Page 1: Portfolio of Selected Professional Work

STEPHEN THOMAS HINES

PORTFOLIO OF

SELECTED PROFESSIONAL WORK

DESIGN

CONSTRUCTION

METHODS

BIM

SYSTEM

INTEGRATION

Problem Solving

Solution Driven

Page 2: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.1

� CONTENTS� Centerpoint - Jackson, Wyoming 5.2� Averon Technologies - Mine Hill, New Jersey 5.2� Talley Residence - Fayetteville, Arkansas 5.3� Courtesy Dealership - McKinney, Texas 5.3� Serranos Salsa Company - Lafayette, Louisiana 5.4� Inspiring Body of Christ Church - Dallas, Texas 5.5� St. Matthew Cumberland Presbyterian Church

Fort Worth, Texas 5.6� Armstrong Ballroom - Sheraton Canal Street

New Orleans, Louisiana 5.6� Appelt Aggieland Visitors Center

Texas A&M University - College Station, Texas 5.7� La Belle Maison - New Orleans, Louisiana 5.7� Vet-At-The-Barn - Chestnut Ridge, New York 5.8� Southwood Welcome Center - Tallahassee, Florida 5.8� Besh Steakhouse - Harrah’s Casino

New Orleans, Louisiana 5.9� Windmark Welcome Home Center 5.9� Ganote Residence - Jackson Hole, Wyoming 5.10� Fire Station #5 - City of Plano, Texas 5.11� Southwood Swimming Pool - College Station, Tx. 5.11� Our Mother of Mercy School - Fort Worth, Texas 5.12

Armstrong Ballroom - Sheraton CanalStreet, New Orleans, LA.

Page 3: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.2

Aviron Computer Technologies - Mine Hill, New

Jersey

� Program Accomplishments� Construction time reduced 4

months;� HRV Systems to recycle energy;� Energy consumption reduced

25%.� ArchiCAD Software - BIM Infused

� Program Accomplishments� Construction time reduced 6

months;� Building shell and systems were

30% below maximum allowed bythe New Jersey State EnergyCode requirements.

� Steel system reduced 45% fromconventional.

� ArchiCAD Software - BIM Infused

� Centerpoint Office Building - Jackson,Wyoming.� Project Highlights:

� 9,600 SF Speculative OfficeSpace - Two Floors

� 1,000 Common and Support � 10,600 SF - $2.2 Million - Not

Built� Construction Composition

� EPS Core SIPs for wall and roofconstruction;

� Half log veneer and stone;wainscot for exterior walls;

� Full log framing and accentsfrom burned forests;

� Concentric boilers

� Aviron Computer Technology, Inc. -Mine Hill Industrial Park, Mine Hill, NewJersey� Project Highlights:

� 8,000SF for Mezzanines� 57,000SF operational floor

space� 65,000 SF - $4.3 Million

� Construction Composition� 8" tilt-up concrete panels with

three zones of verticalreinforcement to also act asretaining walls;

� Rigid insulation for walls, roofand foundation perimeter;

� Building is partially buried.

Centerpoint Office Building - Jackson, Wyoming

Page 4: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.3

Nissan of McKinney Courtesy Dealership

McKinney, Texas

� Program Accomplishments:� Construction time reduced 4 ½

months;� HRV Systems to recycle energy;� Energy consumption reduced

30%.� ArchiCAD Software - BIM Infused

� Program Accomplishments� Structural steel system reduced

40% from conventional;� Energy efficiency was 40% below

State of Texas maximum;� Construction time reduced 30%.

� Talley Residence - Fayetteville,Arkansas� Project Highlights:

� Four Bedrooms, 3 ½ Baths,Formal Living Room, FormalDining Room, Great Room,Kitchen, Study, Bonus Roomover Garage, Lanai, PoolCabana, 3 Car Garage

� 6,400 SF - $650,000.� Construction Composition

� Light Gauge Steel Frame forwalls and roof;

� Spray applied Bio-baseUrethane insulation for wallsand roof structure;

� Climate Controlled SealedAttic;

� Courtesy Dealership - McKinney,Texas� Project Scope

� New Nissan and BuickAutomobile Dealerships Side-by-Side

� Seven Buildings includingShowrooms,

� 93,000 SF - $10 Million� Construction Composition

� 4" Spray applied urethaneroof system;

� Spray applied urethane foaminsulation;

� Energy Star light fixtures;� Central chiller plant for

optimum efficiency.

Talley Residence - Fayetteville, Arkansas

Lonestar Buick Courtesy Dealership - McKinney, Tx.

Page 5: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.4

� Serranos Salsa Company - Lafayette,Louisiana� Project Highlights:

� Stand-alone Brand marqueerestaurant for company asshowcase image across theI-10 Louisiana Corridor servingLatin American Cuisine

� 3 dining areas and patio, barand bar patio; kitchen andoffice

� 6,000 SF - $1.4 Million� Construction Composition

� EPS core SIPs for walls androof deck construction;

� Spray applied Bio-baseUrethane Foam insulation forentry stick-built walls;

� 3" Spray applied bio-basedUrethane foam roofmembrane;

� Mechanical equipment sizereduced 25%.

� Program Accomplishments:� Construction time reduced 3

months;� HRV Systems to recycle

energy;� Energy consumption reduced

30%.� ArchiCAD Software - BIM

Infused.

Serranos - Main Bar Dining

Serranos - Main Entry and Dining Patio

Serranos - Accent and Banquette Dining

Page 6: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.5

� Inspiring Body of Christ Church (IBOC)Dallas, Texas� Project Highlights:

� 4,200 Seat Auditorium� Fellowship Hall to Seat 400

with Dining Patio and FullCommercial Kitchen;

� Choir Practice Room; Youthand Teen Facilities,

� Administration and PastoralSuite

� 172,677 SF - $34 Million � Construction Composition

� 9" tilt-up concrete panels;� Rigid insulation for panel walls

and roof;� TPO membrane roof for lower

roofs - white reflective color;� 70,000 gallon salt water

aquarium used as heat sink;� Three Trane air-cooled chillers

with scroll compressors thatwill load shed and ramp-upas required for optimumefficiency;

� Trane EMS to balance andmanage energy consump-tion goals which also controlslighting

� Program accomplishments� Building shell energy

consumption is 40% betterthan State of Texas EnergyCode requirements;

� Energy consumption to beapproximate 25% less thanconventional

� ArchiCAD Software - BIMInfused

IBOC - Inside South Entry through 70,000 Gallon

Saltwater Aquarium

IBOC - East Aerial - Dallas, Texas

IBOC - South (Main) Entrance from Fountain

Page 7: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.6

� St. Matthew Cumberland PresbyterianChurch - Fort Worth, Texas (Not Built)� Project Highlights

� 1,000 Seat Sanctuary� Renovated Lobby, � Classrooms and Offices;� New Church and Facade

Image� 20,000 SF - $2.9 Million

� Construction Concepts� Insulated Concrete Forms

(ICF) exterior walls;� Glu-Laminated arch and

deck structural system forsanctuary and addition;

� Spray applied bio-basedurethane foam insulation toretrofit existing fellowship hall.

� Program Accomplishments� Construction time reduced 6

months;� Building shell energy

consumption is 40% betterthan State of Texas EnergyCode requirements.

� ArchiCAD Software - BIMInfused

� Armstrong Ballroom - Sheraton CanalStreet New Orleans, Louisiana� Project Highlights

� Restore and renovate to theroom Armstrong resultingdamage caused byHurricane Katrina.

� Work included ballroom,cabana rooms, corridor andbreak-out rooms

� 20,000 SF - Cost notdisclosed

St. Matthew CPC - Aerial Showing New Sanctuary

St. Matthew CPC - Main Entry

Armstrong Ballroom - Sheraton Canal Street

Page 8: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 4, 2009 5.7

� Appelt Aggieland Visitor Center inRudder Tower, Texas A&M UniversityCollege Station, Texas� Project Highlights

� Provide a new and invitingsingle point of service forvisitors to Texas A&MUniversity.

� Multi-media mini-theater with16 screen computer-generated program andmusic

� Three computer stations foruser interactive applicationproviding information tostudents and visitors aboutthe university, the communityand the region

� Information Desk, CommonsArea and Storage.

� 3,500 SF - $1.3 Million

� La Belle Maison - New Orleans,Louisiana - Fairfield Timeshare Resorts� Project Highlights:

� 134 Key TimeshareCondominium incorporatingfour civil war era masonrystructures and adding floorsup to nine stories;

� 228,000 SF +, $28 million� Construction Concepts

� Unreinforced masonry wallsinsulated and strengthenedwith 4" spray applied bio-based urethane foam;

Visitor Center - Information

Desk

Aggieland Visitor Center - Main Entry

La Belle Maison - Magazine

Street Elevation

Page 9: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 14, 2009 5.8

� Vet-At-The-Barn - Chestnut Ridge,New York� Project Highlights:

� Eight Exam Rooms. Lobby,Retail Sales, TreatmentArea, Surgical Suite,Boarding Kennel,Amenities,

� 9,400 SF - $1.5 Million� Construction Composition

� 8" EPS Core SIPs for walland roof construction;

� Mechanical equipmentsize reduced 25%;

� Program Accomplishments� Construction time

reduced 4 months;� HRV System to recycle

energy;� Energy consumption

reduced 25%;� ArchiCAD Software- BIM

Infused.

� Southwood Welcome Home CenterTallahassee, Florida - St. Joe LandCompany� Project Highlights:

� Prototype facility for a newconcept in thedevelopment of healthycommunities and sellinghomes utilizing electronictechnology to link all theSt. Joe communitiestogether

� 9,800 SF - $750,000.00including specialtyinteractive technology

Vet-at-the-Barn - Main Entrance

Southwood - Reception Area

Southwood - Living Room

Page 10: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 14, 2009 5.9

� Besh Steakhouse at Harrah’s Casino -New Orleans, Louisiana � Project Highlights

� Renovation and Additionenlarging the existingrestaurant and adjacentpublic restrooms;

� Renovate kitchen, staffareas and dining facilities

� Re-opened after HurricaneKatrina

� WindMark Beach Welcome Center -Port St. Joe, Florida for St. Joe Townsand Resorts.� Project Scope Included:

� The second of a newconcept in the develop-ment of healthy commu--nities and selling homesutilizing electronictechnology to link all theSt. Joe communitiestogether.

� 10,000 SF - $1.1 millionincluding interactivetechnology

Besh Steakhouse - Horseshoe Bar

Besh Steakhouse - Main Dining Area

Windmark Beach - Living Room

Page 11: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � April 14, 2009 5.10

� Ganote Residence - Jackson,Wyoming� Project Highlights:

� Main HouseFour Bedrooms, FormalLiving Room, FormalDining RoomArea: 7,100 SF

� Guest HouseTwo Bedrooms, Kitchen,Great Room, Two CarGarageArea: 1,000 SF

� Construction Composition:� Wood Frame Walls, Half

Log Siding:� Log Roof Purlins and

Elements� Interior Full Log Walls, River

Rock Wainscot.� 8,100 SF - $4.4 Million

Ganote Residence - Main Entry Stair

Ganote Residence - Rear (West) Elevation

Page 12: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � May 14, 2009 5.11

� Program Accomplishments� Increased filter system

efficiency by 50%;� Stopped leaking through shell

and construction joints;� Reduced pool operation costs

30%.

� Fire Station #5 - Plano, Texas� Project Highlights:

� Three apparatus bays� Day Room, Kitchen,

Watch Room, Dorm Area,Dressing and Showers

� Equipment Storage, SiteWork

� 6,000 SF - $555,000� Construction Composition

� Structural Steel Frame;� Light Gauge Steel Walls

with Brick Veneer� CMU for apparatus bays

with Brick Veneer;� 4 Ply Roof Membrane

� Southwood Swimming Pool - CollegeStation, Texas� Project Highlights:

� Repairs to Pool Shell andBeach Entry

� Install new stainless steel (OGRS); overflow gutterrecirculating system;

� Install Chemical Injectionand Monitor System, FlowMeter and Automatic FillSystem

� Replace Valves andupper layer of sand in theexisting Filter System

� Service Pumps andreplace catch basket.

� Pool Size: 145,000 Gallons- $225,000

Fire Department #5 - Plano, Texas

Southwood Swimming Pool - College Station. Tx.

Fire Station #5 - Plano, Texas

Page 13: Portfolio of Selected Professional Work

5 - PROFESSIONAL PROJECTS

Stephen Thomas Hines � May 14, 2009 5.12

� Program Accomplishments� Energy consumption reduced

30%;� Energy efficiency is reduced

30% better than State of Texasrequirements;

� ArchiCAD Software - BIM Infused

� Our Mother of Mercy School - FortWorth, Texas� Project Highlights:

� Demolition of the existingPre-World War II Facility

� New Facility is for K-8. � 8 Classrooms, Library,

Music Room, CafeteriaCommercial Kitchen,Administration Offices

� 16,000 SF - $2.4 Million� Construction Composition

� 8" ICF Exterior Walls withEIFS Coating;

� Wood Truss Roof withComposition Shingles;

� 4" Spray applied UrethaneInsulation for Roof

� Mechanical EquipmentSize Reduced 25%

� Classroom and Gymnasium Additionto Caldwell Middle School -McKinney ISD� Project Highlights:

� Replacement after fireburned fifty year oldgymnasium

� Four Classrooms, TeacherLounge

� Restrooms and Junior HighGymnasium

� 9,200 SF - $550,000

Our Mother of Mercy School - Fort Worth, Texas

Our Mother of Mercy School - Fort Worth, Texas

Caldwell Middle School - McKinney, Texas