power plant of cnpcjpec
TRANSCRIPT
1
BRIEF INTRODUCTION FOR DIESEL/ NATURAL GAS POWER STATION
CHINA PETROLEUM TECHNOLOGY&DEVELOPMENT
CORPORATION CNPC JICHAI POWER EQUIPMENT COMPANY
OCTOBER, 2012
CPTDC CPTDC CNPC JPECCNPC JPEC
CPTDC & JPEC
2
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
PROGRAMME
2. BASIC CONSTRUCTING STRUCTURE FOR POWER
STATION
3. BASIC TECHNICAL DATAS FOR POWER STATION
4.TYPICAL PROGRAMMES
5.ECONOMIC ANALYSISCPTDC CPTDC CNPC JPECCNPC JPEC
CONTENT
190 series diesel generating sets —from 200kW to 2000kW
( applied as prime power/stand by power/emergency power )
190 series gas generating sets—from 100kW to 1500kW(natural gas, associated gas, biogas, mash gas )
260 series diesel generating sets——from 2000kW to 3500kW
( applied as prime power/stand by power/emergency power )
320 series diesel generating sets—from 4000kW to 9000kW
( applied as prime power/stand by power /emergency power )
320 series HFO generating sets—from 3000kW to 9000kW
( applied as prime power/stand by power /emergency power)
Jichai gensets should be adapted for 400V/3300V/6300V/10500V voltage class ; frequency is applicable for
both 50Hz and 60Hz
Organizational arrange of power station , which including design of power station, and its package, integration
supply service, installation ,operation and maintenance work
Distributed energy system, which including heat-power co generation; combined cooling, heat and power
Power supply :island mode, paralleled operation
BUSINESS SCOPEProducts & Service
4
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
BUSINESS
2.DETAILED DESCRIPTION FOR POWER STATION FROM ONE SYSTEM TO ANOTHER
3. BASIC TECHNICAL FEATURES FOR POWER STATION
4.TYPICAL PROGRAMME
5.ECONOMICAL ANALYSIS
CPTDC CPTDC CNPC JPECCNPC JPEC
CONTENT
POWER STATION PROJECTSYSTEMATICAL ORGANIZATION
Computational control systemFuel impute
(gas ,diesel oil)
Intellectual remote supervision
Fuel delivery and disposal
Cooling media compensation
Cooling system for power station
Electricity generating applicant
Waste heat utilization system
Power distribution
DIESEL FUEL FEEDING SYSTEM
POWER STATION PROJECT
Flow chart for diesel oil deliveryFuel storage tank
Fuel storage tank
Gas pre-treating system
POWER STATION PROJECT
Pipeline gas pre-disposal system: which mainly including pressure regulating system, pressure stabilization system, gas purification system, gas density detector and flame arrestor
CNG disposal system: which mainly composed of decompression pry, pressure stabilization system, gas purified system, gas density detector and flame arrestor
LNG disposal system: which mainly composed of gasify pry, pressure regulating system, pressure stabilization system, gas purified system, gas density detector and flame arrestorOil field associated gas (mash gas pre-disposal system) : which mainly composed of gas-hydro separating system, pressure stabilization, first stage filtration ,second stage filtration, measuring, pressure regulation and fire arrestor
Gas pre-disposal system
POWER STATION PROJECT
Biogas pre-disposal system: which mainly composed of de-sulfur system, root-blowers, drier ,biogas storage, flow gauge, fire arrestor and pipeline controlling valves etc.
Biogas source
Biogas storage
Fire source
desulfurizerRoots blower
dehydrator Flow gauge
Natural gas main pipeline
Dry-type flame arrestor
Natural gas purifier
No 1 biogas generating set
Natural gas purifier
No 2 biogas generating set
Dry-type flame arrestor
Natural gas purifier
No 3 biogas generating set
P
Dry-type flame arrestor
Diesel gensets as prime power
POWER STATION PROJECT
140 Series gensets140 Series gensets 190 Series gensets190 Series gensets
260 Series gensets260 Series gensets 320 series products, co-320 series products, co-operated with MAN operated with MAN diesel ,Germanydiesel ,Germany
Natural gas gensets as prime power
POWER STATION PROJECT
Series 190 natural gas Series 190 natural gas gensetsgensets
Gensets for Gensets for medium & small medium & small power power
320 series 320 series gensets, gensets, co-operated with co-operated with MAN GermanyMAN Germany
Cooling system
POWER STATION PROJECT
Cooling system for power station mainly composed with closed type circulation system and half-open type cooling circulation system
Half-open type cooling circulation systemHalf-open type cooling circulation system Half-open type cooling circulation system is applicable for the stationary power plant in tropical regions with abundant water resource , good cooling water quality. There adopts heat-exchanger on gensets, and the power station should also equipped with cooling water pump, cooling tower, cooling water basin and etc.
。
Flow chart of half-Flow chart of half-open type cooling open type cooling circulation systemcirculation system
Flow chart of half-Flow chart of half-open type cooling open type cooling circulation systemcirculation system
Merits for cooling towerMerits for cooling tower
Cost effectiveness, high cooling Cost effectiveness, high cooling efficiencyefficiencyAbundant water consumptionAbundant water consumptionWell adapted to bad cooling Well adapted to bad cooling water qualitywater qualityCustomer should buy water pump Customer should buy water pump extraordinary extraordinary Low electrical power Low electrical power consumptionconsumption
Fuel cooler Fuel cooler
Inter cooler Inter cooler
Oil
coole
r
natural gas
gensets
natural gas
gensets
Low
te
mp
era
ture
wate
r p
um
p
High temperature
cooling water outlet
High temperature
cooling water outlet
Hig
h co
olin
g
wate
r pu
mp
pressure regulating valve
pressure regulating valve
High temperature
cooling water inlet
High temperature
cooling water inlet
Cooling system
POWER STATION PROJECT
Cooling system for power station are mainly composed of closed circulation cooling system and half-open circulation cooling system
Closed circulation cooling system mainly composed with Closed circulation cooling system mainly composed with integrated close cooling system and split-body close cooling integrated close cooling system and split-body close cooling systemsystemGensets are applied with cooling fans and upgraded radiator or split-body type radiator. This kind of cooling mode is applicable for the site which lack of cooling water, poor cooling water quality and canopy type power generating project
Power distribution system
POWER STATION PROJECT
Basic structure : low voltage system(which including outgoing cabinet ,distribution cabinet),set-up transformer, high voltage system(outgoing switch, PT switch, comprehensive protecting system, direct current system, distribution cabinet for power station and etc, which could applied for multi distribution mode, such as island mode , parallel operation for two units or more.
Central monitoring system
POWER STATION PROJECT
Main composition: engine parameters collecting applicants , electric parameters
collecting applicants, impute harness for auxiliary system, visible supervision system,
Signal processing system ,PC system, background supervision system, type writer, UPS
power source, wireless signal transmission and etc. Central supervision system has the
remote control and communication functions between one power station to another, to
take notes automatically for station operating condition and also transmitted the
reaction to control room automatically.
Distributed energy system
POWER STATION PROJECT
power source
surplus heat taking away from high temperature cooling water
surplus heat taking away from low temperature cooling water
waste gas
other energy
surplus heat taking away from lubricating oil
Distributed energy system
POWER STATION PROJECT
Definition of distributed
energy system Compared with the traditional power
supply system, theory of distributed energy
system is based on the heat and electricity
co-generation; heat, electricity and coolant co-
generation , together to supply electricity
power in a small scale, these power sources of
distributes energy system was located in
industrial zones, community, schools,
hospitals, hotels and supermarkets, also
gensets quantity required is not in large
quantity (from1MW to 50MW) it supply heat
power and cooling in a modulated and
distributed way, these power source finally
transmitted to customer load.
Generally speaking, power sources for
distributed power system are environmental
friendly, clean energy is adopted; such as
natural gas, biogas , coal-bed gas and etc.
Distributed power system usually get
electricity from the local grid power, for new
project, it could also use an isolated D/C panel
as power source , also, it could get energy
from the power it generated it-self.
Natural gas Natural gas
Engine high temperature cooling water
Engine high temperature cooling water
Central air conditior Central air conditior
cooling media cooling media
thermal media thermal media
central controlling central controlling Natural gas Natural gas engine tail gas engine tail gas
Distributed energy system
POWER STATION PROJECT
Natural gas Natural gas
Natural gas gensetsNatural gas gensets
Exhaust tail gas
Exhaust tail gas
central air-conditioningcentral air-conditioning
cold water :seven degrees: thermal efficiency 66%
cold water :seven degrees: thermal efficiency 66%
hot water: sixty-five degrees: thermal efficiency 46%
hot water: sixty-five degrees: thermal efficiency 46%
Jacket water temperature 98 ℃Jacket water temperature 98 ℃
Smoke water is compensation for air-conditioningSmoke water is compensation for air-conditioning
Electricity 38% thermal efficiencyElectricity 38% thermal efficiency
Gensets total installed capacity is 1.2MW, which could satisfy 7000square meters cooling areas , thermal areas totally 15000 ㎡
Gensets total installed capacity is 1.2MW, which could satisfy 7000square meters cooling areas , thermal areas totally 15000 ㎡
Auxiliary system
POWER STATION PROJECT
Ventilation system : axial flow fan, supervising system(which linked with fire controlling
system )
Fire controlling system : flammable gas detecting, smoke alarming applicant, powder fire
extinguisher, emergency lighting system
Sound-proof system : gas intake muffler , gas exhaust muffler, exhaust tail gas muffler, sound-
proof canopy
Light protest earthling : lighting conductor(lighting tower) , earthling equipments, etc
And so on……
louvercanopy
Waste heat utilization equipment Axial flow fan
Waste heat utilization bench
Gas inlet pipeline
Anchor bolt
19CPTDC CPTDC CNPC JPECCNPC JPEC
CONTENT
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
PROGRAMME
2. BASIC CONSTRUCTING STRUCTURE FOR POWER
STATION
3. BASIC TECHNICAL DATAS FOR POWER STATION
4.TYPICAL PROGRAMMES
5.ECONOMIC ANALYSIS
20CPTDC CPTDC CNPC JPECCNPC JPEC
TECHNOLOGY INQUIRE CHART
BASIC PARAMETERS
21CPTDC CPTDC CNPC JPECCNPC JPEC
TECHNOLOGY INQUIRE CHART
BASIC PARAMETERS
22CPTDC CPTDC CNPC JPECCNPC JPEC
CONTENT
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
PROGRAMME
2. BASIC CONSTRUCTING STRUCTURE FOR POWER
STATION
3. BASIC TECHNICAL DATAS FOR POWER STATION
4.TYPICAL PROGRAMMES
5.ECONOMIC ANALYSIS
23CPTDC CPTDC CNPC JPECCNPC JPEC
REMARKABLE PROGRAMMECNOOC CB/AB offshore drilling plant form associated
gas power stationThis is the first unit of gas power generating system applied to the offshore platform, and have passed CCS international certificate
24CPTDC CPTDC CNPC JPECCNPC JPEC
REMARKABLE PROGRAMMENanjing land filled gas
generating programmed5×1000kW/10.5kV
25CPTDC CPTDC CNPC JPECCNPC JPEC
REMARKABLE PROGRAMMELuAn coal mine power station
system of ShanXi province, China6×1100kW/10.5kV
26CPTDC CPTDC CNPC JPECCNPC JPEC
REMARKABLE PROGRAMME
2×1000kW/10.5kVthermal heat co-generating system
Chenming biogas OEM power station system of ShanDong
province, China
27
1.BRIEF INTRODUCTION OF JICHAI POWER STATION
BUSINESS
2.DETAILED DESCRIPTION FOR POWER STATION FROM ONE SYSTEM TO ANOTHER
3. BASIC TECHNICAL FEATURES FOR POWER STATION
4.TYPICAL PROGRAMME
5.ECONOMICAL ANALYSIS
CPTDC CPTDC CNPC JPECCNPC JPEC
CONTENT
28CPTDC CPTDC CNPC JPECCNPC JPEC
CONTENT
Fuel cost
Lubricating oil cost
Spareparts cost
Maintenance cost
Labor cost
Power generating margin + Heat supply
margin + cooling supply margin +
environmental protecting margin
If we disregard the fuel cost, operating
consumption is about 0.10 Yuan to 0.15
Yuan per kW.h ; generally speaking, period
for investment recovery should be ten to
fifteen months.
29CPTDC CPTDC CNPC JPECCNPC JPEC
CNPC POWER EQUIPMENT