power through partnership

17
betterbuildingspartnership.com.au ©Better Buildings Partnership all rights reserved. 0 14 April 2018 Power through Partnership Committed to 80% resource recovery for office refurbishment waste Prepared for BBP 14 April 2018 Esther Bailey Better Buildings Partnership (BBP) City of Sydney

Upload: others

Post on 18-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved. 014 April 2018

Power through PartnershipCommitted to 80% resource recovery for office refurbishment waste

Prepared for BBP 14 April 2018

Esther BaileyBetter Buildings Partnership (BBP)

City of Sydney

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

It takes a team to shift a 55,000 tonne waste problem

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

engaging industry and government

scaling sustainability

benchmarking progress

transforming markets

BETTER BUILDINGS PARTNERSHIPUsing collective impact to drive change toward Sydney 2030

2

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

BETTER BUILDINGS PARTNERSHIP11 commercial | 3 education | 3 industry | 5 property | 2 government

3

institutions bodies managers entitieslandlords

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

INCLUSIVE PROCESS -

PRACTICAL OUTCOMES

✓1. Problem identification

2. Gap analysis

3. Defining Best Practice

4. Iterative co-creation

5. Implementing Best Practice

6. Benchmark progress

7. Transition to standard practice

4

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

Refurbishment waste

can be 4x greater than

operational waste over

a buildings lifetime

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

Resource Recovery Targets

BBPStandard

60%

Industry Standard

20%

International current

80%

BBP Target

80%

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

At GMT, 61% recycling was achieved at

no additional program cost

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

• Guidelines

• Procurement clauses

• Waste Management Plan

• Roles and responsibilities

• Facility Directory

• Reporting Tools

BBP STRIPOUT WASTE GUIDELINES

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

10 STEPS TO BEST PRACTICE

6

2

1

7

8

9

5

4

3

10

Prepare for Strip Out

Ensure demolition contractors are

briefed / resourced for stream

separation and careful disassembly

Remove items by stream and store or

dispose of separately

Conduct regular compliance and

contamination checks and report

Ensure use of pre-used items in refit

Set a 60% to 80% target diversion

rate

Agree the conditions of the

make good settlement early

Create an inventory and code by

recovery pathway

Review contamination thresholds

of resource receivers

Arrange site access / material

removal by third parties

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

Waste Management Report

REPORTING

Material

Reuse / Recycling / Recovery Disposal at LandfillTotal by

Material

(t)

Recovery

by Material

(%)

Reuse / Resale Recycling Energy RecoveryActual (t) Facility Name

Actual (t) Sub-category Actual (t) Facility Name Actual (t) Facility Name

Hard FIll (inc. concrete, tiles etc.) 0

Timber Products 0 0 0 0 0

Plasterboard 0

Glass (inc. laminated) 0

Ceiling Tiles 0 0 0 0 0

Metals 0

Carpet 0 0 0 0 0

Furniture 0 0 0 0 0

Plastics 0

E-waste 0

Hazardous Waste (e.g. Asbestos) 0

Total by Disposal Pathway (t) 0 0 0 0

Recovery by Disposal Pathway (%)

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

DEXUS Property Group trialled new processes for stripout works in a large commercial office tenancy removal in Governor Macquarie Tower (GMT).

The trial resulted in a diversion of over 60% of the material from landfill.

GMT Case Study

EVIDENCE FOR CHANGE

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

• Over 15 refurbishments supported

• 60% average recovery rate

• 8,000 tonnes of materials recovered

• 100 tonnes of furniture distributed to community groups

Demonstrating Success

SUCCESS SO FAR

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

For best impacts, get upstream on the process

KEY PRINCIPLES

Make Good SettlementAgree the conditions and timeline of the Make Good settlement 6~9 months prior to lease end

Release InventoryAs early as possible, preferrably 3~6 months before stripout works

Prepare for and Set targets in Strip Out ContractsSet a 60% and beyond resource recovery target to Builder/Demolisher (subject to composition of materials in tenancy)

Demand consistent reporting during Strip out works-Waste Management Report-Close out Report Template

Tenant

Lease

End

Tenancy Period Contracts for Return to Showroom Period

Demolisher

Strip Out

Builder

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

• New viable product line made from the furniture waste

• Identified new furniture recovery partners

• New market intermediaries

• Procuring with the end in mind

New Market Opportunities

SUCCESS SO FAR

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

• Updated guidelines

• Launch event – 12 June

• Industry directory

• Circular economy manufacturers forum

• Technology platform / inventory connector

Get involved. Amplify the Impact

WHAT’S NEXT?

betterbuildingspartnership.com.au©Better Buildings Partnership – all rights reserved.

Prepared by:Waste Technical Working Group

© Better Buildings Partnership

The material in this publication is made available by

the Better Buildings Partnership as an information

guide only.

For more information, visit

betterbuildingspartnership.com.au