powerpoint presentation · 1 advisories and cautionary statement...

39
APRIL 2020

Upload: others

Post on 29-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

0

APRIL 2020

Page 2: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

1

ADVISORIES AND CAUTIONARY STATEMENTCertain information contained herein may constitute forward-looking statements and information (collectively, "forward-looking statements") within the meaning of applicable securities legislation that involve known and unknown risks, assumptions, uncertaintiesand other factors. Forward-looking statements may be identified by words like ‘‘anticipates’’, ‘‘estimates’’, ‘‘expects’’, ‘‘indicates’’, ‘‘intends’’, “may”, “could” “should”, “would” ‘‘plans’’, ‘‘scheduled’’, ‘‘projects’’, ‘‘outlook’’, ‘‘proposed’’, ‘‘potential’’ ‘‘will’’, and similarexpressions. Forward-looking statements in this investor presentation include statements relating to Inter Pipeline's business strategy, plans, objectives, priorities and desired investment profile characteristics which include, without limitation: (i) Inter Pipeline'sgrowth potential, operational reliability, cash flow quality, available liquidity, counterparty quality, balance sheet strength, financial flexibility, capital structure, investment grade credit rating, dividend, dividend policy or philosophy, targeted dividend payout ratioand EH&S performance and governance initiatives; (ii) benefits or proceeds that may be derived from securing a strategic partner in the Heartland Petrochemical Complex and as a result of the suspension of the DRIP; (iii) the anticipated future EBITDAcontribution from the cost-of-service and fee-based cash flow derived from various business segments or otherwise; (iv) the capital expenditure amounts required, financing plans and anticipated in-service dates, for the completion of various projects andopportunities including the potential benefits to be derived therefrom; (v) the contracting process to secure cost-of-service contracts for the Heartland Petrochemical Complex or other NGL processing opportunities; (vi) Inter Pipeline’s advantages and benefits inthe polypropylene market including demand growth, the propane supply and cost advantages in Canada, the expected delivered cash costs for Alberta produced PP, all potential benefits to propane producers and polypropylene buyers including the commercialframework, propane producer netback and uplift and polypropylene buyer costs; and (vii) the financial forecasts and anticipated financial performance of Inter Pipeline. Such statements reflect the current views of Inter Pipeline with respect to future events andare subject to certain risks, uncertainties and assumptions that could cause the results of Inter Pipeline to differ materially from those expressed in the forward-looking statements. Factors that could cause actual results to vary from forward-looking statements ormay affect the operations, performance, development and results of Inter Pipeline's businesses include, among other things: risks and assumptions associated with operations, such as Inter Pipeline's ability to successfully implement its strategic initiatives andachieve expected benefits, including the further development of its pipeline systems and other facilities or projects including the construction of the Heartland Petrochemical Project; assumptions concerning operational reliability; Inter Pipeline's ability to maintainits investment grade credit ratings; risks and uncertainties associated with Inter Pipeline's ability to maintain its current level of cash dividends to its shareholders; assumptions based upon Inter Pipeline's current guidance including projected future EBITDA levels;the ability to access sufficient capital from internal and external sources including debt and equity capital; risks inherent in Inter Pipeline's Canadian and foreign operations; Inter Pipeline's ability to generate sufficient cash flow from operations to meet its currentand future obligations; the potential delays of and costs of overruns on construction projects, including, but not limited to Inter Pipeline's current and future projects; risks associated with the failure to finalize formal agreements with counterparties incircumstances; Inter Pipeline's ability to make capital investments and the amounts of capital investments; increases in maintenance, operating or financing costs; the realization of the anticipated benefits of acquisitions; the availability and price of labour,equipment and construction materials; the status, credit risk and continued existence of customers having contracts with Inter Pipeline and its affiliates; availability of energy commodities; volatility of and assumptions regarding prices of energy commodities;competitive factors, including competition from third parties in the areas in which Inter Pipeline operates or intends to operate, pricing pressures and supply and demand in the natural gas, propane and oil transportation, natural gas liquids extraction and storageindustries; fluctuations in currency and interest rates; inflation; risks of war, hostilities, civil insurrection, pandemics (including COVID-19), instability and political and economic conditions in or affecting countries in which Inter Pipeline and its affiliates operate;severe weather conditions and risks related to climate change; terrorist threats; risks associated with technology; changes in laws and regulations, including environmental, regulatory and taxation laws, and the interpretation of such changes to Inter Pipeline'sbusiness; the risks associated with existing and potential or threatened future lawsuits and regulatory actions against Inter Pipeline and its affiliates; availability of adequate levels of insurance; difficulty in obtaining necessary regulatory approvals or land accessrights and maintenance of support of such approvals and rights; the effects and impacts of the COVID-19 pandemic as further described below and the oil price war between Russia and Saudi Arabia, the extent and duration of which are uncertain at this time, onInter Pipeline's business and general economic and business conditions and markets, and such other risks and uncertainties described from time to time in Inter Pipeline's reports and filings with the Canadian securities authorities. The impact of any oneassumption, risk, uncertainty or other factor on a forward-looking statement cannot be determined with certainty, as these are interdependent and Inter Pipeline’s future course of action depends on management’s assessment of all information available at therelevant time. You can find a discussion of those risks and uncertainties in Inter Pipeline’s securities filings at www.sedar.com.

In particular and without limitation of the foregoing, the recent outbreak of COVID-19 has had a negative impact on global financial conditions. Inter Pipeline cannot accurately predict the impact COVID-19 will have on its ability to execute its business plans inresponse to government public health efforts to contain COVID-19 and to obtain financing or third parties' ability to meet their contractual obligations with Inter Pipeline, including due to uncertainties relating to the ultimate geographic spread of the virus, theseverity of the disease, the duration of the outbreak, and the length of travel and quarantine restrictions imposed by governments of affected jurisdictions; and future demand for Inter Pipeline's services. In the event that the prevalence of COVID-19 continues toincrease (or fears in respect of COVID-19 continue to increase), governments may increase regulations and restrictions regarding the flow of labour or products, and travel bans, and Inter Pipeline's operations, suppliers and customers, and ability to advance itsprojects or carry out its ongoing business plan, could be adversely affected. In particular, should any employees or consultants of Inter Pipeline become infected with COVID-19 or similar pathogens, it could have a material negative impact on Inter Pipeline'soperations, prospects, business, financial condition and results of operations. Further, without limitation of the foregoing, future dividend payments, if any, and the level thereof is uncertain, as Inter Pipeline's dividend policy and the funds available for thepayment of dividends from time to time is dependent upon, among other things, available funds from operations, financial requirements for Inter Pipeline's operations and the execution of its growth strategy, fluctuations in working capital and the timing andamount of capital expenditures, debt service requirements and other factors beyond Inter Pipeline's control. The ability of Inter Pipeline to pay dividends is subject to applicable laws (including the satisfaction of the solvency test contained in applicable corporatelegislation) and contractual restrictions contained in the instruments governing its indebtedness, including its credit facilities. The estimates of 2020 EBITDA in this investor presentation may be considered to be future-oriented financial information or a financialoutlook under applicable securities laws and are based on the assumptions and factors set out above. The future-oriented financial information and financial outlook contained in this investor presentation have been approved by management as of the date of thisinvestor presentation. Readers are cautioned that any such financial outlook and future oriented financial information contained herein should not be used for purposes other than those for which it is disclosed herein. As actual results could vary significantly fromthe forward-looking statements, you should not put undue reliance on forward-looking statements. Except as required by applicable law, Inter Pipeline assumes no obligation to update or revise any forward-looking statements. The forward-looking statementscontained in this document and all subsequent forward-looking statements, whether written or oral, attributable to Inter Pipeline or persons acting on Inter Pipeline's behalf are expressly qualified in their entirety by these cautionary statements.

NON-GAAP FINANCIAL MEASURES: Certain financial measures referred to in this investor presentation are not measures recognized by GAAP. These non-GAAP financial measures do not have standardized meanings prescribed by GAAP and therefore maynot be comparable to similar measures presented by other entities. Investors are cautioned that these non-GAAP financial measures should not be construed as alternatives to other measures of financial performance calculated in accordance with GAAP suchas net income. In particular, EBITDA is not a measure recognized by GAAP. EBITDA is expressed as net income before financing charges, income taxes, depreciation and amortization. See Inter Pipeline's most recent MD&A for an example of the reconciliationof EBITDA to net income.

IHS MARKIT MATERIALS: The IHS Markit reports, data and information referenced herein (the "IHS Markit Materials") are the copyrighted property of IHS Markit Ltd. and its subsidiaries (“IHS Markit”) and represent data, research, opinions or viewpointspublished by IHS Markit, and are not representations of fact. The IHS Markit Materials speak as of the original publication date thereof and not as of the date of this document. The information and opinions expressed in the IHS Markit Materials are subject tochange without notice and IHS Markit has no duty or responsibility to update the IHS Markit Materials. Moreover, while the IHS Markit Materials reproduced herein are from sources considered reliable, the accuracy and completeness thereof are not warranted,nor are the opinions and analyses which are based upon it. IHS Markit is a trademark of IHS Markit. Other trademarks appearing in the IHS Markit Materials are the property of IHS Markit or their respective owners. Inter Pipeline, and its subsidiaries, subscribe tovarious IHS Markit data services and a subsidiary of Inter Pipeline has contracted with IHS Markit for consultant services with respect to the Heartland Petrochemical Complex.

THIRD PARTY INFORMATION: This investor presentation includes market, industry and economic data which was obtained from various publicly available sources and other sources believed by Inter Pipeline to be true. Although Inter Pipeline believes it to bereliable, it has not independently verified any of the data from third party sources referred to in this investor presentation, or analyzed or verified the underlying reports relied upon or referred to by such sources, or ascertained the underlying economic and otherassumptions relied upon by such sources. Inter Pipeline believes that its market, industry and economic data is accurate and that its estimates and assumptions are reasonable, but there can be no assurance as to the accuracy or completeness thereof. Theaccuracy and completeness of the market, industry and economic data used throughout this investor presentation are not guaranteed and Inter Pipeline makes no representation as to the accuracy of such information.

CREDIT RATINGS: Credit ratings are intended to provide investors with an independent measure of credit quality of an issue of securities. Credit ratings are not recommendations to purchase, hold or sell securities and do not address the market price orsuitability of a specific security for a particular investor. There is no assurance that any rating will remain in effect for any given period of time or that any rating will not be revised or withdrawn entirely by a rating agency in the future if, in its judgment,circumstances so warrant.

Page 3: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

2

INVESTMENT HIGHLIGHTS

▪ Top tier energy infrastructure business that has significant growth potential

▪ Reliable operations, with stable cash flow and a self-funded equity model

▪ Significant liquidity available on $1.5 billion committed credit facility

▪ High-quality counterparties, with ~80% of revenue sourced from investment grade entities

Page 4: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

3

WORLD-SCALE ENERGY INFRASTRUCTURE

2.3 million b/d of contracted

capacity

Conventional Oil Pipelines

Over 240,000 b/d of production

capacity

3,900 km pipeline network in

Western Canada

Oil SandsTransportation

NGL Processing

Bulk Liquid Storage

37 million barrelsof storage capacity

in Europe

55% 20% 15% 10%

2019 Annual EBITDA ($1,051 million)

Page 5: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

4

VALUE CREATION

▪ Pursuing a strategic partner for a material interest in the Heartland Petrochemical Complex

▪ DRIP suspension eliminates dilution and results in self-funded equity model

▪ Stable cost-of-service and fee-based EBITDA contribution expected during 2020 of $780 to $810 million*

▪ $182 million CAPL expansion phases one and two both expected to be in service by mid-2020

*Excludes cost-of-service and fee-based NGL Processing adjusted EBITDA, assuming normal operations

Page 6: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

5

ACTION BASED BUSINESS STRATEGY

ENSURE SAFE AND RELIABLE OPERATION OF OUR HIGH-QUALITYENERGY INFRASTRUCTURE

▪ Oil sands, conventional and bulk liquid storage expected to provide cash flow stability

▪ Continued focus on the construction and commercial underpinning of HPC

▪ Workforce health and safety during these unprecedented times remains a top priority

MEASURES TO ENSURE FINANCIAL STRENGTH AND FLEXIBILITY

▪ Over $0.5 billion of cash flow retained annually through dividend reduction

▪ Reduced capital expenditures and implementing expense reductions organization wide

▪ Exploring partnership opportunities for a material interest in HPC

▪ Suspended DRIP to eliminate shareholder dilution

Page 7: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

6

EBITDA BY CONTRACT TYPE

84% of 2019 EBITDA was generated from cost-of-service and fee-based contracts

Product Margin 3%

Commodity-Based 13%

Fee-Based 17%

Cost-of-Service 67%

100%

66%

71%

22%

25%

21%

57%

29%

Oil Sands Transportation($579 million)

NGL Processing($215 million)

Conventional Oil Pipelines($153 million)

Bulk Liquid Storage($104 million)

9%

Total EBITDA: $1,051 million

Year ended December 31, 2019

Page 8: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

7

DIVIDEND PROFILE

▪ Provides additional financial flexibility

✓ Over $0.5 billion of incremental cash retained annually

▪ Positioned to self-fund the remaining equity required for current capital expenditures

✓ DRIP suspension eliminates dilution

▪ Dividend philosophy

✓ Deliver a meaningful and stable dividend to shareholders

✓ 100% underpinned by cost-of-service and fee-based cash flow

✓ Opportunity to increase the dividend in the future as business conditions permit

Dividends per share

Monthly dividend reset to $0.04 per share or $0.48 on an annualized basis

$1.69 $1.71

$0.79

2018 2019 2020F

2020F based on actual dividends to date and $0.04 per share per month thereafter

Page 9: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

8

Page 10: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

9

HEARTLAND PETROCHEMICAL COMPLEX (HPC)

▪ Transformational growth opportunity

✓ Capacity to consume ~22,000 b/d of propane to produce ~525 kilotonnes per annum (KTA) of polypropylene (PP)

✓ Expected to add approximately $450-500 million of long-term average annual EBITDA

✓ Target 70-85% of processing capacity to be underpinned by cost-of-service contracts

▪ Alberta-produced PP expected to have one of the lowest cash costs in North America

✓ Oversupplied propane market in Western Canada drives a long-term, low-cost feedstock advantage

Page 11: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

10

50

100

150

200

250

300

2015F 2020F 2025F 2030F 2035F

CANADIAN PROPANE SUPPLY ADVANTAGE

▪ Canadian propane market to remain oversupplied over the long-term✓ More than 100,000 b/d of expected

oversupply that will have to be exported

✓ Forecast petrochemical demand and potential international LPG exports will not balance the Canadian propane market

✓ Supply expected to grow as investment in liquids-rich gas plays is projected to continue

▪ Canadian propane market structurally disadvantaged✓ Canadian propane priced at a discount to

the US due to oversupply and lack of egress

✓ Since Cochin reversal, the five-year average Mont Belvieu to Edmonton propane price differential has been $0.28 USD per USG*

000’s b/d

2035F

Propane Exports CKPC PDH Feedstock

Base Propane Demand IPL PDH Feedstock

Source: IHS Markit Materials and IPL estimates*Average from April 2014 to December 2018, representing the period since the Cochin pipeline discontinued Alberta propane export service

Page 12: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

11

$0

$500

$1,000

$1,500

$2,000

$2,500

2013 2014 2015 2016 2017 2018 2019

POLYPROPYLENE IS A PREMIUM PRODUCTUSD per Tonne

Converting Canadian Propane into Polypropylene has significant economic uplift

IHS General Purpose Homopolymer PP Edmonton Propane*

*Price adjusted for propane to polypropylene yield of 1.2x **Average from April 2014 to December 2019, representing the period since the Cochin pipeline discontinued Alberta propane export service

Average PP to Propane Spread**

North American PP to Edmonton Propane Price Differential

Spread ~$1,400 USD per Tonne

Page 13: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

12

POLYPROPYLENE DEMAND

▪ United States is the primary market for PP in North America✓ Targeting the US Midwest for HPC PP,

which accounts for ~45% of US market demand

Canada6%

Mexico18%

United States76%

~8,200 KTA

▪ PP is the world’s single largest polymer ✓ Accounts for ~30% of global demand

✓ Used in many common goods such as consumer packaging, automobile parts, medical equipment, currency and textiles

▪ Types of PP include homopolymer as well as random and impact copolymer✓ HPC to initially focus on homopolymer, which

accounts for ~70% of the global market

▪ Strong demand growth✓ Global demand of ~73,000 KTA forecast to

grow to ~98,000 KTA by 2025

✓ World-scale facility required every ~3 years to meet future North American demand

✓ Canada currently imports 100% of its PP demand

North American PP Demand

Source: IHS Markit Materials; demand figures based on 2018 actuals

Page 14: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

13

PROPANE PRODUCER VALUE PROPOSITION

ProducerDelivers Propane

Propane Producer Receives PP Market Price

Propane Producer Counterparty

IPL PPProduction Process

IPL Receives Fixed Capital Fee +

Operating Cost Recovery

IPL ReceivesPP Delivery Cost

Recovery

▪ Benefits for propane producers:

✓ Offers a higher realized propane price relative to selling in the local, oversupplied market

✓ Creates ratable demand for propane

✓ Adds diversification to propane sales portfolio

▪ Commercial framework:

✓ Producer delivers propane and pays a fixed capital fee, as well as an operating and delivery cost recovery charge in exchange for receiving a PP market price

Propane producers are able to realize an increased netback from converting their low-value propane into higher-value PP

Universe of >60 Producers

Page 15: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

14

0%

100%

200%

300%

400%

500%

2014* 2015 2016 2017 2018 2019

INDICATIVE PROPANE PRODUCER UPLIFT

$1.00

$0.75

$0.00

Edmonton Propane Price

$0.50

$0.25

Heartland Polypropylene Edmonton Propane (USD per USG)

Propane Value Increase

Propane producers would have realized a 105%* uplift in their propane value through the Heartland Complex

65%

415%

166%

29%

133%

Propane value increase based on Edmonton propane price, an indicative capital fee as well as estimated operating, marketing and delivery costs *Data from April 2014 through December 2019, representing the period since the Cochin pipeline discontinued Alberta propane export service

75%

$1.25

Page 16: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

15

PP BUYER VALUE PROPOSITION

▪ Benefits for PP buyers:

✓ Offers lower realized PP feedstock price relative to buying on the spot market

✓ Provides supply diversification

✓ Allows vertical integration without capital outlay

▪ Commercial framework:

✓ Counterparty pays a fixed capital fee as well as a propane, operating and delivery cost recovery charge to receive physical PP production

PP buyers are able to lock in lower cost, Alberta-produced PP

IPL Receives Propane Cost

Recovery

PP Counterparty Receives Production

IPL or 3rd Party Propane Supply

IPL PPProduction Process

IPL Receives Fixed Capital Fee +

Operating Cost Recovery

IPL ReceivesPP Delivery Cost

RecoveryUniverse of >50 PP Buyers

Page 17: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

16

0%

6%

12%

18%

24%

30%

2014* 2015 2016 2017 2018 2019

INDICATIVE PP BUYER SAVINGSEdmonton Propane Price

PP buyers would have saved 20%* through the Heartland Complex

Polypropylene Savings

Polypropylene savings based on Edmonton propane price, an indicative capital fee as well as estimated operating and delivery costs *Data from April 2014 through December 2019, representing the period since the Cochin pipeline discontinued Alberta propane export service

Heartland Polypropylene Edmonton Propane (USD per USG)

18%

26%

22%

10%

27%$1.25

$1.00

$0.75

$0.00

$0.50

$0.25

14%

Page 18: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

17

PROJECT STATUS

▪ Approximately 65% of the $3.5 billion project cost de-risked✓ Based on lump-sum contracts, firm

purchase orders, and substantially completed design and construction activities

▪ Well-advanced PDH project✓ Over $500 million lump-sum/unit rate

contract for construction awarded to Kiewit

✓ Propane-propylene splitter installed on site

▪ PP development progressing✓ FEED complete

✓ Detailed engineering over 85% complete

✓ PP reactor successfully installed on site

▪ COVID-19 implications are currently being assessed

Page 19: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

18

OPERATIONAL EXPERTISE & READINESS

▪ Extensive NGL operating experience

✓ Full operational responsibility for the Cochrane straddle plant, as well as the Pioneer 1 & 2 offgas plants

✓ Management oversight of the Redwater Olefinic Fractionator, as well as the Empress II & V straddle plants

▪ De-risking facility start-up

✓ Utilizing commercially-proven PDH and PP process technologies

✓ Ability to leverage technology licensors for training and support

✓ Over 140 personnel hired, including the GM and senior members of the team

Page 20: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

19

Invested 2020F 2021F

CAPITAL PROFILE & FINANCING STRATEGY

Heartland Complex financing sources

▪ Potential proceeds from a strategic partnership

▪ Capacity available under existing $1.5 billion committed credit facility

✓ Over $1.4 billion available as at Q4 2019

▪ Periodic issuance of new term debt

▪ Hybrid debt securities

✓ Successfully issued $1.45 billion of hybrid notes during 2019

▪ Undistributed cash flow from operations

~$400

~$2,200

$ Million

Positioned to self-fund HPC without external equity or DRIP

As at Q4 2019

Total project cost of ~$3.5 billion

~$900

Page 21: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

20

Central Alberta Pipeline System

CENTRAL ALBERTA PIPELINE SYSTEM EXPANSION EDMONTON

HARDISTY

STETTLER

Phase 1:Stettler Station

Mid-2020($82MM)

Phase 4: Mainline

Expansion

Phase 3:Three Hills

Phase 2:Viking Connector

Q2 2020($100MM)

▪ Phase 1: Stettler Station expansion✓ Product batching and 10,000 b/d of additional

truck unloading capacity completed; two 130,000 barrel tanks under construction

✓ Forecast annual EBITDA of ~$20 million

▪ Phase 2: Viking Connector✓ Bow River to CAPL pipeline connection,

secured by multi-year agreements

✓ Forecast incremental 10,000 to 15,000 b/d

▪ Phases 3 and 4 represent over $400 million of future development potential✓ Pipeline expansion into Three Hills region of

the East Duvernay, where production forecasts are up to 100,000 b/d

✓ Potential mainline expansion required to meet forecast production growth

Bow River Pipeline SystemPhase 2 CAPL ExpansionFuture Expansion Phases

Page 22: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

21

OIL SANDS GROWTH OPPORTUNITIES

Polaris PipelineCold Lake Pipeline

Corridor PipelineDiluent and / or Bitumen BlendAthabasca Oil

Sands

ASPEN PHASE 1 & 2

GRAND RAPIDS

SUNRISE PHASE 2 & DEBOTTLENECK

KIRBY NEXT GENERATION

HORIZON

GROUSE BLACKGOLD

ALGAR LAKEMACKAY RIVER

▪ Identified ~$2.8 billion of long-term growth opportunities

✓ Over 2.3 million b/d of available capacity that can be marketed across all three systems

✓ Well-positioned to accommodate both small-and large-scale projects

✓ Able to provide customers less regulatory, capital and schedule risk

▪ Proven overbuild strategy

✓ 11 bolt-on connections executed and over $580 million of capital deployed

✓ Average EBITDA multiple of ~3.2x

FRONTIER

CLYDEN

MEADOW CREEK

KEARL DEBOTTLENECK

AOC CORNERIMPERIAL CORNER

JACOS

OSUM TAIGA

CLARKE CREEK

IMPERIAL CHARD

Page 23: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

22

NGL PROCESSING OPPORTUNITIES

▪ Cochrane expansion✓ Potential to add 400 mmcf/d of processing

capacity, increasing plant total to 2.9 bcf/d

✓ Currently operating near capacity and bypassing natural gas

▪ Acrylic acid & derivatives facility✓ Opportunity to develop Canada’s first acrylic

acid facility in Alberta’s Heartland region

✓ Acrylic acid is a propylene derivative that is primarily used as a feedstock for super absorbent polymer production

✓ Received $70 million in royalty credits from the Alberta government in 2019

▪ Projects to be underpinned by cost-of-service or fee-based agreements

Page 24: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

23

Page 25: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

24

97%

CREDIT STRENGTH

77%

Bulk Liquid Storage

($294 million)

Oil SandsTransportation

($813 million)

ConventionalOil Pipelines

($717 million)

NGL Processing($711 million)

12 customers

Remaining contract duration of 20+ years

100+ producers

Typical exposure of 55 days

~130 customers

Remaining contract duration of 1+ years

~25 customers

Remaining contract duration of ~5 years

*Canadian operations include investment grade counterparties or contractual rights to obtain a guarantee from an investment grade parent; European operations include subsidiaries of investment grade parents where IPL typically has the contractual right to customary security

Investment Grade Revenue (2019)* Non-Investment Grade Revenue (2019)

Approximately 80% of revenue is sourced from investment grade entities*

44%75%

Page 26: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

25

$0

$2

$4

$6

$8

2014 2015 2016 2017 2018 2019

CAPITAL STRUCTURE

▪ Target capital structure of 50% to 55% sr. recourse debt to total capitalization✓ Strong ratio of 41%*, well below our credit

facility covenant of 65%

▪ Investment grade credit rating✓ DBRS rating of BBB and S&P rating of BBB-

▪ $1.4 billion of consolidated debt is non-recourse to IPL✓ Corridor pipeline system has its own capital

structure and credit ratings

✓ Flow through of interest costs to shippers

✓ IPL bank covenants and credit rating metrics exclude non-recourse debt

▪ $1.45 billion of subordinated hybrid notes issued that receive 50% equity treatment

$ Billion

Recourse Debt Non-Recourse Debt IPL Senior

IPL Subordinated*Corridor

*As at December 31, 2019Hybrid note equity treatment by credit rating agencies

Page 27: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

26

Bulk Liquid Storage NGL Processing

EBITDA BY BUSINESS SEGMENT$ Million

Oil Sands Transportation Conventional Oil Pipelines

2020 adjusted EBITDA of $780 to $810 million expected from Oil Sands, Conventional and Bulk Liquid Storage*

$0

$250

$500

$750

$1,000

$1,250

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

*Excludes NGL Processing and midstream marketing activities, assuming normal operations

Page 28: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

27

Page 29: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

28

▪ Three major pipeline systems✓ Contracted capacity of ~2.3 million b/d;

ultimate capacity of ~4.6 million b/d

✓ Over 3,300 km of pipeline, with 3.8 million barrels of storage capacity

▪ EBITDA underpinned by long-term cost-of-service contracts✓ Independent of throughput volume and

commodity prices, with a flow through of substantially all operating costs

✓ Over 20 years remaining on contracts and ~40 years if extension provisions are exercised

▪ Approximately 97% of revenue from investment grade counterparties

OIL SANDS TRANSPORTATION

AOSP IMPERIAL KEARLHUSKY SUNRISE

AOC HANGINGSTONEJACOS / NEXEN

HANGINGSTONE

CVE NARROWS LAKECVE CHRISTINA LAKE

CNR KIRBY SOUTH

CVE FOSTER CREEK

OSUM ORION

IMPERIAL COLD LAKE

CNR PRIMROSE/ WOLF LAKE

BRUDERHEIMFACILITY

CNR KIRBY NORTH

Polaris PipelineCold Lake Pipeline

Corridor PipelineDiluent and / or Bitumen BlendAthabasca Oil

Sands

Page 30: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

29

NGL PROCESSING

Cochrane~100,000 b/d Capacity

Pioneer I & II

Redwater~40,000 b/d Capacity

Heartland Complex525 KTA Capacity

Empress II & V* ~105,000 b/d Capacity

▪ Large-scale NGL infrastructure ✓ Three straddle plants strategically

located on the NGTL System

✓ Two offgas plants, Pioneer I & II, that have dedicated supply agreements

✓ Ethane-plus fractionation facilityat Redwater

✓ Boreal pipeline, with low cost expansion up to 125,000 b/d

✓ Building the Heartland Complex, Canada’s first integrated PDH and PP facility

▪ Cost-of-service, fee-based and commodity-based business✓ Approximately 77% of revenue from

investment grade counterparties

Boreal PipelineOffgas Extraction

FacilityStraddle Plant

Redwater Olefinic Fractionator

Heartland ComplexAthabasca Oil

SandsNGTL Pipeline

System

*50% working interest in the Empress V facility

Page 31: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

30

CONVENTIONAL OIL PIPELINES

▪ Three pipeline systems

✓ 3,900 km of pipeline and over 1.3

million barrels of storage capacity

✓ Transported ~190,000 b/d in Q4 2019

▪ Cost-of-service, fee-based and product margin business

✓ Serve over 100 producers

✓ Midstream marketing operations

optimize asset footprint

✓ Approximately 75% of revenue from

investment grade counterparties

Bow River PipelineCentral Alberta

PipelineMid-Saskatchewan

PipelineViking Formation

East Duvernay Formation

Page 32: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

31

BULK LIQUID STORAGE▪ 23 petroleum and petrochemical

storage terminals in Europe✓ Operations in six different countries

✓ ~37 million barrels of storage capacity

✓ Generally, serve the petroleum, chemical and biofuel markets

▪ Cost-of-service and fee-based business✓ Diversified customer base

✓ 93% utilization rate in Q4 2019

▪ Over $100 million of adjusted EBITDA generated in 2019✓ Positive outlook for 2020, with the

return of contango market conditions and increased storage demand globally

IRELAND

ENGLAND

GERMANY

SWEDEN

DENMARK

NETHERLANDS

Terminal Location

Page 33: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

32

Page 34: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

33

GOVERNANCE

▪ Commitment to sustainable practices and operational excellence✓ Issued second sustainability report in

accordance with SASB, GRI and TCFD frameworks

✓ Sustainability Steering Committee comprised of CEO and senior management

▪ Strong corporate governance ✓ Board of Directors positioned to have over

35% female representation

✓ All directors independent, excluding CEO

✓ Three directors appointed in 2018, adding a mix of new perspective and petrochemical experience

✓ Two new directors nominated in 2020

Page 35: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

34

ENVIRONMENT

▪ Offgas facilities process waste gas from oil sands upgraders✓ Extracting a valuable liquids stream and

removing ~336,000 tonnes of GHG per year

▪ HPC-produced PP is expected to have a low GHG emissions profile✓ PP is a fully recyclable plastic

✓ GHG footprint ~65% lower than the global average and ~35% lower than the North American average*

✓ Bi-product hydrogen produced at HPC can be used as fuel gas, reducing CO2e emissions by ~130,000 tonnes per year

▪ Safety is a top priority

✓ 99.99% pipeline delivery rate

✓ Achieved six million hours worked without an employee lost time accident**

*Source: IHS Markit Materials **For Canadian operations as at December 2019

Page 36: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

35

0

1

2

3

4

5

$0

$1

$2

$3

$4

$5

2016 2017 2018 2019

$ Million

SOCIAL

▪ Meaningful engagement with community members and indigenous peoples✓ Fort McKay First Nation Joint Venture

▪ Mental health recognized as part of safety culture✓ Industry leader providing awareness

training and extended benefits programs to all employees

✓ 2018 CEPA Foundation Award for Safety, recognizing commitment to mental health

▪ During HPC construction ~$2.75 billion to be invested in the Alberta economy ✓ Approximately 13,000 direct and indirect

jobs during construction and ~200 full-time jobs once HPC is fully operational

Community Investment Volunteer Hours

3,800 hours volunteered in 2019

$4.0

$3.0$2.8

$2.3

Hours (000’s)

Ten-year, $10 million partnershipwith NAIT* to research plasticwaste reduction and support thereuse and recycling of plastic

*Northern Alberta Institute of Technology

Page 37: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

36

LOOKING FORWARD

▪ Self-funded equity model, with significant liquidity available on $1.5 billion committed credit facility

▪ Focus on maintaining financial flexibility

▪ Continuing to progress construction and commercial underpinning of HPC

▪ Diversified asset portfolio expected to generate long-term and predictable cash flow

▪ Objective to deliver meaningful and sustainable dividends to shareholders

Page 38: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

37

HPC SITE

Site photo taken Q4 2019

Page 39: PowerPoint Presentation · 1 ADVISORIES AND CAUTIONARY STATEMENT Certaininformationcontainedhereinmayconstituteforward-lookingstatementsandinformation(collectively,"forward-lookingstatements

3838

INTER PIPELINE LTD.SUITE 3200, 215 – 2ND STREET SWCALGARY, AB T2P 1M4

PHONE: 1 (866) 716 7473PHONE: 1 (403) 290 6000WEB: INTERPIPELINE.COM

[email protected]

CONTACT INFORMATION