power plant construction and qa/qc section 6 – nuclear plant systems
DESCRIPTION
Engineering Technology Division. Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems. Section 6 – Nuclear Plant Systems. Overview. Nuclear Power testing began in 1934 in Germany and 1942 in the US Nuclear Power Generation began in 1956 in England - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/1.jpg)
Power Plant Construction and QA/QC
Section 6 – Nuclear Plant Systems
Engineering Technology Engineering Technology DivisionDivision
![Page 2: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/2.jpg)
2
Section 6 – Nuclear Plant Systems
Overview
• Nuclear Power testing began in 1934 in Germany and 1942 in the US
• Nuclear Power Generation began in 1956 in England
• Nuclear Power generates about 20% of the electricity in the US
• Nuclear Power generates heat through fission of uranium and decay of fission products
• Nuclear renaissance has started
![Page 3: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/3.jpg)
3
Section 6 – Nuclear Plant Systems
Introduction – 6.1 - History
1933 – Chain Reaction realized by Leo Szilard
1942 - First artificial nuclear reactor, Chicago Pile 1, at the University of Chicago
![Page 4: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/4.jpg)
4
Section 6 – Nuclear Plant Systems
1943 - U.S. military developed nuclear reactors for the Manhattan Project
1951 - "World's first nuclear power plant" is EBR-1, Experimental Breeder Reactor
Introduction – 6.1 - History
![Page 5: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/5.jpg)
5
Section 6 – Nuclear Plant Systems
1953 – Eisenhower Atoms for Peace Speech to UN
1954 – First nuclear power plant built for civil purposes was the AM-1 in Soviet Union (graphite)
1955 – First nuclear powered vehicle, US Navy submarine, the USS Nautilus (PWR)
Introduction – 6.1 - History
![Page 6: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/6.jpg)
6
Section 6 – Nuclear Plant Systems
1956 - The first commercial nuclear power station, Calder Hall in Sellafield, England (50 MW)
1961 – SL-1 Accident, Idaho, PWR/BWR cross
1961 – Dresden Unit1, first privately owned commercial reactor (210 MW)
Introduction – 6.1 - History
![Page 7: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/7.jpg)
7
Section 6 – Nuclear Plant Systems
Introduction – 6.1 – History – US Plants
![Page 8: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/8.jpg)
8
Section 6 – Nuclear Plant Systems
Questions?
![Page 9: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/9.jpg)
9
Section 6 – Nuclear Plant Systems
Fission Theory – 6.2
1. Thermal Neutron generated from fission or decay2. Thermal Neutron absorbed by 92U235 or 93Pu239
3. Compound (or excited) 92U235 or 93Pu239
4. Atom splits creating two fragments – mass conversion to energy.5. Fast neutrons produced.6. Fast neutron has thermalized7. Thermal Neutron absorbed by 92U235 or 93Pu239
8. Fission fragment decays9 .First excited daughter decays10. Fast neutron produced11. Fast neutron absorbed by 92U238
1
2 3
65
4
10
9
8
7
10
11
Heat
Decay Heat
Decay Heat
Heat
![Page 10: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/10.jpg)
10
Section 6 – Nuclear Plant Systems
143 + 90 = 233
Fission Theory – 6.2
![Page 11: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/11.jpg)
11
Section 6 – Nuclear Plant Systems
Questions?
![Page 12: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/12.jpg)
12
Section 6 – Nuclear Plant Systems
Nuclear Steam Supply Systems – 6.3
NSSS – Main and Support systems needed to generate steam for turbine.
BWR
PWR
![Page 13: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/13.jpg)
13
Section 6 – Nuclear Plant Systems
Nuclear Steam Supply Systems – 6.3 – Reactor Types
• PWR – Light Water – Westinghouse, Framatome• PWR – Heavy Water – CANDU - Canada• BWR – Light Water – GE, Toshiba• RBMK – Light Water Graphite – Soviet Union (now
Russia)• GCR – Gas Cooled Reactor – England• LMFBR – Liquid Metal (Sodium) Breeder – United
States• LMFBR – Liquid Metal (Lead) Breeder – Soviet Union
(Russia)• MSRE – Molten Salt – United States• PBR – Pebble Bed – US Lead Design• Natural Reactor – Oklo mine in Gabon, West Africa• Fusion Reactor – The Sun
![Page 14: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/14.jpg)
14
Section 6 – Nuclear Plant Systems
Nuclear Steam Supply Systems – 6.3 – World Locations
![Page 15: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/15.jpg)
15
Section 6 – Nuclear Plant Systems
Nuclear Steam Supply Systems – 6.3
Questions?
![Page 16: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/16.jpg)
16
Section 6 – Nuclear Plant Systems
Nuclear Plant Operation, Maintenance and Control – 6.4
![Page 17: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/17.jpg)
17
Section 6 – Nuclear Plant Systems
ContaminationRadiationContamination and Radiation
Nuclear Plant Operation, Maintenance and Control – 6.4
![Page 18: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/18.jpg)
18
Section 6 – Nuclear Plant Systems
Nuclear Plant Operation, Maintenance and Control – 6.4
ContaminationRadiationContamination and Radiation
![Page 19: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/19.jpg)
19
Section 6 – Nuclear Plant Systems
Questions?
Nuclear Plant Operation, Maintenance and Control – 6.4
![Page 20: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/20.jpg)
20
Section 6 – Nuclear Plant Systems
Reactor Safety – 6.5 – Design Basis Accidents
A design basis accident (DBA) or maximum credible accident (MCA) is a postulated accident that a nuclear facility must be designed and built to withstand and not lose any systems, structures, and components necessary to assure public health and safety.
LOCA – Loss of Coolant Accident – BWR & PWRLOFA – Loss of Flow Accident – BWR & PWRLOPA – Loss of Pressure Accident – PWRSeismic Event – Earthquake – BWR & PWRContainment – Outside Penetration – BWR & PWR
![Page 21: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/21.jpg)
21
Section 6 – Nuclear Plant Systems
• Fuel cladding temperature must not exceed 2192 F• The local fuel cladding oxidation must not exceed
18% of the initial wall thickness• The mass of Zirconium converted into ZrO2 must
not exceed 1% of the total mass of cladding• The whole body dose to a member of the staff must
not exceed 5 REM per year• Critical organ (i.e., thyroid) dose to a member of the
staff must not exceed 30 REM
Reactor Safety – 6.5 – Design Basis Accidents - Criteria
![Page 22: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/22.jpg)
22
Section 6 – Nuclear Plant Systems
Reactor Safety – 6.5 – Design Basis Accidents - Systems
Reactor Protection Systems
• Control Rod.
• Safety Injection – Boric Acid, Standby Liquid Control – Potassium Pentaborate
Essential Service Water System
• Flooding – Large Volumes – up to 50,000 gpm
Emergency Core Cooling Systems
• High and Low Pressure – 3,000 to 30,000 gpm
Ventilation
• Control Room
• Containment
![Page 23: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/23.jpg)
23
Section 6 – Nuclear Plant Systems
Reactor Safety – 6.5 – Design Basis Accidents - Systems
Electrical Emergency Systems
• Diesel Generator
• Batteries
Containment Systems
• Reactor Vessel
• Primary Containment – Reactor Compartment, Drywell
• Secondary Containment – Reactor Building
Standby Gas Treatment
• Fission Products
• Hydrogen Gas
![Page 24: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/24.jpg)
24
Section 6 – Nuclear Plant Systems
Reactor Safety – 6.5 – Design Basis Accidents - Systems
![Page 25: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/25.jpg)
25
Section 6 – Nuclear Plant Systems
Reactor Safety – 6.5 – Design Basis Accidents - Systems
![Page 26: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/26.jpg)
26
Section 6 – Nuclear Plant Systems
Reactor Safety – 6.6 – Regulations
CFR – Code of Federal Regulations
![Page 27: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/27.jpg)
27
Section 6 – Nuclear Plant Systems
Reactor Safety – 6.6 – Regulations
CFR – Code of Federal Regulations, Title 10
![Page 28: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/28.jpg)
28
Section 6 – Nuclear Plant Systems
Reactor Safety – 6.6 – Regulations
CFR – Code of Federal Regulations, Title 10, Part ??
![Page 29: Power Plant Construction and QA/QC Section 6 – Nuclear Plant Systems](https://reader035.vdocuments.net/reader035/viewer/2022062301/56814c37550346895db93dec/html5/thumbnails/29.jpg)
29
Questions?