powerpoint-presentatie - new energy coalition · 2020-03-26 · energy utilities ditto mja/eep...
TRANSCRIPT
Industrieagenda
Eemsdelta
Industrieagenda
Eemsdelta
Industry agendaEemsdelta
We close the gap between policy and practice
Industrieagenda
Eemsdelta
Eemsdelta• 2 harbours, 150 companies
• 6.000 direct employees
• 7.000 indirect employees
• € 1,2 billion gross regional product
• 1/3 of Dutch electricity production
• 15% of Dutch base chemicals = basis for making chemical chains sustainable
• Fully integrated state of the art industry cluster
• Energy junction
• Agricultural hinterland
• Digital junction
Industrieagenda
Eemsdelta
Why an Industry agenda?• Sence of urgency to increase sustainability of individual companies
• Many individual challenges are shared challenges
• No cooperation without an agenda
• Visibility of our ambition
• We take the lead!
Industrieagenda
Eemsdelta
De ambitie
We close the gap between policy
and practice. We are taking the
lead in sustainable economical
growth and sustainable
employment.
Industrieagenda
Eemsdelta
We believe that:• Carbon becomes scarce
• A tailor made approach is the only approach
• Chain based transition is the only way and therefore a Cluster approach is
necessary
• Unique competences must be utilized
• In the end fossil should only be used as raw material
• For the time being there will be no major storage issue, all green material/energy
will be used
• We must be front runners to keep our licence to operate
Industrieagenda
Eemsdelta
Energy
efficiency
Change of Energy source
CCS
CCU
Change of
Feedstock
CO2 reduction
Circularity
Process innovation
Industrieagenda
Eemsdelta
Energy EfficiencyFrom incremental to revolutionary
Industrieagenda
Eemsdelta
Energy EfficiencyGreen steam pipe (AKZO-Eneco)
Power to product in order to balance energy network,
ESD - Engie
Energy innovation programm (GSP)
Schale up energy-innovation program
Realization of projects originating from
Energy innovation program
Use of bio mass for heat & elektricity
generation
Construction of heat distribution net work
(s)
What do we need?
Accelleration of investments in energy innovation
by means of temporay compensation of price
difference gas - electricity. Estimated investment
cost € 250-250 mln, needed € 50 mln)
Tailor made approach EEP and MJA3 for cluster
Industrieagenda
Eemsdelta
ElectrificationFrom electrons to molecules
and high temperature heat (steam)
Industrieagenda
Eemsdelta
ElektrificationHydrogen production
Hydrogen backbone, GSP
Net- balancing ESD - Engie
Direct current network pilot, Dante (Green
Deal in the making)
20MW H2 electrolyser (AKZO, Gasunie)
Direct coupling off-shore wind
What do we need ?
4-6 GW Offshore wind
Pertaining energy-infrastructure
Professorate Electrochemistry at RUG
Demo facility electrolyser
Juridical investigation law- and regulation (new)
Energy Utilities
Ditto MJA/EEP discussion
Ditto temporary compensation
Industrieagenda
Eemsdelta
Situation 2018 incl. certain extensions, on basis of use
The industry cluster is well on its way to being CO2 neutral in 2050.
Transition to high caloric gas is temporary
Industrieagenda
Eemsdelta
Situatiion 2022, on basis of use
Industrieagenda
Eemsdelta
Industrieagenda
Eemsdelta
Green Raw materialsTo the highest added value
Industrieagenda
Eemsdelta
Green raw materialsBiorefinery, Avantium (Zambezi)
Glycerin, DGR
Syngas from biomass, Torrgas
CO2 and syngas as raw material, BioMCN
H2 as raw material in combination with electricity
Catalytic pyrolyses to BTX
Glucose and Glycerine derivativesWhat do we need ?
Innovation hub (pilot facilties)
Cleantech guarantee fund
Tailor made permits (ODG)
RIG 2.0
SDC / Green raw material regulation for
schale up Zambezi, Photanol Syngas
for MeOH, Mekong etc.)
Industrieagenda
Eemsdelta
Industrieagenda
Eemsdelta
Process InnovationChain-integrationFrom separate plants to an almost
fully integrated cluster
Industrieagenda
Eemsdelta
Chain-integrationExisting integrated cluster
Hydrogen backbone GSP
HCl from AkzoNobel for Zambezi
CO2 and syngas or H2 for methanol, BioMCN
CO2 for algae production, Photanol
Further exchange of heat
CO2 circular pipeline for CCU to BioMCN
Balancing with biomass power plant & hydrogen
What do we need ?
Energy-infrastructure + CO2 + H2 infra (
estimated investment cost € 100 mln,
needed € 50 mln)
Industrieagenda
Eemsdelta
Process Innovation:Digitalisationfrom ageing assets to ‘fit-for-future’
Industrieagenda
Eemsdelta
Digitalistion / Industry 4.0No front runner as cluster
Major differences between companies
New focal point for RUG
Industry examples available
5-G pilot
What do we need ?
Joint program (eg. RosF)
Industrieagenda
Eemsdelta
What do we aim for ?Working program with five action lines
• Energy-innovation
• Electrification
• Green rawmaterials
• Chain integration
• Digitalisation
Industrieagenda
Eemsdelta
What is needed ?• Capacity to execute
• Green instrumentatium, SDE+ RiG 2.0, Cleantec guarantee fund
• Focussed acquisition game-changers
• Talent, Human Capital agenda
• Innovation hubs, pilot facilities
• Future proof innovation policy
• Means/finance
Industrieagenda
Eemsdelta
Stakeholders• Enterprises, green growth, license to operate, CO2
• Government, employment, innovation example
• Education, destill demand for knowledge, connection with industry
• Employees, sustainable employment
• Environment, quality of life, licence to operate, CO2
• NGO, maintain/sustain nature, world heritage, CO2
Industrieagenda
Eemsdelta
SummaryWhat will we do:
1. Radical energy-innovation projects =
> 30% energy savings next 5 years
2. Electrification => no more use of natural gas
(direct current network, e-infra)
3. Green raw materials + CCU => CO2 sink
4. Chain integration (heat distribution network,
hydrogen network, syngas network, CO2-
network)
5. Digitalisation / Industry 4.0
What do we need?
Accelleration of investments in energy innovation.
Estimated investment cost € 250-250 mln, currently
needed € 50 mln)
Tailor made approach EEP and MJA3 for cluster
4-6 GW wind at sea
Energy-infrastructure + CO2 + H2 infra ( estimated
investment cost € 100 mln, needed € 50 mln)
Innovation hub ZAP XL (€ 2 mln)
Demo-facility Electrolyser ( € 20 mln euro)
RIG 2.0 (€ 20 mln euro)
Suitable law & regulation “Red carpet policy”
SDC / Green raw material regulation for scale up
Zambezi, Photanol Syngas for MeOH, Mekong etc.)
Industrieagenda
Eemsdelta
We close the gap between policy and practise
www.chemport.eu