powergrid ongoing projects

86
POWERGRID CEA-TL 1 of 86 1 2047 7075.33 556.00 54421.1 548 148 228 398 320 154 156 6 16 73 2 2152 2360.95 53.40 1983.7 378 198 250 114 337 334 398 41 31 23 48 वववव 2012-13 वव ववव ववववववववववव वववववववववव ON-GOING PROJECTS FOR THE YEAR 2012-13 ववव -1 : वववववव वववववव PART - I :TRANSMISSION LINES वववव ववव Sl. No. वववववव वववव वव ववव Name of the Trans line ववववव (ववववव ) Length (CKM) वव.व./ वव.ववववव वववव GoI / BoD Appl. वववव (ववववववव व)/ववववव ववववव Cost (Appd.)/ Ant. वववव Expen. ववववव वववव Cumml Exp. वववव वववव वव ववव ववव. B.E. (12-13) ववव वव वववववववव वववव(ववव.'1 2) upto month वववव ववववववववव वववववववववव INTER REGIONAL SYSTEMS 765 वववव वववववव वववववव वव ववव वववव ववववव वव वववववव ववव ववववव वववव ववववववववव ववव वव वववववव ववववववव ववव वववववव वववव.वव वववव ववववव. व ववववव. वववववव वववव Common Scheme for 765KV Pooling Station and Network Associated with DVC & Maithon RB Project etc and Inport by NR & WR via ER वव.'08 Aug'08 400कककक क/क ककककक-ककक कककक (कककक) 400KV D/C Maithon-Gaya line (Q) 765कककक कक/क ककक-ककककककक कककक 765KV S/C Gaya - Sasaram line 765कककक कक/क ककक-ककककक कककक 765KV S/C Gaya - Balia line 765कककक कक/क ककककक- क.कककक. कककककक कककककक 765KV S/C Ranchi - WR Pooling Station 765कककक कक/क ककककक-कककक कककक 765KV S/C Balia - Lucknow line 400कककक क/क ककककक (कक)- ककककक कककक -1 (ककककक) 400KV D/C Ranchi (New) -Ranchi line -I (Quad) 400कककक क/क ककककक (कक)- ककककक कककक -2 (ककककक) 400KV D/C Ranchi (New) -Ranchi line - II (Quad) 400कककक क/क कककक (कक)-कककक कककक -2 (ककककक) 400KV D/C Lucknow (New) - Lucknow line - II (Quad) कककक ककक 400 कककक क/क ककक-ककककक कक कककक LILO of 400KV D/C Barh - Balia at Patna कककक LILO of both Ckt of Allahabad - Mainpuri at वववववव वव ववववव वववव वववव ववववववववव वव वववववव वववव वववववव ववववववव Supplementary Transmission System Associated with DVC & Maithon Right Bank Proejct वव.'08 Aug'08 400कककक क/क ककककक कक.कक-ककककक (कककक) कककक 400KV D/C Maithon RB - Ranchi (PG) line 400कककक क/क कककककक कककककक ककककककक- कककककक कककककक कककक 400KV D/C Bokara TPS Extn.- Koderma TPS line 400कककक क/क कककककक-ककक कककक (ककककक) 400KV D/C Koderma - Gaya line (Quad) 400कककक क/क कककककक-ककककक कककक 400KV D/C Mejia - Maithon line 765कककक कक/क ककककककक-ककककककक कककक-1 765KV S/C Sasaram - Fatehapur line-I 765कककक कक/क ककककककक-कककक कककक 765KV S/C Fatehpur - Agra line 400कककक क/क ककककककककक-ककककककक कककक (ककककक) 400KV D/C Biharshariff - Sasaram line (Quad) कककक LILO of 400KV S/C Singrauli - Kanpur line at कककक LILO of 400KV S/C Allahabad - Kanpur line at ककककककक ककक 220 कककक क/क ककककककक (कककककककककक)- कककककक (कककककककककक) कककक कक कककक LILO of 220KV D/C Fatehpur (UPPCL) - Kanpur (UPPCL) line at Fatehpur ककक ककक 220 कककक क/क ककककक-कककककक कककक कक कककक LILO of 220KV D/C Dehri - Bodhgaya line at Gaya

Upload: surya-narayan-nayak

Post on 29-Oct-2014

96 views

Category:

Documents


6 download

DESCRIPTION

PowerGrid Ongoing Projects

TRANSCRIPT

-1 : PART - I :TRANSMISSION LINES Sl. No. Trans line Name of the

2012-13 ON-GOING PROJECTS FOR THE YEAR 2012-13 ../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. Expen. . B.E. (12-13) Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12)

1

2

765 . . . Common Scheme for 765KV Pooling Station and Network Associated with DVC & Maithon RB Project etc and Inport by NR & WR via ER 400 / - () 400KV D/C Maithon-Gaya line (Q) 765 / - 765KV S/C Gaya - Sasaram line 765 / - 765KV S/C Gaya - Balia line 765 / - .. 765KV S/C Ranchi - WR Pooling Station 765 / - 765KV S/C Balia - Lucknow line 400 / ()- -1 () 400KV D/C Ranchi (New) -Ranchi line -I (Quad) 400 / ()- -2 () 400KV D/C Ranchi (New) -Ranchi line - II (Quad) 400 / ()- -2 () 400KV D/C Lucknow (New) - Lucknow line - II (Quad) 400 / - LILO of 400KV D/C Barh - Balia at Patna - LILO of both Ckt of Allahabad - Mainpuri at Fatehpur Supplementary Transmission System Associated with DVC & Maithon Right Bank Proejct 400 / .- () 400KV D/C Maithon RB - Ranchi (PG) line 400 / - 400KV D/C Bokara TPS Extn.- Koderma TPS line 400 / - () 400KV D/C Koderma - Gaya line (Quad) 400 / - 400KV D/C Mejia - Maithon line 765 / - -1 765KV S/C Sasaram - Fatehapur line-I 765 / - 765KV S/C Fatehpur - Agra line 400 / - () 400KV D/C Biharshariff - Sasaram line (Quad) 400 / - LILO of 400KV S/C Singrauli - Kanpur line at Fatehpur 400 / - LILO of 400KV S/C Allahabad - Kanpur line at Fatehpur 220 / ()- () LILO of 220KV D/C Fatehpur (UPPCL) - Kanpur (UPPCL) line at Fatehpur 220 / - LILO of 220KV D/C Dehri - Bodhgaya line at Gaya

INTER REGIONAL SYSTEMS

2047

.'08 Aug'08

7075.33

556.00

54421.1

'13 Mar'13 '13 Mar'13 '12 Mar'12 .'12 Feb'12 '13 Mar'13 .'12 Feb'12 '13 Mar'13 '13 Mar'13 .'12 Feb'12 '12 Jun'12 '12 Jun'12

548 148 228 398 320 154 156 6 16 73 2152 .'08 Aug'08 2360.95 53.40 1983.7

'13 Mar'13 .'11 Dec'11 '13 Mar'13* '13 Mar'13 .'11 Nov'11 '12 May'12 '12 Jun'12 .'12 Feb'12 .'12 Jan'12 .'11 Dec'11 .'11 Dec'11 '12 Mar'12

378 198 250 114 337 334 398 41 31

23

48

POWERGRID

CEA-TL 1 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 5073 3670 .'09 Feb'09 11130.19

3

- / -1 North East/Northern Western Interconnector -I Proj. -: - / -1 Part-A : North East - Northern/ Western Interconnector -I +/- 800 - - +/- 800KV HVDC Biswanath Chariyali - Agra Bi-pole line 400 - 400KV Balipara - Biswanath Chariyali line - ( ) - 400 / LILO of Ranganadi - Balipara 400KV D/C line at Biswanath Chariyali (Pooling Point) 132 / - () 132KV D/C Biswanath Chariyali - Biswanath Chariyali (AEGCL) line - : Part-B : Transmission System for immediate evacuation of Power from Kameng HEP 400 ./. - 400KV D/C Kameng - Balipara line 400 ./ - 400KV D/C Balipara - Bongaigaon line -: Part-C : Transmission System for immediate evacuation of Power from Lower Subhansiri HEP 400 - -1 400KV Lower Subhansiri - Biswanath Chariyali line -I 400 - - 2 400KV Lower Subhansiri - Biswanath Chariyali line -II -4 -3 (1000 ) . Transmission System of Vindhyachal-IV and Rihand -III (1000MW each) Gen. Proj. 765 / - 765KV D/C Rihand - Vindhyachal Pooling station line 400 / -4 - () 400KV D/C Vindhyachal-IV - Vindhyachal Pooling Station line (Q) 765 / - (-1) 765KV S/C Vindhyachal Pooling Station-Satna line (Ckt-I) 765 / - (234+12 / ) -2 765KV S/C Vindhyachal Pooling Station - Satna line (234 Km +12 Km D/C Portion) Ckt-II 765 / - (-1) 765KV S/C Satna - Gwalior line (Ckt-I) 765 / - (359 +60 / ) -2 765KV S/C Satna - Gwalior line ( 359 Km +60 Km D/C portion ) Ckt-II 765 / - 765KV S/C Sasan - Vindhyachal Pooling Station line 400 / - 400KV D/C Sasan - Vindhyachal Pooling Station line 765 / - () 765KV S/C Gwalior - Jaipur (RVPN) line

Expen. . B.E. (12-13) 1100.4

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'14 5182.3 Sep'14 .'14 Sep'14 .'14 Sep'14 .'13 Aug'13 .'13 Aug'13 .'13 Aug'13 '14 Mar'14 '14 Mar'14 .'13 Feb'13 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13

3478 114

52

26

720

112 608

683

335 348 '10 Mar'10

4

1682

4672.99

1162.30

1659.20

'13 Jun'13 '13 Jun'13 '13 Jun'13 '13 Jun'13 '13 Jun'13 '13 Jun'13 '13 Jun'13 '13 Jun'13 .'12 Nov'12 '13 Mar'13

64

58

253

234

337

304

6 12 300

POWERGRID

CEA-TL 2 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 114 1118 332 768 .'10 Dec'10 2743.19

5

400 / - () () 400KV D/C Bassi -Jaipur (RVPN) line (Q) - -1 Transmission System for Phase-I Generation Projects in ORISSA - Part - B. 765 / - 765 KV D/C Jharsuguda Pooling Station - Dharamjaygarh line 765 / - 765 KV D/C Dharamjaygarh - Jabalpur Pooling Station line / 765 / - () LILO of 765KV S/C Ranchi - Sipat (Bilaspur) Pooling Station at Dharamjaygarh / near Korba 400 / - ( ) 400 KV D/C Jabalpur Pooling Station - Jabalpur (High Capacity) line - -1 Transmission System for Phase-I Generation Projects in ORISSA - Part - C. 765 / - 765 KV D/C Jabalpur Pooling Station - Bina line 765 / - ( ) 765 KV S/C Bina - Gwalior line (3rd Ckt) 765 / - ( ) 765KV S/C Gwalior-Jaipur line (2nd Ckt) 765 / - 765 KV S/C Jaipur - Bhiwani line - II ... Immediate evacuation system with BARH - II TPS 400 KV D/C - II ... - () 400 KV D/C Barh - II TPS - Gorakhpur line (Quad) . - I --2 Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal - Part - A2. 765 / (765/400KV S/S) -/ 765KV S/C Ranchi New(765/400KV S/S) - Dharamjaygarh / Near Korba line 765 / - 765KV S/C Gaya - Varanasi line 765 / - LILO of Gaya - Balia 765KV S/C line at Varanasi (on D/C tower) - Transmission System Associated with KRAISHNAPATNAM UMPP - Part - B. 765 / - 765KV S/C Raichur - Sholapur line 765 / - 765KV S/C Sholapur - Pune line (...) 400 .... - - ( ) LILO of 400KV D/C Parli - Pune & Pune - Aurangabad lline at Pune (GIS) (including Multi - Ckt) 400 / () LILO of 400KV D/C line at Raichur (new) S/Stn.

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'13 Feb'13 896.2 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13

871.70

6

12

6

1248

'11 Mar'11

2569.25

738.60

781.5

'14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14

460 236 300 252 704 704.'11 Dec'11 .'11 Dec'11 901.77

7

148.40

64.50

.'14 Aug'14 .'14 Aug'14 .'14 Aug'14

8

695

2422.66

227.10

83.2

339

.'14 Aug'14 .'14 Aug'14 .'14 Aug'14

246 110 .'12 Feb'12

9

609

1927.16

197.30

37.10

.'14 Oct'14

208 315

.'14 Oct'14 .'14 Oct'14 .'14 Oct'14 .'14 Oct'14

66

20

POWERGRID

CEA-TL 3 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. '12 Mar'12

10

. . . / .... WR - NR HVDC Interconnector for IPP Projects in Chattisgarh ... - ( -) PART-A: WR-NR Interconnector for IPP Projects in Chattisgarh - +/- 800KV +/- 800KV HVDC Bipole between Champa Pooling Station Kurukshetra line (with provision to upgrade HVDC terminal to 6000MW at later date) : ... PART-B: Trans. System Strenthening in NR for IPP Proj. in Chittasgarh 400 .. ./. - () (1 400/220 .. (.....) - 400KV D/C Kurukshetra - Jallandhar line (Quad) (one ckt vis 400/220KV Nakodar (PSTCL) S/Stn.) - () LILO of Abdullapur - Sonepat 400KV D/C at Kurukshetra (Tripal) Proj. . LTOA . - Common System Associated with East Costal Energy Pvt. Ltd and NCC Power Proj. Ltd. LTOA Gen. Proj. in Srikakulam - part-A. 765 .. ./. - 765KV D/C Srikakulam Pooling Station - Angul line XVII System Strengthening - XVII in Southern Regional Grid 765 .. ./. ( )- ( 400 ) 765KV D/C Narendra (New Kudgi) - Kolhapur line (initialy charged at 400KV) 400 .. ./. ( )- () () 400KV D/C Narendra (New Kudgi) - Narendra (extsting) line (Quad) 400 ./. - LILO of both ckt at 400KV D/C Kolhapur - Mapusa line at Kolhapur -3 Trans. System Associated with PARBATI-III HEP () -2- / 400 LILO of Parbati-II - Koldam/Nalagarh 400 kV Line at Parbati Pooling Point (Quad) (-3 () . (i) ) -2 400 LILO of one 400 kV circuit of Parbati-II - Parbati Pooling Point line (created as per point no. (i) at Parbati-III HEP(Quad) - 400 / ( ) Parbati Pooling Point - Amritsar 400 kV D/C Line (ACSR Moose conductor) -3 Transmission System Associated with CHAMERA - III HEP 220 -3 - -2 220KV Chamera-III - Pooling Station Near Chamera-II HEP

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12)

2001

9569.76

680.30

27.70

'15 Jun'15

1365

'15 Jun'15

536

'15 Jun'15 '15 Jun'15'12 Jun'12 '15 Jun'15

100

11

260

1909.24

13.00

0

260 938 '12 Jul'12 1508.74 158.42 0 '15 Apr'15

12

396

370

172

NORTHERN REGION

13

508

'06 Jul'06

557.24

42.50

595

.'13 Feb'13 .'12 Sep'12 .'12 Sep'12 .'13 Feb'13

3

4

501 '08 Apr'08

14

355 30

297.37

14.90

332.13

.'12 Nov'12 .'11 Oct'11

POWERGRID

CEA-TL 4 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant.

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'12 Nov'12

400 / -3 - 400KV D/C Pooling Station near Chamera-III HEP - Jullandhur line 15 - XV Northern Region System Strengthening Scheme -XV 400 / - 400KV D/C Manesar - Neemrana line 400 / - 400KV D/C Bhiwadi - Neemrana line - 400 / LILO of Bhiwadi - Bassi 400KV S/C line at Kotputli - XVIII Northern Region System Strengthening Scheme - XVIII 400 / - 400KV D/C Dehradun - Bagpat line - XIX Northern Region System Strengthening Scheme - XIX 400 / () - LILO of 400KV D/C (Quad) Meerut - Kaithal line at Bagpat Transmission System Associated with RAMPUR HEP. 400 / -- 400KV D/C Patiala - Ludhiana line 400 / - ( ) LILO of 400KV D/C Nathpa Jhakri - Nalagarh line (Tripal Snowbird) at Rampur 400 / - ( ) LILO of 400KV (Tripal Snowbird) Patiala - Hissar line at Kaithal 19 - 1 765 765KV System for Central Part of Northern Grid - PART-I 765 / - 765KV S/C Meerut - Agra line 765 / - 765KV S/C Agra - Jhatikara line 765 / -- 765KV S/C Jhatikara - Bhiwani - Moga line () /- 400 LILO of 400KV both ckt of Mundka/Bawana - Bamnouli line at Jhatikara(Q) - XIII Northern Region System Strengthening Scheme-XIII 400 / - () 400KV D/C Gurgaon - Manesar (Q) line - 3 765 765KV System for Central Part of Northern Grid - PART-III 765 / - 765KV S/C Meerut - Bhiwani line - 400 / LILO of Bareilly - Mandola 400KV D/C line at Meerut /- 400 / LILO of both ckt of Bawana/Badadurgarh - Hissar 400KV D/C line at Bhiwani () System Strengthening in Northern Region for SASAN & MUNDRA (UMPP)

325 .'09 Feb'09

246 134 97 15 330 330 124 124 230 156

520.48

56.20

329.9

.'13 Dec'13 '12 May'12 .'11 Dec'11 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13 '13 Mar'13 .'11 Sep'11 '13 Mar'13 .'11 Aug'11

16

.'09 Feb'09

509.66

102.90

343.5

17

.'09 Feb'09 .'09 Feb'09

410.29

102.80

246.1

18

184.19

7.90

152

8

66 .'09 Feb'09

904 268 252 358

1347.32

94.90

1112.7

.'12 Nov'12 .'12 Nov'12 .'12 Nov'12 .'12 Sep'12 .'12 Sep'12

26 .'09 Feb'09 .'09 Nov'09

20

34 34 456 174 222

317.69

36.20

198.5

21

1075.12

133.90

665.6

.'12 Aug'12 .'12 Aug'12 .'12 Dec'12 .'12 Dec'12 ' 12 Oct'12 '12 July'12

60 .'09 Dec'09

22

1378

1216.83

171.50

780.4

.'13 Dec'13

POWERGRID

CEA-TL 5 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 770 338 156

400 / - 400KV D/C Agra - Sikar line 400 / - 400KV D/C Sikar - Jaipur line 400 / - 400KV D/C Sikar - Ratnagarh line - 400 / ( ) LILO of both ckt of Nathpa Jhakri - Abdullapur 400KV D/C (Tripal Snowbard) at Panchkula ()- 220 / LILO of both ckt of Sikar (RVPN) - Ratnagarh 220KV D/C at Sikar 23 Northern Regional Transmission Strengthening Scheme 400 / - 400KV D/C Bhiwani - Jind line 400 / - LILO of both ckt of 400KV D/C Balia - Lucknow line at Sohawal 400 / - () LILO of both ckt of 400KV D/C Dehradun - Bagpat line (QUAD) at Saharanpur 400 / - () LILO of both ckt of 400KV D/C Lucknow - Bareliiy line (PG) at Shahjahanpur 400 / - LILO of both ckt of 400KV D/C Agra - Jaipur line at Jaipur - XVI Northern Regional System Strengthening Scheme - XVI 400 / - LILO of both ckt of Kishenpur - Wagoora 400KV D/C line at Wanpoh 400 - (132 / +7 ) 400KV D/C Kishenpur - New Wanpoh line (132KM D/C +7Km Multi Ckt) 25 -XXI Northern Regional System Strengthening Scheme - XXI 765 / - 765KV S/C Lucknow - Bareilly line 400 / () - () () 400KV D/C Bareilly (New) - Bareilly (Exist) line (Quad) 400 / - () 400KV D/C Bareilly - Kashipur line (Quad) 400 / - () 400KV D/C Kashipur - Roorkee line (Quad) 400 / - () 400KV D/C Roorkee - Saharanpur line (Quad) - XX Northern Regional System Strengthening Scheme - XX - 400 / LILO of one ckt of Parbati Pooling Stn. - Amritsar 400KV D/C line at Hamirpur

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'12 Dec'12 .'13 Dec'13 .'13 Dec'13 .'12 Feb'12 '12 Apr'12

102

12 '10 Mar'10

468 180 24

965.58

167.90

453.9

'13 Mar'13 '13 Mar'13 .'12 Nov'12 '13 Mar'13 .'12 Nov'12 .'12 Aug'12

58

57

149 404 '10 July'10 752.64 140.60 212.3

24

July'13 '13 July'13 '13 July'13

34

370 .'10 Aug'10

960 270 80 200 330 80 7

1677.57

519.30

570.4

'13 Oct'13 ' 13 Oct'13 ' 13 Oct'13 ' 13 Oct'13 '13 Apr'13 '13 Apr'13 .'13 Jan'13 .'13 Jan'13

26

'10 Oct'10

182.68

93.60

61.3

7

POWERGRID

CEA-TL 6 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 66 66 374 144 230 .'12 Feb'12 .'11 Nov'11 723.63 .'10 Dec'10 209.78

27

- XXII Northern Regional System Strengthening Scheme - XXII 400 / - / 400KV D/C Kishanpur - Samba D/C line - XXIV Northern Regional System Strengthening Scheme - XXIV 400 .../. - () 400KV D/C Dehradun - Abdullapur line (Quad) 400 .../. - () .. 400KV D/C Dulhasti - Kishenpur line (Quad) Single ckt strung. - Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal - Part - B. 765 .. ./. - 765KV D/C Varanasi - Kanpur line 765 .. ./. - 765KV S/C Kanpur - Jhatikara line 400 .../. ()- () () 400KV D/C Kanpur (New) - Kanpur (Exit.) line (Q) - 400 .. 400KV Connectivity at Varanasi S/Stn. - 400 .../. - - 400KV D/C Varanasi-Sarnath line - 400 ../. - - LILO of 400KV Sasaram-Allabhadad at Varanasi. - - - Opening of LILO of one ckt of Sasaram-Allahabad line at Sarnath.

Expen. . B.E. (12-13) 58.70

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'13 95.2 Aug'13 .'13 Aug'13 44 .'14 Nov'14 .'14 Nov'14 .'14 Nov'14

28

88.70

29

883

3201.44

186.0

68.7

'14 Oct'14 ' 14 Oct'14 ' 14 Oct'14 ' 14 Oct'14

362 464 20

37

' 14 Oct'14

30

31 32

33

-2 () Western Region Strengthening Scheme - II (Balance) : .. SET-A : For absorbing import in eastern and central part of WR 400 / - ()- () 400 kV D/C Raipur(PG) Wardha (PG) line -2 () Trans. System associated with Gandhar-II (GBPP) - V Western Region Strengthening Scheme - V 400 ()- / 400KV Vapi (PG) Navi Mumbai D/C line 220 - (... ...) / 220KV Vapi - Khadoli (UT of DNH) D/C line ()- () / LILO of Lonikhand (MSEB) - Kalwa (MSEB) 400KV S/C line at Navi Mumbai. Transmission System Associated with Mundra Ultra Mega Power Project. : () . Part-A - Tr. System of Mundra (UMPP) 400 / - ( ) 400KV D/C Mundra - Limbdi line (Tripal snowbird) 400 / - ( ) 400KV D/C Mundra - Bachchau line (Triple snowbird) 400 / - ( ) 400KV D/C Bachchau - Ranchodpura line (Triple snowbird)

WESTERN REGION

741 741 741

'06 Jul'06

5221.23

22.60

3163.5

.'12 Dec'12 .'12 Dec'12 .'12 Dec'12

332 258 56

.'06 Aug'06 .'07 Dec'07

653.21 477.69

67.50

419

* '13 Mar'13 * .'10 Sep'10 '13 Mar'13

18 .'08 Oct'08

3694

4824.12

641.90

3024.70

.'13 Sep'13

628 198 566

.'12 Feb'12 .'11 Sep'11 .'11 Sep'11

POWERGRID

CEA-TL 7 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 672

400 / - ( ) 400KV D/C Mundra - Jetpur line (Triple snowbird) - : . . () Part-B - Regional System Strengtheing in WR for Mundra (UMPP) 400 / - 400KV D/C Gandhar - Navsari line 400 / - 400KV D/C Navsari - Boisor line 400 / - (1200 ./) 400KV D/C Wardha - Aurangabad line (up-gradation 1200KV S/C) 400 / - () 400KV D/C Aurangabad - Aurangabad (MSETCL) line - 200/ LILO of both Ckt of Kawas - Navsari 200KV D/C at Navsari

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'12 Nov'12

204 432 700 212 82 .'08 Dec'08

'12 July'12 '13 Mar'13 '13 July'13 .'13 Sep'13 '12 July'12 7031.88 790.10 4008.20 . '12 Dec'12

34

Transmission System Associated with Sasan Ultra Mega Power Project. -1 : .. Part-A - Tr. System of Sasan (4000) UMPP 765 / - -1 765KV S/C Sasan - Satna line -I 765 / - - 2 765KV S/C Sasan - Satna line -II 765 / - -1 765KV S/C Satna - Bina line -I 765 / - -2 765KV S/C Satna - Bina line -II 765 / - - 2 765KV S/C Sasaram - Fatehpur line -II 765 / - - 2 765KV S/C Fatehpur - Agra line - II 400 / - () 400KV D/C Bina - Bina (MPPTCL) line - 400 / LILO of both ckt Vindhyachal -Jabalpur 400KV D/C at Sasan - "" () .. Part-B - Regional System Strengtheing in WR for Sasan (UMPP) 765 / - 765KV S/C Bina - Indore line 400 / - () () 400KV D/C Indore - Indore (MPPTL) (Quad) line -XI Western Region Strengthening Scheme - XI . . . 765. /.- LILO of 765KV S/C 2nd Sipat - Seoni line at WR Pooling station Near Sipat Mauda Transmission System 400 / - () 400KV D/C Mauda STPS - Wardha line (Quad) 400 / . : / Split Bus Arrangement & Reconfiguration / Shifting of terminating lines at 400KV Raipur S/Stn.

2150

241 244 274 276 357 333 1 13

.'12 Nov'12 . '12 Dec'12 .12 Jan'12 '12 Jun'12 . '12 Dec'12 . '12 Dec'12 .'12 Nov'12 '12 Mar'12

311 100 8 .'09 Feb'09 409.50 132.90

35

'12 Mar'12 . '12 Dec'12 '12 July'12 '12 July'12

8 .'10 Feb'10

36

248 248

469.38

7

234.00

'12 May'12 '12 May'12 .'12 Oct'12

37

2

.'10 Aug10

15.35

-

POWERGRID

CEA-TL 8 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant.

38

- 400 / - 400 / Bypassing of Bhatapara - Raipur 400KV S/C line to restore the line as Bhatapara - Bhilai 400KV S/C line - - -2 --3 Shifting of Chandrapur-2 and Chandrapur-3 line bays from Section Raipur-B to Raipur-A - "" () Establishment of Pooling Station at Raigarh (Kotra) and Raipur for IPP Gen. Proj. in Chhatisgsrh - A 765 / ( ) - 765KV D/C Raigarh Pooling station (Near Kotra) - Raipur Pooling Station line 400 / ( )- 400KV D/C Raigarh Pooling station (Near Kotra) - Raigarh line 400 / - 400KV D/C Raipur Pooling station - Raipur line - "" ( ) Establishment of Pooling Station at Champa and Raigarh (near Tamnar) for IPP Gen. Proj. in Chhatisgsrh - B 765 / - 765KV D/C Champa Pooling station - Raipur Pooling Station line 765 / ()- () 765KV D/C Raigarh Pooling station (Near Kotra) - Raigarh Pooling station (Near Tamnar) line 765 / - / 765 KV S/C Champa Pooling station - Dharamjaygarh/ near Korba Switching Station line 765 / ( )- 765KV S/C Raigar Pooling Station(Near Kotra) - Champa Pooling station line

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'12 Oct'12 .'12 Oct'12

1.5

0.5

526

.'10 Dec'10

1719.52

589.20

703.70

.'13 Aug'13 .'13 Aug'13 .'13 Aug'13 .'13 Aug'13

470

12 44 '11 May'11

39

547

1961.87

560.20

449.10

'14 May'14 '14 May'14 '14 May'14 '14 May'14 '14 May'14

297

95

59

96

40

... 400/220 / . Transmission System for establishment of 400/220KV GIS Sub sttaion at Kala in UT DNH. ( ) 400 / - LILO of 400KV D/C Vapi - Navi Mumbai line at Kala (Multi-ckt tower) -"" .. Integration of Pooling Station in Chhattishgarh with Central part of WR for IPP Generation Projects in Chhatisgsrh-C 765 / - 765KV D/C Raipur Pooling station - Wardha line

18

'11 July'11

181.93

131.40

54.40

'13 July'13 '13 July'13

18

41

740

.'11 Aug'11

1391.97

256.40

495.80

. '13 Dec'13 . '13 Dec'13

740 Transmission 508 .'11 Aug'11 425.51 191.20 110.50

42

System for Connectivity of MB Power Limited.

.'13 Oct'13 .'13 Oct'13

400 / ()- ( ) 400KV D/C MB TPS (Anuppur) - Jabalpur Pooling Station (Tripal Snowbird) line

480

POWERGRID

CEA-TL 9 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant.

43

44

45

46

47

48

49

50

400 / - - () ( ) 400KV D/C Jabalpur Pooling Station - Jabalpur (exit.) (Tripal Snowbird) line Transmission System for IPP Generation Projects in Madhya Pradesh and Chhatisgsrh 765 / - 765KV S/C Indore - Vadodara line 400 / - () 400KV D/C Vadodara-Pirana (Quad) line . . . . . Trans. System strengthening in Western part of WR for IPP Generation Projects in Chhatisgsrh - part-D 765 ../. - 765KV D/C Wardha - Aurangabad line 400 ../ - () 400KV D/C Aurangabad - Boisar line (Quad) -XIII Western Region Strengthening Scheme - XIII 400 .../. - () 400KV D/C Bachau - Varasna (GETCO) line / . . . - System Strengthening in North/West part of WR for IPP Project in Chhattisgarh. Part - E 765 .... ()- () 765KV D/C Aurangabad (PG) - Padghe (PG) line 400 .... ()-/ () 400KV D/C Padghe (PG) - Padghe /Kudus line (Quad) 400 .... - () 400KV D/C Vadodra - Asoj line (Quad) . . . System Strengthening in Raipur - Wardha Corridor fo IPP Project in Chhattisgarh - Part - F 765 .... - -II 765KV D/C Raipur Pooling Stn. - Wardha line -II 400/220 . . ... .. (..). Transmission System for eastablishment of 400/220KV GIS S/Stn. at Magarwada in UT DD. .. (..) . 400 . ./. - (-.) LILO of 400KV D/C Navsari - Boisar line at Magarwada (Multi Ckttower) . . . . System Strengthening in Wardha - Aurangabad Corridor fo IPP Project in Chhattisgarh. Part-G 765 ....- 765KV D/C Wardha - Aurangabad line Transmission System for connectivity of Essar Power Gujarat Limited. 400 .... ...- () 400KV D/C Essar Gujarat TPS - Bachau line (Triple) 3 4 . ( ) Kaiga 3 & 4 Trans. System (Balance Line)

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'13 Oct'13

28

557

.'11 Sep'11

1366.34

448.50

258.30

. '13 Dec'13 . '13 Dec'13 . '13 Dec'13

293 264 .'11 Nov'11

1337

2127.51

275.60

263.2

'14 July'14 '14 July'14 '14 July'14 .'13 Sep'13 .'13 Sep'13 .'14 Aug'14 .'14 Aug'14 .'14 Aug'14 .'14 Aug'14

689 648 20 20 . '11 Dec'11 . '11 Dec'11 49.39 21.60 0

640

1746.65

101

50.4

560 50 30 .12 Jan'12

760

1422.85

224.40

125.9

.15 Jan'15 .15 Jan'15

760 60 .12 Jan'12 259.28 97.30 23.5

.14 Jan'14 .14 Jan'14

60

712

.'12 Feb'12

1310.85

137.1

105.1

.'15 Feb'15 .'15 Feb'15

712 . '11 Dec'11

500

552.44

159.80

90.20

.'14 Feb'14 .'14 Feb'14

500 '05 Mar'05

SOUTHERN REGION

51

418

1007.16

39.40

845.3

'13 Mar'13

POWERGRID

CEA-TL 10 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 418 297 297 98 '09 Mar'09 196.10 '05 May'05 1779.29

52

53

400 / - 400 KV D/C Mysore - Kozhikode line - . ( ) Kundankulam - APP Trans. System (Balance line) ()- () / () Edamon (KSEB) - Muvattupuzha (PG) D/C (Quad) line . . -XI System Strengthening - XI of SR - 4000 / LILO of both ckt of Udumalpet - Trichure 400KV D/C line at Chulliar

Expen. . B.E. (12-13)

92.0

19.40

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) '13 Mar'13 '13 1846.58 Mar'13 '13 Mar'13 .'12 145.6 Aug'12 .'12 Aug'12

98 '10 Mar'10

54

55

Transmission System Associated with KALPAKKAM PFBR (500 MW) 230 / - 230 KV D/C Kalpakkam PFBR - Kanchepuram line 230 / - 230 KV D/C Kalpakkam PFBR - Arni line 230 / - 230 KV D/C Kalpakkam PFBR - Sirucheri line . . -XII System Strengthening - XII of SR - 400 / - 400 / LILO of Neelamangla - Hoddy 400KV S/C line at Yelahanka and LILO of Somanhally - Hoddy 400KV S/C line at Yelahanka Through Multi-ckt.

446 161 213 72 34

138.58

10.80

116

.'12 Aug'12 .'12 Aug'12 '12 Mar'12 .'11 Nov'11 .'12 Oct'12 .'12 Oct'12

.'10 Feb'10

232.34

38.60

160.4

34

56

57

58

Supplementary Transmission System Associated with Vallur TPS. 400 / - 400KV D/C Vallure TPS - Melakottaiyur line 400 / ()- 400KV D/C Tiruvelam (PG) - Chitoor line "" Transmission System Associated with Krishnapatnam UMPP Part - A. 400 / - () 400KV D/C Nellore - Gooty line (Quad) Common System Associated with ISGS Projects in Krishnapatnam area of Andhra Pradesh. 765 / - 765KV D/C Nellore Pooling Station - Kurnool line 765 / - ( ) 765KV S/C Kurnool - Raichur (IInd-Ckt) line /- 400 / () LILO of Both Ckt of SEPL/MEPL - Nellore 400KV D/C line (Quad) at Nellor Pooling Station "" 0 0 Common System Associated with Costal Energen Private Ltd and Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin area Part - B.. 765 / - ( 400 ) 765KV D/C Tuticorin Pooling Station - Salem Pooling Station line (initialy charged at 400KV)

114 72 42 582 582

.'10 Aug'10

170.36

73.90

51.60

'13 Apr'13 '13 Apr'13 '13 Apr'13 .'13 Aug'13 .'13 Aug'13

.'10 Dec'10

779.21

517.60

599.3

876

.'11 Aug'11

1637.34

699.30

300.6

.'14 Aug'14 .'14 Aug'14 .'14 Aug'14 .'14 Aug'14

606 246

24

59

1188

.'11 Sep'11

1940.13

323.50

339.9

.'14 Sep'14

820

.'14 Sep'14

POWERGRID

CEA-TL 11 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 138

60

61

62

400 / - () 400KV D/C Salem Pooling Station - Salem line (Quad) 765 / - ( 400 ) 765KV S/C Salem Pooling Station - Madhugiri Pooling Station line (initialy charged at 400KV) .. -XIII System Strengthening - XIII of SR Grid 400 / - 400KV D/V Gooty - Madhugiri line 400 / - () 400KV D/V Madhugiri - Yelhanka line (QUAD) .. -XIV System Strengthening in SR - XIV 400 / ( )- 400KV D/C Dharmapuri (Salem New) - Somanahalli line "" 0 0 (....) Common System Associated with Costal Energen Private Ltd and Ind-Barath Power (Madras) Ltd. (LTOA) Gen. Proj. in Tuticorin area Part - A. (..) - 499 / () LILO of both ckts of Tuticorin JV - Maduri 499KV D/C line at Tuticorin Pooling Stration (Quad) - -1 Transmission System Associated with Krishnapatnam UMPP Part - C1. 400 () - () 400KV D/C Kurnool (new) - Kurnool line (Q) - 4000 / LILO of 400KV D/C Nagarjunsagar - Gooty line at Kurnool . () . Transmission System for Connectivity of Thermal Powertech Corporation (I) Ltd. 400 / . () . - () 400KV D/C Thermal Powertech Corp. (I) ltd - Nellore Pooling Station line (Q) .... - "" Common Trans. Scheme Associated with ISGS Project in Vemagiri Area of Andhra Pradesh-Part-A1. 400 / - LILO of Gazuwaka - Vijayawada 400KV S/C line at Vemagiri Pooling Stration . . - XVIII System Strengthening in SR - XVIII 400 .../. - 400KV D/C Vijayawada - Nellor line 400 .../. - () 400KV D/C Nellor - Thiruvalam line (Q) 400 .../. - 400KV D/C Thiruvalam - Sholinganallur line 400 ../.. - LILO of Banglore - Salam 400KV S/C line at Hosur . - XIX System Strengthening in SR - XIX

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'14 Sep'14 .'14 Sep'14

230 .'11 Oct'11

576 422 154 240 240

487.49

172.0

83.66

.'11 Dec'11

297.33

57.70

22.9

'14 Jun'14 '14 Jun'14 '14 Jun'14 .'14 Aug'14 .'14 Aug'14 '14 Apr'14

20

.'11 Dec'11

90.44

41.30

7.2

20

'14 Apr'14

63

55

.'12 Feb'12

324.33

81.60

2.2

.'14 Aug'14 .'14 Aug'14 .'14 Aug'14

18 37 64 .'12 Feb'12 97.36

64

'14 May'14 ' 14 May' 14

64

65

38

'12 Mar'12

206.44

40.90

25.5

'14 Jun'14

38 1107 462 340 300 5 813 .'12 Sep'12 1935.35 20.40 0 '12 Jun'12

'14 Jun'14 1263.26 178.90 53.40 .'14 Nov'14 .'14 Nov'14 .'14 Nov'14 .'14 Nov'14 .'14 Nov'14 . '14 Dec'14

66

67

POWERGRID

CEA-TL 12 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 748 65

765 .../. - 765KV D/C Kurnool - Thiruvalam line 400 .../.-, LILO of existing Kolar-Sriperumbdure 400KV S/C line at Thiruvalam. -I Eastern Region Strengthening Scheme - I 400 / - 400KV D/C Durgapur - Jamshedpur line 400 / -- 400KV D/C Jamshedpur - Baripada 400 / - 400KV D/C Baripada - Mendhasal

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) . '14 Dec'14 . '14 Dec'14

EASTERN REGION

68

1202 374 282 546

.'06 Oct'06

975.96

41.30

866

'13 Mar'13 '12 Apr'12 '12 Mar'12 .'11 Aug'11 '13 Mar'13

400 / - ( ) : Re-conductoring of 400KV D/C Siliguri - Purnea line (HTLS Cond.) 69 Immediate evacuation system for NABINAGAR TPS 400 / - ( ) 400KV D/C Nabinagar - Sasaram line (Twin lapwing)) /.. . Transmission System for Development of Pooling Station in Northern region Part of West Bengal and Transfer of Power from BHUTAN to NR/WR. 400 / - LILO of Bishwanath Chariali - Agra HVDC line at New Pooling Station in Alipurduar for parallel operation of the HVDC stn. ( ) 400 / - - LILO fo 400KV D/C Bongaigaon - Siliguri line at New Pooling Station in Alipurduar (Pvt. Sector) 400 / LILO of 400KV D/C Tala - Siliguri line at New Pooling Station in Alipurduar 400 / -1 ( . . ) ( ) 400KV D/C Punatsangchu-1 (Gen. Proj. in Bhutan) - Alipurduar line (HTLS Cond.) India Portion. 220 / LILO of 220KV D/C Birpara - Salakati line at New Pooling Station in Alipurduar Earth Electrod line at New Pooling Station in Alipurduar & Agra end. ../.. - Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part - A. () - 400 / () LILO of Siliguri (Existing) - Purnea 400KV D/C line (Q) at New Pooling station at Kishanganj 146 146 '10 Apr'10 .'10 Feb'10 215.86 8.1 185.2

'12 Jun'12 '12 Jun'12 .'15 Jan'15

70

454

4404.57

214.10

336

24

.'15 Jan'15

16

.'15 Jan'15

174

.'15 Jan'15 .'15 Jan'15 .'15 Jan'15 .'15 Jan'15 '10 May'10 .'13 Nov'13 .'13 Nov'13

142

8

90

71

77

250.03

86.10

58.4

8

POWERGRID

CEA-TL 13 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant.

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) .'13 Nov'13

() - 400/ ( : ) LILO of Siliguri (Existing) - Purnea 400KV D/C line (on which reconductoring is being carried out) at Kishanganj with QUAD Cond. - 220 / LILO of Siliguri - Dalkhola 220KV D/C line at New Pooling station Kishanganj - 132 / LILO of Gangtok - Melli 132KV S/C line up to Rangpo. -3 Eastern Region Strengthening Scheme - III 400 / - 400KV D/C Sasaram - Deltonganj line 400 / - 400KV D/C Mendhasal - Uttra line 400 / - ( ) LILO of 400KV D/C Kahalgaon - Biharshariff line (Ist line) at Lakhisarai 400 / - ( ) LILO of 400KV D/C Kahalgaon - Biharshariff line (2nd line) at Banka 400 / - LILO of 400KV S/C Meramundali - Jeypore line at Bolangir 400 / - LILO of 400KV S/C Rengali - Baripada line at Keonjhar () 400 / ( ) LILO of 400KV D/C (one ckt) Baripada - Mendhasal line at Dubri (OPTCL) 400 / ( ) - LILO of 400KV D/C (both ckt) Jamshedpur - Rourkela line at Chaibasa - 1 Transmission System for Phase-I Generation Projects in ORISSA - Part - A. 765 / - 1 765 KV S/C Angul Pooling station - Jharsuguda Pooling station line -I 765 / - -2 765KV S/C Angul Pooling station - Jharsuguda Pooling station line -II 400 / - LILO of 400KV D/C Rourkela - Raigarh at Jharsuguda Pooling stn. 400 / - LILO of 400KV S/C Meramunali - Jeypore at Angul Pooling stn. 400/ - LILO of one ckt 400KV D/C Talchar - Meramundali at Angul Pooling station.

48

2

.'13 Nov'13 .'13 Nov'13 '14 Mar'14 .'13 Sep'13 '14 Mar'14 '13 Mar'13 .'12 Nov'12 .'12 Aug'12 .'12 Nov'12 '13 Mar'13 '13 Jun'13 .'10 Sep'10 '13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13

19 708 340 74 '10 July'10 1272.80 348.30 450.2

72

80

62

42 18

34

58

73

693

2074.86

410.80

721

246

246

160

9

32

POWERGRID

CEA-TL 14 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. '10 Oct'10

74

- Interconnection Between Electrical Grid of India and Bungladesh-India Portion 400 / () - ( ) - 400KV D/C Baharampur (India) - Bheramerar (B' Deash) line - India Portion () - 400 / LILO of Farakka - Jeerat 400KV S/C line at Baharampur (India) ../.. - Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part - B. 400 / - () 400KV D/C Kishanganj - Patna line (Quad) (1 / 1.5 /) -5- 400 / LILO of 400KV D/C Teesta-V - Siliguri line at Rangpo (1 D/C & 1.5 M/C) (21 /+1.5 /) -3- 400 / LILO of Teesta-III - Kishanganj 400KV D/C (Q) at Rangpo (21 D/C+1.5 M/C) (being constructed under JV rout) 220 / - ( ) (20.5/ 1.5 /) 220KV D/C Rangpo - New Melli line (twin moose) (20.5 D/C & 1.5 M/C) 132 / - 132KV S/C Gangtok - Rangit line at Rangpo LILO of

Expen. . B.E. (12-13) 36

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) 55 '13 Mar'13 '13 Mar'13 '13 Mar'13

176

160.32

170

6 '11 Mar'11

75

799

1585.12

461.70

443.5

.'13 Nov'13 .'13 Nov'13 .'13 Nov'13

694

5

45

.'13 Nov'13

44

.'13 Nov'13 .'13 Nov'13 '11 Oct'11 .'13 Nov'13 .'13 Nov'13

11

76

. Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal - Part - A. 400 / (765/400... .)- - () 400KV D/C Ranchi (765/400KV S/S) - Jharkhan Pool - Gaya line (Quad) Transmission System associated with Pallatana gas Based Power Project and Bongaigaon Thermal Power Station (BTPS) 400 / - 400KV D/C Bongaigaon TPS - Bongaigaon line 400 / - (132 ) 400KV D/C Pallatana - Surajmaninagar line (charged at 132KV) 400 / - (132 ) 400KV D/C Silchar - Purba Kanchan Bari line (charged at 132KV) 400 / - () (132 ) 400KV D/C Silchar - Melriat (New) line (charged at 132KV) 400 / - () (132 ) 400KV D/C Silchar - Imphal (New) line (charged at 132KV)

396

558.26

205.80

72.30

396

NORTH EASTERN REGION

77

1413

.'10 Feb'10

2144

612.40

940.4

. '13 Dec'13 . '12 Dec'12 '12 Jun'12 '13 Mar'13 '13 Mar'13 '13 Jun'13

6 74

256

286

332

POWERGRID

CEA-TL 15 of 31

Sl. No.

Trans line

Name of the

../. () () Length GoI / BoD / (CKM) Appl. Cost (Appd.)/ Ant. 56

220 / ()- () 220KV D/C Mariani (New) - Mokikchung (PG) 132 - () 132 / 132KV Silchar - Badarpur (PG) Switching station Interconnecting 132KV D/C line 132 / ()- () 132KV D/C Melriat (New) - Melriat (Mizo) Interconnecting line 132 / - () 132KV D/C Silchar - Srikona (AEGCL) line. ( ) 132 / LILO of 132KV D/C Panchgaram -Dullovclong at Silcher line (contigancy arrangement) 132 / ()- () 132KV D/C Mokokchung(PG) - Mokokchung( (Nagaland) line 132 / - (/ ) 132KV S/C Pasighat - Roing line (on D/C) 132 / - (/ ) 132KV S/C Roing -Tezu line (on D/C) 132 / - (/ ) 132KV S/C Tezu - Namsai line(on D/C) () (220 ) 400/ LILO of 400KV S/C Kaithalguri - Misa line at Mariani (New) (Charged at 220KV) () 132 / - LILO of 132KV S/C Loktak - Imphal line at Imphal (New)

Expen. . B.E. (12-13)

Cumml Exp. Compln Tgt. ./ . Ant./ Act. (.'12) upto month (Sep'12) '13 Mar'13 '12 Apr'12 . '13 Dec'13 '12 Mar'12 '12 Jun'12 '13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13 . '12 Dec'12 . '12 Dec'12

38

60 2

38

2 87 82 90

2

2 .'10 Feb'10

78

.... (. ) NETC Lines (JV of POWERGRID-execution by PG)400 . . ./. - 400KV D/C Pallatana - Silchar line 400 . . .. - 400KV D/C Khliehriat - Byrnihat line

1320

22

69

'13 Mar'13 .'12 Nov'12 '13 Mar'13

666 654

POWERGRID

CEA-TL 16 of 31

- 2 : PART - II : SUBSTATION Sl.No - Name of the Sub -Station

... /.. MVA GoI / Ratio BoD Approval

Compl. Tgt. / Ant./ Act'12 Jun'12 -1 '10 -2 .'12 Pole-I Mar'10 & Pole-II Jun'12

1

(3X660 ) ( ) Transmission System associated with Barh Gen. Project (3x660MW) (Balance portion) (..) (..) Balia(PG) & Bhiwadi (PG) Converter station incl. Earth Electrod Stn. & Repeater Stn. 765 .. .. .. Common Scheme for 765KV Pooling Station and Network Associated with DVC & Maithon RB Project etc and Inport by NR & WR via ER 765/400 / . 765/400KV Gaya S/Stn 765/400 / . 765/400KV Sasaram S/Stn 765/400 / . 765/400KV Fatehpur S/Stn 765/400 / . 765/400KV Lucknow S/Stn 765/400 / . 765/400KV Ranchi S/Stn 400 / . 756 Augmentation of 400KV Balia S/Stn. to 765KV 400 / . 756 Augmentation of 400KV Agra S/Stn. to 765KV 400/220 / . Augmentation of 400/220KV Maithon S/Stn. 400/220 / . Augmentation of Extn. 400/220KV Lucknow S/Stn. 400/220 / . Augmentation of 400/220KV Ranchi S/Stn. 400/220 / . Augmentation of 400/220KV Patna S/Stn. 765/400 .. - ( ) Extn. 765/400KV WR Pooling Sub station (Near Bilaspur) / - -1 North East / Northern Western Interconnector -I Project -: - - -1 Part-A : North East - Northern/ Western Interconnector -I 400/132 400/132KV Biswanath Chariyali Pooling Station (3000) HVDC Rectifire Module at Biswanath Chariyali (3000MW ) (3000 ) HVDC Rectifire Module at Agra (3000MW) 400 ./ . Aug. of 400KV Agra S/Stn. 400 ./ . Extn. of 400KV Balipara S/Stn. 132 ./ . Extn. of 132KV Biswanath Chariyali S/Stn. -

- INTER REGIONAL SYSTEMS

2

22500

,'08 Aug'08

'13 Mar'13 '12 May'12 .'12 Dec'12 '12 Mar'12 .'12 Feb'12 '13 Mar'13 .'12 Feb'12 '12 AUg'12 .'12 Dec'12 . '11 Sep'11 '13 Mar'13

3x1500 2x1500 2x1500 2x1500 2x1500 2x1500 2x1500

.'14 Oct'14. '09 Feb'09 '13 Mar'13

3

. '14 Sep'14 . '14 Sep'14 . '14 Sep'14 . '14 Sep'14 . '14 Sep'14 , '13 Aug'13 , '13 Aug'13 , '13 Aug'13

2x200

4x105

SS - page 17 of 31

Sl.No

- Name of the Sub -Station

... /.. MVA GoI / Ratio BoD Approval

Compl. Tgt. / Ant./ Act. '13 Feb'13

-: .. Part-B : Transmission System for immediate evacuation of Power from Kameng HEP 400/220 ./ . 2nd ICT of 400/220KV Misa S/Stn. 400 ./ . Extn. of 400KV Balipara S/Stn. ./ . 400 Extn. of 400KV Bongaigaon S/Stn. -: Part-C : Transmission System for immediate evacuation of Power from Lower Subhansiri HEP 400 Extn. 400KV at Biswanath Chariyali Pooling stn. -4 -3 ( 1000 ) . . Transmission System of Vindhyachal-IV and Rihand -III (1000MW each) Gen. Proj. 765/400 765/400KV Vindhyachal Pooling station 765/400 (.. . . ) Extn. at 765/400KV Vindhyachal Pooling stn. (one each for NR & WR) - 765/400 Extn. at 765/400KV Satna Sub station - 765/400 Extn. at 765/400KV Gwalior Sub station - 765/400 Extn. at 765/400KV Sasan Sub station - 765/400 Extn. at 765/400KV Jaipur Sub station - 765/400 Extn. at 765/400KV Bassi Sub station - -1 . . Transmission System for Phase-I Generation Projects in ORISSA - Part - B. 765 765 KV Dharamjayagarh Switching Station 765/400 765/400KV Jabalpur Pooling station - -1 Transmission System for Phase-I Generation Projects in ORISSA - Part - C. 765/400 / . Extn. at 765/400 KV Gwalior S/stn. 765/400 / . Extn. at 765/400 KV Bina S/stn. 765/400 Extn. at 765/400KV Jabalpur Pooling Stn. 765/400 / . Extn. at 765/400 KV Indor S/stn. 765/400 / . Extn. at 765/400 KV Bhiwani S/stn. - II ... . Immediate evacuation system with BARH - II TPS 400 / . Extn. 400KV Gorakhpur Sub station 400 400KV Switchyard at Barh

1x315

'12 Jun'12 .'13 Feb'13 .'13 Feb'13 .'13 Feb'13 .'13 Feb'13 '10 Mar'10

4

'13 Jun'13 '13 Jun'13

2x1500 . '10 Dec'10

'13 Mar'13

'13 Mar'13 '13 Mar'13 .'13 Feb'13 . '13 Dec'13 . '13 Dec'13 . '13 Dec'13 '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14.'14 Aug'14 .'14 Aug'14 .'14 Aug'14

'13 Jun'13 '13 Jun'13

5

2x1500 '11 Mar'11

6

7

.'11 Dec'11

-

SS - page 18 of 31

Sl.No

- Name of the Sub -Station . - I --2 Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal - Part - A2. 765/400 ( ) / . 765/400KV Varanasi GIS S/stn. - Transmission System Associated with KRAISHNAPATNAM UMPP - Part - B. 765/400 - 765/400KV Raichur Sub station 765/400 - 765/400KV Sholapur Sub station 765/400 ( ) / . 765/400KV Pune (GIS) / .... . . . WR - NR HVDC Interconnector for IPP Projects in Chattisgarh : / . . . PART-A: WR-NR Interconnector for IPP Projects in Chattisgarh (3000) HVDC Rectifier Module of 3000MW capacity at Champa Pooling Station (3000) HVDC Rectifier Module of 3000MW capacity at Kurukshetra 400/220 ( ) / . 400/220KV Kurukshetra S/Stn. (GIS) 400/220/33 765/400 Aug. of 765/400KV Champa Pooling Stn. by 400/220/33 KV : . . . PART-B: Trans. System Strenthening in NR for IPP Proj. in Chittasgarh 400 (.....) / . Extn. 400/220KV Jallandhar & Nakodar (PSTCL) S/stn. Proj. . . LTOA - Common System Associated with East Costal Energy Pvt. Ltd and NCC Power Proj. Ltd. LTOA Gen. Proj. in Srikakulam - part-A.

... /.. MVA GoI / Ratio BoD Approval

Compl. Tgt. / Ant./ Act.'14 Aug'14 .'14 Aug'14

8

.'11 Dec'11

2x1500 .'12 Feb'12 2x1500 2x1500 2x1500 '12 Mar'12

9

.'14 Oct'14 .'14 Oct'14 .'14 Oct'14 '15 Jun'15

.'14 Oct'14

10

2x500 2x200

'15 Jun'15 '15 Jun'15 '15 Jun'15 '15 Jun'15 '15 Jun'15'12 Jun'12 '15 Jun'15 '15 Jun'15

11

12

13

765 765KV Pooling Station at Srikakulam 765/400 / . Extn. 765/400KV Angul Sub station .. - XVII System Strengthening - XVII in Southern Regional Grid 765 /400 .. ( ) ( ) / . ( 400 ) 765/400KV Narendra (New kudgi) Sub station (GIS) (charged at 400KV) 765 /400 .. ( ) / . ( 400 ) 765/400KV Kolhapur Sub station (GIS) (charged at 400KV) 400/220 / . Extn. at 400/220KV Narendra S/stn. Augmentation of Transformation Capacity in Northern Region & Eastern Region

1x1500'12 Jul'12

'15 Jun'15 '15 Apr'15 '15 Apr'15 '15 Apr'15 '15 Apr'15 '12 Jul'12 '14 Mar'14

14

SS - page 19 of 31

Sl.No

- Name of the Sub -Station Transformation Capacity in NR 400/220 .. - at 400/220KV Nalagarh S/stn. 400/220 .. - at 400/220KV Abdullapur S/stn. 400/220 .. - at 400/220KV Amritsar S/stn. 400/220 .. - at 400/220KV Kishanpur S/stn. Transformation Capacity in ER 220/132 .. - 220/132KV Purnea S/stn. 400 .. - of 400KV BR at Biharshariff S/S -3 . Transmission System Associated with PARBATI-III HEP 400 / . New 400 kV Parbati Pooling Point Gas Insulated S/stn. 400/220 / . Ext. of 400/220 kV Amritsar S/Stn -3 Transmission System Associated with CHAMERA - III HEP 400 / . Extension of 400KV at Jullahdhar S/S. - XV Northern Region System Strengthening Scheme - XV 400/220 / . 400/220 KV Neemrana Sub station 400/220 / . 400/220 KV Kotputli Sub station 400/220 / . Extn. 400/220 KV Bhiwadi Sub station 400/220 / . Extn. 400/220 KV Manesar GIS 400/220 / Extn. 400/220 KV Bassi Sub station - XVIII Northern Region System Strengthening Scheme - XVIII 400/220 ./ . 400/220KV Dehradun Sub station 400/220 ... Extn. 400/220KV Bagpat GIS - XIX Northern Region System Strengthening Scheme - XIX 400/220 400/220KV Bagpat Gas Insulated Stn. - XIII Northern Region System Strengthening Scheme - XIII 400/220 400/220KV Manesar GIS 400/220 Extn. 400/220KV at Gugaon GIS

... /.. MVA GoI / Ratio BoD Approval Aug. of Extn. Extn. Extn. Extn. Aug. of Extn. at Extn.2x160 315 315 500 4x105

Compl. Tgt. / Ant./ Act '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14 '14 Mar'14

NORTHERN REGION

15

'06 Jul'06

16

'08 Apr'08

17

. '09 Feb'09 2x315 2x315

18

. '09 Feb'09 2x315

19

. '09 Feb'09 2x500 . '09 Feb'09 2x500

20

.'13 Feb'13 .'13 Feb'13 .'13 Feb'13 .'12 Nov'12 .'12 Nov'12 .'13 Dec'13 '12 Mar'12 . '13 Dec'13 . '11 Nov'11 '12 May'12 . '12 Dec'12 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13 .'13 Dec'13 '12 July'12 '12 July'12 '12 Jun'12

SS - page 20 of 31

Sl.No

- Name of the Sub -Station400/220 Extn. 220KV at Fatehabad -2 765 765KV System for Central Part of Northern Grid - PART-II 765/400 765/400KV Jhatikara Sub station 400/220 / . 765/400 - Aug. of 400/220KV Meerut S/Stn. to 765/400KV Sub station 400/220 / . 765/400 - Aug. of 400/220KV Moga S/Stn. to 765/400KV Sub station 400/220 / . Extn. of 400/220KV Agra Sub station

... /.. MVA GoI / Ratio BoD Approval

Compl. Tgt. / Ant./ Act '12 Jun'12 .'12 Oct'12 . '12 Sep'12 .'12 Oct'12

21

'09 July'09 4x1500 2x1500 2x1500

'12 Aug'12 . '12 Nov'12 . '09 Nov'09 . '12 Dec'12 . '12 Dec'12 . '12 Sep'12 .'12 Oct'12 .'12 Oct'12 . '12 Dec'12 '12 Mar'12 . '12 Feb'12 . '12 Dec'12 . '12 Dec'12 . '12 Sep'12 '13 Mar'13 .'12 Oct'12 '13 Mar'13 '13 Mar'13 '13 Mar'13 .'12 Oct'12 '12 Mar'12 . '12 Nov'12 . '12 Nov'12 . '12 Nov'12 . '12 Nov'12

22

- 3 765 765KV System for Central Part of Northern Grid - PART-III 765/400/220 - 765/400/220KV Bhiwani Sub station 765/400 ./ . Extn 765/400 KV Meerut S/Stn. 400/220 - Extn. of 400/220KV Mandola Sub station 400/220 - (: ) Extn. of 400/220KV Ballabgarh Sub station (realignment works) () System Strengthening in Northern Region for SASAN & MUNDRA (UMPP) 400/220 - 400/220KV Sikar Sub station 400/220 - 400/220KV Panchkula Sub station 765/400 - Extn. 765/400KV Agra Sub station 400/220 ()- Extn. of 400/220KV Ratnagarh (RVPN) Sub station 400/220 - Extn. of 400/220KV Jaipur Sub station Northern Region Transmission Strengthening Scheme 400/220 / . 400/220 KV Sohawal Sub station 400/220 / . 400/220 KV Shahajanpur Sub station 400/220 / . 400/220 KV Saharanpur Sub station 400/220 / . 400/220 KV Jind Sub station 400/220 () - 400/220 KV Jaipur (South) Sub station 400/220 Extn. 400/220 KV at Bhiwadi 400/220 () Extn. 400/220 KV at Gurgaon (GIS) 765/400/220 / . Extn. 765/400/220KV at Bhiwani S/S 400/220 ()/ . Extn. 400/220 KV at Jaipur (Bassi) S/S 400/220 / . Extn. 400/220 KV at Bareilly S/Stn. 2x1000 & 2x315

23

. '09 Dec'09 2x315 2x315

24

'10 Mar'10 2x315 2x315 2x315 2x315 2x500 1x315 -

SS - page 21 of 31

Sl.No

- Name of the Sub -Station -XVI Northern Regional System Strengthening Scheme - XVI 400/220 - 400/220 KV Wanpoh Sub station 400/220 - Extn. of 400/220KV Kishanpur Substation - XXI Northern Regional System Strengthening Scheme - XXI 765/400 - (125 .... ) 765/400 KV Bareilly Sub station (with 125 MVAR Reactor) 400/220 - Extn. of 765/400 KV Lucknow Sub station (PG) 400/220 (..) - Extn. of 400 KV Bareilly Sub station (PG) 400/220 - () Extn. of 400 KV Kashipur Sub station (PTCUL) 400/220 - (..) Extn. of 400 KV Roorkee Sub station (PG) 400/220 - (..) Extn. Of 400KV Saharanpur S/S (PG)

... /.. MVA GoI / Ratio BoD Approval '10 July'10 2x315 '10 Aug'10 2x1500 '10 Aug'10 2x315 . '10 Dec'10 2x315

Compl. Tgt. / Ant./ Act'13 July'13 '13 July'13 '13 July'13 '13 Oct'13 ' 13 Oct'13 ' 13 Oct'13 ' 13 Oct'13 ' 13 Oct'13 '13 Apr'13 '13 Apr'13 .'13 Jan'13 .'13 Jan'13 '13 Aug'13 '13 Aug'13 '13 Aug'13 . '12 Nov'12 ' 12 Oct'12 ' 12 Oct'12 ' 12 Oct'12 '12 Apr'12 '12 Mar'12 '12 Mar'12 ' 12 Oct'12 '12 Apr'12 . '12 Nov'12

25

26

27

- XX Northern Regional System Strengthening Scheme - XX 400/220 - (80 . ) 400/220 KV Hamirpur Sub station, GIS (with 80 MVAR B. Reactor) -XXII Northern Regional System Strengthening Scheme - XXII 400/220 - (80 . ) 400/220 KV Samba Sub station, (with 80 MVAR B. Reactor) 400/220 - Extn. 400/220 KV Kishanpur Sub station, Provision of Bus Reactors in Northern Region 400/220 / . (125....) Extn. at 400/220 KV Gorakhpur S/Stn, (125 MVAR Reactor) 400/220 / . (125....) Extn. at 400/220 KV Allahabad S/Stn, (125 MVAR Reactor) 400/220 / . (125....) Extn. at 400/220 KV Mainpuri S/Stn, (125 MVAR Reactor) 400/220 / . (125....) Extn. at 400/220 KV Hissar S/Stn, (125 MVAR Reactor) 400/220 / . (125....) Extn. at 400/220 KV Jallandhar S/Stn, (125 MVAR Reactor) 400/220 / . (80 ....) Extn. at 400/220 KV Amratsar S/Stn, (80 MVAR Reactor) 400/220 / . (125....) Extn. at 400/220 KV Kankaroli S/Stn, (125 MVAR Reactor) 400/220 / . (125....) Extn. at 400/220 KV Nalagarh S/Stn, (125 MVAR Reactor) 400/220 (..) / . (125....) Extn. at 400/220 KV Vindhyachal (NR Bus) S/Stn, (125 MVAR Reactor)

28

29

. '10 Dec'10

30

- XXIV Northern Regional System Strengthening Scheme - XXIV 400/220 , - Extn. at 400/220 KV Deharadun, Abdullapur and Kishenpur Sub station, 400/220 / . (2x63....) Extn. at 400/220 KV Balia Sub station, (2x63 MVAR Reactor)

.'11 Nov'11

.'14 Nov'14 .'14 Nov'14 .'14 Nov'14

SS - page 22 of 31

Sl.No

- Name of the Sub -Station . - I Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal - Part - B. 765/400 ( ) / . 765/400KV Kanpur Sub station (GIS), - II Western Region Strengthening Scheme - II : .. SET-A : For absorbing import in eastern and central part of WR 400/220 (..) 25% Wardha 400/220 kV Substation (PG) Extension alongwith 25% fixed series compensation 400/220 (..) Raipur 400/220 kV Substation (PG) Extension -2 () Transmission System associated Gandhar -II (GBPP) -5 Western Region Strengthening Scheme - V 400/220 () 400/220 KV Navi Mumbai (GIS). 400/220 () / . Ext. 400/220 KV Vapi (PG) S/Stn. 220/66 (....) / . Ext. 220/66 KV Khadoli (UT & DNH) S/Stn. Transmission System Associated with Mundra Ultra Mega Power Project. 400/220 / . 400/220 KV Bachchau S/Stn. 400/220 / . 400/220 KV Navsari GIS S/Stn. 400 / . Extn. 400KV at Boisar S/Stn. 765/400 / . 765/400KV Wardha S/Stn. 400/220 / . 400/220KV Aurangabad S/Stn. 765 / . Extn. 765KV at Seoni & Wardha S/stn. 400 / . Extn. 400KV at Limbdi S/stn. 400 / . Extn. 400KV at Ranchorpura S/stn. 400 / . Extn. 400KV Jetpur S/stn. - 400 / 40% 40% Fixed Series Compensation on Wardha - Aurangabad 400KV D/C line. Transmission System Associated with Sasan Ultra Mega Power Project. -"" (4000) Part-A - Tr. System of Sasan (4000) UMPP 765/400 / . 765/400 kV Satna S/Stn. 765/400 , , - Extns. 765/400KV at Agra, Gwalior, Bina & Seoni Sub station

... /.. MVA GoI / Ratio BoD Approval.'12 Feb'12 2x1500

Compl. Tgt. / Ant./ Act'14 Oct'14 ' 14 Oct'14

31

'WESTERN REGION

32

'06 Jul'06

. '12 Dec'12

. '12 Dec'12 . '12 Dec'12 * '13 Mar'13 '13 Mar'13 . '12 Oct'12 . '10 Sep'10 .'13 Sep'13 . '11 Sep'11 '12 July'12 '13 Mar'13 '12 Mar'12 .'13 Sep'13 '12 May'12 .'11 Nov'11 .'11 Sep'11 ' 12 Oct'12 '14 Mar'14 . '12 Dec'12 .'12 Aug'12 . '12 Dec'12

33 34

'06 Aug'06 . '07 Dec'07 2x315 . '08 Oct'08 2x315 2x315

35

3x1500 2x315

36

. '08 Dec'08

2x1000

SS - page 23 of 31

Sl.No

- Name of the Sub -Station- "" () .. Part-B - Regional System Strengtheing in WR for Sasan (UMPP) 765/400 / . 765/400KV Indore S/stn. 765/400 / . Extn. 765/400KV Bina S/Stn. 765/400 / . Extn. 765/400KV Gwalior S/Stn. - XI Western Region Strengthening Scheme - XI 765/400 .. ( ) Extn. 765/400KV WR Pooling Station near Sipat (3rd ICT)

... /.. MVA GoI / Ratio BoD Approval

Compl. Tgt. / Ant./ Act. '12 Dec'12 . '12 Dec'12 . '12 Dec'12 '12 July'12 '12 July'12

2x1500 2x1000 2x1500 . '09 Feb'09 1x1500 . '10 Feb'10 '10 July'10 '10 Aug'10

37

38

39

40

41

42

43

Mauda Transmission System 400/220 - Extn. of 400/220KV Wardha S/Stn. 400/220 / . 125 Installation of 125MVAR Bus Reactor at 400/220KV Rajgarh S/Stn. 400 / . : / Split Bus Arrangement & Reconfiguration / Shifting of terminating lines at 400KV Raipur S/Stn. -1 -2 400 ( ) Spliting of 400KV Bus Raipur bus through Bus sectionaliser into two section (RaipurA-RaipurB) at a point between existing line bays of Chandrapur-1 & Chandrapur-2. - "" () Establishment of Pooling Station at Raigarh (Kotra) and Raipur for IPP Gen. Proj. in Chhatisgsrh - A 765/400 () 765/400KV Raigarh(Kotra) Pooling Stn. 765/400 765/400 KV Raipur Pooling Station 400 / . Extn. 400KV Raigarh & Raipur S/Stn. - "" ( ) Establishment of Pooling Station at Champa and Raigarh (near Tamnar) for IPP Gen. Proj. in Chhatisgsrh -B 765/400 765/400 KV Champa Pooling Station 765/400 ( ) 765/400 KV Raigarh Pooling Station (near Tamnar) 765/400 ( ) Extn. 765/400KV Raigarh Pooling Stn. (near Kotra) 765 Extn. 765 KV Raipur Pooling Stn. 765/400 Extn. 765KV Dharamjaygarh Pooling Stn. ... 400/220 / . Transmission System for establishment of 400/220KV GIS Sub sttaion at Kala in UT DNH. ... 400/220 - 400/220KV Kala Sub station (GIS) in UT DNH

'12 May'12 '12 May'12 '12 May'12 .'12 Oct'12

.'12 Oct'12

.'10 Dec'10 4x1500 1x1500

'13 Aug'13 '13 Aug'13 '13 Aug'13 '13 Aug'13

'11 May'11 6x1500 3x1500

'14 May'14 '14 May'14 '14 May'14 '14 May'14 '14 May'14 '14 May'14

'011 July'11 2x315

'13 July'13 '13 July'13

SS - page 24 of 31

Sl.No

- Name of the Sub -Station-"" .. Integration of Pooling Station in Chhattishgarh with Central part of WR for IPP Generation Projects in Chhatisgsrh-C 765 / . Extn. at 765KV Raipur Pooling Sub station 765 / . Extn. at 765KV Wardha Sub station Transmission System for Connectivity of MB Power Limited. 765/400 / . Extn. at 765/400KV Jabalpur Pooling S/stn. 400 / . ( ) Extn. at 400KV Jabalpur S/stn. (for interim arrangement) Transmission System for IPP Generation Projects in Madhya Pradesh and Chhatisgsrh 765/400 () - 765/400KV Vadodra (GIS) Sub station 765/400 / . Extn. at 765/400KV Indore Sub station 400/220 / . Extn. at 400KV Pirana Sub station . . . . . Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhatisgsrh - part-D 765/400 / 765/400KV Aurangabad Sub station 400/220 / . Aug. 400/220KV Boisar Sub station 765/400 / . Extn. at 765/400KV Wardha Sub station -XIII Western Region Strengthening Scheme - XIII

... /.. MVA GoI / Ratio BoD Approval. '11 Sep'11

Compl. Tgt. / Ant./ Act. '13 Dec'13 . '13 Dec'13 . '13 Dec'13 . '13 Oct'13 . '13 Oct'13 . '13 Oct'13 . '13 Dec'13 . '13 Dec'13 . '13 Dec'13 . '13 Dec'13

44

45

'11 Aug'11

46

. '11 Sep'11 2x1500

47

.'11 Nov'11

'14 July'14 '14 July'14 '14 July'14 '14 July'14 .'13 Sep'13 .'13 Sep'13 .'13 Sep'13

2x1500 1x500

48

49

/ . . . - System Strengthening in North/West part of WR for IPP Project in Chhattisgarh. Part - E

400 / . Extn. of 400KV Bachau Sub station 765/400 / . Extn. of 400KV Varsana S/S (GETCO)

. '12 Dec'12

. '12 Dec'12

.'14 Aug'14 .'14 Aug'14 .'14 Aug'14 .'14 Aug'14 .'14 Aug'14 .'14 Aug'14

765/400 / . 765/400KV Padghe S/Stn. GIS 765/400 / . Extn. at 765/400KV Aurangabad 765/400 / . Extn. at 765/400KV Vadodara 765/400 / . Extn. at 765/400KV Asoj 400 / . (....) Extn. at 400KV Padghe S/S. (METCL)

2x1500

SS - page 25 of 31

Sl.No

- Name of the Sub -Station . . . System Strengthening in Raipur - Wardha Corridor fo IPP Project in Chhattisgarh - Part - F

... /.. MVA GoI / Ratio BoD Approval.12 Jan'12

Compl. Tgt. / Ant./ Act.15 Jan'15 .15 Jan'15 .15 Jan'15

50

51

400/220 . . ... .. (..). Transmission System for eastablishment of 400/220KV GIS S/Stn. at Magarwada in UT DD.

765/400 . Extn. of 765KV Raipur Pooling station 765 / . Extn. of 765KV Wardha Sub station

.12 Jan'12

.14 Jan'14 .14 Jan'14

400/220 . . .. (..). (...) 400/220KV Magarwada Sub station in UT DD (GIS)

2x315

52

. . . . System Strengthening in Wardha - Aurangabad Corridor fo IPP Project in Chhattisgarh. Part-G

.'12 Feb'12

.'15 Feb'15 .'15 Feb'15 .'15 Feb'15

765 / . Extn. at 765KV at Wardha Sub station 765 / . Extn. at 765KV at Aurangabad S/stn.

53

. . . Supplementary Transmission Scheme of upcoming IPP Projects in Chhattisgarh.

'12 Mar'12

'14 Mar'14 '14 Mar'14

765/400 / ., Extn. at 765/400KV at Dharamjaygarh/ Korba Pooling station54 ( ) System Strengthening for Western Region (Line bays & Reactor provision).

2x1500 '12 Mar'12

765 ., , / . Extn. at 765KV at Jabalpur Pooling stn, Indore, Aurangabad and Vadodra (GIS)

'14 Mar'14 '14 Mar'14

-

55

( ) System Strengthening common for Western Region and Northern Region (Line bays & Reactor provision).

'12 Mar'12

'14 Mar'14 '14 Mar'14

765 ., / . Extn. at 765KV at Jabalpur Pooling stn, Dharamjaygarh and Bina Sub stn.

. '11 Dec'11

56

. Transmission System for connectivity of Essar Power Gujarat Limited. 400 / . Extn. 400KV Bachau Sub station 400/220KV (315 ) , (1500 ) 765KV - Extn. at 400/220KV Mapusa (315 MVA), Navsari (1500 MVA) and bays at 765KV Indore & 400KV at Pirana Sub station

'12 Jun'12 -

57

Augmentation of Transformer and Bays in Western Region

.'14 Feb'14 .'14 Feb'14 '14 Jun'14

58

. - - . . Interconnector Line Bays and Reactor at Powergrid S/Stn. for RaichurSholapur line for Synch. Interconnector between SR & WR

'12 Jun'12

'14 Mar'14

SS - page 26 of 31

Sl.No

- Name of the Sub -Station765/400 .. - Extn. at 765/400KV Raichur & Sholapur Sub station

... /.. MVA GoI / Ratio BoD Approval.'11 Sep'11 .'12 Aug'12 -

Compl. Tgt. / Ant./ Act

59

- 1x315MVA, 400/220KV () Installation of 1x315MVA, 400/220KV Transformer at Vapi (PG) S/Stn.400/220 .. () - Extn. 400/220KV at Vapi (PG) S/Stn.

. '12 Dec'12

60

, , , , , 400KV 420 ., 125 MVAR . 420KV, 125 MVAR Reactors at Jabalpur, Khandwa, Shujalpur, Bhatapara, Raigarh & Aurangabad 400KV Sub stations. 400 .. 420 ..,80 MVAR 420KV, 80 MVAR Reactor at 400KV Solapur Sub station. 3 4 Kaiga 3 & 4 Transmission System 400/220 / . 400/220 KV Kozhikode S/Stn. 400/220 / . Ext. 400/220 KV Mysore S/stn - ( ) Kundankulam - APP Transmission System (Balance portion) 400/220 / . 400/220 KV Muvattapuzha S/S - XI System Strengthening -XI of SR 400/220 / . 400/220 KV Chulliar S/S (500 ) Transmission System Associated with KALPAKKAM PFBR (500 MW) , 230 Extn. of 230KV TNEB Substations at Kancheepuram. Arni and Sirucheri. - .. XII System Strengthening - XII of SR 400/220 - () 400/220KV Yelahanka Sub station (GIS) Supplementary Transmission System Associated with Vallur TPS. 765/400 765/400KV Tiruvalam Switching station 400/220 / . () Extn. 400/220KV Chittor S/stn. (APTRANSCO) "" Transmission System Associated with Krishnapatnam UMPP Part - A. 400/220 / . Extn. 400/220KV Nellore S/stn. 400/220 / . ( 163 ) Extn. 400/220KV Gooty S/stn. (163 MVAR Reactor on each ckt.) Common System Associated with ISGS Projects in Krishnapatnam area of Andhra Pradesh. 765/400 - 765/400KV Nellore Sub station

Installation of Reactors in Western Region.

.'14 Aug'14

-

SOUTHERN REGION

61

'05 Mar'05 2x315

62

'05 May'05 2x315 '09 Mar'09 2x315 '10 Mar'10

63

64

65

. '10 Feb'10 2x500 '10 Aug'10 -

66

67

-

. '10 Dec'10

'13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13 '12 Mar'12 '12 Mar'12 . '12 Dec'12 . '12 Dec'12 .'12 Oct'12 .'12 Oct'12 '13 Apr'13 '13 Apr'13 '13 Apr'13 '13 Aug'13 '13 Aug'13 '13 Aug'13

68

-

'11 Aug'11

'14 Aug'14 '14 Aug'14

2x1500

SS - page 27 of 31

Sl.No

- Name of the Sub -Station765/400 - Extn. at 765/400KV Kurnool Sub station 765/400 - Extn. at 765/400KV Raichur Sub station "" 0 - 0 Common System Associated with Costal Energen Private Ltd and Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin area Part - B.. 765/400 ( 400 ) 765/400KV Salem Pooling station (initially charged at 400KV) 765/400 Extn. at 765/400KV Tuticorin Pooling Stn 400/220 Extn. at 400/220 KV Madhugiri Pooling Stn 400/220 - Extn. at 400/220KV Salem Sub station .. -XIII System Strengthening - XIII of SR Grid 400/220 - 400/220KV Madhugiri Sub station 400/220 / . Extn. at 400/220KV Gooty S/stn. 400/220 / . Extn. at 400/220KV Yelahanka GIS S/stn. .. -XIV System Strengthening - XIV of SR Grid 400/220 / . Aug. of Hosur Sub sttaion 400/220 / . Extn. at 400/220KV Somanahalli S/stn. 400/220 ( ) / . Extn. at 400/220KV Dharmapuri (Salem New) S/stn. "" 0 - 0 (....) Common System Associated with Costal Energen Private Ltd and Ind-Barath Power (Madras) Ltd. (LTOA) Gen. Proj. in Tuticorin area Part - A. 765 ( 400 ) 765KV Pooling Station in Tuticorin (initially charged in 400KV) - -1 Transmission System Associated with Krishnapatnam UMPP - Part - C1. 765/400 - 765/400KV Kurnool Sub station 400 (APTRANSCO) Extn. at 400KV Kurnool (APTRANSCO) S/S . () . Transmission System for Connectivity of Thermal Powertech Corporation (I) Ltd. 400 Extn. at 400KV Nellore Pooling station .... - "" Common Trans. Scheme Associated with ISGS Project in Vemagiri Area of Andhra Pradesh - Part - A1. 765/400 (...) - 400 765/400KV Vemagiri Pooling Station (GIS) - Initially charged at 400KV

... /.. MVA GoI / Ratio BoD Approval

Compl. Tgt. / Ant./ Act '14 Aug'14 '14 Aug'14 . '14 Sep'14 . '14 Sep'14 . '14 Sep'14 . '14 Sep'14 . '14 Sep'14 '14 Jun'14 '14 Jun'14 '14 Jun'14 '14 Jun'14 .'14 Aug'14 .'14 Aug'14 .'14 Aug'14 .'14 Aug'14 '14 Apr'14 '14 Apr'14

69

-

. '11 Sep'11

70

. '11 Oct'11 2x500

71

.'11 Dec'11 1x315

72

.'11 Dec'11 .'12 Feb'12 2x1500

73

.'14 Aug'14 .'14 Aug'14 .'14 Aug'14 '14 May'14 '14 May'14

74

.'12 Feb'12

75

'12 Mar'12 -

'14 Jun'14 '14 Jun'14

76

. XVIII Strengthening in SR - XVIII

System

'12 Mar'12

'14 Jun'14

SS - page 28 of 31

Sl.No

- Name of the Sub -Station 400/220 .. - Extn. 400/220Kv Vijayawada S/Stn. 400/220 .. (APTRANSCO) - Extn. 400/220Kv Nellor S/Stn. (APTRANSCO) 400/220 .. - Extn. 400/220Kv Nellor S/Stn. 400/220 .. - Extn. 400/220Kv Thiruvalam S/Stn. 400/220 .. - Extn. 400/220Kv Hosur S/Stn. 400/220 .. - Extn. 400/220Kv Sholinganallur S/Stn. . XIX System Strengthening in SR - XIX 765/400 .. - Extn at 765/400KV Kurnool 400 .. 765/400 .. Upgradation 400KV to 765/400KV Thiruvalam S/Stn. (765KV GIS & 400KV AIS) -1 Eastern Region Strengthening Scheme - I 400/220 / . Ext. 400/220KV Jamshedpur S/S 400/220 / . Ext. 400/220KV Durgapur S/S Immediate evacuation system for NABINAGAR TPS 400 / . Extn. of 400KV Sasaram S/stn. / Transmission System for Development of Pooling Station in Northern region Part of West Bengal and Transfer of Power from BHUTAN to NR/WR. 400/220KV HVAC 3000MW +/-800KV HVDC New Pooling Station in Alipurduar 3000 800+/- Extn. of +/- 800KV HVDC at Agra with 3000MW. / "" Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part - A. 400/220/33 - 400/220/33 KV Kishanganj Sub station -3 Eastern Region Strengthening Scheme - III 400/220 - 400/220 KV Daltonganj Sub station 400/220 - 400/220 KV Bolangir Sub station 400/220 - 400/220 KV Kenonjhar Sub station 400/220 - 400/220 KV Chaibasa Sub station

... /.. MVA GoI / Ratio BoD Approval

Compl. Tgt. / Ant./ Act'14 Jun'14 '14 Jun'14 '14 Jun'14 '14 Jun'14 '14 Jun'14 '14 Jun'14

77

.'12 Sep'12

. '14 Dec'14 . '14 Dec'14

2x1500

. '14 Dec'14

EASTERN REGION

78

. '06 Oct'06

79

. '10 Feb'10

. '12 Dec'12 . '12 Dec'12 . '12 Dec'12 '12 Jun'12 '12 Jun'12 . '15 Jan'15 . '15 Jan'15 . '15 Jan'15

80

'10 April'10

2x315

81

'10 May'10 2x315 '10 July'10 2x315 2x315 2x315 2x315

.'13 Nov'13 .'13 Nov'13 '14 Mar'14 . '13 Dec'13 .'12 Sep'12 . '12 Nov'12 '13 Jun'13

82

SS - page 29 of 31

Sl.No

- Name of the Sub -Station400/220 - 400/220 KV Uttara Sub station 400/132 - 400/132 KV Lakhisarai Sub station 400/132 - 400/132 KV Banka Sub station 400 / . Extn. at 400KV Sasaram S/stn. / . () Extn. at 400KV Dubri & Mendhasal S/Stn. (OPTCL) - "" -1 Transmission System for Phase-I Generation Projects in ORISSA - Part - A. 765/400 765/400KV Pooling Station at Jharsuguda 765/400 765/400KV Pooling Station at Angul - Interconnection Between Electrical Grid of India and Bungladesh-India Portion 400 (80 ) 400KV Baharampur Switchinh Station (with 80MVAR Reactor) / "" Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part - B. 400/220/132 () 400/220/132KV Rangpo Sub station (GIS) 220 () 220KV Switching station New Melli (GIS) 400/220 / . Extn. at 400/220KV Kishanganj S/Stn. 400/220 / . Extn. at 400/220KVPatna S/Stn. -4 Eastern Region Strengthening Scheme - IV 220/132 / . Extn. at 220/132Kv Siliguri S/stn. / . 1x50 1x160 Replacement of 1x50MVA Tfr. By 1x160MVA Tfr. in Birpara S/stn. / . 2x50 2x160 Replacement of 2x50MVA Tfr. by 2x160MVA Tfr. in Malda S/stn. 125 400.220 / . 125MVAR Bus Reactor at 400.220Kv Ranchi & Patna S/Stn. / . (400 - -1 ) Addl. Bay at Malda S/Stn. (against 400Kv Malda-Farakka line-I) / - Powergrid Sub station Works associated with Transmission Scheme for Enabling Import of NER/ER Surplus Power by ER. 400 / - () 400KV D/C B'gaon-Siliguri line (Q) / . 2 400 2nos. 400KV bays at Bongaigaon S/Stn. / . 2 400 2nos. 400KV bays at Siliguri S/Stn. 400 / - () 400KV D/C Purnea-B'shariff line(Q)

... /.. MVA GoI / Ratio BoD Approval2x315 2x200 2x200

Compl. Tgt. / Ant./ Act'14 Mar'14 '13 Mar'13 . '12 Nov'12 .'12 Oct'12 '13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13 '13 Mar'13 . '13 Nov'13 . '13 Nov'13 . '13 Nov'13 . '13 Nov'13 . '13 Nov'13 '13 April'13 '13 April'13 '13 April'13 '13 April'13 '13 April'13 '13 April'13

83

. '10 Sep'10 2x1500 4x1500 .' 10 Oct'10

84

85

'11 Mar'11 6x105 3x100

86

'11 July'11 1x160 1x160

2x160

87

. '11 Sep'11

'13 Mar'13

'13 Mar'13 '13 Mar'13

SS - page 30 of 31

Sl.No

- Name of the Sub -Station / . 2 400 2nos. 400KV bays at Purnea S/Stn. / . 2 400 2nos. 400KV bays at Biharshariff S/Stn. 0 - "" 1 Transmission System for Phase-I Generation Projects in Jharkhand and West Bengal - Part - A. 400 ( ) 400KV GIS Pooling Station (Jharkhand Pool) near Essar () Transmission System associated with Pallatana gas Based Power Project and Bongaigaon Thermal Power Station (BTPS) 400/220 / . () 220KV Silchar S/Stn. (New) 220/132 / . () 220/132 KV Mokokchung S/Stn. (New) 132/133 / . (400 ) 132/33 KV Melriat S/Stn. (upgradable to 400KV) 132/33 / . Extn. at 132/33 KV Imphal S/Stn. 220 () 220KV Switching station Mariani (New) 132/33 / . 132/33 KV Roing S/Stn. 132/33 / . 132/33 KV Tezu S/Stn. 132/33 / . 132/33 KV Nmsai S/Stn. 400 , 132 (), 132 ,132 (), 132 (), 132 ( ), () - - Bay extension at 400 KV Bongaigaon , 132 KV Badarpur (POWERGRID), 132 KV Melriat , 132 KV Mokochung (Nagaland), 132KV Ziro (POWERGRID) and 132KV Pasighat (Govt. of Arunachal),Hailakandi & Sirkona (AEGCL) Substations.

... /.. MVA GoI / Ratio BoD Approval

Compl. Tgt. / Ant./ Act '13 Mar'13 '13 Mar'13 . '13 Nov'13 . '13 Nov'13

88

-

. '11 Oct'11

NORTH EASTERN REGION

89

790

. '10 Feb'10

. '13 Dec'13 '12 Jun'12 '13 Mar'13 . '13 Dec'13 '13 Mar'13 '13 Mar'13 . '13 Dec'13 . '13 Dec'13 . '13 Dec'13

2x200 2x50 2x50 2x50 2x15 2x15 2x15

'12 '13 Jun'12 to Mar'13

SS - page 31 of 31