portfolio (manufacturing engineering)
TRANSCRIPT
DAVID DIAZMechanical Engineer
PORTFOLIOManufacturing Engineering
Samples
DAVID DIAZMechanical Engineer
PORTFOLIOSome Samples
TRAVELERS AND PROCESS MAPPINGManufacturing Engineer
Options
Information to add(Options: Explain Op. or just Op. Name)
Qty Accepted and Rejected or just accepted or rejected
Approvals & InformationImportant info like what traveler
number to fallow if rework, info about scrap disposition, etc…
DAVID DIAZMechanical Engineer
PORTFOLIOSome Samples
TRAVELERS AND PROCESS MAPPINGManufacturing Engineer
DAVID DIAZMechanical Engineer
PORTFOLIOSome Samples
TRAVELERS AND PROCESS MAPPINGManufacturing Engineer
Job Traveler contains a all possible operations, when operation is not needed just mark N/A or a line and
sign up
DAVID DIAZMechanical Engineer
PORTFOLIOSome Samples
TRAVELERS AND PROCESS MAPPINGManufacturing EngineerMain Job Traveler
(Parent)
Sub Order Job Traveler(Child)
DAVID DIAZMechanical Engineer
PORTFOLIOSome Samples
TRAVELERS AND PROCESS MAPPINGManufacturing Engineer
Other Information to add
DAVID DIAZMechanical Engineer
PORTFOLIOSome Samples
TRAVELERS AND PROCESS MAPPINGManufacturing Engineer
DAVID DIAZMechanical Engineer
PORTFOLIOSome Samples
TRAVELERS AND PROCESS MAPPINGManufacturing Engineer
Ideas:
• Use plastic sheet protectors with different colors or print Job Traveler in different color papers (by Orders and Sub-Orders or by products).
• Create a SOP (Responsibilities, Job Traveler Process Procedure, etc…).
• Include Materials?
“PAPER BOXES REPLACEMENT”
KANBAN SYSTEM
DAVID DIAZMechanical Engineer
PORTFOLIOSome Samples
PROCESS IMPROVEMENT PROJETManufacturing Engineer
Paper Boxes Location on Main Copy Room8.5”X11” Paper11”X17” Paper
NEW PROCEDURE TO REPLACE PAPER BOXES
3 Boxes are Full
for 8.5”X11” Paper&2 Boxes Full for
11”X17” Paper
Box #2 is empty
NEW PROCEDURE TO REPLACE PAPER BOXES
NEW PROCEDURE TO REPLACE PAPER BOXES
Send Kanban Card to
Main Office Receptionist
NEW PROCEDURE TO REPLACE PAPER BOXES
Receptionist to order boxes
NEW PROCEDURE TO REPLACE PAPER BOXES
Receptionist to order boxes
All information needed to make order is already in the Kanban Card
NEW PROCEDURE TO REPLACE PAPER BOXES
Receptionist to send Kanban Card to Manager
NEW PROCEDURE TO REPLACE PAPER BOXES
Manager to approve Order
NEW PROCEDURE TO REPLACE PAPER BOXES
Manager to send Kanban Card to Shipping & Receiving
NEW PROCEDURE TO REPLACE PAPER BOXES
Shipping & Receiving to
receive Boxes
NEW PROCEDURE TO REPLACE PAPER BOXES
Shipping & Receiving to put Boxes in Item location
Shipping & receiving to
put Kanban Card back in
plastic envelope under box #2 &
You can always review the complete process on the back of the Kanban Card
IMPORTANT!Don’t forget to mark each completed step on the back of the
card or erase check marks once the process is complete!
Use markers located on Kanban Folders only:• Main Front Office• Manager Office and• Shipping & Receiving
Office