Michael Specht, Ulrich Zuberbühler ZSW – Center for Solar Energy and Hydrogen Research, Stuttgart in Co-operation with Umweltbundesamt - International Conference: Elements of a Greenhouse Gas Neutral Society Berlin, 10.10.2013 Power-to-Gas (P2G ® ): Technology and System Operation Results formerly known as

Upload: others

Post on 18-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Michael Specht, Ulrich Zuberbühler

ZSW –

Center for Solar Energy and Hydrogen Research, Stuttgart

in Co-operation with

Umweltbundesamt - International Conference: Elements of a Greenhouse Gas Neutral SocietyBerlin, 10.10.2013

Power-to-Gas (P2G®): Technology and System Operation Results

formerly known as

Page 2: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Agenda: Power-to-Gas (P2G®) - Technology and System Operation Results

GoalPrinciple of P2G®-ProcessLayout / Construction / Experimental Results / Development Status

25kWel -, 250kWel -, 6000kWel -PlantFacts / Frame Conditions (CO2 Resources, Economics)Conclusion

Page 3: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas (P2G®): Key Thesis

Chemical energy carriers are needed for future energy supply in electricity, heat, mobility, and long term energy storage market!

There is no alternative to (electricity-based) chemical energy carriers (eFuels)!

Page 4: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas (P2G®): Main Goals

Equalization of fluctuating supply of renewable energy

Energy storage > 1 week / seasonal storage

Fuel for sustainable mobility (“Energiewende” in mobility sector)

Convergence of electricity grid, gas grid and mobility sector

Reduction of agricultural area for energy plants

Page 5: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Energy Consumption and Storage Capacity in Germany (2012)

Electricity Natural gas Liquid fuels1)

Consumption [TWh/a] 595 909 711

Average power [GW] 70 1002) 80

Storage capacity [TWh] 0.043) 2174) 2505)

Calculated operating range of installed storage capacity6) [h] 0,6 2000 3000

1) Petrol, diesel, kerosene; final energy consumption2) Seasonally fluctuating3) Pumped hydro storage4) 48 underground gas storage facilities [Landesamt

für

Bergbau, Energie

und Geologie

(LBEG), Hannover]5) Provisioning of petrol, diesel, kerosene and heating oil6) Related to average power

Installed PV power 32.6 GW / installed wind power 31.2 GW

Required storage capacity for electricity grid in DE: tens of TWh !Required fuel demand for mobility: hundreds of TWh/a !

Page 6: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Agenda: Power-to-Gas (P2G®) - Technology and System Operation Results

Goal Principle of P2G®-ProcessLayout / Construction / Experimental Results / Development Status

25kWel -, 250kWel -, 6000kWel -PlantFacts / Frame Conditions (CO2 Resources, Economics)Conclusion

Page 7: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Principle of P2G®: Coupling of Electrolysis, CO2 -Source, Methanisation, and Gas Feed-in

AnaerobicDigester

Plant

Concept 2007

Page 8: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

(Digestive) Biomass SNG: State-of-the-Art – Technology / CO2 Source for P2G®

AnaerobicDigester

Plant

Gas Cleaning /Conditioning

Bio-Gas

50 - 70 vol.-%CH4

DigestiveBiomass

Compost

SNG

Separation of• CO2

• H2O• Impurities

(to Grid orFilling

Station)

SNG: Substitute Natural Gas

Page 9: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Principle of P2G®: Coupling of Electrolysis, CO2 -Source, Methanisation, and Gas Feed-in

Page 10: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Principle of P2G®: Coupling of Electrolysis, CO2 -Source, Methanisation, and Gas Feed-in

Page 11: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Principle of P2G®: Coupling of Electrolysis, CO2 -Source, Methanisation, and Gas Feed-in

Page 12: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Principle of P2G®: Coupling of Electrolysis, CO2 -Source, Methanisation, and Gas Feed-in

Page 13: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power plant / Combined

heat

& power

CO2

buffer

Electricity grid

Gas distribution system

Electrolysis

/

H2

bufferMethanation

H2

CO2

CH4

POWER GENERATION

ELECTRICITY STORAGE

CO2

Gas storage

H2

CO2

Electricity H2 SNG Mobility

Fuel Cell Vehicle

CNG Vehicle

Battery Electric Vehicle

Solar

Wind

Concept of Power-to-Gas (P2G®): Convergence of Electricity Grid, Gas Grid and Mobility Sector

Page 14: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas (P2G®) Core Process: Hydrogen Generation by Alkaline Electrolysis

Cathode:

Anode:

−+ e4OH4 2−+ OH4H2 2

−OH4 −++ e4OH2O 22

22 OH2 +2 H2

O

Example:AlkalineElectrolysis

Page 15: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas (P2G®) Core Process: Methanisation of COx

Methanisation:

3 H2

+ CO CH4

+ H2

O ΔHR0

= -206,4 kJ/mol

4 H2 + CO2 CH4

+ 2 H2

O ΔHR0

= -164,9 kJ/mol

Shift- Reaction:

H2

O + CO H2

+ CO2

ΔHR0

= -41,5 kJ/mol

Catalyst SNG (Substitute

Natural Gas) Educt

gas

Page 16: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Agenda: Power-to-Gas (P2G®) - Technology and System Operation Results

Goal Principle of P2G®-ProcessLayout / Construction / Experimental Results / Development Status

25kWel -, 250kWel -, 6000kWel -PlantFacts / Frame Conditions (CO2 Resources, Economics)Conclusion

Page 17: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas (P2G®)

25 kWe

plant

Page 18: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas - Technology: Principle Process Flow Sheet of 25kWel -P2G®-Plant

Page 19: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

25kWel -P2G®-Plant: Technical Realisation for SolarFuel Company in 2009

CH4

-Filling stationca. 15 kg, 200 bar

Electrolyser

CO2

-Recovery

Page 20: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

25kWel -P2G® - Container: Operation with CO2 and at Biogas Plants with Biogas and PSA Off-Gas

Werlte

Stuttgart

2009

2011

Morbach

Beta-Plant

Source:

ETOGAS (formerly known as SolarFuel)

2011

2012

Source: IWES/Mahler

Bad Hersfeld

Page 21: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

25kWel -P2G® – Container (25 kWe ): Operation with Off-Gas at Werlte Biogas Plant

0

10

20

30

40

50

60

70

80

90

100

00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00

Dauer [hh:mm]

y_C

H4 [

Vol-%

]

0

10

20

30

40

50

60

70

80

90

100

y_C

O2,

y_H

2, y_

O2 [

Vol-%

]

CH4 H2 CO2 O2

Gasanalysis: Source

EWE AG

Measurement

ofGas Composition:Source

ZSW

Page 22: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas (P2G®)

250 kWe

plant

Page 23: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Goals of the Ongoing 250kWel -P2G®-Project (1)

Further development of P2G® technology

Process optimisation(efficiency, dynamics, ….)

Scalability of methanisation reactor

Transfer of operating data: 250 kW 6 MW

Transition to commercialization

Start of operation: end of 2012

Co-operation partners of ZSW:

Electrolysis Stacks for 250 kWe System

Page 24: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Installation of 250kWel -P2G®-Plant at Gas Storage Area in Stuttgart-Vaihingen

ZSWP2G®

PlantFacilityMethanisationElectrolysis

Inauguration:30.10.2012

Page 25: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

250kWel -P2G®: Plant Design

Page 26: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

250kWel -P2G®: Plant Construction

Public Fund:

Page 27: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

250kWel -P2G®: Plant Completion

Public Fund:

Page 28: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas (P2G®)

250 kWe

plant:results

Page 29: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Experimental Methanisation Results with 250 kWe Plant: Gas Composition with and without Gas Upgrade

Results: Tube Bundle Reactor + Gas Upgrade via Membrane Technology

Without Gas Upgrade With Gas Upgrade

Reaction

Parameters:SV = 1365 1/hpMethanation

= 6 barg

Reaction

Parameters:SV = 1365 1/hpMethanation

= 4 barg∆pMembran

Unit = 4 bar

Page 30: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Experimental Methanisation Results: Gas Composition at Stand-by/Start-up & Load Change

0

10

20

30

40

50

60

70

80

90

100

00:00 01:00 02:00 03:00 04:00

Dauer [hh:mm]

y_C

H 4, y

_H2, y

_CO

2 [Vo

l-%]

Eduk

tvol

umen

stro

m

y_CH4 y_H2 y_CO2 H2-Strom CO2-Strom

100% H2

70% H2

100% CO270% CO2

0% CO2/H2

Page 31: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Power-to-Gas (P2G®)

6000 kWe

plant

Page 32: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

ETOGAS Layout of 6000kWel -P2G® - Plant in Werlte (Audi e-gas Project)

Electrolysis Methanisation

Page 33: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

ETOGAS Layout of 6000kWel -P2G® - Plant in Werlte (Audi e-gas Project)

Source: www.audi-mediaservices.com

Page 34: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

6000kWel -P2G® - Plant in Werlte (Audi e-gas Project): Inauguration: 25.06.2013

Page 35: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Sustainable Mobility: 6000kWel -P2G® - Plant in Werlte for Fueling Audi Vehicles with e-gas

e-gas-Projectsustainable mobility with renewable

electricity-based CH4 (e-gas)

Page 36: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Agenda: Power-to-Gas (P2G®) - Technology and System Operation Results

Goal Principle of P2G®-ProcessLayout / Construction / Experimental Results / Development Status

25kWel -, 250kWel -, 6000kWel -PlantFacts / Frame Conditions (CO2 Resources, Economics)Conclusion

Page 37: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Biogenic Carbon Resources for P2G®

Is enough biogenic carbonfor P2G®

available?

Page 38: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Biogenic CO2 (CO) Resources: via Anaerobic Digestion, Ethanol Production, Gasification

C6 H12 O6 3 CH4 + 3 CO2

C6 H12 O6 2 C2 H5OH + 2 CO2

Anaerobic Digestion:

Ethanol Production:

Biomass H2, CO, CO2

Thermo-chemical Gasification:

Page 39: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

CO2 / Carbon Potential in Germany for the Production of C-based Fuels

Carbon Resource CO2 C SNG Production Potential

[t/a] [t/a ] [TWhgas /a] Biogas Plants

CH4 Gas Share 7.3 * 106 2.0 * 106 39CO2 Gas Share 5.1 * 106 1.4 * 106 27

Energetic Biomass Utilisation

in DE today (without Biogas) 73 * 106 20 * 106 385

Non-renewable Trash 25 * 106 6.8 * 106 130Cement / Limestone Production 17 * 106 4.8 * 106 92CCPP/CCU 1) (or SOFC/CCU) 27 * 106 7.3 * 106 135Fossile

Power Plants 309 * 106 84 * 106 1618

CO2

from Air unlimited

SNG: Substitute Natural Gas1)

Direct CO2

recycling:CCPP/CCU: Combined Cycle Power Plant / Carbon Capture and Utilisation25 GW, 3000 h/a, η

= 50 %, CO2

retention: 90 %

Page 40: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

P2G® - Economics

What are the costsof e-gas?

Page 41: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Cost Estimate of e-gas (Capital and Energy Costs only): Electricity to Gas - Path

Assumptions•

Estimated life: 20 years•

Interest

rate: 6% p.a.•

No other operating cost, no cost for methan

feed-in etc.

Methan-Path (Status 2020)•

Investment: 1.000 €/kWel•

Efficiency factor electricity to gas: 60%

Hydrogen-Path (Status 2020)•

Investment: 600 €/kWel•

Efficiency factor electricity to gas: 75%

Without reduction of the end consumer fee for electricityan economic operation of a P2G plant is not possible!

0

5

10

15

20

25

30

0 1000 2000 3000 4000 5000 6000 7000 8000

Full utilisation hours per Year

Gas

cos

t [c

t/k

Electricity costs: 5 ct/kWh

Electricity costs: 5 ct/kWh

End consumer fee for electricity: 9 ct/kWh

Biomethane from biogas

Natural Gas

Proceeds of 4-fold counting

Gas

cos

ts[c

t/kW

h]

Load hours per year

0

5

10

15

20

25

30

0 1000 2000 3000 4000 5000 6000 7000 8000

Full utilisation hours per Year

Gas

cos

t [c

t/k

Electricity costs: 5 ct/kWh

Electricity costs: 5 ct/kWh

End consumer fee for electricity: 9 ct/kWh

Biomethane from biogas

Natural Gas

Proceeds of 4-fold counting

Gas

cos

ts[c

t/kW

h]

Load hours per year

Page 42: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Agenda: Power-to-Gas (P2G®) - Technology and System Operation Results

Goal Principle of P2G®-ProcessLayout / Construction / Experimental Results / Development Status

25kWel -, 250kWel -, 6000kWel -PlantFacts / Frame Conditions (CO2 Resources, Economics)Conclusion

Page 43: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Options for Long Term (Seasonal) Energy Storage: Chemical Energy Carriers

Hydrogen

Substitute Natural Gas (SNG)

Liquid Hydrocarbons

Chemical energy carriers are needed for future energy supplyin electricity, heat and mobility market!No alternative for long term energy storage!

Page 44: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

Conclusion: Advantages of P2G® - Technology

Inspired by nature: “P2G® = artificial photosynthesis”

SNG is an ideal chemical storage medium for renewable energy (RE)

Storage of RE with “unlimited” storage capacity in the gas grid

Utilisation of existing underground gas storage facilities

Stabilization of electricity grid (positive and negative control power)

Merging of the energy sectors “electricity grid”, “gas grid”, and “mobility”

Page 45: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

P2G®-ROADMAP

2007:P2G®-Concept

2009: 25kWe P2G®

Demonstration

2012: 250kWe P2G®

Qualification

2013: 6MWe P2G®

(AUDI / ETOGAS)Inauguration: 25.06.2013

2015:commercial P2G®-Plants

Page 46: Power-to-Gas (P2G ): Technology and System Operation Results · Operation with Off-Gas at Werlte Biogas Plant. 0 10 20 30 40 50 60 70 80 90 100 00:00 01:00 02:00 03:00 04:00 05:00

2007:P2G®-Concept

2009: 25kWe P2G®

Demonstration

2012: 250kWe P2G®

Qualification

2013: 6MWe P2G®

(AUDI / ETOGAS)Inauguration: 25.06.2013

2015:commercial P2G®-Plants