Page 1: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

Positive Train Control

Project Status

Metro-North Railroad

Long Island Rail Road

January 28, 2014 CPOC

Page 2: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

Positive Train Control Benefits

• On October 16, 2008, Congress passed the Rail Safety

Improvement Act of 2008 requiring implementation of PTC by Dec.

2015.

• An approved PTC System must prevent the following:

- Train-to-train collisions.

- Over-speed derailments.

- Injuries to workers as the result of unauthorized incursions by train into a work

zone.

- Movement of a train through an improperly aligned switch

1

Page 3: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

PRIMARY

BACK OFFICE ACSES

SAFETY

COMPUTER

Train

Dispatcher

Consoles

Interlocking

Signal

Automatic

Speed

Control

ACSES

DATA

RADIO

ADU

CSS / ATC

ACSES

COMPUTER

In Track Transponders

Signal

System

RAILROAD DATA NETWORK

Transponder Reader

Data Radio

Interlocking Status

and Temporary

Speed Restriction

Radio

Communications

Safety Server Transmits Temporary Speed

Restrictions to Trains

Cab

Signal

PTC System Design

Signal

Location

2

ACSES II Management and

Communications Systems

RWPS

SYSTEM

CELLULAR

WiFi

locations

Wayside

Interface

Unit

2

ACSES II major subsystems:

• On-Board (Rolling Stock)

• Wayside (Interlocking and Right of Way

Infrastructure)

• Back Office (Temporary Speed Restriction

Servers and Central Office Equipment)

• Communications (Ground Based, Land

Mobile Data Radio and Wireless

Networks)

• Roadway Worker Protection System

(RWPS)

Page 4: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

What PTC Does

3

Stop Signal

Stop Signal

Maximum Authorized Speed

Enforce 45 mph Enforce 30 mph Enforce 30 to 15 mph Enforce 15 mph

Interlocking

Typical Signal Block

Interlocking

Enforce 30 to 15 mphEnforce 30 mphEnforce 45 mph

Maximum Authorized Speed

Maximum Authorized Speed

Typical Signal Block

PTC Protects against passing a

stop signal

Train

Protection Against Passing a Stop Signal

Protection Against Train-to-Train CollisionTrain Train

Protection Against Over-Speed Derailments

Train

Maximum Authorized Speed

PTC Protects against Overspeed

on curves and other civil

restrictions.

Cab Signal Protects movement of train through an improperly aligned switch

Train PTC Protects against unauthorized incursions by a train into a work zone

Roadway Protection

Enforces 15 mph to STOP

Roadway Worker

Page 5: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

What Signaling Systems Do

LIRR/MNR Have Today?

• Railroads primarily rely on Automatic Speed Control

(ASC) with CAB signaling

– Monitors train speed

– Maintains safe braking distance

– Maintains train separation

• Exceptions:

– MNR Waterbury Branch

– LIRR segments

• Railroads’ ASC Improvements

– Civil Speed Enforcement

4

Page 6: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

Current MNR Cab Signal System

5

Yonkers Curve

Spuyten Duyvil Curve

Portchester Curve

White Plains Curve

Cos Cob BR.

Devon BR.

Jenkins Curve

Walk BR.

WassaicPoughkeepsie

New Canaan

Danbury

Waterbury

FRA EO-29 Bridges - Complete Sept., 2014

FRA EO-29 Curves – Complete March 1, 2104

Mott Haven

Grand Central

Woodlawn

Stamford

Norwalk

New Haven

North White Plains

Croton-Harmon

Brewster

Port Jervis

Suffern Woodbine Yard

Pearl River

West of Hudson

Cab Signal with Automatic Train Control

Peck BR.

Bridgeport

Manual Block

Cab Signal Project underway for the Port Jervis Line. Currently has an Automatic Block Wayside Signal system. Completion 2018.

FRA EO-29 Curves and Bridges - Completed

Page 7: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

Current LIRR Signal System

6

Page 8: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

PTC Implementation

• System Integration Contract with Joint Venture

between Bombardier/Siemens.

• Schedule Risks.

• Pilot Testing including Roadway Worker

Protection System.

7

Page 9: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

PRIMARY

BACK OFFICE ACSES

SAFETY

COMPUTER

Train

Dispatcher

Consoles

Interlocking

Signal

ACSES

DATA

RADIO

ADU

CSS / ATC

ACSES

COMPUTER

Signal

System

RAILROAD DATA NETWORK

Temporary Speed

Restriction

Communication

Safety Server Transmits Temporary Speed

Restrictions to Trains

RWPS

Signal

Location

8

ACSES II Management and

Communications Systems

RWPS

SYSTEM

CELLULAR

WiFi

locations

Wayside

Interface

Unit

8

EIC

EIC

Portable

Cellular &

WiFi

EIC Device: -Handheld -Laptop -Workstation

Can be Located: -Hi Rail Truck -Station

Page 10: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

Meeting Compliance Date of Dec. 2015

• Rail Industry Position

– Demonstrate good faith efforts

– Secretary of Transportation

• Proposal on waivers

9

Page 11: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

PTC Implementation

Schedule and Acceleration

• Current Negotiations/Targeted Schedule Improvements

– Metro-North

• Enforce Civil and Maximum Authorized Speeds from New Haven to GCT by

mid-2015.

• Install PTC onboard kits on 336 M7s & 138 M3s 16 to 20 months earlier for

Harlem and Hudson Lines by October 2017.

• Complete installation of PTC on all wayside segments 12 months earlier –

by July 2017.

– LIRR

• Complete Installation of PTC Wayside Kits in electric territory by 12 months

earlier – July 2017.

• Complete Installation of PTC On-Board Kits on 836 M-7 cars 16 months

earlier by May 2017.

10 10

Page 12: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

MNR Targeted PTC Implementation

11

Pilot P2

WassaicPoughkeepsie

New Canaan

Danbury

Waterbury

MNR Pilots Complete 3/27/2016

Mott Haven

Grand Central

Woodlawn

Stamford

Norwalk

New Haven

North White Plains

Croton-Harmon

Brewster

Port Jervis

Suffern Woodbine Yard

Pearl River

West of Hudson

Enforcement of Civil and Maximum Authorized Speed – Complete 6/15/2015

Bridgeport

Manual Block

Pascack Valley Line will be done by New Jersey Transit (NJT) and completed by June 2017. Port Jervis Line will be undertaken jointly (NJT to do rolling Syock Installation and completed by January 2018.

Tarrytown

Enforcement of Civil and Maximum Authorized Speed – Complete 4/1/2016

10/2015

Portchester

12/2015

Full Deployment of Wayside PTC4/2016

8/1

/20

16

8/1/2016

8/1

/20

16

3/1

/20

17

11

/1/2

01

63

/1/2

01

7

4/1

/20

17

4/1

/20

17

7/1

/20

17

Pilot P1

On Board Wayside Dec. 31, 2015 129 30 MilesDec. 31, 2016 255 122.3 MilesDec. 31, 2017 443 270.4 MilesDec. 31, 2018 533

Page 13: Positive Train Control Project Status - MTA | Subway, Bus ...web.mta.info/mta/news/books/docs/PTC-CPOC-Presentation.pdfFRA EO-29 Bridges - Complet e Sept ., 2014 FRA EO-29 Curves t

12

LIRR PTC Targeted Implementation

12

Pilot 16 miles

Pilot 17 miles

MNR – LIRR Positive Train Control Status

Dec 31 2015

Dec 31 2016

Dec 31 2017

Dec 31 2018

63 Miles

256 Miles

314 Miles

318 Miles

380 Units

499 Units

520 Units

Wayside OnBoard

61 Units