Page 1: Power Quality Site Survey Presentation
Page 2: Power Quality Site Survey Presentation

• Area Served:

State of Zulia

• Installed Capacity:

1.512 MW

• Maximum Demand:

2.159 MW

• Consumers or Customers:

577.100

• Workers:

2.147

Page 3: Power Quality Site Survey Presentation

� To define the power quality processes: Claims Attention,

Supervising and Quality Certification.

� To analyze the power quality processes for an electricity

regulated market, through a work methodology which

comprises 202 study cases, based on power quality

processes.

Page 4: Power Quality Site Survey Presentation
Page 5: Power Quality Site Survey Presentation
Page 6: Power Quality Site Survey Presentation

N = 202

Page 7: Power Quality Site Survey Presentation

Regulated

Market

• Transients, Sags and Swell.

• Voltage Level.

• Voltage Imbalance.

• Current Imbalance.

• DC Offset.

• Voltage Harmonics.

• Current Harmonics.

• Interharmonics.

• Flicker.

• Power Frequency Variation.

• Power Factor.

Electric Utility

Government

RegulationCustomer

Page 8: Power Quality Site Survey Presentation

CustomerElectric

Utility

Government

RegulationElectric

Utility

Electric

Utility Customer

Claim Attention

Supervising

Certification

Page 9: Power Quality Site Survey Presentation
Page 10: Power Quality Site Survey Presentation

� User requests the attention.

� The cause of the claim must be determined.

� This process provides a direct signal of the existence of a problem in the network or in the user installation.

Page 11: Power Quality Site Survey Presentation

� The regulating entity requests it through an aleatory sample.

� Only level of tension, tension harmonics and flicker is required.

� The quality of the technical product provided must be validated.

Page 12: Power Quality Site Survey Presentation

� The user requests it or is carried out by the initiative of the distribution company - utility.

� The quality of the technical product provided must be confirmed.

Page 13: Power Quality Site Survey Presentation

� What type of equipment is experimenting problems?

� Is it a sensitive charge?

� The equipment presents problems ever since it was installed?

� Does the installation have high power motors installed to it?

� When does it occur? (time, day)

� Are they recurrent?

� Changes on the grounding system have been performed lately ?

� ¿Falls on the luminosity of incandescent bulbs have been observed?

Page 14: Power Quality Site Survey Presentation

� Presence of electric storms.

� Presence of forest zones.

� Small animals.

� Thirds.

� Commuter condenser banks.

� Neighbor charges with high power motors.

� Conductor in bad shape.

� Non adequate caliber.

Page 15: Power Quality Site Survey Presentation

� Visual Inspection of connections.

� “TAP” Position.

� Type of connection.

� Tx Capacity and type.

� Impedance (Z).

� Temperature.

� Existence of vibrations.

� Detection of humming.

� Revision of design (As per CEN).

� Visual Inspection of the connections and electrodes to find any evidence of corrosion.

� Measurement of the grounding impedance.

� Visual Inspection of phase condenser connections.

� Verification of the presence of ground conductors and neutral.

� Verification of phase rotation.

� Revision of conduit gauging (As per CEN).

� Detection of humming.

� Determine the presence of burnt smell.

� Temperature.

Page 16: Power Quality Site Survey Presentation

� Energy Delivery of Sales Point.

� Distribution Circuit.

� Distribution Transformer.

� Equipment presenting failures.

� Direct.

� Indirect.

� During a week or until the perturbance causing the problem is found.

Page 17: Power Quality Site Survey Presentation
Page 18: Power Quality Site Survey Presentation
Page 19: Power Quality Site Survey Presentation

N = 202

Page 20: Power Quality Site Survey Presentation

N = 202

Page 21: Power Quality Site Survey Presentation

N = 202

Page 22: Power Quality Site Survey Presentation

N = 202

Page 23: Power Quality Site Survey Presentation

N = 121

Page 24: Power Quality Site Survey Presentation

� Power quality studies have allowed establishing a more effectivecommunication between the customers and the company.

� The methodology used allowed presenting the user the root of theproblem as well as possible solutions to it.

� Working on claims through quality power may provide the opportunity of getting closer to the condition of quality of a technical product in distribution networks.

Page 25: Power Quality Site Survey Presentation

� The studies carried out provide and approximation of the level of quality of the technical product provided to the users before carrying out controls through measurement campaigns.

� Knowledge of the areas as well as the types of charges, where there are existing problems, allows addressing the resources to areas where there are not as many claims, thus optimizing the control process.

� Power Quality Engineers have developed an important role since he/she is responsible of watching after the quality of the product sold to the users.

Page 26: Power Quality Site Survey Presentation