

tal

item

sou

tput

sTo

tal

item

sou

tput

sTo

tal

item

sou

tput

sTo

tal

Exp

ense

Mea

sure

s

Abo

rigin

al E

mpl

oym

ent S

trate

gy -

reco

ncili

atio

n an

d yo

uth

activ

ities

11.

2 -

- -

- -

- -

- -

- -

-

Nor

ther

n Te

rrito

ry E

mer

genc

y R

espo

nse

Nig

ht P

atro

l Ser

vice

s1

1.2

- 1,0

00 -

- 1,0

00 -

- -

- -

- -

- -

Yam

atji

- nat

ive

title

repr

esen

tativ

e bo

dy -

addi

tiona

l fun

ding

for r

esol

utio

n of

nat

ive

title

cla

im is

sues

11.

2 5

,500

- 5

,500

- -

- -

- -

- -

-

Rec

onci

liatio

n - A

ustra

lia’s

Ong

oing

Com

mitm

ent

11.

2 -

- -

- -

- -

- -

- -

-

Chi

ldre

n w

ith a

utis

m s

pect

rum

dis

orde

rs -

supp

ort f

or fa

mili

es a

nd c

arer

s 2

2.2

- 5

,694

5,6

94 2

5,73

0 3

,630

29,

360

34,

871

2,1

20 3

6,99

1 3

5,53

5 8

56 3

6,39

1

Dis

abili

ty a

ssis

tanc

e - s

uppo

rt fo

r peo

ple

with

dis

abili

ties

thei

r fam

ilies

and

car

ers1

22.

2 1

72,6

35 1

7,67

4 1

90,3

09 1

86,9

82 3

,738

190

,720

188

,379

2,8

64 1

91,2

43 1

70,7

76 2

,676

173

,452

Mov

emen

t of d

isab

ility

ass

ista

nce

pack

age

fund

s to

the

CS

TDA

22.

2 3

3,03

6 -

33,

036

91,

355

- 9

1,35

5 1

54,3

86 -

154

,386

252

,630

- 2

52,6

30

Sen

ior C

once

ssio

n A

llow

ance

- in

crea

se2

2.1

33,

308

1,1

17 3

4,42

5 5

9,62

5 1

12 5

9,73

7 5

7,66

0 1

12 5

7,77

2 5

9,64

6 1

13 5

9,75

9

Nat

iona

l pla

n to

redu

ce v

iole

nce

agai

nst w

omen

and

chi

ldre

n 2

2.5

250

- 2

50 4

50 -

450

250

- 2

50 2

50 -

250

Sen

iors

and

elig

ible

vet

eran

s –

exte

nded

trav

el c

once

ssio

ns

22.

1 -

- -

- -

- -

- -

- -

-

Sen

iors

’ Pac

kage

- In

crea

sed

Tele

phon

e A

llow

ance

2

2.1

6,8

15 -

6,8

15 3

1,54

5 -

31,

545

36,

028

- 3

6,02

8 4

2,38

8 -

42,

388

Soc

ial I

nclu

sion

Uni

t2

2.1

- 2.5

-- 2

58- 2

58 -

- 468

- 468

-- 4

72- 4

72 -

- 478

- 478

Soc

ial s

ecur

ity a

gree

men

t bet

wee

n A

ustra

lia a

nd G

reec

e

22.

1 -

- -

- -

- -

- -

- -

-

Util

ities

Allo

wan

ce -

incr

ease

and

ext

end

elig

ibili

ty to

incl

ude

all r

ecip

ient

s of

D

isab

ility

Sup

port

Pen

sion

, Ser

vice

Pen

sion

and

Car

er P

aym

ent

22.

1 - 2

.3 4

59,3

18 1

0,97

9 4

70,2

97 9

61,8

12 3

31 9

62,1

43 1

,004

,390

334

1,0

04,7

24 1

,054

,944

261

1,0

55,2

05

Vete

rans

’ Dis

abili

ty P

ensi

on –

cha

nges

to in

dexa

tion

and

incr

ease

s to

the

Gen

eral

an

d E

xtre

me

Dis

able

men

t Adj

ustm

ent R

ates

2

2.1

- 419

-- 4

19- 1

,744

-- 1

,744

- 2,2

41 -

- 2,2

41- 2

,812

-- 2

,812

Car

er B

onus

- su

pple

men

tatio

n2

2.3

- 1

,610

1,6

10 -

- -

- -

- -

- -

Sen

iors

’ Bon

us -

supp

lem

enta

tion

22.

1 - 2

.3 -

261

261

- -

- -

- -

- -

-

Cha

nnel

7 T

elet

hon

Trus

t - c

ontr

ibut

ion

33.

150

0-

-500

--

--

--

--

-

Dro

ught

Pac

kage

200

7 –

addi

tiona

l fina

ncia

l, so

cial

and

em

otio

nal c

ouns

ellin

g3

3.1

2,4

21 7

81 3

,202

6,3

69 1

,051

7,4

20 -

- -

- -

-

Ear

ly D

evel

opm

ent a

nd L

earn

ing

Ser

vice

s - P

aren

ting

Sup

port

3

3.1

612

- 6

12 3

,118

- 3

,118

4,7

75 -

4,7

75 8

,118

- 8

,118

Nat

iona

l Rol

l-out

of t

he A

ustra

lian

Ear

ly D

evel

opm

ent I

ndex

33.

1- 6

73 -

- 673

- 1,0

04 -

- 1,0

04- 1

,154

-- 1

,154

- -

-

Mea

sure

s —

Age

ncy

sum

mar

y

Tabl

e 1.

4: S

umm

ary

of m

easu

res

sinc

e th

e 20

07–0

8 B

udge

t

Page 33: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

19

Offi

ce o

f Wor

k an

d Fa

mily

33.

1 -

- 327

- 327

-- 5

31- 5

31 -

- 363

- 363

-- 3

68- 3

68

Abo

lish

Com

mun

ity B

usin

ess

Par

tner

ship

44.

4- 3

00- 4

10- 7

10- 5

00 -

- 500

- -

- -

- -

Bre

ndan

’s F

und

- ex-

grat

ia p

aym

ent

44.

4 3

50 -

350

- -

- -

- -

- -

-

Dau

ghte

rs o

f Cha

rity

- fun

ding

44.

4 2

,500

- 2

,500

- -

- -

- -

- -

-

Dis

aste

r rel

ief f

undi

ng -

Hun

ter,

Cen

tral C

oast

and

Gip

psla

nd re

gion

s4

4.3

19,

030

5,6

64 2

4,69

4 -

156

156

- -

- -

- -

Dro

ught

Pac

kage

200

7 - a

dditi

onal

fund

ing

for t

he E

mer

genc

y R

elie

f Pro

gram

4

4.2

1,5

00 -

1,5

00 2

,775

225

3,0

00 -

- -

- -

-

Equ

ine

influ

enza

- as

sist

ance

44.

3 1

7,88

7 3

,398

21,

285

- -

- -

- -

- -

-

Equ

ine

influ

enza

- tw

elve

wee

k ex

tens

ion

of a

ssis

tanc

e4

4.3

10,

362

- 1

0,36

2 -

- -

- -

- -

- -

Est

ablis

hmen

t of a

n O

ffice

for H

ousi

ng

44.

1 -

339

339

- 8

28 8

28 -

835

835

- 8

43 8

43

Food

bank

SA

- fin

anci

al a

ssis

tanc

e

4

4.4

100

- 1

00 1

00 -

100

- -

- -

- -

Hom

e in

Que

anbe

yan

Men

tal H

ealth

Ser

vice

44.

1 2

,000

- 2

,000

- -

- -

- -

- -

-

Nat

iona

l Hou

sing

Sup

ply

Res

earc

h C

ounc

il

4

4.1

- 8

90 8

90 -

2,3

04 2

,304

- 2

,323

2,3

23 -

2,3

45 2

,345

Syd

ney

Chr

istm

as P

arad

e - c

ontr

ibut

ion

44.

4 -

- -

- -

- -

- -

- -

-

Sav

ings

for L

abor

’s B

ette

r Prio

ritie

s –

Abo

litio

n of

the

Acc

ess

Car

d

2,3

2.1,

2.3,

3.1

-- 6

6- 6

6 -

- 67

- 67

-- 6

8- 6

8 -

- 69

- 69

Wel

fare

refo

rm -

Cap

e Yo

rk tr

ial 2

1,2,

41.

2,2.

2,4.

3- 3

,304

2,7

51- 5

53- 7

,145

1,9

01- 5

,244

4,6

68 1

,440

6,1

08 3

,630

1,5

74 5

,204

Nor

ther

n Te

rrito

ry E

mer

genc

y R

espo

nse

– em

ploy

men

t and

wel

fare

refo

rm1,

21.

2,2.

2 3

8,77

8 5

,388

44,

166

64,

163

7,9

31 7

2,09

4 6

4,10

2 7

,874

71,

976

- -

-

Tugg

eran

ong

Offi

ce P

ark

– tra

nsiti

onal

acc

omm

odat

ion

cost

s 3

1,2,

3,4

- 6

,446

6,4

46 -

11,

005

11,

005

- -

- -

- -

Add

ition

al 0

.25

per c

ent E

ffici

ency

Div

iden

d in

MY

EFO

1,2,

3,4

- -

- -

- 3,0

99- 3

,099

-- 6

,028

- 6,0

28 -

- 9,0

84- 9

,084

Ele

ctio

n C

omm

itmen

t Sav

ings

: 2 p

er c

ent E

ffici

ency

Div

iden

d1,

2,3,

4 -

- 5,7

47- 5

,747

-- 2

3,69

2- 2

3,69

2 -

- 23,

371

- 23,

371

-- 2

3,64

0- 2

3,64

0

Tota

l of E

xpen

se M

easu

res

801

,206

56,

184

857

,390

1,4

23,6

31 5

,355

1,4

28,9

86 1

,546

,114

- 12,

400

1,5

33,7

14 1

,625

,105

- 24,

971

1,6

00,1

34

Cap

ital M

easu

res

Dis

abili

ty a

ssis

tanc

e su

ppor

t for

peo

ple

with

dis

abili

ties,

thei

r fam

ilies

and

car

ers

22.

2 -

2,5

47 2

,547

- -

- -

- -

- 3

58 3

58

Tota

l of C

apita

l Mea

sure

s-

2,54

72,

547

- -

- -

- -

- 3

58 3

58

Tota

l of A

ll M

easu

res

801

,206

58,

731

859

,937

1,4

23,6

31 5

,355

1,4

28,9

86 1

,546

,114

- 12,

400

1,5

33,7

14 1

,625

,105

- 24,

613

1,6

00,4

92

1 Th

e G

over

nmen

t has

var

ied

this

mea

sure

ann

ounc

ed b

y th

e pr

evio

us g

over

nmen

t in

the

2007

-08

MY

EFO

, with

uns

pent

and

unc

omm

itted

fund

ing

bein

g tra

nsfe

rred

to th

e C

STD

A ($

531,

407

mill

ion

from

200

7-08

to 2

010-

11 a

nd $

369,

748

in 2

011-

12).

2 T

he re

duct

ion

in C

DE

P o

utla

ys re

gist

ered

her

e is

offs

et b

y ad

ditio

nal i

ncom

e su

ppor

t exp

endi

ture

and

exp

endi

ture

on

incr

ease

d se

rvic

es in

oth

er p

ortfo

lios,

incl

udin

g fro

m th

e co

nver

sion

of f

orm

er C

DE

P p

ositi

ons

into

real

jobs

.

3 T

he G

over

nmen

t has

var

ied

this

mea

sure

ann

ounc

ed b

y th

e pr

evio

us g

over

nmen

t in

the

2007

-08

MY

EFO

, with

dep

artm

enta

l fun

ding

bei

ng re

duce

d by

$1.

7 m

illio

n.

The

Gov

ernm

ent i

s no

t pro

ceed

ing

with

the

follo

win

g m

easu

re a

nnou

nced

by

the

prev

ious

gov

ernm

ent i

n th

e 20

07-0

8 M

YE

FO: C

entre

link

- fur

ther

cal

l cen

tre s

uppl

emen

tatio

n

Tabl

e 1.

4: S

umm

ary

of m

easu

res

sinc

e th

e 20

07–0

8 B

udge

t (co

ntin

ued)

Page 34: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

20

Outcome 1 Measures

Aboriginal Employment Strategy - reconciliation and youth activities

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered - - - -

Departmental - - - -

Total - - - -

Measure Administered - - - -

Departmental - - - -

Resourcing Total - - - -

Related Capital - - - -

Northern Territory Emergency Response Night Patrol Services

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered - 1,000 - - -

Departmental - - - -

Total - 1,000 - - -

Measure Administered - 1,000 - - -

Departmental - - - -

Resourcing Total - 1,000 - - -

Related Capital - - - -

Yamatji - native title representative body - additional funding for resolution of native title claim issues

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered 5,500 - - -

Departmental - - - -

Total 5,500 - - -

Measure Administered 5,500 - - -

Departmental - - - -

Resourcing Total 5,500 - - -

Related Capital - - - -

Reconciliation - Australia’s Ongoing Commitment

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered - - - -

Departmental - - - -

Total - - - -

Measure Administered - - - -

Departmental - - - -

Resourcing Total - - - -

Related Capital - - - -

Statement of Post 2007–08 Budget Measures

Page 35: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

21

Outcome 2 Measures

Children with autism spectrum disorders - support for families and carers

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered - 25,730 34,871 35,535

Departmental 5,694 3,630 2,120 856

Total 5,694 29,360 36,991 36,391

Measure Administered - 25,730 34,871 35,535

Departmental 5,694 3,630 2,120 856

Resourcing Total 5,694 29,360 36,991 36,391

Related Capital - - - -

Disability assistance - support for people with disabilities their families and carers

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered 172,635 186,982 188,379 170,776

Departmental 17,674 3,738 2,864 2,676

Total 190,309 190,720 191,243 173,452

Measure Administered 172,635 186,982 188,379 170,776

Departmental 17,674 3,738 2,864 2,676

Resourcing Total 190,309 190,720 191,243 173,452

Related Capital 2,547 - - 358

Movement of disability assistance package funds to the CSTDA

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered 33,036 91,355 154,386 252,630

Departmental - - - -

Total 33,036 91,355 154,386 252,630

Measure Administered 33,036 91,355 154,386 252,630

Departmental - - - -

Resourcing Total 33,036 91,355 154,386 252,630

Related Capital - - - -

Seniors Concession Allowance - increase

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered 33,308 59,625 57,660 59,646

Departmental 1,117 112 112 113

Total 34,425 59,737 57,772 59,759

Measure Administered 33,308 59,625 57,660 59,646

Departmental 1,117 112 112 113

Resourcing Total 34,425 59,737 57,772 59,759

Related Capital - - - -

Page 36: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

22

National plan to reduce violence against women and children

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered 250 450 250 250

Departmental - - - -

Total 250 450 250 250

Measure Administered 250 450 250 250

Departmental - - - -

Resourcing Total 250 450 250 250

Related Capital - - - -

Seniors and eligible veterans – extended travel concessions

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered - - - -

Departmental - - - -

Total - - - -

Measure Administered - - - -

Departmental - - - -

Resourcing Total - - - -

Related Capital - - - -

Seniors’ Package - Increased Telephone Allowance

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered 6,815 31,545 36,028 42,388

Departmental - - - -

Total 6,815 31,545 36,028 42,388

Measure Administered 6,815 31,545 36,028 42,388

Departmental - - - -

Resourcing Total 6,815 31,545 36,028 42,388

Related Capital - - - -

Social Inclusion Unit

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered - - - -

Departmental - 258 - 468 - 472 - 478

Total - 258 - 468 - 472 - 478

Measure Administered - - - -

Departmental - 258 - 468 - 472 - 478

Resourcing Total - 258 - 468 - 472 - 478

Related Capital - - - -

Page 37: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

23

Social security agreement between Australia and Greece

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered - - - -

Departmental - - - -

Total - - - -

Measure Administered - - - -

Departmental - - - -

Resourcing Total - - - -

Related Capital - - - -

Utilities Allowance - increase and extend eligibility to include all recipients of Disability Support Pension, Service Pension and Carer Payment

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered 459,318 961,812 1,004,390 1,054,944

Departmental 10,979 331 334 261

Total 470,297 962,143 1,004,724 1,055,205

Measure Administered 459,318 961,812 1,004,390 1,054,944

Departmental 10,979 331 334 261

Resourcing Total 470,297 962,143 1,004,724 1,055,205

Related Capital - - - -

Veterans’ Disability Pension – changes to indexation and increases to the General and Extreme Disablement Adjustment Rates

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered - 419 - 1,744 - 2,241 - 2,812

Departmental - - - -

Total - 419 - 1,744 - 2,241 - 2,812

Measure Administered - 419 - 1,744 - 2,241 - 2,812

Departmental - - - -

Resourcing Total - 419 - 1,744 - 2,241 - 2,812

Related Capital - - - -

Carer Bonus - supplementation

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered - - - -

Departmental 1,610 - - -

Total 1,610 - - -

Measure Administered - - - -

Departmental 1,610 - - -

Resourcing Total 1,610 - - -

Related Capital - - - -

Page 38: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

24

Seniors’ Bonus - supplementation

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered - - - -

Departmental 261 - - -

Total 261 - - -

Measure Administered - - - -

Departmental 261 - - -

Resourcing Total 261 - - -

Related Capital - - - -

Outcome 3 Measures

Channel 7 Telethon Trust - contribution

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 3 Administered 500 - - -

Departmental - - - -

Total 500 - - -

Measure Administered 500 - - -

Departmental - - - -

Resourcing Total 500 - - -

Related Capital - - - -

Drought Package 2007 – additional financial, social and emotional counselling

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 3 Administered 2,421 6,369 - -

Departmental 781 1,051 - -

Total 3,202 7,420 - -

Measure Administered 2,421 6,369 - -

Departmental 781 1,051 - -

Resourcing Total 3,202 7,420 - -

Related Capital - - - -

Early Development and Learning Services - Parenting Support

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 3 Administered 612 3,118 4,775 8,118

Departmental - - - -

Total 612 3,118 4,775 8,118

Measure Administered 612 3,118 4,775 8,118

Departmental - - - -

Resourcing Total 612 3,118 4,775 8,118

Related Capital - - - -

Page 39: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

25

National Rollout of the Australian Early Development Index

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 3 Administered - 673 - 1,004 - 1,154 -

Departmental - - - -

Total - 673 - 1,004 - 1,154 -

Measure Administered - 673 - 1,004 - 1,154 -

Departmental - - - -

Resourcing Total - 673 - 1,004 - 1,154 -

Related Capital - - - -

Office of Work and Family

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 3 Administered - - - -

Departmental - 327 - 531 - 363 - 368

Total - 327 - 531 - 363 - 368

Measure Administered - - - -

Departmental - 327 - 531 - 363 - 368

Resourcing Total - 327 - 531 - 363 - 368

Related Capital - - - -

Outcome 4 Measures

Abolish Community Business Partnership

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered - 300 - 500 - -

Departmental - 410 - - -

Total - 710 - 500 - -

Measure Administered - 300 - 500 - -

Departmental - 410 - - -

Resourcing Total - 710 - 500 - -

Related Capital - - - -

Brendan’s Fund - ex-gratia payment

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered 350 - - -

Departmental - - - -

Total 350 - - -

Measure Administered 350 - - -

Departmental - - - -

Resourcing Total 350 - - -

Related Capital - - - -

Page 40: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

26

Daughters of Charity - funding

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered 2,500 - - -

Departmental - - - -

Total 2,500 - - -

Measure Administered 2,500 - - -

Departmental - - - -

Resourcing Total 2,500 - - -

Related Capital - - - -

Disaster relief funding - Hunter, Central Coast and Gippsland regions

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered 19,030 - - -

Departmental 5,664 156 - -

Total 24,694 156 - -

Measure Administered 19,030 - - -

Departmental 5,664 156 - -

Resourcing Total 24,694 156 - -

Related Capital - - - -

Drought Package 2007 - additional funding for the Emergency Relief Program

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered 1,500 2,775 - -

Departmental - 225 - -

Total 1,500 3,000 - -

Measure Administered 1,500 2,775 - -

Departmental - 225 - -

Resourcing Total 1,500 3,000 - -

Related Capital - - - -

Equine influenza - assistance

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered 17,887 - - -

Departmental 3,398 - - -

Total 21,285 - - -

Measure Administered 17,887 - - -

Departmental 3,398 - - -

Resourcing Total 21,285 - - -

Related Capital - - - -

Page 41: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

27

Equine influenza - twelve week extension of assistance

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered 10,362 - - -

Departmental - - - -

Total 10,362 - - -

Measure Administered 10,362 - - -

Departmental - - - -

Resourcing Total 10,362 - - -

Related Capital - - - -

Establishment of an Office for Housing

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered - - - -

Departmental 339 828 835 843

Total 339 828 835 843

Measure Administered - - - -

Departmental 339 828 835 843

Resourcing Total 339 828 835 843

Related Capital - - - -

Foodbank SA - financial assistance

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered 100 100 - -

Departmental - - - -

Total 100 100 - -

Measure Administered 100 100 - -

Departmental - - - -

Resourcing Total 100 100 - -

Related Capital - - - -

Home in Queanbeyan Mental Health Service

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered 2,000 - - -

Departmental - - - -

Total 2,000 - - -

Measure Administered 2,000 - - -

Departmental - - - -

Resourcing Total 2,000 - - -

Related Capital - - - -

Page 42: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

28

National Housing Supply Research Council

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered - - - -

Departmental 890 2,304 2,323 2,345

Total 890 2,304 2,323 2,345

Measure Administered - - - -

Departmental 890 2,304 2,323 2,345

Resourcing Total 890 2,304 2,323 2,345

Related Capital - - - -

Sydney Christmas Parade - contribution

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 4 Administered - - - -

Departmental - - - -

Total - - - -

Measure Administered - - - -

Departmental - - - -

Resourcing Total - - - -

Related Capital - - - -

Multiple Outcomes

Savings for Labor’s Better Priorities – Abolition of the Access Card

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 2 Administered - - - -

Departmental - 36 - 37 - 37 - 38

Total - 36 - 37 - 37 - 38

Outcome 3 Administered - - - -

Departmental - 30 - 30 - 31 - 31

Total - 30 - 30 - 31 - 31

Measure Administered - - - -

Departmental - 66 - 67 - 68 - 69

Resourcing Total - 66 - 67 - 68 - 69

Related Capital - - - -

Page 43: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

29

Welfare reform - Cape York trial 1

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered - 4,212 - 9,352 4,175 3,127

Departmental 2,751 1,901 1,440 1,574

Total - 1,461 - 7,451 5,615 4,701

Outcome 2 Administered 686 1,724 - -

Departmental - - - -

Total 686 1,724 - -

Outcome 4 Administered 222 483 493 503

Departmental - - - -

Total 222 483 493 503

Measure Administered -3,304 -7,145 4,668 3,630

Departmental 2,751 1,901 1,440 1,574

Resourcing Total - 553 -5,244 6,108 5,204

Related Capital - - - -

Northern Territory Emergency Response – employment and welfare reform

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered 41,074 67,955 68,039 -

Departmental 5,388 7,931 7,874 -

Total 46,462 75,886 75,913 -

Outcome 2 Administered - 2,296 - 3,792 - 3,937 -

Departmental - - - -

Total - 2,296 - 3,792 - 3,937 -

Measure Administered 38,778 64,163 64,102 -

Departmental 5,388 7,931 7,874 -

Resourcing Total 44,166 72,094 71,976 -

Related Capital - - - -

1 The reduction in CDEP outlays registered here is offset by additional income support expenditure and expenditure on increased services in other portfolios, including from the conversion of former CDEP positions into real jobs.

Page 44: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

30

Tuggeranong Office Park – transitional accommodation costs

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered - - - -

Departmental 2,066 3,524 - -

Total 2,066 3,524 - -

Outcome 2 Administered - - - -

Departmental 1,536 2,634 - -

Total 1,536 2,634 - -

Outcome 3 Administered - - - -

Departmental 1,685 2,866 - -

Total 1,685 2,866 - -

Outcome 4 Administered - - - -

Departmental 1,159 1,981 - -

Total 1,159 1,981 - -

Measure Administered - - - -

Departmental 6,446 11,005 - -

Resourcing Total 6,446 11,005 - -

Related Capital - - - -

Additional 0.25 per cent Efficieny Dividend in MYEFO

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered

Departmental - - 132 - 249 - 376

Total - - 132 - 249 - 376

Outcome 2 Administered

Departmental - - 1,159 - 2,260 - 3,407

Total - - 1,159 - 2,260 - 3,407

Outcome 3 Administered

Departmental - - 1,570 - 3,048 - 4,591

Total - 1,570 - 3,048 - 4,591

Outcome 4 Administered

Departmental - - 238 - 471 - 710

Total - 238 - 471 - 710

Measure Administered - - - -

Departmental - - 3,099 - 6,028 - 9,084

Resourcing Total - - 3,099 - 6,028 - 9,084

Related Capital - - - -

Page 45: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

31

Election Commitment Savings: 2 per cent Efficiency Dividend

2007-08 2008-09 2009-10 2010-11

($’000) ($’000) ($’000) ($’000)

Outcome 1 Administered - - - -

Departmental - 224 - 1,008 - 991 - 1,020

Total - 224 - 1,008 - 991 - 1,020

Outcome 2 Administered

Departmental - 2,165 - 8,855 - 8,742 - 8,833

Total - 2,165 - 8,855 - 8,742 - 8,833

Outcome 3 Administered

Departmental - 2,909 - 12,002 - 11,815 - 11,941

Total - 2,909 - 12,002 - 11,815 - 11,941

Outcome 4 Administered

Departmental - 449 - 1,827 - 1,823 - 1,846

Total - 449 - 1,827 - 1,823 - 1,846

Measure Administered - - - -

Departmental - 5,747 - 23,692 - 23,371 - 23,640

Resourcing Total - 5,747 - 23,692 - 23,371 - 23,640

Related Capital - - - -

Page 46: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

32

Breakdown of additional estimates by appropriation bill

Tables 1.5 and 1.6 outline the proposed variations to annual administered and departmental appropriations in Appropriation Bill (No. 3) and Appropriation Bill (No. 4).

Table 1.5: Appropriation Bill (No. 3) 2007-08

Appropriation Bill (No. 3) supplements Appropriation Act (No. 1) 2007–08, and includes funding for departmental expenses and existing programs administered by the department on behalf of the Australian Government. The proposed variations in Appropriation Bill (No. 3) result in an increase of $164.2 million for 2007–08. This is offset by a saving of $0.8 million against Appropriation Act (No. 1) 2007–08.

2006-07 2007-08 2007-08 Additional Reduced

Available Budget Revised Estimates Estimates

($’000) ($’000) ($’000) ($’000) ($’000)

ADMINISTERED ITEMS

Outcome 1:

Greater self-reliance and economic, social and community engagement for Indigenous Australians 361,828 508,513 535,502 26,989 -

Outcome 2:

Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged to participate in the community 315,791 414,838 456,062 41,224 -

Outcome 3:

Families and children have choices and opportunities 355,469 446,008 449,208 3,200 -

Outcome 4:

Strong and resilient communities 99,859 110,577 146,341 35,764 -

Total Administered 1,132,947 1,479,936 1,587,113 107,177 -

DEPARTMENTAL OUTPUTS

Outcome 1:

Greater self-reliance and economic, social and community engagement for Indigenous Australians 136,774 258,731 268,712 9,981 -

Outcome 2:

Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged to participate in the community 399,277 430,453 466,865 36,412 -

Outcome 3:

Families and children have choices and opportunities 547,598 572,118 571,318 - - 800

Outcome 4:

Strong and resilient communities 107,293 108,846 119,437 10,591 -

Total Departmental 1,190,942 1,370,147 1,426,331 56,984 - 800

Total Administered and Departmental 2,323,889 2,850,083 1,426,331 164,161 - 800

Note 1: 2006-07 Available appropriation is the amount available to be drawn down, and is equal to:

Budget Appropriation + Additional Estimates Appropriation + DIAB + AFM - Savings

- Rephasings - Other Reductions +/- Section 32

Note 2: 2007-08 Revised estimates do not reflect the impact of Section 32 transfers arising from the Administrative Arrangements Order.

Page 47: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

33

Table 1.6: Appropriation Bill (No. 4) 2007–08

Appropriation Bill (No. 4) supplements Appropriation Act (No. 2) 2007–08, and includes funding for payments to state and territory governments, departmental administered capital injections and new programs. Appropriation Bill (No. 4) accounts for the remainder of the proposed variations for 2007–08, an increase of $35.6 million.

2006-07 2007-08 2007-08 Additional Reduced

Available Budget Revised Estimates Estimates

($’000) ($’000) ($’000) ($’000) ($’000)

PAYMENTS TO STATES, ACT, NT AND LOCAL GOVERNMENT

Outcome 1: - -

Greater self-reliance and economic, social and community engagement for Indigneous Australians

4,467 15,234 15,234

Outcome 2:

Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged to participate in the community

828,305 858,738 891,774 33,036 -

Outcome 3:

Families and children have choices and opportunities 56,087 71,995 71,995 - -

Outcome 4:

Strong and resilient communities 1,138,589 1,158,379 1,158,379 - -

Subtotal 2,027,448 2,104,346 2,137,382 33,036 -

OTHER ADMINISTERED ITEMS

Subtotal - - - - -

Non-operating

Equity injections - 38,389 40,936 2,547 -

Subtotal - 38,389 40,936 2,547 -

TOTAL 2,027,448 2,142,735 2,178,318 35,583 -

Note 1: 2006-07 Available appropriation is the amount available to be drawn down, and is equal to:

Budget Appropriation + Additional Estimates Appropriation + DIAB + AFM - Savings

- Rephasings - Other Reductions +/- Section 32

Note 2: 2007-08 Revised estimates do not reflect the impact of Section 32 transfers arising from the Administrative Arrangements Order.

Additional information on the reasons for variations can be found at Tables 1.2 and 1.3 on pages 12 to 17.

Page 48: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

34

Budget Estimate 2007-08 ($’000)

Revised Estimate 2007-08 ($’000)

Departmental Other Receipts

Section 31 of the Financial Management and Accountability Act 1997 18,177 29,225

Total departmental other receipts available to be used 18,177 29,225

Administered other receipts

Indigenous Land Fund (Special Account) 94,554 94,554

Ministerial Council Activities (OSW) Special Account 44 44

National Youth Affairs Research Scheme Special Account (Admin) 240 240

Reciprocal Agreement with New Zealand 50,900 52,427

SAAP Research and Development Special Account 3,350 3,350

Total administered other receipts available to be used 149,088 150,615

2007-08 Budget 2007-08 Revised Variation

Outcome 1: 1,099 1,118 19

Greater self-reliance and economic, social and community engagement for Indigenous Australians

Outcome 2: 559 660 101

Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged to participate in the community

Outcome 3: 904 904 -

Families and children have choices and opportunities

Outcome 4: 283 293 10

Strong and resilient communities

TOTAL 2,845 2,975 130

Other receipts available to be used

Table 1.8 provides details of other receipts available to be used and includes FMA s.31 receipts, CAC body receipts that are available to be spent, special accounts (non-appropriation receipts) and resources received free of charge.

Expenditure on these revenue sources is shown on an outcome basis in Table 2.1.1 at page 40 - 41, Table 2.2.1 at page 44 - 45, Table 2.3.1 at page 48 - 49 and Table 2.4.1 on page 52 - 53.

Table 1.8: Other receipts available to be used

Summary of staffing changes

Table 1.7 shows changes in estimated Average Staffing Level (ASL) for the department. ASL is the average number of full-time equivalent employees (ongoing and non-ongoing) during the year.

Table 1.7: Average Staffing Level

Page 49: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

35

Estimates of expenses from special appropriationsRevisions to estimated expenditure in 2007–08 for special appropriations are detailed in Table 1.9 and show an increase of $4.68 billion since the 2007–08 Budget. The variation is largely due to the transfers as a result of the Administrative Arrangements Order —Disability Support Pension ($5.21 billion) (to FaHCSIA) and Child Care Benefit ($605.2 million) (to DEEWR). Other variations include a reduction in Family Tax Benefit ($416.9 million) and Age Pension ($82.2 million), partly offset by increases in Utilities Allowance ($459.4 million) and Seniors Concession Allowance ($33.4 million). Table 1.9: Estimates of expenses from special appropriations

Outcome No.

Opening balance Receipts Payments Adjustments Closing

balance

2007-08 2007-08 2007-08 2007-08 2007-08

2006-07 2006-07 2006-07 2006-07 2006-07

$’000 $’000 $’000 $’000 $’000

Aboriginal Advancement Trust Account (A) 1 619 - - - 619

619 - - - 619

Aboriginals Benefit Account (A) 1 150,730 88,376 - 118,510 - 120,596

135,881 86,499 - 71,650 - 150,730

Aboriginal and Torres Strait Islander Land Fund (A) 1 1,547,883 94,554 - - 1,642,437

1,546,539 97,764 - 96,420 - 1,547,883

Condah Land Account (A) 1 - - - - -

- - - - -

Framlingham Forest Account (A) 1 - - - - -

- - - - -

Queensland Education Trust Fund (A) 1 133 - - - 133

- 306 - 173 - 133

Northern Territory Flexible Funding Pool Account (A) 1 - 46,462 - 34,847 - 11,616

- - - - -

Comcare Trust Account (A) 2 754 570 - 550 - 774

734 560 - 540 - 754

Commonwealth State Territory Disability Agreement Account (A) 2 374 - - - 374

930 200 - 756 - 374

National Youth Affairs Research Scheme Special Account (A) 2 - - - - -

- - - - -

National Youth Affairs Research Scheme (A) 2 628 240 - 300 - 568

573 229 - 174 - 628

Other Trust Monies (A) 2 306 - - - 306

306 - - - 306

Other Services - Services for other Government and Non-Government Bodies (A) 2 37 44 - 45 - 36

83 44 - 90 - 37

Child care Centre Capital Replacement and Upgrade Special Account (A) 3 - - - - -

- - - - -

Social Security - Services for other Government and Non-Government Bodies (A) 3 348 - - - 348

348 - - - 348

SAAP Research and Development Account (A) 4 1,560 3,350 - 3,888 - 1,022

1,608 3,694 - 3,742 - 1,560

Total Special Accounts 2007-08 Budget Estimate 1,703,372 233,596 - 151,170 - 1,785,798

Total Special Accounts 2006-07 Estimate Actual 1,687,621 189,296 - 173,545 - 1,703,372

(A) = Administered; (D) = Departmental

Page 50: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

36

Estimates of special account flows

Table 1.10 details the movement in payments and receipts and other adjustments in special accounts since the 2007–08 Budget.

Table 1.10: Estimates of special account flows

Item Outcome No. Budget Estimates 2007-08 ($’000) Revised Estimates 2007-08 ($’000)

Estimated expenses

A New Tax System (Family Assistance) (Administration) Act 1999

Child Care Benefit 3 1,691,646 1,086,397

Child Care Tax Rebate 3 457,162 385,745

Family Assistance Scheme 2004 3 - -

Family Tax Benefit A 3 11,270,883 10,897,991

Family Tax Benefit B 3 3,477,335 3,433,259

Income Management Special Appropriation 3 - 4,000

Maternity Immunisation Allowance 3 59,287 59,421

Baby Bonus 3 1,312,867 1,283,355

Sub Total 18,269,180 17,150,168

Social Security (Administration) Act 1999

Age Pension 2 23,963,293 23,881,056

Bereavement Allowance 2 1,411 1,415

Carer Allowance Adult 2 794,047 811,779

Carer Allowance Child 2 365,737 360,558

Carer Allowance Child - Disability Assistance Payment 2 - 132,361

Carer Payment 2 1,507,869 1,507,735

Seniors Concession Allowance 2 54,163 87,514

Special Benefit 2 72,966 73,119

Telephone Allowance for Commonwealth Senior Health Card Holders 2 16,312 17,193

Utilities Allowance 2 161,842 621,253

Widow B Pension 2 6,605 6,655

Wife Pension (Age) 2 153,178 153,894

Wife Pension (DSP) 2 213,516 214,540

Disability Support Pension 2 - 5,212,089

Double Orphan Pension 3 2,832 2,834

Disaster Recovery Payment 4 2,252 34,030

Aboriginal Benefits Account Special Appropriation 1 88,376 88,376

Ranger Payment 1 200 200

Sub Total 27,404,599 33,206,601

Total estimated expenses 45,673,779 50,356,769

Page 51: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

37

Section 2: Revisions to agency outcomes

Outcomes, administered items and outputs

Figure 2: Outcome and Output Structure for the Department of Families, Housing, Community Services and Indigenous Affairs

Department of Families, Housing, Community Services and Indigenous Affairs

Secretary: Dr Jeff Harmer

Total Resources1 $ 55,871m Departmental Appropriations $ 1,455m Administered Appropriations $ 54,416m

Outcome 1Greater self-reliance and economic, social and

community engagement for Indigenous Australians

Total $ 1,358m Resources1

Departmental Appropriations $ 284m Administered Appropriations $ 1,074m

See Table 2.1.1 for resources

Output Group 1.1Whole-of-government coordination of policy development

and service delivery for Indigenous Australians

Departmental Appropriations $ 68m Administered Appropriations $ -

Output Group 1.2Services for Indigenous Australians

Departmental Appropriations $ 209m Administered Appropriations $ 1,074m

Output Group 1.3Incorporation, regulation and capacity building of

Indigenous corporations

Departmental Appropriations $ 6m Administered Appropriations $ -

Outcome 2Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged

to participate in the community

Total $ 34,951m Resources1

Departmental Appropriations $ 469m Administered Appropriations $ 34,482m

See Table 2.2.1 for resources

Output Group 2.0Appropriations applicable across Outcome 2

Departmental Appropriations $ 3m Administered Appropriations $ 75m

Output Group 2.1Support for the Aged

Departmental Appropriations $ 311m Administered Appropriations $ 24,873m

Output Group 2.2Support for People with Disabilities

Departmental Appropriations $ 57m Administered Appropriations $ 6,264m

Output Group 2.3Support for Carers

Departmental Appropriations $ 60m Administered Appropriations $ 2,826m

Output Group 2.4Support for Youth

Departmental Appropriations $ 12m Administered Appropriations $ 49m

Output Group 2.5Support for Women

Departmental Appropriations $ 27m Administered Appropriations $ 395m

1. ‘Total Resources’ includes Departmental and Administered Appropriations, Non-Directly Appropriated Expenses and Revenue from Other Sources. Therefore, it may differ from Total Resources.

Page 52: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

38

Department of Families, Housing, Community Services and Indigenous Affairs

Secretary: Dr Jeff Harmer

Total Resources1 $ 55,871m Departmental Appropriations $ 1,455m Administered Appropriations $ 54,416m

Outcome 3Families and children have choices and opportunities

Total $ 18,095m Resources1

Departmental Appropriations $ 577m Administered Appropriations $ 17,518m

See Table 2.3.1 for resources

Output Group 3.1Support for Families

Departmental Appropriations $ 427m Administered Appropriations $ 15,860m

Output Group 3.2Child Support

Departmental Appropriations $ 14m Administered Appropriations $ -

Output Group 3.3Child Care Support

Departmental Appropriations $ 135m Administered Appropriations $ 1,658m

Outcome 4Strong and resilient communities

Total $ 1,467m Resources1

Departmental Appropriations $ 125m Administered Appropriations $ 1,342m

See Table 2.4.1 for resources

Output Group 4.1Housing Support

Departmental Appropriations $ 75m Administered Appropriations $ 1,158m

Output Group 4.2Supporting Financial Management

Departmental Appropriations $ 10m Administered Appropriations $ 42m

Output Group 4.3Community Recovery

Departmental Appropriations $ 20m Administered Appropriations $ 66m

Output Group 4.4Community Partnership and Delivery

Departmental Appropriations $ 20m Administered Appropriations $ 77m

Figure 2: Outcome and Output Structure for the Department of Families, Housing, Community Services and Indigenous Affairs (continued)

Page 53: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

39

OUTCOME 1—GREATER SELF-RELIANCE AND ECONOMIC, SOCIAL AND COMMUNITY ENGAGEMENT FOR INDIGENOUS AUSTRALIANSServices and assistance that promote greater self-reliance and engagement for Indigenous families and communities through: shared responsibility; practical support; and innovative whole-of-government policy.

ResourcesTable 2.1.1 shows total resourcing in 2007–08 for Outcome 1, including total administered expenses, revenue from government (appropriation) for outputs and the total price of outputs.

Total resourcing in 2007–08 for Outcome 1 is estimated to be $1,358.7 million, which represents an increase of $378.0 million compared with estimated resourcing at the 2007–08 Budget.

MeasuresTable 1.4 on page 18 - 31 documents the impact of new measures on Outcome 1 resourcing. Measures under Outcome 1 are:

Aboriginal Employment Strategy - reconciliation and youth activities•

Northern Territory Emergency Response Night Patrol Services•

Yamatji - native title representative body - additional funding for resolution of native •title claim issues

Reconciliation – Australia’s Ongoing Commitment•

Welfare reform - Cape York trial (also under Outcomes 2 and 4) •

Northern Territory Emergency Response – employment and welfare reform (also under •Outcome 1)

Tuggeranong Office Park – transitional accommodation costs (also under Outcomes 1, 3 •and 4)

Additional 0.25 per cent Efficiency Dividend in MYEFO (also under Outcomes 1, 3 •and 4)

Election Commitment Savings: 2 per cent Efficiency Dividend (also under Outcomes •1, 3 and 4)

Page 54: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

40

Table 2.1.1: Total Resources for Outcome 1Available Budget Revised

Estimates Estimates

2006-07 2007-08 2007-08

$’000 $’000 $’000

ADMINISTERED APPROPRIATIONS

Appropriation Bill (No. 3)

Australian Remote Indigenous Accommodation Programme - 6,162 6,162

Community Development and Employment Program - - 266,371

Community Housing and Infrastructure 232,053 306,385 366,385

Family Relationships 12,454 - -

Indigenous Accommodation - 2,754 2,754

Indigenous Communities Strategic Investment 37,150 29,391 28,860

Indigenous Leadership 7,967 9,060 9,060

Native Title and Land Rights 61,189 59,753 65,253

Northern Territory Emergency Response - 91,298 127,139

Parenting 5,634 - -

Payments to Universities 2,048 309 309

Public Awareness 2,801 2,858 2,858

Repatriation 532 543 543

Subtotal 361,828 508,513 875,694

Appropriation Bill (No. 4)

Improving Policing in Very Remote Areas 4,467 15,234 15,234

Subtotal 4,467 15,234 15,234

Special Appropriations

Aboriginal Benefits Account Special Appropriation 86,500 88,376 88,376

Ranger payment 200 200 200

Subtotal 86,700 88,576 88,576

Total Administered Appropriations

Appropriation Bill (No. 3) 358,495 508,513 875,694

Appropriation Bill (No. 4) 4,467 15,234 15,234

Special Appropriations 86,700 88,576 88,576

Total Administered Appropriations 449,662 612,323 979,504

Non-Directly Appropriated Expenses

Indigenous Land Fund (Special Account) 97,764 94,554 94,554

Total Non-Directly Appropriated Expenses 97,764 94,554 94,554

Total Administered Resourcing (A) 547,426 706,877 1,074,058

Page 55: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

41

Table 2.1.1: Total Resources for Outcome 1 (Continued) Budget Revised Estimate

Available estimate 2007-08

2006-07 2007-08 $’000

$’000 $’000 $’000

DEPARTMENTAL APPROPRIATIONS

Appropriations applicable across Outcome 1

Policy Services and Program Management 336 329 328

Total items across Outcome 1 336 329 328

Output Group 1.1 - Whole-of-Government coordination of policy development and service delivery for Indigenous Australians

Policy Services and Program Management 31,539 31,018 30,968

Service Delivery 39,634 37,513 37,452

Total Output Group 1.1 71,173 68,531 68,420

Output Group 1.2 - Services for Indigenous Australians

Policy Services and Program Management 22,232 23,942 25,515

Service Delivery 36,509 159,529 168,121

Total Output Group 1.2 58,741 183,471 193,636

Output Group 1.3 - Incorporation, regulation and capacity building of Indigenous corporations

Policy Services and Program Management - - -

Service Delivery 6,524 6,400 6,390

Total Output Group 1.3 6,524 6,400 6,390

Total Revenue from Government (Appropriations) (B) 136,774 258,731 268,774

Revenue from Other Sources

Section 31 of the Financial Management and Accountability Act 1997 14,725 15,085 15,835

Total Revenue from Other Sources (C) 14,725 15,085 15,835

Total Price of Departmental Outputs (B+C) (Total revenue from Government and from other sources) 151,499 273,816 284,609

Total Estimated Resourcing for Outcome 1 (A+B+C) (Total price of outputs and administered expenses) 698,925 980,693 1,358,667

Average staffing level (number) 900 1,099 1,118

Page 56: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

42

Administered Effectiveness Indicators Performance information Performance information

2007-08 Budget ($’000)

2007-08 Revised ($’000)

Output 1.2 - Services for Indigenous Australians

Indigenous Communities Strategic Investment

Price: 27,391 Price: 28,860

Welfare Reform - Cape York Trial Quantity: na Quantity: SRAs signed concerning Pride of Place and tenancy reforms. Persons participating in Family Income Management in the trial communities. Persons referred by the Family Responsibilities Commission to case management, conditional income management.

Consultations on Indigenous Apology Quality: na Quality: An apology is made to Indigenous people by 30 June 2008. Estimate: The apology is made.

Quantity: na Quantity: Consultation strategy for a national representative body for Indigenous Australians is put in place by 30 June 2008. Estimate: Consultation strategy in place.

Native Title and Land Rights Price: 59,753 Price: 65,253

Northern Territory Emergency Response Price: 91,298 Price: 127,139

Northern Territory Emergency Response – employment and welfare reform

Quality: na Quality: Conversion of Australian and NT Government related positions from CDEP to real jobs.

Quantity: na Quantity: Up to approximately 2,000 former CDEP Australian and NT Government related service delivery positions.

Departmental output Indicators Performance information Performance information

2007-08 Budget 2007-08 revised

($’000) ($’000)

Output 1.2 - Services for Indigenous Australians

Price: 183,471 Price: 193,636

Performance InformationTable 2.1.2 shows performance information for outputs affected by additional estimates under Outcome 1.

Table 2.1.2 - Performance information for outputs affected by additional estimates: Outcome 1

Page 57: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

43

OUTCOME 2—SENIORS, PEOPLE wITH DISAbILITIES, CARERS, YOUTH AND wOMEN ARE SUPPORTED, RECOGNISED AND ENCOURAGED TO PARTICIPATE IN THE COMMUNITY Services and assistance that help people to: participate actively in community and economic life; access a responsive and sustainable safety net; and develop their capabilities.

ResourcesTable 2.2.1 shows total resourcing in 2007–08 for Outcome 2, including total administered expenses, revenue from government (appropriation) for outputs and the total price of outputs.

Total resourcing in 2007–08 for Outcome 2 is estimated to be $34,951.1 million, which represents an increase of $5,882.9 million compared with estimated resourcing at the 2007–08 Budget.

MeasuresTable 1.4 on page 18 - 31 documents the impact of new measures on Outcome 2 resourcing. Measures under Outcome 2 are:

Children with autism spectrum disorders - support for families and carers •

Disability assistance - support for people with disabilities their families and carers•

Movement of disability assistance package funds to the CSTDA •

Seniors Concession Allowance - increase•

National plan to reduce violence against women and children •

Seniors and eligible veterans – extended travel concessions •

Seniors’ Package - Increased Telephone Allowance•

Social Inclusion Unit•

Social security agreement between Australia and Greece •

Utilities Allowance - increase and extend eligibility to include all recipients of Disability • Support Pension, Service Pension and Carer Payment

Veterans Disability Pension – changes to indexation and increases to the General and • Extreme Disablement Adjustment Rates

Carer Bonus - supplementation•

Seniors’ Bonus - supplementation•

Savings for Labor’s Better Priorities – Abolition of the Access Card (also in Outcome 3)•

Welfare reform - Cape York trial – (also in Outcomes 1 and 4) •

Page 58: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

44

Northern Territory Emergency Response – employment and welfare reform (also in • Outcome 1)

Tuggeranong Office Park – transitional accommodation costs (also in Outcomes 1, 3 • and 4)

Additional 0.25 per cent Efficiency Dividend in MYEFO (also in Outcomes 1, 3 and 4)•

Election Commitment Savings: two per cent Efficiency Dividend (also in Outcomes 1, 3 • and 4)

AvailableBudget

EstimatesRevised

Estimates

2006-07 ($’000)

2007-08 ($’000)

2007-08 ($’000)

Administered AppropriationsAppropriation Bill (No. 3)Payments under s.33 of the FMA Act 1997 170 170 170

Financial Management 487 - -

Reimbursement to Great Southern Rail for concessional fares 7,506 6,844 6,844

Mental Health 8,674 93,766 93,766

Services for People with a Disability 236,232 246,367 286,641

Ex-Gratia Payments to Unsuccessful Applicants of Carer Payment (Child) 10 5,000 5,000

Support for Carers 7,962 8,880 8,880

Youth Engagement 34,749 34,916 34,904

Support for Victims of Trafficking 755 55 755

Women’s Leadership and Development 3,808 3,831 3,831

Women’s Safety Agenda 15,438 15,014 15,264

Subtotal 315,791 414,843 456,055

Appropriation Bill (No. 4)Compensation for Extension of Fringe Benefits 201,834 206,027 206,027

Commonwealth State Territory Disability Agreement 620,792 636,916 669,952

Disability Services LGA 1,489 1,529 1,529

COAG Health Services - Younger People with Disability in Residential Aged Care 4,190 14,266 14,266

Subtotal 828,305 858,738 891,774

Special AppropriationsBereavement Allowance 1,287 1,411 1,415

Special Benefit 68,762 72,966 73,119

Age Pension 22,838,770 23,963,293 23,881,056

Seniors Concession Allowance 214,671 54,163 87,514

Telephone Allowance for Commonwealth Seniors Health Card Holders 15,566 16,312 17,193

Utilities Allowance 148,780 161,842 621,253

Disability Support Pension - - 5,212,089

Carer Allowance Adult 921,804 794,047 811,779

Carer Allowance Child 413,013 365,737 360,558

Carer Allowance Child - Disability Assistance Payment - - 132,361

Carer Payment 1,401,621 1,507,869 1,507,735

Widow B Pension 7,065 6,605 6,655

Wife Pension (Age) 161,243 153,178 153,894

Wife Pension (DSP) 234,161 213,516 214,540

Subtotal 26,426,743 27,310,939 33,081,161

Total Administered AppropriationsAppropriation Bill (No. 3) 315,791 414,843 456,055

Appropriation Bill (No. 4) 828,305 858,738 891,774

Special Appropriations 26,426,743 27,310,939 33,081,161

Total Administered Appropriations 27,570,839 28,584,520 34,428,990

Table 2.2.1: Total Resources for Outcome 2

Page 59: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

45

AvailableBudget

EstimatesRevised

Estimates

2006-07 ($’000)

2007-08 ($’000)

2007-08 ($’000)

Non-Directly Appropriated ExpensesMinisterial Council Activities (OSW) Special Account 44 44 44

National Youth Affairs Research Scheme Special Account (Admin) 229 240 240

Reciprocal Agreement with New Zealand 58,390 50,900 52,427

Total Non-Directly Appropriated Expenses 58,663 51,184 52,711

Total Administered Resourcing (A) 27,629,502 28,635,704 34,481,701

Departmental appropriationsAppropriations applicable across Outcome 2Policy Services and Program Management 775 760 756

Service Delivery 1,420 2,123 2,112

Total items across Outcome 2 2,195 2,884 2,869Output Group 2.1 - Support for the Aged

Policy Services and Program Management 12,508 13,145 13,972

Service Delivery 265,537 285,116 296,388

Total Output Group 2.1 278,045 298,261 310,360

Output Group 2.2 - Support for People with DisabilitiesPolicy Services and Program Management 21,975 23,919 31,030

Service Delivery 6,344 9,264 25,290

Total Output Group 2.2 28,319 33,184 56,320

Output Group 2.3 - Support for CarersPolicy Services and Program Management 9,368 9,233 9,187

Service Delivery 45,616 49,171 50,535

Total Output Group 2.3 54,984 58,404 59,722

Output Group 2.4 - Support for YouthPolicy Services and Program Management 6,832 6,745 6,711

Service Delivery 3,848 4,808 4,783

Total Output Group 2.4 10,680 11,553 11,494

Output Group 2.5 - Support for WomenPolicy Services and Program Management 4,999 4,947 4,922

Service Delivery 20,057 21,222 21,115

Total Output Group 2.5 25,056 26,168 26,037

Total Revenue from Government (Appropriations) (B) 399,279 430,453 466,802

Revenue from Other SourcesSection 31 of the Financial Management and Accountability Act 1997 1,713 1,948 2,594

Total Revenue from Other Sources (C) 1,713 1,948 2,594

Total Price of Departmental Outputs (B+C) (Total revenue from Government and from other sources)

400,992 432,401 469,396

Total Estimated Resourcing for Outcome 2 (A+B+C) (Total price of outputs and administered expenses)

28,030,494 29,068,105 34,951,097

Average staffing level (number) 542 559 660

Table 2.2.1: Total Resources for Outcome 2 (Continued)

Page 60: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

46

Table 2.2.2 - Performance information for outputs affected by additional estimates: Outcome 2Administered effectiveness indicators Performance information

2007-08 Budget ($’000)

Performance information 2007-08 revised ($’000)

Output 2.2 - Support for People with Disabilities

Services for People with a Disability Price: 246,367 Price: 286,641

Children’s Services Quality: na Quantity: Number of clients assisted: 250 families supported

Child Disability Assistance Payment Number of children in respect of whom the Child Disability Assistance Payment was made: estimate 132,361

Disability Supported Employment Number of places: estimate 750 Per cent of clients satisfied: estimate 100

Targeted Support Services Number of people with disability continuing to receive targeted support services: estimate 400

Output 2.5 - Support for Women

Women’s Safety Agenda Price: 15,014 Price: 15,264

Early Development and Learning Services – Parenting Support

Quality: na Quality: Key objectives and measures in the National Plan are implemented in a timely manner over three years and in accordance with the set timelines in the plan.

Departmental output Performance information ($’000)

Performance information ($’000)

Output 2.2 - Support for People with Disabilities

Quantity: Number of contracts/service agreements under management

Quantity: Number of contracts/service agreements under management

598 823

Price: 33,184 Price: 56,320

Output 2.5 - Support for Women Price: 26,168 Price: 26,037

Performance Information

Table 2.2.2 shows performance information for outputs affected by additional estimates under Outcome 2.

Page 61: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

47

OUTCOME 3—FAMILIES AND CHILDREN HAVE CHOICES AND OPPORTUNITIESServices and assistance that: help children to have the best possible start to life; promote healthy family relationships; help families adapt to changing economic and social circumstances; and assist families with the costs of children.

ResourcesTable 2.3.1 shows total resourcing in 2007–08 for Outcome 3, including total administered expenses, revenue from government (appropriation) for outputs and the total price of outputs.

Total resourcing in 2007–08 for Outcome 3 is estimated to be $18,094.5 million, which represents a decrease of $1,268.4 million compared with estimated resourcing at the 2007–08 Budget.

MeasuresTable 1.4 on page 18 - 31 documents the impact of new measures on Outcome 3 resourcing. Measures under Outcome 3 are:

Channel 7 Telethon Trusts - contribution•

Drought Package 2007 – additional financial, social and emotional counselling•

Early Development and Learning Services - Parenting Support•

National Rollout of the Australian Early Development Index •

Office of Work and Family•

Savings for Labor’s Better Priorities – Abolition of the Access Card (also under • Outcome 2)

Tuggeranong Office Park – transitional accommodation costs (also under Outcome 1, 2 • and 4)

Additional 0.25 per cent Efficiency Dividend in MYEFO (also under Outcome 1, 2 and 4) •

Election Commitment Savings: two per cent Efficiency Dividend (also under Outcome 1, • 2 and 4)

Page 62: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

48

Table 2.3.1: Total Resource for Outcome 3

AvailableBudget

EstimatesRevised

Estimates

2006-07 ($’000)

2007-08 ($’000)

2007-08 ($’000)

Administered Appropriations

Appropriation Bill (No. 3)

Family Relationships 55,392 74,652 77,413

Parenting 60,692 75,759 78,198

Child Care Services Support 191,347 249,316 142,760

Jobs Education and Training Child Care Fee Assistance 48,038 46,281 10,705

Subtotal 355,469 446,008 309,076

Appropriation Bill (No. 4)

Family Violence Partnership (SPP) - 8,322 8,322

Services for Families LGA 7 166 166

Services for Families with Children (SPP) 385 386 386

Child Care Services Support (SPP) 10,026 8,198 5,780

Northern Territory Emergency Response - supporting families (SPP) - 14,459 14,459

Children’s Services LGA 45,669 40,464 26,714

Subtotal 56,087 71,995 55,827

Special Appropriations

Baby Bonus 1,198,661 1,312,867 1,283,355

Double Orphan Pension 2,747 2,832 2,834

Family Assistance Scheme 2004 2,438 - -

Family Tax Benefit A 10,700,606 11,270,883 10,897,991

Family Tax Benefit B 3,362,725 3,477,335 3,433,259

Maternity Immunisation Allowance 55,480 59,287 59,421

Child Care Benefit 1,470,655 1,691,646 1,086,397

Child Care Tax Rebate 450,734 457,162 385,745

Income Management Special Appropriation - - 4,000

Subtotal 17,244,046 18,272,012 17,153,002

Total Administered Appropriations

Appropriation Bill (No. 3) 355,469 446,008 309,076

Appropriation Bill (No. 4) 56,087 71,995 55,827

Special Appropriations 17,244,046 18,272,012 17,153,002

Total Administered Appropriations 17,655,602 18,790,015 17,517,905

Total Administered Resourcing (A) 17,655,602 18,790,015 17,517,905

Table 2.3.1: Total Resources for Outcome 3

Page 63: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

49

AvailableBudget

EstimatesRevised

Estimates

2006-07 ($’000)

2007-08 ($’000)

2007-08 ($’000)

Departmental Appropriations

Appropriations applicable across Outcome 3

Policy Services and Program Management 346 340 338

Service Delivery 2,111 9 9

Total items across Outcome 3 2,457 349 347

Output Group 3.1 - Support for families

Policy Services and Program Management 37,279 37,594 38,082

Service Delivery 376,830 386,886 386,349

Total Output Group 3.1 414,109 424,480 424,431

Output Group 3.2 - Child support

Policy Services and Program Management 12,823 12,578 12,514

Service Delivery 844 828 824

Total Output Group 3.2 13,667 13,406 13,338

Output Group 3.3 - Child Care Support

Policy Services and Program Management 27,084 27,109 26,971

Service Delivery 90,281 106,773 106,230

Total Output Group 3.3 117,365 133,882 133,201

Total Revenue from Government (Appropriations) (B) 547,598 572,118 571,318

Revenue from Other Sources

Section 31 of the Financial Management and Accountability Act 1997 648 821 5,316

Total Revenue from Other Sources (C) 648 821 5,316

Total Price of Departmental Outputs (B+C) (Total revenue from Government and from other sources)

548,246 572,939 576,634

Total Estimated Resourcing for Outcome 3 (A+B+C) (Total price of outputs and administered expenses)

18,203,848 19,362,954 18,094,539

Average staffing level (number) 845 904 904

Table 2.3.1: Total Resources for Outcome 3 (Continued)

Page 64: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

50

Performance InformationTable 2.3.2 shows performance information for outputs affected by additional estimates under Outcome 3.

Table 2.3.2 - Performance information for outputs affected by additional estimates: Outcome 3

Administered Effectiveness Indicators Performance Information 2007-08 Budget

Performance Information 2007-08 Revised

($’000) ($’000)

Output 3.1 - Support for FamiliesParenting Price: 77,759 Price: 78,198

Early Development and Learning Services - Parenting Support

Quality: na Quality: Percentage of funded projects meeting milestones agreed with FaHCSIA

Quantity: na Quantity: Number of parenting support services funded: 4. Number of families accessing the parenting support services: 100

Departmental output indicators Performance information 2007-08 Budget

Performance information 2007-08 revised

($’000) ($’000)

Output 3.1 - Support for Families Price: 424,480 Price: 424,431

Page 65: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

51

OUTCOME 4—STRONG AND RESILIENT COMMUNITIES Services and assistance that: help homeless people and low-income households to gain affordable and appropriate housing; promote community partnerships; and encourage participation in the local community by individuals, families, business and government.

ResourcesTable 2.4.1 shows total resourcing in 2007–08 for Outcome 4, including total administered expenses, revenue from government (appropriation) for outputs and the total price of outputs.

Total resourcing in 2007–08 for Outcome 4 is estimated to be $1,467.0 million, which represents a increase of $83.3 million compared with estimated resourcing at the 2007–08 Budget.

MeasuresTable 1.4 on page 18 - 31 documents the impact of new measures on Outcome 4 resourcing. Measures under Outcome 4 are:

Abolish Community Business Partnership •

Brendan’s Fund - ex-gratia payment•

Daughters of Charity – funding•

Disaster relief funding - Hunter, Central Coast and Gippsland regions•

Drought Package 2007 - additional funding for the Emergency Relief Program •

Equine influenza – assistance•

Equine influenza - twelve week extension of assistance•

Establishment of an Office for Housing •

Home in Queanbeyan Mental Health Service •

National Housing Supply Research Council •

Sydney Christmas Parade - contribution •

Welfare reform - Cape York trial (also under Outcomes 1 and 4 )•

Tuggeranong Office Park – transitional accommodation costs (also under Outcomes 1, 2 • and 3)

Additional 0.25 per cent Efficiency Dividend in MYEFO (also under Outcomes 1, 2 and 3)•

Election Commitment Savings: two per cent Efficiency Dividend (also under Outcomes 1, • 2 and 3)

• Foodbank SA– financial assistance

Page 66: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

52

Table 2.4.1: Total Resource for Outcome 4

AvailableBudget

EstimatesRevised

Estimates

2006-07 ($’000)

2007-08 ($’000)

2007-08 ($’000)

Administered Appropriations

Appropriation Bill (No. 3)Homelessness and Housing 4,103 4,179 6,179

Financial Management 37,608 39,810 41,532

Ex-Gratia Assistance for Tsunami Aftermath 70 - -

Ex-Gratia Payments to Victims and Family Members of the Bali Terrorist Attacks 1,510 1,510 1,510

Pandemic Influenza Preparedness 2,260 791 1,826

Ex Gratia Payment to East Timor Medical Evacuees 341 - 108

Ex-Gratia Payments for Equine Workers’ Hardship - - 28,249

Ex-Gratia Payment - Brendan’s Fund - - 350

Ex-Gratia Assistance for Cyclone Larry 4,544 - -

Ex-Gratia Assistance to Victims of the London Bombings 1,215 - -

Ex-Gratia Payments to Victims of Terrorist Bombings in Egypt 70 - -

Community Engagement 45,099 63,377 65,682

Indigenous Communities Strategic Investment 2,416 - -

Innovation and Investment Fund 500 500 500

Payments under Special Circumstances 5 5 5

Reconnecting People Assistance Package 118 400 400

Subtotal 99,859 110,572 146,341

Appropriation Bill (No. 4)Supported Accommodation Assistance Programme 175,256 175,616 175,616

Commonwealth State Housing Agreement 954,636 970,604 970,604

Social Housing Subsidy 1,995 1,995 1,995

Innovation and Investment Fund SPP 6,702 10,164 10,164

Subtotal 1,138,589 1,158,379 1,158,379

Special AppropriationsDisaster Recovery Payment 4,803 2,252 34,030

Subtotal 4,803 2,252 34,030

Total Administered AppropriationsAppropriation Bill (No. 3) 99,859 110,572 146,341

Appropriation Bill (No. 4) 1,138,589 1,158,379 1,158,379

Special Appropriations 4,803 2,252 34,030

Total Administered Appropriations 1,243,251 1,271,203 1,338,750

Non-Directly Appropriated ExpensesSAAP Research and Development Special Account 3,694 3,350 3,350

Total Non-Directly Appropriated Expenses 3,694 3,350 3,350

Total Administered Resourcing (A) 1,246,945 1,274,553 1,342,100

Table 2.4.1: Total Resources for Outcome 4

Page 67: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

53

AvailableBudget

EstimatesRevised

Estimates

2006-07 ($’000)

2007-08 ($’000)

2007-08 ($’000)

Departmental appropriations

Appropriations applicable across Outcome 4Policy Services and Program Management 2,616 2,620 2,609

Service Delivery - - -

Total items across Outcome 4 2,616 2,620 2,609

Output Group 4.1 - Housing SupportPolicy Services and Program Management 913 895 2,700

Service Delivery 70,405 67,780 68,079

Total Output Group 4.1 71,318 68,676 70,780

Output Group 4.2 - Supporting Financial ManagementPolicy Services and Program Management 3,996 3,920 3,904

Service Delivery 4,960 4,866 4,846

Total Output Group 4.2 8,956 8,786 8,750

Output Group 4.3 - Community RecoveryPolicy Services and Program Management 3,132 3,072 3,059

Service Delivery 4,479 7,416 16,037

Total Output Group 4.3 7,611 10,488 19,096

Output Group 4.4 - Community Partnership and DeliveryPolicy Services and Program Management 7,679 7,541 7,510

Service Delivery 9,113 10,736 10,693

Total Output Group 4.4 16,792 18,276 18,203

Total Revenue from Government (Appropriations) (B) 107,293 108,846 119,438

Revenue from Other Sources -

Section 31 of the Financial Management and Accountability Act 1997 123 323 5,480

Total Revenue from Other Sources (C) 123 323 5,480

Total Price of Departmental Outputs (B+C) (Total revenue from Government and from other sources)

107,416 109,169 124,918

Total Estimated Resourcing for Outcome 4 (A+B+C) (Total price of outputs and administered expenses)

1,354,361 1,383,722 1,467,018

Average staffing level (number) 278 283 293

Table 2.4.1: Total Resources for Outcome 4 (Continued)

Page 68: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

54

Table 2.4.2 - Performance information for outputs affected by additional estimates: Outcome 4

Performance InformationTable 2.4.2 shows performance information for outputs affected by additional estimates under Outcome 4.

Administered effectiveness Performance information 2007-08 Budget

Performance information 2007-08 revised

($’000) ($’000)

Output 4.2 - Supporting Financial Management

Financial Management Price: 39,810 Price: 41,532

Emergency Relief (Drought Relief Package 2007 - Additional Funding for the Emergency Relief Program)

Quality: Number of clients assisted 440,000 Quantity: Number of Emergency Relief Episodes 880,000

Quality: Number of clients assisted 610,000 Quantity: Number of Emergency Relief Episodes 1,051,463

Output 4.3 - Community Recovery

Disaster Recovery Payment Price: 2,252 Price: 34,030

Disaster Relief Funding - Hunter, Central Coast and Gippsland Regions

Quantity: na Quantity: Number of eligible individuals who received AGDRP for each activation. Proportion of activations where all legislative requirements were met within 24 hours of decision to activate AGDRP.

Output 4.4 - Community Partnership and Delivery

Community Engagement Price: 63,377 Price: 65,682

Daughters of Charity - Funding Quality: na Quality: The building will be completed by December 2009

Departmental output indicators Performance information 2007-08 Budget

Performance information 2007-08 Revised

($’000) ($’000)

Output 4.1 - Housing Support Price: 68,676 Price: 70,780

Establishment of an Office for Housing Quality: na Quality: Facilitation of high quality implementation plans for new housing initiatives delivered under the COAG Housing Working Group Estimate: Level of stakeholder satisfaction with Implementation Plans.

Quantity: Number of Implementation Plans completed for new housing initiatives delivered by FaHCSIA. Estimate: 4

National Housing Supply Council Facilitation of establishment of Council including appointment of Council members. Estimate: Completion of appointments of Council members

Quantity: na Quantity: Report on the state of housing supply. Estimate: Annually

Output 4.2 - Supporting Financial Management

Price: 8,786 Price: 8,750

Output 4.3 - Community Recovery

Price: 10,488 Price: 19,096

Output 4.4 - Community Partnership and Delivery

Price: 18,276 Price: 18,203

Page 69: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

55

Section 3: Budgeted financial statements

Overview

Revisions to the budgeted departmental financial statements and notes showing administered financial statements for the department since the 2007–08 Portfolio Budget Statements are presented in this section.

Analysis of budgeted financial statements

An analysis of the revisions to FaHCSIA’s budgeted financial statements for 2007–08 is provided below.

OPERATING RESULTS

Departmental

Operating revenueTotal operating revenue for 2007–08 is estimated at $1.456 billion, consisting of government appropriations of $1.426 billion and revenue from other independent sources of $29.2 million and representing an increase of $188.0 million over the 2007–08 Portfolio Budget Statements.

The reason for the variation is increased funding of $188.0 million to implement new measures and variations to existing measures.

Operating expensesTotal expenses are estimated to be $1.455 billion, representing an increase of $189.0 million over the 2007–08 Portfolio Budget Statements. This includes the following major variations:

An increase of $80.5 million in payments to suppliers•

An increase of $19.5 million in Employees expenses•

An increase of $74.6 million in payments to Centrelink for delivery of services. •

Administered

Operating revenueFaHCSIA will administer the collection of non-taxation revenue estimated at $191.4 million compared with the 2007–08 Portfolio Budget Statements of $150.3 million.

The major reason for the change is an increase in estimated revenues from non taxation sources.

Page 70: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

56

Balance Sheet

Departmental

Net asset positionThe department’s revised net asset position for 2007–08 is estimated to increase by $71.6 million to $215.5 million.

The major reason for the change is an increase in receivables of $12.7 million and an increase of $71.1 million in non-financial assets: partly offset by an increase in liabilities of $16.7 million.

Total assetsThe department’s total assets are forecast to increase by $88.3 million, compared with the 2007–08 Portfolio Budget Statements, to $328.3 million.

This increase is primarily due to an increase in receivables of $12.7 million and an increase in Non-Financial assets of $71.1 million.

Total liabilitiesThe department’s total liabilities are estimated to increase by $16.7 million, compared with the 2007–08 Portfolio Budget Statements, to $112.8 million. This increase is primarily due to an increase in accounts payable to suppliers of $11.1 million and a increase in Provisions of $6.1 million.

Administered

Total assets Total administered assets are forecast to decrease by $788.4 million, compared with the 2007–08 Portfolio Budget Statements, to $3.5 billion.

This decrease is primarily attributable to a decrease in receivables of $888.1 million.

Total liabilitiesTotal administered liabilities are forecast to decrease by $361.9 million compared with the 2007–08 Portfolio Budget Statements, to $4.1 billion.

This decrease is primarily due to a reduction in personal benefits payable and personal benefits provision of $283.8 million, partly offset by decrease in Other Payables of $56.7 million.

Page 71: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

57

bUDGETED FINANCIAL STATEMENTS

Departmental financial statements

Budgeted Departmental Income Statement (see Table 3.1)The statement provides a picture of the expected financial result for the department by identifying full accrual expenses and revenues.

Budgeted Departmental Balance Sheet (see Table 3.2)The balance sheet shows the projected asset, liability and equity position for the department over the current and forward years.

Budgeted Departmental Statement of Cash Flows (see Table 3.3)Budgeted cash flows, as reflected in the statement of cash flows, provides important information on the extent and nature of cash flows by characterising them into expected cash flows from operating activities, investing activities and financing activities.

Departmental Statement of Changes in Equity—Summary of Movement (see Table 3.4)

Departmental Capital Budget Statement (see Table 3.5)The statement shows all planned capital expenditure (capital expenditure on non-financial assets), whether funded through capital appropriations, additional equity borrowings or from funds from internal sources.

Departmental Property, Plant, Equipment and Intangibles — Summary of Movement (Budget year 2007–08) (see Table 3.6)

Page 72: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

58

Actual Revised budget

Forward estimate

Forward estimate

Forward estimate

2006-07 ($’000)

2007-08 ($’000)

2008-09 ($’000)

2009-10 ($’000)

2010-11 ($’000)

INCOME

Revenue

Revenues from Government 1,192,150 1,426,331 1,192,382 1,158,421 1,160,547

Goods and services 21,765 13,987 13,987 13,987 13,987

Interest - - - - -

Dividends - - - - -

Rents - - - - -

Royalties - - - - -

Other 764 15,238 10,624 8,660 8,460

Total revenue 1,214,679 1,455,556 1,216,993 1,181,068 1,182,994

Gains

Net foreign exchange gains 275 - - - -

Reversals of previous asset write-downs - - - - -

Net gains from sale of assets 21 - - - -

Other 2,788 - - - -

Total gains 3,084 - - - -

Total income 1,217,763 1,455,556 1,216,993 1,181,068 1,182,994

EXPENSE

Employees 234,085 278,081 260,390 239,653 237,125

Suppliers 179,644 258,478 206,204 189,894 187,573

Grants - - - - -

Subsidies - - - - -

Depreciation and amortisation 15,917 28,156 21,571 22,503 20,418

Finance costs 821 - - - -

Write-down of assets and impairment of assets 3,580

- - - -

Net losses from sale of assets - - - - -

Net foreign exchange losses 23 - - - -

Other 789,114 889,873 728,828 729,018 737,878

Total expenses 1,223,184 1,454,588 1,216,993 1,181,068 1,182,994

Share of operating results of associates and joint ventures accounted for using the equity method - - - - -

Operating result before Income Tax

Income Tax expense - - - - -

Net operating result (5,421) 968 - - -

Table 3.1: Budgeted departmental income statement (for the period ended 30 June)

Page 73: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

59

Table 3.1: Budgeted departmental income statement (for the period ended 30 June) (Continued)

Actual Revised budget

Forward estimate

Forward estimate

Forward estimate

2006-07 ($’000)

2007-08 ($’000)

2008-09 ($’000)

2009-10 ($’000)

2010-11 ($’000)

Operating result from continuing operations

Operating result from discontinued operations - - - - -

Gain (loss) on remeasuring discontinued operations - - - - -

Operating result

Minority interest in net surplus or (deficit) - - - - -

Net surplus or (deficit) attributable to the Australian Government (5,421) 968 - - -

Page 74: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

60

Table 3.2: Budgeted departmental balance sheet (as at 30 June)Actual Revised

budgetForward estimate

Forward estimate

Forward estimate

2006-07 ($’000)

2007-08 ($’000)

2008-09 ($’000)

2009-10 ($’000)

2010-11 ($’000)

ASSETS

Financial assets

Cash and cash equivalents 5,973 9,512 19,783 34,385 52,081

Receivables 115,813 127,377 108,224 111,402 114,095

Investments accounted for under the equity method - - - - -

Investments (s.39 FMA Act; s.18 CAC Act; s.19 CAC Act) - - - - -

Other investments - - - - -

Tax assets - - - - -

Accrued revenues - - - - -

Other financial assets - - - - -

Total financial assets 121,786 136,889 128,007 145,787 166,176

Non-financial assets

Land and buildings 95,703 101,175 96,200 91,943 87,000

Infrastructure, plant and equipment 12,059 19,997 41,352 37,435 29,087

Investment properties - - - - -

Heritage and cultural assets - - - - -

Inventories - - - - -

Intangibles 44,933 46,344 42,075 35,363 28,721

Deferred tax asset - - - - -

Biological assets - - - - -

Assets held for sale - - - - -

Other non-financial assets 23,846 23,846 23,846 23,846 23,846

Total non-financial assets 176,541 191,362 203,473 188,587 168,654

Total assets 298,327 328,251 331,480 334,374 334,830

LIABILITIES

Payables

Suppliers 40,991 23,769 26,472 29,155 29,155

Grants - - - - -

Dividends - - - - -

Financing costs - - - - -

Tax liabilities - - - - -

Deferred tax liabilities - - - - -

Other payables 12,775 12,775 12,775 12,775 12,775

Total payables 53,766 36,544 39,247 41,930 41,930

Interest bearing liabilities

Loans - - - - -

Leases 556 556 556 556 556

Deposits - - - - -

Overdraft - - - - -

Other interest bearing liabilities - - - - -

Total interest bearing liabilities 556 556 556 556 556

Provisions

Employees 64,428 67,438 67,929 68,105 68,146

Other provisions 8,230 8,230 8,230 8,230 8,230

Total provisions 72,658 75,668 76,159 76,335 76,376

Liabilities included in disposal groups held for sale - - - - -

Total liabilities 126,980 112,768 115,962 118,821 118,862

Page 75: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

61

Table 3.2: Budgeted departmental balance sheet (as at 30 June) (Continued)

Actual Revised budget

Forward estimate

Forward estimate

Forward estimate

2006-07 ($’000)

2007-08 ($’000)

2008-09 ($’000)

2009-10 ($’000)

2010-11 ($’000)

EQUITY*

Parent entity interest

Contributed equity 19,725 60,661 60,696 60,731 61,146

Other capital movements - 2,232 2,232 2,232 2,232

Reserves 36,105 36,105 36,105 36,105 36,105

Statutory funds - - - - -

Retained surpluses or accumulated deficits 115,517 116,485 116,485 116,485 116,485

Total parent entity interest 171,347 215,483 215,518 215,553 215,968

Minority interest

Contributed equity - - - - -

Reserves - - - - -

Statutory funds - - - - -

Retained surpluses or accumulated deficits - - - - -

Total minority interest - - - - -

Total equity 171,347 215,483 215,518 215,553 215,968

Current assets 145,632 160,240 161,816 163,229 163,451

Non-current assets 152,695 168,011 169,664 171,145 171,379

Current liabilities 113,867 101,123 103,987 106,551 106,587

Non-current liabilities 13,113 11,645 11,975 12,270 12,275

*Note: ‘equity’ is the residual interest in assets after deduction of liabilities.

Page 76: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

62

(for the period ended 30 June)

Actual Revised budget

Forward estimate

Forward estimate

Forward estimate

2006-07 ($’000)

2007-08 ($’000)

2008-09 ($’000)

2009-10 ($’000)

2010-11 ($’000)

OPERATING ACTIVITIES

Cash received

Goods and services 25,789 13,728 13,470 13,268 13,418

Appropriations 1,193,803 1,457,462 1,192,382 1,158,421 1,160,547

Interest - - - - -

Dividends - - - - -

Net GST received 17,600 - - - -

Other cash received 9 2,827 20,827 20,827 18,721

Total cash received 1,237,201 1,474,017 1,226,679 1,192,516 1,192,686

Cash used

Employees 234,425 274,790 221,852 203,328 193,628

Suppliers 160,886 262,759 244,815 242,453 254,416

Grants - - - - -

Financing costs - - - - -

Net GST paid - - - - -

Payments for Service Delivery 783,364 887,877 743,966 726,358 721,529

Total cash used 1,178,675 1,425,426 1,210,633 1,172,139 1,169,573

Net cash from or (used by)

operating activities 58,526 48,591 16,046 20,377 23,113

INVESTING ACTIVITIES

Cash received

Proceeds from sales of property, plant and equipment 354 - - - -

Proceeds from sales of financial instruments - - - - -

Bills of exchange and promissory notes - - - - -

Repayments of loans made - - - - -

Investments (s.39 FMA Act; s.18 CAC Act; s.19 CAC Act) - - - - -

Other cash received - - - - -

Total cash received 354 - - - -

Cash used

Purchase of property, plant and equipment 66,856 85,988 5,810 5,810 5,867

Purchase of financial instruments - - - - -

Bills of exchange and promissory notes - - - - -

Loans made - - - - -

Investments (s.39 FMA Act; s.18 CAC Act; s.19 CAC Act) - - - - -

Other cash used - - - - -

Total cash used 66,856 85,988 5,810 5,810 5,867

Net cash from or (used by)

investing activities (66,502) (85,988) (5,810) (5,810) (5,867)

Table 3.3: Budgeted departmental statement of cash flows (for the period ended 30 June)

Page 77: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

63

Table 3.3: Budgeted departmental statement of cash flows (for the period ended 30 June) (Continued)

Actual Revised budget

Forward estimate

Forward estimate

Forward estimate

2006-07 ($’000)

2007-08 ($’000)

2008-09 ($’000)

2009-10 ($’000)

2010-11 ($’000)

FINANCING ACTIVITIES

Cash received

Appropriations - contributed equity 13,847 40,936 35 35 450

Proceeds from issuing financial instruments - - - - -

Proceeds from loans - - - - -

Other cash received - - - - -

Total cash received 13,847 40,936 35 35 450

Cash used

Repayments of debt (including finance lease principal) - - - - -

Dividends paid - - - - -

Other cash used - - - - -

Total cash used - - - - -

Net cash from or (used by) financing activities 13,847 40,936 35 35 450

Net increase or (decrease)

in cash held 5,871 3,539 10,271 14,602 17,696

Cash at the beginning of the reporting period

102 5,973 9,512 19,783 34,385

Effect of exchange rate movements on cash at the beginning of reporting period - - - - -

Cash at the end of the reporting period 5,973 9,512 19,783 34,385 52,081

Page 78: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

64

Table 3.4: Departmental statement of changes in equity — summary of movement (Budget 2007–08)

Accumulated Asset Other Contributed Total

results revaluation reserves equity/ equity

reserve capital

$’000 $’000 $’000 $’000 $’000

Opening balance as at 1 July 2007

Balance carried forward from previous period 115,517 36,105 19,725 171,347

Adjustment for changes in accounting policies - - - - -

Adjusted opening balance 115,517 36,105 - 19,725 171,347

Income and expense

Income and expenses recognised directly in equity:

Revaluation adjustment - - - - -

Adjustment to asset revaluation reserve for makegood - - - - -

Sub-total income and expense recognised directly in equity - - - - -

Net operating result 968 - 968

Total income and expenses 968 - - - 968

Sub-total income and expense attributable to Australian Government - - - - -

attributable to minority interest - - - - -

Transactions with owners

Distributions to owners

Returns on capital Dividends - - - - -

Returns of capital Restructuring - - - - -

Other: [provide details] - - - - -

Contribution by owners

Appropriation (equity injection) - - - 40,936 40,936

Other: - - - - -

Transfer of assets from DIMIC 2,232 2,232

Sub-total transactions with owners - - - 43,168 43,168

Transfers between equity components - - - - -

Closing balance less minority interests - - - - -

Estimated closing balance

as at 30 June 2008 116,485 36,105 - 62,893 215,483

Page 79: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

65

Table 3.5: Departmental capital budget statement

Actual Revised budget

Forward estimate

Forward estimate

Forward estimate

2006-07 2007-08 2008-09 2009-10 2010-11

$’000 $’000 $’000 $’000 $’000

CAPITAL APPROPRIATIONS

Total equity injections 15,750 40,936 35 415 57

Total loans

Total capital appropriations 15,750 40,936 35 415 57

Represented by:

Purchase of non-financial assets 15,750 40,936 35 35 415

Other - - - - -

Total represented by 15,750 40,936 35 35 415

PURCHASE OF NON-FINANCIAL ASSETS

Funded by capital appropriation 15,750 40,936 35 35 415

Funded internally by Departmental resources 50,660 45,052 10,954 10,955 -

Total 66,410 85,988 10,989 10,990 415

Page 80: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

66

Table 3.6: Departmental property, plant, equipment and intangibles — summary of movement (Budget year 2007–08)

Land

Inve

stm

ent

Bui

ldin

gsS

peci

alis

tO

ther

Her

itage

Com

pute

rO

ther

Tota

l

prop

erty

mili

tary

infra

stru

ctur

ean

d cu

ltura

lso

ftwar

ein

tang

ible

s

equi

pmen

tpl

ant a

ndas

sets

equi

pmen

t

$’00

0$’

000

$’00

0$’

000

$’00

0$’

000

$’00

0$’

000

$’00

0

As

at 1

Jul

y 20

07

Gro

ss b

ook

valu

e 1

4,68

8 -

95,

171

- 1

9,08

8 -

- 6

8,99

3 1

97,9

40

Acc

umul

ated

dep

reci

atio

n -

(14,

156)

- (7

,028

) -

- (2

4,06

0) (4

5,24

4)

Ope

ning

net

boo

k va

lue

14,6

88 -

81,0

15 -

12,0

60 -

- 44

,933

152,

696

Add

ition

s:

by p

urch

ase

- -

27,

960

- 2

4,68

8 -

- 3

3,34

0 8

5,98

8

by fi

nanc

e le

ase

- -

- -

- -

- -

-

inte

rnal

ly d

evel

oped

from

acq

uisi

tions

of

ent

ities

or

oper

atio

ns (i

nclu

ding

rest

ruct

urin

g) -

- 2

,232

-

- -

- -

2,2

32

Rev

alua

tions

and

impa

irmen

t thr

ough

eq

uity

Rec

lass

ifica

tions

- -

- -

- -

- -

-

Dep

reci

atio

n/am

ortis

atio

n ex

pens

e -

- (1

0,56

4) -

(9,7

23)

- -

(7,8

69)

(28,

156)

Impa

irmen

ts re

cogn

ised

in o

pera

ting

resu

lt -

- -

- -

- -

- -

Oth

er m

ovem

ents

- -

- -

- -

- -

-

Dis

posa

ls:

from

dis

posa

l of e

ntiti

es o

r op

erat

ions

(inc

ludi

ng re

stru

ctur

ing)

- -

- -

- -

- -

-

othe

r dis

posa

ls -

- -

- -

- -

- -

As

at 3

0 Ju

ne 2

008

Gro

ss b

ook

valu

e 1

4,68

8 -

111

,207

-

36,

748

- -

78,

273

240

,916

Acc

umul

ated

dep

reci

atio

n -

- (2

4,72

0) -

(16,

751)

- -

(31,

929)

(73,

400)

Estim

ated

clo

sing

net

boo

k va

lue

14,6

88 -

86,4

87 -

19,9

97 -

- 46

,344

167,

516

Page 81: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

67

Schedule of administered activity

Table 3.7: Schedule of budgeted income and expenses administered on behalf of government (for the period ended 30 June)

Actual Revised Forward Forward Forward

budget estimate estimate estimate

2006-07 2007-08 2008-09 2009-10 2010-11

$’000 $’000 $’000 $’000 $’000

INCOME ADMINISTERED ON

BEHALF OF GOVERNMENT

Revenue

Taxation

Income tax - - - - -

Indirect tax - - - - -

Other taxes, fees and fines - - - - -

Total taxation - - - - -

Non-taxation

Goods and services - - - - -

Interest 104,266 102,354 112,376 111,698 112,268

Dividends - - - - -

Other sources of non-taxation revenues 173,966 89,079 53,960 42,464 31,788

Rents - - - - -

Royalties - - - - -

Total non-taxation 278,232 191,433 166,336 154,162 144,056

Total revenues administered

on behalf of Government 278,232 191,433 166,336 154,162 144,056

Gains

Net foreign exchange gains - - - - -

Net gains from sale of assets 59 - - - -

Other gains - - - - -

Total gains administered

on behalf of Government 59 - - - -

Total income administered

on behalf of Government 278,291 191,433 166,336 154,162 144,056

Page 82: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

68

EXPENSES ADMINISTERED ON

BEHALF OF GOVERNMENT

Grants 3,043,077 3,786,150 4,030,948 4,123,106 4,308,078

Subsidies 12,586 6,844 7,314 7,659 7,875

Personal benefits 43,278,241 50,376,857 56,279,585 58,997,475 62,424,865

Employees - - - - -

Suppliers 174,752 143,846 87,347 94,568 22,243

Depreciation and amortisation - - - - -

Write down and impairment of assets 207,167 - - - -

Interest - - - - -

Other 65,425 6,433 4,464 3,856 1,228

Losses

Net foreign exchange losses - - - - -

Net loss from sale of assets - - - - -

Other losses - - - - -

Total expenses administered

on behalf of Government 46,781,248 54,320,130 60,409,658 63,226,664 66,764,289

Table 3.7: Schedule of budgeted income and expenses administered on behalf of government (for the period ended 30 June) - (continued)

Page 83: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

69

Table 3.8: Schedule of budgeted assets and liabilities administered on behalf of government (as at 30 June)

Actual Revised Forward Forward Forward

budget estimate estimate estimate

2006-07 2007-08 2008-09 2009-10 2010-11

$’000 $’000 $’000 $’000 $’000

ASSETS ADMINISTERED ON

BEHALF OF GOVERNMENT

Financial assets

Cash and cash equivalents [this can include investments including s.39 FMA Act] 53,640 149,987 213,898 310,297 383,945

Receivables 829,130 1,126,238 1,253,376 1,357,829 1,473,868

Investments (s.39 FMA Act) 2,198,232 2,219,062 2,237,912 2,254,762 2,270,362

Accrued revenues - - - - -

Other financial assets - - - - -

Total financial assets 3,081,002 3,495,287 3,705,186 3,922,888 4,128,175

Non-financial assets

Land and buildings - - - - -

Infrastructure, plant and equipment - - - - -

Investment properties - - - - -

Heritage and cultural assets - - - - -

Inventories - - - - -

Intangibles - - - - -

Biological assets - - - - -

Assets held for sale - - - - -

Other 96,635 180 180 180 180

Total non-financial assets 96,635 180 180 180 180

Total assets administered on behalf of Government 3,177,637 3,495,467 3,705,366 3,923,068 4,128,355

LIABILITIES ADMINISTERED ON BEHALF OF GOVERNMENT

Interest bearing liabilities

Australian Government securities - - - - -

Loans - - - - -

Leases - - - - -

Deposits - - - - -

Overdraft - - - - -

Other - - - - -

Total interest bearing liabilities - - - - -

Provisions

Employees - - - - -

Taxation refunds provided - - - - -

Australian currency on issue - - - - -

Other provisions 3,026,517 3,057,997 3,092,588 3,129,431 3,168,592

Total provisions 3,026,517 3,057,997 3,092,588 3,129,431 3,168,592

Page 84: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

70

Table 3.8: Schedule of budgeted assets and liabilities administered on behalf of government (as at 30 June) (Continued)

Actual Revised Forward Forward Forward

budget estimate estimate estimate

2006-07 2007-08 2008-09 2009-10 2010-11

$’000 $’000 $’000 $’000 $’000

Payables

Suppliers 20,127 21,735 21,735 21,735 21,735

Grants and subsidies 49,142 28,424 28,430 28,437 28,435

Dividends - - - - -

Borrowing costs - - - - -

Personal benefits payable 1,094,931 981,114 1,075,274 1,156,465 1,233,346

Taxation refunds due - - - - -

Other payables - - - - -

Total payables 1,164,200 1,031,273 1,125,439 1,206,637 1,283,516

Liabilities included in disposal groups held for sale - - - - -

Total liabilities administered on behalf of Government 4,190,717 4,089,270 4,218,027 4,336,068 4,452,108

Page 85: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

71

Table 3.9: Schedule of budgeted administered cash flows (for the period ended 30 June)

Actual Revised Forward Forward Forward

budget estimate estimate estimate

2006-07 ($’000_

2007-08 ($’000)

2008-09 ($’000)

2009-10 ($’000)

2010-11 ($’000)

OPERATING ACTIVITIES

Cash received

Income tax - - - - -

Indirect tax - - - - -

Other taxes, fees and fines - - - - -

Sales of goods - - - - -

Rendering of services - - - - -

Interest 609 14,669 112,376 111,698 112,268

Dividends - - - - -

Net GST received 96,036 62,981 64,252 63,197 63,197

Other 180,336 150,110 48,822 42,471 34,743

Total cash received 276,981 227,760 225,450 217,366 210,208

Cash used

Borrowing costs - - - - -

Employees - - - - -

Grant payments 3,188,494 3,796,944 4,027,680 4,117,114 4,302,185

Interest paid - - - - -

Subsidies paid 12,585 6,843 7,313 7,658 7,874

Personal benefits 42,654,541 49,835,134 56,090,788 58,862,614 62,309,184

Suppliers 65,024 148,147 93,531 100,250 25,385

Net GST paid - 62,981 64,252 63,197 63,197

Other 162,110 (3,463) 2,478 14,905 1,230

Total cash used 46,082,754 53,846,586 60,286,042 63,165,738 66,709,055

Net cash from operating activities (45,805,773) (53,618,826) (60,060,592) (62,948,372) (66,498,847)

INVESTING ACTIVITIES

Cash received

Proceeds from sales of property, plant and equipment and intangibles - - - - -

Proceeds from sales of equity instruments - - - - -

Proceeds from sales of investments 4,166,164 - - - -

Repayments of advances - - - - -

Transfers from other entities - - - - -

Investments (s.39 FMA Act) - - - - -

Other 112,154 - - - -

Total cash received 4,278,318 - - - -

Page 86: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

72

Actual Revised Forward Forward Forward

budget estimate estimate estimate

2006-07 2007-08 2008-09 2009-10 2010-11

$’000 $’000 $’000 $’000 $’000

Cash used

Purchase of property, plant and equipment and intangibles - - - - -

Purchase of equity instruments - - - - -

Advances and loans made - - - - -

Transfers to other entities - - - - -

Investments (s.39 FMA Act) 4,209,563 14,669 18,850 15,850 15,600

Other - - - - -

Total cash used 4,209,563 14,669 18,850 15,850 15,600

Net cash from

investing activities 68,755 (14,669) (18,850) (15,850) (15,600)

FINANCING ACTIVITIES

Cash received

Proceeds from borrowing - - - - -

Cash from Official Public Account - - - - -

Other - - - - -

Total cash received - - - - -

Cash used

Net repayment of borrowings - - - - -

Dividends paid - - - - -

Cash to Official Public Account - - - - -

Other - - - - -

Total cash used - - - - -

Net cash from financing activities - - - - -

Net increase or (decrease) in cash held (45,737,018) (53,633,495) (60,079,442) (62,964,222) (66,514,447)

Cash at beginning of reporting period 120,669 53,640 149,987 213,898 310,297

Cash from Official Public Account for:

- appropriations 45,965,875 54,095,114 60,767,743 63,714,616 67,280,031

- special accounts 4,938 - - - -

Transfers from other entities

(Finance - Whole of Government) - - - - -

Cash to Official Public Account for:

- appropriations (297,084) (365,272) (624,390) (653,995) (691,936)

- special accounts (3,740) - - - -

Transfers to other entities

(Finance - Whole of Government) - - - - -

Effect of exchange rate

movements on cash at - - - - -

beginning of reporting period - - - - -

Cash at end of reporting period 53,640 149,987 213,898 310,297 383,945

Table 3.9: Schedule of budgeted administered cash flows (for the period ended 30 June) (Continued)

Page 87: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget
Page 88: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

74

INDIGENOUS BUSINESS AUSTRALIA

Page 89: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

75

INDIGENOUS BUSINESS AUSTRALIA Section 1: Agency overview and resources; variations and measures

OVERVIEW

Indigenous Business Australia’s (IBA) vision is for a nation in which Indigenous peoples share equitably in commercial and economic outcomes and for IBA to make a significant contribution to that outcome. IBA was established by the Aboriginal and Torres Strait Islander Commission Amendment Act 2001, which came into effect on 17 April 2001. IBA extends on the role of the former Aboriginal and Torres Strait Commercial Development Corporation (CDC).

IBA was originally created to assist and enhance Aboriginal and Torres Strait Islanders’ economic advancement, primarily through facilitating Aboriginal and Torres Strait Islander equity involvement in sound commercial ventures. Under the enabling legislation, IBA is required to meet this role by accumulating and using a substantial capital asset. The Act specifically requires that IBA engages in commercial activities.

With the passage of the Aboriginal and Torres Strait Islander Act 2005 in March 2005, IBA’s responsibilities were expanded to include two new programs. These programs provide home loans and business loans together with business development assistance.

The Home Ownership Programme provides concessional loans to low income Indigenous Australians and their families in order that they might purchase or construct a home. The program can also provide loans to assist in essential repairs or improvements.

The Business Development Programme provides concessional business loans and in certain circumstances business grants. The program also meets costs associated with the assessment of loan applications, the provision of aftercare to borrowers and general mentoring support for Indigenous people in business. The program also supports the cost of research to improve knowledge on regional economic circumstances which would impact on small business viability.

The Home Ownership on Indigenous Land Programme provides subsidised loan and grant packages secured by a mortgage over a long-term lease.

IBA's newly formed construction and facility management capability will deliver essential infrastructure to communities to improve their economic outcomes. The aims of this initiative are to reduce the cost of construction in remote areas, increase Indigenous participation in construction of local houses and to create small business and self-employment opportunities for Indigenous people.

IBA is contributing to the Northern Territory emergency response by assisting in the creation of viable small businesses from CDEP enterprises, providing asset leasing to

Page 90: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

76

community organisations to purchase new assets and equipment and managing a trust for existing and new assets, and expanding the Outback Stores initiative to more communities in the Northern Territory to ensure that they have access to stores that provide healthy, reasonably priced food.

Table 1.1: Agency outcomes and output groups lists the Outcome statement and Output Groups for Indigenous Business Australia.

Table 1.1: Agency outcomes and output groups

ADDITIONAL ESTIMATES AND VARIATIONS TO OUTCOMES Indigenous Business Australia (IBA) has had the following additional estimates variations.

Departmental Outputs

The revised 2007–08 departmental outputs appropriation has increased by $0.350 million to $61.329 million, as a result of the new measure—Cape York Welfare Reform.

Departmental Equity Injection

A departmental equity injection of $4.650 million has been provided under Cape York Welfare Reform to construct a business precinct in Cape York and provide a range of services to new Indigenous business in Cape York communities. The revised 2007–08 departmental equity injection has increased by $4.650 million to $59.949 million.

Outcome Description OutputsOutcome 1Stimulating the This outcome reflects the legislative Output 1.1 Equity and Investmentseconomic charter of IBA as set out in s.146, Output 1.2 Home Ownershipadvancement of s.147 and s.148 of the Aboriginal Output 1.3 Business DevelopmentAboriginal and Torres Strait Islander Act 2005. and Assistanceand Torres Strait These sections give IBA the Output 1.4 Home Ownership onIslander peoples responsibility to assist and enhance Indigenous Land

Indigenous self management andself sufficiency.

Page 91: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

77

Table 1.2: Additional estimates and variations to outcomes – measures

2007-08 2008-09 2009-10 2010-11($'000) ($'000) ($'000) ($'000)

Outcome 1Increase in estimates (departmental)Cape York Welfare Reform 5,000 - - -

Total increase in estimate (departmental) 5,000 - - -

Total variation of appropriation for outcome 1 5,000 - - -

Page 92: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

78

MEA

SUR

ES —

AG

ENC

Y SU

MM

AR

Y

Tabl

e 1.

4: S

umm

ary

of m

easu

res

sinc

e th

e 20

07–0

8 B

udge

t

Mea

sure

Titl

eO

utco

me

Out

put

grou

psaf

fect

edA

dmin

Dep

tA

dmin

Dep

tA

dmin

Dep

tA

dmin

Dep

tite

ms

outp

uts

Tota

lite

ms

outp

uts

Tota

lite

ms

outp

uts

Tota

lite

ms

outp

uts

Tota

lEx

pens

e M

easu

res

Cap

e Y

ork

Wel

fare

Ref

orm

11.

3-

35

0

35

0

-

-

-

-

-

-

-

-

-

Tota

l Exp

ense

Mea

sure

s-

35

0

35

0

-

-

-

-

-

-

-

-

-

Cap

ital M

easu

res

Cap

e Y

ork

Wel

fare

Ref

orm

11.

3-

4,

650

4,

650

-

-

-

-

-

-

-

-

-

Tota

l Cap

ital M

easu

res

-

4,65

0

4,65

0

-

-

-

-

-

-

-

-

-

Tota

l of A

ll M

easu

res

-

5,00

0

5,00

0

-

-

-

-

-

-

-

-

-

2007

-08

($'0

00)

2008

-09

($'0

00)

2009

-10

($'0

00)

2010

-11

($'0

00)

Page 93: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

79

BREAKDOWN OF ADDITIONAL ESTIMATES BY APPROPRIATION BILL

Tables 1.5 and 1.6 outline the proposed variations to annual departmental appropriations in Appropriation Bill (No.3) and Appropriation Bill (No.4).

Appropriation Bill (No.3) supplements Appropriation Act (No.1) 2007–08, and includes funding for departmental expenses. The proposed variations in Appropriation Bill (No.3) result in an increase of $0.350 million for 2007–08.

Table 1.5: Appropriation Bill (No. 3) 2007–08

2006-07 2007-08 2007-08 Additional Reducedavailable Budget revised estimates estimates

($'000) ($'000) ($'000) ($'000) ($'000)DEPARTMENTAL OUTPUTSOutcome 1Stimulating the economic advancementof Aboriginal and Torres Strait Islanderpeoples 32,794 60,979 61,329 350 - Total 32,794 60,979 61,329 350 - Total administered and

departmental 32,794 60,979 61,329 350 -

Note 1: Available appropriation is the amount available to be drawn down, and is equal to:Budget Appropriation + Additional Estimates Appropriation + DIAB + AFM - Savings - Rephasings - Other Reductions +/- Section 32

Page 94: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

80

Appropriation Bill (No. 4) supplements Appropriation Act (No.2) 2007–08, and includes funding for departmental capital injections. Appropriation Bill (No.4) accounts for the remainder of the proposed variations for 2007–08, an increase of $4.650 million.

Table 1.6: Appropriation Bill (No. 4) 2007–08

2006-07 2007-08 2007-08 Additional Reducedavailable Budget revised Estimates estimates

($'000) ($'000) ($'000) ($'000) ($'000)PAYMENTS TO STATES, ACT, NT

AND LOCAL GOVERNMENTOutcome 1Stimulating the economic advancementof Aboriginal and Torres Strait IslanderpeoplesTotal - - - - - Non-operating

Equity injections 57,090 55,299 59,949 4,650 - Loans - - - - - Previous years' outputs - - - - - Administered assets and liabilities - - - - -

Total non-operating 57,090 55,299 59,949 4,650 - Indigenous Business AustraliaTotal 57,090 55,299 59,949 4,650 -

Note 1: 2006-07 available appropriation is included to allow a comparison of this year's appropriation with what was made available for use in the previous year. Available appropriation is the amount available to be drawn down, and is equal to:Budget Appropriation + Additional Estimates Appropriation + DIAB + AFM - Savings - Rephasings - Other Reductions +/- Section 32

Page 95: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

81

SUMMARY OF STAFFING CHANGES

Table 1.7 shows changes in estimated Average Staffing Level (ASL) for Indigenous Business Australia. ASL is the average number of full-time equivalent employees (ongoing and non-ongoing) during the year.

Table 1.7: Average Staffing Level (ASL)

OTHER RECEIPTS AVAILABLE TO BE USED

Table 1.8 provides details of other revenues available to be used and include receipts under s.31 of the FMA Act 1997, receipts on behalf of bodies covered by the CAC Act 1997 that is available to be spent, special accounts (non-appropriation receipts) and resources received free of charge.

Table 1.8: Other receipts available to be used

2007-08 2007-08Budget Revised Variation

Outcome 1Stimulating the economic advancementof Aboriginal and Torres Strait Islanderpeoples 190 201 11Total 190 201 11

Budget Revisedestimate estimate2007-08 2007-08

($'000) ($'000)Departmental other receiptsOutcome 1Goods and Services 120 140Interest on Advances 61,857 27,868Iinterest on Deposits 3,709 3,470Dividends 8,366 8,366Other 11,861 35,545Rents 42 42

Total departmental other receipts available to be used 85,955 75,431

Page 96: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

82

Section 2: Revisions to agency outcomes

OUTCOMES, ADMINISTERED ITEMS AND OUTPUTS

There have been no changes to Indigenous Business Australia’s outcome and output structure since the 2007–08 Budget.

Figure 2: Outcome and output structure for Indigenous Business Australia

Outcome 1 Stimulating the economic advancement of Aboriginal and Torres Strait Islander peoples Total price: $136.760 million Departmental outcome appropriation:$61.329 million

Indigenous Business Australia General Manager: Ron Morony Total Price of Outputs: $136.760 million Total Departmental outcome appropriation: $61.329 million

Output 1.1 Equity and Investments Total price: $65.771 million Dept output approp: $21.519 million

Output 1.2 Home Ownership Total price: $33.076 million Dept output approp: $6.947 million

Output 1.3 Business Development and Assistance Total price: $31.865m Dept output approp: $26.815 million

Output 1.4 Home Ownership on Indigenous Land Total price: $6.048 million Dept output approp: $6.048 million

Page 97: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

83

Outcome 1

Explanation of Variations Outcome 1 has the following additional variations:

Departmental Outputs The departmental output appropriation for Outcome 1 in 2007–08 has increased by $0.350 million to $61.329 million. The increase is due to:

An increase for the new measure Cape York welfare reform of $0.350 million.

Departmental Equity Injections The departmental equity injections for Outcome 1 in 2007–08 has increased by $4.650 million to $59.949 million. The increase is due to:

An increase for the new measure Cape York welfare reform of $4.650 million.

Revised performance information 2007–08 The only changes to the performance information for Outcome 1 since the 2007–08 Portfolio Budget Statements are as follows. The estimated output prices have been revised to:

Reflect extra funding received through the Additional Estimates process

Table 2.1: Performance information for outputs affected by additional estimates — Outcome 1

Output Performance Information 2007–08 Budget

Performance Information 2007–08 revised

Output 1.3 - Business Development Program

Cape York Welfare Reform Quality: na Quality: • Tenancy occupancy rate greater

than 70%

• Indigenous ownership of retail businesses of greater than 70%

Quantity: na Quantity:• 1 business precinct constructed

• 5 new Indigenous enterprises supported into new business opportunities

Price: na Price: 350

Page 98: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

84

Section 3: Budgeted financial statements

ANALYSIS OF BUDGETED FINANCIAL STATEMENTS

An analysis of the primary causes of movements in the financial statements from those published in the 2007-08 PBS follows.

BUDGETED FINANCIAL STATEMENTS

The major changes in the Budgeted financial statements since the Portfolio Budgeted Statements 2007-08 can be attributed to the update of actual figures for the 2006-07 financial year, and the addition of the Cape York welfare reform measure.

Departmental financial statements

Budgeted departmental income statement

Total income has increased by $14.040 million and total expenses have increased by $14.083 million resulting in a decrease in net surplus of $0.043 million.

Budgeted departmental balance sheet

Total Assets have increased by $72.950 million, liabilities have increased by $18.797 million and equity has increased by $54.153 million.

Budgeted departmental statement of cash flows

The closing cash balance has decreased by $37.960 million.

Budgeted departmental statement of changes in equity – summary of movement

Total equity has increased by $54.153 million due to additional equity injection and update of the actual figures for 2006-07 in accumulated results.

Departmental capital budget statement

Total capital budget has increased by additional equity injection, giving a total of $59.949 million.

Departmental property, plant, equipment and intangibles – summary of movement

A significant change is due to update of actual figures for 2006-07 and a reclassification of opening balances to include Investment Properties.

Page 99: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

85

Table 3.1: Budgeted departmental income statement (for the period ended 30 June)

Actual Revised Forward Forward Forwardbudget estimate estimate estimate

2006–07 2007–08 2008–09 2009–10 2010–11($'000) ($'000) ($'000) ($'000) ($'000)

INCOMERevenueRevenues from Government 32,794 61,329 38,608 42,783 42,670 Goods and services 17,008 140 125 130 135 Interest 32,728 31,338 31,601 31,113 31,283 Rents 185 42 - - - Dividends 27,733 8,366 15,000 15,600 16,224 Other - 35,545 17,500 10,000 - Total revenue 110,448 136,760 102,834 99,626 90,312 GainsNet foreign exchange gains - - - - - Net gains from sale of assets 4 - - - - Other - - - - - Total gains 4 - - - - Total income 110,452 136,760 102,834 99,626 90,312

EXPENSEEmployees 15,296 24,808 21,537 21,768 22,559 Suppliers 16,464 35,912 17,449 18,250 19,049 Grants 10,683 22,489 19,951 22,544 22,446 Depreciation and amortisation 493 948 948 948 948 Finance costs - - - - - Write-down of assets andimpairment of assets 2,177 8,481 8,800 9,150 9,400 Net losses from sale of assets - - - - - Other 13,683 32,465 15,000 8,000 - Total expenses 58,796 125,103 83,685 80,660 74,402

Share of operating results ofassociates and joint venturesaccounted for using the equitymethod - - - - -

Operating result from continuingoperations 51,656 11,657 19,149 18,966 15,910

Minority interest in net surplusor (deficit) - - - - -

Net surplus or (deficit) attributableto the Australian Government 51,656 11,657 19,149 18,966 15,910

Page 100: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

86

Table 3.2: Budgeted departmental balance sheet (as at 30 June)

Actual Revised Forward Forward Forwardbudget estimate estimate estimate

2006-07 2007-08 2008-09 2009-10 2010-11($'000) ($'000) ($'000) ($'000) ($'000)

ASSETSFinancial assets

Cash 73,315 63,747 63,940 47,892 48,767 Receivables 429,732 484,593 534,581 588,519 625,645 Investments (s.39 FMA Act;

s.18 CAC Act, s.19 CAC Act) 128,658 157,227 168,165 179,703 191,865 Accrued revenues 77,414 69,780 69,780 69,780 69,780 Other 5 5 5 5 5

Total financial assets 709,124 775,352 836,471 885,899 936,062 Non-financial assets

Land and buildings 675 7,875 7,875 7,875 7,875 Infrastructure, plant and equipment 380 272 272 272 272 Inventories - - - - - Intangibles 732 140 140 140 140 Investment Property 22,488 22,488 22,488 22,488 22,488 Other - - - - -

Total non-financial assets 24,275 30,775 30,775 30,775 30,775 Total assets 733,399 806,127 867,246 916,674 966,837 LIABILITIESPayables

Suppliers 7,818 7,818 7,818 7,818 7,818 Other payables 14,051 14,051 14,051 14,051 14,051

Total payables 21,869 21,869 21,869 21,869 21,869 Interest bearing liabilities

Loans - - - - - Other - - - - -

Total interest bearing liabilities - - - - - Provisions

Employees 3,936 4,304 4,977 5,677 6,405 Other - - - - -

Total provisions 3,936 4,304 4,977 5,677 6,405

Liabilities included in disposalgroups held for sale - - - - -

Total liabilities 25,805 26,173 26,846 27,546 28,274

Page 101: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

87

Table 3.2: Budgeted departmental balance sheet (as at 30 June) continued

Actual Revised Forward Forward Forwardbudget estimate estimate estimate

2006-07 2007-08 2008-09 2009-10 2010-11($'000) ($'000) ($'000) ($'000) ($'000)

EQUITY*Parent entity interest

Contributed equity 634,242 694,191 735,699 768,869 802,039 Reserves 10,440 10,440 10,440 10,440 10,440 Statutory Funds - - - - - Retained surpluses or

accumulated deficits 62,912 75,323 94,261 109,819 126,084 Total parent entity interest 707,594 779,954 840,400 889,128 938,563 Minority interest

Contributed equity - - - - - Reserves - - - - - Retained surpluses or

accumulated deficits - - - - - Total minority interest - - - - - Total equity 707,594 779,954 840,400 889,128 938,563 Current assets 256,699 244,882 254,449 248,410 257,863 Non-current assets 476,700 561,245 612,797 668,264 708,975 Current liabilities 21,869 21,869 21,869 21,869 21,869 Non-current liabilities 3,936 4,304 4,977 5,677 6,405

*Note: 'equity' is the residual interest in assets after deduction of liabilities.

Page 102: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

88

Table 3.3: Budgeted departmental statement of cash flows (for the period ended 30 June)

Actual Revised Forward Forward Forwardbudget estimate estimate estimate

2006–07 2007–08 2008–09 2009–10 2010–11($'000) ($'000) ($'000) ($'000) ($'000)

OPERATING ACTIVITIESCash receivedGoods and services 20,181 140 125 130 135 Appropriations 32,794 61,329 38,608 42,783 42,670 Interest 18,126 31,338 31,601 31,113 31,283 Dividends 20,266 16,000 15,000 15,600 16,224 Other 1,070 35,587 17,500 10,000 - Total cash received 92,437 144,394 102,834 99,626 90,312 Cash usedEmployees 15,265 24,440 20,864 20,361 21,261 Suppliers 9,633 35,158 17,660 21,059 19,519 Grants 10,683 22,489 19,951 23,595 22,446 Write-down and impairment of assetsOther - 32,465 15,000 8,000 - Total cash used 35,581 114,552 73,475 73,015 63,226 Net cash from or (used by)operating activities 56,856 29,842 29,359 26,611 27,086 INVESTING ACTIVITIESCash receivedProceeds from sales of property,plant and equipment 950 - - - - Proceeds from sales of financialinstruments - - - - - Repayments of loans made 64,630 68,301 77,720 75,082 72,174 Investments (s.39 FMA Act,s.18 CAC Act, s.19 CAC Act) 8,074 - - - - Other - - - - - Total cash received 73,654 68,301 77,720 75,082 72,174 Cash usedPurchase of property, plant and equipment 19,882 7,448 948 948 948 Purchase of financial instruments - - - - - Loans made 140,854 131,643 136,508 138,425 118,445 Investments (s.39 FMA Act,s.18 CAC Act, s.19 CAC Act) 33,652 28,569 10,938 11,538 12,162 Other - - - - - Total cash used 194,388 167,660 148,394 150,911 131,555 Net cash from or (used by) investing activities (120,734) (99,359) (70,674) (75,829) (59,381)

Page 103: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

89

Table 3.3: Budgeted departmental statement of cash flows (for the period ended 30 June) continued

Actual Revised Forward Forward Forwardbudget estimate estimate estimate

2006–07 2007–08 2008–09 2009–10 2010–11($'000) ($'000) ($'000) ($'000) ($'000)

FINANCING ACTIVITIESCash ReceivedAppropriations - contributed equity 57,090 59,949 41,508 33,170 33,170 Proceeds from Loans - - - - - Other - - - - - Total cash received 57,090 59,949 41,508 33,170 33,170 Cash usedRepayments of Debts - - - - - Other - - - - - Total cash used - - - - - Net cash from or (used by)financing activities 57,090 59,949 41,508 33,170 33,170 Net increase or (decrease)in cash held (6,788) (9,568) 193 (16,048) 875 Cash at the beginning ofthe reporting period 80,103 73,315 63,747 63,940 47,892 Cash at the end of thereporting period 73,315 63,747 63,940 47,892 48,767

Page 104: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

90

Table 3.4: Departmental statement of changes in equity — summary of movement (Budget 2007–08)

Accumulated Asset Other Contributed Totalresults revaluation reserves equity/ equity

reserve capital($'000) ($'000) ($'000) ($'000) ($'000)

Opening balance as at 1 July 2007Balance carried forward fromprevious period 62,912 10,440 - 634,242 707,594 Opening balance adjustment - - - - - Adjusted opening balance 62,912 10,440 - 634,242 707,594 Income and expenseIncome and expenses recogniseddirectly in equity:Other 754 - - - 754 Sub-total income and expense 63,666 10,440 - 634,242 708,348 Net operating result 11,657 - - - 11,657

Total income and expenses recognised directly in equity 75,323 10,440 - 634,242 720,005

Transactions with ownersDistributions to ownersReturns of capitalDividends - - - - - Restructuring - - - - - Other - - - - - Contribution by ownersAppropriation (equity injection) - - - 59,949 59,949 OtherRestructuring - - - - - Sub-total transactions with owners - - - 59,949 59,949 Transfers between equitycomponents - - - - - Closing balance as at 30 June 2008 75,323 10,440 - 694,191 779,954

Page 105: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

91

Table 3.5: Departmental capital budget statements

Actual Revised Forward Forward Forwardbudget estimate estimate estimate

2006–07 2007–08 2008–09 2009–10 2010–11($'000) ($'000) ($'000) ($'000) ($'000)

CAPITAL APPROPRIATIONSTotal equity injections 57,090 59,949 41,508 33,170 33,170 Total loans - - - - - Total capital appropriations 57,090 59,949 41,508 33,170 33,170 Represented by:Purchase of non-financial assets - 7,200 - - - Other 57,090 52,749 41,508 33,170 33,170 Total represented by 57,090 59,949 41,508 33,170 33,170 PURCHASE OF NON-FINANCIAL ASSETSFunded by capital appropriationFunded internally by - 7,200 - - - departmental resources 19,882 248 948 948 948 Total 19,882 7,448 948 948 948

Page 106: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

92

Table 3.6: Departmental property, plant, equipment and intangibles — summary of movement (Budget year 2007–08)

Buildings Other Other Investment Totalinfrastructure intangibles Property

plant andequipment

($'000) ($'000) ($'000) ($'000) ($'000)As at 1 July 2007Gross book value 828 898 940 22,488 25,154 Accumulated depreciation 153 518 208 - 879 Opening net book value 675 380 732 22,488 24,275 Additions:by purchase 7,200 216 32 - 7,448 by finance lease - - - - - internally developed - - - - - from acquisitions of entities or operations (including restructuring) - - - - -

Revaluations and impairment throughequity - - - - - Reclassifications - - - - - Depreciation/amortisation expense - 324 624 - 948 Impairments recognised in operatingresult - - - - - AEIFRS adjustment - - - - -

Disposals:from disposal of entities or operations (including restructuring) - - - - - other disposals - - - - -

As at 30 June 2008Gross book value 8,028 1,114 972 22,488 32,602 Accumulated depreciation 153 842 832 - 1,827 Estimated closing net book value 7,875 272 140 22,488 30,775

Page 107: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

93

ABBREVIATIONSAAO Administrative Arrangement Orders

AAT Administrative Appeals Tribunal

AEIFR Australian Equivalent to International Financial Reporting Standards

AFM Advance from the Finance Minister

AGDRP Australian Government Disaster Recovery Payment

AHL Aboriginal Hostels Limited

AIFS Australian Institute of Family Studies

ARO Authorised Review Officer

ASL Average Staffing Level

ATO Australian Taxation Office

ATSI Act 2005 Aboriginal and Torres Strait Islander Act 2005

AVO Australian Valuation Office

CAC Act 1997 Commonwealth Authorities and Companies Act 1997

CDEP Community Development Employment Program

CHIN Community Housing and Infrastructure Needs

CHIP Community Housing and Infrastructure Program

COAG Council of Australian Governments

CRF Consolidated Revenue Fund

CSTDA Commonwealth State Territory Disability Agreement

CTC Competitive Tendering and Contracting

DAFF Department of Agriculture, Fisheries and Forestry

DEEWR Department of Education, Employment and Workplace Relations

DIAB Departmental Item - Adjustments and Borrowings

DIAC Department of Immigration and Citizenship

DSP Disability Support Pension

EOWA Equal Opportunity for Women in the Workplace Agency

FaHCSIA Department of Families, Housing, Community Services and Indigenous Affairs

FAO Family Assistance Office

FDC Family Day Care

FDCQA Family Day Care Quality Assurance

FTB Family Tax Benefit

FMA Act 1997 Financial Management and Accountability Act 1997

FTB Family Tax Benefit

GST Goods and Services Tax

IBA Indigenous Business Australia

ILC Indigenous Land Corporation

LGA Local Government Area/s

LSAC Longitudinal Study of Australian Children

MTAWE Male Total Average Weekly Earnings

MYEFO Mid-Year Economic and Fiscal Outlook

NGOs Non-Government Organisations

OfW Office for Women

PAES Portfolio Additional Estimates Statements

PBS Portfolio Budget Statements

Page 108: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

94

RA Rent Assistance

SAAP Supported Accommodation Assistance Program

SPP Specific Purpose Payments

SRA Shared Responsibility Agreements

SSAT Social Security Appeals Tribunal

TSRA Torres Strait Regional Authority

Page 109: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

95

GLOSSARYAccrual Accounting System of accounting where items are brought to account

and included in the financial statements as they are earned or incurred, rather than as they are received or paid.

Accumulated Depreciation The aggregate depreciation recorded for a particular depreciating asset.

Administered Items Expenses, revenues, assets or liabilities managed by agencies on behalf of the Commonwealth. Agencies do not control administered items. Administered expenses include grants, subsidies and benefits. In many cases, administered expenses fund the delivery of third party outputs.

Additional Estimates Where amounts appropriated at Budget time are insufficient, Parliament may appropriate more funds to portfolios through the Additional Estimates Acts.

AEIFRS Australian Equivalents to International Financial Reporting Standards which were issued by the Australian Accounting Standards Board in July 2004.

Appropriation An authorisation by Parliament to spend moneys from the Consolidated Revenue Fund for a particular purpose.

Annual Appropriation Acts of Parliament, which provide appropriation for the Government’s activities during a specific financial year. Three Appropriation Bills are introduced into Parliament in May and comprise the Budget. Further supplementary Bills are introduced later in the financial year as part of the Additional Estimates process. The Parliamentary Departments have their own Appropriation Bills.

Appropriation Bill (No. 1) This Bill proposes spending from the Consolidated Revenue Fund for the ordinary annual services of Government. Once the Bill is passed by Parliament and given royal assent, it becomes the Appropriation Act (No. 1).

Appropriation Bill (No. 2) This Bill proposes spending from the Consolidated Revenue Fund for purposes other than the ordinary annual services of Government. Under existing arrangements between the two Houses of Parliament (the ‘Compact’), this Bill includes appropriation funding of administered expenses for new outcomes, payments to the states and territories, and for departmental or administered capital. Funding for extensions to existing programs can be included in Appropriation Bill (No. 1). Once the Bill is passed by Parliament and given royal assent, it becomes the Appropriation Act (No. 2).

Appropriation Bills (Nos 3 and 4) If an amount provided in Appropriation Acts (No. 1 or 2) is not enough to meet approved expenditure to be paid in a financial year, supplementary appropriation may be sought in Appropriation Bills (No. 3 or 4). Once these Bills are passed by Parliament and given royal assent, they become the Appropriation Acts (Nos 3 and 4). However, they are also commonly referred to as the Additional Estimates Bills.

Assets Future economic benefits controlled by an entity as a result of past transactions or other past events.

Page 110: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

96

Average Staffing Level (ASL) ASL is the average number of employees receiving salary/wages (or compensation in lieu of salary/wages) over a financial year, with adjustments for casual and part-time employees to show the full-time equivalent.

Capital expenditure Expenditure by an agency on capital projects, for example purchasing a building.

Consolidated Revenue Fund Section 81 of the Constitution stipulates that all revenue raised or money received by the Commonwealth forms the one consolidated revenue fund (CRF). The CRF is not a bank account. The Official Public Account reflects most of the operations of the CRF.

Cross Portfolio Budget Measure A Budget measure, which affects programs administered in a number of portfolios.

Departmental Items Assets, liabilities, revenues and expenses that are controlled by the agency to produce outputs. Departmental items would generally include computers, plant and equipment assets used by agencies in providing goods and services and most employee expenses, supplier costs and other administrative expenses incurred.

Depreciation Apportionment of an asset’s capital value as an expense over its estimated useful life to take account of normal usage, obsolescence, or the passage of time.

Effectiveness Indicators Indicators to assess the degree of success in achieving outcomes. As outcomes are generally long-term in nature, effectiveness indicators often relate to intermediate outcomes (shorter-term impacts) below the planned outcomes specified.

Efficiency Indicators Measures the adequacy of an agency’s management of its outputs (and where applicable, administered items). Includes Price, Quality and Quantity indicators. The interrelationship between the three efficiency indicators of any one output should be considered when judging efficiency.

Equity or Net Assets Residual interest in the assets of an entity after deduction of its liabilities.

Estimates Estimates are an agency’s expected revenues, expenses, assets, liabilities and cash flows. They are prepared for each output in the Budget, in consultation with the Department of Finance and Administration. (See also Forward Estimates and Additional Estimates).

Expenses Expenses represent the full costs of an activity, that is, the total value of all the resources consumed in producing goods and services or the loss of future economic benefits in the form of reductions in assets or increases in liabilities of the entity. Expenses include cash items such as salary payments as well as expenses that have been incurred, such as accruing employee entitlements that will be paid in the future.

Page 111: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

97

Fair value Valuation methodology: the amount for which an asset could be exchanged or a liability settled between knowledgeable, willing parties in an arm’s length transaction. Australian Government entities will move to this method incrementally by 30 June 2006 for valuing most infrastructure, plant and equipment.

Financial Management and Accountability (FMA) Act 1997

The principal legislation governing the proper use and management of public money and public property, and other Commonwealth resources. FMA Regulations and FMA Orders are made pursuant to the Act.

Forward Estimates The financial statement estimate for the three outyears after the Budget year.

Grants Non-reciprocal transfers of economic resources, where the payer agency does not receive approximately equal value in return.

Groups See Output Groups.Intermediate Outcomes More specific medium-term impacts (for example, trend

data, targets or milestones) below the level of the planned outcomes specified in the Budget. A combination of several intermediate outcomes can at times be considered as a proxy for determining the achievement of outcomes or progress towards outcomes. (See also Outcomes)

Measure Decision by the Cabinet or Ministers that has been finalised since the 2006–07 Budget, which has a financial impact in the Budget or forward years.

Mid Year Economic and Fiscal Outlook (MYEFO)

The Mid-Year Economic and Fiscal Outlook provides an update of the Government’s Budget Estimates by examining expenses and revenues year-to-date, as well as provisions for new decisions that have been taken since the budget. It occurs around the middle of the financial year. Major updates such as the Mid Year Economic and Fiscal Outlook, coincide with the availability of revised economic parameters.

Operating result Equals revenue less expenses.Outcomes The Government’s objectives in each portfolio area.

Outcomes are desired results, impacts or consequences for the Australian community as influenced by the actions of the Australian Government. Actual outcomes are assessments of the end results or impacts actually achieved.

Output Groups A logical aggregation of agency outputs, where useful, and based either on homogeneity, type of product, business line or beneficiary target group. Aggregation of outputs may also be needed for the provision of adequate information for performance monitoring, or based on a materiality test.

Outputs The goods and services produced by agencies on behalf of Government for external organisations or individuals. Outputs also include goods and services for other areas of government external to the agency.

Page 112: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

98

Performance Indicators

Qualitative and quantitative measures of an output which provide a guide on performance where direct causal links are not obvious and changes in performance are difficult to measure directly.

Performance Information Evidence about performance that is collected and used systematically. Evidence may relate to appropriateness, effectiveness and efficiency. It may be about outcomes, factors that affect outcomes, and what can be done to improve them.

Price One of the three key efficiency indicators. The amount the Government or the community pays for the delivery of agreed outputs.

Quality One of the three key efficiency indicators. Relates to the characteristics by which customers or stakeholders judge an organisation, product or service. Assessment of quality involves use of information gathered from interested parties to identify differences between users’ expectations and experiences.

Quantity One of the three key efficiency indicators. Examples include: the size of an output; count or volume measures; how many or how much.

Receipts The total or gross amount received by the Commonwealth. Each receipt item is either revenue, an offset within outlays, or financing transactions. Receipts include taxes, interest, charges for goods and services, borrowings and Government Business Enterprise dividends received.

Revenue Total value of resources earned or received to cover the production of goods and services.

Senate Legislation Committee The Senate Legislation Committee is a body of Senators that examines the use of Government funding. Its purpose is to question Government officials about the estimates and activities of their respective agencies.

Special Account Balances existing within the Consolidated Revenue Fund (CRF) that are supported by standing appropriations (Financial Management and Accountability (FMA) Act 1997, ss.20 and 21). Special Accounts allow money in the CRF to be acknowledged as set aside (hypothecated) for a particular purpose. Amounts credited to a Special Account may only be spent for the purposes of the Special Account. Special Accounts can only be established by a written determination of the Finance Minister (s.20 FMA Act) or through an Act of Parliament (referred to in s.21 of the FMA Act).

Special Appropriations (including Standing Appropriations)

An amount of money appropriated by a particular Act of Parliament for a specific purpose and number of years. For special appropriations, the authority to withdraw funds from the Consolidated Revenue Fund does not generally cease at the end of the financial year.Standing appropriations are a sub-category consisting of ongoing special appropriations. The amount appropriated will depend on circumstances specified in the legislation.

Page 113: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

99

Specific Purpose Payments (SPPs) Commonwealth payments to the states are divided into General Purpose Payments (GPPs) and Specific Purpose Payments (SPPs). The term payments is used because the amounts referred to are gross transfers, not net, which would include repayments of advances to the states and territories. Most SPPs are conditional on policy objectives set by the Commonwealth or the achievement of national policy objectives agreed between the Commonwealth and the states and territories.

Page 114: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

100

INDEX A Abbreviations, 93 Aboriginal Hostels Limited (AHL), 3 Aboriginal Land Commissioner, 4, 6 Aboriginals Benefit Account Advisory Committee, 6 Additional estimates and variations to outcomes, 5, 12, 13, 14, 15, 16, 17, 76, 77 Administrative Arrangement Orders (AAOs) i, 3, 9 Agency Additional Estimates Statements, ii Agency Overview and Resources, variations and measures, 9 Appropriation Bill (No. 3)

2007–08, i, 32, 40, 44, 48, 52, 79 Appropriation Bill (No. 4)

2007–08, i, 33, 40, 44, 48, 52, 79, 80

Australian Institute of Family Studies (AIFS), 9, 11

Average Staffing Level (ASL), 34, 41, 45, 49, 53, 81, 93, 96

B Balance Sheet, 56, 57, 60, 61, 84, 86, 87 Breakdown of additional estimates by appropriation, 79 Budgeted financial statements, 55-72 C Centrelink, 19, 55 Community Development EmploymentProjects (CDEP),

19, 29, 40

D Department of Education,

Employment and Workplace Relations (DEEWR), 3, 9 Department of Employment and Workplace Relations (DEWR), 11 Department of Families, Housing, Community Services and Indigenous Affairs (FaHCSIA), 3, 5, 9, 11, 35, 37, 38, 50, 54, 55 Department of Families, Community Services and Indigenous Affairs (FaCSIA), 11 Disability Support Pension (DSP), 36, 44 EEstimates of expenses from special appropriations, ii, 5, 35 Estimates of special account flows, ii, 5, 35 Equal Opportunity for Women in the Workplace Agency

(EOWA), 3, 9 G Glossary, 95-99 I Indigenous Business Australia (IBA), 3, 5, 9, 75-92 Indigenous Land Corporation, 3, 5, 6 L Land Councils (Northern Territory), 6 M Measures—Agency Summary, 6

Page 115: PORTFOLIO ADDITIONAL ESTIMATES STATEMENTS … · US E R GUDI E Introduction The purpose of the Portfolio Additional Estimates Statements (PAES), like that of the Portfolio Budget

101

O Other receipts available to be used, 34, 81 Outcome 1- Greater self- reliance and economic, social and community engagement for Indigenous Australians 6, 10, 11, 37, 39, 40, 41, 42

- measures 12, 16, 20, 29, 30, 31, 32, 33, 34, 39

Outcome 2- Seniors, people with disabilities, carers, youth and women are supported, recognised and encouraged to participate in the community 6, 10, 13, 16, 37, 43, 44, 45, 46, 47 - measures 20, 21, 22, 23, 28, 29, 30, 31, 32, 33, 34, 43

Outcome 3- Families and children have choices and opportunities 6, 9, 10, 11, 14, 17, 38, 47, 48, 49, 50 - measures 24, 25, 28, 30, 31, 32, 33, 34, 47

Outcome 4- Strong and resilient communities 6, 10, 38, 51, 52, 53, 54 - measures 15, 17, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 51

P Portfolio Overview ii, 3 Portfolio of Prime Minister and Cabinet, 11 R Registrar of Aboriginal and Torres Strait Islander

Corporations, 4, 6 Revisions to Agency Outcomes, 37, 82 S Social Security Appeals Tribunal

(SSAT), 33

Structure of the Portfolio

Additional Estimates Statements, ii Summary of Agency Savings, Summary of staffing changes 34, 81 T Torres Strait Regional Authority,

3, 5, 6 U User Guide, i, ii W Wreck Bay Aboriginal

Community Council, 4, 6