portfolio june 24 finished portfolio
Embed Size (px)
TRANSCRIPT

Portfolio 2014/2015
Andrew Johnson
[email protected] 1-250-897-5306
Building Technologist- Hand drafting- Vectorworks- Autocad- Sketchup

Andrew Johnson Building Technologist [email protected] 1-250-897-5306
Vectorworks
10'-3
"
2'-0
"
8'-0
3/4
"
6 1/
2"4
1/2"
8"
Ex05d-[4.3] A4 Section-MAR.27,2015 v1-AF.vwx
Dwg Name
Re fere nce
CAD File Name
Drawn By Da te
A4 - Section
Wothers Addition AF Mar.2015
Venti lation
3 - 2 x 10 Header
Crawl Space Crawl Space Access
Family Room
Walls to extendto u/s of Vaultedceiling
Closet
Attic access
Pre engineered trusses, refermanufacturers specifications
Skylight Location
vented attic space
KitchenDin ing(former kitchen)
Remove existing window and sid ing. Support existing roof deckwi th gurder truss over. (refermanufacturer's specs. cut opening in existing wall
exist 3x7 purlin beam (typ)
w2
F1
w2F2
w1
R1 Existing ResidenceProposed addition
w2Base refer to schedule
1x2 pour strip 2x6 plate on 6" foamplate gasket with 1/2"0 anchor bolts @ 4'-0"o.c. (typ)
Clearence to framing4" min. to concrete
8" min. typical tobackfill
Dampproofing emulsion2% slope
roof water drain - 4" diasolid PVC
w3
2' rigid insulation
CONSTRUCTION SCHEDULE
WALL LEGEND
W.1EXTERIOR RAIN SCREEN WALL- 1x6 T&G cedar siding to match existing- 1x2 vertica l strips @ 16" o/c- bui lding paper -2 layers 60 min. or bu ild ing wrap -1/2" Standard grade plywood sheath ing or equal- 2 X 6 wood studs (unless otherwise noted) a t 16" o/c - R.20 batt insula tion- 6 mil. U.V. po ly. vapour barrier- 1/2" gypsum board (unless otherwise noted)
W.2INTERIOR WALL-1/2" gypsum board each side of2 X 4 (unless otherwise noted) wood studs at 16" o/cnote: refer to plan for location of R12 (4" ) batt sound insula tion
W3FOUNDATION WALL-8" reinforced concrete on 8" x 16" strip footing -1 coat o f dampproofing be low grade-1 1/2" rig id insula tion to inside face of wall
R.1Flat Cei ling- 30 year fibreglass roof shingles to match existing (provide eaves protection from edge of eaves to min. 12" past inside face of exterior wall )-7/16" OSB sheath ing with H clips-pre engineered trusses to manucaturers specifications or conventional framing- R28 batt insula tion- 6 mil. U.V.poly. vapour barrier- 1/2" rein forced GWB cei ling
R.2Vaulted Ceiling (family room)- 30 year fibreglass roof shingles to match existing (provide eaves protection from edge of eaves to min. 12" past inside face of exterior wall )-7/16" OSB sheath ing with H clips-pre engineered trusses to manucaturers specifications- R28 batt insula tion- 6 mil. U.V.poly. vapour barrier- 1x6 T&G cedar lined cei ling (or 1/2" reinforced GWB ceiling)
F.1CONCRETE SLAB- 2" Concrete ground seal- 6 mil. poly. vapour barrier- 6" min. compacted granular base (3/4" minus crush) or washed sand
F.2WOOD FLOOR- 3/4" hardwood flooring (Fir)-3/4" T & G p lywood sheathing or equa - gluedl- 2 x 10 (#1 & #2 spruce KD) floor jo ists @ 16" o/c c/w- 2 X 2 bridg ing or 2 x 10 so lid b locking @ max 7'-0" o /c -R28 batt insulation
F.3DECK- waterproof deckcoat-3/4" T & G p lywood sheathing or equa - gluedl- 2 x 8 (#1 & #2 spruce KD) floor joists @ 16" o /c c/w- 2 X 2 bridg ing or 2 x 10 so lid b locking @ max 7'-0" o /c
ROOF LEGEND FLOOR LEGEND
1'-9 3/4"
8'-0
3/4
"
stacked W/D
Ref
WallOven/Mwave overCooktop /
rangehood over
12'-0"
6'-0
"
2'-0
"4'
-8"
1'-9
1/2
"
20'-0
"
2'-0"
6'-8"
20'-0"
5'-0"
6'-8"
20'-0"
5'-5 1/2"
12'-0"
7'-0
"7'
-0"
3'-0
"3'
-0"
5'-0" 5'-0"5'-0"
5'-6
"3'
-8"
2'-7
"2'
-6"
5'-9
"
5'-0" clear
eqeq
ex electrical service panel
4/0w x 3/0h
2/8x
6/8
2x6
2/8x
6/8
pock
et
5/0x6/8
5/0x6/8
2/6x6/8
2/8x6/8
4/0w x 2/0h over2/0w x 4/0h
2/6w
x 4
/0h
provide header and frame for possible future 2'6 wide window
16" roof o/hang
16" roof o/hang
+/-2
4" ro
of o
/han
g
+/-24" roof o/hang
+/-24" roof o/hang
3-2x
10
3-2x
10
2-2x
102-
2x102-2x10 2-2x10
walls to extend to u/s of vaulted ceiling
ridge
valle
y
ridge
valley
valle
y
ridgevalley
valle
y
valley
22" x 30" c'space access hatch
22" x 22" attic access hatch
step
kitchen
laundry
bath
family room(vaulted ceiling)tile surround on aquaboard
FFL 22.10m
ex FFL 22.48m
ex FFL 22.10m
24" x 48" skylight
dining (former kitchen)
Remove existing window and siding. Support existing roof deck with gurder truss over. Cut opening in existing wall
exist
ing
roof
o/h
ang
exist
ing
roof
o/h
ang
step
2/0w x 4/0h 4/0w x 4/0h
2/0w x 3/0h
7"8'
-9"
1'-8
1/2
"
exhaust vent in wall
exis
ting
win
dow
W1(typ)
W2(typ)
F2
existing residence
wood deck
FFL 21.72m
step
new deck
1A4
1A4
Floor PlanScale 1/4" = 1'-0"
north
hose bib
living room
study
F3
ex conc patio
2 1/2" RWL (connect into solid pipe system)
1'-9
"
3'-6"
DW
step
Date

Andrew Johnson Building Technologist [email protected] 1-250-897-5306
Vectorworks
RevisionDate
35 year warranty laminated fiberglass shingles
1x6 T&G cedar prestained sid ing to match existing
dbl glazed aluminum frame windows with 1x4 pa inted wood trim
Wood glased door (paint) with 1x4 painted wood trim
2 piece barge board -STK 1x10 with 1x4 trim Paint to match existing
5" continuous a luminum gutter on STK 2x6 painted fascia board
1
2
3
4
5
6
Material Legend
2 1/2" RWL concealed in 1x6 boxed trim to match existing (connect into solid pipe system)
concrete foundation
2'x 4' skylight
Roof Vent
Gas stove vent
7
8
9
10
11
22.10m
21.67m21.26m21.44m
86.47m / 4 = 21.62m Average GradeMax Height 7.5m = 29.12m
Grade Calculations
4" 4" 4" 4" 4" 4" 4" 4"
4"4"
1'-9"
4"3"
1'-0"
7'-3"
7'-0"
6'-3"
1 1/2"22 '-0"1 1/2"EQ EQ
EQ EQ EQ EQ EQ EQ
P1
MDF chai r ra il, moulding and 4" basePainted P1 (refer dwg A9)
3bA7
6A7
5aA7
Bil lo cei ling system
Extend framing to U/S of slabrefer dwg A3 for wallassembly deta ils
T-Bar Cei ling
1/2" GWB on suspended ceil ing systemProvide seismic bracing
Existing 1Hrrated wall
P1
Boardroom Millwork unit
1A6
Off-2
1 1/2 Pr HingesLever LatchsetAcoustic SealsAutomatic Door BottomAluminum Threshold - Low riseDoor Stop - Wall Mounted
Hardware Groups Off-1
1 1 1/2 Pr HingesLever LatchsetDoor stop - Wall Mounted
Off-3
3 Pr HingesLever LatchsetDoor stop -Floor Mounted
Off-4
Existing Hardware coordinateinstall in new frame
Door Stop - Wall Mounted
Tem
pere
d G
lass
Tem
pere
d G
lass
7'-3"AFF
Alig n topof wind ow re turn with top of do ortrim (typ)
Floor Level
1. WOOD FRAME TO MATCH DOOR - CLEAR FINISH2. NEW GLAZING TO BE 6MM LAMINATED GLASS IN METAL U CHANNEL AT SILL & HEAD.SILICONE SIDES - FINISH: Powdercoat white
C - rehang existingDoors in new frame
3bA7
3aA7
Tem
pere
d G
lass
Tem
pere
d G
lass
Doo
r as
sch
edu
led
Doo
r as
sch
edu
led
Doo
r as
sch
edu
led
Doo
r as
sch
edu
led
a b c
1'-0"
A B
Door Types Frame Types Finish Legend AT Acoust ic tile in 48"x24" Suspended Ceiling GridPG Painted Gypsum BoardWM Wall MouldingsRB Rubber BaseCPT CarpetEHF Engineered Hardwood FlooringVCT Vinyl Composite TileAS-VCT Anti-Static Vinyl Composite TileVSH Sheet VinylSC Special Ceiling - Bilo -Refer Dwg A7
Board Room - North Elevation1/4" = 1'-0"
1A8 Board Room Section
1/4" = 1'-0"2
A8
3 layers1/4" bending plyto both sidesof curved frame
KeyboardTray
2" 0 steel legWhite powder coat

Andrew Johnson Building Technologist [email protected] 1-250-897-5306
HWT
bedroom
living room
kitchen
closet
patio
entry
C
dining room
storage
electric fire place
GFI
GFI
GFI
GFI
220
Hood Fan
220
GFI GFI
GFIGFI
GFI
Electrical box
30x68
30x68
30x68
28x68
30x40
30x4030x40
30x40
30x40 30x40
30x4
030
x40
microwave
Electrical box
exhaust fan
1 2 3
B B
A A
C C
1 2 3
1 2 3
B
A
C
1 2 3
2'-4"
Crawl space door access
Bathroom
bedroom
Bathroom
entry
kitchen
dining room
living room
B
A
C
2
3
4
5
1
1
6
SD
SD
4A
4A
4A
4A
B6
D 6
C6
A6
1 2 3 4
Door ScheduleDoors #s Type Width Door operation
1 Solid Wood/Glass 3'-0" 6'-8" Swing2 Solid Wood 3'-0" 6'-8" Swing3 MDF Hollow Core 2'-8" 6'-8" Swing4 MDF Solid 2'-4" 6'-8" Slider5 MDF Hollow Core 2'-4" 6'-8" Swing6 MDF 2'-0" 6'-4" Bi-fold
Window Schedulewindow #s Width Window operation Type
A 3'-0" 4'-0" Slide Double Glaze VinylB 3'-0" 4'-0" Fixed w/over Awning Double Glaze VinylC 3'-0" 4'-0" Swing Double Glaze Vinyl
A B C
5 6
Autocad

Andrew Johnson Building Technologist [email protected] 1-250-897-5306
Sketchup
1994 fleetwood travel trailer Renovation plansComox Valley 2015144sqftDesigner - Andrew Johnson