2009 9/18 Matunaga-Lab ARLISS Project 2009 1
ARLISS2009Matunaga-Lab A-team
Members
Nobuhiko Kisa Kyohei Akiyama
Mitsuhiro Yamazumi Kazuya Ishizaka Hiroyuki Morishita Masanori Matsushita
2009 9/18 Matunaga-Lab ARLISS Project 2009 2
Our CanSat & Mission
Our CanSat is consist of Two Satellites
『Tom』 shoots 『Jerry』 with camera
Mission
Tom Jerry
2009 9/18 Matunaga-Lab ARLISS Project 2009 3
Requirement & Design
• 『Tom』 must Know direction of itself
Hand made Sun Sensor used for this requirement
Get out-put of Sun direction
Direction of 『Tom』 determined
The Position of the Sun determined by time
Sun Sensor
2009 9/18 Matunaga-Lab ARLISS Project 2009 4
Requirement & Design
• 『Tom』 must know 『Jerry’s』 GPS data
『Jerry』 uplink the GPS position to 『Tom』
『Tom』『Jerry』
GPS data
Uplink !
2009 9/18 Matunaga-Lab ARLISS Project 2009 5
Requirement & Design
• 『Tom』 must have camera rotation mech.
table rotating axis
We designed following mechanism
camera rotating axis
Camera
Rod
motor2
motor1
Timing belt
gear
2009 9/18 Matunaga-Lab ARLISS Project 2009 6
Demo
Movie of camera rotation
2009 9/18 Matunaga-Lab ARLISS Project 2009 7
1st flight
2009 9/18 Matunaga-Lab ARLISS Project 2009 8
Result of 1st flight
•『Tom 』 got sensor data
•『Tom』 communicated with GS
•Rotation system worked
•Separation system worked
Success
failure
•『Jerry』 didn’t work
•Camera didn’t work
Plot of GPS data
40.82
40.83
40.84
40.85
40.86
40.87
40.88
119.1150 119.1200 119.1250 119.1300 119.1350 119.1400 119.1450 119.1500
La
titu
de
[d
eg
]
Longitude [deg]
射場
GPSデータ取得開始
GPSデータ取得終了および機体回収場所
Launch site
GPS tracking start
point
Retrieve
point
2009 9/18 Matunaga-Lab ARLISS Project 2009 9
2nd flight
2009 9/18 Matunaga-Lab ARLISS Project 2009 10
Result of 2nd flight
•22 Pictures(640×480picel)
•『Jerry』 uplinked data to 『Tom』(1time)
•『Tom』&『Jerry』 got their sensor data
•Rotation,Separation system worked
Success
failure
•『Jerry』 is not in these pictures
•『Tom』 froze 5min after launch
Example of pictures
2009 9/18 Matunaga-Lab ARLISS Project 2009 11
• Minimum success ○・separation system ・camera rotation system
・saving sensor data ・getting pictures
• Middle success △・communication Tom with Jerry succeeded 1 time
・Sun sensor worked
• Full success ×
・attitude determination failure
・taking a picture of launch site was failure
• Advanced success ×・Taking a picture of 『Jerry』 was failure
Success dgree(2nd flight)
2009 9/18 Matunaga-Lab ARLISS Project 2009 12
Additional flight
We could take a third flight fortunately. (But it is not success. GPSR was broken)
2009 9/18 Matunaga-Lab ARLISS Project 2009 13
Thank you !