powerpoint-presentatie - new energy coalition · 2020-03-26 · energy utilities ditto mja/eep...

29

Upload: others

Post on 12-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl
Page 2: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl
Page 3: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl
Page 4: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Page 5: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Industry agendaEemsdelta

We close the gap between policy and practice

Page 6: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Eemsdelta• 2 harbours, 150 companies

• 6.000 direct employees

• 7.000 indirect employees

• € 1,2 billion gross regional product

• 1/3 of Dutch electricity production

• 15% of Dutch base chemicals = basis for making chemical chains sustainable

• Fully integrated state of the art industry cluster

• Energy junction

• Agricultural hinterland

• Digital junction

Page 7: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Why an Industry agenda?• Sence of urgency to increase sustainability of individual companies

• Many individual challenges are shared challenges

• No cooperation without an agenda

• Visibility of our ambition

• We take the lead!

Page 8: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

De ambitie

We close the gap between policy

and practice. We are taking the

lead in sustainable economical

growth and sustainable

employment.

Page 9: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

We believe that:• Carbon becomes scarce

• A tailor made approach is the only approach

• Chain based transition is the only way and therefore a Cluster approach is

necessary

• Unique competences must be utilized

• In the end fossil should only be used as raw material

• For the time being there will be no major storage issue, all green material/energy

will be used

• We must be front runners to keep our licence to operate

Page 10: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Energy

efficiency

Change of Energy source

CCS

CCU

Change of

Feedstock

CO2 reduction

Circularity

Process innovation

Page 11: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Energy EfficiencyFrom incremental to revolutionary

Page 12: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Energy EfficiencyGreen steam pipe (AKZO-Eneco)

Power to product in order to balance energy network,

ESD - Engie

Energy innovation programm (GSP)

Schale up energy-innovation program

Realization of projects originating from

Energy innovation program

Use of bio mass for heat & elektricity

generation

Construction of heat distribution net work

(s)

What do we need?

Accelleration of investments in energy innovation

by means of temporay compensation of price

difference gas - electricity. Estimated investment

cost € 250-250 mln, needed € 50 mln)

Tailor made approach EEP and MJA3 for cluster

Page 13: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

ElectrificationFrom electrons to molecules

and high temperature heat (steam)

Page 14: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

ElektrificationHydrogen production

Hydrogen backbone, GSP

Net- balancing ESD - Engie

Direct current network pilot, Dante (Green

Deal in the making)

20MW H2 electrolyser (AKZO, Gasunie)

Direct coupling off-shore wind

What do we need ?

4-6 GW Offshore wind

Pertaining energy-infrastructure

Professorate Electrochemistry at RUG

Demo facility electrolyser

Juridical investigation law- and regulation (new)

Energy Utilities

Ditto MJA/EEP discussion

Ditto temporary compensation

Page 15: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Situation 2018 incl. certain extensions, on basis of use

The industry cluster is well on its way to being CO2 neutral in 2050.

Transition to high caloric gas is temporary

Page 16: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Situatiion 2022, on basis of use

Page 17: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Page 18: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Green Raw materialsTo the highest added value

Page 19: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Green raw materialsBiorefinery, Avantium (Zambezi)

Glycerin, DGR

Syngas from biomass, Torrgas

CO2 and syngas as raw material, BioMCN

H2 as raw material in combination with electricity

Catalytic pyrolyses to BTX

Glucose and Glycerine derivativesWhat do we need ?

Innovation hub (pilot facilties)

Cleantech guarantee fund

Tailor made permits (ODG)

RIG 2.0

SDC / Green raw material regulation for

schale up Zambezi, Photanol Syngas

for MeOH, Mekong etc.)

Page 20: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Page 21: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Process InnovationChain-integrationFrom separate plants to an almost

fully integrated cluster

Page 22: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Chain-integrationExisting integrated cluster

Hydrogen backbone GSP

HCl from AkzoNobel for Zambezi

CO2 and syngas or H2 for methanol, BioMCN

CO2 for algae production, Photanol

Further exchange of heat

CO2 circular pipeline for CCU to BioMCN

Balancing with biomass power plant & hydrogen

What do we need ?

Energy-infrastructure + CO2 + H2 infra (

estimated investment cost € 100 mln,

needed € 50 mln)

Page 23: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Process Innovation:Digitalisationfrom ageing assets to ‘fit-for-future’

Page 24: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Digitalistion / Industry 4.0No front runner as cluster

Major differences between companies

New focal point for RUG

Industry examples available

5-G pilot

What do we need ?

Joint program (eg. RosF)

Page 25: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

What do we aim for ?Working program with five action lines

• Energy-innovation

• Electrification

• Green rawmaterials

• Chain integration

• Digitalisation

Page 26: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

What is needed ?• Capacity to execute

• Green instrumentatium, SDE+ RiG 2.0, Cleantec guarantee fund

• Focussed acquisition game-changers

• Talent, Human Capital agenda

• Innovation hubs, pilot facilities

• Future proof innovation policy

• Means/finance

Page 27: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

Stakeholders• Enterprises, green growth, license to operate, CO2

• Government, employment, innovation example

• Education, destill demand for knowledge, connection with industry

• Employees, sustainable employment

• Environment, quality of life, licence to operate, CO2

• NGO, maintain/sustain nature, world heritage, CO2

Page 28: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

SummaryWhat will we do:

1. Radical energy-innovation projects =

> 30% energy savings next 5 years

2. Electrification => no more use of natural gas

(direct current network, e-infra)

3. Green raw materials + CCU => CO2 sink

4. Chain integration (heat distribution network,

hydrogen network, syngas network, CO2-

network)

5. Digitalisation / Industry 4.0

What do we need?

Accelleration of investments in energy innovation.

Estimated investment cost € 250-250 mln, currently

needed € 50 mln)

Tailor made approach EEP and MJA3 for cluster

4-6 GW wind at sea

Energy-infrastructure + CO2 + H2 infra ( estimated

investment cost € 100 mln, needed € 50 mln)

Innovation hub ZAP XL (€ 2 mln)

Demo-facility Electrolyser ( € 20 mln euro)

RIG 2.0 (€ 20 mln euro)

Suitable law & regulation “Red carpet policy”

SDC / Green raw material regulation for scale up

Zambezi, Photanol Syngas for MeOH, Mekong etc.)

Page 29: PowerPoint-presentatie - New Energy Coalition · 2020-03-26 · Energy Utilities Ditto MJA/EEP discussion Ditto temporary compensation. Industrieagenda Eemsdelta Situation 2018 incl

Industrieagenda

Eemsdelta

We close the gap between policy and practise

www.chemport.eu