portfolio + work

Download Portfolio + Work

Post on 13-Mar-2016

219 views

Category:

Documents

2 download

Embed Size (px)

DESCRIPTION

visit my website: www.herbertjulius.com

TRANSCRIPT

  • DESIGN + WORKSPORTFOLIOH E R B E R T J U L I U SMONTEVIRGEN

  • LAHARSCAPADESLahar-laden Land Reclamation through Landscape Design

    URBAN CANAL REVITALIZATIONRochor Canal

    EXPERIENCING NATURESungei Buloh Wetland Reserve

    STORMWATER MANAGEMENTABC Waters Programme

    THE BLUE AND GREEN CONNECTIONKallang River Bishan

    THE BASICSGeneral University Design Plates

    H E R B E R T J U L I U S M . M O N T E V I R G E NWEBSITE: w w w . h e r b e r t j u l i u s . c o mEMAIL: m a i l @ h e r b e r t j u l i u s . c o m

  • LAHARSCAPADESLahar-laden Land Reclamation through Landscape Design

    URBAN CANAL REVITALIZATIONRochor Canal

    EXPERIENCING NATURESungei Buloh Wetland Reserve

    STORMWATER MANAGEMENTABC Waters Programme

    THE BLUE AND GREEN CONNECTIONKallang River Bishan

    THE BASICSGeneral University Design Plates

    01

    02

    03

    04

    05

    06

    Integration with otherAgencies

    Kallang River SideJurong LakeJurong CanalSg LancharGeylang River

    8

    9

    Drainage ProjectsBukit Timah 1st Diversion CanalSiglap CanalKallang River (Bishan/Braddell)Kallang River (MRT stn)Sg BedokAlexandra Subdrain FSg TongkangBukit Timah Canal

    Integration with otheragencies (with approved funding)

    Sg SerangoonSg PinangHougang Avenue 10

    7

    Request by stakeholders

    Pang Sua pondBukit BatokUpper Seletar ReservoirSg WhampoaSg Sembawang

    6

    12

    123

    5

    9

    4

    4

    1011

    1213

    19

    16

    17181920216

    2

    5

    3

    1314

    15

    21

    17

    11

    141516

    20

    18

    78

    10

    1

  • 6 Hours of Trekking for siTe VisiT368-page THesis Book12-MonTH THesis preparaTion40 presenTaTion Boards1 CoMpleTe seT of Working draWings1 sCale Model1 THesis defenseBesT landsCape arCHiTeCTural THesis 2009

    AT A GLANCE

    a b cd e

    a The Proposed Landscape Masterplan of the Eco-Advbenture Complex located at Tambo Lake, 18 km away from the crater of Mt. Pinatubo

    b The eruption of Mount Pinatubo in 1991 buried not only villages and houses in the dreaded lahar but the dreams of thousands of people in Central Luzon.

  • c The Master Trail Plan derived through visual resource inventory. Indicative of the intensive Space bubble programming for the core lake development

    LAHARSCAPADESLAHAR-LADEN LAND

    RECLAMATIONTHROUGH

    LANDSCAPE DESIGN01d Landscape Design : bridging the exisingt touri-sim industry potentials and the ongoing ecological restoration taking place in the area e Space programming axonometric layers of the proposed Eco-Adventure Complex

  • a b

    a the overall landscape design elements -- from visual resource inventory, to the sediment and erosion control, to

    riskmanagement, to utilization of lahar

    and rehabilitation of vegetation and human

    and cultural resouces.

    b Some working drawings of the proposed

    landscape plans

  • LAHAR-LADEN LAND RECLAMATION THROUGH LANDSCAPE DESIGN

    LAHARSCAPADES

    01

  • a bc d

    SOIL FORMATIONPROCESS

  • LAHAR-LADEN LAND RECLAMATION THROUGH LANDSCAPE DESIGNLAHARSCAPADES

    01

    a The DYNAMIC FLOW concept which was inspired by the importance of risk taking in life and the holistic dynamisn of the outdoors.

    b Somecross-sectionsportrayingthedifferentproposed activities of the Eco-Adventure Complex.

    c Master Tree Planting Plan showing the phases for the promotion of the ecological succession; a tablultion of the key characteristics of trees assessed.

    d Some perspective drawings of the key amenities of the Eco-Adventure Complex.

  • PEIRCE RESERVOIRBISHAN

    MARINA PROMENADE

    ANG MO KIO

    BRADDELL

    TOA PAYOHPOTONG PASIR

    WHAMPOA

    ROCHOR

    MARINA BAY

    AT A GLANCEa

    bc d

    e

    a A study of buildings mass made through a Sketch-up model of Rochor Canal

    b The graphical Vision used for Rochor Canal1.1 kM of urBan Canal3 disTinCT CulTural BaCkdrop1 full seT of Working draWings

    inTer-agenCy ConsulTaTionsagenCy suBMissionsriBBon ConCepT: 4 edge VariaTions

    MasTerplan renderingpr BroCHure

    projeCT under aTeleier dreiseiTl asia pTe lTd.

  • UNIQUE IDENTITY CONNECTIVITY HUMAN SCALE SUSTAINABILITYGREEN LUNG

    URBANCANALREVITALIZATIONROCHOR CANALSINGAPORE02c The toolbox used for the Ribbon Concept. These images where developed to show four different expressions of the canal edge.d A study was made through a box model with strings to explore the different variations of edges . e Some artist impressions for the Rochor Canal Development (images from Atelier Dreiseitl asia)

  • a b c d

  • ROCHOR CANAL | SINGAPOREURBAN CANAL REVITALIZATION

    02

    a The Proposed Landscape Masterplan of Rochor Canal

    b Artisit Impression of Rochor Canal with Future developments which is mostly residential v(image by Atelier Dreiseitl)

    c Rendered sections along Rochor Canal showing the different edge expression and reatment.

    d The main promenade serves as a main spine for pedestrian. And circulation analysis was made to fully understand the usage of space along the canal.

  • Future Land Parcels

    Canal Spine

    Existing Blue Network

    New Development Network

    Landscape

    Community

    Community Water Landscape

    Future Land Parcels

    Canal Spine

    Existing Blue Network

  • ROCHOR CANAL | SINGAPOREURBAN CANAL REVITALIZATION

    02Future Land Parcels

    Canal Spine

    Existing Blue Network

    New Development Network

    Landscape

    Community

    Community Water Landscape

    Future Land Parcels

    Canal Spine

    Existing Blue Network

    New Development Network

    Landscape

    Community

    Community Water Landscape

    ab

    cd

    a The existing and proposed blue network for Rochor Canal. Proposal includes integration of landscape and community as part of the ABC strategy.

    b ThedetailofthevegetativefilterusedalongRochorCanal.

    c The ABC Strategy: A rendered section showing the stormwater flow before it reaches the canal.

    d A perspective montage of proposed side drain treatment. The opened side drain shall serve as an educational tool about stormwater.

  • AT A GLANCEab c d

    a Some sketches and perspective montages of the proposed adventure playground and amenities

    b The concept image of the One Place, Three Experiences

    1plaCe 3experienTial loops3naTural MangroVe ZonesaMeniTy ConCepT designVisual pHoToMonTage renderings

    adVenTure playground ConCepT and analysisprojeCT under aTeleier dreiseiTl asia pTe lTd.

  • 03EXPERIENCING NATURESUNGEI BULOH WETLAND RESERVE MASTERPLANSINGAPOREc The proposed Landscape Masterplan of Sungei Buloh Wetland Reserve

  • SUNGEI BULOH WETLAND RESERVE REDEVELOPMENT | SINGAPOREEXPERIENCING NATURE

    03a b c

    a Site Layers of its ex-isting ecological situation, zoning of mangroves and landscape assessment based visual resource inventory.

    b Sketches of the proposed site amenities

    c Proposed plans of the mudplayground and the fresh-waterpond, together with the bubble space diagrams to help in studying the spaces

  • AT A GLANCE

    ac d e

    29WaTerWays of singaporeaBC WaTers feaTure for sTorMWaTer ManageMenT3Major CaTCHMenTs of singaporeMasTerplan sCHeMaTisCs

    raingardens / WeTlands / green field runoff goalprojeCT under aTeleier dreiseiTl asia pTe lTd.

    a The overall map of the Singapore Stormwater Catchment (Images by Atelier Dreiseitl)

    b Conceptual Sketches for the nodes for the waterways , incorporating the ABC strategies.

    BLUE NETWORK

    GREEN NETWORK

    COMMUNITY NETWORK

    ACCESNETWORK

    CIVICNETWORK

    THE LAYERS: A HOLISTIC OVERVIEW

  • SURFACE CONTACTWITH CATCHMENT ELEMENTS TREATMENT CONVEYANCE STORAGE

    STORMWATER MANAGEMENTTHE ABC WATERS PROGRAMME PHASE 2SINGAPORE04

    LEGEND

    purification

    retention

    detention

    swale

    water retention

    conveyance

    biological uptake

    THE STORMWATERPROCESS

    c Some of the ABC elements used for stormwater management. (images by PUB)

    d Catchment areas were calculated to facilitate in the design of the ABC elements.

    e A graphical image to show thestormwater process with the treat-ment process used (inlet image)v

  • BIO-RETENTION SWALES

    FILTER MEDIA

    TRANSITION LAYER

    DRAINAGE LAYER WITH PERFORATED PIPE

    LEGEND

    purification

    retention

    detention

    swale

    water retention

    conveyance

    biological uptake

    LEGEND

    purification

    retention

    detention

    swale

    water retention

    conveyance

    biological uptake

    Play field

    Detention boxes

    Gravel bed

    Bio-retention swale

    canal

    ab c

    de

    a A graphical rendition to show the concept of the greenfield run-off rate

    b A graphical rendition of a bio-retention swale and its major components and a rendered section which shows integration of a bio-retention swale.

    DESIGNING FOR GREENFIELD RUNOFF RATE

    10% runoff

    10% runoff

    55% runoff15%

    infiltration50% infiltration 50% infiltration

    40% evapotranspiration30% evapotranspiration 40% evapotranspiration

    1

    C1

    Geylang Rd

    C2

    C3

    C4

    C5

    C6

    C7

    C8

    C9

    C12

    C13

    C15C10

    C11

    C14

    C16Bioretention swaleRain Garden

    4.5%treatment of open space

    26%treatmen

    tof

    private plots

  • LEGEND

    purification

    retention