Power8 and A350XWB UpdatesPower8 and A350XWB Updates
Presented by
Fabrice BrégierChief Operating OfficerAirbus
Paris, Wednesday 20th June 2007Paris, Wednesday 20th June 2007
Airbus turn-around in progress
Power8 program on track
• 2007 quick wins > €200m
• Overhead reduction forecast by year-end 2007 > 2000 FTE
• All Modules fully launched
• Zephyr project in an active phase
A new Airbus model fully integrated
Page 2©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
A new Airbus model fully integrated
Integration
Simplification
Priority to Operations
Strengthening of architect role
• Trans-national Centres of Excellence• Trans-national commodities for Procurement• Further integration of support functions
• Procurement Multi-Functional Teams re-energised, and aligned with supply markets
• Alignment of Customer Services' organisation with Airlines
• One set of Tools / Methods / Processes
• Programme axis reinforced in CoEs• Project management reinforced
• Putting architect skills & competence first in all areas
• Simplification of Engineering organisation and strengthening of Design Authority
A new trans-national CoE organisation
AerostructuresB George
Wing / PylonB Fleet
Brough-ton
Fuselage CabinR Fuchs
SNZ(Gron)
Toulouse
Head of Head of Operations – G WeberGerald Weber
Empennage/Aft Fuselage
M Hita-Romero
Hamburg(VTP)
Illescas
Puerto RealBremen
Stade
BRE(high lift +
wing equip)
Deputy Head of Operations in charge of Industrial Processes
B George
Varel Meaulte
SNZ (ville)
NantesNorden-ham
Laup-heim
Getafe
FiltonHamburg
Electrics
St Eloi
Reinforced transverse role for synergies across CoEs
Design Office
Buxehud
Page 3©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
Evolution of Engineering to a "mission focused" organisation
Aircraft Integration & Architecture
R Lafontan
Design OfficeJ Javelle
Head of Engineering – P GavinP Gavin
R&TA Krein
Test CentreC Lelaie Successor:
F. Alonso
AirworthinessW. Engler
HRBusiness Planning & Controlling
ChangeProcess, Methods and Tools A Ramier
Integration & Architecture
Chief EngineersChief EngineersChief Engineers
Programmes
Creation of Senior Chief Engineer /
integration of Architects
All CoCs in a single design
office
Quality E Roelen
Integrated a/c level tests to improve
Strong development processes, properly
applied
Airbus will focus on Architect and Integrator roleTodayPast
Airbus / integrator roleSuppliers of parts or sub-assemblies
Industry trend
(1) Major Component Assemblies
Assembly
Sub-assemblies
Elementary parts
Assembly
MCAs
Sub-assemblies
Elementary parts
Assembly
MCAs
Sub-assemblies
Elementary parts
MCAs (1)
• Make or Buy policy has been reviewed, and the new policy will start to be applied on the A350 XWB
• Airbus aims at developing an "extended enterprise" concept and creating European Champions in the Aerostructures Business
• These champions will invest in new technologies, and/or bring new business opportunities to the 7 concerned sites
Larger, more solid Tier 1 Risk
Sharing Partners
Page 4©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
Light, robust,repairable Structure
Advanced Rolls Royce Trent XWB Engines
delivering best levels offuel efficiency, maintainability
and environmental impact
A380 Systems andCockpit commonality
A350 XWB
Wider, more comfortable Cabinincorporating innovative Airbus CabinVision features and personalised IFE
Aerodynamicsfor Mach 0.85 cruise with
unequalled levels of efficiency
Page 5©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
A350 XWB - Programme timing
Final assembly
1st
FlightA350-900
EIS
2009 2010 2011 2012 2013200820072006
Design freeze
Detailed definition
freezeIndustrial
launch
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
4 strands to success
ProgrammeManagement
New ways of working
RSPs
New tools and Processes
Robust Design
On time delivery
Developfaster
SecuredRamp- up
Deliver Performance
Customer Focus
Maturity Gates
Page 6©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
A350 – state-of-the-art cabin©
AIR
BU
S S
.A.S
. All
right
s re
serv
ed. C
onfid
entia
l and
pro
prie
tary
docu
men
t.
Widest Economy seat
• Best long-haul comfort level : a tool for differentiation (19.5” seat width)
Dimensioned for the future
Page 7©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
A350 XWB Aerodynamic design
Outstanding accuracy for performance prediction, flight test provenBetter representation of aerodynamic phenomenon turned into better design choices-40% WTT days in A350 aero development vs A380To date, ~6 months aero development time saving achieved
High-fidelity Computational Fluid Dynamics
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
A350 XWB Wing design
M 0.85 cruise speed
Advanced high lift devices
Significantly improved High-Lift efficiency without increasing weight & complexity
Maintenance cost savings
CFRP structure
Page 8©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
Aerodynamics Design Progress – Low Speed
Low speed wind tunnel test campaign in Bremen AIRBUS Facilities
Low speed wind-tunnel test campaigns in Filton AIRBUS facilities
Low speed wind-tunnel test campaigns in F1 ONERA facilities
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
CFRP Wing experience
A380
A400M
Page 9©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
CFRP Fuselage experience
A380
A340-500/600
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
Cockpit and Avionics
Advanced cockpit based on A380 design
Page 10©A
IRB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
A350-1000
A350-900
Xtra efficiency – next generation engines
95Klbs87Klbs75Klbs
Single engine type across aircraft familyLow noise and emissions levels
A350-800
Trent XWB
©AI
RB
US
S.A
.S. A
ll rig
hts
rese
rved
. Con
fiden
tial a
nd p
ropr
ieta
rydo
cum
ent.
A350 XWB
3 models designed to be ahead of the competitionProgramme team in place Industrial principles agreed Risk-sharing partner and supplier selections in progress
A solid programme based upon a very large market