POST PIT OPTIMISATION
STRATEGIC ALIGNMENTPresented by:
MF Breed
Mining Business Optimisation
Conference 2015
Michiel Breed Daan van Heerden
Pr.Eng (Mining),
M.Eng (Project Management),
MSAIMM
Pr.Eng (Mining),
M.Comm. (Bus. Admin.),
FSAIMM, AMMSA
Authors
• Introduction
• Pit Optimisation
• Post Pit Optimisation – Aligning your strategy
• Post Pit Optimisation Process
• Pit Selection▫ Selection of Ultimate Pit
▫ Optimisation within Ultimate Pit
• Significance of Discount Rate
• Conclusions
Agenda
• It is common to select a optimal pit shell defining the mineral reserve without much further consideration
• Other strategic opportunities are being ignored?
• Small value compromise for significant strategic gain
Introduction
• The objective is to determine the maximum inventory of open pit minable reserves
▫ One of the methods, Lerchs and Grossmann algorithm utilised in many of the commercially available software packages
▫ Run various scenarios
▫ Typically Optimise Maximum Cash Flow
Pit Optimisation
Steps of the traditional open pit mine design process (Dagdelen 2001)
Pit O
ptim
isa
tio
n
• Strategic issues that could be considered:▫ Annual cash flow
▫ Life of mine
▫ Operating risk
▫ Technical, economic and political risks
▫ Product requirements (Blending Strategies)
• Where to focus post pit optimisation process?1. Selection of ‘Ultimate Pit’
2. Optimisation within the ultimate pit
Post Pit OptimisationAligning to your Strategy
Post Pit Optimisation Process
Pit O
ptim
isa
tio
n
Post Pit Optimisation ProcessP
it O
ptim
isa
tio
n
Pit Selection
-
1
2
3
4
5
6
7
-
5
10
15
20
25
30
35
40 P
it 1
Pit
6
Pit
11
Pit
16
Pit
21
Pit
26
Pit
31
Pit
36
Pit
41
Pit
46
Pit
51
Pit
56
Pit
61
Pit
66
Pit
71
Pit
76
Pit
81
Pit
86
Pit
91
Oth
er K
ey P
erfo
rman
ce I
nd
icat
ors
Val
ue
(exc
l. C
apit
al)
NPV (USDm) Life of Mine (x10 yrs) Annual CF (USDm) Average Grade (g/t)
Optimal Pit
Range of potential pits
Value
Compromise
Increase Life of Mine
Increase Annual CF
Selection of the Ultimate Pit
-300%
-250%
-200%
-150%
-100%
-50%
0%
50%
100%
150%
Pit
1
Pit
6
Pit
11
Pit
16
Pit
21
Pit
26
Pit
31
Pit
36
Pit
41
Pit
46
Pit
51
Pit
56
Pit
61
Pit
66
Pit
71
Pit
76
Pit
81
Pit
86
Pit
91
% M
ove
men
t fr
om
Op
tim
al P
it
% Movement from Optimal - Life of Mine % Move from Optimal - Annual CF NPV Variance%
Optimal Pit NPV
Reduced
NPV
Reduced
CF
Improved
LoM
Optimise within Ultimate Pit
50,000
90,000
130,000
170,000
210,000
250,000
290,000
330,000
370,000
- 0.21 0.42 0.64 0.85 1.06 1.27
Pro
du
ctio
n V
olu
me
Cut-off Grade
Production Volumes
Cut-off grade
Combined
Volume & Grade
Pro
du
ctio
n
Vo
lum
e
Va
lue
Cut-off Grade
Optimise within Ultimate Pit
-60%
-50%
-40%
-30%
-20%
-10%
0%
10%
20%
- 0.20 0.40 0.60 0.80 1.00 1.20 1.40
% Movement from Optimal - Life of Mine % Move from Optimal - Annual CF NPV Variance%
Optimal Pit Cut-off
Reduced
NPV
Reduced
LoM
Improved
CF
Improved
LoM
Reduced
NPV & CF
Significance of Discount Rate
0
10
20
30
40
50
60
Pit
1
Pit
6
Pit
11
Pit
16
Pit
21
Pit
26
Pit
31
Pit
36
Pit
41
Pit
46
Pit
51
Pit
56
Pit
61
Pit
66
Pit
71
Pit
76
Pit
81
Pit
86
Pit
91
Val
ue
(NP
V e
xcl.
Cap
ital
)
0% Discount Rate 5% Discount Rate 10% Discount Rate 15% Discount Rate
Significance of Discount Rate
90%
91%
92%
93%
94%
95%
96%
97%
98%
99%
100%
NPV @ 0% NPV @ 5% NPV @ 10% NPV @ 15%
Per
cen
tage
rel
ativ
e to
max
imu
m t
he
valu
e at
th
e sp
ecif
ic
dis
cou
nt
rate
Pit 15 Pit 17 Pit 20 Pit 23
NPV @
0%
NPV @
5%
NPV @
10%
NPV @
15%
Pit 15 55.05 35.41 24.69 18.38
Pit 17 58.57 36.52 24.96 18.35
Pit 20 59.35 36.61 24.85 18.21
Pit 23 59.84 36.30 24.39 17.77
• Pit optimisation is a iterative process further future analysis after the initial pit optimisations can add strategic gain
• Changes to the optimisation input parameters, specifically the discount rate, without due process may have a significant impact on the pit selection
• Understanding the sensitivities will reduce the risk of executing a sub-optimal life of mine plan
Conclusion
c/o Hendrik Potgieter & van Staden Roads
Little Falls. Roodepoort
Tel: +27 11 958 2899
www.minxcon.co.za