powerpoint · ppt file · web viewpower plan. load calculations. ... tobacco smoke...

40

Upload: dangbao

Post on 17-Mar-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:
>

creation

Patrick Zuza

Patrick Zuzas Album

2012

530287

eng - iTunNORM 0000025B 00000003 0000ABE5 0000026B 000001A1 0000011F 00007E61 00007ECA 000001BC 000001BC

eng - iTunSMPB 00000000 00000210 0000070B 0000000000038865 00000000 00000000 00000000 00000000 00000000 00000000 00000000 00000000

Model

BIM Ex Plan

Integration

CodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

Integration

BIM Project Execution Plan Overview

Mission StatementldquoCreationrsquos one true aim is to enhance the quality of the communities we work with through innovative ideas and sustainable designrdquo

Project Mission StatementldquoTo create a lsquohigh performancersquo elementary school that functions as a multipurpose space for the community through a collaborative multi-disciplinary environmentrdquo

-ingenuity -quality -enjoyment -integrity

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Plan Overview

Goals for Bimbull Design a constructable elementary school for the

communitybull Integrate on the design to enhance the building for a

broader user groupbull Incorporate energy efficiency while being mindful of cost by

focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp

construction processbull - Achieve LEED Certification for the building

- Understand the effects of discipline specific decisions on the broader project team

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Project Schedule

PROJECT MILESTONE ESTIMATED START

ESTIMATED COMPLETION

PROJECT DELIVERABLE

INVOLVED PROJECT STAKEHOLDERS

Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM

Schematic Design 91412 10312 Presentation 2 MEP Struct CM

Design Development 10312 102412 Presentation3 MEP Struct CM

Construction Documents 102412 111212 Proposal MEP Struct CM

AEI Submission 111212 22212 Electronic Submission

MEP Struct CM

Short List Selection 22212 3812 None MEP Struct CM

Finalist Presentation 3812 4312 Final Presentation

MEP Struct CM

Award 4512 4512 None MEP Struct CM

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models

and construction updates

Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering

LightingElectrical

bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering

Mechanical

bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering

Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 2: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Model

BIM Ex Plan

Integration

CodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

Integration

BIM Project Execution Plan Overview

Mission StatementldquoCreationrsquos one true aim is to enhance the quality of the communities we work with through innovative ideas and sustainable designrdquo

Project Mission StatementldquoTo create a lsquohigh performancersquo elementary school that functions as a multipurpose space for the community through a collaborative multi-disciplinary environmentrdquo

-ingenuity -quality -enjoyment -integrity

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Plan Overview

Goals for Bimbull Design a constructable elementary school for the

communitybull Integrate on the design to enhance the building for a

broader user groupbull Incorporate energy efficiency while being mindful of cost by

focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp

construction processbull - Achieve LEED Certification for the building

- Understand the effects of discipline specific decisions on the broader project team

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Project Schedule

PROJECT MILESTONE ESTIMATED START

ESTIMATED COMPLETION

PROJECT DELIVERABLE

INVOLVED PROJECT STAKEHOLDERS

Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM

Schematic Design 91412 10312 Presentation 2 MEP Struct CM

Design Development 10312 102412 Presentation3 MEP Struct CM

Construction Documents 102412 111212 Proposal MEP Struct CM

AEI Submission 111212 22212 Electronic Submission

MEP Struct CM

Short List Selection 22212 3812 None MEP Struct CM

Finalist Presentation 3812 4312 Final Presentation

MEP Struct CM

Award 4512 4512 None MEP Struct CM

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models

and construction updates

Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering

LightingElectrical

bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering

Mechanical

bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering

Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 3: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

Integration

BIM Project Execution Plan Overview

Mission StatementldquoCreationrsquos one true aim is to enhance the quality of the communities we work with through innovative ideas and sustainable designrdquo

Project Mission StatementldquoTo create a lsquohigh performancersquo elementary school that functions as a multipurpose space for the community through a collaborative multi-disciplinary environmentrdquo

-ingenuity -quality -enjoyment -integrity

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Plan Overview

Goals for Bimbull Design a constructable elementary school for the

communitybull Integrate on the design to enhance the building for a

broader user groupbull Incorporate energy efficiency while being mindful of cost by

focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp

construction processbull - Achieve LEED Certification for the building

- Understand the effects of discipline specific decisions on the broader project team

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Project Schedule

PROJECT MILESTONE ESTIMATED START

ESTIMATED COMPLETION

PROJECT DELIVERABLE

INVOLVED PROJECT STAKEHOLDERS

Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM

Schematic Design 91412 10312 Presentation 2 MEP Struct CM

Design Development 10312 102412 Presentation3 MEP Struct CM

Construction Documents 102412 111212 Proposal MEP Struct CM

AEI Submission 111212 22212 Electronic Submission

MEP Struct CM

Short List Selection 22212 3812 None MEP Struct CM

Finalist Presentation 3812 4312 Final Presentation

MEP Struct CM

Award 4512 4512 None MEP Struct CM

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models

and construction updates

Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering

LightingElectrical

bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering

Mechanical

bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering

Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 4: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

BIM Project Execution Plan Overview

Mission StatementldquoCreationrsquos one true aim is to enhance the quality of the communities we work with through innovative ideas and sustainable designrdquo

Project Mission StatementldquoTo create a lsquohigh performancersquo elementary school that functions as a multipurpose space for the community through a collaborative multi-disciplinary environmentrdquo

-ingenuity -quality -enjoyment -integrity

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Plan Overview

Goals for Bimbull Design a constructable elementary school for the

communitybull Integrate on the design to enhance the building for a

broader user groupbull Incorporate energy efficiency while being mindful of cost by

focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp

construction processbull - Achieve LEED Certification for the building

- Understand the effects of discipline specific decisions on the broader project team

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Project Schedule

PROJECT MILESTONE ESTIMATED START

ESTIMATED COMPLETION

PROJECT DELIVERABLE

INVOLVED PROJECT STAKEHOLDERS

Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM

Schematic Design 91412 10312 Presentation 2 MEP Struct CM

Design Development 10312 102412 Presentation3 MEP Struct CM

Construction Documents 102412 111212 Proposal MEP Struct CM

AEI Submission 111212 22212 Electronic Submission

MEP Struct CM

Short List Selection 22212 3812 None MEP Struct CM

Finalist Presentation 3812 4312 Final Presentation

MEP Struct CM

Award 4512 4512 None MEP Struct CM

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models

and construction updates

Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering

LightingElectrical

bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering

Mechanical

bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering

Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 5: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

BIM Project Execution Plan Overview

Goals for Bimbull Design a constructable elementary school for the

communitybull Integrate on the design to enhance the building for a

broader user groupbull Incorporate energy efficiency while being mindful of cost by

focusing on both short term and lifetime cost benefitsbull Use BIM as a tool to improve our building design amp

construction processbull - Achieve LEED Certification for the building

- Understand the effects of discipline specific decisions on the broader project team

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Project Schedule

PROJECT MILESTONE ESTIMATED START

ESTIMATED COMPLETION

PROJECT DELIVERABLE

INVOLVED PROJECT STAKEHOLDERS

Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM

Schematic Design 91412 10312 Presentation 2 MEP Struct CM

Design Development 10312 102412 Presentation3 MEP Struct CM

Construction Documents 102412 111212 Proposal MEP Struct CM

AEI Submission 111212 22212 Electronic Submission

MEP Struct CM

Short List Selection 22212 3812 None MEP Struct CM

Finalist Presentation 3812 4312 Final Presentation

MEP Struct CM

Award 4512 4512 None MEP Struct CM

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models

and construction updates

Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering

LightingElectrical

bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering

Mechanical

bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering

Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 6: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

BIM Project Execution Project Schedule

PROJECT MILESTONE ESTIMATED START

ESTIMATED COMPLETION

PROJECT DELIVERABLE

INVOLVED PROJECT STAKEHOLDERS

Preliminary Planning 9112 91412 Presentation 1 MEP Struct CM

Schematic Design 91412 10312 Presentation 2 MEP Struct CM

Design Development 10312 102412 Presentation3 MEP Struct CM

Construction Documents 102412 111212 Proposal MEP Struct CM

AEI Submission 111212 22212 Electronic Submission

MEP Struct CM

Short List Selection 22212 3812 None MEP Struct CM

Finalist Presentation 3812 4312 Final Presentation

MEP Struct CM

Award 4512 4512 None MEP Struct CM

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models

and construction updates

Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering

LightingElectrical

bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering

Mechanical

bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering

Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 7: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

For each phase of the project the project team willbull Check and ensure completeness and accuracy of modelbull Check amp ensure completeness and accuracy of BIM Project Execution Planbull Coordinate all updates for individual models specialized discipline models

and construction updates

Team Responsibilitiesbull Develop BIM Modelbull Update amp Synchronize changes with Central Filesbull Proper Maintenance of Model and File Saving bull Maintain amp Revise BIM Planbull Integrate Discipline Models into Architectural BIM Model

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering

LightingElectrical

bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering

Mechanical

bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering

Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 8: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Managementbull Scheduling amp Sequencingbull Site Logisticsbull Equipment Procurementbull Cost Estimatingbull Constructability Analysisbull 4D Modeling Needsbull Construction Trends bull Clash Detection amp Coordinationbull Value Engineering

LightingElectrical

bull Lighting Planbull Power Planbull Load Calculationsbull Electrical Equipment Proposalbull Daylightingbull Clash Detection amp Coordinationbull Value Engineering

Mechanical

bull Heating amp Cooling Loadingbull Mechanical System Designbull Plumbing Designbull Energy Saving Analysisbull Clash Detection amp Coordinationbull Value Engineering

Structuralbull Structural System Designbull Analysis of Structural System Optionsbull Load Calculationsbull Clash Detection amp Coordinationbull Value Engineering

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 9: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

TASK ROLE Staff Size

Hours Planned Weeks

Model Development

Architect(Collaborative)CM

ElectricalLighting

MechanicalStructural

822222

2 hrswk8 hrswk8 hrswk8 hrswk8 hrswk8 hrswk

388888

Model Review

CMElectricalLighting

MechanicalStructural

22222

1 hrwk1 hrwk1 hrwk1 hrwk1 hrwk

1616161616

Structural Analysis amp Design

Structural

2

10 hrswk

8

LightingElectrical Analysis amp

Design

LightingElectrical

2

10 hrswk

8

Mechanical Analysis amp

Design

Mechanical

2

10 hrswk

8

LEED Certification Plus+

Reviews

Collaborative

8

4 hrswk

6

Schedule Development

Construction

Manager

2

5 hrswk

2

Cost Estimating

Construction Manager

2

10 hrswk

2

Value Engineering

Collaborative

8

3 hrswk

Ongoing

3D Coordination

Structural LightingElectrical

MechanicalConstruction Manager

2222

4 hrswk4 hrswk4 hrswk7 hrswk

3333

4D Modeling

Construction Manager

2

5 hrswk

3

Integration

BIM Project Execution Roles amp Organization

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

TASK ROLE Staff Size

Hours Planned

Weeks

Model Development

Architect(Collaborative) CM

Electrical Lighting

Mechanical Structural

8 2 2 2 2 2

2 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk 8 hrswk

3 8 8 8 8 8

Model Review

CM Electrical Lighting

Mechanical Structural

2 2 2 2 2

1 hrwk 1 hrwk 1 hrwk 1 hrwk 1 hrwk

16 16 16 16 16

Structural Analysis

amp Design

Structural

2

10 hrswk

8

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 10: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

BIM Project Execution Software

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

SOFTWARE VERSION PROJECT STAKE HOLDER TASK TYPE

Revit 2013 ARCH Design Authoring

3DS Max 2013 ARCHLE Design Rendering

Revit MEP 2013 ME Mechanical Authoring

Trane Trace v700 ME Mechanical Calculations

Revit MEP 2013 LE LightingElectrical Authoring

ComCheck 2013 LE Lighting Requirements

DaySim 2013 LE Lighting Daylighting

Agi32 Version 22 LE LE Calculations

ComFen 2013 LE Glazing Analysis

Revit Structure 2013 STRUCT Structural Authoring

RAM v1403 STRUCT Structural Analysis

SAP 2013 STRUCT Frame Analysis

Structure Point 2013 STRUCT Structural Analysis

RS Means CostWorks 2013 CM Cost Estimation

Primavera 2013 CM Project Scheduling

Navisworks 2013 CM 4D Modeling

Navisworks 2013 CM Clash Detection

Record Modeling 2013 CM Revit

Revit Navisworks 2013 MEPCM Revit Navisworks

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 11: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

BIM Project Execution File Naming

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

FILE SHOULD BE NAMED ACCORDING TO THE FOLLOWING AEITEAMNUMBER_DISCIPLINE_PHASE_DATEXYZ

ARCHITECTURAL MODEL AEI1_ARCH_SCHEMATIC_DATERVT

MECHANICALPLUMBING MODEL AEI1_MECH_SCHEMATIC_DATERVT

ELECTRICAL MODEL AEI1_ELEC_SCHEMATIC_DATERVT

LIGHTING MODEL AEI1_LTG_SCHEMATIC_DATERVT

STRUCTURAL MODEL AEI1_STRUCT_SCHEMATIC_DATERVT

CONSTRUCTION MODEL AEI1_CONST_SCHEMATIC_DATERVT

COORDINATION MODEL AEI1_COORD_SCHEMATIC_DATERVT

ENERGY MODEL AEI1_ENERGY_SCHEMATICRVT

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 12: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

BIM Project Execution Quality Control

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

CHECKS DEFINITION RESPONSIBLE PARTY

RECOMMENDEDPROJECT MILESTONES

VisualEnsure there are no unintended model components and the design intent has been followed

ALL Daily

Interference Check Ensure there are no collisions among disciplines through clash detection methods CM Daily

Model Integrity

Ensure that the BIM model has no undefined incorrectly defined or duplicated elements ensure a reporting process and corrective action plans have been developed for noncompliant elements ensure all disciplines are using same origin and dimension scale

All Daily

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 13: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Structural

Local MaterialsRecyclability ReusabilityEfficient SystemsInformed Decisions

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 14: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Structural

Local Materials

bull Native wood productsbull Local vendors

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 15: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Structural

Recyclability Reusability

bull Reduce cement CO2 emissionsbull Fly ashbull Slag

bull Ground up concrete for parking lot

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 16: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Structural

Efficient Systemsbull Combine materials to

optimize the performance of each

bull Braced framebull CMUsbull Metal stud walls

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 17: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Structural

Informed Decisions

bull Recovery time after high wind or seismic event

bull Bolted connectionsbull Prefabricated materials amp precast

concrete

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 18: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull No boiler necessarybull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Higher first costbull Requires large footprint

Geothermal Heat Pump with Ground Loops

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 19: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

Advantagesbull Less initial costbull Good controllabilitybull Simultaneous heating and

coolingbull Good for larger buildings

Disadvantagesbull Requires boiler amp cooling towerbull Can leak humidity indoors

while unit is offbull Does not address latent load

effectively

Water Source Heat Pump

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 20: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical System Options

bull Heats air before entering building systembull 75 efficientbull South facing solar- air absorbs wall warmth bull Maintenance freebull 1SF of collection wall produces 4-10CFM

warm air

Keys for usingbull South facing wallbull Good for large ventilation loadsbull For cooling- bypass

Solar Wall

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 21: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Mechanical

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LEED Design Ideasbull Water use reductionbull Enhanced refrigeration

managementbull Tobacco smoke controlbull Outdoor air delivery monitoringbull Increased ventilationbull Thermal comfort

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 22: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

LightingElectrical

Electrical Design

bull PhotovoltaicsSolar Arraysbull Solar Panel Windowsbull Solar Roofing Materialbull Solar Heat Harvesting

bull Lighting Layout amp Circuitingbull SwitchingControlsbull ReceptacleAV Layoutbull Fire AlarmSecurity Design

Supplemental Energy

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 23: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

LightingElectrical

Daylightingbull Solatubesbull Clerestoriesbull Sky lightsbull Light shelvesbull Overhangsbull Vertical finsbull louvers

bull Roller Shades bull Automated

bull Window Glazingbull Frit

Shading

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 24: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

LightingElectrical

Lighting

bull Grafik Eyebull Scene Controlbull Dimmingbull Photosensorsbull OccVacancy Sensorsbull Override Switchesbull Switching Panelboards

bull LEDsbull High efficiency lamps and ballastsbull Indoor and Outdoor Fixtures

Controls

All images from googlecom

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 25: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

LightingElectrical

LEED Design Ideas

All images from googlecom

bull Lighting Controlsbull Daylight Harvestingbull Mercury Reductionbull On-Site Renewable Energybull Light Trespass Reductionbull Innovative Low-Energy Lighting

Design

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 26: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Construction Management

Funding amp costsModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Project Delaysbull State Funding

Costsbull Reading PAbull 1 Storybull 45000 SFbull Union vs Open Shop

httpwwwreedconstructiondatacomrsmeansmodelselementary-schoolpennsylvaniareading

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 27: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Construction Management

Prefabrication amp Modularization

Benefits of Prefabrication bull Qualitybull Costbull Schedulebull Safety

Opportunitiesbull Mechanical Systemsbull Electrical Systemsbull Redundant construction (ie Classrooms)bull Bathroom Pods

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 28: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Construction Management

Sustainable Materials

Sustainability- The Capacity to endure

Possible Materialsbull Cork Flooring

bull Agricultural Waste Products

bull Green Roof amp Cool Roof

bull Supplementary Cementitious Materials

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 29: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Construction Management

Proactive Commissioning Plan

Proactive - acting in anticipation of future problems needs or changes

Commissioning Goalsbull Optimize Energy Use

bull Minimize Operating Costs

bull Ensure Proper Building Systems Documentation

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

All images from googlecom

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 30: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Construction Management

Operations amp Maintenance

Carry design and construction earned benefits through to operations

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 31: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Construction Management Structural Mechanical LightingElectrical Architecture

Construction Management

Scheduling Cost Crane Positioning amp Size Sequencing Plenum Spaces

Lead Times for Equipment

Value Engineering of Systems

Operating Costs of the Building

Prefabbing MEP systems Photovoltaics Passive Lighting Systems PhasingSequencing Storage of materials Cost of equipment

installation

Constructability Issues Material Selection Functionality

Structural

system selection phasing cranes and equipment cost excavation transport requirements

Shaft locations Roof loads from

equipment Loads in plenum space

Column layout and bay spacing

Ceiling depth for recessed fixtures

WindowDaylighting area

FaccediladeAppearance of building

Overhangs Roof systems

Mechanical

Costs of equipmentinstallation

Payback period of geothermal systems

Intersection of duct work with structural beamscolumns

Thermal Mass Placement of air handlers Material selection

Coolingheating loads from equipment daylighting

Coordinate plenum space

Location of diffusers w fixtures etc

Designated location for MEP room

Limited plenum space

LightingElectrical

Costs of equipmentinstallation

Payback period for photovoltaics

WindowDaylighting area Material effects

reflectance Equipment mounting Spacing of lighting Ceiling heights Covedetail areas with

specific lighting needs

Location of fixtures w diffusers etc

Wiring for all elecmech equipment

Equipment loads Space in MEP room AV equipment Fire alarm layout Solar harvesting for

heatelec Coordinate plenum

space

Window Layout Materials Architectural Cove

Spaces

Architecture Material Selection

Faccedilade Bay spacinglocation of

columns Blending materials to

environment Overall aesthetics Functionality

Ceiling types for hidden ductequipment

Area for equipment

Window location for daylightingskylights

Outdoor lighting will influence appearance

Lighting to accent spaces

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 32: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Integration

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

A Few Examples of Integration Pointsbull Coordination of plenum space between MEPbull Scheduling of building processbull Effects of materials on other designs

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 33: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Northeast Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 34: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Southwest Isometric

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 35: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 36: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Individual floors

Individual CeilingsPlenum Space

14rsquo WallsGeneric Wall Type

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 37: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Construction Codes

PA Uniform Construction CodeInternational Building CodeOSHA StandardsNFPAADA

Mechanical Codes

IMCASHRAE 621ASHRAE 55ASHRAE 901

LightingElectrical Codes

ASHRAE Standard 901 2009NEC 2009Reference ndash IESNA Lighting Handbook 2011

Structural Codes

PA Uniform Construction CodeInternational Building Code 2009ASCE7

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 38: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Looking forward

bull Aware of Communitybull Team Effectivenessbull All Encompassingbull Innovative Ideas

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 39: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Deliverables

bull Development of System Designsbull Create Architectural Appealbull Develop Model to LOD 200+bull Preliminary Cost amp Schedule

bull Rombull Assemblies Estimate

ModelBim Ex PlanIntegrationCodesLooking Forward

Research

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40
Page 40: PowerPoint  · PPT file · Web viewPower Plan. Load Calculations. ... Tobacco smoke control. Outdoor air delivery monitoring. ... PowerPoint Presentation Last modified by:

Mechanical Lightingelectrical Constructionmanagement

Integration structural

  • Slide 1
  • Slide 2
  • Slide 3
  • Slide 4
  • Slide 5
  • Slide 6
  • Slide 7
  • Slide 8
  • Slide 9
  • Slide 10
  • Slide 11
  • Slide 12
  • Slide 13
  • Slide 14
  • Slide 15
  • Slide 16
  • Slide 17
  • Slide 18
  • Slide 19
  • Slide 20
  • Slide 21
  • Slide 22
  • Slide 23
  • Slide 24
  • Slide 25
  • Slide 26
  • Slide 27
  • Slide 28
  • Slide 29
  • Slide 30
  • Slide 31
  • Slide 32
  • Slide 33
  • Slide 34
  • Slide 35
  • Slide 36
  • Slide 37
  • Slide 38
  • Slide 39
  • Slide 40