Page 1: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

Circuit Reliability Review

Irvine

2020

Page 2: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

2

• Southern California Edison (SCE) is an Edison International company

• One of the nation’s largest electric utilities

• More than 130 years of history

• Headquartered in Rosemead, California

• Regulated by the California Public Utilities Commission (CPUC) and the Federal Energy Regulatory Commission (FERC)

• 50,000 square miles of SCE service area across Central, Coastal, and Southern California

• 15 million residents in service territory

• 5 million customer accounts in 445 cities and communities

Who We Are

Page 3: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

Our Grid

To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system.

730,000 Transformers

119,000 Miles of Transmission and Distribution Lines

4,600 Circuits

1.5 Million Poles

50,000 Square Miles

3

Page 4: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

Strengthening and Modernizing the Grid

• Infrastructure reliability – updating underground

cables, poles, switches, and transformers

• Wildfire mitigation – hardening infrastructure,

bolstering situational awareness capabilities, and

enhancing operational practices

• Transmission – connecting renewables, installing

new substations, and updating lines

• Grid readiness – updating the grid for impacts

from new technologies

• Long-term energy policy – supporting energy

storage, electric vehicles, and renewables

SCE plans to spend more than $5B each

year to maintain, improve, and harden

its infrastructure.

SCE’s investments support safe, reliable, affordable, and clean energy for our customers

2019 Capital Investments

179 miles of underground cable replaced

502 miles of overhead conductor replaced for public safety

16.4k distribution poles replaced

4.3k transmission poles replaced

71 underground structure replacements

4

Page 5: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

PATHWAY 2045SCE’S vision to help California achieve a carbon neutral future

Carbon neutrality is achieved through deep decarbonization of

electricity, transportation and building electrification,

and the use of low-carbon fuels

Meeting California’s Climate Change Goals

5

Page 6: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

• SCE filed its second Wildfire

Mitigation Plan in February 2020

• It builds on the progress made

in 2019 to reduce the risk of fire

ignitions caused by utility

infrastructure

• SCE crews will continue to work

to install hi-tech wildfire

mitigation tools and

technologies to make

communities safer, more

resilient, and to help reduce the

number of Public Safety Power

Shutoffs (PSPS)

Addressing Wildfire Risk

6

Page 7: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

• De-energizing power lines to prevent ignitions

• Used during elevated fire conditions

• Primarily impacts circuits in high fire risk areas

• Use of multiple methods to notify people in affected areas before, during and after a de-energization event

Public Safety Power Shutoffs (PSPS)

7

4-7 DAYS AHEAD

3 DAYSAHEAD

2 DAYSAHEAD

1 DAY AHEAD POWER SHUTOFF

POWER RESTORATION

PLANNING AND MONITORING OUTAGE

*Erratic or sudden onset of conditions may impact our ability to provide advanced notice to customers.

Forecast Weather & Fire

Conditions

SCE Incident Management Team on Alert

County Operational Areas

informed of potential activation

SCE Incident Management

Team Activated

1st Notification PSPS Possible sent

to agencies and customers

2nd Notification PSPS

Possible

3rd Notification Power Shutoff

4th Notification Power Restored After Inspection

Page 8: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

Reliability Overview

8

Page 9: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

What is Reliability?

• In simplest terms:

Having dependable electricity when you need it.

• Outages:

• Maintenance outages (aka planned outages)

• Repair outages (aka unplanned outages)

• Sustained Outage = An outage lasting > 5 minutes

• Momentary Outage = An outage lasting ≤ 5 minutes

9

Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather).

Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.

Page 10: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

How Do We Measure Reliability?

SAIDI SAIFI MAIFI CAIDI

10

Page 11: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CityList1Communities in the SADDLEBACK District

COTO DE CAZA

IRVINE

LAGUNA BEACH

LAGUNA HILLS

LAGUNA NIGUEL

LAGUNA WOODS

ALISO VIEJO

LAKE FOREST

LAS FLORES

MISSION VIEJO

RANCHO SANTA MARGARITA

11

Page 12: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

*”Exclusions” are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature.**In the columns showing “Rank,” lower numbers indicate poorer performance.

12

Page 13: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitList1Overview of IrvineThere are 127 circuits that serve Irvine 1

Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers

ALLERGAN(12KV) 72 ECLIPSE(12KV) 2,187 MAGAZINE(12KV) 2,062 SCORPIO(12KV) 561

ANTEATER(12KV) 1,154 EL TORO(12KV) 2,746 MANGANESE(12KV) 1,635 SCRABBLE(12KV) 481

AQUARIUS(12KV) 78 ELDEN(12KV) 3,313 MARACA(12KV) 2,310 SIDNEY(12KV) 1,497

ARIES(12KV) 119 ELPAC(12KV) 31 MARRIOTT(12KV) 26 SILVER(12KV) 694

ARNOLD(12KV) 2,921 EURO(12KV) 434 MC CORMICK(12KV) 1,560 SKYPARK(12KV) 59

ARSENIC(12KV) 553 FARTHING(12KV) 32 MONEY(12KV) 297 SLATE(12KV) 177

ASTROLOGY(12KV) 316 FIJI(12KV) 775 MONOPOLY(12KV) 119 SOLITAIRE(12KV) 119

ATLANTA(12KV) 946 FLORES(12KV) 232 MORSE(12KV) 2,238 SPADES(12KV) 72

AVCO(12KV) 308 FORINT(12KV) 2,537 MUIRLANDS(12KV) 2,905 SRI LANKA(12KV) 1,406

BARBADOS(12KV) 2,487 FRANC(12KV) 2,377 MYFORD(12KV) 2,440 ST. CROIX(12KV) 138

BARCELONA(12KV) 2,050 GOLD(12KV) 84 OBSIDIAN(12KV) 703 STARGAZER(12KV) 1,055

BARDEEN(12KV) 1,699 GRAPHITE(12KV) 24 OXY(12KV) 2,943 STILLWELL(12KV) 114

BEGONIA(12KV) 367 GUILDER(12KV) 1,185 PEARCY(12KV) 2,041 TAURUS(12KV) 944

BEIJING(12KV) 1,798 HALEY(12KV) 36 PENCE(12KV) 2,830 TELLER(12KV) 2,963

BERTEA(12KV) 640 HINES(12KV) 1,961 PENINSULA(12KV) 1,656 TOLAR(12KV) 2,685

BILLINGS(12KV) 135 HOROSCOPE(12KV) 2,686 PISCES(12KV) 476 TORINO(12KV) 2,433

CANCER(12KV) 776 HUDSON(12KV) 503 PLATINUM(12KV) 645 TRABUCO(12KV) 1,321

CAPRICORN(12KV) 21 IRON(12KV) 235 POLLARD(12KV) 339 TURTLE(12KV) 3,851

CAYMEN(12KV) 3,256 JEFFREY(12KV) 1,731 QUARTZ(12KV) 274 VASCO(12KV) 10

CENTAVO(12KV) 183 JOAQUIN(12KV) 345 RAND(12KV) 1,616 VIRGO(12KV) 226

CHURCHILL(12KV) 35 KEELINE(12KV) 756 REDHILL(12KV) 173 WINGATE(12KV) 1,293

CORDOBA(12KV) 81 KELVIN(12KV) 3,322 RINGO(12KV) 1,464 XEROX(12KV) 833

COUNTERFEIT(12KV) 68 KRONA(12KV) 3,339 ROMMEL(12KV) 1,772 YEN(12KV) 1,363

CROMWELL(12KV) 3,252 KUNA(12KV) 2,269 RUBIN(12KV) 2,155 ZODIAC(12KV) 1,006

DACHSHUND(12KV) 1,283 KWACHA(12KV) 167 RUBLE(12KV) 107 MUNICH(12KV) 2,454

DIME(12KV) 1,853 LA SALLE(12KV) 65 RUBY(12KV) 830 MCFADDEN(12KV) 536

DOOLITTLE(12KV) 2,235 LARTHIEN(12KV) 1,781 RUTGERS(12KV) 966 MENDOCINO(12KV) 1

DRACHMA(12KV) 1,886 LIRE(12KV) 198 SAGITTARIUS(12KV) 3,400 CALGARY(12KV) 1,666

DUCAT(12KV) 36 LONDON(12KV) 264 SAN JUAN(12KV) 1,032 CRANK(12KV) 3,290

DUPONT(12KV) 84 MACHO(12KV) 2,553 SCHILLING(12KV) 283 CULVERDALE(12KV) 3,286

Grand Total 159,254

13

Page 14: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitList2Overview of IrvineThere are 127 circuits that serve Irvine 2

Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers

OSLO(33KV) 3,694 - - -

PANTANI(12KV) 14 - - -

PARAGON(12KV) 4,517 - - -

SCILACCI(12KV) 1,807 - - -

CADENCE(33KV) 2,079 - - -

FROOME(12KV) 3 - - -

GREAT PARK(0KV) 449 - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Grand Total 159,254

14

Page 15: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

BarChart

SCE SYSTEMWIDE

**Data is as of 02/14/2020, data

can be slightly different due to

outage data validation process

Irvine

Reliability History of Circuits Serving Irvine (No Exclusions)

**“Exclusions” are days which

utilities are allowed to

remove from their metrics

because the outages on

those days were caused by

acts of nature.

80.6

45.733.9

181.4

134.5 139.7 136.8

178.0

0.0

50.0

100.0

150.0

200.0

2016 2017 2018 2019

SAIDI

(average

minutes of

sustained

interruptions)

0.9

0.4

0.3

0.7

1.11.2

0.9

1.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

SAIFI

(average

frequency of

sustained

interruptions)

0.9

0.4

0.1

0.3

1.6

1.8

1.4 1.4

0.0

0.5

1.0

1.5

2.0

MAIFI

(average

frequency of

momentary

interruptions)

15

Page 16: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

SAIDIChart

SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

Causes of Repair Outages in Irvine

2019

3rd Party

0.1%

Equipment Failure

12.6%

Operation

1.5%

Other

85.4%

Vegetation /Animal

0.0%

Weather /Fire

/Earthquake

0.4%PSPS

0.0%

Contributions to SAIDI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found,

PSPS Operations

e.g., urgent maintenance w/o 3-daynotice

3rd Party e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

16

Page 17: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

SAIFIChart

SAIFI = the number of times the average customer is interrupted by “sustained” outages each year

Causes of Repair Outages in Irvine

2019

3rd Party

0.1%

Equipment Failure

34.7%

Operation

9.7%

Other

37.6%

Vegetation /Animal

0.9% Weather /Fire

/Earthquake

17.1%

PSPS

0.0%

Contributions to SAIFI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found

Operationse.g., urgent maintenance w/o 3-day

notice 3rd Party

e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

17

Page 18: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

18

Page 19: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

19

Page 20: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

Back-up Slides

Reliability Histories of Circuits Serving Irvine

Updated through Dec 2019

20

Page 21: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CitySummary

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

80.6 0.9 0.9 45.7 0.4 0.4 33.9 0.3 0.1 10.0 0.2 0.1 8.2 0.1 0.2 154.2 0.2 0.0 8.9 0.1 0.0 181.4 0.7 0.3

3rd Party 6% 5% 18% 2% 2% 0% 0% 0% 4% 1% 0% - 0% 0% 8% 0% 0% - - - - 0% 0% 4%

Equipment Failure 80% 71% 24% 77% 78% 25% 75% 70% 56% 86% 43% 29% 41% 46% 7% 2% 13% 7% 82% 48% 18% 13% 35% 14%

Operation 7% 6% 5% 18% 13% 4% 8% 13% 23% 5% 4% - 4% 4% 13% 0% 2% 0% 17% 46% 14% 2% 10% 7%

Other 4% 9% 6% 3% 7% 27% 15% 14% 14% 0% 0% 6% 56% 50% 69% 97% 84% 93% - - - 85% 38% 49%

Vegetation/Animal 1% 9% 45% 0% 0% 33% 0% 0% - - - 15% - - 3% - - - 1% 6% 68% 0% 1% 9%

Weather/Fire/Earthquake 1% 1% 2% 0% 0% 10% 1% 3% 2% 7% 53% 50% - - - - - - - - - 0% 17% 16%

PSPS - - - - - - 0% 0% - - - - - - - - - - - - - - - -

SCE SYSTEMWIDE 134.5 1.1 1.6 139.7 1.2 1.8 136.8 0.9 1.4 28.1 0.3 0.4 18.9 0.2 0.4 31.8 0.2 0.3 99.3 0.3 0.3 178.0 1.0 1.4

2nd Qtr 2019 3rd Qtr 2019

127 Circuits Serving Irvine -- Total Customers:

159,254

Average Reliability of 127 Circuits Serving Irvine

4th Qtr 2019 20192016 2017 2018 1st Qtr 2019

Notes:

No outages are excluded from the metrics.

Outage Causes: Other: e.g., patrolled but no cause could be foundOperations: e.g., urgent maintenance w/o 3-day notice to customers3rd Party: e.g., balloons, car hit pole, dig-inVegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductorsPSPS: e.g., Public Safety Power Shutoff

SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.

21

Page 22: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory1

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ALLERGAN(12KV) - Customers: 72 7.0 1.0 - - - - - - - - - - - - - 395.0 1.0 1.0 - - - 395.0 1.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% 100% - - - 100% 100% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ANTEATER(12KV) - Customers: 1,154 - - - - - - - - - - - - - - - 330.7 1.0 - - - - 330.7 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

AQUARIUS(12KV) - Customers: 78 - - 2.0 - - - 0.4 0.0 - - - - - - - - - - 0.7 0.0 - 0.7 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ARIES(12KV) - Customers: 119 310.0 1.1 1.6 885.1 1.8 0.2 - - - - - - - - - - - - 76.3 1.1 - 76.3 1.1 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 94% 87% 36% 100% 100% 100% - - - - - - - - - - - - 100% 100% - 100% 100% -

Operation 6% 13% - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 64% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 1 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

22

Page 23: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory2

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ARNOLD(12KV) - Customers: 2,921 18.8 1.0 - 10.6 0.0 - 0.1 0.0 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 52% 3% - 60% 77% - - - - - - - - - - - - - - - - - - -

Operation - - - 40% 23% - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 48% 97% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ARSENIC(12KV) - Customers: 553 167.9 2.0 - 67.2 1.0 1.0 0.7 0.0 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 11% 7% - 100% 100% 0% 100% 100% - - - - - - - - - - - - - - - -

Operation 89% 93% - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ASTROLOGY(12KV) - Customers: 316 - - 1.0 - - - - - - - - - - - - 32.1 0.2 - - - - 32.1 0.2 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ATLANTA(12KV) - Customers: 946 - - - 76.8 1.0 4.0 73.5 1.0 - 3.3 0.0 - - - - - - - - - - 3.3 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 99% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - 99% 100% - - - - - - - - - - - - - - - -

Other - - - 1% 0% 75% - - - 100% 100% - - - - - - - - - - 100% 100% -

Vegetation/Animal - - - - - 25% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 0% 0% - 1% 0% - - - - - - - - - - - - - - - -

PSPS - - - - - - 0% 0% - - - - - - - - - - - - - - - -

2019

Reliability Histories for Individual Circuits Serving Irvine - 2 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019

23

Page 24: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory3

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

AVCO(12KV) - Customers: 308 - - - 45.4 1.0 - - - - - - - - - - 520.8 2.0 - - - - 520.8 2.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - - - - - - - - - - 13% 38% - - - - 13% 38% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 87% 62% - - - - 87% 62% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BARBADOS(12KV) - Customers: 2,487 199.5 1.0 - 12.4 0.0 1.0 - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BARCELONA(12KV) - Customers: 2,050 - - - 0.2 0.0 1.0 2.9 0.1 - - - - - - - - - - 3.3 0.0 - 3.3 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 53% 71% - - - - - - - - - - - - - - - -

Operation - - - 100% 100% - 47% 29% - - - - - - - - - - 100% 100% - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BARDEEN(12KV) - Customers: 1,699 7.0 0.1 1.8 - - - - - - - - - - - - 912.9 1.0 - - - - 912.9 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 3 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

24

Page 25: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory4

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

BEGONIA(12KV) - Customers: 367 191.6 1.0 1.0 - - 1.9 272.9 2.8 0.7 6.3 0.5 - - - - - - - - - 1.0 6.3 0.5 1.0

3rd Party 99% 100% - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 1% 0% 100% - - 50% 30% 38% - 100% 100% - - - - - - - - - 100% 100% 100% 100%

Operation - - - - - - - - 100% - - - - - - - - - - - - - - -

Other - - - - - - 70% 62% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 50% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BEIJING(12KV) - Customers: 1,798 91.7 1.0 1.0 47.3 0.2 1.0 5.6 0.0 - - - - 1.5 0.0 - - - - - - - 1.5 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 46% 51% - 99% 98% - - - - - - - - - - - - - - - -

Operation - - - 54% 49% - - - - - - - 100% 100% - - - - - - - 100% 100% -

Other - - 3% - - 2% 1% 2% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 98% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 100% 100% 97% - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BERTEA(12KV) - Customers: 640 7.0 1.0 - - - - 64.2 2.0 1.0 - - - 23.1 1.0 - 375.4 1.0 1.0 - - - 398.4 2.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - 38% 50% 100% - - - 3% 0% - 0% 0% - - - - 0% 0% -

Operation - - - - - - 62% 50% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - 97% 100% - 100% 100% 100% - - - 100% 100% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BILLINGS(12KV) - Customers: 135 54.4 0.7 0.7 4.2 0.1 3.0 254.9 3.0 1.0 - - 1.0 - - - - - 1.0 - - - - - 2.0

3rd Party - - - - - - - - 100% - - - - - - - - - - - - - - -

Equipment Failure 100% 100% 100% - - - 35% 33% - - - 100% - - - - - - - - - - - 50%

Operation - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - 33% 43% 33% - - - - - - - - - 100% - - - - - 50%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 67% 22% 33% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 4 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

25

Page 26: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory5

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

CADENCE(12KV) - Customers: 2,079 - - - - - - - - - - - - - - - - - - 0.1 0.0 - 0.1 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CALGARY(12KV) - Customers: 1,666 - - - - - 1.0 4.3 0.0 - - - - - - - - - - 3.0 0.0 - 3.0 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CANCER(12KV) - Customers: 776 14.3 0.1 0.7 0.4 0.0 - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CAPRICORN(12KV) - Customers: 21 - - 2.1 - - - 156.3 1.0 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 5 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

26

Page 27: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory6

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

CAYMEN(12KV) - Customers: 3,256 0.9 0.0 1.0 - - - 50.4 0.0 - - - - - - - 0.8 0.0 - 0.1 0.0 - 0.9 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - 100% 100% - - - - 87% 96% -

Operation 100% 100% - - - - - - - - - - - - - - - - 100% 100% - 13% 4% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CENTAVO(12KV) - Customers: 183 - - - - - - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CHURCHILL(12KV) - Customers: 35 9.0 1.0 - - - - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CORDOBA(12KV) - Customers: 81 58.0 1.0 - - - - 9.1 0.1 - - - - - - 1.0 - - - - - - - - 1.0

3rd Party - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 6 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

27

Page 28: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory7

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

COUNTERFEIT(12KV) - Customers: 68 26.0 2.1 1.0 111.8 1.0 - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 36% 50% 100% 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other 64% 50% - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CRANK(12KV) - Customers: 3,290 - - - - - - 741.6 2.8 0.1 - - - - - - 0.2 0.0 - - - - 0.2 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 31% 64% 100% - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Other - - - - - - 69% 36% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CROMWELL(12KV) - Customers: 3,252 - - 1.0 - - - - - - 6.0 1.0 - - - - - - - - - - 6.0 1.0 -

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - 100% 100% - - - - - - - - - - 100% 100% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CULVERDALE(12KV) - Customers: 3,286 0.4 0.0 2.1 27.6 0.1 - 22.2 0.1 - 5.2 0.1 - 15.8 0.0 - 633.0 1.1 - 5.0 0.0 - 659.0 1.2 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - 100% 100% - 100% 100% - 100% 100% - 1% 3% - 88% 79% - 4% 13% -

Operation 100% 100% - - - - - - - - - - - - - 0% 3% - 12% 21% - 0% 3% -

Other - - - - - - - - - - - - - - - 99% 94% - - - - 95% 83% -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 7 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

28

Page 29: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory8

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

DACHSHUND(12KV) - Customers: 1,283 84.1 0.2 2.0 0.9 0.0 - 81.0 0.1 - 0.4 0.0 - 25.2 0.1 0.6 0.1 0.0 0.0 - - - 25.7 0.1 0.6

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 39% 48% - - - - 100% 100% - - - - 100% 100% 100% - - - - - - 98% 84% 100%

Operation 61% 52% 50% 100% 100% - - - - 100% 100% - - - - 100% 100% 100% - - - 2% 16% 0%

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 50% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DIME(12KV) - Customers: 1,853 329.1 2.3 0.6 95.5 0.9 - 202.3 1.1 0.0 43.4 0.2 - - - 1.0 - - - 8.8 0.1 - 52.2 0.4 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 98% 97% 100% 55% 69% - 85% 67% 100% 91% 72% - - - - - - - 89% 76% - 91% 74% -

Operation 2% 3% - 45% 31% - 15% 33% - 9% 28% - - - - - - - 11% 24% - 9% 26% -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DOOLITTLE(12KV) - Customers: 2,235 59.8 1.2 - 103.6 1.1 0.3 10.6 0.1 - 10.5 0.2 - - - - - - - 4.1 0.0 - 14.6 0.2 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 55% 7% - 99% 92% 64% 70% 80% - 100% 100% - - - - - - - 100% 100% - 100% 100% -

Operation 31% 13% - 1% 8% 36% 30% 20% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 14% 80% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DRACHMA(12KV) - Customers: 1,886 88.3 2.0 1.0 1.5 0.0 - - - - - - - - - 1.0 - - - - - - - - 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 13% 50% 100% 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other 87% 50% - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 8 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

29

Page 30: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory9

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

DUCAT(12KV) - Customers: 36 9.8 0.0 - 0.3 0.0 - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation 100% 100% - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DUPONT(12KV) - Customers: 84 222.2 4.0 - 84.1 1.0 - - - - - - - - - - 411.5 1.0 - - - - 411.5 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ECLIPSE(12KV) - Customers: 2,187 2.0 0.0 2.0 - - - 2.6 0.0 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Operation 4% 42% - - - - - - - - - - - - - - - - - - - - - -

Other 96% 58% - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

EL TORO(12KV) - Customers: 2,746 31.7 0.1 1.0 279.7 1.1 - 0.2 0.0 - - - 1.0 - - - - - - 16.6 0.0 - 16.6 0.0 1.0

3rd Party - - 98% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 99% 85% - 99% 98% - 100% 100% - - - - - - - - - - 100% 100% - 100% 100% -

Operation 1% 15% 2% 1% 2% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - 100% - - - - - - - - - - - 100%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 9 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

30

Page 31: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory10SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ELDEN(12KV) - Customers: 3,313 0.0 0.0 1.0 54.1 0.1 0.9 0.1 0.0 - 6.0 1.0 - - - - - - - 0.4 0.0 - 6.4 1.0 -

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% 100% 100% 100% - - - - - - - - - - - - - - - -

Operation 100% 100% - - - - - - - - - - - - - - - - 100% 100% - 7% 2% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - 100% 100% - - - - - - - - - - 93% 98% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ELPAC(12KV) - Customers: 31 - - - - - - - - - - - - - - - 283.1 1.0 - - - - 283.1 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

EURO(12KV) - Customers: 434 92.1 2.6 1.8 - - - - - - - - - - - - - - - 113.1 0.5 - 113.1 0.5 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 94% 86% 100% - - - - - - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other 6% 14% - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

FARTHING(12KV) - Customers: 32 27.5 2.0 1.0 2.3 0.0 - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 36% 50% 100% 100% 100% - - - - - - - - - - - - - - - - - - -

Operation 6% 0% - - - - - - - - - - - - - - - - - - - - - -

Other 58% 50% - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 10 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

31

Page 32: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory11SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

FIJI(12KV) - Customers: 775 - - 1.0 - - - - - - - - - - - - - - - 2.5 0.0 - 2.5 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

FLORES(12KV) - Customers: 232 - - - 482.0 3.6 3.9 - - 2.0 - - 1.0 - - - - - - 0.3 0.0 - 0.3 0.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 42% 44% - - - - - - 100% - - - - - - - - - - - 100%

Operation - - - 58% 56% 52% - - - - - - - - - - - - 100% 100% - 100% 100% -

Other - - - - - 26% - - 100% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 22% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

FORINT(12KV) - Customers: 2,537 646.0 3.1 - 15.7 0.1 - 45.1 0.4 - - - - - - - - - - 0.5 0.0 - 0.5 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 97% 66% - 46% 25% - 80% 57% - - - - - - - - - - - - - - - -

Operation 1% 1% - 14% 38% - 20% 43% - - - - - - - - - - 100% 100% - 100% 100% -

Other 2% 33% - 40% 38% - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

FRANC(12KV) - Customers: 2,377 77.2 0.4 - 4.3 0.0 - 167.4 1.4 0.0 - - - 154.2 2.0 - 2.8 0.1 - 11.1 0.1 - 168.1 2.2 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 99% 85% - 100% 100% - 87% 76% - - - - 59% 50% - - - - 96% 62% - 60% 48% -

Operation 1% 15% - - - - 13% 24% 100% - - - - - - 100% 100% - 4% 38% - 2% 6% -

Other - - - - - - - - - - - - 41% 50% - - - - - - - 38% 45% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 11 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

32

Page 33: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory12SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

FROOME(33KV) - Customers: 3 - - - - - - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

GOLD(12KV) - Customers: 84 63.0 1.0 - - - 1.0 - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

GRAPHITE(12KV) - Customers: 24 - - - - - 0.9 1.0 0.2 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

GREAT PARK(12KV) - Customers: 449 - - - - - - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 12 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

33

Page 34: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory13SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

GUILDER(12KV) - Customers: 1,185 131.2 3.0 1.0 - - - 183.7 1.9 - 141.9 1.0 - - - - - - - - - - 141.9 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 86% 67% 100% - - - 100% 100% - 100% 100% - - - - - - - - - - 100% 100% -

Operation 1% 0% - - - - - - - - - - - - - - - - - - - - - -

Other 13% 33% - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

HALEY(12KV) - Customers: 36 - - 2.0 279.3 1.0 1.0 - - - - - - - - - - - - - - - - - -

3rd Party - - - 100% 100% 100% - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

HINES(12KV) - Customers: 1,961 248.8 1.9 5.7 - - - 3.2 0.0 - 14.1 1.1 - - - 1.2 - - - - - - 14.1 1.1 1.2

3rd Party - - 11% - - - - - - 53% 2% - - - - - - - - - - 53% 2% -

Equipment Failure 98% 99% 58% - - - 90% 83% - 0% 0% - - - - - - - - - - 0% 0% -

Operation 2% 1% - - - - 10% 17% - - - - - - 100% - - - - - - - - 100%

Other - - 31% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - 46% 98% - - - - - - - - - - 46% 98% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

HOROSCOPE(12KV) - Customers: 2,686 65.5 1.1 1.0 144.2 1.0 - 9.4 0.1 - - - - - - - 0.0 0.0 - - - - 0.0 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 96% 93% - 99% 99% - - - - - - - - - - - - - - - - - - -

Operation 4% 7% - 1% 1% - 100% 100% - - - - - - - 100% 100% - - - - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 13 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

34

Page 35: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory14SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

HUDSON(12KV) - Customers: 503 173.9 2.0 1.0 42.9 0.3 2.4 136.6 1.1 - - - - - - - - - - 64.8 0.4 0.7 64.8 0.4 0.7

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - 100% 100% 58% 100% 100% - - - - - - - - - - - - - - - -

Operation - - 100% - - - - - - - - - - - - - - - 100% 100% 100% 100% 100% 100%

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 42% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

IRON(12KV) - Customers: 235 - - - 412.5 1.0 1.0 55.7 1.0 1.0 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% 100% 100% 100% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

JEFFREY(12KV) - Customers: 1,731 27.7 0.1 1.0 81.7 1.1 0.5 13.8 0.1 - 43.9 1.1 0.0 0.2 0.0 - - - - - - - 44.1 1.1 0.0

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - 100% 98% 100% 100% 100% - 86% 5% 91% 100% 100% - - - - - - - 86% 5% 91%

Operation - - - 0% 2% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - 14% 95% 9% - - - - - - - - - 14% 95% 9%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

JOAQUIN(12KV) - Customers: 345 708.7 3.9 9.1 144.0 0.5 5.9 183.6 2.8 3.0 19.4 0.1 3.9 0.5 0.0 - - - 1.0 3.0 0.0 - 22.9 0.1 4.9

3rd Party - - - - - - 3% 3% 30% - - - - - - - - - - - - - - -

Equipment Failure 95% 92% 49% 95% 50% 17% 57% 32% - 100% 100% 23% - - - - - - 100% 100% - 98% 94% 19%

Operation 5% 6% - 3% 33% - - - - - - - 100% 100% - - - - - - - 2% 6% -

Other 0% 2% 51% - - 34% - - 67% - - 77% - - - - - 100% - - - - - 81%

Vegetation/Animal - - - 2% 17% 15% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 34% 41% 64% 3% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 14 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

35

Page 36: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory15SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

KEELINE(12KV) - Customers: 756 - - 1.0 93.8 1.3 - - - - 4.1 0.1 1.1 - - - - - - - - - 4.1 0.1 1.1

3rd Party - - 100% 100% 100% - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - 100% 100% - - - - - - - - - - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - 100% - - - - - - - - - - - 100%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

KELVIN(12KV) - Customers: 3,322 - - - - - - - - - - - - - - - 1814.5 1.0 - - - - 1814.5 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

KRONA(12KV) - Customers: 3,339 - - - 22.1 0.0 - 90.8 1.0 - - - - - - 1.0 14.3 0.0 - - - - 14.3 0.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - 100% 100% - - - - - - - 100% 100% - - - - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

KUNA(12KV) - Customers: 2,269 105.3 1.2 - - - - 67.0 0.2 - 37.3 1.0 - - - 1.0 19.7 0.0 - - - - 57.1 1.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 93% 91% - - - - 43% 72% - 100% 100% - - - - 100% 100% - - - - 100% 100% -

Operation 7% 9% - - - - 57% 28% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 15 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

36

Page 37: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory16SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

KWACHA(12KV) - Customers: 167 48.4 1.0 - - - - - - - - - - - - 1.0 - - - - - - - - 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 99% 99% - - - - - - - - - - - - - - - - - - - - - -

Operation 1% 1% - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LA SALLE(12KV) - Customers: 65 113.9 2.9 - - - - 3.8 0.0 - - - - - - - 512.0 2.0 - - - - 512.0 2.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - 100% 100% - - - - - - - 12% 50% - - - - 12% 50% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 88% 50% - - - - 88% 50% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LARTHIEN(12KV) - Customers: 1,781 113.5 1.0 - - - 1.0 - - - - - - - - - - - - 79.0 1.0 - 79.0 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LIRE(12KV) - Customers: 198 - - - 86.9 1.0 0.7 - - - - - - - - 1.0 - - - - - - - - 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% 100% - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 16 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

37

Page 38: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory17SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

LONDON(12KV) - Customers: 264 315.9 0.9 0.2 58.8 2.0 1.0 - - - - - - - - - 33.0 0.2 - - - - 33.0 0.2 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 97% 94% 100% 69% 50% - - - - - - - - - - - - - - - - - - -

Operation 0% 0% - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Other 3% 6% - 31% 50% - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MACHO(12KV) - Customers: 2,553 323.3 4.0 2.1 35.0 1.0 - 11.2 0.1 - 20.2 0.1 - - - - 26.8 0.1 - 28.2 0.1 - 75.1 0.3 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 78% 79% 87% 98% 100% - 100% 100% - 88% 50% - - - - 100% 100% - 98% 77% - 96% 75% -

Operation 1% 3% - 2% 0% - - - - 12% 50% - - - - - - - 2% 23% - 4% 25% -

Other 21% 18% 13% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MAGAZINE(12KV) - Customers: 2,062 - - 1.0 - - - - - - - - 1.0 - - - - - - - - - - - 1.0

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - 100% - - - - - - - - - - - 100%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MANGANESE(12KV) - Customers: 1,635 145.3 2.0 0.9 114.7 0.4 1.0 - - - - - - - - - 0.1 0.0 - - - - 0.1 0.0 -

3rd Party - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Equipment Failure 32% 51% - 57% 36% - - - - - - - - - - - - - - - - - - -

Operation 68% 49% 100% 43% 64% 2% - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 98% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 17 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

38

Page 39: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory18SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

MARACA(12KV) - Customers: 2,310 107.7 1.0 - 21.3 0.1 - 11.9 0.1 - - - - - - - 73.6 1.0 - - - - 73.6 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 97% 97% - 100% 99% - 95% 52% - - - - - - - 100% 100% - - - - 100% 100% -

Operation 3% 3% - 0% 1% - 5% 48% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MARRIOTT(12KV) - Customers: 26 7.0 1.0 - 245.6 1.0 - - - - - - - - - - 674.7 1.0 1.0 - - - 674.7 1.0 1.0

3rd Party - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% 100% - - - 100% 100% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MC CORMICK(12KV) - Customers: 1,560 - - 2.6 - - - - - - - - - - - - 1917.1 1.0 - - - - 1917.1 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MCFADDEN(12KV) - Customers: 536 - - - 104.9 1.1 1.1 215.1 1.1 1.0 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% 100% 16% 7% 100% - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - 84% 93% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 18 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

39

Page 40: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory19SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

MENDOCINO(12KV) - Customers: 1 - - - - - - - - 1.0 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - 100% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MONEY(12KV) - Customers: 297 - - - 3.2 0.0 - - - - - - - 67.1 1.0 - - - - - - - 67.1 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - 100% 100% - - - - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MONOPOLY(12KV) - Customers: 119 92.4 1.1 2.0 - - - - - - - - - 0.5 0.0 - - - - 233.1 0.5 - 233.7 0.5 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 94% 99% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - 100% 100% - - - - 100% 100% - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 6% 1% 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MORSE(12KV) - Customers: 2,238 361.5 0.6 1.8 33.4 0.1 - 12.3 0.1 - - - - - - - 225.2 1.1 - - - - 225.2 1.1 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - 100% 100% - 100% 100% - - - - - - - 2% 3% - - - - 2% 3% -

Operation - - - - - - - - - - - - - - - 3% 3% - - - - 3% 3% -

Other - - - - - - - - - - - - - - - 95% 94% - - - - 95% 94% -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 19 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

40

Page 41: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory20SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

MUIRLANDS(12KV) - Customers: 2,905 136.7 1.0 1.0 64.0 1.6 1.9 10.4 0.1 - 80.7 1.1 1.6 - - - - - - 68.3 1.0 0.0 148.9 2.1 1.6

3rd Party 100% 100% 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% 100% 84% 50% - 100% 100% 37% - - - - - - 100% 100% 100% 100% 100% 38%

Operation 0% 0% - - - - 16% 50% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - 63% - - - - - - - - - - - 62%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MUNICH(12KV) - Customers: 2,454 - - - 2.6 0.0 1.0 0.0 0.0 - - - - - - - - - - 0.1 0.0 - 0.1 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - 100% 100% - - - - - - - - - - - - - 100% 100% - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MYFORD(12KV) - Customers: 2,440 - - 1.0 - - - 26.6 0.0 - 6.0 1.0 - - - - 5.8 0.0 - - - - 11.8 1.0 -

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - 100% 100% - - - - 49% 3% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - 100% 100% - - - - - - - - - - 51% 97% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

OBSIDIAN(12KV) - Customers: 703 - - - - - 1.0 116.9 2.5 - 297.3 0.6 - 1.5 0.1 - 3.4 0.0 - - - - 302.2 0.8 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 75% 86% - 100% 100% - - - - 100% 100% - - - - 99% 82% -

Operation - - - - - - 25% 14% - - - - 100% 100% - - - - - - - 1% 18% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - 0% 0% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

4th Qtr 2019 2019

Reliability Histories for Individual Circuits Serving Irvine - 20 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019

41

Page 42: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory21SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

OSLO(12KV) - Customers: 3,694 - - - 63.9 1.0 1.0 2.2 0.0 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

OXY(12KV) - Customers: 2,943 110.3 2.0 - - - - - - - - - - 6.7 0.0 - 259.4 1.0 1.0 - - - 266.1 1.0 1.0

3rd Party 94% 50% - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 6% 50% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - 100% 100% - - - - - - - 3% 5% -

Other - - - - - - - - - - - - - - - 100% 100% 100% - - - 97% 95% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PANTANI(33KV) - Customers: 14 - - - - - - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PARAGON(12KV) - Customers: 4,517 41.7 1.0 0.9 0.0 0.0 - 0.4 0.0 - 5.7 0.9 - - - - - - - - - - 5.7 0.9 -

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 99% 98% - - - - - - - - - - - - - - - - - - - - - -

Operation 1% 2% - 100% 100% - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - 100% 100% - - - - - - - - - - 100% 100% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 21 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

42

Page 43: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory22SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

PEARCY(12KV) - Customers: 2,041 94.1 0.6 2.0 284.0 2.1 1.0 0.2 0.0 - 16.8 0.0 - 193.5 3.3 0.4 290.2 1.0 - - - - 500.5 4.3 0.4

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 89% 73% - 100% 100% 100% 100% 100% - 100% 100% - - - - - - - - - - 3% 1% -

Operation 9% 22% - - - - - - - - - - 7% 8% - - - - - - - 3% 6% -

Other 2% 5% - - - - - - - - - - 93% 92% 100% 100% 100% - - - - 94% 93% 100%

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PENCE(12KV) - Customers: 2,830 208.4 3.5 1.9 102.7 1.1 0.4 174.0 1.2 1.0 - - - - - 1.0 - - - 37.5 2.0 - 37.5 2.0 1.0

3rd Party - - - 14% 3% - - - - - - - - - - - - - - - - - - -

Equipment Failure 75% 88% 100% 33% 57% 100% 100% 100% 93% - - - - - - - - - - - - - - -

Operation 25% 12% - 53% 39% - - - 7% - - - - - - - - - 100% 100% - 100% 100% -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PENINSULA(12KV) - Customers: 1,656 - - 1.0 - - - 3.4 0.0 - 28.7 0.8 0.8 - - - - - - - - 1.2 28.7 0.8 2.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - - - - - - - 100% 100% - - - - - - - - - - 100% 100% -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - 100% - - - - - - - - 100% - - 100%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PISCES(12KV) - Customers: 476 - - 2.0 - - - 0.7 0.0 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 22 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

43

Page 44: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory23SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

PLATINUM(12KV) - Customers: 645 11.7 0.1 - 317.1 2.8 1.0 9.8 0.0 1.0 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 93% 85% - 100% 100% 100% - - - - - - - - - - - - - - -

Operation 100% 100% - 1% 8% - - - - - - - - - - - - - - - - - - -

Other - - - 6% 6% - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

POLLARD(12KV) - Customers: 339 374.0 1.9 1.0 265.3 3.9 1.0 179.4 3.0 1.0 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 1% 0% - 93% 78% - 38% 66% - - - - - - - - - - - - - - - -

Operation 89% 54% - 7% 22% - - - - - - - - - - - - - - - - - - -

Other - - - - - 100% 62% 34% 100% - - - - - - - - - - - - - - -

Vegetation/Animal 10% 46% 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

QUARTZ(12KV) - Customers: 274 - - - - - 1.0 0.1 0.0 0.9 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - 100% - - - - - - - - - - - - - - -

Operation - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

RAND(12KV) - Customers: 1,616 - - - - - - - - - - - - - - 1.0 - - - 0.2 0.0 - 0.2 0.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - 100% 100% - 100% 100% -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 23 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

44

Page 45: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory24SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

REDHILL(12KV) - Customers: 173 - - - - - - - - 1.0 - - - - - - 44.1 1.0 - - - - 44.1 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - 100% 99% - - - - 100% 99% -

Operation - - - - - - - - - - - - - - - 0% 1% - - - - 0% 1% -

Other - - - - - - - - 100% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

RINGO(12KV) - Customers: 1,464 - - 1.7 6.4 0.6 - - - - - - - - - - 2002.9 3.0 - - - - 2002.9 3.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ROMMEL(12KV) - Customers: 1,772 9.0 1.0 - 154.0 0.9 0.2 - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - 100% 100% 100% - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

RUBIN(12KV) - Customers: 2,155 - - - 114.4 1.3 8.0 167.3 1.1 1.1 - - - - - 1.0 0.0 0.0 - - - - 0.0 0.0 1.0

3rd Party - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Equipment Failure - - - 25% 12% 12% 0% 0% - - - - - - - - - - - - - - - -

Operation - - - 14% 4% - 1% 1% 100% - - - - - - 100% 100% - - - - 100% 100% -

Other - - - 61% 84% 88% 99% 99% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 24 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

45

Page 46: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory25SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

RUBLE(12KV) - Customers: 107 - - - - - - - - - - - - 65.1 1.0 - - - - - - - 65.1 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - 100% 100% - - - - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

RUBY(12KV) - Customers: 830 12.1 0.1 - 6.7 0.1 1.0 - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation 100% 100% - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

RUTGERS(12KV) - Customers: 966 6.9 0.0 1.0 98.6 0.1 1.0 95.7 1.0 - - - 1.2 - - - 0.2 0.0 - 6.6 0.8 - 6.8 0.8 1.2

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - 100% 100% 100% - - - - - - - - - 100% 100% - - - - 2% 4% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% 100% - - - - - - - - 100% - - - - - - 100% 100% - 98% 96% 100%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SAGITTARIUS(12KV) - Customers: 3,400 6.0 1.0 3.0 - - - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - 33% - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% 67% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 25 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

46

Page 47: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory26SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

SAN JUAN(12KV) - Customers: 1,032 262.8 2.0 3.0 1.8 0.0 - - - - 23.7 0.2 - - - - 36.0 0.1 - - - - 59.6 0.2 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% 66% - - - - - - - - - - - - 100% 100% - - - - 60% 32% -

Operation - - - 100% 100% - - - - 100% 100% - - - - - - - - - - 40% 68% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 34% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SCHILLING(12KV) - Customers: 283 - - - 127.1 1.0 - - - - - - - - - 1.0 - - - - - - - - 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SCILACCI(12KV) - Customers: 1,807 - - - - - - - - - 1.1 0.0 - - - - 7.8 0.1 - - - - 8.9 0.1 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - 100% 100% - - - - - - - - - - 12% 10% -

Operation - - - - - - - - - - - - - - - 100% 100% - - - - 88% 90% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SCORPIO(12KV) - Customers: 561 40.6 0.1 0.1 - - - - - - - - - - - - 1.6 0.0 - - - - 1.6 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 26 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

47

Page 48: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory27SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

SCRABBLE(12KV) - Customers: 481 100.9 1.1 2.0 82.0 1.0 1.0 128.7 0.2 1.8 - - - - - - - - - - - - - - -

3rd Party - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Equipment Failure 94% 87% 100% - - - 100% 100% 100% - - - - - - - - - - - - - - -

Operation 6% 13% - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SIDNEY(12KV) - Customers: 1,497 113.9 1.0 2.0 115.9 1.1 1.0 407.2 0.9 0.1 80.3 1.0 0.9 68.5 2.0 - - - - - - - 148.8 3.0 0.9

3rd Party - - - - - - - - - - - - 0% 1% - - - - - - - 0% 0% -

Equipment Failure 100% 100% - 99% 94% - 100% 100% 100% 100% 100% 100% 100% 99% - - - - - - - 100% 100% 100%

Operation - - - 1% 6% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 50% - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - 50% - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SILVER(12KV) - Customers: 694 - - - - - 1.0 15.8 0.2 1.0 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 90% 50% 100% - - - - - - - - - - - - - - -

Operation - - - - - - 10% 50% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SKYPARK(12KV) - Customers: 59 170.5 1.0 1.7 - - - - - 1.0 - - - - - - - - - 109.1 1.0 - 109.1 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% 40% - - - - - - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - 60% - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - 100% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 27 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

48

Page 49: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory28SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

SLATE(12KV) - Customers: 177 - - - - - 1.0 - - - - - - - - - 0.3 0.0 - 1.0 0.0 - 1.3 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - 100% 100% - 74% 25% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 26% 75% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SOLITAIRE(12KV) - Customers: 119 - - - - - - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SPADES(12KV) - Customers: 72 173.6 1.8 - - - - 167.3 1.2 0.2 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - 100% 100% 100% - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SRI LANKA(12KV) - Customers: 1,406 73.0 1.0 - 15.8 0.1 - 76.8 1.1 - 94.8 1.0 0.4 - - - - - - 5.6 0.1 - 100.3 1.1 0.4

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - 85% 74% - 29% 8% - 100% 100% 100% - - - - - - - - - 94% 92% 100%

Operation - - - 15% 26% - - - - - - - - - - - - - 100% 100% - 6% 8% -

Other - - - - - - 71% 92% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 28 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

49

Page 50: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory29SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ST. CROIX(12KV) - Customers: 138 - - 1.0 - - - 131.5 1.0 - - - - - - - - - - 219.4 1.7 - 219.4 1.7 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

STARGAZER(12KV) - Customers: 1,055 - - 2.3 149.5 0.3 - - - - 33.3 1.3 0.7 18.3 0.3 0.7 29.1 0.3 - - - - 80.7 1.8 1.4

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - 100% 100% 100% 100% 100% 100% 100% 100% - - - - 100% 100% 100%

Operation - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

STILLWELL(12KV) - Customers: 114 - - 1.0 477.7 2.0 - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 98% 50% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - 2% 50% - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

TAURUS(12KV) - Customers: 944 - - 0.8 0.1 0.0 1.0 - - 1.0 - - - 4.9 0.0 1.0 - - - - - - 4.9 0.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - 100% - - - 100% 100% - - - - - - - 100% 100% -

Operation - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - 100% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - 100% - - - - - - - - 100%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 29 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

50

Page 51: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory30SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

TELLER(12KV) - Customers: 2,963 81.0 2.1 0.0 41.6 0.2 0.0 72.7 1.1 - 36.3 1.1 - - - - 225.2 1.3 1.0 1.0 0.0 - 262.4 2.4 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 99% 99% - 63% 50% - 86% 94% - 100% 100% - - - - 10% 16% - 98% 93% - 23% 56% -

Operation 1% 1% 100% 37% 50% 100% 14% 6% - - - - - - - 0% 5% - 2% 7% - 0% 2% -

Other - - - - - - - - - - - - - - - 90% 80% 100% - - - 77% 42% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

TOLAR(12KV) - Customers: 2,685 - - - - - - - - - - - - 71.9 0.9 1.0 - - - - - - 71.9 0.9 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - 100% 100% 100% - - - - - - 100% 100% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

TORINO(12KV) - Customers: 2,433 16.2 0.2 - - - 1.0 6.0 0.1 - - - - 30.4 1.9 - - - - - - - 30.4 1.9 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - 100% 100% - - - - - - - 100% 100% -

Operation 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

TRABUCO(12KV) - Customers: 1,321 0.2 0.0 1.0 177.1 1.2 0.1 27.1 0.2 - 6.0 1.0 - - - - - - - 34.8 0.1 - 40.8 1.1 -

3rd Party - - 100% - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 95% 91% - 93% 62% - - - - - - - - - - 100% 100% - 85% 6% -

Operation 100% 100% - 5% 9% 100% 7% 38% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - 100% 100% - - - - - - - - - - 15% 94% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 30 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

51

Page 52: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory31SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

TURTLE(12KV) - Customers: 3,851 102.9 2.1 2.0 18.7 0.1 - 19.4 0.1 0.0 - - - - - - 1260.2 1.0 - - - - 1260.2 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - 68% 60% - 48% 36% 32% - - - - - - - - - - - - - - -

Operation - - - 32% 40% - 42% 50% 68% - - - - - - - - - - - - - - -

Other - - - - - - 10% 14% - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

VASCO(12KV) - Customers: 10 - - 2.0 627.2 1.1 - 25.8 0.4 - - - - - - - 1834.3 2.0 - - - - 1834.3 2.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - 0% 50% - - - - 0% 50% -

Other - - - - - - - - - - - - - - - 100% 50% - - - - 100% 50% -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

VIRGO(12KV) - Customers: 226 - - 2.0 111.1 0.9 0.9 - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - 100% - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

WINGATE(12KV) - Customers: 1,293 9.0 1.0 - - - - - - - - - - - - - 0.1 0.0 - - - - 0.1 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 31 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

52

Page 53: PowerPoint Presentation · • Infrastructure reliability –updating underground cables, poles, switches, and transformers • Wildfire mitigation –hardening infrastructure, bolstering

CircuitHistory32SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

XEROX(12KV) - Customers: 833 36.1 0.2 - 51.7 1.0 - 46.7 0.9 - - - - 57.4 0.8 0.7 612.7 2.2 1.0 - - - 670.1 3.0 1.7

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - 100% 100% 100% 10% 47% 100% - - - 18% 61% 100%

Operation 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Other - - - 100% 100% - - - - - - - - - - 90% 53% - - - - 82% 39% -

Vegetation/Animal - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

YEN(12KV) - Customers: 1,363 118.4 0.8 0.6 51.5 0.1 - - - - - - - - - 1.0 - - - 361.0 1.0 - 361.0 1.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% 100% 91% 67% - - - - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - 9% 33% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - 100% - - - - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ZODIAC(12KV) - Customers: 1,006 - - 1.0 49.7 1.0 - - - - - - - - - - - - - 56.7 1.0 - 56.7 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - 100% 100% - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Irvine - 32 of 32

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

53