poughkeepsie city school district
TRANSCRIPT
BOARD OF EDUCATION MEETINGAugust 5th, 2020
POUGHKEEPSIECITY SCHOOL DISTRICT OUTLINE:
▪ Proposition 1
▪ Smith Early Learning Center
▪ Clinton Elementary School
▪ Krieger Elementary School
▪ Morse Elementary School
▪ Warring Elementary School
▪ Poughkeepsie Middle School
▪ Poughkeepsie High School
▪ Proposition 2
▪ Columbus School / PACE
▪ Pathways: Opportunity Schools
▪ Smith Early Learning Center
▪ Clinton Elementary School
▪ Krieger Elementary School
▪ Morse Elementary School
▪ Warring Elementary School
▪ Poughkeepsie Middle School
▪ Poughkeepsie High School
▪ Schedule
▪ Questions & Answers
PROPOSITION 1SECURITY AND INFRASTRUCTURE
Includes upgrades to building security / safety and addresses important infrastructure needs.
$48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
ESmith School ELC
Priority 1
Priority 2
▪ Provide Digital Signage and Landscaping
▪ New Security Entrance
▪ Renovate (6) Toilet Rooms
▪ Renovate (7) Single Toilet Rooms
▪ Restore / Replace Roofing
▪ Replace Ineffective Snow Guards on Roof
▪ Replace Backup Steam Boiler
Energy Performance Contract – Separate From Bond Referendum
▪ Replace Air Handling Unit for Gym
▪ Replace Air Handling Unit for Cafeteria
▪ New HVAC Control System
▪ Upgrade Emergency / Exit Lighting to LED
Fixtures
▪ Replace Unit Ventilators in Classrooms
Proposition 1 Total: $48,250,000
Work to be determined by Audit, could include the following:
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
ESmith School ELC
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EClinton Elementary School
Priority 1
▪ New Security Entrance
▪ Renovate (6) Toilet Rooms and Associated
Janitors’ Closets
▪ Renovate (4) Single Toilet Rooms
▪ Replace Roofing
▪ Replace Roof Drains
▪ Replace Non-Operational Boiler
Priority 2
▪ Install New Digital Signage
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
E
▪ Replace Vacuum Condensate Pump
▪ New HVAC Control System
▪ Upgrade Emergency / Exit Lighting to LED
Fixtures
▪ Replace Unit Ventilators in All Classrooms.
Add Unit Ventilators to Basement
Classrooms.
▪ Replace Exhaust Fans in Girls’ Toilet Rooms
▪ Replace Lighting Fixtures Throughout
Building (Includes Classrooms, Corridors,
Gymnasium, Library, Cafetorium, and
Kitchen)
▪ Replace Air-handling Units for Cafetorium
and Gym
▪ Replace Exhaust Fans for East and West
Wing Classrooms
Clinton Elementary School
Proposition 1 Total: $48,250,000
Energy Performance Contract – Separate From Bond Referendum
Work to be determined by Audit, could include the following:
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EClinton Elementary School
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EKrieger Elementary School
Priority 1
▪ New Security Entrance
▪ Renovate (4) Toilet Rooms
▪ Renovate (3) Single Toilet Rooms
▪ Install ADA Compliant Fixtures in PT/OT
Room
▪ Restore Roofing
▪ Replace Select Exterior Doors
▪ Replace Select Interior Doors
▪ Replace Ceilings in Older Portion of the
Building
▪ Replace Second Boiler
▪ Add Exhaust Air to (4) Classrooms by Gym
▪ Replace Vacuum Condensate Return
Pump
Priority 2
▪ Install New Digital Signage ▪ Reconstruct (3) Concrete Entryways
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EKrieger Elementary School
▪ Replace Exterior Lighting with New LED
Fixtures
▪ Upgrade Emergency / Exit Lighting to LED
Fixtures
▪ Replace Unit Ventilators in Older
Classrooms and Cafeteria
▪ Replace Lighting Fixtures Throughout
Building (Includes Classrooms, Corridors,
Gymnasium, Cafetorium)
▪ Replace Air-handling Units for Gym and
Add Exhaust Fan
▪ New HVAC Control System
Proposition 1 Total: $48,250,000
Energy Performance Contract – Separate From Bond Referendum
Work to be determined by Audit, could include the following:
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EKrieger Elementary School
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EMorse Elementary School
Priority 1
▪ New Security Entrance
▪ Renovate (4) Toilet Rooms
▪ Renovate (6) Single Toilet Rooms
▪ Replace / Restore Roofing
▪ Replace Select, Non-Rated Doors
▪ Replace Sanitary Piping in Gang Toilet
Rooms (includes floor drains)
▪ Replace Sanitary Traps in Janitors’ Closets
(add trap primer)
▪ Replace Boilers
▪ Replace Piped Heating System and
Radiators Throughout Building.
Priority 2
▪ Install New Digital Signage
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EMorse Elementary School
▪ Replace Exterior Lighting with New LED
Fixtures
▪ New HVAC Control System
▪ Upgrade Emergency / Exit Lighting to LED
Fixtures
▪ Replace Unit Ventilators in Older
Classrooms and Cafetorium (Include New
Outdoor Louvers)
▪ Replace Lighting Fixtures Throughout
Building (Includes Classrooms, Corridors,
Gymnasium, Cafetorium, and Display
Cabinets)
▪ Replace Air-handling Units and Exhaust
Fans for Gym
Proposition 1 Total: $48,250,000
Energy Performance Contract – Separate From Bond Referendum
Work to be determined by Audit, could include the following:
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EMorse Elementary School
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EWarring Elementary School
Priority 1
▪ New Security Entrance
▪ Renovate (4) Toilet Rooms
▪ Renovate (6) Single Toilet Rooms
▪ Replace / Restore Roofing
▪ Replace Select, Non-Rated Doors
▪ Replace Non-Operational Boiler
Priority 2
▪ Install New Digital Signage
▪ Add Air-Handling Equipment Where Necessary
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EWarring Elementary School
▪ New HVAC Control System
▪ Install New Exhaust Fans and Vents in All
Classrooms
▪ Replace Unit Ventilators in All Classrooms
▪ Replace Lighting Fixtures Throughout
Building (Includes Classrooms, Corridors,
Gymnasium, Library, Cafeteria)
▪ Replace Air-handling Units and Exhaust
Fan for Gym
▪ Replace Air-handling Unit for Cafeteria
▪ Remove old Air-Handling Unit in
Psychologist’s Office and Install an Exhaust
Fan
Proposition 1 Total: $48,250,000
Energy Performance Contract – Separate From Bond Referendum
Work to be determined by Audit, could include the following:
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EWarring Elementary School
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EPoughkeepsie Middle School
Priority 1
Priority 2
▪ Replace Boilers, Burners and Associated
Controls
▪ Provide Digital Signage and Landscaping
▪ New Security Entrance
▪ Renovate (20) Toilet Rooms
▪ Renovate (14) Single Toilet Rooms
▪ Restore / Replace Roofing
▪ Replace Select, Non-Rated Interior Doors
▪ Replace Exterior Doors
▪ Replace Hot and Cold Water Distribution
Piping Back to Main (where replacing
fixtures)
▪ Replace Sanitary Piping Throughout
Building
▪ Add Boiler Box Ventilator and Exhaust
Venting System in Boiler Room
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
E
▪ Replace Casework in Classrooms and Art
Room
▪ Replace Lighting Fixtures Throughout
Building (Includes Classrooms, Corridors,
Gymnasium, Cafeteria, Auditorium,
Library, Locker Rooms)
▪ Provide Exhaust Air for All Classrooms
▪ Disconnect / Remove Dust Busters from
Former Woodshop
▪ Replace Cabinet Heater in Office Spaces
▪ Replace Air Handling Unit for Cafeteria
and Install New Exhaust Fans
▪ Replace Air Handling Unit for Pool Area
and Install New Exhaust Fans
▪ New HVAC Control System
▪ Upgrade Emergency / Exit Lighting to LED
Fixtures
▪ Replace Unit Ventilators in Classrooms
Poughkeepsie Middle School
Proposition 1 Total: $48,250,000
Energy Performance Contract – Separate From Bond Referendum
Work to be determined by Audit, could include the following:
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EPoughkeepsie Middle School
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EPoughkeepsie High School
Priority 1
▪ New Security Entrance
▪ Renovate (13) Toilet Rooms
▪ Renovate (14) Single Toilet Rooms
▪ Renovate Girls’ and Boys’ Locker Rooms
▪ Provide Landscaping at Sign
▪ Install Catch Basins and Storm Pipe in
Select Parking lots
▪ Repave Select Parking Lots
▪ Replace Exterior Doors
▪ Replace Overhead Doors (east side of
building)
▪ Restore / Replace Roofing
▪ Replace Select Interior Doors
▪ Provide Ventilation to Necessary Spaces
▪ Provide First Floor Corridor Exhaust Air
Priority 2
▪ Replace Old Condensate Lines in Building
Proposition 1 Total: $48,250,000
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EPoughkeepsie High School
Priority 3
▪ Provide Air Handling Equipment for First Floor Offices
▪ Replace or Provide New Casework Under
Classroom Windows
▪ Replace Lighting Fixtures Throughout
Building (Includes Classrooms, Corridors,
Gymnasium, Cafeterias, Auditorium,
Library)
▪ Replace or Add Unit Ventilators to
Classrooms
▪ Replace Corridor Exhaust and Supply Fan
▪ Replace Auditorium Air-Handling Unit
▪ Upgrade Emergency / Exit Lighting to LED
Fixtures
Proposition 1 Total: $48,250,000
Energy Performance Contract – Separate From Bond Referendum
Work to be determined by Audit, could include the following:
PR
OP
OSIT
ION
1SEC
UR
ITY
AN
D I
NFR
ASTR
UC
TUR
EPoughkeepsie High School
Proposition 1 Total: $48,250,000
PROPOSITION 2COMPREHENSIVE EDUCATIONAL
PATHWAYS
Includes everything in PROPOSITION 1 and major overhauls to schools and curriculums
$50,541,306
▪ Supermajority Vote▪ Special Legislation▪ Longer Phasing
PROPOSITION 1
+ PROPOSITION 2
$98,791,306
PR
OP
OSIT
ION
2Columbus School / PACE
▪ New Security Entrance
▪ Renovate (6) Toilet Rooms
▪ Install Unit Ventilators in Classrooms and
Install Split Systems for Office Spaces
▪ Replace Exterior Doors
▪ Replace Air-handling Units for Gym
▪ Replace Fans in Toilet Rooms
▪ Update HVAC Controls to Tie Into BMS
District Wide
Energy Performance Contract
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Proposition 2 Scope
PR
OP
OSIT
ION
2Columbus School / PACE
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
PR
OP
OSIT
ION
2Pathways: Opportunity Schools
Proposition 2 Total: $50,541,306
CO
MPR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Morse Elementary School
Warring Elementary School
Smith Early Learning Center
Poughkeepsie Middle School
Columbus School / PACE
Clinton Elementary School
Krieger Elementary School
Poughkeepsie High School
(Arts)
(Technology)
(Medical)
(Literacy)
(Performing Arts)
(Arts, Technology, Medical, Performing Arts)
(Arts, Technology, Medical, Performing Arts)
Each school will focus on an area of
education, and potentially partner
with “Pathway” organizations to aid
student development.
PROP1 + PROP2 = $98,791,306/
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
SPathways: Opportunity Schools
KriegerElementary School
PerformingArts
ClintonElementary School
Technology
MorseElementary School
Arts
WarringElementary School
Medical
PM
SPH
S
Arts
Medical
Technology
Performing Arts
Arts
Medical
Technology
Performing Arts
Academic Pathways to be determined by
Superintendent and BOE
PR
OP
OSIT
ION
2Smith School ELC
Additional Proposition 2 Scope
▪ Creation of Literacy Center
▪ Renovate Cafeteria
▪ Sidewalk and Driveway Replacement
▪ Building Façade Improvements
▪ Replace All Windows
▪ Replace Vinyl Tile Throughout Building
▪ Restore Wood Floors in Classroom Cubbies
▪ Replace Non-Rated Interior Doors
▪ Replace Acoustic Ceilings Throughout the
Building
▪ Replace Interior Handrails & Guardrails to
meet ADA Standards
▪ Install ADA Lift from First to Second Floor
▪ Replace Drinking Fountains
▪ Air Conditioning Improvements
▪ Piped Heating & Cooling Improvements
▪ Additional Ventilation Improvements
Security & Infrastructure Energy Performance Contract
CO
MPR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Smith School ELC
Ground Floor Plan
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
LITERACYCENTER
RENOVATED CORRIDORS
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Smith School ELC
Basement Floor Plan
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
RENOVATEDCAFETERIA
RENOVATEDCLASSROOMS
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Clinton Elementary School
▪ Technology Programing
▪ Replace Underground Fuel Storage Tank
▪ Replace Acoustic Ceilings Throughout the
Building
▪ Replace/Restore Exterior Handrails &
Guardrails
▪ Replace Select Exterior Doors
▪ Reconstruct Site Retaining Walls
▪ Replace Vinyl Flooring Where Necessary
▪ Reconstruct Damaged Interior Walls
▪ Restore Wood Floors in Classroom Cubbies
▪ Replace Non-Rated Interior Doors
▪ Replace Interior Handrails & Guardrails to
meet ADA Standards
▪ Provide Elevator System
▪ Air Conditioning Improvements
▪ Add Ventilation/Exhaust to Offices, Kitchen,
Reading Room
Security & Infrastructure Energy Performance Contract
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Additional Proposition 2 Scope
Clinton Elementary School
MAKER SPACE
Second Floor Plan
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S RENOVATEDCLASSROOMS
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Krieger Elementary School
▪ Performing Arts Programing
▪ Restore Gymnasium Floor
▪ Classroom Renovations
▪ Restore Wood Floor in Classroom Cubbies
▪ Replace Interior Handrails & Guardrails to
meet ADA Standards
Security & Infrastructure Energy Performance Contract
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Additional Proposition 2 Scope
Krieger Elementary School
Ground Floor Plan
PERFORMING ARTS SPACE
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Morse Elementary School
▪ Art Programing
▪ Replace All Windows
▪ Replace Acoustic Ceilings Throughout the
Building
Security & Infrastructure Energy Performance Contract
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Additional Proposition 2 Scope
Morse Elementary School
Ground Floor Plan
ART STUDIO SPACE
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Warring Elementary School
▪ Medical Programing
▪ Gut & Renovate School in its Entirety
▪ Replace Underground Fuel Storage Tank
▪ Air Condition Improvements
▪ Provide Vestibule at Gym Entrance
▪ Relocate the Existing Playground
▪ Address Site Drainage Issues
▪ Building Façade Improvements
▪ Replace Windows Throughout Building
▪ Replace Window Lintels where Necessary
▪ Piped Heating & Cooling Improvements
Security & Infrastructure Energy Performance Contract
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Additional Proposition 2 Scope
Warring Elementary School
MEDICAL PROGRAM
Ground Floor Plan
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S RENOVATED CORRIDORS
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Poughkeepsie Middle School
▪ Pathways Programing
▪ Renovate Cafeteria
▪ Replace Auditorium Seating
▪ Repave West Most Parking Lot
▪ Provide Handrails at Select Exterior Steps
▪ Replace Vinyl Tile in Classrooms
▪ Restore Auditorium Floor
▪ Replace Tile in Kitchen & Locker Rooms
▪ Restore Stage Flooring
▪ Replace Acoustic Ceilings Throughout the
Building
Security & Infrastructure Energy Performance Contract
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Additional Proposition 2 Scope
Poughkeepsie Middle School
CAFETERIA RENOVATION
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Basement Floor Plan
Anticipated Pathways Location
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Poughkeepsie High School
▪ Pathways Programing
▪ Auditorium Lobby Collaborative Space
▪ Repave Select Parking Lots
▪ Replace Library Flooring
▪ Replace Tile Flooring Throughout Older Portion
of the Building
▪ Restore Auditorium Stage
▪ Ceiling Improvements Throughout Building
Security & Infrastructure Energy Performance Contract
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
Additional Proposition 2 Scope
Poughkeepsie High School
Ground Floor Plan
PR
OP
OSIT
ION
2C
OM
PR
EH
EN
SIV
E E
DU
CA
TIO
NA
L
PA
THW
AY
S
COLLABORATIVESPACE
Anticipated Pathways Location
RENOVATED CORRIDORS
Proposition 2 Total: $50,541,306 PROP1 + PROP2 = $98,791,306/
SCHEDULE
2020
07 08 09 10 11 12
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
SEQRA
BOE Adopts Vote Date & Scope
Referendum Vote (October 27th)
Design (Proposition 1)
SED Review (Proposition 1)
Design (Proposition 2)
SED Review (Proposition 2)
2031
Questions & Answers
Poughkeepsie City School District
PREVOTE - Estimated Impact of Proposed Capital Project
Draft: August 5, 2020
Prepared By: BERNARD P. DONEGAN, INC. (585) 924-2145
345 Woodcliff Drive, 2nd Floor
Fairport, New York 14450
PROPOSED CAPITAL PROJECT
PRE-VOTE PRE-VOTE
Page
Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .o 3
Debt Statement Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .o 5
Summary of Existing and Future Building Debt Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
BAR CHART - Estimated Net Local Share of Existing and Future Building Debt Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Property Valuation and Tax Rate Background Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Historical Change In Assessed Valuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Projected Change In Future Assessed Value and Full Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
PROP 1 - PRE-VOTE PROPOSED $48,250,000 CAPITAL PROJECT
Estimated State Aid Payments By Project Based On An Assumed Amortization Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
Estimated State Building Aid Annual Payments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
Projected Net Local Share Of Debt Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Summary of Existing & Proposed Capital Project Debt Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
BAR CHART - Estimated Net Local Share of Existing Building Debt Service and Proposed Capital Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15
Projected Future Annual Tax Rate per $1,000 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Average Cost to Taxpayer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
PROP 1 & 2 - PRE-VOTE PROPOSED $98,791,306 CAPITAL PROJECT
Estimated State Aid Payments By Project Based On An Assumed Amortization Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Estimated State Building Aid Annual Payments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Projected Net Local Share Of Debt Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Summary of Existing & Proposed Capital Project Debt Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
BAR CHART - Estimated Net Local Share of Existing Building Debt Service and Proposed Capital Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Projected Future Annual Tax Rate Per $1,000 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
Average Cost To Taxpayer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24
Appendix
Analysis of Estimated Project Cost and Maxium Cost Allowance by Building. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A
History of State Building Aid Ratios. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .o B
STAR Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .o C
Poughkeepsie City School District
Table of Contents
ASSUMPTIONS
(1) Enhanced Building Aid Ratio: 91.2% Est. 2020-21
(2) Estimated Bond Percentage: 95.0% Prop 1
95.0% Various Buildings70.0% Various Buildings70.0% Prop 1 & 2
70.0% Various Buildings
Phase 1 Phase 2 Phase 3 Phase 4 * Phase 5 *
(3) Vote Date: October 2020 October 2020 October 2020 December 2020 December 2020
(4) SED Approval: January 2022 January 2023 January 2024 January 2025 January 2026
(5) Certificate of Substantial Completion Date: June 2024 June 2025 June 2026 June 2027 June 2028
(6) Final Cost Report Submittal: June 2024 June 2025 June 2026 June 2027 June 2028
(7) First Borrowing: June 15, 2022 June 15, 2023 June 15, 2024 June 15, 2025 June 15, 2026
(8) First Interest: June 15, 2023 June 15, 2024 June 15, 2025 June 15, 2026 June 15, 2027
(9) First Principal: June 15, 2024 June 15, 2025 June 15, 2026 June 15, 2027 June 15, 2028
(10) Borrowing Rates:Bond Anticipation Notes 4.00% 4.00% 4.00% 4.00% 4.00%Serial Bonds 5.00% 5.00% 5.00% 5.00% 5.00%
(11) Period of Probable Usefulness in Bond Resolution: 30 Years 30 Years 30 Years 30 Years 30 Years
(12) Capital Reserve: $0 $0 $0 $0 $0
(13) Assumed Amortization of State Building Aid:(a) Assumed Interest Rate 4.50% 4.50% 4.50% 4.50% 4.50%(b) PPU for State Aid Purposes 15 Years for Reconstruction 15 Years for Reconstruction 15 Years for Reconstruction 15 Years for Reconstruction 15 Years for Reconstruction(c) Commence the later of 18 Months after SED Approval or CSC/Final Cost Report Date Half Year 2023-24 Half Year 2024-25 Half Year 2025-26 Half Year 2026-27 Half Year 2027-28
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
(14) Vote Date: October 2020 October 2020 October 2020 October 2020 October 2020
(15) SED Approval: January 2022 January 2023 January 2024 January 2025 January 2026
(16) Certificate of Substantial Completion Date: June 2024 June 2025 June 2026 June 2027 June 2028
(17) Final Cost Report Submittal: June 2024 June 2025 June 2026 June 2027 June 2028
(18) First Borrowing: June 15, 2022 June 15, 2023 June 15, 2024 June 15, 2025 June 15, 2026
(19) First Interest: June 15, 2023 June 15, 2024 June 15, 2025 June 15, 2026 June 15, 2027
(20) First Principal: June 15, 2024 June 15, 2025 June 15, 2026 June 15, 2027 June 15, 2028
(21) Borrowing Rates:Bond Anticipation Notes 4.00% 4.00% 4.00% 4.00% 4.00%Serial Bonds 5.00% 5.00% 5.00% 5.00% 5.00%
(22) Period of Probable Usefulness in Bond Resolution: 30 Years 30 Years 30 Years 30 Years 30 Years
(23) Capital Reserve: $0 $0 $0 $0 $0
(24) Assumed Amortization of State Building Aid:(a) Assumed Interest Rate 4.50% 4.50% 4.50% 4.50% 4.50%(b) PPU for State Aid Purposes 15 Years for Reconstruction 15 Years for Reconstruction 15 Years for Reconstruction 15 Years for Reconstruction 15 Years for Reconstruction(c) Commence the later of 18 Months after SED Approval or CSC/Final Cost Report Date Half Year 2023-24 Half Year 2024-25 Half Year 2025-26 Half Year 2026-27 Half Year 2027-28
Poughkeepsie City School District
Bond Percentage is an estimate based on Building Aid Units and presumes that 5% of expenses within the maximum costallowance will not be considered "eligible" costs by SED.
Each year the Current Building Aid Ratio is calculated based on statistics that are 3 years old as provided by the NYS Office ofReal Property Services. (Please refer to Appendix A for a History of State Building Aid Ratios.) Based on the current NYSEducation Law, the Building Aid Ratio will not drop below the Selected Aid Ratio. Some School Districts may be eligible for more
than the Selected Aid Ratio. For School Districts that are eligible for more, the formula will change from year to year.The Building Aid formula is based on the date of the voter referendum.
CAUTION: The schedules shown in this report are based on current laws and regulations and the assumptions listed below. Any changes to these assumptions could significantly alter the local impact. This financial plan is used for illustrative purposes only and is based upon manyvariables: timing of events, interest rates, and District cash flow needs. Your particular financial plan may vary significantly based upon actual future events.
Prop 1
Prop 1 & 2
cjd/kec
Updated: 7/14/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc. TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
SUMMARIZED ASSUMPTIONS 1
3
ASSUMPTIONS
CAUTION: The schedules shown in this report are based on current laws and regulations and the assumptions listed below. Any changes to these assumptions could significantly alter the local
impact. This financial plan is used for illustrative purposes only and is based upon many variables: timing of events, interest rates, and District cash flow needs. Your particular financial plan mayvary significantly based upon actual future events.
Poughkeepsie City School District
(25) Revenue and Expense Breakdown: Prop 1 (Simple majority vote required)
Capital Reserves -$ Construction/Incidental Costs 43,025,000$
48,250,000 DASNY Fee 1 1,255,000
SUBTOTAL 2 $ 44,280,000
Capitalized Interest Expense 3 3,970,000
TOTAL AUTHORIZATION: $ 48,250,000 TOTAL AUTHORIZATION 48,250,000$
Revenue and Expense Breakdown: Prop 1 & 2 (60% majority vote required)
Capital Reserves -$ Construction/Incidental Costs 89,181,306$
98,791,306 DASNY Fee 1 2,530,000
SUBTOTAL 2 $ 91,711,306
Capitalized Interest Expense 3 7,080,000
TOTAL AUTHORIZATION: $ 98,791,306 TOTAL AUTHORIZATION 98,791,306$
Notes:
1
2
3
EXPENSES
Bonding Amount
REVENUES
FP-Fs submitted to the State in regards to this project should not exceed this total.
Capitalized Interest will be reported to the State separately as part of the Final Cost Report, but will not be included inFP-Fs or SA-139s. Capitalized Interest must be during construction. No capitalized interest expense can be incurredafter the date of CSC's.
REVENUES EXPENSES
Bonding Amount
Additional Issuance Costs for Selling Bonds via the Dormitory Authority of State of New York (Rationale: MatchingInterest Rate for State Aid Reimbursement Purposes).
cjd/kec
Updated: 7/14/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc. TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
SUMMARIZED ASSUMPTIONS 2
4
CITY SCHOOL DISTRICT OF THE CITY OF POUGHKEEPSIE
DEBT STATEMENT SUMMARY
As of October 20, 2020
AssessedValuation
Equalization
Rates1 Equalized Value
1,624,626,421$ 104.09% 1,560,790,106$
1,594,662,390 102.30% 1,558,809,765
1,604,715,418 97.64% 1,643,502,067
1,672,057,310 101.57% 1,646,211,7851,795,464,195 108.46% 1,655,416,001
8,064,729,724$
1,612,945,945$
80,647,297$
Borrowings:
7,310,000$
15,245,0002,557,005
25,112,005$
Exclusions:
0$ 2
2,352,903 3
2,352,903$
22,759,102$
48,250,000$
4,300,000
1,917,0001,522,950
215,000 * 55,774,950
78,534,052$
2,113,245$
97.38%
Notes: 1
2
3
*
Budgeted appropriations, Refunded Bonds and Revenue Anticipation Notes are automatically excludedpursuant to provisions of the New York State Constitution and Section 136.00 of the Local Finance Law.
Minus - Appropriations of BOCES CP Excludable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total Net Indebtedness After Giving Effect to the Proposed Capital Project/EPC/BOCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Net Debt-Contracting Margin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Percentage of Debt-Contracting Power Exhausted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Special equalization rates used for computation of the constitutional debt limit for city school districts areestablished each year by the New York State Department of Equalization and Assessment, and may varyfrom year to year. Therefore, the equalized values shown here may not agree with those shown under thesection "Financial Information".
Although city school districts are prohibited from excluding estimated building aid when computing theirdebt limits, city school districts do receive State building aid.
Energy Performance Contract . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total Inclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3rd BOCES Payment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Building Aid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appropriations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total Exclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Total Net Indebtedness Before Giving Effect to the Proposed Capital Project/EPC/BOCES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Proposed Capital Project - October Vote. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Proposed Energy Performance Contract . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2nd BOCES Payment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preliminary, subject to change.
06/30/21
Fiscal YearEnded
06/30/17
06/30/18
06/30/19
06/30/20
Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Five-Year Average Equalized Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Debt Limit (5% thereof) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Serial Bonds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Refunding Serial Bonds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5
A B C D E F G H I J K L M N
(A+B) (C-D-E+F) (K-I) (G+M)
Fiscal YearEnding June 30: Total Principal Total Interest
Total DebtService
EstimatedBuilding Aid
Debt ServiceOffsets
Cash Projects /Adjustments
Estimated NetLocal Share Cash Payment Total Principal Total Interest
Total DebtService
EstimatedBOCES
RWADA AidEstimated NetLocal Share
TOTAL NETLOCAL
SHARE FORBUILDINGS $ Change
(K)
2019 2,306,311 987,029 3,293,339 3,527,816 1 142,465 2 650,000 273,059 - - - - - - 273,059 674,7452020 2,344,152 907,231 3,251,383 3,226,270 1 132,510 2 925,000 5 817,602 479,250 - - 479,250 317,992 161,258 978,860 705,801
2021 2,155,586 847,472 3,003,058 1,519,802 120,842 2 - 1,362,413 - 215,000 62,303 277,303 188,876 88,426 1,450,839 471,979
2022 2,202,431 789,686 2,992,118 1,519,802 108,195 2 - 1,364,120 - 104,950 177,372 282,322 192,295 90,027 1,454,147 3,3082023 2,254,704 729,896 2,984,600 1,519,802 94,403 2 - 1,370,394 - 110,000 171,600 281,600 191,803 89,797 1,460,191 6,0432024 2,302,416 663,545 2,965,961 1,519,802 79,583 2 - 1,366,576 - 115,000 165,550 280,550 191,088 89,462 1,456,038 (4,153)2025 2,360,587 593,919 2,954,505 1,519,802 63,697 2 - 1,371,005 - 120,000 159,225 279,225 190,186 89,039 1,460,044 4,0062026 2,384,627 521,788 2,906,415 1,519,802 46,712 2 - 1,339,901 - 120,000 152,625 272,625 185,690 86,935 1,426,835 (33,209)2027 2,452,669 421,639 2,874,308 1,519,802 28,833 2 - 1,325,672 - 135,000 146,025 281,025 191,412 89,613 1,415,286 (11,550)2028 1,750,000 345,931 2,095,931 1,198,355 9,863 2 - 887,713 - 140,000 138,600 278,600 189,760 88,840 976,553 (438,733)2029 1,405,000 267,275 1,672,275 255,754 - - 1,416,521 - 150,000 130,900 280,900 191,327 89,573 1,506,094 529,5412030 1,465,000 201,563 1,666,563 255,754 - - 1,410,809 - 155,000 122,650 277,650 189,113 88,537 1,499,346 (6,749)2031 1,450,000 132,438 1,582,438 127,877 - - 1,454,561 - 165,000 114,125 279,125 190,118 89,007 1,543,568 44,2222032 1,410,000 85,950 1,495,950 - - - 1,495,950 - 175,000 105,050 280,050 190,748 89,302 1,585,252 41,6842033 1,455,000 43,650 1,498,650 - - - 1,498,650 - 180,000 95,425 275,425 187,597 87,828 1,586,478 1,2252034 - - - - - - - - 195,000 85,525 280,525 191,071 89,454 89,454 (1,497,024)2035 - - - - - - - - 200,000 74,800 274,800 187,172 87,628 87,628 (1,826)2036 - - - - - - - - 210,000 63,800 273,800 186,491 87,309 87,309 (319)2037 - - - - - - - - 220,000 52,250 272,250 185,435 86,815 86,815 (494)2038 - - - - - - - - 235,000 40,150 275,150 187,410 87,740 87,740 9252039 - - - - - - - - 245,000 27,225 272,225 185,418 86,807 86,807 (933)
2040 - - - - - - - - 250,000 13,750 263,750 179,645 84,105 84,105 (2,703)
Totals 35,489,278$ 11,393,128$ 46,882,406$ -$ 1,307,708$ 1,575,000$ 18,754,946$ 479,250$ 3,439,950$ 2,098,950$ 6,018,150$ 4,090,647$ 1,927,502$ 19,659,039$
Includes:Various Cash Projects$18,605,000 Refunding Serial Bond dated December 27, 2017$5,000,000 Energy Performance Contract - Vote 11/18/09$17,225,000 Authorization - Vote 11/17/09Emergency Project
Note: 1. FY 2017-18 building aid forward has been adjusted based on the 2016-17 State Assumed Interest Rate of 2.00%.
2.
3. Does not include Circle of Courage lease payments.
4. Includes Premium of $3,160.
5. Assumes $925,000 will be spent in the 2019-20 fiscal year and reported at year end on the District's ST-3.
CAUTION:
Poughkeepsie City School District
SUMMARY OF EXISTING and FUTURE BUILDING DEBT SERVICE3
Building Debt Excluding BOCES Projects BOCES Capital Project
Federal Subsidy rate reduced by 6.8% for expenses after October 1, 2015. Federal Subsidy rate reduced to 6.9% for expenses afterOctober 1, 2016. Federal Subsidy rate reduced to 6.6% for expenses after October 1, 2017. Federal Subsidy rate reduced to 6.2% forexpenses after October 1, 2018. Reduction in federal subsidy could vary on an annual basis.
State aid may be reduced. Pursuant to Education Law 3602 (6)(e)(5)(c), at least at the end of each ten year segment of an
assumed amortization established for a retro or prospective project, the remaining scheduled assumed semi-annual payments
will be revised based on the interest rate applicable for the current year, if the difference between the current year interest rate
and the interest rate upon which the original assumed amortization is based exceeds one quarter of one-one hundredth.
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020
Bernard P. Donegan, Inc. Summary-Bldg (2)TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
6
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020 Bernard P. Donegan, Inc.
TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20BAR CHART - Summary-Bldg
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Estimated Net Local Share 1,362,413 1,364,120 1,370,394 1,366,576 1,371,005 1,339,901 1,325,672 887,713 1,416,521 1,410,809 1,454,561 1,495,950 1,498,650
$(250,000)
$250,000
$750,000
$1,250,000
$1,750,000
$2,250,000
$2,750,000
Est.
Net
Lo
calS
hare
Fiscal Year Ending June 30
Poughkeepsie City School DistrictEstimated Net Local Share of Existing and Future Building Debt Service
(Excludes Emergency Projects and BOCES Capital Project)
7
Towns
Projected AssessedValue Change from
Fiscal Year End2021
EqualizationRate
EnhancedExemption
(SENIOR) for2020-21
BasicExemption for
2020-21
Date Certifiedby NYS Office
of RealPropertyServices
Fiscal Year End2021 Tax Rate
Per $1,000
Percentageof Full
Valuation
\BPD_FS1\SYS\DATA\Reference\Equalization Rates\2005-06 STAR\Albany STAR Exemption Status.htm
City of Poughkeepsie 2.03% 100.00% 82,120$ 35,860$ 04/09/19 $17.04 100.00%
$17.04
$104,466,005
2020-21 Tax Levy: $30,600,878
Tax Levy % of Budget: 29.29%
Poughkeepsie City School District
PROPERTY VALUATION AND TAX RATE BACKGROUND INFORMATION
FULL VALUE Tax Rate
2020-21 General Fund BudgetedAppropriations:
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020
Bernard P. Donegan, Inc. TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20BACKGROUND
8
Poughkeepsie City School District
HISTORICAL CHANGE IN ASSESSED
VALUATION
Fiscal Year Ended
June 30: City of Poughkeepsie
2016 Assessed Valuation: 1,628,111,586$
% Increase -0.21%
2017 Assessed Valuation: 1,624,626,421
% Increase -1.84%
2018 Assessed Valuation: 1,594,662,390
% Increase 0.63%
2019 Assessed Valuation: 1,604,715,418
% Increase 4.20%
2020 Assessed Valuation: 1,672,057,310
% Increase 7.38%
2021 Assessed Valuation: 1,795,464,195
Average Value Change 33,470,522$
% Change 2.03%
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020
Bernard P. Donegan, Inc. TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20FININFO
9
Poughkeepsie City School District
PROJECTED CHANGE IN FUTURE ASSESSED
VALUE AND FULL VALUE
Projected Full
Value Assessed ValueCity of Poughkeepsie
NYS Equal. Rate 100.00%
Average AnnualA.V. Change 2.03%
Fiscal YearEnding June 30:
2021 1,795,464,195$ 1,795,464,195$ ##
2022 1,831,912,118 1,831,912,118 ##
2023 1,869,099,934 1,869,099,934 ##
2024 1,907,042,663 1,907,042,663 ##
2025 1,945,755,629 1,945,755,629 ##
2026 1,985,254,468 1,985,254,468 ##
2027 2,025,555,134 2,025,555,134 ##
2028 2,066,673,903 2,066,673,903 ##
2029 2,108,627,383 2,108,627,383 ##
2030 2,151,432,519 2,151,432,519 ##
2031 2,195,106,599 2,195,106,599 ##
2032 2,239,667,263 2,239,667,263 ##
2033 2,285,132,509 2,285,132,509 ##
2034 2,331,520,699 2,331,520,699 ##
2035 2,378,850,569 2,378,850,569 ##
2036 2,427,141,235 2,427,141,235 ##
2037 2,476,412,202 2,476,412,202 ##
2038 2,526,683,370 2,526,683,370 ##
2039 2,577,975,043 2,577,975,043 ##
2040 2,630,307,936 2,630,307,936 ##
2041 2,683,703,187 2,683,703,187 ##
2042 2,738,182,362 2,738,182,362 ##
2043 2,793,767,464 2,793,767,464 ##
cjd/kec
Updated: 7/14/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc. TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
PROJASSESSED
10
12/1/2001
Project Name: Various Buildings Various Buildings Various Buildings
Project Number: 000?-00? 000?-00? 000?-0??
Type of Project: Alterations Alterations Alterations
Date of Approval: 01/15/22 Estimated 01/15/23 Estimated 01/15/24 Estimated
FCR Submittal: 06/15/24 Estimated 06/15/25 Estimated 06/15/26 Estimated
Project Costs: 14,096,667$ 301,316.25 14,096,667$ 301,316.25 16,086,667$ 343,852.50
Date of General Contracts: Estimated 308,095.87 Estimated 308,095.87 Estimated 351,589.18
Date Aid Accrual Commences: Jun-24 Estimated 609,412.12 0.5 Jun-25 Estimated 609,412.12 0.5 Jun-26 Estimated 695,441.68 0.5
Building Aid Ratio: 91.2% Est. 2020-21 91.2% Est. 2020-21 91.2% Est. 2020-21
Bond Percentage: 95.000% Estimated 95.000% Estimated 95.000% Estimated
State Approved Project Costs: - - - - - -
- - -
Term (years): 15 - 15 - 15 -
Rate: 4.5000% Estimated 4.5000% Estimated 4.5000% Estimated
Yes Cap. Int. included in aid payments Yes Cap. Int. included in aid payments Yes Cap. Int. included aid payments
Debt Service on AssumedAmortization (@ BondPercentage): $1,237,388 $1,237,388 $1,412,067
Aid on Assumed
Amortization of Debt
Service
State Assumed
Aid on
Capitalized
Interest (current
calculation)
Total Estimated State
Aid Payments with
Cap. Int.
Aid on Assumed
Amortization of Debt
Service
State Assumed
Aid on
Capitalized
Interest (current
calculation)
Total Estimated State
Aid Payments with
Cap. Int.
Aid on Assumed
Amortization of Debt
Service
State Assumed
Aid on
Capitalized
Interest (current
calculation)
Total Estimated State
Aid Payments with
Cap. Int.
SEMI-ANNUAL PAYMENT: $564,249 $25,677 $589,926 $564,249 $25,677 $589,926 $643,903 $29,302 $673,204ANNUAL PAYMENTS $1,128,498 $51,354 $1,179,851 $1,128,498 $51,354 $1,179,851 $1,287,806 $58,603 $1,346,409
Total Aid Payments $770,305 $17,697,770 $770,305 $17,697,770 $879,048 $20,196,131
Phase 1 Phase 2 Phase 3
Poughkeepsie City School District
ESTIMATED STATE AID PAYMENTS BY PROJECT BASED ON AN ASSUMED AMORTIZATION SCHEDULE
cjd/kec
Updated: 7/27/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc.
TRIR - PRE & POST CP - Prop 1 - 8-5-20
PREVOTE AMORTIZE PROJ
11
ESTIMATED STATE BUILDING AID ANNUAL PAYMENTS
Phase 1 Phase 2 Phase 3
Various Buildings Various Buildings Various Buildings
6/30 000?-00? 000?-00? 000?-0??
2022 # 0 02023 1 -$ # -$ # -$ # -$2024 2 589,926 # 589,926 # - # -2025 3 1,769,777 # 1,179,851 # 589,926 # -2026 4 3,032,907 # 1,179,851 # 1,179,851 # 673,2042027 5 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092028 6 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092029 7 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092030 8 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092031 9 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092032 # 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092033 # 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092034 # 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092035 # 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092036 # 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092037 # 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092038 # 3,706,111 # 1,179,851 # 1,179,851 # 1,346,4092039 # 3,116,186 # 589,926 # 1,179,851 # 1,346,4092040 # 1,936,334 # - # 589,926 # 1,346,4092041 # 673,204 # - # - # 673,204
TOTALS 55,591,672$ 17,697,770$ 17,697,770$ 20,196,131$
Total AnnualState AidPayments
Poughkeepsie City School District
cjd/kec
Updated: 7/27/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc.
TRIR - PRE & POST CP - Prop 1 - 8-5-20
PREVOTE ANNUAL AID BY PROJ
12
Poughkeepsie City School District
Proposed $48,250,000 Capital Project
Proposed 19 -Year Maturity Schedule
A B C D E F G H I JC + E F - G H - I
Maturity DateCapital
ReserveAnnual Principal
Payment
RemainingPrincipal Amount
OutstandingAnnual Interest
PaymentAnnual Debt
ServiceLess StateBuilding Aid
Gross LocalShare
Less DebtServiceOffsets Net Local Share
6/15 10291003 5.00% Bonds 4.5000%4.00% Notes
48,250,000$
2023 # -$ -$ 48,250,000 616,800$ 616,800$ -$ 616,800$ 420,000$ 1 196,800$
2024 - 620,000 47,630,000 1,387,800 2,007,800 589,926 1,417,874 1,020,000 1 397,874
2025 - 1,300,000 46,330,000 2,207,400 3,507,400 1,769,777 1,737,623 1,145,000 1 592,623
2026 - 2,520,000 43,810,000 2,316,500 4,836,500 3,032,907 1,803,593 975,000 1 828,593
2027 - 2,770,000 41,040,000 2,190,500 4,960,500 3,706,111 1,254,389 410,000 1 844,389
2028 - 2,935,000 38,105,000 2,052,000 4,987,000 3,706,111 1,280,889 - 1,280,8892029 - 2,550,000 35,555,000 1,905,250 4,455,250 3,706,111 749,139 - 749,1392030 - 2,685,000 32,870,000 1,777,750 4,462,750 3,706,111 756,639 - 756,6392031 - 2,775,000 30,095,000 1,643,500 4,418,500 3,706,111 712,389 - 712,3892032 - 2,875,000 27,220,000 1,504,750 4,379,750 3,706,111 673,639 - 673,6392033 - 3,015,000 24,205,000 1,361,000 4,376,000 3,706,111 669,889 - 669,8892034 - 3,205,000 21,000,000 1,210,250 4,415,250 3,706,111 709,139 - 709,1392035 - 3,365,000 17,635,000 1,050,000 4,415,000 3,706,111 708,889 - 708,8892036 - 3,535,000 14,100,000 881,750 4,416,750 3,706,111 710,639 - 710,6392037 - 3,710,000 10,390,000 705,000 4,415,000 3,706,111 708,889 - 708,8892038 - 3,895,000 6,495,000 519,500 4,414,500 3,706,111 708,389 - 708,3892039 - 3,500,000 2,995,000 324,750 3,824,750 3,116,186 708,564 - 708,5642040 - 2,075,000 920,000 149,750 2,224,750 1,936,334 288,416 - 288,4162041 - 920,000 - 46,000 966,000 673,204 292,796 - 292,796
Totals -$ 48,250,000$ 23,850,250$ 72,100,250$ 55,591,672$ 16,508,584$ 3,970,000$ 12,538,584$
Averages(2024-2041) $0 2,680,556 $0 1,363,968 3,971,303 3,088,426 882,877 $208,947 685,655
Interest/Principal 49.43% Current Tax Levy 30,600,878$
Average Net Local Share/Current Tax Levy 2.24%
Note: 1. Use of Capitalized Interest.
PROJECTED NET LOCAL SHARE OF DEBT SERVICENOTE:
This Financial plan is used for illustrative purposesonly and is based upon many variables: timing of
events, interest rates and District cash flow needs.Your particular financial plan may vary significantly
based upon actual future events.
Prop 1
cjd/kec
Updated: 7/27/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc.
TRIR - PRE & POST CP - Prop 1 - 8-5-20
PRE VOTE MATURITY
13
A B C D E F G H I J K L M N O P Q R S T U
(A+B) (C-D-E+F) (H+I) (J-K-L) (G+M) (R-S) (N+T)
Fiscal YearEnding June
30: Total Principal Total InterestTotal Debt
ServiceEstimated
Building AidDebt Service
OffsetsCash Projects/ Adjustments
EstimatedExisting NetLocal Share Total Principal Total Interest
Total DebtService
EstimatedBuilding Aid
CapitalizedInterest
EstimatedProposed NetLocal Share
TOTAL NETLOCAL SHAREFOR EXISTING
AND PROPOSED $ Change
CashPayment Total Principal Total Interest
Total DebtService
EstimatedBOCES
RWADA AidEstimated NetLocal Share
TOTAL NETLOCAL
SHARE FORBUILDINGS
- - - - - - (N)
2019 2,306,311 987,029 3,293,339 3,527,816 1 142,465 2 650,000 273,059 -$ -$ -$ -$ -$ -$ 273,059$ - - - - - - - 273,059$
2020 2,344,152 907,231 3,251,383 3,226,270 1 132,510 2 925,000 5 817,602 - - - - - - 817,602 544,543 479,250 - - 479,250 317,992 161,258 978,860
2021 2,155,586 847,472 3,003,058 1,519,802 120,842 2 - 1,362,413 - - - - - - 1,362,413 544,811 - 215,000 62,303 277,303 188,876 88,426 1,450,839
2022 2,202,431 789,686 2,992,118 1,519,802 108,195 2 - 1,364,120 - - - - - - 1,364,120 1,707 - 104,950 177,372 282,322 192,295 90,027 1,454,147
2023 2,254,704 729,896 2,984,600 1,519,802 94,403 2 - 1,370,394 - 616,800 616,800 - 420,000 196,800 1,567,194 203,074 - 110,000 171,600 281,600 191,803 89,797 1,656,991
2024 2,302,416 663,545 2,965,961 1,519,802 79,583 2 - 1,366,576 620,000 1,387,800 2,007,800 589,926 1,020,000 397,874 1,764,451 197,257 - 115,000 165,550 280,550 191,088 89,462 1,853,912
2025 2,360,587 593,919 2,954,505 1,519,802 63,697 2 - 1,371,005 1,300,000 2,207,400 3,507,400 1,769,777 1,145,000 592,623 1,963,628 199,178 - 120,000 159,225 279,225 190,186 89,039 2,052,667
2026 2,384,627 521,788 2,906,415 1,519,802 46,712 2 - 1,339,901 2,520,000 2,316,500 4,836,500 3,032,907 975,000 828,593 2,168,494 204,865 - 120,000 152,625 272,625 185,690 86,935 2,255,428
2027 2,452,669 421,639 2,874,308 1,519,802 28,833 2 - 1,325,672 2,770,000 2,190,500 4,960,500 3,706,111 410,000 844,389 2,170,061 1,567 - 135,000 146,025 281,025 191,412 89,613 2,259,674
2028 1,750,000 345,931 2,095,931 1,198,355 9,863 2 - 887,713 2,935,000 2,052,000 4,987,000 3,706,111 - 1,280,889 2,168,602 (1,459) - 140,000 138,600 278,600 189,760 88,840 2,257,442
2029 1,405,000 267,275 1,672,275 255,754 - - 1,416,521 2,550,000 1,905,250 4,455,250 3,706,111 - 749,139 2,165,660 (2,942) - 150,000 130,900 280,900 191,327 89,573 2,255,233
2030 1,465,000 201,563 1,666,563 255,754 - - 1,410,809 2,685,000 1,777,750 4,462,750 3,706,111 - 756,639 2,167,447 1,788 - 155,000 122,650 277,650 189,113 88,537 2,255,984
2031 1,450,000 132,438 1,582,438 127,877 - - 1,454,561 2,775,000 1,643,500 4,418,500 3,706,111 - 712,389 2,166,949 (498) - 165,000 114,125 279,125 190,118 89,007 2,255,956
2032 1,410,000 85,950 1,495,950 - - - 1,495,950 2,875,000 1,504,750 4,379,750 3,706,111 - 673,639 2,169,589 2,639 - 175,000 105,050 280,050 190,748 89,302 2,258,891
2033 1,455,000 43,650 1,498,650 - - - 1,498,650 3,015,000 1,361,000 4,376,000 3,706,111 - 669,889 2,168,539 (1,050) - 180,000 95,425 275,425 187,597 87,828 2,256,3662034 - - - - - - - 3,205,000 1,210,250 4,415,250 3,706,111 - 709,139 709,139 (1,459,400) - 195,000 85,525 280,525 191,071 89,454 798,5922035 - - - - - - - 3,365,000 1,050,000 4,415,000 3,706,111 - 708,889 708,889 (250) - 200,000 74,800 274,800 187,172 87,628 796,517
2036 - - - - - - - 3,535,000 881,750 4,416,750 3,706,111 - 710,639 710,639 1,750 - 210,000 63,800 273,800 186,491 87,309 797,948
2037 - - - - - - - 3,710,000 705,000 4,415,000 3,706,111 - 708,889 708,889 (1,750) - 220,000 52,250 272,250 185,435 86,815 795,7042038 - - - - - - - 3,895,000 519,500 4,414,500 3,706,111 - 708,389 708,389 (500) - 235,000 40,150 275,150 187,410 87,740 796,1282039 - - - - - - - 3,500,000 324,750 3,824,750 3,116,186 - 708,564 708,564 176 - 245,000 27,225 272,225 185,418 86,807 795,371
2040 - - - - - - - 2,075,000 149,750 2,224,750 1,936,334 - 288,416 288,416 (420,149) - 250,000 13,750 263,750 179,645 84,105 372,520
2041 - - - - - - - 920,000 46,000 966,000 673,204 - 292,796 292,796 4,380 - - - - - - 292,796
Totals 35,489,278$ 11,393,128$ 46,882,406$ -$ 1,307,708$ 1,575,000$ 18,754,946$ 48,250,000$ 23,850,250$ 72,100,250$ 55,591,672$ 3,970,000$ 12,538,578$ 31,293,524$ 479,250$ 3,439,950$ 2,098,950$ 6,018,150$ 4,090,647$ 1,927,502$ 33,221,026$
Includes:Various Cash Projects$18,605,000 Refunding Serial Bond dated December 27, 2017$5,000,000 Energy Performance Contract - Vote 11/18/09$17,225,000 Authorization - Vote 11/17/09Emergency Project
Note: 1. FY 2017-18 building aid forward has been adjusted based on the 2016-17 State Assumed Interest Rate of 2.00%.
2.
3. Does not include Circle of Courage lease payments.
4. Includes Premium of $3,160.
5. Assumes $925,000 will be spent in the 2019-20 fiscal year and reported at year end on the District's ST-3.
CAUTION: State aid may be reduced. Pursuant to Education Law 3602 (6)(e)(5)(c), at least at the end of each ten year segment of an
assumed amortization established for a retro or prospective project, the remaining scheduled assumed semi-annual
payments will be revised based on the interest rate applicable for the current year, if the difference between the current year
interest rate and the interest rate upon which the original assumed amortization is based exceeds one quarter of one-one
hundredth.
Poughkeepsie City School District
SUMMARY OF EXISTING and FUTURE BUILDING DEBT SERVICE 3
Building Debt Excluding BOCES Projects Proposed $48,250,000 Capital Project BOCES Capital Project
Federal Subsidy rate reduced by 6.8% for expenses after October 1, 2015. Federal Subsidy rate reduced to 6.9% for expenses afterOctober 1, 2016. Federal Subsidy rate reduced to 6.6% for expenses after October 1, 2017. Federal Subsidy rate reduced to 6.2% forexpenses after October 1, 2018. Reduction in federal subsidy could vary on an annual basis.
cjd/kecUpdated: 7/27/2020Printed: 7/27/2020
Bernard P. Donegan, Inc. Summary-Bldg CombinedTRIR - PRE & POST CP - Prop 1 - 8-5-20
14
cjd/kecUpdated: 7/27/2020Printed: 7/27/2020
Bernard P. Donegan, Inc.TRIR - PRE & POST CP - Prop 1 - 8-5-20
Combined Local Share Chart
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041
Combined Net Local Share Proposed - - 196,800 397,874 592,623 828,593 844,389 1,280,889 749,139 756,639 712,389 673,639 669,889 709,139 708,889 710,639 708,889 708,389 708,564 288,416 292,796
Combined Net Local Share 1,362,413 1,364,120 1,370,394 1,366,576 1,371,005 1,339,901 1,325,672 887,713 1,416,521 1,410,809 1,454,561 1,495,950 1,498,650 - - - - - - - -
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
Est.
Net
Lo
calS
hare
Fiscal Year Ending June 30
Poughkeepsie City School DistrictEstimated Net Local Share of Existing Building Debt Service and Proposed $48,250,000 Capital Project
(Excludes Emergency Projects and BOCES Capital Project)
95% BondPercentage
15
Poughkeepsie City School District
PROJECTED FUTURE ANNUAL TAX RATE PER$1,000
Proposed $48,250,000 Capital Project
Proposed 19 -Year Maturity Schedule
City of Poughkeepsie
2023 0.08$ 0.08$
2024 0.17 0.17
2025 0.25 0.25
2026 0.34 0.34
2027 0.32 0.32
2028 0.30 0.30
2029 0.27 0.27
2030 0.25 0.25
2031 0.23 0.23
2032 0.21 0.21
2033 0.19 0.19
Totals 2.61$ 2.61$
Averages 0.24$ 0.24$
Current YearTax Rate 17.04$ 17.04$
% of CurrentYear Tax
Rate 1.39%
Full Value
Fiscal YearEnding
June 30:
Assessed Value
Average Marginal Increase 2023-2033
cjd/kecUpdated: 7/27/2020Printed: 7/27/2020 Bernard P. Donegan, Inc.
TRIR - PRE & POST CP - Prop 1 - 8-5-20PREVOTE PRPD TAX RATE 1
16
Poughkeepsie City School District
AVERAGE COST TO TAXPAYER
19 Year Maturity Schedule for $48,250,000 Capital Project
Income Restrictions* Primary Residence Non-Primary Residence
Annual Monthly Annual Monthly Annual Monthly
Full Value
82120 35860
$50,000 -$ -$ 3$ 0.25$ 12$ 1.00$
75,000 - - 9 0.75 18 1.50
100,000 4 0.33 15 1.25 24 2.00
125,000 10 0.83 21 1.75 30 2.50
150,000 16 1.33 27 2.25 36 3.00
175,000 22 1.83 33 2.75 42 3.50
200,000 28 2.33 39 3.25 48 4.00
Average Marginal Increase 2023-2033
NO STARSENIOR/STAR
$82,120 Equalized Value
Exemption Exemption
WITH STAR$35,860 Equalized Value
cjd/kec
Updated: 7/27/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc. TRIR - PRE & POST CP - Prop 1 - 8-5-20
PREVOTE TAXPAYER FULL17
12/1/2001
Project Name: Various Buildings Various Buildings Various Buildings
Project Number: 000?-00? 000?-00? 000?-0??
Type of Project: Alterations Alterations Alterations
Date of Approval: 01/15/22 Estimated 01/15/23 Estimated 01/15/24 Estimated
FCR Submittal: 06/15/24 Estimated 06/15/25 Estimated 06/15/26 Estimated
Project Costs: 17,375,306$ 273,661.07 18,584,000$ 292,698.00 18,584,000$ 292,698.00
Date of General Contracts: Estimated 279,818.44 Estimated 299,283.71 Estimated 299,283.71
Date Aid Accrual Commences: Jun-24 Estimated 553,479.51 0.5 Jun-25 Estimated 591,981.71 0.5 Jun-26 Estimated 591,981.71 0.5
Building Aid Ratio: 91.2% Est. 2020-21 91.2% Est. 2020-21 91.2% Est. 2020-21
Bond Percentage: 70.000% Estimated 70.000% Estimated 70.000% Estimated
State Approved Project Costs: - - - - - -
- - -
Term (years): 15 - 15 - 15 -
Rate: 4.5000% Estimated 4.5000% Estimated 4.5000% Estimated
Yes Cap. Int. included in aid payments Yes Cap. Int. included in aid payments Yes Cap. Int. included aid payments
Debt Service on AssumedAmortization (@ BondPercentage): $1,123,819 $1,201,996 $1,201,996
Aid on AssumedAmortization of Debt
Service
State AssumedAid on
CapitalizedInterest (current
calculation)
Total Estimated StateAid Payments with
Cap. Int.
Aid on AssumedAmortization of Debt
Service
State AssumedAid on
CapitalizedInterest (current
calculation)
Total Estimated StateAid Payments with
Cap. Int.
Aid on AssumedAmortization of Debt
Service
State AssumedAid on
CapitalizedInterest (current
calculation)
Total Estimated StateAid Payments with
Cap. Int.
SEMI-ANNUAL PAYMENT: $512,461 $23,320 $535,782 $548,110 $24,942 $573,053 $548,110 $24,942 $573,053ANNUAL PAYMENTS $1,024,923 $46,640 $1,071,563 $1,096,220 $49,885 $1,146,105 $1,096,220 $49,885 $1,146,105
Total Aid Payments $699,606 $16,073,447 $748,273 $17,191,579 $748,273 $17,191,579
Project Name: Various Buildings Various Buildings ???
Project Number: 000?-00? 000?-0?? 000?-00?Type of Project: Alterations Alterations Alterations
Date of Approval: 01/15/25 Estimated 01/15/26 Estimated January 2024 Estimated
FCR Submittal: 06/15/27 Estimated 06/15/28 Estimated June 2026 Estimated
Project Costs: 18,584,000$ 292,698.00 18,584,000$ 292,698.00 -$ -
Date of General Contracts: Estimated 299,283.71 Estimated 299,283.71 Estimated -
Project Costs: Estimated 292,698.00 Estimated 292,698.00 -
Date Aid Accrual Commences: Jun-27 Estimated 591,981.71 Jun-28 Estimated 591,981.71 Jun-01 Estimated -
Date of General Contracts: April-04 891,265.41 0.5 June-01 891,265.41 0.5 June-01 - 0.5Building Aid Ratio: 91.2% Est. 2020-21 91.2% Est. 2020-21 89.1%
Bond Percentage 70.000% Estimated 70.000% Estimated 95.000% Estimated
State Approved Project Costs - - - - - -
- - -
Term (years): 15 - 15 - 15 -
Rate: 4.5000% Estimated 4.5000% Estimated 4.5000% Estimated
Yes Cap. Int. included aid payments Yes Cap. Int. included aid payments Yes Cap. Int. included aid payments
Debt Service on AssumedAmortization (@ BondPercentage): $1,201,996 $1,201,996 $0
Aid on AssumedAmortization of Debt
Service
State AssumedAid on
CapitalizedInterest (current
calculation)
Total Estimated StateAid Payments with
Cap. Int.
Aid on AssumedAmortization of Debt
Service
State AssumedAid on
CapitalizedInterest (current
calculation)
Total Estimated StateAid Payments with
Cap. Int.
Aid on AssumedAmortization of Debt
Service
State AssumedAid on
CapitalizedInterest (current
calculation)
Total Estimated StateAid Payments with
Cap. Int.
SEMI-ANNUAL PAYMENT: $548,110 $24,942 $573,053 $548,110 $24,942 $573,053 $0 $0 $0ANNUAL PAYMENTS $1,096,220 $49,885 $1,146,105 $1,096,220 $49,885 $1,146,105 $0 $0 $0
Total Aid Payments $748,273 $17,191,579 $748,273 $17,191,579 $0 $0
Phase 1 Phase 2 Phase 3
Phase 4 Phase 5
Poughkeepsie City School District
ESTIMATED STATE AID PAYMENTS BY PROJECT BASED ON AN ASSUMED AMORTIZATION SCHEDULE
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020
Bernard P. Donegan, Inc.TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
PREVOTE AMORTIZE PROJ
18
ESTIMATED STATE BUILDING AID ANNUAL PAYMENTS
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Various Buildings Various Buildings Various Buildings Various Buildings Various Buildings
6/30 000?-00? 000?-00? 000?-0?? 000?-00? 000?-0??
2022 # 0 0 0 02023 1 -$ # -$ # -$ # -$ # -$ # -$2024 2 535,782 # 535,782 # - # - # - # -2025 3 1,644,616 # 1,071,563 # 573,053 # - # - # -2026 4 2,790,721 # 1,071,563 # 1,146,105 # 573,053 # - # -2027 5 3,936,826 # 1,071,563 # 1,146,105 # 1,146,105 # 573,053 # -2028 6 5,082,931 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 573,0532029 7 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052030 8 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052031 9 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052032 # 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052033 # 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052034 # 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052035 # 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052036 # 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052037 # 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052038 # 5,655,984 # 1,071,563 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052039 # 5,120,202 # 535,782 # 1,146,105 # 1,146,105 # 1,146,105 # 1,146,1052040 # 4,011,368 # - # 573,053 # 1,146,105 # 1,146,105 # 1,146,1052041 # 2,865,263 # - # - # 573,053 # 1,146,105 # 1,146,1052042 # 1,719,158 # - # - # - # 573,053 # 1,146,1052043 # 573,053 # - # - # - # - # 573,053
TOTALS 84,839,761$ 16,073,447$ 17,191,579$ 17,191,579$ 17,191,579$ 17,191,579$
Total AnnualState AidPayments
Poughkeepsie City School District
cjd/kec
Updated: 7/14/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc.
TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
PREVOTE ANNUAL AID BY PROJ
19
Poughkeepsie City School District
PROJECTED NET LOCAL SHARE OF DEBT SERVICE
Proposed $98,791,306 Capital Project
Proposed 21 -Year Maturity Schedule
A B C D E F G H I JC + E F - G H - I
Maturity DateCapital
ReserveAnnual Principal
Payment
RemainingPrincipal Amount
OutstandingAnnual Interest
PaymentAnnual Debt
ServiceLess State
Building AidGross Local
Share
Less DebtServiceOffsets Net Local Share
6/15 10291003 5.00% Bonds 4.5000%4.00% Notes
98,791,306$
2023 # -$ -$ 98,791,306 751,652$ 751,652$ -$ 751,652$ 560,000$1
191,652$
2024 - 816,306 97,975,000 1,739,565 2,555,871 535,782 2,020,090 1,435,0001
585,090
2025 - 1,715,000 96,260,000 2,698,750 4,413,750 1,644,616 2,769,134 1,520,0001
1,249,134
2026 - 2,635,000 93,625,000 3,613,000 6,248,000 2,790,721 3,457,279 1,545,0001
1,912,279
2027 - 3,665,000 89,960,000 4,481,250 8,146,250 3,936,826 4,209,424 1,650,0001
2,559,424
2028 - 4,595,000 85,365,000 4,498,000 9,093,000 5,082,931 4,010,069 370,0001
3,640,0692029 - 4,935,000 80,430,000 4,268,250 9,203,250 5,655,984 3,547,266 - 3,547,2662030 - 5,195,000 75,235,000 4,021,500 9,216,500 5,655,984 3,560,516 - 3,560,5162031 - 5,415,000 69,820,000 3,761,750 9,176,750 5,655,984 3,520,766 - 3,520,7662032 - 5,655,000 64,165,000 3,491,000 9,146,000 5,655,984 3,490,016 - 3,490,0162033 - 5,960,000 58,205,000 3,182,250 9,142,250 5,655,984 3,486,266 - 3,486,2662034 - 6,280,000 51,925,000 2,882,000 9,162,000 5,655,984 3,506,016 - 3,506,0162035 - 6,595,000 45,330,000 2,565,750 9,160,750 5,655,984 3,504,766 - 3,504,7662036 - 6,930,000 38,400,000 2,234,375 9,164,375 5,655,984 3,508,391 - 3,508,3912037 - 7,245,000 31,155,000 1,920,000 9,165,000 5,655,984 3,509,016 - 3,509,0162038 - 7,605,000 23,550,000 1,557,750 9,162,750 5,655,984 3,506,766 - 3,506,7662039 - 7,275,000 16,275,000 1,177,500 8,452,500 5,120,202 3,332,298 - 3,332,2982040 - 6,170,000 10,105,000 813,750 6,983,750 4,011,368 2,972,382 - 2,972,3822041 - 4,960,000 5,145,000 505,250 5,465,250 2,865,263 2,599,987 - 2,599,9872042 - 3,385,000 1,760,000 257,250 3,642,250 1,719,158 1,923,092 - 1,923,0922043 - 1,760,000 - 88,000 1,848,000 573,053 1,274,947 - 1,274,947
Totals -$ 98,791,306$ 50,508,593$ 149,299,899$ 84,839,761$ 64,460,139$ 7,080,000$ 57,380,139$
Averages
(2024-2043) $0 2,905,627 $0 2,487,847 7,427,412 4,241,988 3,185,424 $337,143 2,859,424
Interest/Principal 51.13% Current Tax Levy 30,600,878$
Average Net Local Share/Current Tax Levy 9.34%
Note: 1. Use of Capitalized Interest.
NOTE:This Financial plan is used for illustrative purposes only
and is based upon many variables: timing of events,interest rates and District cash flow needs. Your
particular financial plan may vary significantly basedupon actual future events.
Prop 1 & 2
cjd/kec
Updated: 7/14/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc.
TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
PRE VOTE MATURITY
20
A B C D E F G H I J K L M N O P Q R S T U
(A+B) (C-D-E+F) (H+I) (J-K-L) (G+M) (R-S) (N+T)
Fiscal YearEnding June
30: Total Principal Total InterestTotal Debt
ServiceEstimated
Building AidDebt Service
OffsetsCash Projects/ Adjustments
EstimatedExisting NetLocal Share Total Principal Total Interest
Total DebtService
EstimatedBuilding Aid
CapitalizedInterest
EstimatedProposed NetLocal Share
TOTAL NETLOCAL SHAREFOR EXISTING
AND PROPOSED $ Change
CashPayment Total Principal Total Interest
Total DebtService
EstimatedBOCES
RWADA AidEstimated NetLocal Share
TOTAL NETLOCAL
SHARE FORBUILDINGS
- - - - - - (N)
2019 2,306,311 987,029 3,293,339 3,527,816 1 142,465 2 650,000 273,059 -$ -$ -$ -$ -$ -$ 273,059$ - - - - - - - 273,059$
2020 2,344,152 907,231 3,251,383 3,226,270 1 132,510 2 925,000 5 817,602 - - - - - - 817,602 544,543 479,250 - - 479,250 317,992 161,258 978,860
2021 2,155,586 847,472 3,003,058 1,519,802 120,842 2 - 1,362,413 - - - - - - 1,362,413 544,811 - 215,000 62,303 277,303 188,876 88,426 1,450,839
2022 2,202,431 789,686 2,992,118 1,519,802 108,195 2 - 1,364,120 - - - - - - 1,364,120 1,707 - 104,950 177,372 282,322 192,295 90,027 1,454,147
2023 2,254,704 729,896 2,984,600 1,519,802 94,403 2 - 1,370,394 - 751,652 751,652 - 560,000 191,652 1,562,046 197,926 - 110,000 171,600 281,600 191,803 89,797 1,651,843
2024 2,302,416 663,545 2,965,961 1,519,802 79,583 2 - 1,366,576 816,306 1,739,565 2,555,871 535,782 1,435,000 585,090 1,951,666 389,620 - 115,000 165,550 280,550 191,088 89,462 2,041,128
2025 2,360,587 593,919 2,954,505 1,519,802 63,697 2 - 1,371,005 1,715,000 2,698,750 4,413,750 1,644,616 1,520,000 1,249,134 2,620,139 668,474 - 120,000 159,225 279,225 190,186 89,039 2,709,179
2026 2,384,627 521,788 2,906,415 1,519,802 46,712 2 - 1,339,901 2,635,000 3,613,000 6,248,000 2,790,721 1,545,000 1,912,279 3,252,180 632,040 - 120,000 152,625 272,625 185,690 86,935 3,339,114
2027 2,452,669 421,639 2,874,308 1,519,802 28,833 2 - 1,325,672 3,665,000 4,481,250 8,146,250 3,936,826 1,650,000 2,559,424 3,885,096 632,917 - 135,000 146,025 281,025 191,412 89,613 3,974,709
2028 1,750,000 345,931 2,095,931 1,198,355 9,863 2 - 887,713 4,595,000 4,498,000 9,093,000 5,082,931 370,000 3,640,069 4,527,782 642,686 - 140,000 138,600 278,600 189,760 88,840 4,616,622
2029 1,405,000 267,275 1,672,275 255,754 - - 1,416,521 4,935,000 4,268,250 9,203,250 5,655,984 - 3,547,266 4,963,787 436,005 - 150,000 130,900 280,900 191,327 89,573 5,053,360
2030 1,465,000 201,563 1,666,563 255,754 - - 1,410,809 5,195,000 4,021,500 9,216,500 5,655,984 - 3,560,516 4,971,324 7,538 - 155,000 122,650 277,650 189,113 88,537 5,059,861
2031 1,450,000 132,438 1,582,438 127,877 - - 1,454,561 5,415,000 3,761,750 9,176,750 5,655,984 - 3,520,766 4,975,326 4,002 - 165,000 114,125 279,125 190,118 89,007 5,064,334
2032 1,410,000 85,950 1,495,950 - - - 1,495,950 5,655,000 3,491,000 9,146,000 5,655,984 - 3,490,016 4,985,966 10,639 - 175,000 105,050 280,050 190,748 89,302 5,075,268
2033 1,455,000 43,650 1,498,650 - - - 1,498,650 5,960,000 3,182,250 9,142,250 5,655,984 - 3,486,266 4,984,916 (1,050) - 180,000 95,425 275,425 187,597 87,828 5,072,7432034 - - - - - - - 6,280,000 2,882,000 9,162,000 5,655,984 - 3,506,016 3,506,016 (1,478,900) - 195,000 85,525 280,525 191,071 89,454 3,595,4702035 - - - - - - - 6,595,000 2,565,750 9,160,750 5,655,984 - 3,504,766 3,504,766 (1,250) - 200,000 74,800 274,800 187,172 87,628 3,592,394
2036 - - - - - - - 6,930,000 2,234,375 9,164,375 5,655,984 - 3,508,391 3,508,391 3,625 - 210,000 63,800 273,800 186,491 87,309 3,595,700
2037 - - - - - - - 7,245,000 1,920,000 9,165,000 5,655,984 - 3,509,016 3,509,016 625 - 220,000 52,250 272,250 185,435 86,815 3,595,8312038 - - - - - - - 7,605,000 1,557,750 9,162,750 5,655,984 - 3,506,766 3,506,766 (2,250) - 235,000 40,150 275,150 187,410 87,740 3,594,5062039 - - - - - - - 7,275,000 1,177,500 8,452,500 5,120,202 - 3,332,298 3,332,298 (174,468) - 245,000 27,225 272,225 185,418 86,807 3,419,105
2040 - - - - - - - 6,170,000 813,750 6,983,750 4,011,368 - 2,972,382 2,972,382 (359,916) - 250,000 13,750 263,750 179,645 84,105 3,056,486
2041 - - - - - - - 4,960,000 505,250 5,465,250 2,865,263 - 2,599,987 2,599,987 (372,395) - - - - - 2,599,9872042 - - - - - - - 3,385,000 257,250 3,642,250 1,719,158 - 1,923,092 1,923,092 (676,895) - - - - - 1,923,092
2043 - - - - - - - 1,760,000 88,000 1,848,000 573,053 - 1,274,947 1,274,947 (648,145) - - - - - 1,274,947
Totals 35,489,278$ 11,393,128$ 46,882,406$ -$ 1,307,708$ 1,575,000$ 18,754,946$ 98,791,306$ 50,508,593$ 149,299,899$ 84,839,761$ 7,080,000$ 57,380,138$ 76,135,083$ 479,250$ 3,439,950$ 2,098,950$ 6,018,150$ 4,090,647$ 1,927,502$ 78,062,586$
Includes:Various Cash Projects$18,605,000 Refunding Serial Bond dated December 27, 2017$5,000,000 Energy Performance Contract - Vote 11/18/09$17,225,000 Authorization - Vote 11/17/09Emergency Project
Note: 1. FY 2017-18 building aid forward has been adjusted based on the 2016-17 State Assumed Interest Rate of 2.00%.
2.
3. Does not include Circle of Courage lease payments.
4. Includes Premium of $3,160.
5. Assumes $925,000 will be spent in the 2019-20 fiscal year and reported at year end on the District's ST-3.
CAUTION:
Poughkeepsie City School District
SUMMARY OF EXISTING and FUTURE BUILDING DEBT SERVICE3
Building Debt Excluding BOCES Projects BOCES Capital Project
Federal Subsidy rate reduced by 6.8% for expenses after October 1, 2015. Federal Subsidy rate reduced to 6.9% for expenses afterOctober 1, 2016. Federal Subsidy rate reduced to 6.6% for expenses after October 1, 2017. Federal Subsidy rate reduced to 6.2% forexpenses after October 1, 2018. Reduction in federal subsidy could vary on an annual basis.
State aid may be reduced. Pursuant to Education Law 3602 (6)(e)(5)(c), at least at the end of each ten year segment of an
assumed amortization established for a retro or prospective project, the remaining scheduled assumed semi-annual
payments will be revised based on the interest rate applicable for the current year, if the difference between the current year
interest rate and the interest rate upon which the original assumed amortization is based exceeds one quarter of one-one
hundredth.
Proposed $98,791,306 Capital Project
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020
Bernard P. Donegan, Inc. Summary-Bldg CombinedTRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
21
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020
Bernard P. Donegan, Inc.TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
Combined Local Share Chart
2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043
Combined Net Local Share Proposed - - 191,652 585,090 1,249,134 1,912,279 2,559,424 3,640,069 3,547,266 3,560,516 3,520,766 3,490,016 3,486,266 3,506,016 3,504,766 3,508,391 3,509,016 3,506,766 3,332,298 2,972,382 2,599,987 1,923,092 1,274,947
Combined Net Local Share 1,362,413 1,364,120 1,370,394 1,366,576 1,371,005 1,339,901 1,325,672 887,713 1,416,521 1,410,809 1,454,561 1,495,950 1,498,650 - - - - - - - - - -
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
Est.
Net
Lo
calS
hare
Fiscal Year Ending June 30
Poughkeepsie City School DistrictEstimated Net Local Share of Existing Building Debt Service and Proposed $98,791,306 Capital Project
(Excludes Emergency Projects and BOCES Capital Project)
70% BondPercentage
22
Poughkeepsie City School District
PROJECTED FUTURE ANNUAL TAX RATEPER $1,000
Proposed $98,791,306 Capital ProjectProposed 21 -Year Maturity Schedule
City ofPoughkeepsie
2023 0.07$ 0.07$
2024 0.27 0.27
2025 0.59 0.59
2026 0.88 0.88
2027 1.16 1.16
2028 1.44 1.44
2029 1.59 1.59
2030 1.55 1.55
2031 1.51 1.51
2032 1.47 1.47
2033 1.43 1.43
2034 0.76 0.76
2035 0.73 0.73
2036 0.71 0.71
2037 0.68 0.68
2038 0.65 0.65
2039 0.55 0.55
2040 0.39 0.39
2041 0.23 0.23
Totals 16.66$ 16.66$
Averages 0.88$ 0.88$
CurrentYear Tax
Rate 17.04$ 17.04$
% ofCurrent
Year TaxRate 5.15%
Full Value
Fiscal YearEnding
June 30:
Assessed Value
Average Marginal Increase 2023-2041
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020 Bernard P. Donegan, Inc.
TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20PREVOTE PRPD TAX RATE 1
23
Poughkeepsie City School District
AVERAGE COST TO TAXPAYER
21 Year Maturity Schedule for $98,791,306 Capital Project
Income Restrictions* Primary Residence Non-Primary Residence
Annual Monthly Annual Monthly Annual Monthly
Full Value
82120 35860
$50,000 -$ -$ 12$ 1.00$ 44$ 3.67$
75,000 - - 34 2.83 66 5.50
100,000 16 1.33 56 4.67 88 7.33
125,000 38 3.17 78 6.50 110 9.17
150,000 60 5.00 100 8.33 132 11.00
175,000 81 6.75 122 10.17 153 12.75
200,000 103 8.58 144 12.00 175 14.58
Average Marginal Increase 2023-2041
NO STARSENIOR/STAR
$82,120 Equalized Value
Exemption Exemption
WITH STAR$35,860 Equalized Value
cjd/kec
Updated: 7/14/2020
Printed: 7/27/2020
Bernard P. Donegan, Inc. TRIR - PRE & POST CP - Prop 1 & 2 - 8-5-20
PREVOTE TAXPAYER FULL24
Poughkeepsie City School District
A B C D E F H I
(SUM A TO I)
Columbus School SFB Morse Elementary Gov. Clinton School
Charles B. Warring
Academy
G.W Krieger
Elementary Jr/ Sr High School Middle School
Administration
Building
TOTAL
AUTHORIZATION
0001-xxx 0002-xxx 0004-xxx 0005-xxx 0006-xxx 0007-xxx 0015-xxx 1003-xxx
Alteration/ Alteration/ Alteration/ Alteration/ Alteration/ Alteration/ Alteration/ Alteration/ Alteration/
Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction Reconstruction
CONSTRUCTION: SED Approval
Maximum Cost Allowance -$ 11,425,783$ 7,277,961$ 7,786,802$ 12,243,011$ 34,971,221$ 5,720,601$ 24,500,244$ -$ 103,925,623$
Less: Emergency Boiler Replacement (#0001-012) 7/19/2019 (775,000) - - - - - - - - (775,000)
Less: Various Project #1003-005 10/7/2019 - - - - - - - - - -
Less: Various Project #0001-013 10/16/2019 - - - - - - - - - -
Less: Proposed Capital Project __/__/__ - - - - - - - - - -
Less: Proposed Energy Performance Contract __/__/__ - - - - - - - - - -
Maximum Cost Allowance Available (775,000)$ 11,425,783$ 7,277,961$ 7,786,802$ 12,243,011$ 34,971,221$ 5,720,601$ 24,500,244$ -$ 103,150,626$
INCIDENTALS:
Maximum Cost Allowance -$ 2,285,157$ 1,455,592$ 1,557,360$ 2,448,602$ 8,742,805$ 1,144,120$ 6,125,061$ -$ 23,758,698$
Less: Emergency Boiler Replacement (#0001-012) 7/19/2019 - - - - - - - - - -
Less: Various Project #1003-005 10/7/2019 - - - - - - - - - -
Less: Various Project #0001-013 10/16/2019 - - - - - - - - - -
Less: Proposed Capital Project __/__/__ - - - - - - - - - -
Less: Proposed Energy Performance Contract __/__/__ - - - - - - - - - -
Maximum Cost Allowance Available -$ 2,285,157$ 1,455,592$ 1,557,360$ 2,448,602$ 8,742,805$ 1,144,120$ 6,125,061$ -$ 23,758,701$
126,909,326$
KEY: RED Exceeds aid ceiling. All dollars expended in excess of aid ceiling are 100% local share.
GREEN Positive margin to work with. Total Authorization:
Maximum Cost Allowance based on:
(a) 2019-20 Regional Cost Factor of 1.3188 and
(b) Monthly Cost Index for Dcecember 2019.
(c) Building Aid Units from SA-4 dated 7/30/15, 2/4/16, and 3/10/16.
0
ANALYSIS OF ESTIMATED PROJECT COST AND MAXIMUM COST ALLOWANCE BY BUILDING
G
0008-xxx
W.W. Smith
Elementary
cjd/kecUpdated: 7/14/2020Printed: 7/27/2020
Bernard P. Donegan, Inc. MCA 5-Year Rolling Aid Ceiling AnalysisAnalysis - No Project Costs
A
/NJM
Updated: 12/30/2019
Printed: 7/27/2020
Bernard P. Donegan, Inc. State Aid Ratio Hist 2020-21 Est
State Aid Chart
1999-00 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-202020-21
Est.
Current 62.8% 69.9% 68.9% 69.1% 60.6% 64.5% 64.5% 65.3% 65.3% 66.2% 68.3% 70.4% 73.5% 75.4% 75.4% 77.4%
Selected 65.7% 72.3% 72.3% 72.3% 72.3% 72.3% 72.3% 72.3% 72.3% 72.3% 72.3% 72.3% 73.5% 75.4% 75.4% 77.4%
BLD 4 83.3% 82.3% 82.5% 73.6% 77.7% 77.7% 78.5% 78.5% 79.5% 81.7% 83.9% 87.1% 89.1% 89.1% 91.2%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
History of State Building Aid Ratios1
BLD 4 = (Projects with Voter Approval on or after July 1, 2005)Greater of a) 1999-00 Selected - 10% =
or b) Current Year Calculated =or c) Low Wealth Aid Ratio = N/A
=
BLD 4 Aid Ratio
89.1%
89.1%
MaximumAid Ratio= 95%
Maximum High NeedsAid Ratio= 98%
+
High Needs5% of Building Aid Ratio From "A"
3.7%
A E
SED STATEWIDE AVERAGE INTEREST RATE ASSIGNED BASED ON SED APPROVAL DATE
1 The State Building Aid Ratio may change yearly. The voter authorization only "locks" the District into an aid calculation formula, not the aid ratio.
Merger Aid
++Plus 10%
10.0%
B C D
SED Statewide Average Interest Rate for BuildingSED Interest Rate for Retro ProjectsBorrowings prior to December 1, 2001 Rates not yet available
Poughkeepsie City School District
55.7%
75.4%
N/A75.4%
2019-20Fiscal Year
A+B+C+D =
?.???%4.500% 3.875% 3.625% 3.500% 3.000% 2.625% 2.375% 2.250% 2.250% 2.125% 2.000% 2.000% 2.500% ?.???%2.500%
$5,600,000EPC
Vote Date:11-17-09Yes = 655No = 188
$17,225,000AuthorizationVote Date:11-17-09Yes = 655No = 188
B
C
C
C