power generation in pakistan - global edisonhydropower project swat, nwfp 100 125. future projects -...
TRANSCRIPT
Sequence
Present Energy Production
Hydro Power Projects
Thermal Units
Projects likely to be commissioned in next 5 years
List of Hydro power in the pipeline
Lists of IPPs in the pipeline
Future Energy requirement Estimates
Incentives offered by the Govt for investment in IPPs
Impediments in the way of IPPs
Steps Required to start an IPP
Introduction
Total Installed capacity
19,420 MW
Hydro Power: 6,479 MW
Thermal: 12,478 MW
Nuclear & Imported: 462 MW
Ratio
Hydro: Thermal
33 : 67
33%
36%
28%
3%
0%
TOTAL INSTALLED CAPACITY
Hydel
Gas
Oil
Nuclear & Imported
Coal
Energy Data of Hydro Power StationsPower Station Installed
Generation Capacity MW
Units GeneratedGwh
Overall Cost of GenerationPs/KWh
Utilization Factor%
TarbelaGhazi BrothaManglaWarsakChashmaMalakandDargaiRasulShadiwalChichoki Malian
NandipurKurram GarhiRenalaChitralTotal
3478.0
1450.0
1000.0
243.0
184.0
19.6
20.0
22.0
13.5
13.2
13.8
4.0
1.1
1.0
6,463.2
16145.71
6942.81
6150.91
1035.38
1145.78
54.31
148.47
91.78
33.12
33.22
40.15
17.41
3.03
3.87
31,845.95
21.73
12.01
24.15
16.73
6.71
36.91
22.12
40.71
35.95
58
99.39
101.39
19.95
52.85
54.51
70.02
48.51
70.89
31.54
84.51
47.50
27.93
28.65
33.12
49.55
31.40
44.05
675.03
Public Sector Thermal Units
WAPDA KESC
JPCL(GENCO-1)
CPGCL(GENCO-2)
NPGCL(GENCO-3)
LPGCL(GENCO-4)
REGIONALSBUs
TPS Jamshoro TPS GudduTPS Muzaffargarh
FBC Lakhra TPS Korangi
GTPS Kotri TPS Quetta NGPS MultanGTPS KorangiTown
GTPS Faisalabad GTPS Site
SPS Faisalabad TPS Bin Qasim
GTPS Shahdara
Public Sector Thermal UnitsWAPDA
Power Station Installed & De
rated Gen
Cap MW
Type of
Fuel
Units Gen
(GWh)
Average
Fuel Cost
(Rs/ Kwh)
Overall
Cost of Gen
(Rs/ Kwh)
GTPS Shahdara 59 / 50 Gas 26.30 6.92 7.35
SPS Faisalabad 132 / 100 Gas, FO 534.76 5.47 5.68
GTPS Faisalabad 244 / 175 Gas 637.67 2.94 3.22
NGPS Multan 130 / 100 Gas, FO 344.88 5.66 6.52
TPS Muzaffargarh 1350 / 1300 Gas, FO 7044.29 4.91 5.11
TPS Guddu(Unit 1-4) 640 / 430 Gas, FO 1726.58 2.80 3.43
TPS Guddu(Unit 5-13) 1015 / 760 Gas 6073.82 2.27 2.47
GTPS Kotri 174 / 825 Gas 790.61 2.96 3.47
FBC Lakhra 150 / 120 Coal 136.13 1.61 6.11
TPS Jamshoro 850 / 650 Gas, FO 4229.00 3.81 4.17
TPS Quetta 35 / 35 Gas 49.13 4.32 6.42
TPS Pasni 17 / 12 HSD 1.13 9.26 15.55
GTPS Panjgur 39 / 26 HSD 2.95 16.62 23.43
WAPDA Sub Total 4,900 / 3933 21,597.24 3.66 3.985
Public Sector Thermal Units
KESCPower Station Installed
Gen Cap
MW
Type of
Fuel
Units Gen
GWh
Average
Fuel Cost
Ps/ Kwh
Overall Gen
Cost
TPS Korangi 316 Gas, FO 887.48 359.26 NA
GTPS Korangi Town 80 Gas, HSD 362.72 412.67 NA
GTPS Site 100 Gas, HSD 382.88 419.10 NA
TPS Bin Qasim 1,260 Gas, FO 6535.76 341.34 NA
KESC TOTAL: 1,756 8168.83 1532.37
Private Sector Thermal UnitsPower Station Inst Gen Cap
MW
Type of
Fuel
Units
Gen
GWh
Av. Fuel
Cost Ps/
Kwh
O. Gen
Cost (Ps/
Kwh)
1 AES Lal Pir ,M.Garh 362 FO 1468.52 502.79 Na
2 AES Pak Gen , M.Garh 365 FO 2079.99 492.01 Na
3 Altern Energy 10.5 na na Na Na
4 Fauji Kabirwala 157 Gas 1184.29 173.89 Na
5 Gul Ahmad, Karachi 136 FO 855.17 Na Na
6 Habibullah 129 Gas,HSD 989.44 210.85 Na
7 HUBCO, Hub 1292 FO 7214.00 497.71 Na
8 Japan Power 135.6 FO, HSD 549.82 Na Na
9 KAPCO, Kot Addu 1466 Gas, HSD 8451.17 Na Na
10 Kohinoor Energy Lahore 131 FO 834.71 Na Na
11 Rousch Power 450 Gas 3157.28 200.72 Na
12 Saba Power 134 FO 915.22 Na Na
13 Southern Electric 117 FO, HSD 576.63 Na Na
14 Tapal Energy, Karachi 126 FO, HSD 736.09 Na Na
15 TNB Liberty Power 235 Gas 1305.48 367.33 Na
16 Uch Power 586 Gas 3888.08 Na Na
IPP Total 5,833 34,205.88 2,445.3
FUTURE PROJECTs- WAPDA
Hydropower Projects under Study
Sr. No. Project River LocationInstalled Capacity
(MW)
Estimated Construction Cost (US$)
1 Keyal Khwar Keyal Khwar Patan 122 160 million
2 Kohala Jhelum Kohala 1100 1.7 billion
3 Dasu Indus Dasu 4000 6.5 billion
4Lower Spat Gah
Spat Gah Patan 610 700 million
5Lower Palas Valley
Chor Nullah Patan 621 700 million
6 Bunji Indus Gilgit 5400 6 billion
7 Phandar Ghizar Gilgit 80 65 million
FUTURE PROJECTs - WAPDA8 Basho Basho Skardu 28 30 million
9 Lawi ShishiDarosh-Chitral
70 120 million
10 Thakot Indus Thakot 2800 5 billion
11 Patan Indus Patan 2800 5 billion
12 Golen GolGolen Gol-Mastuj
Chitral-Mastuj
106 130 million
13 HarpoHarpo-Lungma
Skardu 33 40 million
14 Yulbo Indus Skardu 3000 6 billion
TOTAL 20770 32.15 billion
FUTURE PROJECTs - PPIB
RESOURCE TYPE
Expected Commercial Operation Date
2008-2010 2010-2012 Beyond 2012
No of Projects
Capacity (MW)
No of Projects
Capacity (MW)
No of Projects
Capacity (MW)
OIL/ GAS 6 1100 16 3400 30 3300
HYDEL
COAL
WIND
IPPs – Expected COD 2008-2010
S.No Company Name Capacity Location Status COD/ ECOD
1 DHA COGEN 94 KarachiFinancial
Close Jun -08
2Attock Gen Power Project
150 RawalpindiFinancial
Close Oct-08
3Orient Power Company (Pvt) Ltd 225
BallokiFinancial
Close Dec-08
4Sapphire Power Company Limited 235
MuridkeFinancial
Close Jul-09
5Fauji Mari Power Project
175 DaharkiFinancial
Close Sep-09
6 Saif Power Limited 225Sahiwal
Financial Close Feb-10
Total 1104
IPPs – Expected COD 2010 -2012S. No Company Name Capacity Location Status COD/ ECOD
1 Nishat Chunian Power Project 200 Lahore Imp Agreement
2 Nishat Power 200 Lahore Imp Agreement
3 Atlas Power 225 Sheikhupura Imp Agreement
4 Star Thermal Power Project 134 Daharki Imp Agreement
5 Halmore Power Project 225 Bhikki, Punjab Imp Agreement
6 Engro Energy 226 Qadirpur, Sindh Imp Agreement
7 Bestway Group 200 Taxila Tariff Approved
8 Hub Power Company 220 Narowal Tariff Approved
9 InterGen Power Project 150 Kohat, NWFP Tariff Approved
10 Japan Power Gen (Expansion) 200 Raiwind, Lahore Tariff Approved
11 Kohinoor Energy (Expansion) 200 Raiwind, Lahore Tariff Approved
12 Tapal Energy (Expansion) 200 Karachi Tariff Approved
13 Gujranwala (Gulistan) Project 200 Gujranwala Tariff Approved
14 Green Power Project (Phase 1) 205 Zamzama T/Petition Filed
15 Warda Power Project 200 Near Lahore T/ Petition Filed
16 KAPCO-Expansion Project 400 Kot Addu T/ Petition Filed
TOTAL 3385
IPPs – Expected COD Beyond 2012S. No Company Name Capacity Location Status COD/ ECOD
1 Gulf Power 179 Sahuwala LOI Issued
2 Taiyo Hills 127 Eminabad LOI Issued
3 Eastern Power 150 Pasrur LOI Issued
4 Western Electric Power Project
150 Karachi LOI Issued
5 Fauji Korangi Power Project 150 Karachi LOI Issued
6 Faisalabad ICB Project 400 Faisalabad LOI Issued
7 Uch II ICB Project 450 Kashmore LOI Issued
8 Existing IPPs Cap Expansion 405 Near Lahore LOI Issued
9 Khuzdar ICB Project 100 Khuzdar LOI Issued
10Chichoki Mallian ICB project 350
Chichoki Mallian
LOI Issued
11 Kandra ICB Project 60 Kandra (Sukkur) LOI Issued
12 Engro Power Project 150 Daharki LOI Issued
13 Lakhra Coal Project(FatehGp)
200 Lakhra, Sindh LOI Issued
14 Shaheen Business & Inv Gp 800 Bhikki, Punjab LOI Issued
15 PMS Power 120 Punjab LOI Issued
16 Liberty Power Tech 200 Punjab LOI Issued
COD BEYOND 2012 - ContdS. No Company Name Capacity Location Status COD/ ECOD
17 Ampower 225 LOI Issued
18 GAMA Power 150 Pasrur LOI Issued
19 Gharibwal Cement 150 LOI Issued
20 Swift Energy 125 LOI Issued
21 Continental Energy 120 LOI Issued
22 Associated Engineering 200 LOI Issued
23 Amazon Energy 115 Muridke LOI Issued
24 Harbin Power Engineering 750 LOI Issued
25 Tecna Corporation 785 LOI Issued
26 ACME 180 LOI Issued
27 Fatima Sugar Cogen 110 Sanawan LOI Issued
28 Shahpur Energy Ltd 150 Thar LOI Issued
29 Leading Group 200 LOI Issued
30 Rupali Group 250 LOI Issued
TOTAL 3510
FUTURE PROJECTs - PPIB Hydel
Project Location Capacity in MW Investment in US $ Million
New Bong Escape
Hydel ProjectNear Mangla, AJK 79 99
Rajdhani Hydro Power
ProjectMangla, AJK 132 165
Matiltan Hydro Power
ProjectDir, NWFP 84 105
Kotli Hydel Project Kotli, AJK 100 125
Gulpur Hydro Power
projectGulpur, AJK 101 126
Tarbela 4th Extension NWFP 960 500
Gabral-Kalam
Hydropower ProjectSwat, NWFP 100 125
FUTURE PROJECTs - PPIBPatrind Hydropower
ProjectNWFP/ AJK 130 163
Hari-Ghal Hydropower
ProjectAJK 53 66
Madyan Hydropower
ProjectNWFP 148 185
Sharmai Hydropower
ProjectNWFP 115 144
Suki KinariHydropower Project
NWFP 655 819
Munda Hydropower Project
NWFP 740 925
Mahl Hydropower Project
AJK 245 306
Karang Hydropower Project
NWFP 458 573
Karot Hydel Project AJK 240 300
Azad Patan HydelProject
AJK 222 278
FUTURE PROJECTs - PPIBAsrit-Kedam HydelProject
NWFP 209 261
Kalam-Asrit HydelProject
NWFP 197 246
Chakothi-HattianProject
AJK 139 174
Sehra Hydel Project AJK 65 81
Kaigah Hydel Project NWFP 548 685
Sub Total (Hydel) 5720 6450
FUTURE PROJECTs - PPIB Coal
S. No Project Location Capacity in MW
Investment in US $ Million
1Habibullah Energy Coal Project
Ghotki, Sindh 150 150
2 Dadabhoy Coal ProjectJherruk-Sonda,
Sindh200 200
3Lakhra Coal Project by Fateh Group
Lakhra, Sindh 200 200
4Imported Coal Based Project
Near Karachi 1000 1000
5 AES Thar Coal Project Thar, Sindh 1000 1000
Sub Total (Coal) 2550 2550
ELECTRICITY CONSUMPTION( NUMBER OF CONSUMERS (000) (WAPDA + KESC)
FUTURE PROJECTIONEXISTING STATISTICS
11-1210-1109-1008-0907-0806-0705-0604-0503-0402-03Years
25597241482278121491202751912717793167141584115003T.Gen Gwh
6.0%6.0%6.0%6.0%6.0%7.5 %6.5%5.5%5.5%Growth %
Table D-19 -Source *
CONSUMPTION PER CONSUMER - KWh
FUTURE PROJECTIONEXISTING STATISTICSr
11-1210-1109-1008-0907-0806-0705-0604-0503-0402-03Years
558752704972469144254,1753,9223,7153,6543,562T.Gen Gwh
6.0%6.0%6.0%6.0%6.0%7.0 %5.5%2.0 %2.5 %Growth %
Table D-19Source *
ELECTRICITY BALANCESUnit:
GWh
ACGR
2006-072005-062004-052003-042002-032001-02Source
6.3%982139362985629808277568272405Total Generation
4.3%362334633303304130072929Auxiliary Consumption
(137)(203)(70)42324Net purchase from PASMIC
1711461097300Imported
6.4%946239010982365778627269969500Net Supply
7.5%727126760361328574915265550622Consumption
3.0%219122250621037203712004318878T & D Losses
-3.1%23.2%25.0%25.5%26.2%27.6%27.2%(as % of Net Supply)
HYDROPOWER PROJECTSCapacity Project NameS.No
548 MWKaigh HPP1
197 MWKalam-Asrit HPP2
209 MWAsrit – Kedam HPP3
222 MWAzad Pattan HPP4
139 MWChakothihattian HPP5
65 MWSehra HPP6
240 MWKarrot HPP7
101 MWSwat HPP/
Gabral-Kalam HPP
8
60 MWGulpur HPP9
53 MWHarighal HPP10
115 MWSharmi HPP11
130 MWPatrind HPP12